SlideShare a Scribd company logo
1 of 14
2Q13 Earnings Release
Rio de Janeiro | August, 2013
Disclaimer
The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries (collectively, “MPX” or the “Company”)
as of the date of the presentation. It is information in summary form and does not purport to be complete. No representation or warranty, express or implied, is
made concerning, and no reliance should be placed on, the accuracy, fairness, or completeness of this information.
This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views and/or expectations of the
Company and its management with respect to its performance, business and future events. Forward looking statements include, without limitation, any
statement that may predict, forecast, indicate or imply future results, performance or achievements, and may contain words like “may”, “plan”, “believe”,
“anticipate”, “expect”, “envisages”, “will likely result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks,
uncertainties and assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans, objectives,
expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its affiliates, directors, officers, agents or
employees nor any of the placement agents shall be liable before any third party (including investors) for any investment or business decision made or action
taken in reliance on the information and statements contained in this presentation or for any consequential, special or similar damages.
This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities.
Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever.
Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own
advisors in this regard.
The market and competitive position data, including market forecasts, used throughout this presentation were obtained from internal surveys, market research,
publicly available information and industry publications. Although we have no reason to believe that any of this information or these reports are inaccurate in any
material respect, we have not independently verified the competitive position, market share, market size, market growth or other data provided by third parties
or by industry or other publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such information.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MPX’s prior
written consent.
2
2Q13 Highlights & Subsequent Events
3
Financial & Operational Highlights:
 Commercial gross generation capacity reached 1,779 MW;
 Additional 1,114 MW currently under construction;
 Generation net revenues amounted to R$ 508.6 million;
 Production of natural gas in the Panaíba basin reached R$ 4.5 MMm3/day.
Changes in the Controlling Group:
 E.ON increased its interest to 36.2% and joined Mr. Eike Batista in the Company’s controlling group
 Mr. Eike Batista reduced his stake to 29% and resigned as member and Chairman of the Board
Share Capital Increase
4
MPX Shareholding Structure as of June 30, 2012
36.2% 29.0%
EIKE
BATISTA
FREE
FLOAT
34.8% ~38% ~24%
EIKE
BATISTA
FREE
FLOAT
~38%
MPX Indicative Shareholding Structure after the
Capital Increase
 A R$ 800 million private capital increase was approved by the Board of Directors on July 03;
 81,235,437 newly-issued common shares, equivalent to approximately R$ 524 million, were
subscribed and paid-in during the Initial Preemptive Right Period, which ended on Aug 8;
 The First Additional Subscription Period begins on Aug 14 and will end on Aug 16.
Obs: Assuming no subscription by Eike Batista and R$ 366.7 million by E.ON
Revenues & Costs
5
196.1
395.1
1Q13 2Q13
Net Operating Revenues (R$ MM)
101.5%
312.6
418.3
1Q13 2Q13
33.8%
Operating Costs (R$ MM)
Net Operating Revenues: + 101.5% vs. 1Q13 resulting from increased
commercial capacity
• Itaqui: The plant has stabilized during the quarter. In the beginning of April
the plant started being remunerated according to its total capacity.
• Parnaíba I: Achieved full commercial capacity in early April.
Operating Costs: + 33.8% vs. 1Q13
• Increased fuel costs resulting from full capacity operation of Parnaíba I
• Decreasing needs for energy acquisition
• Unavailability charges impacted by:
• In May, Itaqui stopped to adjust ventilation system (R$ 41.2 MM) and
Parnaíba I stopped to conduct repairs in the substation (R$ 19.6 MM)
• Operations have been stable in both plants since then
Operational Performance
6
 Decreasing need to acquire energy to fulfill contractual obligations
 In June, Pecém II had to purchase energy to ensure compliance with PPA. The plant has completed all
electrical tests required by ONS and commercial operation is now conditional to the availability of the
transmission system under construction by Chesf/TDG
0
100
200
300
400
500
600
700
800
900
Jan Feb Mar Apr May Jun
Net Energy Produced (GWh) Energy sold (GWh)
48.3
42.0
2Q12 2Q13
Operating Expenses
7
Operating Expenses: - 13.1% vs. 2Q12
 Personnel: - 14.8%, mainly attributable to:
 Optimization of administrative and operating teams (- R$ 0.4 million)
 Reduction of personnel expenses resulting from the spin-off of the
Colombian mining assets (-R$ 2.9 million)
 Outsourced Services: -8.2%, mainly attributable to :
