Part 01 of 09
                Overview to Lean Six Sigma




Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Copyright License




                         This work is licensed under the Creative Commons Attribution-
                       ShareAlike 3.0 Unported License. To view a copy of this license, visit
                       http://creativecommons.org/licenses/by-sa/3.0/ or send a letter to
                    Creative Commons, 171 Second Street, Suite 300, San Francisco, California,
                                                  94105, USA.

            LASSIB Team
                                                                                                 2
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Enterprise-wide View




History of                           Value and                  Value and                 Integration of lean     Business                     Six sigma and lean
continuous                           foundations of six         foundations of            and six sigma           processes and                applications
improvement                          sigma                      lean                      •The relationship       systems                      •How these tools are
•The origins of                      •The value of six          •The value of lean, its    between lean and six   •The relationship among       applied to processes in
 continuous                           sigma, its                 philosophy, history,      sigma.                  various business             all types of enterprises:
 improvement and its                  philosophy, history, an    and goals.                                        processes                    manufacturing, service,
 impact on other                      d goals.                                                                     (design, production, pu      transactional, product
 improvement models.                                                                                               rchasing, accounting, sa     and process
                                                                                                                   les, etc.) and the impact    design, innovation, etc.
                                                                                                                   these relationships can
                                                                                                                   have on business
                                                                                                                   systems.




                                                                                                                                                                        3
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
The origins of continuous improvement and its impact on other improvement


                HISTORY OF CONTINUOUS IMPROVEMENT
                models




                                                                                            4
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
History of continuous Improvement

                               WESTERN MODELS                   EASTERN MODELS

                            • W Edwards                        • 7 QC Tools
                              Deming                           • New 7 Tools
                            • Joseph M Juran                   • Quality Circles
                            • Phil Crosby                      • Kaizen
                            • Walter Shewhart                  • Poka Yoke
                            • Value Engineering                •5S
                            • IDEAL Model                      • TPM
                                                               • Just-In Time




                                                                                   5
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
W Edwards Deming – The Deming Wheel




Source:
     http://www.aacc.org/SiteCollectionDocuments
     /hall_of_fame/Deming_W_Edwards_200.gif




                                                                Source: http://upload.wikimedia.org/wikipedia/commons/7/7c/PDCA-Cycle.png




                                                                                                                                        6
 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
 Release date: 8th Feb, 2011  Version: 1.0
W Edwards Deming – Deming’s 14 principles
     Deming offered fourteen key principles for management for transforming business effectiveness. The
     points were first presented in his book Out of the Crisis.


     1.         Create constancy of purpose toward improvement of product and service, with the aim to become
                competitive and stay in business, and to provide jobs.
     2.         Adopt the new philosophy. We are in a new economic age. Western management must awaken to
                the challenge, must learn their responsibilities, and take on leadership for change.
     3.         Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass
                basis by building quality into the product in the first place.
     4.         End the practice of awarding business on the basis of price tag. Instead, minimize total cost. Move
                towards a single supplier for any one item, on a long-term relationship of loyalty and trust.
     5.         Improve constantly and forever the system of production and service, to improve quality and
                productivity, and thus constantly decrease cost.
     6.         Institute training on the job.
     7.         Institute leadership. The aim of supervision should be to help people and machines and gadgets to
                do a better job. Supervision of management is in need of overhaul, as well as supervision of
                production workers.




                                                                                                                      7
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
W Edwards Deming – Deming’s 14 principles
     8.         Drive out fear, so that everyone may work effectively for the company.
     9.         Break down barriers between departments. People in research, design, sales, and production must work
                as a team, to foresee problems of production and in use that may be encountered with the product or
                service.
     10.        Eliminate slogans, exhortations, and targets for the work force asking for zero defects and new levels of
                productivity. Such exhortations only create adversarial relationships, as the bulk of the causes of low
                quality and low productivity belong to the system and thus lie beyond the power of the work force.
     11.        Eliminate work standards (quotas) on the factory floor. Substitute leadership. Eliminate management by
                objective. Eliminate management by numbers, numerical goals. Substitute workmanship.
     12.        Remove barriers that rob the hourly worker of his right to pride of workmanship. The responsibility of
                supervisors must be changed from sheer numbers to quality. Remove barriers that rob people in
                management and in engineering of their right to pride of workmanship. This means, inter
                alia, abolishment of the annual or merit rating and of management by objective.
     13.        Institute a vigorous program of education and self-improvement.
     14.        Put everyone in the company to work to accomplish the transformation. The transformation is everyone's
                work. "Massive training is required to instill the courage to break with tradition. Every activity and every
                job is a part of the process."




                                                                                                                               8
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
W Edwards Deming – Seven Deadly Diseases

       The Seven Deadly Diseases (also known as the "Seven Wastes"):
       1.         Lack of constancy of purpose
       2.         Emphasis on short-term profits
       3.         Evaluation by performance, merit rating, or annual review of performance
       4.         Mobility of management
       5.         Running a company on visible figures alone
       6.         Excessive medical costs
       7.         Excessive costs of warranty, fueled by lawyers who work for contingency fees


       A Lesser Category of Obstacles:
               Neglecting long-range planning
               Relying on technology to solve problems
       •


               Seeking examples to follow rather than developing solutions
       •


               Excuses, such as "Our problems are different”
       •
       •




                                                                                                 9
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Joseph M Juran – The Pareto Principle

        It was in 1941 that Juran                                                                            The Pareto principle of Time vs. Results

        discovered the work of
        Vilfredo Pareto
•

                                                                                                                                           20% of
        Juran expanded the Pareto                                                                                                          results
        principle applying it to
        quality       issues     (for
•

                                                                                                             80% of time
        example, 80% of a problem                                                                             expended
        is caused by 20% of the
                                                               Source:
                                                                    http://img.freebase.com/api/trans/imag



        causes)
                                                                    e_thumb/en/joseph_m_juran?pad=1&ma

                                                                                                                                           80% of
                                                                    xheight=110&mode=fillcropmid&maxwi


                                                                                                                                           results
                                                                    dth=110


        This is also known as "the
        vital few and the trivial
        many". In later years Juran
•

                                                                                                             20% of time
        has preferred "the vital few
        and the useful many" to
        signal that the remaining
        80% of the causes should not
        be totally ignored




                                                                                                                                                        10
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Joseph M Juran – The Management Thoery
               When Juran began his career in the 1920s the principal focus in quality management was on the quality of
               the end, or finished, product
       •

               The tools then used were from the Bell system of acceptance sampling, inspection plans, and control
               charts. The ideas of Frederick Winslow Taylor dominated
       •

               Juran is widely credited for adding the human dimension to quality management. He pushed for the
               education and training of managers
       •

               For Juran, human relations problems were the ones to isolate. Resistance to change—or, in his
               terms, cultural resistance—was the root cause of quality issues. Juran credits Margaret Mead's book
               Cultural Patterns and Technical Change for illuminating the core problem in reforming business quality.
       •


               He wrote Managerial Breakthrough, which was published in 1964, outlining the issue
               Juran's vision of quality management extended well outside the walls of the factory to encompass non-
               manufacturing processes, especially those that might be thought of as service related. For example, in an
               interview published in 1997 he observed:
       •


                    “The key issues facing managers in sales are no different than those faced by managers in other
                    disciplines. Sales managers say they face problems such as "It takes us too long or we need to reduce
                    the error rate." They want to know, "How do customers perceive us?" These issues are no different
                    than those facing managers trying to improve in other fields. The systematic approaches to
                    improvement are identical…
                    There should be no reason our familiar principles of quality and process engineering would not work
                    in the sales process…”




                                                                                                                            11
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Joseph M Juran – The Quality Trilogy

      QUALITY PLANNING                                                   QUALITY CONTROL (DURING OPERATIONS)


                                                                      Sporadic
                                                                        zone
                                       40 -
     (as a % of operating budget)
          Cost of poor quality




                                                                                                    Original zone of
                                                                                                    quality control

                                       20 -                  Chronic waste
                                                            (an opportunity




                                                                                                                                    Savings
                                                           for improvement)
                                                                                                                        New zone of
                                                                                                                       quality control


                                                                                             QUALITY IMPROVEMENT

                                         0                        Time

                                                               Lessons learnt




                                                                                                                                              12
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Philip Crosby
          Philip Crosby started the management consulting company Philip Crosby
          Association, Inc
 •

          This consulting group provided educational courses in quality
          management both at their headquarters in Winter Park, Florida, and at
          eight foreign locations. In 1979 Crosby published his first business book,
 •


          Quality Is Free. This book became popular at the time because of the crisis
          in North American quality
          During the late 1970s and into the 1980s North American manufacturers
          were losing market share to Japanese products largely due to the
          superiority of quality of the Japanese products.
 •


          Crosby's response to the quality crisis was the principle of "doing it right
          the first time" (DIRFT). He would also include four major principles:
 •

            – the definition of quality is conformance to requirements
            – the system of quality is prevention
            – the performance standard is zero defects
            – the measurement of quality is the price of nonconformance
                                                                                         Source:
                                                                                             http://www.wppl.org/wphistory/phili
                                                                                             pcrosby/PhilipCrosby.jpg




                                                                                                                                   13
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Philip Crosby’s Quality Improvement Program


       1.           Management is Committed to Quality         8.    Train supervisors in quality
       2.           Create Quality Improvement Teams                 improvement
       3.           Measure processes to determine             9.    Hold zero defects days
                    current and potential quality issues       10.   Encourage employees to create their
       4.           Calculate Cost of (poor) Quality                 own quality improvement goals
       5.           Raise Quality Awareness of all             11.   Encourage employee communication
                    Employees                                        with management about obstacles to
       6.           Take Actions to Correct Quality                  quality (Error-Cause Removal)
                    Issues                                     12.   Recognise participants’ effort
       7.           Monitor progress of quality                13.   Create quality councils
                    improvement – establish a zero             14.   Do it all over again – quality
                    defects committee                                improvement does not end




                                                                                                           14
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Philip Crosby’s Stages


Uncertainty                                    Awakening            Enlightenment     Wisdom                      Certainty

      • COPQ : 20%                                   • COPQ : 18%      • COPQ : 12%     • COPQ : 8%                   • COPQ : 2.5%
      • Blame QD                                     • QM begins       • CA             • DP is routine               • QI is normal




   Crosby's name is best known in relation to concepts of “Do it Right, First time” and
   “Zero Defect”.



