SlideShare uma empresa Scribd logo
1 de 14
Baixar para ler offline
PPS6 EDEN
Introduction to the first
       workshop

      IST – Luke Murray


   PPS6 EDEN first workshop, Porto, 28 March 2007
By way of introduction

• Overview of key background information
  and policy relating to hydrogen and fuel
  cell technoloy development in EU & PT
• Aims of PPS6 project and today’s
  workshop
• Outline of the morning’s workshop
• Ice Breaker!!!
           PPS6 EDEN first workshop, Porto, 28 March 2007
EU energy policy goals

•   Security of EU energy supply
•   Reduction of EU greenhouse gases
    and pollutant emissions (Kyoto and
    beyond)
•   Improve EU industrial competitiveness



          PPS6 EDEN first workshop, Porto, 28 March 2007
Key challenges: EU
            energy scenarios

• Average annual growth rate of 1.8% global primary
energy consumption between 2020 and 2030
• CO emissions from developing countries will count for
more than ½ total by 2030
• EU energy dependency from 50% to 70% by 2030,
causing volatility of oil prices and geopolitical instability
• Global energy investments of € 12 trillion required up
to 2030 – a huge opportunity for EU industry



               PPS6 EDEN first workshop, Porto, 28 March 2007
Importance of hydrogen
       and fuel cells in the EU

An integrated hydrogen and fuel cell infrastructure will
     respond to key EU challenges:
•   Security of supply
    - oil peak production/ geopolitical issues
•   Environmental concerns
    - climate change and local pollution
•   EU Competitiveness
    - a potentially huge market = investment, growth, jobs

               PPS6 EDEN first workshop, Porto, 28 March 2007
Paradigm shift


In 2002 the EC declared that the deployment of a
fully integrated hydrogen infrastructure in the coming
decades is one of its chief priorities in the energy
field.




              PPS6 EDEN first workshop, Porto, 28 March 2007
Strategic overview:
          realising the EU vision

1.   Market penetration phases:
     –   2006/7/8: Small portable sector, driven by the added functionality
         (compared to rechargeable batteries – SRE)
     –   2010: Early markets for domestic heat and electricity generation
     –   2010 – 2015: Larger stationary fuel cell CHP systems.
     –   Before 2020: Roll-out of mass hydrogen fuelled road transport.
     Market enabling factors need to be put in place:
2.
     –   Trained scientists and engineers
     –   Widespread public acceptance of a new fuel
     –   Incentives to ensure affordability whilst the economies of large-scale
         production build-up
3.   A substantial, combined public-private-partnership is
     required to implement this vision.

                  PPS6 EDEN first workshop, Porto, 28 March 2007
EU Initiatives

• H2 / FC Technology Platform
–   EU vision & structure
–   new & on-going projects & initiatives
–   strategic research agenda & implementation plan
–   2007 – 2013 implementation and action plan in action
• Joint Technology Initiative
– build industry and public confidence through long-term shared
 commitment and well-channelled investment
– Oct 2006: signed by 45 companies and 130 letters of intent
– € 6 billion of investment into the sector pledged



             PPS6 EDEN first workshop, Porto, 28 March 2007
Portugal energy policy
          goals

• Improving security of supply

• Promoting economic competition

• Ensuring environmental sustainability




        PPS6 EDEN first workshop, Porto, 28 March 2007
Key challenges Portugal
       energy scenarios

• Energy consumption is non-productive, demand
  rising exponentially without corresponding growth
  in the economy
• Plans to meet the UNFCCC obligations as set out
  by the PNAC proving difficult to meet. What
  happens in the post-Kyoto period?
• High oil, coal and natural gas import dependency.
• Challenging government led targets for RES –
  39% of electricity production by 2010



           PPS6 EDEN first workshop, Porto, 28 March 2007
Importance of hydrogen
       and fuel cells in Portugal
An integrated hydrogen and fuel cell infrastructure
has potential to respond to Portugal challenges:
• Security   of supply
      - import dependence
      - maintain diverse energy portfolio through the use of high RES
      potential

•PT competitiveness
      - a potentially huge market = investment, growth, jobs
      - opportunity for Portugal’s economy?