 Shared services in the holding company, resulting from the reduction
of EBX’s service structure (-R$ 4.4 million)
 Increase in IT expenses (+R$ 2.7 million)
 Leases and Rents: -37.0%, mainly attributable to reduced real estate
rental expenses at the holding level (-R$ 1.2 million)
 Other Expenses: -31.3%, mainly attributable to a decrease in publicity
and advertising expenses at the holding level (-R$ 1.1 million)
Consolidated Operating Expenses
(R$ MM)
- 13.1%
Consolidated EBITDA
8
2Q13 Reported vs Adjusted EBITDA (R$ MM)
The Consolidated EBITDA does not include the Pecém I results.
-38.6
50.3
10.3
69.5
9.0
2Q13
Consolidated
EBITDA
Net costs related
to the acquisition
of energy
Unavailability
charges
Startup costs 2Q13
Consolidated
Adjusted EBITDA
 Adjusted EBITDA in 2Q13 would amount to R$
50.3 million, mainly due to:
• Elimination of net losses resulting from the
acquisition of energy to fulfill contractual
obligations
• Elimination of unavailability charges stemming
from maintenance stoppages
• Adjustment of diesel consumption so as to
eliminate increased start-up costs
9
Debt
Consolidated gross debt profile (R$ million)
2,651
46%
3,082
54%
Short Term Long Term
2,651
1,121 1,530
Project Holding
Short Term Debt (R$ million)
100 350
Paid-off by
capital increase
Project
debentures
1,080
LT debentures
at holding
Short Term Debt (2Q13):
 R$ 1,121.5 million at project level:
• R$ 845.2 million refer to outstanding bridge-loans to Parnaíba
I & II power plants  to be paid-off with draw down from
long-term financing.
• R$ 276.2 million refer to current portion of the project finance
debts of Pecém II, Itaqui and Parnaíba I
 MPX holding plans to eliminate outstanding intercompany
loans with its subsidiaries through the issue of LT tax-
advantaged infrastructure debentures at project level with
subsequent use of funds to pay-off loans
 The remaining short-term debt balance at the holding level
will be replaced by a long-term debenture, with an estimated
5 to 7-year maturity
Total:
R$ 5,733 MM
10
Cash Position
364.7
282.3 263.1
218.2
175.8
237.4
64.2
6.4 20.0
149.5
Cash and Cash Equivalents (1Q13)Revenues CAPEXOperating Costs and ExpensesDebt Service Debt Raised Intercompany LoanContribution of Partners and Capital IncreaseEscrow AccountsCash and Cash Equivalents (2Q13)
Consolidated Cash (R$ million)
 Cash position impacted by:
• Full commercial capacity reached in Parnaíba I and Itaqui, resulting in higher revenues
• Increased costs resulting from unavailability charges and acquisition of energy to fulfill
contractual obligations
• Increased debt service resulting from higher debt position
• Additional debt raised to meet working capital needs and capex requirements
11
Installed Gross Generation Capacity and Status of Projects
under Construction (MW)
MPX’s power plants under construction: Pecém II, Parnaíba II, III and IV, totaling 1,114 MW of installed capacity:
• The implementation of Parnaíba II CCGT is underway according to schedule of PPA.
• Construction works at Parnaíba III have been completed and commissioning is expected to 3Q13, pending the
conclusion of the expansion of the capacity of the Gas Treatment Unit.
• Pecém II (365 MW): Commercial operation is now conditioned to the availability of the new 500kV
substation/transmission line under construction by Chesf/TDG
1,779
365
517 176 2,89356
2Q13 Pecém II Parnaíba II Parnaíba III Parnaíba IV 2014
12
Ongoing Regulatory Issues
 Discussions with ANEEL regarding hourly unavailability penalties vs 60-month moving average
unavailability criteria (ADOMP);
 Discussions with ANEEL regarding pass-through criteria for energy acquired;
 Possibility to increase firm energy of Pecém I and Itaqui by 10MW/each, reflecting contractual capacity of
360MW/each vs 350 MW registered in the energy auctions). New firm energy numbers should be
calculated by MME;
 Request filed at ANEEL so that appropriate treatment is given to Pecém II as the MPX cannot be held
liable for delays in transmission systems for which it is not responsible.
EXPLORATION
 In 2Q13, 5 new wells drilled by OGX, 3 of them are
wildcats*:
 Fazenda Alencar prospect (OGX-112): 22 meters of
net pay of gas discovered
 Fazenda Sossego prospect (OGX-114): 14 meters of
net pay of gas discovered
 Fazenda Havana prospect (OGX-115): In progress
 Additionally, 2 wildcat adjacent wells commenced to be
drilled:
 SE Bom Jesus (OGX-111), adjacent to Bom Jesus
(OGX-88): 20 meters of net pay of gas discovered
 NW Fazenda Chicote (OGX-113), adjacent to Fazenda
Chicote (OGX-107): Gas shows were found
*A wildcat well is the first well drilled on a new prospect.
13
Parnaíba Basin: Natural Gas E&P
GAS PRODUCTION AT GAVIÃO REAL
 Natural gas production supplies Parnaíba I OCGT’s four
gas turbines
 2Q13 Production Ramp-up
In May, average daily natural gas production decreased compared to
April due to a periodic intervention at the Gas Treatment Unit (GTU).
 In 2H13, GTU capacity will be expanded enabling the
startup of the Parnaíba III OCGT
4.1
3.9
4.5
April May June
Average Daily Natural Gas
Production (MMm³/day)
For more information, contact:
Investor Relations
(55 21) 2163-9215
ri.mpx@mpx.com.br

