World Maritime trade flow
Source: International Trade Statistics-2008
Bahia Economic Prospects
Brazil is a strong source of economic growth. In effect, it is a
new growth engine. The driver for its growth is a large
domestic market. But in addition, the discovery of huge new
oil reserves of 8 billion barrels of light crude will further
develop infrastructure projects.
Brazil’s financial system stability have allowed investment to
proceed with a low level of risk to investors. The largest share
of investment is going into the commodity sector because the
worldwide boom in commodities this decade has made such
investment very profitable.
Bahia has been expanding at a strong pace, and the IMF
forecasts that Brazil’s overall economy will grow at the rate of
5% in 2010.
Brazil Economic Development Axles


Main Areas
                                                                   Ferrovia
Macro Projects                                                     Transnordestina



                                          Rodovia
    Northeast                        Belém-Brasília


                                        Ferrovia Norte Sul

   Integration Area                                                              Hidrovia
                                                                            São Francisco
                            Ferrovia da Integração
                                       Oeste Leste                              Complexo
                                                                             Portuário da
                                                                            Baía de Todos
                                                                                os Santos

                                                                    Porto Sul

   Southeast
                                                             Sub rótula de Integração

                                                             Ferrovia Oeste Leste

                                                             Ferrovia Norte Sul

                                                             Ferrovia FCA

                                                              Ferrovia Transnordestina

                                                             Ferrovia Carajás

                                                              Rod. Belém - Brasília
Bahia Economic Prospects

Bahia trade costs play
an important role in
attracting FDI.
 The availability of
infrastructure, such as           Oeste Baiano


railway lines, Ports, and
roads is positively
correlated with
investments foreign
entry.
                                                 Porto Sul


•   Population: 14 Millions
    14,1 milhõe
•   Área: 567.000 Km2
•   36 % of Norteast region
•   1.183 km Coastline
•   6ª State economy in Brasil
Bahia Economic Data
         Triple Economic
          Concentration




Espacial (RMS)
Sectorial (Petrochemical)
Capital Owners                   Bahia Economic Data   RMS


Fonte: SEI
Bahia Economic Data

Agro business areas                              Juazeiro




West (Soja)
Northeast (Fruticultura)             Oeste

South (Celulose)


AGRICULTURE Production
concentration

                                                            Extremo Sul
Bahia Economic Data

       Taxes Revenues: Evolution and Main sectors
RECEITAS CORRENTES 2008           EVOLUÇÃO ICMS NOMINAL




                             ICMS POR SETOR
PRINCIPAL MINERALS RESOURCES




                                    ZPE

                               Ferrovia
Bahia Iron Ore Reserves -Railway and port
Porto Juazeiro                                               Br-116 Bridge between
Transport – PAC (Growth                                                                                                                                              BA/PE Conbstruction
Program)                                                                                                                                                     Paulo Afonso
                                                                                                                   Juazeiro
        Ferrovia




                                                                                                                                 BR - 116
        Oeste-Leste                                                                    Sento Sé                                                                    BR-101-Duplication.
                                                                                                                                                                   BR-324

                Formosa do Rio Preto                               Barra                                                                                                Complexo Viário
                                       BR - 135
                                                                                                                                                                        2 de Julho-aeroporto
                                                                                                                                                                        Salvador




                                                                                                                                                        01
                                                                                                                           Feira de




                                                                                                                                                       -1
                                                                                                                                                    BR
                                                                           Ibotirama                                       Santana
                                                             BR - 242

                              Barreiras
                                                                                             BR - 242
                                                                                                                       São Félix
                                                                                                                                             BR - 324                  RailwayCamaçari – Arat
                                                                                         Seabra
                                                                                                                                                        Camaçari
                                                                                                                                                                       (
Paving
                                                  BR - 135




                                                                        Bom Jesus                                                                Salvador
                                                                        da Lapa
BR-135 PI/BA/MG
                                                                                                        Jequié                                                   Railway
                                        Cocos                                                                                                                    São Félix/Cachoeira




                                                                                                             116
                                                                   Malhada




                                                                                                        BR -
                                                                                                                                                   Subway Sysrtem Salvador
 Multimodal Integration                                                                                 Vitória da
                                                                                                        Conquista
BR-                                                          Concessão
242/Waterway/FCA/Port                                        PPP-BR-116/324
of Aratu                                                                                                                                                           Porto Sul

         Waterway dredging S.Francisco River                                                                                                Harbor Expressway
                                                                                                                      BR - 101



         and rail access to Port of Juazeiro                                                                                                Salvador
Hidrovia São Francisco
Infrastructure Logístic
Structural Axles
Sistema BA 093
Sistema BR 324 / BR 116




                                                                            122
( Concessão / Duplicação )




                                                                         BR-
                                          Oeste Baiano
BR 101
( Norte: Duplicação Feira / divisa SE )
( Sul: Duplicação Feira / divisa ES )

BR 030
( Complementação / Pavimentação )




                                                              22
                                                         BR-1
BR 251/ BR 415
( divisa MG - BR 101 - acesso Porto Sul




                                                                                               001
/Duplicação Ilhéus - Itabuna )




                                                                                            BA-
                                                                                                 Porto Sul
BR 235
( Complementação / Pavimentação )

BR 122
( Construção / Pavimentação
Juazeiro / Seabra / Caetité )

BA 001 ( Construção )
Canavieiras / Belmonte / Trancoso
Prado / Caravelas / Nova Visçosa
INVESTIMENTOS NA ÁREA DE INFLUENCIA DA FERROVIA OESTE LESTE


Seguimento / Empresa              Localização             Atividade / Produto        Empregos                   Investimento




EMPRESAS EM FASE DE IMPLANTAÇÃO 2008                                                       4.792      R$            4.696.000.000


Bahia Mineração                   Caetité           Mineração de ferro                     1.000           R$         3.680.000.000


Mirabela Mineração                Itagibá / Ipiaú   Concentrado de Níquel                  3.450           R$           900.000.000


Vanádio de Maracás                Maracás           Ferro Vanádio e Gusa                        200        R$           216.000.000


Fianco Agrícola ltda.             LEM               Biodiesel                                   142        R$           130.000.000


Outros                                                                                       199           R$             4.040.000


