IBM Technical Summit 2013
Gestão de Portfólio

Anderson Luis de Paula Silva, PMP, CSM
Technical Leader / Accelerated Value Leader
anderson.silva@br.ibm.com

© 2013 IBM Corporation
Please note the following
IBM’s statements regarding its plans, directions, and intent are subject to change or
withdrawal without notice at IBM’s sole discretion.
Information regarding potential future products is intended to outline our general product
direction and it should not be relied on in making a purchasing decision.
The information mentioned regarding potential future products is not a commitment,
promise, or legal obligation to deliver any material, code or functionality. Information
about potential future products may not be incorporated into any contract. The
development, release, and timing of any future features or functionality described for our
products remains at our sole discretion.
Performance is based on measurements and projections using standard IBM
benchmarks in a controlled environment. The actual throughput or performance that any
user will experience will vary depending upon many factors, including considerations
such as the amount of multiprogramming in the user’s job stream, the I/O configuration,
the storage configuration, and the workload processed. Therefore, no assurance can be
given that an individual user will achieve results similar to those stated here.

2
Desafios Empresarias
Gerenciar Mudanças
Controlar a
Complexidade

Conformidades Legais
& Obrigatórias

Satisfazer as
corretas
necessidades dos
clientes

Decidir entre “Fazer em
Casa” ou “Terceirizar”

Remover Barreiras
Para Inovação

Melhorar a Gestão de
Portfólio
Desenvolver Produtos
de Alta Qualidade para
o Mercado
Planejamento Estratégico

 "O processo orçamentário, adotado hoje pela
maioria das empresas, deveria ser abolido.

 "O processo de elaboração dos orçamentos
corporativos é uma piada e todos sabem disso.

 As mesmas empresas que juram permanecer
próximo do cliente para poder reagir rapidamente
a preciosas informações sobre mudanças no
mercado fiam-se de modo tenaz ao processo
orçamentário – que desautoriza a linha de frente,
desencoraja a partilha de informações e retarda
a resposta à evolução do mercado até que seja
tarde demais."

 Consome um tempo absurdo dos executivos,
forçando-os a passar por intermináveis e
enfadonhas reuniões e tensas negociações.
Encoraja os gerentes a mentir e a enganar –
depreciando objetivos e supervalorizando
resultados – e os penaliza quando dizem a
verdade. Converte decisões comerciais em
elaborados exercícios na arte de jogar."

 Michael C. Jensen
 HOPE, Jeromy and FRASER, Robin.
 Extraído do artigo “Quem precisa de
orçamentos? “Harvard Business Review,
Fevereiro 2003.
4

 Extraído do artigo "O Orçamento não funciona.
Vamos consertá-lo." publicado na Edição
Especial Exame Harvard Business Review,
integrante da Edição 764 de Exame (Abril 2002)
Alinhamento Estratégico

 Existe uma distância muito grande de alinhamento entre o planejamento estratégico e os
projetos executados?

 Os seus projetos iniciam imediatamente após serem aprovados?
Gerenciamento de Portfólio de Projetos
Solução de PPM para Planejamento e Execução
“Fazendo o
investimento
certo”
Financials

Medição do desempenho do
time e resultados dos projetos

Alinhamento dos investimentos
do portfólio com as prioridades
de negócio

Rational
Focal Point
Rational
Insight

Gerência e otimização
da execução do projeto

“Medindo desempenho
alinhado aos objetivos
de negócio”

Rational Team
Concert

Scope, Tasks & Time

Resources

Future
IBM
Capabilities

“Fazendo
corretamente”

Your
existing
capabilities

Business
Planning &
Alignment

Product
& Project
Management

Collaborative
Lifecycle
Management

Compliance
& Security

Engineering
& Software
Tools

3rd-Party
Jazz
Capabilities

Best Practice Processes

Integrated
Data
management
Skills

Collaboration

Presentation:
Mashups

Discovery

Query

Storage

Administration:
Users, projects,
process
IBM Rational Focal Point

•

Alinhe investimentos do portfólio com prioridades de negócio

•

Foco no que é mais importante para direcionar os resultados
de negócio

•

Organize o trabalho com base no valor
–
–

Identifique e priorize atividades e entregas pelo valor que
elas geram

–

•

Faça análise de custo/benefício para tomar decisões de
investimentos com base em informações objetivas

Alinhe e ajuste o “roadmap” rapidamente de acordo com
as mudanças nas necessidades de mercado e valor para
o negócio.