More Related Content

What's hot

3Q13 Presentation
 3Q13 Presentation 3Q13 Presentation
3Q13 PresentationCteep_ri
 
DTE_4Q07_earnings
DTE_4Q07_earningsDTE_4Q07_earnings
DTE_4Q07_earningsfinance41
 
1 q08 earnings call presentation
1 q08 earnings call presentation1 q08 earnings call presentation
1 q08 earnings call presentationAES Tietê
 
sempra energy 2001 Financial Report
sempra energy 2001 Financial Reportsempra energy 2001 Financial Report
sempra energy 2001 Financial Reportfinance24
 
progress energy Q1 04 earnings release
progress energy Q1 04 earnings releaseprogress energy Q1 04 earnings release
progress energy Q1 04 earnings releasefinance25
 
.integrysgroup company update
.integrysgroup company update.integrysgroup company update
.integrysgroup company updatefinance26
 
progress energy Q2 03 earnings release
progress energy Q2 03 earnings releaseprogress energy Q2 03 earnings release
progress energy Q2 03 earnings releasefinance25
 
clearchannel 290
clearchannel 290clearchannel 290
clearchannel 290finance31
 
EnergyEastQ22007EarningsRelease
EnergyEastQ22007EarningsReleaseEnergyEastQ22007EarningsRelease
EnergyEastQ22007EarningsReleasefinance40
 
The Stimulus Package And Energy Projects
The Stimulus Package And Energy ProjectsThe Stimulus Package And Energy Projects
The Stimulus Package And Energy ProjectsAndrew Ratzkin
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentationamereninvestors
 
Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011UCSD-Strategic-Energy
 
Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11Peterborough Telegraph
 
Opportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageOpportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageAndrew Ratzkin
 
Newjersey solar pres
Newjersey solar presNewjersey solar pres
Newjersey solar presmarzan
 

What's hot (17)

DTE_4Q07_ER
DTE_4Q07_ERDTE_4Q07_ER
DTE_4Q07_ER
 
3Q13 Presentation
 3Q13 Presentation 3Q13 Presentation
3Q13 Presentation
 
DTE_4Q07_earnings
DTE_4Q07_earningsDTE_4Q07_earnings
DTE_4Q07_earnings
 
1 q08 earnings call presentation
1 q08 earnings call presentation1 q08 earnings call presentation
1 q08 earnings call presentation
 
sempra energy 2001 Financial Report
sempra energy 2001 Financial Reportsempra energy 2001 Financial Report
sempra energy 2001 Financial Report
 
progress energy Q1 04 earnings release
progress energy Q1 04 earnings releaseprogress energy Q1 04 earnings release
progress energy Q1 04 earnings release
 
.integrysgroup company update
.integrysgroup company update.integrysgroup company update
.integrysgroup company update
 
Power sector presentation
Power sector presentationPower sector presentation
Power sector presentation
 
progress energy Q2 03 earnings release
progress energy Q2 03 earnings releaseprogress energy Q2 03 earnings release
progress energy Q2 03 earnings release
 
clearchannel 290
clearchannel 290clearchannel 290
clearchannel 290
 
EnergyEastQ22007EarningsRelease
EnergyEastQ22007EarningsReleaseEnergyEastQ22007EarningsRelease
EnergyEastQ22007EarningsRelease
 
The Stimulus Package And Energy Projects
The Stimulus Package And Energy ProjectsThe Stimulus Package And Energy Projects
The Stimulus Package And Energy Projects
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentation
 
Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011
 
Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11
 
Opportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus PackageOpportunities and Compliance Obligations under the Federal Stimulus Package
Opportunities and Compliance Obligations under the Federal Stimulus Package
 
Newjersey solar pres
Newjersey solar presNewjersey solar pres
Newjersey solar pres
 

Viewers also liked

Quarterly Earnings Apple Inc. Q1-2009
Quarterly Earnings Apple Inc. Q1-2009Quarterly Earnings Apple Inc. Q1-2009
Quarterly Earnings Apple Inc. Q1-2009Tom Feys
 
Quarterly earnings Coca-cola
Quarterly earnings Coca-colaQuarterly earnings Coca-cola
Quarterly earnings Coca-colaSilviedg
 
Yahoo! Q4 2012 Quarterly Earnings
Yahoo! Q4 2012 Quarterly EarningsYahoo! Q4 2012 Quarterly Earnings
Yahoo! Q4 2012 Quarterly EarningsKit Seeborg
 
Final q2 fy16 quarterly earnings presentation
Final q2 fy16 quarterly earnings presentationFinal q2 fy16 quarterly earnings presentation
Final q2 fy16 quarterly earnings presentationrockwell_collins
 
CONE Midstream Quarterly Earnings Presentation - May 5, 2016
CONE Midstream Quarterly Earnings Presentation - May 5, 2016CONE Midstream Quarterly Earnings Presentation - May 5, 2016
CONE Midstream Quarterly Earnings Presentation - May 5, 2016Marcellus Drilling News
 
1Q11 Earnings Release Presentation
1Q11 Earnings Release Presentation1Q11 Earnings Release Presentation
1Q11 Earnings Release Presentationbrproperties
 
Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo...
 	Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo... 	Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo...
Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo...finance2
 

Viewers also liked (8)

Quarterly Earnings Apple Inc. Q1-2009
Quarterly Earnings Apple Inc. Q1-2009Quarterly Earnings Apple Inc. Q1-2009
Quarterly Earnings Apple Inc. Q1-2009
 
Quarterly earnings Coca-cola
Quarterly earnings Coca-colaQuarterly earnings Coca-cola
Quarterly earnings Coca-cola
 
Yahoo! Q4 2012 Quarterly Earnings
Yahoo! Q4 2012 Quarterly EarningsYahoo! Q4 2012 Quarterly Earnings
Yahoo! Q4 2012 Quarterly Earnings
 
Final q2 fy16 quarterly earnings presentation
Final q2 fy16 quarterly earnings presentationFinal q2 fy16 quarterly earnings presentation
Final q2 fy16 quarterly earnings presentation
 
CONE Midstream Quarterly Earnings Presentation - May 5, 2016
CONE Midstream Quarterly Earnings Presentation - May 5, 2016CONE Midstream Quarterly Earnings Presentation - May 5, 2016
CONE Midstream Quarterly Earnings Presentation - May 5, 2016
 
1Q11 Earnings Release Presentation
1Q11 Earnings Release Presentation1Q11 Earnings Release Presentation
1Q11 Earnings Release Presentation
 
PLANIFICACIÓN
PLANIFICACIÓNPLANIFICACIÓN
PLANIFICACIÓN
 
Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo...
 	Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo... 	Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo...
Verizon Reports Sustained Revenue Growth and Continued Strong Cash Flows fo...
 

Similar to 2Q13 Earnings Release Presentation

Earnings release 2Q14
Earnings release 2Q14Earnings release 2Q14
Earnings release 2Q14ersa_ri
 
Earnings release 3 q14_final
Earnings release 3 q14_finalEarnings release 3 q14_final
Earnings release 3 q14_finalCPFL RI
 
MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX_RI
 
Contract Availability for LRET Development
Contract Availability for LRET DevelopmentContract Availability for LRET Development
Contract Availability for LRET DevelopmentSimon Mathis
 
01 11-18 evercore isi utilities ceo retreat final
01 11-18 evercore isi utilities ceo retreat final01 11-18 evercore isi utilities ceo retreat final
01 11-18 evercore isi utilities ceo retreat finalAES_BigSky
 
Earnings release 1Q14
Earnings release 1Q14Earnings release 1Q14
Earnings release 1Q14ersa_ri
 
1Q13 Results Presentation
1Q13 Results Presentation1Q13 Results Presentation
1Q13 Results PresentationMPX_RI
 
public serviceenterprise group Investor 06//17/06
public serviceenterprise group Investor 06//17/06public serviceenterprise group Investor 06//17/06
public serviceenterprise group Investor 06//17/06finance20
 