                                                                                                          COPQ - Cost of Poor Quality
                    Quality is defined as
               conformance to requirements,
                                                                                                          QD – Quality Deployment

              not as “goodness” or “elegance”.                                                            QM –Quality Management
                                                                                                          CA – Cost Acceptance
                                                                                                          DP – Defect Prevention
                                                                                                          QI – Quality Improvement




                                                                                                                                        15
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Walter Shewhart
               Statistical Process Control (SPC) is an
               effective method of monitoring a process
               through the use of control charts.
       •


               Control charts enable the use of objective
               criteria for distinguishing background
               variation from events of significance based
       •

               on statistical techniques. Much of its power
               lies in the ability to monitor both process
               center and its variation about that center.
               By collecting data from samples at various
               points within the process, variations in the
                                                                 Source:


               process that may affect the quality of the end
                                                                     http://www.firstmetre.co.uk/image.php?
       •

               product or service can be detected and
                                                                     w=250&h=334&f=/UserFiles/Image/Oc
                                                                     tober+Images/Shewhart-c1926.jpg


               corrected, thus reducing waste as well as the
               likelihood that problems will be passed on to
               the customer.
               Because of its emphasis on early detection
               and prevention of problems, SPC has a
               distinct      advantage      over       quality
       •

               methods, such as inspection, that apply
               resources to detecting and correcting
               problems in the end product or service.




                                                                                                              16
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Walter Shewhart – Father of Statistical Process Control

       Statistical Process Control is the application of statistical techniques in the
          Control of processes
                                                                             Define
                                                                            Problem

                                                               Implement                    Define
                                                                Solution                    Process




                                                                Analyze                   List Possible
                                                                 Data                       Reasons

                                                                           Collect Data




                                                                                                          17
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Value Engineering
                                                                                       Value Engineering objective:
                                                                         To develop the best solution to meet the project objective


                                                                                       Step 1: Information gathering
                                                                                          Define project objective
                                                                                        Develop terms of reference
                                                                                      Identify assumptions and facts
                                                                         Gather information (physical parameters, cost, schedule)


                                                                                         Step 2:Function analysis
                                                                          Analyze functions required to deliver project objectives
                                                                                    Describe each identified functions
                                                                                    Classify functions: Basic functions


                                                                                             Step 3:Value analysis
                                                                     Creatively identify options and alternatives to perform functions
                                                                                               Research options
                                                                                       Identify cost and cost benefits                            Idea roots identified for
                                                                                 Identify risks (barriers and uncertainties)                           further analysis
              Alternative solutions to
                   perform functions

                                                                                           Step 4:Option evaluation
                                                               Evaluate idea roots developed in Step 3 and identify those for further analysis
                                                                Compare solutions and screen out unfeasible / least valuable alternatives
                                                                               Identify solutions for further analysis (iterate)                 Screen out unsuitable
                                                                                                                                                     options


                                                                                             Step 5:Judgment
                                                                              Use judgment to identify the best value solution




                                                                                                                                                                              18
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
IDEAL Model
                                                                 Analyze and                             Learning
                                                                  validate
                                      Implement                                   Propose future
                                       solution                                      actions

      Acting


                                                                                                                                    Build                 Set     Stimulus for
                                                                                                                                                                     change
                                                                                                        Charter
                Refine solution
                                                                                                    infrastructure               sponsorship            Content

                                                                                                                                           Initiation


                                                                                                          Characterize
       Pilot / test solution                                                                            desired & current
                                                                                                              state




                                                                                                       Develop
                Create solutions
                                                                                                   recommendations
                                                                                                                            Diagnosis



                                     Plan actions                                 Set priorities

                                                               Develop approach


                                                                Establishing




                                                                                                                                                                                 19
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Seven QC tools
                                                                                                          Check sheets


                                      Process behavior / Control charts
                                                                                                                                                                    Pareto diagram




                                      Graphs
                                                                                                                                                                                       Fish bone diagram




                                                                             Histograms
                                                                                                                                        Scatter diagrams
Source: http://media.texample.net/tikz/examples/PNG/pie-chart.png




                                                                                                                          Source: http://farm3.static.flickr.com/2671/4235318918_15e2a8feaf.jpg
                                    Source: http://upload.wikimedia.org/wikipedia/commons/c/c7/Histograma_pisuaktom.JPG




                                                                                                                                                                                                           20
  Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
  Release date: 8th Feb, 2011  Version: 1.0
Release date: 8th Feb, 2011  Version: 1.0
                                                                                                       Matrix diagrams




Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
                                                                                                                                                  Arrow diagrams
                                                                                                                                                                                    New Seven QC Tools




                                                                                      Matrix data analysis
                                                                                                                                                                                 Affinity Diagrams




                                                                                       program chart
                                                                                      Process decision
                                                                                                                                                    Relationship Diagrams




                                                                                                       Tree Diagrams




                                                               Source:
                                                               Affinity Diagram: http://farm4.static.flickr.com/3136/2583400109_7c57ff718c_o.png
                                                               Relationship Diagram: http://upload.wikimedia.org/wikipedia/commons/b/b7/Typical_dependency_relations_between_AIS_services.JPG
                                                               Tree Diagram: http://farm1.static.flickr.com/14/15276524_45307f082d.jpg
                                                               Process decision program chart: http://1.bp.blogspot.com/_5ieXw28ZUpg/SULVbS2LvxI/AAAAAAAAAwI/SPYcwibZkfE/s1600-h/obap2.PNG
                                                               Matrix data analysis: http://upload.wikimedia.org/wikipedia/commons/7/76/Folio_Plot_BCG_Matrix_Example.png
21




                                                               Matrix diagrams: http://farm3.static.flickr.com/2182/2040911590_f6f946e72a_o.png
                                                               Arrow diagrams: http://upload.wikimedia.org/wikipedia/commons/a/af/Linalg_map_change_basis_3.png
Quality Circle Concept

     S.No.             Particulars                             What they mean?

         1             Concept                                 The main objective of Quality Circles is “self” and mutual
                                                               development, cohesive team work and to be engaged in continuous
                                                               improvement activities, thus improving their quality of work life
         2             Identification of problem               QC Members with the help of Round Robin Method, try to identify
                                                               their own day to day work related problems
         3             Problem selection                       Identified problems are segregated into three categories based on
                                                               difficulty of their solution
         4             Meetings                                QCs have periodic meetings to discuss, analyze and find solutions to
                                                               the problems on a pre-fixed schedule
         5             Various problem solving steps           QCs follow a 12 step methodology, starting from identification of
                                                               problems to solution, implementation, follow up and review.
         6             Approval of project                     Project has to be approved by the Steering Committee or the
                                                               executives nominated by the Steering Committee.
         7             Gains                                   The aim of QC is to “develop people”. In other words, self and mutual
                                                               development through QC activities. Hence, the focus is not on gains in
                                                               terms of money




                                                                                                                                    22
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Kaizen

       • Japanese term that means continuous improvement, taken from words:
          – ‘kai' which means continuous
          – 'zen' which means improvement
       • Kaizen, or rapid improvement processes, are the building block of all Lean
         production methods. Kaizen philosophy implies that all, incremental
         changes routinely applied and sustained over a long period result in
         significant improvements
       • The kaizen strategy aims to involve workers from multiple functions and
         levels in the organization in working together to address a problem or
         improve a particular process
       • The team uses analytical techniques, such as Value Stream Mapping, to
         quickly identify opportunities to eliminate waste in a targeted process.
         The team works to rapidly implement chosen improvements




                                                                                      23
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Kaizen – Continuous improvement
                                                               Do it again

                                                                             Document
                                                 Celebrate
                                                                              reality




                                                                                        Identify       Start
                            Standardize                                                                here
                                                                                         waste




                              Measure                                                   Eliminate
                              results                                                     waste




                                                   Verify                     Reality    For counter
                                                  changes                     check       measures

                                                                 Make
                                                                changes




                                                                                                               24
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Poka Yoke / Mistake Proofing - Overview
                               • A technique for eliminating errors
                               • Making it impossible to make mistakes


                                   Elimination
     Best
                                              Eliminate the possibility of error
                                   Replacement
                                      –



                                                                                      Use the highest level
                                              Substitute a more reliable process

                                                                                        possible for the
                                   Facilitation
                                      –

   Better
                                                                                           application.
                                              Make work simpler to perform
                                   Detection
                                      –


                                              Detect the error at the defect source
     Good                          Mitigation
                                      –


                                      –       Minimize the effect




It is good to do it right the first time; it is even better to make it impossible to do it wrong the first time.




                                                                                                               25
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Poka Yoke / Mistake Proofing - Examples

       • While closing a word document, one is asked
         whether to save the file or not
       • Spelling check option in a word document




                                                               Source: http://upload.wikimedia.org/wikipedia/commons/0/04/DIN_lang_-_Letter_Window.JPG
       • In three pin plugs / socket, the earth pin / socket
         is larger in length and diameter so that one
         doesn’t mistakenly insert it otherwise
       • The window in a envelop ensures that right
         content reaches the right person
       • The fuse box in a house is meant to prevent fire in
         electrical systems




                                                                                             26
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
5S – A Framework to create and maintain your workplace




•Means SORT -
                                                          SEITON        •Means SHINE -
                                                                                                     SEIKETSU           •Means SUSTAIN – Self
 Organization                                                            Cleanliness                                     discipline
•Distinguish between                          •Means SET IN ORDER       •Cleaning and looking   •Means STANDARDIZE      •Stick to the
 what is and is not                            - Orderliness             for ways to keep it     – Adherence             rules, scrupulously
 needed                                       •A place for everything    clean                  •Clearly define tasks
                                               and everything in its                             and procedures


             SEIRI                                                               SEISO                                       SHITSUKE
                                               place




                     Implementing the 5S is often the first step in Lean Transformation




                                                                                                                                            27
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
TPM - Total Productive Maintenance

       • TPM (Total Productive Maintenance) seeks to engage all levels and
         functions in an organization in maximizing the overall effectiveness of the
         process
       • TPM's goal is the total elimination of all losses
       • TPM focuses on preventing:
          – Breakdowns (preventive maintenance)
          – “Mistake-proofing" the equipment (or poka-yoke) to prevent
            breakdowns
          – Make maintenance easier (corrective maintenance)
          – Designing and installing equipment that needs little or no
            maintenance (maintenance prevention)
          – Quickly repairing equipment after breakdowns occur (breakdown
            maintenance).