Capture todas as entradas de informação em um único lugar
com um processo consistente
–

Capture necessidades de negócio e demandas, feedback
de clientes em um ponto único de entrada, garantindo
que as melhores ideias/propostas se tornem realidade
Faça um inventário das ideias

 Utilize uma abordagem
top-down capturando as
principais informações
em alto nível

Focal Point
Defina critérios de priorização
 Os critérios de priorização de
projetos devem ser informados,
suportando dois cenários:
– Objetivo: Comparação de iniciativas
tendo como objetivo a maximização ou
minimização de alguma informação
como maximizar VPL ou reduzir Custo
Operacional
– Sensitivo: Comparação de iniciativas
considerando a opinião dos envolvidos.
Ex: Qual iniciativa está mais alinhada
com o desenvolvimento de novas
tecnologias?

Focal Point
Capture as informações
 Padronize a forma como as propostas
devem ser informadas:
– Título
– Descrição
– Tipo
– Portfólio
– Unidade de negócio
– Aplicações relacionadas
– Projetos relacionados
– Objetivo estratégico primário
– Objetivo do projeto
– Valor para o negócio
– Recursos necessários em alto nível

Focal Point
Visibilidade

 Mostre o relacionamento e
dependência entre:
– Aplicações
– Necessidades de negócio
– Financeiro
– Produtos
– Riscos
– Outros Projetos
– Etc.

Focal Point
Governança

 Estabeleça um processo
 Papéis colaborando junto com os
projetos
 Permissões para quem pode ver
e/ou alterar o que e quando
 Defina portais de aprovação
 Exemplo: Aprovação de um
Business Case

Focal Point
Business Case
 Invista no detalhamento de um
Business Case
– Avaliação de Risco
– Probabilidade e Impacto
– Prioridade
– Classificação
– Estratégia de mitigação
– Financeiro
– Custos e Benefícios
– VPL, ROI, TIR
– Escopo em alto nível
– Custo estimado
– Seleção de prioridades de negócio versus
aplicações alvo
Focal Point
Alinhamento Estratégico
 Alinhar Projetos com Estratégia
– Comparar propostas de projetos com os pesos dos objetivos estratégicos
– Resultado é uma lista priorizada de projetos
– Topo da lista – Projetos alinhados com a estratégia

Focal Point
Análise de Valor
 Análise de Valor dos Projetos
 Outros fatores que podem afetar a
decisão:
– Risco
– Gastos
– Alinhamento de negócio
– Faseabilidade
– Benefícios financeiros
– Novo ranking de projetos
– Peso dos critérios

Focal Point
Incremente o Valor do Portfólio – Roadmap de Projetos
 Relacionamento e Dependências
 Otimize o custo e maximize os ganhos redistribuindo os projetos ao longo do
tempo
 Verifique a oferta e demanda de recursos ao longo do tempo

Focal Point
Detalhando a Execução de Projeto
Team Concert

Focal Point

Dashboard
Plan
Project
Plan Item
Plan Item
Plan Item
Business
Business
Business
Need
Need
Need