PROTOCOLOS DE INTENÇÃO ASSINADOS EM 2008                                                     970      R$             680.000.000


Multigrain S.A.                   São Desidério     Alcool e Energia elétrica                   250        R$           500.000.000


Bioclean Energy                   LEM               Oleos,farelos,glicerina,tortas              220        R$           120.000.000


Valmesa-Valadares Metalurgia      Jequié            Ferro Gusa                                  500        R$            60.000.000


Outros                                                                                       821           R$            12.054.000


TOTAL                                                                                      5.762                      6.506.000.000
Structural logistic Axles

Federal and State Roads
Structural Axles

BR 242
Restoration and construction of stretches                  BR 242
and adequacy of capacity between            Luís Eduardo

BA 160 e Castro Alves                        Magalhães



                                                                    BR 116
Investiment: R$ 841 millions                                                 BR 324
Start: 2009 - PNLT
TO/BA border and intersection with
BA 460

Investiment: R$ 110 millions
Start: 2009 - PNLT


BR-324 / BR-116
Road Ring and duplication of the 116
(recovery and increase of capacity
of traffic) Salvador – Feira de Santana

Start: 2009
Airports

SALVADOR
Ampliação do terminal de
passageiros e de cargas

Implantação de nova pista
Construção de novos fingers

 Novo aeroporto de ILHÉUS
 Terminal de passageiros e
 cargas, área para galpões
 industriais e acesso
 rodoviário.
                                    PORTO SUL

 PORTO SEGURO
 Terminal de passageiros e cargas
 e acesso rodoviário
 Início: 2008


Barreiras, Vitória da Conquista
e PETROLINA
Ampliação e Recuperação - PPA
São Francisco River Port
                                                                                                                                         B U C O
                                                                                                                             P E R N A M
                                          Maranhão                                            Í
                                                                  HIDROVIA               U
                                                                                     A
                                                                                                                                                      Paulo
                                                                               I                                                                     Afonso            ALAGOAS

                                                                                                                  Juazeiro




                                                                         P




                                                                                                                                                                                   E
                                                                                                                                                     BR
                                                                                                     Sento Sé




                                                                                                                                                                               I P
                                                                                                                                                     - 11
                                                     S
                                                                                                   Xique-Xique




                                                                                                                                                                       S E R G
                                                                                                                                                          6
                                         C A N T I N
                       Tocantins
                                                                                                                                       -
                                                             Luis Eduardo Magalhães                                                                       Serrinha
                                                                                                                                   Feira de                             Esplanada
                                                                                                                                   Santana
                                                                                                         BR 242                                                 Alagoinhas
    Mato Grosso

                                     T O
                                                                         Barreiras
      Do Sul                                                                                       Boquira




                                                                                                                                                                                              O
                                                                                                                                                                  Salvador
                                                                                             Bom Jesus




                                                                                                                                                                                          I C
                                                                                                                                                 1
                                                                                                                                           - - 10
                                                            Correntina                       da Lapa
                                                G O I Á S




                                                                                                                                                                                           T
                                                                         Sta. Maria da




                                                                                                                                           BR
                                                                                                                      Tanhaçu




                                                                                                                                                                                       Â N
                                                                            Vitória                                               Jequié              COMPLEXO PORTUÁRIO
                       Goiás                                                          Caetité
                                                                                                                                                       SALVADOR - ARATU




                                                                                                                                                                                 T L
                                                                                                   Brumado
                                                                                    Guanambi




                                                                                                                          16
                                                                                                                                                                 E OUTROS




                                                                                                                        -1




                                                                                                                                                                               A
                                                                                                                      BR
                                                                                                         Vitória da             Itabuna                       Porto Sul
                                                                                                         Conquista
                                                                                                                                                      Ilhéus




                                                                                                                                                                       O
Curto Prazo




                                                                                                                                                                   E A N
                                                                    M I N A    S     G E R A
                                                                                             I S
                                                                                                                                                                  PORTO SUL
   Hidrovia




                                                                                                                                                                   C
                                                                                                                         Eunápolis




                                                                                                                                                                   O
                                                                                             FERROVIA                                                Porto Seguro
   Porto Sul




                                                                                                                                   - 101
                                                                                             OESTE LESTE




                                                                                                                                  BR -
   Plataforma Juazeiro/Aratu
   Inclui 6 km de ferrovia ( Porto Juazeiro / FCA)
                                                                                                                       ESPÍRITO
                                                                                             FERROVIA                   SANTO
   Complexo Portuário Salvador – Aratu e Outros                                              EXISTENTE - FCA
Bahia Economic Data

    Semi-árido
Population 6,7 milhões

48 % do Estado



68 % da área do Estado



Income Per Capita


R$ 3.572,00



    Fonte: IBGE.
Power Plants

                                                                                                        UTE Pecém II
                                                                                                                UTE Vale do Açu-Gás

                                                                                                                       UTE Potiguar III

                                                                                                                         UTE Pau Ferro
                                                          UHE Estreito
           UHE Dardanelos
          UHE Rondon II                                UHE São Salvador                                                 UTE Termomanaus
                                                   UHE Corumbá III                                           UTE Camaçari Muricy I
                                              UTE Goiânia II
                                                                                UHE Batalha                     UTE Camaçari Muricy II
                            UHE Barra dos Coqueiros
                               UHE Caçu                                                 UHE Serra do Facão  UTE Camaçari  Pólo de Apoio
                                                                                                         UHE Retiro Baixo
                                       UHE Salto                                                        UHE Baguari
            UHE Olho d´Água
                                                                                                    UHE Baú I
       UTE Quirinópolis (BC)
                                UHE Foz do Rio Claro                                                      UHE Barra do Braúna
        UHE Salto do Rio Verdinho                                                                        UHE Simplicio
     UTE Três Lagoas (GN)                                                             UTE Colorado BC
           UTE Interlagos BC        UTE Santa Isabel BC                                      UTE São José BC
                                      UTE Costa Pinto BC                                  UTE Rafard BC
                          UHE Foz do Chapecó                             UHE Mauá           UTE São João Biogás
                                                                            UHE Salto Pilão UTE Cubatão GN
                            UHE Passo São João
                                                                                   UHE Pai-Querê
                               UHE São José
                                                                           UHE Monjolinho
                                  UHE 14 de julho
                                                                                    UTE Canoas (ampliação) GN
                                    UHE Castro Alves                 UTE Jacuí C
                                                               UTE Candiota III C