                                                                                       28
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Release date: 8th Feb, 2011
                                                                Autonomous Maintenance




                             Version: 1.0
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
                                                                   Focus Improvement




                                                                  Planned Maintenance




                                                                  Quality Maintenance
                                                                                                            TPM - Total Productive Maintenance



                                                                                             8 Pillars of TPM




                                                                   Initial Flow Control




                                                                  Education & Training




                                                               Safety, Health &Environment




                                                                      TPM in office
29
Just in Time (JIT)

            • Just In Time (JIT) is a manufacturing philosophy which leads to
              "Producing the necessary units, in the necessary quantities at the
              necessary time with the required quality”
            • It is an approach to achieving excellence in the reduction or total
              elimination of waste (Non-Value Added Activities)
            • Examples of waste according to JIT:
               – Overproduction
               – Unneeded Inventory
               – Defective Products
               – Transport and Waiting Time




                                                                                    30
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
The value of six sigma, its philosophy, history, and goals
                VALUE AND FOUNDATION OF SIX SIGMA




                                                                             31
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Evolution of Quality
                                                                                                                                      LEAN ENTERPRISE


                                                                                           ROBUST PROCESS     BUSINESS INTELLIGENCE
                                                                                           DESIGN


                                                                              DOE
                                                                                                                                                          BUSINESS RESULTS


                                                                                     ECONOMETRICS
                                                                                                                                 BUSINESS PROCESS MANAGEMENT



                                                          DMAIC


                                            RCM

                                                                                                                  DFSS
         TPM



                                                                                    TEAM BUILDING
                                5S                                                                                                        FMEA

  SPC
                                                                                           CONCURRENT ENGINEERING

                                                                  ZD
                                                                                                                                            QFD
                                                                                                             VE
                                                      TQM
                                                                                                                                                                     DF(X)


                       KAIZEN                                          CQI   PROBLEM SOLVING
                                                                                                        STRATEGY
    7 QCT                                                      PDCA




                                                                                                                                                                             32
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
INDUSTRY SNIPPETS

'No matter which level of Six Sigma training the respondents completed, their average salaries
are higher than the respondents who didn't complete any Six Sigma training.’


'During the past 10 years Six Sigma has become one of the most widely practiced process
improvement methodologies in both service and manufacturing industries.’


'GE produces annual benefits of over $2.5 billion across the organization from Six Sigma.’


'The savings as a percentage of revenue for a company can vary from 1.2% to 4.5%.’


'Lean Six Sigma techniques implemented throughout the Army continue to prove successful, and
leaders anticipate reaching a $2 billion-savings mark this year.’




                                                                                                 33
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
What is Lean Six Sigma?


             A Set of Proven Tools and                                                  A set of proven tools and technique
             Techniques used to achieve                                                   used to solve business problems
             Business growth and goals                               Control
                                                                                   Define



                                                               Improve
             A framework that builds                                                                A mechanics to develop

                                                                                     Measure
             a Customer centric approach                                                           leadership talent within
             with a focus on delivering                                                                    an organization
             business results                                            Analyze




                                                                                                                              34
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Lean Six Sigma – Why is it so successful?



                                                                                         Highest
                                          Leaders
                                                               Lean and Six Sigma (6σ)




                                                                                          Skill

                                                                                         Medium
                                       Managers
                                                                    Larger % of           Skill

                                                                                         Lower
                                                                    employees in
                                                                    need of skills to


                                     Associates
                                                                                          Skill
                                                                    deliver
                                                                    customer value
                                                                    and Business
                                                                    Value




                                                                                                   35
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Historical Perspective



          1979:
        Motorola                                                1995: Jack                    2000: GE
        Starts Six                                                Welch                       Saves ~$2
          Sigma                                                Initiates Six                    Billion
        Initiative                                             Sigma in GE                     Annually




                                                1986:                          1998: Allied
                                              Motorola                         Signal Saves
                                             Saves ~$16                           ~$1.2
                                               Billion                            Billion




                                                                                                          36
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Mean vs. Variation




                                            Archer A                                               Archer B




                  Mean of Archer A is zero and that of Archer B is significantly higher. But which one would you choose?
      One that had inconsistent performance (Archer A, high variation) or one that was very consistent (Archer B, very low variation)




                                                                                                                                        37
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Statistical Perspective


                                                                      Mean = 20




        (Lower Specification)
                                                                      σ = 0.5                (Upper Specification)




                                                               σ                      σ


                                   A defect is any value that falls outside Customer Specifications




                                                                                                  23
                  17




                                                                   20




                                                                                                                     38
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Quantitative Perspective
                         99% Right (3.8 Sigma)                                   99.99966% Right (6 Sigma)

      No electricity for 7 hours per month                           No electricity for 1 hour every 34 years


      5,000 incorrect operations per week                            1.7 incorrect operations per week


      20,000 wrong prescriptions per year                            68 wrong prescriptions per year



                                                                   Defects per Million
                                                               σ
                                                                     Opportunities
                                                               1      697,672.15
                                                               2      308,770.21
                                                               3       66,810.63
                                                               4       6,209.70
                                                               5        232.67
                                                               6          3.40




                                                                                                                39
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Quantitative Perspective
                                                                                                             Airline fatality rate 0.52 PPM
                     Sigma (σ)
                                                    World Class, Six Sigma 3.4 PPM

                                                                                                         1:1,000,000

                                     Five Sigma 233 PPM

                                                                             Motorola 1990
                     Four Sigma 6,209 PPM



                                                                Hospital fatality rate due to mistakes
                                                                Restaurant bills
                                                      1:100     Doctor prescriptions
                                                                Payroll processing
                                                                Airline baggage handling


                                                      Three Sigma 66,810 PPM




                                          Two Sigma
                                          308,770 PPM




                                                                                                                                              40
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Customers Perspective

                                                      Six Sigma Starts and Ends with Customers

                                                                                  What is my
                                                                                customers view
                                                                                of the process?
                                                                  Are my                            What do the
                                                                customers                         customers expect
                                                               referring and                          out of the
                                                               buying again?                          process?

                                                                                 CUSTOMERS

                                                                                                    How do my
                                                               Is my customer
                                                                                                     customers
                                                                 satisfaction
                                                                                                    measure the
                                                                 increasing?
                                                                                                      process?
                                                                                 What is my
                                                                                 customers
                                                                                definition of a
                                                                                   defect?




                                                                                                                     41
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Operational Perspective



                                                                         Control
                                                                                        Define




                                                               Improve


                                                                                        Measure


                                                                              Analyze




                                                                                                  42
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
The value of lean, its philosophy, history, and goals
                VALUE AND FOUNDATION OF LEAN




                                                                        43
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN History


                                                                             Toyota
                                                                        Production System


                                                                              People
                                                                              People
                          •     Single Piece Flow                                                •   Automation




                                                               Just-in-Time
                          •     Pull Production                                                  •   Built-In Quality


                                                                              People




                                                                                            Jidoka
                          •     TAKT Time Production                                             •   Stopping at Abnormalities




                                                                               Heijunka

                                                                        •   Level Loading
                                                                        •   Sequencing
                                                                        •   Stability

                                                       Some Key Lean Concepts developed at Toyota




                                                                                                                                 44
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN Thinking

A principle driven, tool based philosophy that focuses on eliminating waste so that
           all activities/steps add value from the customers perspective.


                                 Lean Thinking is all about continuous waste elimination !

                                                               Imagine Office Processes with:

                                                               •   Higher Customer Satisfaction
                                                               •   Shorter Lead Time
                                                               •   Higher Flexibility
                                                               •   Higher Quality
                                                               •   Lower Costs
                                                               •   Higher Employee Satisfaction




                                                                                                  45
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN Explained

               A strategy, philosophy, process and leadership approach for operating in a
               superior way. Results include:
       •


                     – Reduced cycle times (product development and production)

                     – Increased quality

                     – Reduced costs and inventory

                     – Increased capacity potential

                     – Improved customer service

                     – High levels of worker involvement, ownership and commitment

                     – Improved financial returns



                                   Lean concepts apply across all processes and industries




                                                                                             46
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN Explained

           Earlier: Price = Cost + Profit                                                Now: Profit = Price - Cost

               Increase Profit by Price increase                                          Increase Profit by cost reduction
                                                                                     Price to sell
                                                                               1.5
   1.5

                                                                                                      Some profit      Bigger profit
                                                               Bigger profit
              Price to sell
     1                                                                          1
                                                                                     Cost of production
                                  Some profit



   0.5                                                                         0.5
                Cost of production



     0                                                                          0




                                                                                                                                       47
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Where are We going?
                                                                                               Advanced tools

                                                                                               Tool
                                                                                               • Creating Continuous Flow
                                                                                               • Pull production

                                                               Basic tools                     Challenge
                                                                                               • More waste reduction
                                                               Tool                               • Real continuous flow
                                                               • Value Stream                     • Flexible workforce
                                                                 Mapping, other lean              • Less variance
                                                                 tools, etc.                      • Less waste
                   Old situation
                                                               Results
                                                               • Reduction of waste
                   Issues                                      • Learned to ‘see the flow’
                   • Inventory                                 • Couple of improvements
                   • Waiting
                   • Defects                                   Remaining Issues
                   •…                                          • No real continuous flow
                                                               • Still significant amount of
                   No flow in the value                          waste.
                    stream.

                   Processes full of waste




                                                                                                                            48
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Lean Toolkit

                                               Level 1                                                   Level 2


                                                                                       Reduce Variability, Control the Process



                                            Expose the Waste                          • Value Stream Mapping
                                                                                      • Standardized Work
                                                                                      • Intro to Continuous Flow
                            • 5S                                                      • Intro to Pull Production
                            • MUDA
Tool Sophistication




                            • Mistake proofing
                            • Intro to Value Stream Mapping
                            • Visual Management




                Time / Cultural Maturity


                                                           Applying the right tools at the right stage




                                                                                                                                 49
    Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
    Release date: 8th Feb, 2011  Version: 1.0
Lean Tools Overview

                                               A number of Lean Tools and Techniques are available


                      Bring Organization &
                                                                                         5S Framework
                      Cleanliness to work
                      area
                                            Understand Value                                    Value Stream Mapping




                                                                                                                                 Tools and Techniques
                                        Implement pull-based flow                                        Kanban, Just-in Time
Action




                                                                Reconfigure work areas                        U-Shaped Cells

                     Institute continuous improvement philosophy                                                        Kaizen Events




                       Appropriate Tools and Techniques are to be used depending on the need




                                                                                                                                            50
 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
 Release date: 8th Feb, 2011  Version: 1.0
The relationship between LEAN and Six Sigma
                INTEGRATION OF LEAN AND SIX SIGMA




                                                               51
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN vs. Six Sigma


Methodology
Strengths




                            Define                              Measure                   Analyze                      Improve                    Control
                                                                                     Lean               Six Sigma


     Six Sigma            • VOC is Powerful                    • Confirms Data          • Data Driven               • Few Tools to            • Few Tools or
                                                                 Quality                  Analysis                    Create Change in          Direction
                                                                                                                      Critical X’s

                          • Value Stream                       • Standard Work         • Observation and            • Many Tools for          • Communicative
        Lean
                            Mapping . . .                        & Target                Intuition Based              Driving Change          • Centered on
                            Boundary less &                      Sheets . . .            Analysis . . .                                         Stable, Repeatable
                                                                                                                    • Mixed Model
                            Multi-Generational                   Assumes Data            PQ, PR, TAKT                                           Process
                                                                                                                      Plan, Kan Ban, Visual
                                                                 is Good                 Time
                                                                                                                      Management              • Automation
                                                                       Apply Any Tool from your Quality Tool Box




                                                                                                                                                                     52
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
When do I use LEAN?

