SlideShare uma empresa Scribd logo
1 de 21
AIESEC
Structure and
Opportunities
Gilberto Muniz Júnior
LCVP Dev
AIESEC Structure
28/5/2013 2
• Estratégias e direcionamentos para que o MC
garanta resultados de forma sustentável.
AIESEC
International (AI)
• Direcionamentos e relacionamento dos países
dividos por blocos.
Growth Network
(GN)
• Estratégias e direcionamentos para que o LC
garanta resultados de forma sustentável.
Member
Committee (MC)
• Oferecer um grande numero de experiências
completas de AIESEC com qualidade.
Local
Committee(CL)
28/5/2013 Induction Day - AIESEC Maringá 3
LCP - Local Committee President
GCDP OGX
GCDP ICX
GIP OGX
GIP ICX
DEV
Global Community Development Program Outgoing Exchange
Global Community Development Program Incoming Exchange
Global Internship Program Outgoing Exchange
Global Internship Program Incoming Exchange
Development
TXP Team Experiences
Comitê Local AIESEC em Maringá
28/5/2013 Induction Day - AIESEC Maringá 4
FIN
COMM
Finances
Communication
PR Public Relations
LCP
VP
Project
Manager/Manager
Membro
28/5/2013 Induction Day - AIESEC Maringá 5
Estrutura do Comitê Local (CL)
Cíntia
LCP
Fernanda
VP ICX GCDP
Giovana
VP ICX GIP
Lucas
VP FIN
Barbara
VP COMM
João
VP OGX GIP
Felipe
VP OGX GCDP
Vitor Walter
VP TXP
Victor Hugo
VP PR
Gilberto
VP DEV
EB - Executive Board
Os Administradores da AIESEC
Maringá
28/5/2013 Induction Day - AIESEC Maringá 6
28/5/2013 Induction Day - AIESEC Maringá 7
EB Action- Corpo Executivo da AIESEC Mari
Felipe- VP GCDP OGX
Giovana- VP GIP ICX Cíntia- LCP João- VP GIP OGX Vitor Walter- VP TXP
Lucas – VP F Bárbara- VP COMM Fernanda- VP GCDP ICX Victor Hugo- VP PR
Gilberto- VP DEV
LCP
TXP
PMO
IXP
JT
JL
Seleção
FIN
Student
Corporate
A&E
TLA
COM
Brand
Channels
Universtiy
Promotion
DEV
Information
LC
Teacher
Performanc
e
PR
BD
Events
IP
AS
GCDP OGX
Off-Peak
POPI
GIP OGX
Gestão
Expansion
GCDP ICX
Terceiro
Setor
Gira-Mundo
Millenium
Talk
GIP ICX
Sales
Delivery
Account
28/5/2013 Induction Day - AIESEC Maringá 8
Estrutura da AIESEC Maringá
EBzão
28/5/2013 Induction Day - AIESEC Maringá 9
Carreira dentro da @MA;
• Membresia Híbrida;
• OCs (Comite organizador de eventos);
• Project Manager (Gestor de projetos);
• Manager (Especialista em uma
determinada Job);
• VP (Diretor locais);
• LCP (Presidente do Comite Local).
28/5/2013 Induction Day - AIESEC Maringá 10
MC – Member Committee
28/5/2013 Induction Day - AIESEC Maringá 11
34 Comitês Locais
35 Expansões
MC AIESEC Brasil 2012/2013
28/5/2013 Induction Day - AIESEC Maringá 12
28/5/2013 Induction Day - AIESEC Maringá 13
MCP
MCVP
COMM
MCVP FIN MCVP OD
MC OD
Manager
MCVP Dev
MCVP BD
MC BD
Manager (3)
MCVP PD
MCVP GIP
ICX
MCVP GIP
OGX
MCVP GCDP
ICX
MCVP GCDP
OGX
MCVP TXP
MCVP PR
MC PR
Manager
MC PR Social
Projects
28/5/2013 Induction Day - AIESEC Maringá 14
Carreira Nacional dentro da
@Bazi
28/5/2013 Induction Day - AIESEC Maringá 15
• NST (time nacional de suporte);
• OC´s (organização de conferências
nacionais);
• TNA (time nacional de auditoria);
• MCVP´s (Diretores Nacionais);
• MC Managers (Gerentes Nacionais);
• MCP (presidente da @Bazi).
AI – AIESEC
International
28/5/2013 Induction Day - AIESEC Maringá 16
Holanda
AIESEC International
2012/2013
Carreira internacional dentro da
@• NST Abroad (trabalhar no time de suporte de
outro país)
• GST (time global de suporte);
• MCs Abroad (trabalhar num escritório
nacional de outro país)
• ICB (Equipe internacional de controle);
• AI Managers (gerentes da AIESEC
Internacional);
• AIVPs (Diretores da AIESEC Internacional);
• PAI (Presidente da AIESEC internacional);
28/5/2013 Induction Day - AIESEC Maringá 18
Dúvidas?
So...
A AIESEC é uma grande, grande plataforma
de desenvolvimento, contamos uma rede
enorme e grandes oportunidades para
jovens líderes que estão interessados em se
desenvolver e causar impacto positivo na
sociedade.
Você faz parte disso tudo agora, Enjoy it !
28/5/2013 Induction Day - AIESEC Maringá 20
Obrigado!
28/5/2013 Induction Day - AIESEC Maringá 21
De novo...