Apresentação de resultados eng final
Apresentação de resultados eng finalApresentação de resultados eng final
Apresentação de resultados eng finalcesarkomoti
 
11 03-17 eei final
11 03-17 eei final11 03-17 eei final
11 03-17 eei finalAES_BigSky
 
.integrysgroup 02/26/2009_slides
.integrysgroup  02/26/2009_slides.integrysgroup  02/26/2009_slides
.integrysgroup 02/26/2009_slidesfinance26
 
11 06-14 third quarter 2014 financial review final
11 06-14 third quarter 2014 financial review final11 06-14 third quarter 2014 financial review final
11 06-14 third quarter 2014 financial review finalAES_BigSky
 
ACCIONA Results Presentation H1 2020
ACCIONA Results Presentation H1 2020ACCIONA Results Presentation H1 2020
ACCIONA Results Presentation H1 2020acciona
 
AES Q1 2017 Financial Review
AES Q1 2017 Financial ReviewAES Q1 2017 Financial Review
AES Q1 2017 Financial ReviewAES_BigSky
 
2014 Second Quarter Financial Review
2014 Second Quarter Financial Review2014 Second Quarter Financial Review
2014 Second Quarter Financial ReviewAES_BigSky
 
02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review finalAES_BigSky
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBanaDurga
 
05 08-17 first quarter 2017 financial review final
05 08-17 first quarter 2017 financial review final05 08-17 first quarter 2017 financial review final
05 08-17 first quarter 2017 financial review finalAES_BigSky
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation engMPX_RI
 
05 11-15 first quarter 2015 financial review final
05 11-15 first quarter 2015 financial review final05 11-15 first quarter 2015 financial review final
05 11-15 first quarter 2015 financial review finalAES_BigSky
 

Similar to 2Q13 Earnings Release Presentation (20)

Earnings release 2Q14
Earnings release 2Q14Earnings release 2Q14
Earnings release 2Q14
 
Earnings release 3 q14_final
Earnings release 3 q14_finalEarnings release 3 q14_final
Earnings release 3 q14_final
 
MPX Corporate Presentation (July)
MPX Corporate Presentation (July)MPX Corporate Presentation (July)
MPX Corporate Presentation (July)
 
Contract Availability for LRET Development
Contract Availability for LRET DevelopmentContract Availability for LRET Development
Contract Availability for LRET Development
 
01 11-18 evercore isi utilities ceo retreat final
01 11-18 evercore isi utilities ceo retreat final01 11-18 evercore isi utilities ceo retreat final
01 11-18 evercore isi utilities ceo retreat final
 
Earnings release 1Q14
Earnings release 1Q14Earnings release 1Q14
Earnings release 1Q14
 
1Q13 Results Presentation
1Q13 Results Presentation1Q13 Results Presentation
1Q13 Results Presentation
 
public serviceenterprise group Investor 06//17/06
public serviceenterprise group Investor 06//17/06public serviceenterprise group Investor 06//17/06
public serviceenterprise group Investor 06//17/06
 
Apresentação de resultados eng final
Apresentação de resultados eng finalApresentação de resultados eng final
Apresentação de resultados eng final
 
11 03-17 eei final
11 03-17 eei final11 03-17 eei final
11 03-17 eei final
 
.integrysgroup 02/26/2009_slides
.integrysgroup  02/26/2009_slides.integrysgroup  02/26/2009_slides
.integrysgroup 02/26/2009_slides
 
11 06-14 third quarter 2014 financial review final
11 06-14 third quarter 2014 financial review final11 06-14 third quarter 2014 financial review final
11 06-14 third quarter 2014 financial review final
 
ACCIONA Results Presentation H1 2020
ACCIONA Results Presentation H1 2020ACCIONA Results Presentation H1 2020
ACCIONA Results Presentation H1 2020
 
AES Q1 2017 Financial Review
AES Q1 2017 Financial ReviewAES Q1 2017 Financial Review
AES Q1 2017 Financial Review
 
2014 Second Quarter Financial Review
2014 Second Quarter Financial Review2014 Second Quarter Financial Review
2014 Second Quarter Financial Review
 
02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final02 24-16 fourth quarter & fy 2015 financial review final
02 24-16 fourth quarter & fy 2015 financial review final
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
05 08-17 first quarter 2017 financial review final
05 08-17 first quarter 2017 financial review final05 08-17 first quarter 2017 financial review final
05 08-17 first quarter 2017 financial review final
 
Mpx corp presentation eng
Mpx corp presentation engMpx corp presentation eng
Mpx corp presentation eng
 