                         Six Sigma                                                                 Action
                                                                        Hybrid
                          Project                                                                 Workout
Effort




                                                               Effort




                                                                                         Effort
                                   Time                                     Time                     Time


              Average ~ 4 Months                                                             Average ~ 1½ Months
                                                                    Average ~ 4 Months




                                        Lean For Quick Fixes….Six Sigma For Complex Processes !!




                                                                                                                   53
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN vs. Six Sigma

                                              LEAN
                                                              Simple / Wing
                                                                                Spans breadth                Spans                      Complex and
                                                                                                                                                         Six Sigma




                                                   X                                                                             X
                                                                                                               depth
                                                                 to Wing                                                                  focused
Lean: Strengthens journey to Excellence




                                           Lean                                 Lean                         Six Sigma                           Six Sigma/Lean
                                          Helps identify steps that             Identifies problems in the   Improves the capability of steps    Improving the capability can
                                          do not add value and                  flow                         that do add value                   eliminate additional steps
                                          provides     tools     to
                                          eliminate them




                                                           Lean success
                                                                                                                                        Six Sigma
                                                                                        •Energizing

                                                                                        •Team work,
                                                             factors /
                                                                                                                                          Values
                                                                                        •Empowering

                                                                                        •Boundary less / Open mindset
                                                              Impact                    •Passion for improvement
                                                                                        •Intuition / Action
                                                                                        •Customer focus




                                                                                                                                                                                54
                 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
                 Release date: 8th Feb, 2011  Version: 1.0
LEAN or Six Sigma – When to use?




                                                                 Just Do it         Lean
                                                                  Preference I   Preference III




                                                               Ask an Expert     Six Sigma
                                                                 Preference II    Preference IV




                                                                                                  55
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
The relationship among various business processes
                (design, production, purchasing, accounting, sales, etc.) and the impact these
                relationships can have on business systems
                BUSINESS PROCESSES AND SYSTEMS




                                                                                                 56
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Release date: 8th Feb, 2011  Version: 1.0
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
                                                                                                                                              KINDUZ Business Excellence




                                                               Source: http://www.kinduz.com/index.php/research/kinduz-excellence-framework
57




                                                               For more information, kindly visit: http://www.kinduz.com
Baldrige Excellence Framework




                                                               Source: http://farm3.static.flickr.com/2082/2531423852_895e11268d.jpg




                                                                                                                                       58
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
European Foundation for Quality – EFQM Excellence model

                                                Enablers                                         Results




                                                               People                     People results




                                                                                                            Key Performance Results
           Leadership



                                                               Policy &                     Customer




                                                                          Processes
                                                               Strategy                      results



                                                        Partnerships
                                                                                          Society results
                                                        & resources




                                                                              Innovation and Learning




                                                                                                                                      59
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
How these tools are applied to processes in all types of enterprises:
                manufacturing, service, transactional, product and process
                design, innovation, etc.
                SIX SIGMA AND LEAN APPLICATIONS




                                                                                        60
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Value Stream Mapping – A Petrol Station / Gas Station Example

                                                                 Helpers /
         Customers Enters                                                        Customer Starts
                                                               Customer Fills
           Petrol Station                                                            Vehicle
                                                                   Tank



                                                                                Customer Carefully
                                                                                                     Non value added service

           Customer Finds
                                                               Customer Stops     Exits, avoiding
             Pump with
                                                                   Vehicle        other Standing
            smallest Cue
                                                                                      Traffic
                                                                                                      Value added service




         Customer Waits in                                     Customer Makes
                                                                                 Customer Exits
              a Cue                                               Payment




                          Goal is to eliminate or make non-value added activities more efficient




                                                                                                                            61
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Value Stream Mapping – Original layout
                                            Existing
                                             Dock



                                          Lay down
                                                                                                 Material Lay down areas:
                                                                                                 • Deliver to receiving dock
                                           area #1
           Receiving

                                                                                                 • Queue for receipt
           inspection                                           Lay down
                                                                 area #2             Stock

                                                                                                 • Waiting to move to inspection
         Lay down                                                                    room


                                                                                                 • Delivered to inspection
          area #5
                                                               Receiving




                                                                           Storage
                                                                                                 • Queue for inspection
                                          Lay down
                                           area #4


                                                                                                 • Waiting to move to stock room
                                                                                                 • Queue for put away
                                                                Lay down
                                                                 area #3
                                                                                      Lay down
                                                                                       area #7
                        Lay down
                         area #6




                                                                                                                                   62
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Value Stream mapping – proposed layout

                          Existing Dock


                                                     New Deck




                                                               Roller belt




                                                               Receiving


                                                                                              Stock room
                                                   Bulk incoming material
                                                                             New Inspection
                                                    (hold for inspection)




                                                                                                           63
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Case Study: Reduction in the cycle time of issuance of
        corporate loans
   About the Organization Serviced:
   • The Company Serviced is one of the Largest Banking
     Organizations in the Kingdom of Saudi Arabia with annual        Issue: Getting buy-in for validating data from all the
     turnover of 3 Billion $                                           managers was a big challenge as it would directly impact
   • The Bank is catering to the needs of Individuals, Corporate’s     their role & reputation of that particular department
     and Trade Finance activities across the country with
     extensive branch network                                        Resolution: The key was to get the Buy – in from the Senior
                                                                      most manager and ask him to communicate to the whole
                                                                      team about the importance and gravity of issue. This
   Objective of the Initiative / Business Case:                       involved extensive people management and Perception
   • The process of issuing/ rejecting Corporate Loan application     Management
     process was consuming an average of 73 days considering all
     the regions and types of credit applications which was
     leading to customer dissatisfaction and loss of revenue
                                                                     Issue: Getting the required data from various systems being
                                                                       used and generating reports on a weekly basis and
   Results Delivered:                                                  validating the reports of each department with the
   • Our Consultant helped reduce the average time consumed            respective Manger
     from 73 days to 27days considering all regions and types of
     credit applications processed involving 14 Departments in 6     Resolution: This was achieved with couple of software
     months                                                           analysts collating the data with the Black belt, then the
   • Helped streamline various sub processes to be aligned with       reports were circulated to the respective managers for
     the core process                                                 them to audit and get their acceptance after which they
   • Held extensive training/ mentoring for all the team members      were circulated to the EVP
     to achieve the desired results




                                                                                                                                   64
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Reduction in the Cycle time of Account Opening process
  About the Organization Serviced:
                                                                    Issue: Getting buy-in for changing the systems and work
  • The Company Serviced is one of the Largest Banking
                                                                      scheduling from batch processing to lean processing to
    Organizations in the Kingdom of Saudi Arabia with annual
                                                                      optimize load balancing across the back office
    turnover of 3 Billion $
  • The Bank is catering to the needs of Individuals, Corporate’s
    and Trade Finance activities across the country with            Resolution: The issue was solved by conducting a pilot with
    extensive branch network                                         the authorization of the concerned manager and validating
                                                                     the results after which Lean cells were created as an
                                                                     intermediate step to reduce the cycle time until new
  Objective of the Initiative / Business Case:                       systems are stabilized
  • The process of opening an account was consuming an
    average of 7 days for the customer signature to be uploaded
                                                                    Issue: Making a business case to change the systems in sync
    into the master database only after which customer will be
                                                                      with the information architecture of the bank which would
    able to use all the services. This was leading to customer
                                                                      result in investment s and results in significant
    dissatisfaction
                                                                      productivity improvement
                                                                    Resolution: The process was taken up with the IT team and a
  Results Delivered:                                                 strong
  • Our Consultant helped reduce the average time consumed
    from 7 days to 1 day considering applications from all
    regions
  • Helped optimize various back office processes to be aligned
    with the core process
  • Held extensive training/ mentoring for all the team members
    to achieve the desired results




                                                                                                                                  65
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
The responsibilities of executive leaders and how they affect the deployment
                of six sigma in terms of providing resources, managing
                change, communicating ideas, etc.
                ENTERPRISE LEADERSHIP RESPONSIBILITIES




                                                                                               66
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Leadership




Enterprise leadership                        Organizational                   Change management                Six sigma projects and            Six sigma roles and
responsibilities                             roadblocks                       •Use of various techniques for   kaizen events                     responsibilities
•The responsibilities of                     •The impact an organization’s     facilitating and managing       •How projects and kaizen          •Describe the roles and
 executive leaders and how                    culture and inherent             organizational change.           events are selected, when to      responsibilities of six sigma
 they affect the deployment of                structure can have on the                                         use six sigma instead of other    participants: black belt,
 six sigma in terms of                        success of six sigma, and how                                     problem-solving                   master black belt, green belt,
 providing resources,                         deployment failure can result                                     approaches, and the               champion, process owners,
 managing change,                             from the lack of                                                  importance of aligning their      and project sponsors.
 communicating ideas, etc.                    resources, management                                             objectives with
                                              support, etc.; identify and                                       organizational goals.
                                              apply various techniques to
                                              overcome these barriers.