Mais conteúdo relacionado

Semelhante a 6 aiesec structure and opp. 2013

The Big Book of Job Descriptions 2020.1 AIESEC in Brazil
The Big Book of Job Descriptions 2020.1 AIESEC in BrazilThe Big Book of Job Descriptions 2020.1 AIESEC in Brazil
The Big Book of Job Descriptions 2020.1 AIESEC in BrazilJosé Arthur Botelho
 
The Big Book of Job Descriptions 2021.1 - AIESEC in Brazil
The Big Book of Job Descriptions 2021.1 - AIESEC in BrazilThe Big Book of Job Descriptions 2021.1 - AIESEC in Brazil
The Big Book of Job Descriptions 2021.1 - AIESEC in BrazilEstela Mírian
 
The Big Book of Job Descriptions of AIESEC in Brazil
The Big Book of Job Descriptions of AIESEC in BrazilThe Big Book of Job Descriptions of AIESEC in Brazil
The Big Book of Job Descriptions of AIESEC in BrazilAIESEC in Brazil
 
Gestão de membros
Gestão de membrosGestão de membros
Gestão de membrosicxgipbrazil
 
21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires
21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires
21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b airesThiago Souza Santos
 
Xxv forum estadual-gestão-29_11-update-sem-market_up
Xxv forum estadual-gestão-29_11-update-sem-market_upXxv forum estadual-gestão-29_11-update-sem-market_up
Xxv forum estadual-gestão-29_11-update-sem-market_upJuliano Rodrigues
 
6ª CBAPL: Atuação das Instituições GTP-APL Sebrae
6ª CBAPL: Atuação das Instituições GTP-APL Sebrae6ª CBAPL: Atuação das Instituições GTP-APL Sebrae
6ª CBAPL: Atuação das Instituições GTP-APL Sebraeredesocialapl
 
Apresentação Dr. Josias Albuquerque CMA
Apresentação Dr. Josias Albuquerque CMAApresentação Dr. Josias Albuquerque CMA
Apresentação Dr. Josias Albuquerque CMACNC
 
Relatório atitudes rede rso pt 2013
Relatório atitudes rede rso pt 2013Relatório atitudes rede rso pt 2013
Relatório atitudes rede rso pt 2013Dianova
 
Mps br final - mps
Mps br final - mpsMps br final - mps
Mps br final - mpsEdvaldo Cruz
 
Plano de Ação GIFT, por Rui Freitas - 2014 09-05,
Plano de Ação GIFT, por Rui Freitas - 2014 09-05,Plano de Ação GIFT, por Rui Freitas - 2014 09-05,
Plano de Ação GIFT, por Rui Freitas - 2014 09-05,Rui Freitas
 
Apresentacao guia projetos_ageis_sisp
Apresentacao guia projetos_ageis_sispApresentacao guia projetos_ageis_sisp
Apresentacao guia projetos_ageis_sispSebastião Figueiredo
 
PMO em Lisarb - Legav Consulting
PMO em Lisarb - Legav ConsultingPMO em Lisarb - Legav Consulting
PMO em Lisarb - Legav ConsultingMarco Coghi
 

Semelhante a 6 aiesec structure and opp. 2013 (20)

The Big Book of Job Descriptions 2020.1 AIESEC in Brazil
The Big Book of Job Descriptions 2020.1 AIESEC in BrazilThe Big Book of Job Descriptions 2020.1 AIESEC in Brazil
The Big Book of Job Descriptions 2020.1 AIESEC in Brazil
 
The Big Book of Job Descriptions 2021.1 - AIESEC in Brazil
The Big Book of Job Descriptions 2021.1 - AIESEC in BrazilThe Big Book of Job Descriptions 2021.1 - AIESEC in Brazil
The Big Book of Job Descriptions 2021.1 - AIESEC in Brazil
 