05 11-15 first quarter 2015 financial review final
05 11-15 first quarter 2015 financial review final05 11-15 first quarter 2015 financial review final
05 11-15 first quarter 2015 financial review final
 

More from MPX_RI

MPX Corporate Presentation (September)
MPX Corporate Presentation (September)MPX Corporate Presentation (September)
MPX Corporate Presentation (September)MPX_RI
 
MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)MPX_RI
 
Mpx corporate presentation (august)
Mpx corporate presentation (august)Mpx corporate presentation (august)
Mpx corporate presentation (august)MPX_RI
 
Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)MPX_RI
 
Apresentação de Resultados 2T13
Apresentação de Resultados 2T13Apresentação de Resultados 2T13
Apresentação de Resultados 2T13MPX_RI
 
MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)MPX_RI
 
Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013MPX_RI
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13MPX_RI
 
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...MPX_RI
 
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
 Definitive Agreements between the Controlling Shareholder and E.ON, and Capi... Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...MPX_RI
 
4Q12 MPX Results
4Q12 MPX Results4Q12 MPX Results
4Q12 MPX ResultsMPX_RI
 
4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPX4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPXMPX_RI
 
MPX Corporate Presentation February
MPX Corporate Presentation FebruaryMPX Corporate Presentation February
MPX Corporate Presentation FebruaryMPX_RI
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroMPX_RI
 
MPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiroMPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiroMPX_RI
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroMPX_RI
 
Apresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiroApresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiroMPX_RI
 
Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5MPX_RI
 
Mpx 4 t12_port_v5
Mpx 4 t12_port_v5Mpx 4 t12_port_v5
Mpx 4 t12_port_v5MPX_RI
 
Teleconference 4Q12
Teleconference 4Q12Teleconference 4Q12
Teleconference 4Q12MPX_RI
 

More from MPX_RI (20)

MPX Corporate Presentation (September)
MPX Corporate Presentation (September)MPX Corporate Presentation (September)
MPX Corporate Presentation (September)
 
MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)MPX Apresentação Corporativa (Setembro)
MPX Apresentação Corporativa (Setembro)
 
Mpx corporate presentation (august)
Mpx corporate presentation (august)Mpx corporate presentation (august)
Mpx corporate presentation (august)
 
Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)Mpx apresentação corporativa (agosto)
Mpx apresentação corporativa (agosto)
 
Apresentação de Resultados 2T13
Apresentação de Resultados 2T13Apresentação de Resultados 2T13
Apresentação de Resultados 2T13
 
MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)MPX Apresentação Corporativa (Julho)
MPX Apresentação Corporativa (Julho)
 
Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013Apresentação Corporativa MPX - Maio 2013
Apresentação Corporativa MPX - Maio 2013
 
Apresentação Resultados 1T13
Apresentação Resultados 1T13Apresentação Resultados 1T13
Apresentação Resultados 1T13
 
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
Acordos Definitivos entre o Acionista Controlador e a E.ON e Capitalização da...
 
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
 Definitive Agreements between the Controlling Shareholder and E.ON, and Capi... Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
Definitive Agreements between the Controlling Shareholder and E.ON, and Capi...
 
4Q12 MPX Results
4Q12 MPX Results4Q12 MPX Results
4Q12 MPX Results
 
4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPX4T12 Apresentação Resultados MPX
4T12 Apresentação Resultados MPX
 
MPX Corporate Presentation February
MPX Corporate Presentation FebruaryMPX Corporate Presentation February
MPX Corporate Presentation February
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - Fevereiro
 
MPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiroMPX CORPORATE corporate presentation fevereiro
MPX CORPORATE corporate presentation fevereiro
 
Apresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - FevereiroApresentação Corporativa MPX - Fevereiro
Apresentação Corporativa MPX - Fevereiro
 
Apresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiroApresentação corporativa mpx fevereiro
Apresentação corporativa mpx fevereiro
 
Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5Mpx 4 t12_inglês_v5
Mpx 4 t12_inglês_v5
 
Mpx 4 t12_port_v5
Mpx 4 t12_port_v5Mpx 4 t12_port_v5
Mpx 4 t12_port_v5
 
Teleconference 4Q12
Teleconference 4Q12Teleconference 4Q12
Teleconference 4Q12
 

Recently uploaded

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...lizamodels9
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 

Recently uploaded (20)