                                                                                                                                                                              67
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
Candidate Selection
          Drive                                                                       Mindset
                    Willing to APPLY what was covered in class                              Open and flexible mindset
 •                                                                              •


                    Drive the solution                                                      For both class and project work wants to
             •                                                                          •


                    Is able to have a focused schedule and keep                             stay focused on the process and not on
             •                                                                          •


                    project on time                                                         blaming people! “Blame the process not
             •


                    Resolves barriers or gets help resolving                                the people”
                    barriers quickly
             •


                    Does not let ‘artificial’                  organizational
                    boundaries get in the way
             •



     • Communication                                                                • Readiness
             • High team involvement, collaborative                                    • Open to constructive criticism
             • Able to communicate progress frequently                                 • Able to ask the fundamental or tough
                                                                                         questions
             • Able to lead a group effort (flip charts &
                                                                                       • Candidate prepared for class and
               post-its)                                                                 completes tools per schedule
             • Mentoring time taken seriously                                          • Basic MS Office Computer Skills
                                                                                       • Basic statistics knowledge




                                                                                                                                       68
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
LEAN Six Sigma drive benefits

       • Financial                                             • Cultural:
         • Companies embracing Lean                               • Deliberate and proven-
            Six Sigma report payback                                 approach to work
            (inclusive of all costs) within                       • Returns dependent on:
            12 months                                                 • Selecting and engaging
          • Ultimate ROI (Return on                                     the right people
            Investment) in range of                                   • Providing the right
            25-50 months or over 2-4                                    Resources
            years                                                     • Executing the right
                                                                        projects
                                                                      • Fully engaging company
                                                                        leadership




                                                                                                 69
Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/
Release date: 8th Feb, 2011  Version: 1.0
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma
01   overview of lean six sigma

Mais conteúdo relacionado

Mais procurados

VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingJessica Mitchell
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolbhanutomar
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?Tina Arora
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That WorkCreative Safety Supply
 
Operational Excellence PowerPoint Presentation Slides
Operational Excellence PowerPoint Presentation SlidesOperational Excellence PowerPoint Presentation Slides
Operational Excellence PowerPoint Presentation SlidesSlideTeam
 
Leading Agility "Inside-Out"
Leading Agility "Inside-Out"Leading Agility "Inside-Out"
Leading Agility "Inside-Out"Pete Behrens
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 

Mais procurados (20)

VSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturingVSM - Value Stream Mapping for made-to-order manufacturing
VSM - Value Stream Mapping for made-to-order manufacturing
 
Operational Excellence Roadmap
Operational Excellence RoadmapOperational Excellence Roadmap
Operational Excellence Roadmap
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing tool
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
Operational Excellence
Operational ExcellenceOperational Excellence
Operational Excellence
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
Lean basics
Lean basicsLean basics
Lean basics
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
Introduction To Lean Six Sigma
Introduction To Lean Six SigmaIntroduction To Lean Six Sigma
Introduction To Lean Six Sigma
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work
 
Operational Excellence PowerPoint Presentation Slides
Operational Excellence PowerPoint Presentation SlidesOperational Excellence PowerPoint Presentation Slides
Operational Excellence PowerPoint Presentation Slides
 
Leading Agility "Inside-Out"
Leading Agility "Inside-Out"Leading Agility "Inside-Out"
Leading Agility "Inside-Out"
 
Basics of Six Sigma
Basics of Six SigmaBasics of Six Sigma
Basics of Six Sigma
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Introducing Lean Six Sigma 2014...
Introducing Lean Six Sigma 2014...Introducing Lean Six Sigma 2014...
Introducing Lean Six Sigma 2014...
 

Destaque

WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...
WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...
WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...EXCELLENCE CONSULTING
 
Apresentação Pilar desenvolv. de pessoas (WCM)
Apresentação Pilar desenvolv. de pessoas (WCM)Apresentação Pilar desenvolv. de pessoas (WCM)
Apresentação Pilar desenvolv. de pessoas (WCM)Adeirechris Santos
 
bringing design to life with lean ux & lean engineering - Lean Day West 2013
bringing design to life with  lean ux & lean engineering - Lean Day West 2013bringing design to life with  lean ux & lean engineering - Lean Day West 2013
bringing design to life with lean ux & lean engineering - Lean Day West 2013Bill Scott
 
Lean In Life
Lean In LifeLean In Life
Lean In Lifeabhinav
 
World Class Manufacturing, Fábrica Oculta e OEE
World Class Manufacturing, Fábrica Oculta e OEEWorld Class Manufacturing, Fábrica Oculta e OEE
World Class Manufacturing, Fábrica Oculta e OEEFlavio Maeda
 
Como Formar Uma Equipe de Alto Desempenho
Como Formar Uma Equipe de Alto DesempenhoComo Formar Uma Equipe de Alto Desempenho
Como Formar Uma Equipe de Alto DesempenhoDanielle Dalavechia
 
Lean A3 Report for Planning Downtime Elimination
Lean A3 Report for Planning Downtime EliminationLean A3 Report for Planning Downtime Elimination
Lean A3 Report for Planning Downtime EliminationRodrigo André Marques
 
WCM Manual de ferramentas cnh contagem
WCM Manual de ferramentas cnh contagemWCM Manual de ferramentas cnh contagem
WCM Manual de ferramentas cnh contagemAntonio Carlos Seniuk
 
Inteligência emocional as 5 chaves fundamentais
Inteligência emocional   as 5 chaves fundamentaisInteligência emocional   as 5 chaves fundamentais
Inteligência emocional as 5 chaves fundamentaisManuela Selas
 

Destaque (11)

WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...
WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...
WCM 2009-TT18 Saint Gobain-CÉLULA TÉCNICA E A3 CRIANDO SINERGIA INTERDEPARTAM...
 
MANUAL DA I.A.M (ANATOMIA)
MANUAL DA I.A.M (ANATOMIA)MANUAL DA I.A.M (ANATOMIA)
MANUAL DA I.A.M (ANATOMIA)
 
Apresentação Pilar desenvolv. de pessoas (WCM)
Apresentação Pilar desenvolv. de pessoas (WCM)Apresentação Pilar desenvolv. de pessoas (WCM)
Apresentação Pilar desenvolv. de pessoas (WCM)
 
bringing design to life with lean ux & lean engineering - Lean Day West 2013
bringing design to life with  lean ux & lean engineering - Lean Day West 2013bringing design to life with  lean ux & lean engineering - Lean Day West 2013
bringing design to life with lean ux & lean engineering - Lean Day West 2013
 
Lean In Life
Lean In LifeLean In Life
Lean In Life
 
World Class Manufacturing, Fábrica Oculta e OEE
World Class Manufacturing, Fábrica Oculta e OEEWorld Class Manufacturing, Fábrica Oculta e OEE
World Class Manufacturing, Fábrica Oculta e OEE
 
Palestra masp
Palestra   maspPalestra   masp
Palestra masp
 
Como Formar Uma Equipe de Alto Desempenho
Como Formar Uma Equipe de Alto DesempenhoComo Formar Uma Equipe de Alto Desempenho
Como Formar Uma Equipe de Alto Desempenho
 
Lean A3 Report for Planning Downtime Elimination
Lean A3 Report for Planning Downtime EliminationLean A3 Report for Planning Downtime Elimination
Lean A3 Report for Planning Downtime Elimination
 
WCM Manual de ferramentas cnh contagem
WCM Manual de ferramentas cnh contagemWCM Manual de ferramentas cnh contagem
WCM Manual de ferramentas cnh contagem
 
Inteligência emocional as 5 chaves fundamentais
Inteligência emocional   as 5 chaves fundamentaisInteligência emocional   as 5 chaves fundamentais
Inteligência emocional as 5 chaves fundamentais
 

Semelhante a 01 overview of lean six sigma

40 Agile Methods in 40 Minutes
40 Agile Methods in 40 Minutes40 Agile Methods in 40 Minutes
40 Agile Methods in 40 MinutesCraig Smith
 
Comparing Ways to Scale Agile at Agile Product and Project Manager Meetup
Comparing Ways to Scale Agile at Agile Product and Project Manager MeetupComparing Ways to Scale Agile at Agile Product and Project Manager Meetup
Comparing Ways to Scale Agile at Agile Product and Project Manager MeetupBernd Schiffer
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to KanbanImaginet
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to KanbanImaginet
 
Normalizing agile and lean product development and aim
Normalizing agile and lean product development and aimNormalizing agile and lean product development and aim
Normalizing agile and lean product development and aimRussell Pannone
 
Six Sigma - Benefits to Individuals
Six Sigma - Benefits to IndividualsSix Sigma - Benefits to Individuals
Six Sigma - Benefits to IndividualsBenchmark Six Sigma
 
AGILE2017 Top 10 Takeaways by Synerzip
AGILE2017 Top 10 Takeaways by SynerzipAGILE2017 Top 10 Takeaways by Synerzip
AGILE2017 Top 10 Takeaways by SynerzipSynerzip
 
Final synerzip-agile2017-top10-v1
Final synerzip-agile2017-top10-v1Final synerzip-agile2017-top10-v1
Final synerzip-agile2017-top10-v1Hemant Elhence
 
Creating Successful Change Using Continuous Improvement Methods
Creating Successful Change Using Continuous Improvement MethodsCreating Successful Change Using Continuous Improvement Methods
Creating Successful Change Using Continuous Improvement Methodssaw2w
 
What Are The Root Causes Of Subway Customers
What Are The Root Causes Of Subway CustomersWhat Are The Root Causes Of Subway Customers
What Are The Root Causes Of Subway CustomersAngela Hays
 
Introduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile FrameworksIntroduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile FrameworksMehul Kapadia
 
Agile celebrates 20. opening
Agile celebrates 20. openingAgile celebrates 20. opening
Agile celebrates 20. openingOlga Savich
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayHeidi Owens
 

Semelhante a 01 overview of lean six sigma (20)

40 Agile Methods in 40 Minutes
40 Agile Methods in 40 Minutes40 Agile Methods in 40 Minutes
40 Agile Methods in 40 Minutes
 
Comparing Ways to Scale Agile at Agile Product and Project Manager Meetup
Comparing Ways to Scale Agile at Agile Product and Project Manager MeetupComparing Ways to Scale Agile at Agile Product and Project Manager Meetup
Comparing Ways to Scale Agile at Agile Product and Project Manager Meetup
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
Introduction to Kanban
Introduction to KanbanIntroduction to Kanban
Introduction to Kanban
 
Normalizing agile and lean product development and aim
Normalizing agile and lean product development and aimNormalizing agile and lean product development and aim
Normalizing agile and lean product development and aim
 
Six Sigma - Benefits to Individuals
Six Sigma - Benefits to IndividualsSix Sigma - Benefits to Individuals
Six Sigma - Benefits to Individuals
 
AGILE2017 Top 10 Takeaways by Synerzip
AGILE2017 Top 10 Takeaways by SynerzipAGILE2017 Top 10 Takeaways by Synerzip
AGILE2017 Top 10 Takeaways by Synerzip
 
Final synerzip-agile2017-top10-v1
Final synerzip-agile2017-top10-v1Final synerzip-agile2017-top10-v1
Final synerzip-agile2017-top10-v1
 
B292
B292B292
B292
 
Creating Successful Change Using Continuous Improvement Methods
Creating Successful Change Using Continuous Improvement MethodsCreating Successful Change Using Continuous Improvement Methods
Creating Successful Change Using Continuous Improvement Methods
 
State of Agile 2017
State of Agile 2017State of Agile 2017
State of Agile 2017
 
What Are The Root Causes Of Subway Customers
What Are The Root Causes Of Subway CustomersWhat Are The Root Causes Of Subway Customers
What Are The Root Causes Of Subway Customers
 
Introduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile FrameworksIntroduction to Enterprise Agile Frameworks
Introduction to Enterprise Agile Frameworks
 