• Environmental      concerns
      - EU and Kyoto emissions constraints and local pollution

                   PPS6 EDEN first workshop, Porto, 28 March 2007
Aims

PPS6 EDEN Project:
To create a policy & technology roadmap for
the development of hydrogen and fuel cell
technologies in Portugal.
First Workshop:
To develop a consensus vision for hydrogen
and fuel cell development in Portugal until
2050.

            PPS6 EDEN first workshop, Porto, 28 March 2007
First Workshop outline

• Introduction
• Vision development
• Hydrogen pathways development
• Review & Project overview
• Informal networking lunch afterwards

           PPS6 EDEN first workshop, Porto, 28 March 2007
Ice Breaker

• Need to get a signature/ initials from a
  different person who has completed the
  action in each box
• 10 minutes
• Free 50kw PEM fuel cell system from SRE
  for the person with the most initials!

           PPS6 EDEN first workshop, Porto, 28 March 2007

Mais conteúdo relacionado

Mais procurados

Energy policy of the european union (1)
Energy policy of the european union (1)Energy policy of the european union (1)
Energy policy of the european union (1)
Julia Katsarova
 
German wind energy_assotiation
German wind energy_assotiationGerman wind energy_assotiation
German wind energy_assotiation
Ahmad Eid
 

Mais procurados (20)

Boosting building renovation: what potential and value for Europe?
Boosting building renovation: what potential and value for Europe?Boosting building renovation: what potential and value for Europe?
Boosting building renovation: what potential and value for Europe?
 
2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy
 
COGEN Europe presentation: Micro-CHP overview at EU level
COGEN Europe presentation: Micro-CHP overview at EU levelCOGEN Europe presentation: Micro-CHP overview at EU level
COGEN Europe presentation: Micro-CHP overview at EU level
 
Presentation 5 Slides - Oscar Miguel - EGVIA CIDETEC
Presentation 5 Slides - Oscar Miguel - EGVIA CIDETECPresentation 5 Slides - Oscar Miguel - EGVIA CIDETEC
Presentation 5 Slides - Oscar Miguel - EGVIA CIDETEC
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growth
 
European union policy for renewable sourse
European union policy for renewable sourseEuropean union policy for renewable sourse
European union policy for renewable sourse
 
Uk 2
Uk 2Uk 2
Uk 2
 
Netherlands energy efficiency programme
Netherlands energy efficiency programmeNetherlands energy efficiency programme
Netherlands energy efficiency programme
 
LNG overview the Netherlands
LNG overview the NetherlandsLNG overview the Netherlands
LNG overview the Netherlands
 
Gccsi japan members'_meeting_200613_juho-lipponen_iea
Gccsi japan members'_meeting_200613_juho-lipponen_ieaGccsi japan members'_meeting_200613_juho-lipponen_iea
Gccsi japan members'_meeting_200613_juho-lipponen_iea
 
EDEN -Projectoverview
EDEN -ProjectoverviewEDEN -Projectoverview
EDEN -Projectoverview
 
Ace
AceAce
Ace
 
ETP SG General Assembly leading to ETIP SmartGrids and Storage: 'Smart, adap...
ETP SG General Assembly leading to  ETIP SmartGrids and Storage: 'Smart, adap...ETP SG General Assembly leading to  ETIP SmartGrids and Storage: 'Smart, adap...
ETP SG General Assembly leading to ETIP SmartGrids and Storage: 'Smart, adap...
 
Energy policy of the european union (1)
Energy policy of the european union (1)Energy policy of the european union (1)
Energy policy of the european union (1)
 
EU REP5 Project
EU REP5 ProjectEU REP5 Project
EU REP5 Project
 
German wind energy_assotiation
German wind energy_assotiationGerman wind energy_assotiation
German wind energy_assotiation
 
Hydrogen, fuel cells and Electro-mobility in European Regions
Hydrogen, fuel cells and  Electro-mobility in European Regions Hydrogen, fuel cells and  Electro-mobility in European Regions
Hydrogen, fuel cells and Electro-mobility in European Regions
 
Energy and macro-economic effects of decentralisation trends in the European ...
Energy and macro-economic effects of decentralisation trends in the European ...Energy and macro-economic effects of decentralisation trends in the European ...
Energy and macro-economic effects of decentralisation trends in the European ...
 