Story
Story

Test Plan

Requirement
Collection

Test Suite
Test Suite
Requirement
Requirement
Requirement
Test Case
Test Case

Requirements Composer

Quality Manager
FP-CLM integration

CLM integration

Dashboard
Detalhando a Execução de Projeto
Gantt charts

Taskboards

Roadmap charts
Gestão de Progresso por Hora
ou Tamanho

Team Concert
IBM Rational Insight

 Meça desempenho do time e resultados
dos projetos

 Meça, monitore, analise e acompanhe
tendências de desempenho de processos e
projetos
 Acesse dados através de todo o ciclo de
vida da aplicação utilizando a plataforma
aberta Jazz
 Colete dados automaticamente usando
coletores prontos

Informação em
tempo real em
visão única através
de projetos,
produtos e
geografias

Painel de
Controle

Melhor

Resultados

 Biblioteca de melhores práticas em
métricas e painéis de acompanhamento.
 Diversos relatórios e gráficos “out-of-thebox”
20
Monitore o Progresso da Execução dos Projeto

 Revise os projetos em
execução
–Visão Geral
–Negócio
–Finanças
–Prazos
–Semáforos indicadores

Insight
22
Acknowledgements and disclaimers
Availability: References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries
in which IBM operates.
The workshops, sessions and materials have been prepared by IBM or the session speakers and reflect their own views. They are provided
for informational purposes only, and are neither intended to, nor shall have the effect of being, legal or other guidance or advice to any
participant. While efforts were made to verify the completeness and accuracy of the information contained in this presentation, it is provided
AS-IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise
related to, this presentation or any other materials. Nothing contained in this presentation is intended to, nor shall have the effect of, creating
any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license
agreement governing the use of IBM software.
All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may
have achieved. Actual environmental costs and performance characteristics may vary by customer. Nothing contained in these materials is
intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue
growth or other results.
© Copyright IBM Corporation 2013. All rights reserved.
– U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.

IBM, the IBM logo, ibm.com, Rational, the Rational logo, Telelogic, the Telelogic logo, Green Hat, the Green Hat logo, and other IBM products
and services are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or
both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these
symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may
also be registered or common law trademarks in other countries. A current list of IBM trademarks is available on the Web at “Copyright and
trademark information” at www.ibm.com/legal/copytrade.shtml
Other company, product, or service names may be trademarks or service marks of others.

23
© Copyright IBM Corporation 2013. All rights reserved. The information
contained in these materials is provided for informational purposes only, and is
provided AS IS without warranty of any kind, express or implied. IBM shall not be
responsible for any damages arising out of the use of, or otherwise related to,
these materials. Nothing contained in these materials is intended to, nor shall
have the effect of, creating any warranties or representations from IBM or its
suppliers or licensors, or altering the terms and conditions of the applicable license
agreement governing the use of IBM software. References in these materials to
IBM products, programs, or services do not imply that they will be available in all
countries in which IBM operates. Product release dates and/or capabilities
referenced in these materials may change at any time at IBM’s sole discretion
based on market opportunities or other factors, and are not intended to be a
commitment to future product or feature availability in any way. IBM, the IBM logo,
Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products
and services are trademarks of the International Business Machines Corporation,
in the United States, other countries or both. Other company, product, or service
names may be trademarks or service marks of others.