Operational Excellence Consulting - Training Brochure
Operational Excellence Consulting - Training BrochureOperational Excellence Consulting - Training Brochure
Operational Excellence Consulting - Training Brochure
 
B292
B292B292
B292
 
201211-Morris
201211-Morris201211-Morris
201211-Morris
 
B285
B285B285
B285
 
Agile celebrates 20. opening
Agile celebrates 20. openingAgile celebrates 20. opening
Agile celebrates 20. opening
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
 
Enterprise scaled agile overview (1)
Enterprise scaled agile overview (1)Enterprise scaled agile overview (1)
Enterprise scaled agile overview (1)
 

Último

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 

Último (20)

Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 

01 overview of lean six sigma

  • 1. Part 01 of 09 Overview to Lean Six Sigma Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 2. Copyright License This work is licensed under the Creative Commons Attribution- ShareAlike 3.0 Unported License. To view a copy of this license, visit http://creativecommons.org/licenses/by-sa/3.0/ or send a letter to Creative Commons, 171 Second Street, Suite 300, San Francisco, California, 94105, USA. LASSIB Team 2 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 3. Enterprise-wide View History of Value and Value and Integration of lean Business Six sigma and lean continuous foundations of six foundations of and six sigma processes and applications improvement sigma lean •The relationship systems •How these tools are •The origins of •The value of six •The value of lean, its between lean and six •The relationship among applied to processes in continuous sigma, its philosophy, history, sigma. various business all types of enterprises: improvement and its philosophy, history, an and goals. processes manufacturing, service, impact on other d goals. (design, production, pu transactional, product improvement models. rchasing, accounting, sa and process les, etc.) and the impact design, innovation, etc. these relationships can have on business systems. 3 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 4. The origins of continuous improvement and its impact on other improvement HISTORY OF CONTINUOUS IMPROVEMENT models 4 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 5. History of continuous Improvement WESTERN MODELS EASTERN MODELS • W Edwards • 7 QC Tools Deming • New 7 Tools • Joseph M Juran • Quality Circles • Phil Crosby • Kaizen • Walter Shewhart • Poka Yoke • Value Engineering •5S • IDEAL Model • TPM • Just-In Time 5 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 6. W Edwards Deming – The Deming Wheel Source: http://www.aacc.org/SiteCollectionDocuments /hall_of_fame/Deming_W_Edwards_200.gif Source: http://upload.wikimedia.org/wikipedia/commons/7/7c/PDCA-Cycle.png 6 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 7. W Edwards Deming – Deming’s 14 principles Deming offered fourteen key principles for management for transforming business effectiveness. The points were first presented in his book Out of the Crisis. 1. Create constancy of purpose toward improvement of product and service, with the aim to become competitive and stay in business, and to provide jobs. 2. Adopt the new philosophy. We are in a new economic age. Western management must awaken to the challenge, must learn their responsibilities, and take on leadership for change. 3. Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass basis by building quality into the product in the first place. 4. End the practice of awarding business on the basis of price tag. Instead, minimize total cost. Move towards a single supplier for any one item, on a long-term relationship of loyalty and trust. 5. Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease cost. 6. Institute training on the job. 7. Institute leadership. The aim of supervision should be to help people and machines and gadgets to do a better job. Supervision of management is in need of overhaul, as well as supervision of production workers. 7 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 8. W Edwards Deming – Deming’s 14 principles 8. Drive out fear, so that everyone may work effectively for the company. 9. Break down barriers between departments. People in research, design, sales, and production must work as a team, to foresee problems of production and in use that may be encountered with the product or service. 10. Eliminate slogans, exhortations, and targets for the work force asking for zero defects and new levels of productivity. Such exhortations only create adversarial relationships, as the bulk of the causes of low quality and low productivity belong to the system and thus lie beyond the power of the work force. 11. Eliminate work standards (quotas) on the factory floor. Substitute leadership. Eliminate management by objective. Eliminate management by numbers, numerical goals. Substitute workmanship. 12. Remove barriers that rob the hourly worker of his right to pride of workmanship. The responsibility of supervisors must be changed from sheer numbers to quality. Remove barriers that rob people in management and in engineering of their right to pride of workmanship. This means, inter alia, abolishment of the annual or merit rating and of management by objective. 13. Institute a vigorous program of education and self-improvement. 14. Put everyone in the company to work to accomplish the transformation. The transformation is everyone's work. "Massive training is required to instill the courage to break with tradition. Every activity and every job is a part of the process." 8 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 9. W Edwards Deming – Seven Deadly Diseases The Seven Deadly Diseases (also known as the "Seven Wastes"): 1. Lack of constancy of purpose 2. Emphasis on short-term profits 3. Evaluation by performance, merit rating, or annual review of performance 4. Mobility of management 5. Running a company on visible figures alone 6. Excessive medical costs 7. Excessive costs of warranty, fueled by lawyers who work for contingency fees A Lesser Category of Obstacles: Neglecting long-range planning Relying on technology to solve problems • Seeking examples to follow rather than developing solutions • Excuses, such as "Our problems are different” • • 9 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 10. Joseph M Juran – The Pareto Principle It was in 1941 that Juran The Pareto principle of Time vs. Results discovered the work of Vilfredo Pareto • 20% of Juran expanded the Pareto results principle applying it to quality issues (for • 80% of time example, 80% of a problem expended is caused by 20% of the Source: http://img.freebase.com/api/trans/imag causes) e_thumb/en/joseph_m_juran?pad=1&ma 80% of xheight=110&mode=fillcropmid&maxwi results dth=110 This is also known as "the vital few and the trivial many". In later years Juran • 20% of time has preferred "the vital few and the useful many" to signal that the remaining 80% of the causes should not be totally ignored 10 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 11. Joseph M Juran – The Management Thoery When Juran began his career in the 1920s the principal focus in quality management was on the quality of the end, or finished, product • The tools then used were from the Bell system of acceptance sampling, inspection plans, and control charts. The ideas of Frederick Winslow Taylor dominated • Juran is widely credited for adding the human dimension to quality management. He pushed for the education and training of managers • For Juran, human relations problems were the ones to isolate. Resistance to change—or, in his terms, cultural resistance—was the root cause of quality issues. Juran credits Margaret Mead's book Cultural Patterns and Technical Change for illuminating the core problem in reforming business quality. • He wrote Managerial Breakthrough, which was published in 1964, outlining the issue Juran's vision of quality management extended well outside the walls of the factory to encompass non- manufacturing processes, especially those that might be thought of as service related. For example, in an interview published in 1997 he observed: • “The key issues facing managers in sales are no different than those faced by managers in other disciplines. Sales managers say they face problems such as "It takes us too long or we need to reduce the error rate." They want to know, "How do customers perceive us?" These issues are no different than those facing managers trying to improve in other fields. The systematic approaches to improvement are identical… There should be no reason our familiar principles of quality and process engineering would not work in the sales process…” 11 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 12. Joseph M Juran – The Quality Trilogy QUALITY PLANNING QUALITY CONTROL (DURING OPERATIONS) Sporadic zone 40 - (as a % of operating budget) Cost of poor quality Original zone of quality control 20 - Chronic waste (an opportunity Savings for improvement) New zone of quality control QUALITY IMPROVEMENT 0 Time Lessons learnt 12 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 13. Philip Crosby Philip Crosby started the management consulting company Philip Crosby Association, Inc • This consulting group provided educational courses in quality management both at their headquarters in Winter Park, Florida, and at eight foreign locations. In 1979 Crosby published his first business book, • Quality Is Free. This book became popular at the time because of the crisis in North American quality During the late 1970s and into the 1980s North American manufacturers were losing market share to Japanese products largely due to the superiority of quality of the Japanese products. • Crosby's response to the quality crisis was the principle of "doing it right the first time" (DIRFT). He would also include four major principles: • – the definition of quality is conformance to requirements – the system of quality is prevention – the performance standard is zero defects – the measurement of quality is the price of nonconformance Source: http://www.wppl.org/wphistory/phili pcrosby/PhilipCrosby.jpg 13 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 14. Philip Crosby’s Quality Improvement Program 1. Management is Committed to Quality 8. Train supervisors in quality 2. Create Quality Improvement Teams improvement 3. Measure processes to determine 9. Hold zero defects days current and potential quality issues 10. Encourage employees to create their 4. Calculate Cost of (poor) Quality own quality improvement goals 5. Raise Quality Awareness of all 11. Encourage employee communication Employees with management about obstacles to 6. Take Actions to Correct Quality quality (Error-Cause Removal) Issues 12. Recognise participants’ effort 7. Monitor progress of quality 13. Create quality councils improvement – establish a zero 14. Do it all over again – quality defects committee improvement does not end 14 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 15. Philip Crosby’s Stages Uncertainty Awakening Enlightenment Wisdom Certainty • COPQ : 20% • COPQ : 18% • COPQ : 12% • COPQ : 8% • COPQ : 2.5% • Blame QD • QM begins • CA • DP is routine • QI is normal Crosby's name is best known in relation to concepts of “Do it Right, First time” and “Zero Defect”. COPQ - Cost of Poor Quality Quality is defined as conformance to requirements, QD – Quality Deployment not as “goodness” or “elegance”. QM –Quality Management CA – Cost Acceptance DP – Defect Prevention QI – Quality Improvement 15 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 16. Walter Shewhart Statistical Process Control (SPC) is an effective method of monitoring a process through the use of control charts. • Control charts enable the use of objective criteria for distinguishing background variation from events of significance based • on statistical techniques. Much of its power lies in the ability to monitor both process center and its variation about that center. By collecting data from samples at various points within the process, variations in the Source: process that may affect the quality of the end http://www.firstmetre.co.uk/image.php? • product or service can be detected and w=250&h=334&f=/UserFiles/Image/Oc tober+Images/Shewhart-c1926.jpg corrected, thus reducing waste as well as the likelihood that problems will be passed on to the customer. Because of its emphasis on early detection and prevention of problems, SPC has a distinct advantage over quality • methods, such as inspection, that apply resources to detecting and correcting problems in the end product or service. 