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 

2Q13 Earnings Release Presentation

  • 1. 2Q13 Earnings Release Rio de Janeiro | August, 2013
  • 2. Disclaimer The material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries (collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the accuracy, fairness, or completeness of this information. This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views and/or expectations of the Company and its management with respect to its performance, business and future events. Forward looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results, performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans, objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including investors) for any investment or business decision made or action taken in reliance on the information and statements contained in this presentation or for any consequential, special or similar damages. This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities. Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever. Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own advisors in this regard. The market and competitive position data, including market forecasts, used throughout this presentation were obtained from internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe that any of this information or these reports are inaccurate in any material respect, we have not independently verified the competitive position, market share, market size, market growth or other data provided by third parties or by industry or other publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such information. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MPX’s prior written consent. 2
  • 3. 2Q13 Highlights & Subsequent Events 3 Financial & Operational Highlights:  Commercial gross generation capacity reached 1,779 MW;  Additional 1,114 MW currently under construction;  Generation net revenues amounted to R$ 508.6 million;  Production of natural gas in the Panaíba basin reached R$ 4.5 MMm3/day. Changes in the Controlling Group:  E.ON increased its interest to 36.2% and joined Mr. Eike Batista in the Company’s controlling group  Mr. Eike Batista reduced his stake to 29% and resigned as member and Chairman of the Board
  • 4. Share Capital Increase 4 MPX Shareholding Structure as of June 30, 2012 36.2% 29.0% EIKE BATISTA FREE FLOAT 34.8% ~38% ~24% EIKE BATISTA FREE FLOAT ~38% MPX Indicative Shareholding Structure after the Capital Increase  A R$ 800 million private capital increase was approved by the Board of Directors on July 03;  81,235,437 newly-issued common shares, equivalent to approximately R$ 524 million, were subscribed and paid-in during the Initial Preemptive Right Period, which ended on Aug 8;  The First Additional Subscription Period begins on Aug 14 and will end on Aug 16. Obs: Assuming no subscription by Eike Batista and R$ 366.7 million by E.ON
  • 5. Revenues & Costs 5 196.1 395.1 1Q13 2Q13 Net Operating Revenues (R$ MM) 101.5% 312.6 418.3 1Q13 2Q13 33.8% Operating Costs (R$ MM) Net Operating Revenues: + 101.5% vs. 1Q13 resulting from increased commercial capacity • Itaqui: The plant has stabilized during the quarter. In the beginning of April the plant started being remunerated according to its total capacity. • Parnaíba I: Achieved full commercial capacity in early April. Operating Costs: + 33.8% vs. 1Q13 • Increased fuel costs resulting from full capacity operation of Parnaíba I • Decreasing needs for energy acquisition • Unavailability charges impacted by: • In May, Itaqui stopped to adjust ventilation system (R$ 41.2 MM) and Parnaíba I stopped to conduct repairs in the substation (R$ 19.6 MM) • Operations have been stable in both plants since then
  • 6. Operational Performance 6  Decreasing need to acquire energy to fulfill contractual obligations  In June, Pecém II had to purchase energy to ensure compliance with PPA. The plant has completed all electrical tests required by ONS and commercial operation is now conditional to the availability of the transmission system under construction by Chesf/TDG 0 100 200 300 400 500 600 700 800 900 Jan Feb Mar Apr May Jun Net Energy Produced (GWh) Energy sold (GWh)
  • 7. 48.3 42.0 2Q12 2Q13 Operating Expenses 7 Operating Expenses: - 13.1% vs. 2Q12  Personnel: - 14.8%, mainly attributable to:  Optimization of administrative and operating teams (- R$ 0.4 million)  Reduction of personnel expenses resulting from the spin-off of the Colombian mining assets (-R$ 2.9 million)  Outsourced Services: -8.2%, mainly attributable to :  Shared services in the holding company, resulting from the reduction of EBX’s service structure (-R$ 4.4 million)  Increase in IT expenses (+R$ 2.7 million)  Leases and Rents: -37.0%, mainly attributable to reduced real estate rental expenses at the holding level (-R$ 1.2 million)  Other Expenses: -31.3%, mainly attributable to a decrease in publicity and advertising expenses at the holding level (-R$ 1.1 million) Consolidated Operating Expenses (R$ MM) - 13.1%