24

Gestão de Portfólio para DevOps

  • 1.
    IBM Technical Summit2013 Gestão de Portfólio Anderson Luis de Paula Silva, PMP, CSM Technical Leader / Accelerated Value Leader anderson.silva@br.ibm.com © 2013 IBM Corporation
  • 2.
    Please note thefollowing IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion. Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion. Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon many factors, including considerations such as the amount of multiprogramming in the user’s job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve results similar to those stated here. 2
  • 3.
    Desafios Empresarias Gerenciar Mudanças Controlara Complexidade Conformidades Legais & Obrigatórias Satisfazer as corretas necessidades dos clientes Decidir entre “Fazer em Casa” ou “Terceirizar” Remover Barreiras Para Inovação Melhorar a Gestão de Portfólio Desenvolver Produtos de Alta Qualidade para o Mercado
  • 4.
    Planejamento Estratégico  "Oprocesso orçamentário, adotado hoje pela maioria das empresas, deveria ser abolido.  "O processo de elaboração dos orçamentos corporativos é uma piada e todos sabem disso.  As mesmas empresas que juram permanecer próximo do cliente para poder reagir rapidamente a preciosas informações sobre mudanças no mercado fiam-se de modo tenaz ao processo orçamentário – que desautoriza a linha de frente, desencoraja a partilha de informações e retarda a resposta à evolução do mercado até que seja tarde demais."  Consome um tempo absurdo dos executivos, forçando-os a passar por intermináveis e enfadonhas reuniões e tensas negociações. Encoraja os gerentes a mentir e a enganar – depreciando objetivos e supervalorizando resultados – e os penaliza quando dizem a verdade. Converte decisões comerciais em elaborados exercícios na arte de jogar."  Michael C. Jensen  HOPE, Jeromy and FRASER, Robin.  Extraído do artigo “Quem precisa de orçamentos? “Harvard Business Review, Fevereiro 2003. 4  Extraído do artigo "O Orçamento não funciona. Vamos consertá-lo." publicado na Edição Especial Exame Harvard Business Review, integrante da Edição 764 de Exame (Abril 2002)
  • 5.
    Alinhamento Estratégico  Existeuma distância muito grande de alinhamento entre o planejamento estratégico e os projetos executados?  Os seus projetos iniciam imediatamente após serem aprovados?
  • 6.
  • 7.
    Solução de PPMpara Planejamento e Execução “Fazendo o investimento certo” Financials Medição do desempenho do time e resultados dos projetos Alinhamento dos investimentos do portfólio com as prioridades de negócio Rational Focal Point Rational Insight Gerência e otimização da execução do projeto “Medindo desempenho alinhado aos objetivos de negócio” Rational Team Concert Scope, Tasks & Time Resources Future IBM Capabilities “Fazendo corretamente” Your existing capabilities Business Planning & Alignment Product & Project Management Collaborative Lifecycle Management Compliance & Security Engineering & Software Tools 3rd-Party Jazz Capabilities Best Practice Processes Integrated Data management Skills Collaboration Presentation: Mashups Discovery Query Storage Administration: Users, projects, process
  • 8.
    IBM Rational FocalPoint • Alinhe investimentos do portfólio com prioridades de negócio • Foco no que é mais importante para direcionar os resultados de negócio • Organize o trabalho com base no valor – – Identifique e priorize atividades e entregas pelo valor que elas geram – • Faça análise de custo/benefício para tomar decisões de investimentos com base em informações objetivas Alinhe e ajuste o “roadmap” rapidamente de acordo com as mudanças nas necessidades de mercado e valor para o negócio. Capture todas as entradas de informação em um único lugar com um processo consistente – Capture necessidades de negócio e demandas, feedback de clientes em um ponto único de entrada, garantindo que as melhores ideias/propostas se tornem realidade
  • 9.
    Faça um inventáriodas ideias  Utilize uma abordagem top-down capturando as principais informações em alto nível Focal Point
  • 10.
    Defina critérios depriorização  Os critérios de priorização de projetos devem ser informados, suportando dois cenários: – Objetivo: Comparação de iniciativas tendo como objetivo a maximização ou minimização de alguma informação como maximizar VPL ou reduzir Custo Operacional – Sensitivo: Comparação de iniciativas considerando a opinião dos envolvidos. Ex: Qual iniciativa está mais alinhada com o desenvolvimento de novas tecnologias? Focal Point
  • 11.