16 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 17. Walter Shewhart – Father of Statistical Process Control Statistical Process Control is the application of statistical techniques in the Control of processes Define Problem Implement Define Solution Process Analyze List Possible Data Reasons Collect Data 17 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 18. Value Engineering Value Engineering objective: To develop the best solution to meet the project objective Step 1: Information gathering Define project objective Develop terms of reference Identify assumptions and facts Gather information (physical parameters, cost, schedule) Step 2:Function analysis Analyze functions required to deliver project objectives Describe each identified functions Classify functions: Basic functions Step 3:Value analysis Creatively identify options and alternatives to perform functions Research options Identify cost and cost benefits Idea roots identified for Identify risks (barriers and uncertainties) further analysis Alternative solutions to perform functions Step 4:Option evaluation Evaluate idea roots developed in Step 3 and identify those for further analysis Compare solutions and screen out unfeasible / least valuable alternatives Identify solutions for further analysis (iterate) Screen out unsuitable options Step 5:Judgment Use judgment to identify the best value solution 18 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 19. IDEAL Model Analyze and Learning validate Implement Propose future solution actions Acting Build Set Stimulus for change Charter Refine solution infrastructure sponsorship Content Initiation Characterize Pilot / test solution desired & current state Develop Create solutions recommendations Diagnosis Plan actions Set priorities Develop approach Establishing 19 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 20. Seven QC tools Check sheets Process behavior / Control charts Pareto diagram Graphs Fish bone diagram Histograms Scatter diagrams Source: http://media.texample.net/tikz/examples/PNG/pie-chart.png Source: http://farm3.static.flickr.com/2671/4235318918_15e2a8feaf.jpg Source: http://upload.wikimedia.org/wikipedia/commons/c/c7/Histograma_pisuaktom.JPG 20 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 21. Release date: 8th Feb, 2011 Version: 1.0 Matrix diagrams Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Arrow diagrams New Seven QC Tools Matrix data analysis Affinity Diagrams program chart Process decision Relationship Diagrams Tree Diagrams Source: Affinity Diagram: http://farm4.static.flickr.com/3136/2583400109_7c57ff718c_o.png Relationship Diagram: http://upload.wikimedia.org/wikipedia/commons/b/b7/Typical_dependency_relations_between_AIS_services.JPG Tree Diagram: http://farm1.static.flickr.com/14/15276524_45307f082d.jpg Process decision program chart: http://1.bp.blogspot.com/_5ieXw28ZUpg/SULVbS2LvxI/AAAAAAAAAwI/SPYcwibZkfE/s1600-h/obap2.PNG Matrix data analysis: http://upload.wikimedia.org/wikipedia/commons/7/76/Folio_Plot_BCG_Matrix_Example.png 21 Matrix diagrams: http://farm3.static.flickr.com/2182/2040911590_f6f946e72a_o.png Arrow diagrams: http://upload.wikimedia.org/wikipedia/commons/a/af/Linalg_map_change_basis_3.png
  • 22. Quality Circle Concept S.No. Particulars What they mean? 1 Concept The main objective of Quality Circles is “self” and mutual development, cohesive team work and to be engaged in continuous improvement activities, thus improving their quality of work life 2 Identification of problem QC Members with the help of Round Robin Method, try to identify their own day to day work related problems 3 Problem selection Identified problems are segregated into three categories based on difficulty of their solution 4 Meetings QCs have periodic meetings to discuss, analyze and find solutions to the problems on a pre-fixed schedule 5 Various problem solving steps QCs follow a 12 step methodology, starting from identification of problems to solution, implementation, follow up and review. 6 Approval of project Project has to be approved by the Steering Committee or the executives nominated by the Steering Committee. 7 Gains The aim of QC is to “develop people”. In other words, self and mutual development through QC activities. Hence, the focus is not on gains in terms of money 22 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 23. Kaizen • Japanese term that means continuous improvement, taken from words: – ‘kai' which means continuous – 'zen' which means improvement • Kaizen, or rapid improvement processes, are the building block of all Lean production methods. Kaizen philosophy implies that all, incremental changes routinely applied and sustained over a long period result in significant improvements • The kaizen strategy aims to involve workers from multiple functions and levels in the organization in working together to address a problem or improve a particular process • The team uses analytical techniques, such as Value Stream Mapping, to quickly identify opportunities to eliminate waste in a targeted process. The team works to rapidly implement chosen improvements 23 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 24. Kaizen – Continuous improvement Do it again Document Celebrate reality Identify Start Standardize here waste Measure Eliminate results waste Verify Reality For counter changes check measures Make changes 24 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 25. Poka Yoke / Mistake Proofing - Overview • A technique for eliminating errors • Making it impossible to make mistakes Elimination Best Eliminate the possibility of error Replacement – Use the highest level Substitute a more reliable process possible for the Facilitation – Better application. Make work simpler to perform Detection – Detect the error at the defect source Good Mitigation – – Minimize the effect It is good to do it right the first time; it is even better to make it impossible to do it wrong the first time. 25 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 26. Poka Yoke / Mistake Proofing - Examples • While closing a word document, one is asked whether to save the file or not • Spelling check option in a word document Source: http://upload.wikimedia.org/wikipedia/commons/0/04/DIN_lang_-_Letter_Window.JPG • In three pin plugs / socket, the earth pin / socket is larger in length and diameter so that one doesn’t mistakenly insert it otherwise • The window in a envelop ensures that right content reaches the right person • The fuse box in a house is meant to prevent fire in electrical systems 26 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 27. 5S – A Framework to create and maintain your workplace •Means SORT - SEITON •Means SHINE - SEIKETSU •Means SUSTAIN – Self Organization Cleanliness discipline •Distinguish between •Means SET IN ORDER •Cleaning and looking •Means STANDARDIZE •Stick to the what is and is not - Orderliness for ways to keep it – Adherence rules, scrupulously needed •A place for everything clean •Clearly define tasks and everything in its and procedures SEIRI SEISO SHITSUKE place Implementing the 5S is often the first step in Lean Transformation 27 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 28. TPM - Total Productive Maintenance • TPM (Total Productive Maintenance) seeks to engage all levels and functions in an organization in maximizing the overall effectiveness of the process • TPM's goal is the total elimination of all losses • TPM focuses on preventing: – Breakdowns (preventive maintenance) – “Mistake-proofing" the equipment (or poka-yoke) to prevent breakdowns – Make maintenance easier (corrective maintenance) – Designing and installing equipment that needs little or no maintenance (maintenance prevention) – Quickly repairing equipment after breakdowns occur (breakdown maintenance). 28 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 29. Release date: 8th Feb, 2011 Autonomous Maintenance Version: 1.0 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Focus Improvement Planned Maintenance Quality Maintenance TPM - Total Productive Maintenance 8 Pillars of TPM Initial Flow Control Education & Training Safety, Health &Environment TPM in office 29
  • 30. Just in Time (JIT) • Just In Time (JIT) is a manufacturing philosophy which leads to "Producing the necessary units, in the necessary quantities at the necessary time with the required quality” • It is an approach to achieving excellence in the reduction or total elimination of waste (Non-Value Added Activities) • Examples of waste according to JIT: – Overproduction – Unneeded Inventory – Defective Products – Transport and Waiting Time 30 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 31. The value of six sigma, its philosophy, history, and goals VALUE AND FOUNDATION OF SIX SIGMA 31 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 32. Evolution of Quality LEAN ENTERPRISE ROBUST PROCESS BUSINESS INTELLIGENCE DESIGN DOE BUSINESS RESULTS ECONOMETRICS BUSINESS PROCESS MANAGEMENT DMAIC RCM DFSS TPM TEAM BUILDING 5S FMEA SPC CONCURRENT ENGINEERING ZD QFD VE TQM DF(X) KAIZEN CQI PROBLEM SOLVING STRATEGY 7 QCT PDCA 32 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 33. INDUSTRY SNIPPETS 'No matter which level of Six Sigma training the respondents completed, their average salaries are higher than the respondents who didn't complete any Six Sigma training.’ 'During the past 10 years Six Sigma has become one of the most widely practiced process improvement methodologies in both service and manufacturing industries.’ 'GE produces annual benefits of over $2.5 billion across the organization from Six Sigma.’ 'The savings as a percentage of revenue for a company can vary from 1.2% to 4.5%.’ 'Lean Six Sigma techniques implemented throughout the Army continue to prove successful, and leaders anticipate reaching a $2 billion-savings mark this year.’ 33 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 34. What is Lean Six Sigma? A Set of Proven Tools and A set of proven tools and technique Techniques used to achieve used to solve business problems Business growth and goals Control Define Improve A framework that builds A mechanics to develop Measure a Customer centric approach leadership talent within with a focus on delivering an organization business results Analyze 34 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 35. Lean Six Sigma – Why is it so successful? Highest Leaders Lean and Six Sigma (6σ) Skill Medium Managers Larger % of Skill Lower employees in need of skills to Associates Skill deliver customer value and Business Value 35 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 36. Historical Perspective 1979: Motorola 1995: Jack 2000: GE Starts Six Welch Saves ~$2 Sigma Initiates Six Billion Initiative Sigma in GE Annually 1986: 1998: Allied Motorola Signal Saves Saves ~$16 ~$1.2 Billion Billion 36 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 37. Mean vs. Variation Archer A Archer B Mean of Archer A is zero and that of Archer B is significantly higher. But which one would you choose? One that had inconsistent performance (Archer A, high variation) or one that was very consistent (Archer B, very low variation) 37 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 38. Statistical Perspective Mean = 20 (Lower Specification) σ = 0.5 (Upper Specification) σ σ A defect is any value that falls outside Customer Specifications 23 17 20 38 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 39. Quantitative Perspective 99% Right (3.8 Sigma) 99.99966% Right (6 Sigma) No electricity for 7 hours per month No electricity for 1 hour every 34 years 5,000 incorrect operations per week 1.7 incorrect operations per week 20,000 wrong prescriptions per year 68 wrong prescriptions per year Defects per Million σ Opportunities 1 697,672.15 2 308,770.21 3 66,810.63 4 6,209.70 5 232.67 6 3.40 39 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 40. Quantitative Perspective Airline fatality rate 0.52 PPM Sigma (σ) World Class, Six Sigma 3.4 PPM 1:1,000,000 Five Sigma 233 PPM Motorola 1990 Four Sigma 6,209 PPM Hospital fatality rate due to mistakes Restaurant bills 1:100 Doctor prescriptions Payroll processing Airline baggage handling Three Sigma 66,810 PPM Two Sigma 308,770 PPM 40 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 41. Customers Perspective Six Sigma Starts and Ends with Customers What is my customers view of the process? Are my What do the customers customers expect referring and out of the buying again? process? CUSTOMERS How do my Is my customer customers satisfaction measure the increasing? process? What is my customers definition of a defect? 