Session 1 daniel jansen ecn_cenii
Session 1 daniel jansen ecn_ceniiSession 1 daniel jansen ecn_cenii
Session 1 daniel jansen ecn_cenii
 
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and ResultsSecond Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
Second Ukrainian NDC to the Paris Agreement: Modelling Approach and Results
 

Semelhante a Eden Pps6 1 Introdu O Ao Evento Luke Murray

Inauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacionalInauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacional
kubikbytecnalia
 
ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...
ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...
ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...
Maghrenov
 
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
RCREEE
 

Semelhante a Eden Pps6 1 Introdu O Ao Evento Luke Murray (20)

Susanna Galloni - R&D in Geothermal Energy
Susanna Galloni - R&D in Geothermal Energy Susanna Galloni - R&D in Geothermal Energy
Susanna Galloni - R&D in Geothermal Energy
 
Inauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacionalInauguracion kubik campos_isoird_visioninternacional
Inauguracion kubik campos_isoird_visioninternacional
 
2016 03 02 cogen europe ppt_hungary
2016 03 02 cogen europe ppt_hungary2016 03 02 cogen europe ppt_hungary
2016 03 02 cogen europe ppt_hungary
 
ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...
ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...
ESFRI ENE-SW by Pilar García - Maghrenov workshop on research infrastructure...
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
 
The European Commission's science and knowledge service
The European Commission's science and knowledge service The European Commission's science and knowledge service
The European Commission's science and knowledge service
 
Solving the finance conundrum affecting innovative renewable energy technologies
Solving the finance conundrum affecting innovative renewable energy technologiesSolving the finance conundrum affecting innovative renewable energy technologies
Solving the finance conundrum affecting innovative renewable energy technologies
 
EC POLICY UPDATE ON RESEARCH AND INNOVATION ON CCUS
EC POLICY UPDATE ON RESEARCH AND INNOVATION ON CCUSEC POLICY UPDATE ON RESEARCH AND INNOVATION ON CCUS
EC POLICY UPDATE ON RESEARCH AND INNOVATION ON CCUS
 
Janez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatJanez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community Secretariat
 
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
Session1 eu policy_initiatives_to_promote_re_based_electricity_generation_in_...
 
The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)
 
Vassilios Kougionas.pptx
Vassilios Kougionas.pptxVassilios Kougionas.pptx
Vassilios Kougionas.pptx
 
A NEW ENERGY ERA - Renewable Energy and Energy Efficiency in Portugal by Manu...
A NEW ENERGY ERA - Renewable Energy and Energy Efficiency in Portugal by Manu...A NEW ENERGY ERA - Renewable Energy and Energy Efficiency in Portugal by Manu...
A NEW ENERGY ERA - Renewable Energy and Energy Efficiency in Portugal by Manu...
 
The energy policy of the European Union, targets 2030 - Andreas Pilzecker
The energy policy of the European Union, targets 2030 - Andreas PilzeckerThe energy policy of the European Union, targets 2030 - Andreas Pilzecker
The energy policy of the European Union, targets 2030 - Andreas Pilzecker
 
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
The Important Role of Nuclear in a Low-Carbon World - The view of the ENS Hig...
 
Europeanbldgchallengesmar142014
Europeanbldgchallengesmar142014Europeanbldgchallengesmar142014
Europeanbldgchallengesmar142014
 
START FLYER
START FLYERSTART FLYER
START FLYER
 
Biogas In Poland
Biogas In PolandBiogas In Poland
Biogas In Poland
 
From Ugly Duckling to Superstar: how energy efficiency (almost) got to the to...
From Ugly Duckling to Superstar: how energy efficiency (almost) got to the to...From Ugly Duckling to Superstar: how energy efficiency (almost) got to the to...
From Ugly Duckling to Superstar: how energy efficiency (almost) got to the to...
 