Em implantação
BAHIA
                                              Oil & Gás
         Petróleo e Gás Natural
04. Refinaria Landulpho Alves Mataripe -
RLAM                                       1.800.000.000,00 Petrobrás                  SEI: R$ 3.555 bilhões
Campo de Manati
                                                                                       Já foram realizadas 99% das obras. O
                                                                                       total estimado é de R$ 210 mi. Estão
                                             40.000.000,00 PPP                  2007   previstos p/ 2007 R$ 40 milhões.
Gasene                                                                                 Invest. Realizado até abril de 2007 R$
                                                                                       400 milhões e estão previstos para
                                                                                       2007 mais R$1,95 bi. Segundo a SEI
                                                                                       este valor é de R$ 2,9 Bilhões.
                                                                                       Segundo o site:w w w .gasnet.com.br
                                                                                       PARA A BAHIA U$$ 882 milhões,
                                           1.600.000.000,00 Petrobrás   Ba-ES   2009   cerca de R$ 1,6 bilhão.
Usina de biodiesel em Candeias
                                                                                       Valor fornecido pela SEI. Segundo site
                                                                                       da Rede Baiana de Biocombustíveis o
                                                                                       valor é de U$$ 20 mi (em reais cerca
                                                                                       de 36 milhões).w w w .rbb.ba.gov.br
                                             78.000.000,00 Petrobrás    Bahia   2007   em 29/9/06
                Subtotal                   3.518.000.000,00
              Sub total                    3.518.000.000,00
Oil Industry Investments


•The oil giant Petrobras had total revenues of $92B in
2008 and a total profit of $14B. This placed the
company in the 25th rank in the Forbes Global 2000
list.
•Brazil has 12.6 billion barrels of proven oil reserves,
the second-largest in South America after Venezuela.
•Petrobras has announced the world’s largest capital
expenditure programme, worth $174 billion over the
next five years.
Ilhéus

Porto Sul




              **Booz Allen
Sistema Recôncavo

  Ferrovia Camaçari - Aratu

 Investimento: 120 milhões (PAC)
 Projeto Executivo concluído/ construção
 Ministério dos Transporte

 Via Portuária

 Custo Estimado: 340 milhões
 Extensão: 43 km
 Percurso: Porto SSA / BR 324
 Estrutura: Túneis elevados, pista
 de rolamento, passarelas, ciclovias,
 calçadões, faixa de tráfego
 Fluxo Estimado: 63 mil veículos / dia

 Acesso Ferroviário Porto SSA


  Área Retroportuária do Cia


 Complexo 2 de Julho


 Viadutos

Av. Caribé-Aeroporto ; SSA-Lauro de Freitas
BA - 026 (CIA-Aeroporto) ; Estrada do
Coco - São Cristovão
Minimum Qualification Structure for Mobility in RMS for the 2014 World Cup



 Tipo 1 – Rapid Transport
 Tipo 1 – Rapid Transport


       Tipo 2 --Bus
       Tipo 2 Bus



        Subway
        Subway




                                                           PIRAJÁ




                                                           RETIRO




                                            ACESSO NORTE
TABELA - PROJETOS DE MOBILIDADE COPA 2014
                                                                              Projetos Prioritários

                                     PROJETO                                                         CARACTERIZAÇÃO

Projeto Componente da Matriz de Responsabilidades - COPA (Firmada entre os Governo Federal, Estadual e Municipal em 13 de janeiro de 2010) - Com Recursos Definidos (PAC COPA)
                                                                                          • Corredor Estruturante de transporte de alta
                                                                                                      capacidade em BRT;
                                                 CORREDOR ESTRUTURANTE                              • Conexão Metropolitana;
                    1                                                                                                                                  570.316.000,00
                                                AEROPORTO / ACESSO NORTE               • Acessibilidade ao Estádio da Fonte Nova (COPA
                                                                                                             2014).

Projetos Componentes da Matriz de Responsabilidades - COPA (Firmada entre os Governo Federal, Estadual e Municipal em 13 de janeiro de 2010) - Sem Recursos Definidos
                                                                                        • Corredor de transporte de alta capacidade, modo
                                                 CORREDOR ESTRUTURANTE                           BRT, com 14,8 km de extensão;
                    2                                                                                                                                   260.542.059,06
                                              AEROPORTO / LAURO DE FREITAS             • Componente do Sistema Integrado de Transporte
                                                                                                           Metropolitano
                    3                                                                    • Corredores de transporte de média capacidade,
                    4                                                                         modo BRT, com 18,6 km de extensão;
                                                  CORREDOR TRANSVERSAL                • Corredores alimentadores do Corredor Estruturante
                                                                                                                                                        481,079.498,31
                                                       ALIMENTADOR - I                               Aeroporto/Acesso Norte;
                    5                                                                 • Componentes do Sistema Integrado de Transporte
                                                                                                           Metropolitano


                                                                             • Corredor de transporte de alta capacidade, modo
                                                                                       BRT, com 10 km de extensão;
                                           CORREDOR ESTRUTURANTE IGUATEMI - • Componente do Sistema Integrado de Transporte
                    6
                                                        LAPA                Metropolitano, complementa o Corredor Estruturante
                                                                            Aeroporto/Acesso Norte, em uma conexão urbana;
                                                                                   • Permite a racionalização operacional


Projetos Complementares
                                                                                        • Corredores de transporte de média capacidade,
                                                                                             modo BRT, com 14,5 km de extensão;
                                                  CORREDOR TRANSVERSAL                • Componentes do Sistema Integrado de Transporte
                    7                                                                                                                                  481.702.366,45
                                                      ALIMENTADOR II                                      Metropolitano;
                                                                                      • Corredores alimentadores do Corredor Estruturante
                                                                                                   Aeroporto/Acesso Norte;
                                                                                                      Micro Acessibilidade
                                                                                     • Acesso de veículos à nova Arena da Fonte Nova e
                                                                                          melhoramentos no tráfego no seu entorno
                                                                                                     Rotas acessíveis 1 e 2
                    8                      Acessibilidade à Arena da Nova Fonte Nova   • Rotas accessíveis para pedestres e bicicletas -                39.118.000,00
                                                                                                    acesso à Arena e Metrô
                                                                                       • Projeto de acordo com as leis de acessibilidade
                                                                                      universal (Lei Federal 10.098/2000, 10.048/2000 e
                                                                                                Decreto Presidencial 5296/2004)
INTEGRATED
 Accessibility
  CUP 2014