GP2017 NO$
GP2017 NO$GP2017 NO$
GP2017 NO$
 
SBGC - Projeto Rede de Melhoria de Gestao - Petrobras
SBGC  - Projeto Rede de Melhoria de Gestao - PetrobrasSBGC  - Projeto Rede de Melhoria de Gestao - Petrobras
SBGC - Projeto Rede de Melhoria de Gestao - Petrobras
 
The Big Book of Job Descriptions of AIESEC in Brazil
The Big Book of Job Descriptions of AIESEC in BrazilThe Big Book of Job Descriptions of AIESEC in Brazil
The Big Book of Job Descriptions of AIESEC in Brazil
 
Gestão de membros
Gestão de membrosGestão de membros
Gestão de membros
 
21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires
21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires
21 10 - painel gestão do conhecimento e inovação aberta - marcia regina b aires
 
Xxv forum estadual-gestão-29_11-update-sem-market_up
Xxv forum estadual-gestão-29_11-update-sem-market_upXxv forum estadual-gestão-29_11-update-sem-market_up
Xxv forum estadual-gestão-29_11-update-sem-market_up
 
e-Kar FATEC ECATU versao1_2021
e-Kar FATEC ECATU versao1_2021e-Kar FATEC ECATU versao1_2021
e-Kar FATEC ECATU versao1_2021
 
6ª CBAPL: Atuação das Instituições GTP-APL Sebrae
6ª CBAPL: Atuação das Instituições GTP-APL Sebrae6ª CBAPL: Atuação das Instituições GTP-APL Sebrae
6ª CBAPL: Atuação das Instituições GTP-APL Sebrae
 
Apresentação Dr. Josias Albuquerque CMA
Apresentação Dr. Josias Albuquerque CMAApresentação Dr. Josias Albuquerque CMA
Apresentação Dr. Josias Albuquerque CMA
 
Financiamento
FinanciamentoFinanciamento
Financiamento
 
Finances
FinancesFinances
Finances
 
Relatório atitudes rede rso pt 2013
Relatório atitudes rede rso pt 2013Relatório atitudes rede rso pt 2013
Relatório atitudes rede rso pt 2013
 
Mps br final - mps
Mps br final - mpsMps br final - mps
Mps br final - mps
 
Tcc carlos ribeiro luiz v02
Tcc   carlos ribeiro luiz v02Tcc   carlos ribeiro luiz v02
Tcc carlos ribeiro luiz v02
 
Plano de Ação GIFT, por Rui Freitas - 2014 09-05,
Plano de Ação GIFT, por Rui Freitas - 2014 09-05,Plano de Ação GIFT, por Rui Freitas - 2014 09-05,
Plano de Ação GIFT, por Rui Freitas - 2014 09-05,
 
Programas STEM PBL
Programas STEM PBLProgramas STEM PBL
Programas STEM PBL
 
Apresentacao guia projetos_ageis_sisp
Apresentacao guia projetos_ageis_sispApresentacao guia projetos_ageis_sisp
Apresentacao guia projetos_ageis_sisp
 
PMO em Lisarb - Legav Consulting
PMO em Lisarb - Legav ConsultingPMO em Lisarb - Legav Consulting
PMO em Lisarb - Legav Consulting
 