Mais de h2portugal

Lisbon Statement On Hydrogen
Lisbon Statement On HydrogenLisbon Statement On Hydrogen
Lisbon Statement On Hydrogen
h2portugal
 
Eden Pps6 Profiling Report Portugal Draft 1
Eden Pps6 Profiling Report   Portugal   Draft 1Eden Pps6 Profiling Report   Portugal   Draft 1
Eden Pps6 Profiling Report Portugal Draft 1
h2portugal
 

Mais de h2portugal (20)

Lisbon Statement On Hydrogen
Lisbon Statement On HydrogenLisbon Statement On Hydrogen
Lisbon Statement On Hydrogen
 
Weto H2 2050 Com Europeia Jan07[1]
Weto H2 2050 Com Europeia Jan07[1]Weto H2 2050 Com Europeia Jan07[1]
Weto H2 2050 Com Europeia Jan07[1]
 
Final Programme Hypothesisviii.Doc[1]
Final Programme Hypothesisviii.Doc[1]Final Programme Hypothesisviii.Doc[1]
Final Programme Hypothesisviii.Doc[1]
 
Workshop Ap2 H2 Conclusoes
Workshop Ap2 H2   ConclusoesWorkshop Ap2 H2   Conclusoes
Workshop Ap2 H2 Conclusoes
 
EDEN - Tarefa E 3.7 Purificacao
EDEN - Tarefa E 3.7 PurificacaoEDEN - Tarefa E 3.7 Purificacao
EDEN - Tarefa E 3.7 Purificacao
 
EDEN - Tarefa E3 6 Termolise
EDEN - Tarefa E3 6 TermoliseEDEN - Tarefa E3 6 Termolise
EDEN - Tarefa E3 6 Termolise
 
EDEN - Scoping Report Eden V1
EDEN - Scoping Report Eden V1EDEN - Scoping Report Eden V1
EDEN - Scoping Report Eden V1
 
EDEN - Regulamento Senergia
EDEN - Regulamento SenergiaEDEN - Regulamento Senergia
EDEN - Regulamento Senergia
 
EDEN - Reciclagem 57 Pps2 26 04 2007
EDEN - Reciclagem  57  Pps2 26 04 2007EDEN - Reciclagem  57  Pps2 26 04 2007
EDEN - Reciclagem 57 Pps2 26 04 2007
 
EDEN - Portugal Vision 28 05 07
EDEN - Portugal Vision 28 05 07EDEN - Portugal Vision 28 05 07
EDEN - Portugal Vision 28 05 07
 
EDEN - Pps2 26 04 2007
EDEN - Pps2 26 04 2007EDEN - Pps2 26 04 2007
EDEN - Pps2 26 04 2007
 
EDEN - Pps6 Eden Project Description
EDEN - Pps6 Eden Project DescriptionEDEN - Pps6 Eden Project Description
EDEN - Pps6 Eden Project Description
 
EDEN - Minuta 2workshop
EDEN - Minuta 2workshopEDEN - Minuta 2workshop
EDEN - Minuta 2workshop
 
EDEN - Kcam
EDEN - KcamEDEN - Kcam
EDEN - Kcam
 
EDEN - Lucis Project
EDEN - Lucis ProjectEDEN - Lucis Project
EDEN - Lucis Project
 
EDEN - Formularioinscricao10
EDEN - Formularioinscricao10EDEN - Formularioinscricao10
EDEN - Formularioinscricao10
 
Folheto Web Eden
Folheto Web EdenFolheto Web Eden
Folheto Web Eden
 
Eden Pps 2
Eden Pps 2Eden Pps 2
Eden Pps 2
 
Eden Pps6 Workshop Agenda
Eden Pps6 Workshop AgendaEden Pps6 Workshop Agenda
Eden Pps6 Workshop Agenda
 
Eden Pps6 Profiling Report Portugal Draft 1
Eden Pps6 Profiling Report   Portugal   Draft 1Eden Pps6 Profiling Report   Portugal   Draft 1
Eden Pps6 Profiling Report Portugal Draft 1
 

Último

Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
panagenda
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
UXDXConf
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
UK Journal
 

Último (20)

How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
Your enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4jYour enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4j
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 