41 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 42. Operational Perspective Control Define Improve Measure Analyze 42 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 43. The value of lean, its philosophy, history, and goals VALUE AND FOUNDATION OF LEAN 43 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 44. LEAN History Toyota Production System People People • Single Piece Flow • Automation Just-in-Time • Pull Production • Built-In Quality People Jidoka • TAKT Time Production • Stopping at Abnormalities Heijunka • Level Loading • Sequencing • Stability Some Key Lean Concepts developed at Toyota 44 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 45. LEAN Thinking A principle driven, tool based philosophy that focuses on eliminating waste so that all activities/steps add value from the customers perspective. Lean Thinking is all about continuous waste elimination ! Imagine Office Processes with: • Higher Customer Satisfaction • Shorter Lead Time • Higher Flexibility • Higher Quality • Lower Costs • Higher Employee Satisfaction 45 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 46. LEAN Explained A strategy, philosophy, process and leadership approach for operating in a superior way. Results include: • – Reduced cycle times (product development and production) – Increased quality – Reduced costs and inventory – Increased capacity potential – Improved customer service – High levels of worker involvement, ownership and commitment – Improved financial returns Lean concepts apply across all processes and industries 46 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 47. LEAN Explained Earlier: Price = Cost + Profit Now: Profit = Price - Cost Increase Profit by Price increase Increase Profit by cost reduction Price to sell 1.5 1.5 Some profit Bigger profit Bigger profit Price to sell 1 1 Cost of production Some profit 0.5 0.5 Cost of production 0 0 47 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 48. Where are We going? Advanced tools Tool • Creating Continuous Flow • Pull production Basic tools Challenge • More waste reduction Tool • Real continuous flow • Value Stream • Flexible workforce Mapping, other lean • Less variance tools, etc. • Less waste Old situation Results • Reduction of waste Issues • Learned to ‘see the flow’ • Inventory • Couple of improvements • Waiting • Defects Remaining Issues •… • No real continuous flow • Still significant amount of No flow in the value waste. stream. Processes full of waste 48 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 49. Lean Toolkit Level 1 Level 2 Reduce Variability, Control the Process Expose the Waste • Value Stream Mapping • Standardized Work • Intro to Continuous Flow • 5S • Intro to Pull Production • MUDA Tool Sophistication • Mistake proofing • Intro to Value Stream Mapping • Visual Management Time / Cultural Maturity Applying the right tools at the right stage 49 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 50. Lean Tools Overview A number of Lean Tools and Techniques are available Bring Organization & 5S Framework Cleanliness to work area Understand Value Value Stream Mapping Tools and Techniques Implement pull-based flow Kanban, Just-in Time Action Reconfigure work areas U-Shaped Cells Institute continuous improvement philosophy Kaizen Events Appropriate Tools and Techniques are to be used depending on the need 50 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 51. The relationship between LEAN and Six Sigma INTEGRATION OF LEAN AND SIX SIGMA 51 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 52. LEAN vs. Six Sigma Methodology Strengths Define Measure Analyze Improve Control Lean Six Sigma Six Sigma • VOC is Powerful • Confirms Data • Data Driven • Few Tools to • Few Tools or Quality Analysis Create Change in Direction Critical X’s • Value Stream • Standard Work • Observation and • Many Tools for • Communicative Lean Mapping . . . & Target Intuition Based Driving Change • Centered on Boundary less & Sheets . . . Analysis . . . Stable, Repeatable • Mixed Model Multi-Generational Assumes Data PQ, PR, TAKT Process Plan, Kan Ban, Visual is Good Time Management • Automation Apply Any Tool from your Quality Tool Box 52 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 53. When do I use LEAN? Six Sigma Action Hybrid Project Workout Effort Effort Effort Time Time Time Average ~ 4 Months Average ~ 1½ Months Average ~ 4 Months Lean For Quick Fixes….Six Sigma For Complex Processes !! 53 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 54. LEAN vs. Six Sigma LEAN Simple / Wing Spans breadth Spans Complex and Six Sigma X X depth to Wing focused Lean: Strengthens journey to Excellence Lean Lean Six Sigma Six Sigma/Lean Helps identify steps that Identifies problems in the Improves the capability of steps Improving the capability can do not add value and flow that do add value eliminate additional steps provides tools to eliminate them Lean success Six Sigma •Energizing •Team work, factors / Values •Empowering •Boundary less / Open mindset Impact •Passion for improvement •Intuition / Action •Customer focus 54 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 55. LEAN or Six Sigma – When to use? Just Do it Lean Preference I Preference III Ask an Expert Six Sigma Preference II Preference IV 55 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 56. The relationship among various business processes (design, production, purchasing, accounting, sales, etc.) and the impact these relationships can have on business systems BUSINESS PROCESSES AND SYSTEMS 56 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 57. Release date: 8th Feb, 2011 Version: 1.0 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ KINDUZ Business Excellence Source: http://www.kinduz.com/index.php/research/kinduz-excellence-framework 57 For more information, kindly visit: http://www.kinduz.com
  • 58. Baldrige Excellence Framework Source: http://farm3.static.flickr.com/2082/2531423852_895e11268d.jpg 58 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 59. European Foundation for Quality – EFQM Excellence model Enablers Results People People results Key Performance Results Leadership Policy & Customer Processes Strategy results Partnerships Society results & resources Innovation and Learning 59 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 60. How these tools are applied to processes in all types of enterprises: manufacturing, service, transactional, product and process design, innovation, etc. SIX SIGMA AND LEAN APPLICATIONS 60 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 61. Value Stream Mapping – A Petrol Station / Gas Station Example Helpers / Customers Enters Customer Starts Customer Fills Petrol Station Vehicle Tank Customer Carefully Non value added service Customer Finds Customer Stops Exits, avoiding Pump with Vehicle other Standing smallest Cue Traffic Value added service Customer Waits in Customer Makes Customer Exits a Cue Payment Goal is to eliminate or make non-value added activities more efficient 61 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 62. Value Stream Mapping – Original layout Existing Dock Lay down Material Lay down areas: • Deliver to receiving dock area #1 Receiving • Queue for receipt inspection Lay down area #2 Stock • Waiting to move to inspection Lay down room • Delivered to inspection area #5 Receiving Storage • Queue for inspection Lay down area #4 • Waiting to move to stock room • Queue for put away Lay down area #3 Lay down area #7 Lay down area #6 62 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 63. Value Stream mapping – proposed layout Existing Dock New Deck Roller belt Receiving Stock room Bulk incoming material New Inspection (hold for inspection) 63 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 64. Case Study: Reduction in the cycle time of issuance of corporate loans About the Organization Serviced: • The Company Serviced is one of the Largest Banking Organizations in the Kingdom of Saudi Arabia with annual Issue: Getting buy-in for validating data from all the turnover of 3 Billion $ managers was a big challenge as it would directly impact • The Bank is catering to the needs of Individuals, Corporate’s their role & reputation of that particular department and Trade Finance activities across the country with extensive branch network Resolution: The key was to get the Buy – in from the Senior most manager and ask him to communicate to the whole team about the importance and gravity of issue. This Objective of the Initiative / Business Case: involved extensive people management and Perception • The process of issuing/ rejecting Corporate Loan application Management process was consuming an average of 73 days considering all the regions and types of credit applications which was leading to customer dissatisfaction and loss of revenue Issue: Getting the required data from various systems being used and generating reports on a weekly basis and Results Delivered: validating the reports of each department with the • Our Consultant helped reduce the average time consumed respective Manger from 73 days to 27days considering all regions and types of credit applications processed involving 14 Departments in 6 Resolution: This was achieved with couple of software months analysts collating the data with the Black belt, then the • Helped streamline various sub processes to be aligned with reports were circulated to the respective managers for the core process them to audit and get their acceptance after which they • Held extensive training/ mentoring for all the team members were circulated to the EVP to achieve the desired results 64 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 65. Reduction in the Cycle time of Account Opening process About the Organization Serviced: Issue: Getting buy-in for changing the systems and work • The Company Serviced is one of the Largest Banking scheduling from batch processing to lean processing to Organizations in the Kingdom of Saudi Arabia with annual optimize load balancing across the back office turnover of 3 Billion $ • The Bank is catering to the needs of Individuals, Corporate’s and Trade Finance activities across the country with Resolution: The issue was solved by conducting a pilot with extensive branch network the authorization of the concerned manager and validating the results after which Lean cells were created as an intermediate step to reduce the cycle time until new Objective of the Initiative / Business Case: systems are stabilized • The process of opening an account was consuming an average of 7 days for the customer signature to be uploaded Issue: Making a business case to change the systems in sync into the master database only after which customer will be with the information architecture of the bank which would able to use all the services. This was leading to customer result in investment s and results in significant dissatisfaction productivity improvement Resolution: The process was taken up with the IT team and a Results Delivered: strong • Our Consultant helped reduce the average time consumed from 7 days to 1 day considering applications from all regions • Helped optimize various back office processes to be aligned with the core process • Held extensive training/ mentoring for all the team members to achieve the desired results 65 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 66. The responsibilities of executive leaders and how they affect the deployment of six sigma in terms of providing resources, managing change, communicating ideas, etc. ENTERPRISE LEADERSHIP RESPONSIBILITIES 66 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 67. Leadership Enterprise leadership Organizational Change management Six sigma projects and Six sigma roles and responsibilities roadblocks •Use of various techniques for kaizen events responsibilities •The responsibilities of •The impact an organization’s facilitating and managing •How projects and kaizen •Describe the roles and executive leaders and how culture and inherent organizational change. events are selected, when to responsibilities of six sigma they affect the deployment of structure can have on the use six sigma instead of other participants: black belt, six sigma in terms of success of six sigma, and how problem-solving master black belt, green belt, providing resources, deployment failure can result approaches, and the champion, process owners, managing change, from the lack of importance of aligning their and project sponsors. communicating ideas, etc. resources, management objectives with support, etc.; identify and organizational goals. apply various techniques to overcome these barriers. 67 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 68. Candidate Selection Drive Mindset Willing to APPLY what was covered in class Open and flexible mindset • • Drive the solution For both class and project work wants to • • Is able to have a focused schedule and keep stay focused on the process and not on • • project on time blaming people! “Blame the process not • Resolves barriers or gets help resolving the people” barriers quickly • Does not let ‘artificial’ organizational boundaries get in the way • • Communication • Readiness • High team involvement, collaborative • Open to constructive criticism • Able to communicate progress frequently • Able to ask the fundamental or tough questions • Able to lead a group effort (flip charts & • Candidate prepared for class and post-its) completes tools per schedule • Mentoring time taken seriously • Basic MS Office Computer Skills • Basic statistics knowledge 68 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0
  • 69. LEAN Six Sigma drive benefits • Financial • Cultural: • Companies embracing Lean • Deliberate and proven- Six Sigma report payback approach to work (inclusive of all costs) within • Returns dependent on: 12 months • Selecting and engaging • Ultimate ROI (Return on the right people Investment) in range of • Providing the right 25-50 months or over 2-4 Resources years • Executing the right projects • Fully engaging company leadership 69 Overview to Lean Six Sigma | LASSIB | http://www.lassib.org/ Release date: 8th Feb, 2011 Version: 1.0