                 New Road
                  Station
Parallel Avenue pathways Cross / Terminal Integration

                                                                                                                   Lauro de Freitas
                               Salvador
                                                                   Cajazeiras
Baía de Todos                                                                                      São Cristovão
  os Santos                                             Pau da Lima                                Estação
                                                                                                  Mussurunga

                                          Pirajá
                                                                           Terminal
                                                                           Alphavile                                Aeroporto
                                                                                           Terminal
                                                                                           Malvinas
                                                     CAB
                                                                          Av. Paralela
                             Metrô
                                                                                                      Itapuã
                                             Lapa              Terminal
                                                                 CAB
                                                                                          Piatã
            Campo da                 Acesso Norte
                                                                              Jaguaribe
             Pólvora                                Terminal
                                                     Imbuí
                                                                Boca do Rio
                Lapa   Fonte Nova




                                                                                                                   Oceano Atlântico
Why Invest in Bahia?

• The World Bank predicts that if Brazil continues on the path
  it is on now, it will move from being the tenth largest
  economy in the world today to the fifth largest by 2016.

• The sense of urgency created by the advent of the World
  Cup in 2014 and the Olympics in 2016 can be very positive
  for Brazil as this stirs the public and private sectors to carry
  out badly needed infrastructure investments.
Atraction of foreign direct investment (FDI)

Industrial Tax Incentives

Market and supplier access are the main factors affecting investments
entry. Also the access to customers and suppliers of inputs are key
determinants of FDI inflows.

Our Governments spend large sums of money to entice foreign direct
investment (FDI), offering generous tax incentives. We believe that
foreign firms will generate positive externalities on domestic firms.

The Bahia State Programs: Desenvolve and Probahia support with tax
isention the atraction of foreign direct investment (FDI) .
Thank you Very Much




       www.seplan.ba.gov.br

Mais conteúdo relacionado

Mais procurados

ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...
ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...
ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...Alerj
 
Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...
Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...
Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...Banco do Nordeste
 
Balanço do PAC em SP, janeiro a abril de 2009
Balanço do PAC em SP, janeiro a abril de 2009Balanço do PAC em SP, janeiro a abril de 2009
Balanço do PAC em SP, janeiro a abril de 2009Aloizio Mercadante
 
Apresentação de Projeto
Apresentação de ProjetoApresentação de Projeto
Apresentação de Projetojubijoux
 
10º Balanço do PAC no Estado de São Paulo
10º Balanço do PAC no Estado de São Paulo10º Balanço do PAC no Estado de São Paulo
10º Balanço do PAC no Estado de São PauloEdinho Silva
 
Desafios da Expansão da Produção Mineral na Bahia
Desafios da Expansão da Produção Mineral na BahiaDesafios da Expansão da Produção Mineral na Bahia
Desafios da Expansão da Produção Mineral na BahiaRomeu Temporal
 
Empresas apresentam alta taxa de sobrevivência na região de Bauru
Empresas apresentam alta taxa de sobrevivência na região de BauruEmpresas apresentam alta taxa de sobrevivência na região de Bauru
Empresas apresentam alta taxa de sobrevivência na região de BauruBruno Caetano
 
Apresentação institucional 2008
Apresentação institucional 2008Apresentação institucional 2008
Apresentação institucional 2008EquatorialRI
 

Mais procurados (18)

ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...
ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...
ALERJ – Fórum de Desenvolvimento: Logística e infraestrutura para a competiti...
 
10 50 marcelo pricoli [modo de compatibilidade]
10 50 marcelo pricoli [modo de compatibilidade]10 50 marcelo pricoli [modo de compatibilidade]
10 50 marcelo pricoli [modo de compatibilidade]
 
Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...
Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...
Infraestrutura Macrologística do Nordeste: Caracterização e Propostas de Inte...
 
Nordeste Competitivo - Lista de Eixos e Projetos
Nordeste Competitivo - Lista de Eixos e ProjetosNordeste Competitivo - Lista de Eixos e Projetos
Nordeste Competitivo - Lista de Eixos e Projetos
 
Balanço do PAC em SP, janeiro a abril de 2009
Balanço do PAC em SP, janeiro a abril de 2009Balanço do PAC em SP, janeiro a abril de 2009
Balanço do PAC em SP, janeiro a abril de 2009
 
Apresentação de Projeto
Apresentação de ProjetoApresentação de Projeto
Apresentação de Projeto
 
Boletim informativo de Sumare - Janeiro de 2010
Boletim informativo de Sumare - Janeiro de 2010Boletim informativo de Sumare - Janeiro de 2010
Boletim informativo de Sumare - Janeiro de 2010
 
10º Balanço do PAC no Estado de São Paulo
10º Balanço do PAC no Estado de São Paulo10º Balanço do PAC no Estado de São Paulo
10º Balanço do PAC no Estado de São Paulo
 
Edição 75 mai 2012
Edição 75   mai 2012Edição 75   mai 2012
Edição 75 mai 2012
 
Desafios da Expansão da Produção Mineral na Bahia
Desafios da Expansão da Produção Mineral na BahiaDesafios da Expansão da Produção Mineral na Bahia
Desafios da Expansão da Produção Mineral na Bahia
 
Boletim informativo de Caraguatatuba - Janeiro de 2010
Boletim informativo de Caraguatatuba - Janeiro de 2010Boletim informativo de Caraguatatuba - Janeiro de 2010
Boletim informativo de Caraguatatuba - Janeiro de 2010
 
Boletim informativo de Sumare - Fevereiro de 2010
Boletim informativo de Sumare - Fevereiro de 2010Boletim informativo de Sumare - Fevereiro de 2010
Boletim informativo de Sumare - Fevereiro de 2010
 
Pdf corrigido
Pdf corrigidoPdf corrigido
Pdf corrigido
 
Projeto Maria Fumaça
Projeto Maria FumaçaProjeto Maria Fumaça
Projeto Maria Fumaça
 