Eden Pps6 1 Introdu O Ao Evento Luke Murray

  • 1. PPS6 EDEN Introduction to the first workshop IST – Luke Murray PPS6 EDEN first workshop, Porto, 28 March 2007
  • 2. By way of introduction • Overview of key background information and policy relating to hydrogen and fuel cell technoloy development in EU & PT • Aims of PPS6 project and today’s workshop • Outline of the morning’s workshop • Ice Breaker!!! PPS6 EDEN first workshop, Porto, 28 March 2007
  • 3. EU energy policy goals • Security of EU energy supply • Reduction of EU greenhouse gases and pollutant emissions (Kyoto and beyond) • Improve EU industrial competitiveness PPS6 EDEN first workshop, Porto, 28 March 2007
  • 4. Key challenges: EU energy scenarios • Average annual growth rate of 1.8% global primary energy consumption between 2020 and 2030 • CO emissions from developing countries will count for more than ½ total by 2030 • EU energy dependency from 50% to 70% by 2030, causing volatility of oil prices and geopolitical instability • Global energy investments of € 12 trillion required up to 2030 – a huge opportunity for EU industry PPS6 EDEN first workshop, Porto, 28 March 2007
  • 5. Importance of hydrogen and fuel cells in the EU An integrated hydrogen and fuel cell infrastructure will respond to key EU challenges: • Security of supply - oil peak production/ geopolitical issues • Environmental concerns - climate change and local pollution • EU Competitiveness - a potentially huge market = investment, growth, jobs PPS6 EDEN first workshop, Porto, 28 March 2007
  • 6. Paradigm shift In 2002 the EC declared that the deployment of a fully integrated hydrogen infrastructure in the coming decades is one of its chief priorities in the energy field. PPS6 EDEN first workshop, Porto, 28 March 2007
  • 7. Strategic overview: realising the EU vision 1. Market penetration phases: – 2006/7/8: Small portable sector, driven by the added functionality (compared to rechargeable batteries – SRE) – 2010: Early markets for domestic heat and electricity generation – 2010 – 2015: Larger stationary fuel cell CHP systems. – Before 2020: Roll-out of mass hydrogen fuelled road transport. Market enabling factors need to be put in place: 2. – Trained scientists and engineers – Widespread public acceptance of a new fuel – Incentives to ensure affordability whilst the economies of large-scale production build-up 3. A substantial, combined public-private-partnership is required to implement this vision. PPS6 EDEN first workshop, Porto, 28 March 2007
  • 8. EU Initiatives • H2 / FC Technology Platform – EU vision & structure – new & on-going projects & initiatives – strategic research agenda & implementation plan – 2007 – 2013 implementation and action plan in action • Joint Technology Initiative – build industry and public confidence through long-term shared commitment and well-channelled investment – Oct 2006: signed by 45 companies and 130 letters of intent – € 6 billion of investment into the sector pledged PPS6 EDEN first workshop, Porto, 28 March 2007
  • 9. Portugal energy policy goals • Improving security of supply • Promoting economic competition • Ensuring environmental sustainability PPS6 EDEN first workshop, Porto, 28 March 2007
  • 10. Key challenges Portugal energy scenarios • Energy consumption is non-productive, demand rising exponentially without corresponding growth in the economy • Plans to meet the UNFCCC obligations as set out by the PNAC proving difficult to meet. What happens in the post-Kyoto period? • High oil, coal and natural gas import dependency. • Challenging government led targets for RES – 39% of electricity production by 2010 PPS6 EDEN first workshop, Porto, 28 March 2007
  • 11. Importance of hydrogen and fuel cells in Portugal An integrated hydrogen and fuel cell infrastructure has potential to respond to Portugal challenges: • Security of supply - import dependence - maintain diverse energy portfolio through the use of high RES potential •PT competitiveness - a potentially huge market = investment, growth, jobs - opportunity for Portugal’s economy? • Environmental concerns - EU and Kyoto emissions constraints and local pollution PPS6 EDEN first workshop, Porto, 28 March 2007
  • 12. Aims PPS6 EDEN Project: To create a policy & technology roadmap for the development of hydrogen and fuel cell technologies in Portugal. First Workshop: To develop a consensus vision for hydrogen and fuel cell development in Portugal until 2050. PPS6 EDEN first workshop, Porto, 28 March 2007
  • 13. First Workshop outline • Introduction • Vision development • Hydrogen pathways development • Review & Project overview • Informal networking lunch afterwards PPS6 EDEN first workshop, Porto, 28 March 2007
  • 14. Ice Breaker • Need to get a signature/ initials from a different person who has completed the action in each box • 10 minutes • Free 50kw PEM fuel cell system from SRE for the person with the most initials! PPS6 EDEN first workshop, Porto, 28 March 2007