  • 8. Consolidated EBITDA 8 2Q13 Reported vs Adjusted EBITDA (R$ MM) The Consolidated EBITDA does not include the Pecém I results. -38.6 50.3 10.3 69.5 9.0 2Q13 Consolidated EBITDA Net costs related to the acquisition of energy Unavailability charges Startup costs 2Q13 Consolidated Adjusted EBITDA  Adjusted EBITDA in 2Q13 would amount to R$ 50.3 million, mainly due to: • Elimination of net losses resulting from the acquisition of energy to fulfill contractual obligations • Elimination of unavailability charges stemming from maintenance stoppages • Adjustment of diesel consumption so as to eliminate increased start-up costs
  • 9. 9 Debt Consolidated gross debt profile (R$ million) 2,651 46% 3,082 54% Short Term Long Term 2,651 1,121 1,530 Project Holding Short Term Debt (R$ million) 100 350 Paid-off by capital increase Project debentures 1,080 LT debentures at holding Short Term Debt (2Q13):  R$ 1,121.5 million at project level: • R$ 845.2 million refer to outstanding bridge-loans to Parnaíba I & II power plants  to be paid-off with draw down from long-term financing. • R$ 276.2 million refer to current portion of the project finance debts of Pecém II, Itaqui and Parnaíba I  MPX holding plans to eliminate outstanding intercompany loans with its subsidiaries through the issue of LT tax- advantaged infrastructure debentures at project level with subsequent use of funds to pay-off loans  The remaining short-term debt balance at the holding level will be replaced by a long-term debenture, with an estimated 5 to 7-year maturity Total: R$ 5,733 MM
  • 10. 10 Cash Position 364.7 282.3 263.1 218.2 175.8 237.4 64.2 6.4 20.0 149.5 Cash and Cash Equivalents (1Q13)Revenues CAPEXOperating Costs and ExpensesDebt Service Debt Raised Intercompany LoanContribution of Partners and Capital IncreaseEscrow AccountsCash and Cash Equivalents (2Q13) Consolidated Cash (R$ million)  Cash position impacted by: • Full commercial capacity reached in Parnaíba I and Itaqui, resulting in higher revenues • Increased costs resulting from unavailability charges and acquisition of energy to fulfill contractual obligations • Increased debt service resulting from higher debt position • Additional debt raised to meet working capital needs and capex requirements
  • 11. 11 Installed Gross Generation Capacity and Status of Projects under Construction (MW) MPX’s power plants under construction: Pecém II, Parnaíba II, III and IV, totaling 1,114 MW of installed capacity: • The implementation of Parnaíba II CCGT is underway according to schedule of PPA. • Construction works at Parnaíba III have been completed and commissioning is expected to 3Q13, pending the conclusion of the expansion of the capacity of the Gas Treatment Unit. • Pecém II (365 MW): Commercial operation is now conditioned to the availability of the new 500kV substation/transmission line under construction by Chesf/TDG 1,779 365 517 176 2,89356 2Q13 Pecém II Parnaíba II Parnaíba III Parnaíba IV 2014
  • 12. 12 Ongoing Regulatory Issues  Discussions with ANEEL regarding hourly unavailability penalties vs 60-month moving average unavailability criteria (ADOMP);  Discussions with ANEEL regarding pass-through criteria for energy acquired;  Possibility to increase firm energy of Pecém I and Itaqui by 10MW/each, reflecting contractual capacity of 360MW/each vs 350 MW registered in the energy auctions). New firm energy numbers should be calculated by MME;  Request filed at ANEEL so that appropriate treatment is given to Pecém II as the MPX cannot be held liable for delays in transmission systems for which it is not responsible.
  • 13. EXPLORATION  In 2Q13, 5 new wells drilled by OGX, 3 of them are wildcats*:  Fazenda Alencar prospect (OGX-112): 22 meters of net pay of gas discovered  Fazenda Sossego prospect (OGX-114): 14 meters of net pay of gas discovered  Fazenda Havana prospect (OGX-115): In progress  Additionally, 2 wildcat adjacent wells commenced to be drilled:  SE Bom Jesus (OGX-111), adjacent to Bom Jesus (OGX-88): 20 meters of net pay of gas discovered  NW Fazenda Chicote (OGX-113), adjacent to Fazenda Chicote (OGX-107): Gas shows were found *A wildcat well is the first well drilled on a new prospect. 13 Parnaíba Basin: Natural Gas E&P GAS PRODUCTION AT GAVIÃO REAL  Natural gas production supplies Parnaíba I OCGT’s four gas turbines  2Q13 Production Ramp-up In May, average daily natural gas production decreased compared to April due to a periodic intervention at the Gas Treatment Unit (GTU).  In 2H13, GTU capacity will be expanded enabling the startup of the Parnaíba III OCGT 4.1 3.9 4.5 April May June Average Daily Natural Gas Production (MMm³/day)
  • 14. For more information, contact: Investor Relations (55 21) 2163-9215 ri.mpx@mpx.com.br