Empresas apresentam alta taxa de sobrevivência na região de Bauru
Empresas apresentam alta taxa de sobrevivência na região de BauruEmpresas apresentam alta taxa de sobrevivência na região de Bauru
Empresas apresentam alta taxa de sobrevivência na região de Bauru
 
Boletim informativo de Votuporanga - Outubro de 2009
Boletim informativo de Votuporanga - Outubro de 2009Boletim informativo de Votuporanga - Outubro de 2009
Boletim informativo de Votuporanga - Outubro de 2009
 
Se
SeSe
Se
 
Apresentação institucional 2008
Apresentação institucional 2008Apresentação institucional 2008
Apresentação institucional 2008
 

Destaque

Shortbrief Turismo Futuro
Shortbrief Turismo FuturoShortbrief Turismo Futuro
Shortbrief Turismo FuturoAdvank
 
Shortbrief UrbanAddict
Shortbrief UrbanAddictShortbrief UrbanAddict
Shortbrief UrbanAddictAdvank
 
Trends from the New Energy Consumer: Getting Instant Everything from Energy P...
Trends from the New Energy Consumer: Getting Instant Everything from Energy P...Trends from the New Energy Consumer: Getting Instant Everything from Energy P...
Trends from the New Energy Consumer: Getting Instant Everything from Energy P...accenture
 
New Business Opportunities for Utility Distribution Companies in an Expanded ...
New Business Opportunities for Utility Distribution Companies in an Expanded ...New Business Opportunities for Utility Distribution Companies in an Expanded ...
New Business Opportunities for Utility Distribution Companies in an Expanded ...accenture
 
Travelling
TravellingTravelling
TravellingAdvank
 
Brochura Advank
Brochura Advank Brochura Advank
Brochura Advank Advank
 
Gestão e Governança de TI - Uma visão executiva
Gestão e Governança de TI - Uma visão executivaGestão e Governança de TI - Uma visão executiva
Gestão e Governança de TI - Uma visão executivaCompanyWeb
 
Digital in 2016: The Year of Consumer-Led Communications Marketing
Digital in 2016: The Year of Consumer-Led Communications MarketingDigital in 2016: The Year of Consumer-Led Communications Marketing
Digital in 2016: The Year of Consumer-Led Communications MarketingEdelman
 
Digital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing WorldDigital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing WorldEdelman
 

Destaque (16)

Shortbrief Turismo Futuro
Shortbrief Turismo FuturoShortbrief Turismo Futuro
Shortbrief Turismo Futuro
 
Shortbrief UrbanAddict
Shortbrief UrbanAddictShortbrief UrbanAddict
Shortbrief UrbanAddict
 
Turismo Negro
Turismo NegroTurismo Negro
Turismo Negro
 
Turistificação
TuristificaçãoTuristificação
Turistificação
 
Turismo negro
Turismo negroTurismo negro
Turismo negro
 
Trends from the New Energy Consumer: Getting Instant Everything from Energy P...
Trends from the New Energy Consumer: Getting Instant Everything from Energy P...Trends from the New Energy Consumer: Getting Instant Everything from Energy P...
Trends from the New Energy Consumer: Getting Instant Everything from Energy P...
 
New Business Opportunities for Utility Distribution Companies in an Expanded ...
New Business Opportunities for Utility Distribution Companies in an Expanded ...New Business Opportunities for Utility Distribution Companies in an Expanded ...
New Business Opportunities for Utility Distribution Companies in an Expanded ...
 
Travelling
TravellingTravelling
Travelling
 
Brochura Advank
Brochura Advank Brochura Advank
Brochura Advank
 
Gestão e Governança de TI - Uma visão executiva
Gestão e Governança de TI - Uma visão executivaGestão e Governança de TI - Uma visão executiva
Gestão e Governança de TI - Uma visão executiva
 
Digital in 2016: The Year of Consumer-Led Communications Marketing
Digital in 2016: The Year of Consumer-Led Communications MarketingDigital in 2016: The Year of Consumer-Led Communications Marketing
Digital in 2016: The Year of Consumer-Led Communications Marketing
 
Digital in 2017: Northern America
Digital in 2017: Northern AmericaDigital in 2017: Northern America
Digital in 2017: Northern America
 
Digital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing WorldDigital Trends in 2017: Making Business Impact in a Changing World
Digital Trends in 2017: Making Business Impact in a Changing World
 
Digital in 2017: Eastern Asia
Digital in 2017: Eastern AsiaDigital in 2017: Eastern Asia
Digital in 2017: Eastern Asia
 
2017 Digital Yearbook
2017 Digital Yearbook2017 Digital Yearbook
2017 Digital Yearbook
 
Digital in 2017 Global Overview
Digital in 2017 Global OverviewDigital in 2017 Global Overview
Digital in 2017 Global Overview
 

Mais de Jose_Sergio_Gabrielli

Apresentação na Câmara de Vereadores
Apresentação na Câmara de VereadoresApresentação na Câmara de Vereadores
Apresentação na Câmara de VereadoresJose_Sergio_Gabrielli
 
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...Jose_Sergio_Gabrielli
 
Rio Corrente - Diálogos Territoriais
Rio Corrente - Diálogos Territoriais Rio Corrente - Diálogos Territoriais
Rio Corrente - Diálogos Territoriais Jose_Sergio_Gabrielli
 
20130529 apresentacao padrao-v46 (1)
20130529 apresentacao padrao-v46 (1)20130529 apresentacao padrao-v46 (1)
20130529 apresentacao padrao-v46 (1)Jose_Sergio_Gabrielli
 
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...Jose_Sergio_Gabrielli
 
Hidrovia são francisco intermodalidade logística
Hidrovia são francisco intermodalidade logísticaHidrovia são francisco intermodalidade logística
Hidrovia são francisco intermodalidade logísticaJose_Sergio_Gabrielli
 
Bahia Conjuntura e Perspectivas 2013
Bahia Conjuntura e Perspectivas 2013Bahia Conjuntura e Perspectivas 2013
Bahia Conjuntura e Perspectivas 2013Jose_Sergio_Gabrielli
 

Mais de Jose_Sergio_Gabrielli (20)

Apresentação na Câmara de Vereadores
Apresentação na Câmara de VereadoresApresentação na Câmara de Vereadores
Apresentação na Câmara de Vereadores
 