6 aiesec structure and opp. 2013

  • 3. • Estratégias e direcionamentos para que o MC garanta resultados de forma sustentável. AIESEC International (AI) • Direcionamentos e relacionamento dos países dividos por blocos. Growth Network (GN) • Estratégias e direcionamentos para que o LC garanta resultados de forma sustentável. Member Committee (MC) • Oferecer um grande numero de experiências completas de AIESEC com qualidade. Local Committee(CL) 28/5/2013 Induction Day - AIESEC Maringá 3
  • 4. LCP - Local Committee President GCDP OGX GCDP ICX GIP OGX GIP ICX DEV Global Community Development Program Outgoing Exchange Global Community Development Program Incoming Exchange Global Internship Program Outgoing Exchange Global Internship Program Incoming Exchange Development TXP Team Experiences Comitê Local AIESEC em Maringá 28/5/2013 Induction Day - AIESEC Maringá 4 FIN COMM Finances Communication PR Public Relations
  • 5. LCP VP Project Manager/Manager Membro 28/5/2013 Induction Day - AIESEC Maringá 5 Estrutura do Comitê Local (CL)
  • 6. Cíntia LCP Fernanda VP ICX GCDP Giovana VP ICX GIP Lucas VP FIN Barbara VP COMM João VP OGX GIP Felipe VP OGX GCDP Vitor Walter VP TXP Victor Hugo VP PR Gilberto VP DEV EB - Executive Board Os Administradores da AIESEC Maringá 28/5/2013 Induction Day - AIESEC Maringá 6
  • 7. 28/5/2013 Induction Day - AIESEC Maringá 7 EB Action- Corpo Executivo da AIESEC Mari Felipe- VP GCDP OGX Giovana- VP GIP ICX Cíntia- LCP João- VP GIP OGX Vitor Walter- VP TXP Lucas – VP F Bárbara- VP COMM Fernanda- VP GCDP ICX Victor Hugo- VP PR Gilberto- VP DEV
  • 8. LCP TXP PMO IXP JT JL Seleção FIN Student Corporate A&E TLA COM Brand Channels Universtiy Promotion DEV Information LC Teacher Performanc e PR BD Events IP AS GCDP OGX Off-Peak POPI GIP OGX Gestão Expansion GCDP ICX Terceiro Setor Gira-Mundo Millenium Talk GIP ICX Sales Delivery Account 28/5/2013 Induction Day - AIESEC Maringá 8 Estrutura da AIESEC Maringá
  • 9. EBzão 28/5/2013 Induction Day - AIESEC Maringá 9
  • 10. Carreira dentro da @MA; • Membresia Híbrida; • OCs (Comite organizador de eventos); • Project Manager (Gestor de projetos); • Manager (Especialista em uma determinada Job); • VP (Diretor locais); • LCP (Presidente do Comite Local). 28/5/2013 Induction Day - AIESEC Maringá 10
  • 11. MC – Member Committee 28/5/2013 Induction Day - AIESEC Maringá 11 34 Comitês Locais 35 Expansões
  • 12. MC AIESEC Brasil 2012/2013 28/5/2013 Induction Day - AIESEC Maringá 12
  • 13. 28/5/2013 Induction Day - AIESEC Maringá 13 MCP MCVP COMM MCVP FIN MCVP OD MC OD Manager MCVP Dev MCVP BD MC BD Manager (3) MCVP PD MCVP GIP ICX MCVP GIP OGX MCVP GCDP ICX MCVP GCDP OGX MCVP TXP MCVP PR MC PR Manager MC PR Social Projects
  • 14. 28/5/2013 Induction Day - AIESEC Maringá 14
  • 15. Carreira Nacional dentro da @Bazi 28/5/2013 Induction Day - AIESEC Maringá 15 • NST (time nacional de suporte); • OC´s (organização de conferências nacionais); • TNA (time nacional de auditoria); • MCVP´s (Diretores Nacionais); • MC Managers (Gerentes Nacionais); • MCP (presidente da @Bazi).
  • 16. AI – AIESEC International 28/5/2013 Induction Day - AIESEC Maringá 16 Holanda
  • 18. Carreira internacional dentro da @• NST Abroad (trabalhar no time de suporte de outro país) • GST (time global de suporte); • MCs Abroad (trabalhar num escritório nacional de outro país) • ICB (Equipe internacional de controle); • AI Managers (gerentes da AIESEC Internacional); • AIVPs (Diretores da AIESEC Internacional); • PAI (Presidente da AIESEC internacional); 28/5/2013 Induction Day - AIESEC Maringá 18
  • 20. So... A AIESEC é uma grande, grande plataforma de desenvolvimento, contamos uma rede enorme e grandes oportunidades para jovens líderes que estão interessados em se desenvolver e causar impacto positivo na sociedade. Você faz parte disso tudo agora, Enjoy it ! 28/5/2013 Induction Day - AIESEC Maringá 20
  • 21. Obrigado! 28/5/2013 Induction Day - AIESEC Maringá 21 De novo...