    Capture as informações Padronize a forma como as propostas devem ser informadas: – Título – Descrição – Tipo – Portfólio – Unidade de negócio – Aplicações relacionadas – Projetos relacionados – Objetivo estratégico primário – Objetivo do projeto – Valor para o negócio – Recursos necessários em alto nível Focal Point
  • 12.
    Visibilidade  Mostre orelacionamento e dependência entre: – Aplicações – Necessidades de negócio – Financeiro – Produtos – Riscos – Outros Projetos – Etc. Focal Point
  • 13.
    Governança  Estabeleça umprocesso  Papéis colaborando junto com os projetos  Permissões para quem pode ver e/ou alterar o que e quando  Defina portais de aprovação  Exemplo: Aprovação de um Business Case Focal Point
  • 14.
    Business Case  Invistano detalhamento de um Business Case – Avaliação de Risco – Probabilidade e Impacto – Prioridade – Classificação – Estratégia de mitigação – Financeiro – Custos e Benefícios – VPL, ROI, TIR – Escopo em alto nível – Custo estimado – Seleção de prioridades de negócio versus aplicações alvo Focal Point
  • 15.
    Alinhamento Estratégico  AlinharProjetos com Estratégia – Comparar propostas de projetos com os pesos dos objetivos estratégicos – Resultado é uma lista priorizada de projetos – Topo da lista – Projetos alinhados com a estratégia Focal Point
  • 16.
    Análise de Valor Análise de Valor dos Projetos  Outros fatores que podem afetar a decisão: – Risco – Gastos – Alinhamento de negócio – Faseabilidade – Benefícios financeiros – Novo ranking de projetos – Peso dos critérios Focal Point
  • 17.
    Incremente o Valordo Portfólio – Roadmap de Projetos  Relacionamento e Dependências  Otimize o custo e maximize os ganhos redistribuindo os projetos ao longo do tempo  Verifique a oferta e demanda de recursos ao longo do tempo Focal Point
  • 18.
    Detalhando a Execuçãode Projeto Team Concert Focal Point Dashboard Plan Project Plan Item Plan Item Plan Item Business Business Business Need Need Need Story Story Test Plan Requirement Collection Test Suite Test Suite Requirement Requirement Requirement Test Case Test Case Requirements Composer Quality Manager FP-CLM integration CLM integration Dashboard
  • 19.
    Detalhando a Execuçãode Projeto Gantt charts Taskboards Roadmap charts Gestão de Progresso por Hora ou Tamanho Team Concert
  • 20.
    IBM Rational Insight Meça desempenho do time e resultados dos projetos  Meça, monitore, analise e acompanhe tendências de desempenho de processos e projetos  Acesse dados através de todo o ciclo de vida da aplicação utilizando a plataforma aberta Jazz  Colete dados automaticamente usando coletores prontos Informação em tempo real em visão única através de projetos, produtos e geografias Painel de Controle Melhor Resultados  Biblioteca de melhores práticas em métricas e painéis de acompanhamento.  Diversos relatórios e gráficos “out-of-thebox” 20
  • 21.
    Monitore o Progressoda Execução dos Projeto  Revise os projetos em execução –Visão Geral –Negócio –Finanças –Prazos –Semáforos indicadores Insight
  • 22.
  • 23.
    Acknowledgements and disclaimers Availability:References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. The workshops, sessions and materials have been prepared by IBM or the session speakers and reflect their own views. They are provided for informational purposes only, and are neither intended to, nor shall have the effect of being, legal or other guidance or advice to any participant. While efforts were made to verify the completeness and accuracy of the information contained in this presentation, it is provided AS-IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this presentation or any other materials. Nothing contained in this presentation is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results. © Copyright IBM Corporation 2013. All rights reserved. – U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. IBM, the IBM logo, ibm.com, Rational, the Rational logo, Telelogic, the Telelogic logo, Green Hat, the Green Hat logo, and other IBM products and services are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law trademarks in other countries. A current list of IBM trademarks is available on the Web at “Copyright and trademark information” at www.ibm.com/legal/copytrade.shtml Other company, product, or service names may be trademarks or service marks of others. 23
  • 24.
    © Copyright IBMCorporation 2013. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others. 24

Notas do Editor

  • #23 Optional slide. Graphic is available in English only.