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
 
Litoral Norte e Agreste Baiano
Litoral Norte e Agreste BaianoLitoral Norte e Agreste Baiano
Litoral Norte e Agreste Baiano
 
Baixo Sul - Diálogos Territoriais
Baixo Sul - Diálogos Territoriais Baixo Sul - Diálogos Territoriais
Baixo Sul - Diálogos Territoriais
 
Rio Corrente - Diálogos Territoriais
Rio Corrente - Diálogos Territoriais Rio Corrente - Diálogos Territoriais
Rio Corrente - Diálogos Territoriais
 
Apresentaçao litoral sul 21 3-18hr
Apresentaçao litoral sul 21 3-18hrApresentaçao litoral sul 21 3-18hr
Apresentaçao litoral sul 21 3-18hr
 
Apresentação vj 16.05
Apresentação vj 16.05Apresentação vj 16.05
Apresentação vj 16.05
 
Lobato presal 2205 15 hrs
Lobato presal 2205 15 hrsLobato presal 2205 15 hrs
Lobato presal 2205 15 hrs
 
Apresentação zeec 21052013
Apresentação zeec 21052013Apresentação zeec 21052013
Apresentação zeec 21052013
 
20130529 apresentacao padrao-v46 (1)
20130529 apresentacao padrao-v46 (1)20130529 apresentacao padrao-v46 (1)
20130529 apresentacao padrao-v46 (1)
 
20130529 apresentacao padrao-v47
20130529 apresentacao padrao-v4720130529 apresentacao padrao-v47
20130529 apresentacao padrao-v47
 
Sisal
SisalSisal
Sisal
 
Apresentação ssf 02.05 (2)
Apresentação ssf 02.05 (2)Apresentação ssf 02.05 (2)
Apresentação ssf 02.05 (2)
 
Litoral Norte e Agreste Baiano
Litoral Norte e Agreste BaianoLitoral Norte e Agreste Baiano
Litoral Norte e Agreste Baiano
 
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
Plano de Desenvolvimento Socioeconômico da Macro Área de Influência da Ponte ...
 
Apresentação Recôncavo Baiano
Apresentação Recôncavo BaianoApresentação Recôncavo Baiano
Apresentação Recôncavo Baiano
 
Engenharia bahia
Engenharia bahiaEngenharia bahia
Engenharia bahia
 
Hidrovia são francisco intermodalidade logística
Hidrovia são francisco intermodalidade logísticaHidrovia são francisco intermodalidade logística
Hidrovia são francisco intermodalidade logística
 
Intermodalidade 2901 18 hr
Intermodalidade 2901 18 hrIntermodalidade 2901 18 hr
Intermodalidade 2901 18 hr
 
Bahia Conjuntura e Perspectivas 2013
Bahia Conjuntura e Perspectivas 2013Bahia Conjuntura e Perspectivas 2013
Bahia Conjuntura e Perspectivas 2013
 