Notas do Editor

  1. Custom animation effects: spinning clip art with text(Intermediate)To reproduce the clip art on this slide, do the following:On the Home tab, in theSlides group, click Layout, and then click Blank.On the Insert tab, in the Illustrations group, click Clip Art.In the Clip Art pane, in the Search for box, enter j0435540. In the Search in list, select Everywhere, and then click Go. Select the clip art file in the pane to insert it into the slide. (Note: If you choose another clip art file, the clip art must be in the Windows Metafile format [.wmf].)On the slide, select the clip art. Under Drawing Tools, on the Format tab, in the Size group, do the following:In the Shape Height box, enter 5.83”.In the Shape Width box, enter 8.12”.On the Home tab, in the Drawing group, click Arrange, and then click Ungroup.In the Microsoft Office PowerPoint dialog box, click Yes. On the slide, select the converted clip art. On the Home tab, in the Editing group, click Select, and then click Selection Pane. In the Selection and Visibility pane, select the top-level group. On the Home tab, in the Drawing group, click Arrange, and then click Ungroup. Also in the Selection and Visibility pane, select the Autoshape object, and then press DELETE. Press CTRL+A to select all of the objects on the slide. On the Home tab, in the Drawing group, click Arrange, and then click Group.Select the group. On the Home tab, in the Drawing group, click Shape Effects, point to Preset, and then under Presets click Preset 8 (second row, fourth option from the left). With the group still selected, under DrawingTools, on the Format tab, in the bottom right corner of the Size group, click the Size and Position dialog box launcher, and do the following:On the Size tab, in the Height box, enter 6.27”.On the Size tab, in the Width box, enter 6.27”.On the Position tab, in the Horizontal box, enter 3.89”. On the Position tab, in the Vertical box, enter 1.55”To reproduce the text on this slide, do the following:On the Insert tab, in the Text group, click TextBox.Drag to draw a text box on the slide.In the text box, enter text and select it. On the Home tab, in the Font group do the following:In the Font list, select Candara.In the FontSize box, enter 32 pt.In the FontColor list, under StandardColors select Orange (third option from the left). Click Italic. Select the text box on the slide, and then under DrawingTools, on the Format tab, in the Size group, do the following:In the ShapeHeight box, enter 7.29”.In the ShapeWidth box, enter 7.29”.Under DrawingTools, on the Format tab, in the WordArtStyles group, click TextEffects, point to Transform, and under FollowPath select ArchUp (first option from the left).To wrap the text upside down, at the bottom of the text box, drag the pink adjustment diamond from the center left position in the text box to the lower right corner of the text box. With the text box still selected, under DrawingTools, on the Format tab, in the bottom right corner of the Size group, click the Size and Position dialog box launcher, and then on the Position tab do the following:In the Horizontal box, enter 3.38”. In the Vertical box, enter 1.04”.To reproduce the animation effects on this slide, do the following:On the Animation tab, in the Animations group, click CustomAnimation.Select the circle clip art on the slide, and then in the CustomAnimation task pane, do the following:Click AddEffect, point to Emphasis effect and select MoreEffects. In the AddEmphasisEffect dialog box, under Basic select Spin, and then click OK.Click the arrow to the right of the spin emphasis effect, select Effect Options,and do the following:On the Effect tab, under Settings, in the Amount list, select QuarterSpin.On the Effect tab, under Settings, in the Amount list, select Counterclockwise.On the Timing tab, in the Start list, select WithPrevious.On the Timing tab, in the Speed box enter4.0 seconds.Click OK.On the slide, select the text box, and then in the CustomAnimation task pane, do the following:Click the AddEffect, point to Entrance and select MoreEffects. In the AddEntranceEffect dialog box, under Subtle select Fade, and then click OK.Select the fade entrance effect (second effect), and under Modify: Fade do the following:In the Start list, select WithPrevious.In the Speed list, select Slow. With the text box still selected, click AddEffect, point to Emphasis and select MoreEffects. In the AddEmphasisEffect dialog box, under Basic select Spin, and then click OK.Select the spin emphasis effect (third effect), and under Modify: Spin do the following:In the Start list, select WithPrevious.In the Amount list, select HalfSpin.In the Speed list select Slow. With the text box still selected, click AddEffect, point to Emphasis and select MoreEffects. In the AddEmphasisEffect dialog box, under Basic select Spin, and then click OK.Click the arrow to the right of the spin emphasis effect (fourth effect), select Effect Options,and do the following:On the Effect tab, under Settings, in the Amount list, in the Custom box enter 30°, and then press ENTER.On the Effect tab, under Settings, in the Amount list, select Counterclockwise.On the Timing tab, in the Start list, select WithPrevious.On the Timing tab, in the Delay box enter 3.0 seconds.On the Timing tab, in the Speed box enter1 seconds (Fast).Click OK.To reproduce the background on this slide, do the following:Right-click the slide background area, and then click Format Background. In the Format Background dialog box, click Fill in the left pane, select Gradient fill in the Fill pane, and then do the following:In the Type list, select Linear.In the Direction, list click Linear Down (first row, second option from the left)Under Gradient stops, click Add or Remove until two stops appear in the drop-down list.Also under Gradient stops, customize the gradient stops as follows:Select Stop 1 from the list, and then do the following:In the Stop position box, enter 0%.Click the button next to Color, and then under Theme Colors click Black, Text 1 (first row, second option from the left). Select Stop 2 from the list, and then do the following: In the Stop position box, enter 100%.Click the button next to Color, and then under Theme Colors clickBlack, Text 1, Lighter 50% (second row, second option from the left).