Bahia investment opportunities word bank washington-usa

  • 1.
  • 2.
  • 4. Source: International Trade Statistics-2008
  • 5. Bahia Economic Prospects Brazil is a strong source of economic growth. In effect, it is a new growth engine. The driver for its growth is a large domestic market. But in addition, the discovery of huge new oil reserves of 8 billion barrels of light crude will further develop infrastructure projects. Brazil’s financial system stability have allowed investment to proceed with a low level of risk to investors. The largest share of investment is going into the commodity sector because the worldwide boom in commodities this decade has made such investment very profitable. Bahia has been expanding at a strong pace, and the IMF forecasts that Brazil’s overall economy will grow at the rate of 5% in 2010.
  • 6. Brazil Economic Development Axles Main Areas Ferrovia Macro Projects Transnordestina Rodovia Northeast Belém-Brasília Ferrovia Norte Sul Integration Area Hidrovia São Francisco Ferrovia da Integração Oeste Leste Complexo Portuário da Baía de Todos os Santos Porto Sul Southeast Sub rótula de Integração Ferrovia Oeste Leste Ferrovia Norte Sul Ferrovia FCA Ferrovia Transnordestina Ferrovia Carajás Rod. Belém - Brasília
  • 7. Bahia Economic Prospects Bahia trade costs play an important role in attracting FDI. The availability of infrastructure, such as Oeste Baiano railway lines, Ports, and roads is positively correlated with investments foreign entry. Porto Sul • Population: 14 Millions 14,1 milhõe • Área: 567.000 Km2 • 36 % of Norteast region • 1.183 km Coastline • 6ª State economy in Brasil
  • 8. Bahia Economic Data Triple Economic Concentration Espacial (RMS) Sectorial (Petrochemical) Capital Owners Bahia Economic Data RMS Fonte: SEI
  • 9. Bahia Economic Data Agro business areas Juazeiro West (Soja) Northeast (Fruticultura) Oeste South (Celulose) AGRICULTURE Production concentration Extremo Sul
  • 10. Bahia Economic Data Taxes Revenues: Evolution and Main sectors RECEITAS CORRENTES 2008 EVOLUÇÃO ICMS NOMINAL ICMS POR SETOR
  • 12. Bahia Iron Ore Reserves -Railway and port
  • 13. Porto Juazeiro Br-116 Bridge between Transport – PAC (Growth BA/PE Conbstruction Program) Paulo Afonso Juazeiro Ferrovia BR - 116 Oeste-Leste Sento Sé BR-101-Duplication. BR-324 Formosa do Rio Preto Barra Complexo Viário BR - 135 2 de Julho-aeroporto Salvador 01 Feira de -1 BR Ibotirama Santana BR - 242 Barreiras BR - 242 São Félix BR - 324 RailwayCamaçari – Arat Seabra Camaçari ( Paving BR - 135 Bom Jesus Salvador da Lapa BR-135 PI/BA/MG Jequié Railway Cocos São Félix/Cachoeira 116 Malhada BR - Subway Sysrtem Salvador Multimodal Integration Vitória da Conquista BR- Concessão 242/Waterway/FCA/Port PPP-BR-116/324 of Aratu Porto Sul Waterway dredging S.Francisco River Harbor Expressway BR - 101 and rail access to Port of Juazeiro Salvador
  • 14.
  • 15. Hidrovia São Francisco Infrastructure Logístic Structural Axles Sistema BA 093 Sistema BR 324 / BR 116 122 ( Concessão / Duplicação ) BR- Oeste Baiano BR 101 ( Norte: Duplicação Feira / divisa SE ) ( Sul: Duplicação Feira / divisa ES ) BR 030 ( Complementação / Pavimentação ) 22 BR-1 BR 251/ BR 415 ( divisa MG - BR 101 - acesso Porto Sul 001 /Duplicação Ilhéus - Itabuna ) BA- Porto Sul BR 235 ( Complementação / Pavimentação ) BR 122 ( Construção / Pavimentação Juazeiro / Seabra / Caetité ) BA 001 ( Construção ) Canavieiras / Belmonte / Trancoso Prado / Caravelas / Nova Visçosa
  • 16. INVESTIMENTOS NA ÁREA DE INFLUENCIA DA FERROVIA OESTE LESTE Seguimento / Empresa Localização Atividade / Produto Empregos Investimento EMPRESAS EM FASE DE IMPLANTAÇÃO 2008 4.792 R$ 4.696.000.000 Bahia Mineração Caetité Mineração de ferro 1.000 R$ 3.680.000.000 Mirabela Mineração Itagibá / Ipiaú Concentrado de Níquel 3.450 R$ 900.000.000 Vanádio de Maracás Maracás Ferro Vanádio e Gusa 200 R$ 216.000.000 Fianco Agrícola ltda. LEM Biodiesel 142 R$ 130.000.000 Outros 199 R$ 4.040.000 PROTOCOLOS DE INTENÇÃO ASSINADOS EM 2008 970 R$ 680.000.000 Multigrain S.A. São Desidério Alcool e Energia elétrica 250 R$ 500.000.000 Bioclean Energy LEM Oleos,farelos,glicerina,tortas 220 R$ 120.000.000 Valmesa-Valadares Metalurgia Jequié Ferro Gusa 500 R$ 60.000.000 Outros 821 R$ 12.054.000 TOTAL 5.762 6.506.000.000
  • 17. Structural logistic Axles Federal and State Roads Structural Axles BR 242 Restoration and construction of stretches BR 242 and adequacy of capacity between Luís Eduardo BA 160 e Castro Alves Magalhães BR 116 Investiment: R$ 841 millions BR 324 Start: 2009 - PNLT TO/BA border and intersection with BA 460 Investiment: R$ 110 millions Start: 2009 - PNLT BR-324 / BR-116 Road Ring and duplication of the 116 (recovery and increase of capacity of traffic) Salvador – Feira de Santana Start: 2009
  • 18. Airports SALVADOR Ampliação do terminal de passageiros e de cargas Implantação de nova pista Construção de novos fingers Novo aeroporto de ILHÉUS Terminal de passageiros e cargas, área para galpões industriais e acesso rodoviário. PORTO SUL PORTO SEGURO Terminal de passageiros e cargas e acesso rodoviário Início: 2008 Barreiras, Vitória da Conquista e PETROLINA Ampliação e Recuperação - PPA
  • 19. São Francisco River Port B U C O P E R N A M Maranhão Í HIDROVIA U A Paulo I Afonso ALAGOAS Juazeiro P E BR Sento Sé I P - 11 S Xique-Xique S E R G 6 C A N T I N Tocantins - Luis Eduardo Magalhães Serrinha Feira de Esplanada Santana BR 242 Alagoinhas Mato Grosso T O Barreiras Do Sul Boquira O Salvador Bom Jesus I C 1 - - 10 Correntina da Lapa G O I Á S T Sta. Maria da BR Tanhaçu  N Vitória Jequié COMPLEXO PORTUÁRIO Goiás Caetité SALVADOR - ARATU T L Brumado Guanambi 16 E OUTROS -1 A BR Vitória da Itabuna Porto Sul Conquista Ilhéus O Curto Prazo E A N M I N A S G E R A I S PORTO SUL Hidrovia C Eunápolis O FERROVIA Porto Seguro Porto Sul - 101 OESTE LESTE BR - Plataforma Juazeiro/Aratu Inclui 6 km de ferrovia ( Porto Juazeiro / FCA) ESPÍRITO FERROVIA SANTO Complexo Portuário Salvador – Aratu e Outros EXISTENTE - FCA
  • 20. Bahia Economic Data Semi-árido Population 6,7 milhões 48 % do Estado 68 % da área do Estado Income Per Capita R$ 3.572,00 Fonte: IBGE.
  • 21. Power Plants UTE Pecém II UTE Vale do Açu-Gás UTE Potiguar III UTE Pau Ferro UHE Estreito UHE Dardanelos UHE Rondon II UHE São Salvador UTE Termomanaus UHE Corumbá III UTE Camaçari Muricy I UTE Goiânia II UHE Batalha UTE Camaçari Muricy II UHE Barra dos Coqueiros UHE Caçu UHE Serra do Facão UTE Camaçari Pólo de Apoio UHE Retiro Baixo UHE Salto UHE Baguari UHE Olho d´Água UHE Baú I UTE Quirinópolis (BC) UHE Foz do Rio Claro UHE Barra do Braúna UHE Salto do Rio Verdinho UHE Simplicio UTE Três Lagoas (GN) UTE Colorado BC UTE Interlagos BC UTE Santa Isabel BC UTE São José BC UTE Costa Pinto BC UTE Rafard BC UHE Foz do Chapecó UHE Mauá UTE São João Biogás UHE Salto Pilão UTE Cubatão GN UHE Passo São João UHE Pai-Querê UHE São José UHE Monjolinho UHE 14 de julho UTE Canoas (ampliação) GN UHE Castro Alves UTE Jacuí C UTE Candiota III C Em implantação
  • 22. BAHIA Oil & Gás Petróleo e Gás Natural 04. Refinaria Landulpho Alves Mataripe - RLAM 1.800.000.000,00 Petrobrás SEI: R$ 3.555 bilhões Campo de Manati Já foram realizadas 99% das obras. O total estimado é de R$ 210 mi. Estão 40.000.000,00 PPP 2007 previstos p/ 2007 R$ 40 milhões. Gasene Invest. Realizado até abril de 2007 R$ 400 milhões e estão previstos para 2007 mais R$1,95 bi. Segundo a SEI este valor é de R$ 2,9 Bilhões. Segundo o site:w w w .gasnet.com.br PARA A BAHIA U$$ 882 milhões, 1.600.000.000,00 Petrobrás Ba-ES 2009 cerca de R$ 1,6 bilhão. Usina de biodiesel em Candeias Valor fornecido pela SEI. Segundo site da Rede Baiana de Biocombustíveis o valor é de U$$ 20 mi (em reais cerca de 36 milhões).w w w .rbb.ba.gov.br 78.000.000,00 Petrobrás Bahia 2007 em 29/9/06 Subtotal 3.518.000.000,00 Sub total 3.518.000.000,00
  • 23. Oil Industry Investments •The oil giant Petrobras had total revenues of $92B in 2008 and a total profit of $14B. This placed the company in the 25th rank in the Forbes Global 2000 list. •Brazil has 12.6 billion barrels of proven oil reserves, the second-largest in South America after Venezuela. •Petrobras has announced the world’s largest capital expenditure programme, worth $174 billion over the next five years.
  • 24. Ilhéus Porto Sul **Booz Allen
  • 25. Sistema Recôncavo Ferrovia Camaçari - Aratu Investimento: 120 milhões (PAC) Projeto Executivo concluído/ construção Ministério dos Transporte Via Portuária Custo Estimado: 340 milhões Extensão: 43 km Percurso: Porto SSA / BR 324 Estrutura: Túneis elevados, pista de rolamento, passarelas, ciclovias, calçadões, faixa de tráfego Fluxo Estimado: 63 mil veículos / dia Acesso Ferroviário Porto SSA Área Retroportuária do Cia Complexo 2 de Julho Viadutos Av. Caribé-Aeroporto ; SSA-Lauro de Freitas BA - 026 (CIA-Aeroporto) ; Estrada do Coco - São Cristovão
  • 26. Minimum Qualification Structure for Mobility in RMS for the 2014 World Cup Tipo 1 – Rapid Transport Tipo 1 – Rapid Transport Tipo 2 --Bus Tipo 2 Bus Subway Subway PIRAJÁ RETIRO ACESSO NORTE
  • 27. TABELA - PROJETOS DE MOBILIDADE COPA 2014 Projetos Prioritários PROJETO CARACTERIZAÇÃO Projeto Componente da Matriz de Responsabilidades - COPA (Firmada entre os Governo Federal, Estadual e Municipal em 13 de janeiro de 2010) - Com Recursos Definidos (PAC COPA) • Corredor Estruturante de transporte de alta capacidade em BRT; CORREDOR ESTRUTURANTE • Conexão Metropolitana; 1 570.316.000,00 AEROPORTO / ACESSO NORTE • Acessibilidade ao Estádio da Fonte Nova (COPA 2014). Projetos Componentes da Matriz de Responsabilidades - COPA (Firmada entre os Governo Federal, Estadual e Municipal em 13 de janeiro de 2010) - Sem Recursos Definidos • Corredor de transporte de alta capacidade, modo CORREDOR ESTRUTURANTE BRT, com 14,8 km de extensão; 2 260.542.059,06 AEROPORTO / LAURO DE FREITAS • Componente do Sistema Integrado de Transporte Metropolitano 3 • Corredores de transporte de média capacidade, 4 modo BRT, com 18,6 km de extensão; CORREDOR TRANSVERSAL • Corredores alimentadores do Corredor Estruturante 481,079.498,31 ALIMENTADOR - I Aeroporto/Acesso Norte; 5 • Componentes do Sistema Integrado de Transporte Metropolitano • Corredor de transporte de alta capacidade, modo BRT, com 10 km de extensão; CORREDOR ESTRUTURANTE IGUATEMI - • Componente do Sistema Integrado de Transporte 6 LAPA Metropolitano, complementa o Corredor Estruturante Aeroporto/Acesso Norte, em uma conexão urbana; • Permite a racionalização operacional Projetos Complementares • Corredores de transporte de média capacidade, modo BRT, com 14,5 km de extensão; CORREDOR TRANSVERSAL • Componentes do Sistema Integrado de Transporte 7 481.702.366,45 ALIMENTADOR II Metropolitano; • Corredores alimentadores do Corredor Estruturante Aeroporto/Acesso Norte; Micro Acessibilidade • Acesso de veículos à nova Arena da Fonte Nova e melhoramentos no tráfego no seu entorno Rotas acessíveis 1 e 2 8 Acessibilidade à Arena da Nova Fonte Nova • Rotas accessíveis para pedestres e bicicletas - 39.118.000,00 acesso à Arena e Metrô • Projeto de acordo com as leis de acessibilidade universal (Lei Federal 10.098/2000, 10.048/2000 e Decreto Presidencial 5296/2004)
  • 28. INTEGRATED Accessibility CUP 2014 New Road Station
  • 29. Parallel Avenue pathways Cross / Terminal Integration Lauro de Freitas Salvador Cajazeiras Baía de Todos São Cristovão os Santos Pau da Lima Estação Mussurunga Pirajá Terminal Alphavile Aeroporto Terminal Malvinas CAB Av. Paralela Metrô Itapuã Lapa Terminal CAB Piatã Campo da Acesso Norte Jaguaribe Pólvora Terminal Imbuí Boca do Rio Lapa Fonte Nova Oceano Atlântico
  • 30.
  • 31. Why Invest in Bahia? • The World Bank predicts that if Brazil continues on the path it is on now, it will move from being the tenth largest economy in the world today to the fifth largest by 2016. • The sense of urgency created by the advent of the World Cup in 2014 and the Olympics in 2016 can be very positive for Brazil as this stirs the public and private sectors to carry out badly needed infrastructure investments.
  • 32. Atraction of foreign direct investment (FDI) Industrial Tax Incentives Market and supplier access are the main factors affecting investments entry. Also the access to customers and suppliers of inputs are key determinants of FDI inflows. Our Governments spend large sums of money to entice foreign direct investment (FDI), offering generous tax incentives. We believe that foreign firms will generate positive externalities on domestic firms. The Bahia State Programs: Desenvolve and Probahia support with tax isention the atraction of foreign direct investment (FDI) .
  • 33. Thank you Very Much www.seplan.ba.gov.br