Practical Stakeholder
Engagement
John Sherwood
COSAC 2014
© The SABSA Institute 1995 - 2014
1
Objectives for this Session
l  Use this session as a workshop
l  Present some ideas
l  Discuss the ideas
l  Capture new ideas
l  Recruit a team to take the work forward
l  Develop a white paper by iterating and critiquing drafts
l  Publish the White Paper under The SABSA Institute with
joint authorship
Creating a New White Paper
© The SABSA Institute 1995 - 2014
Action
l Appoint a scribe to capture the ideas
l Can be more than one scribe
© The SABSA Institute 1995 - 2014 2
Agenda
l  Stakeholder context – theoretical models
l  Step-by-step stakeholder engagement process
l  Stakeholder identification: viewpoints and views
l  Stakeholder intake – getting them on board
l  Stakeholder consultation – psychological factors
l  Stakeholder analysis
l  RACI mapping
l  Concerns, prioritisation
l  Input validation
l  On-going stakeholder engagement
l  Internal publication
l  Open discussion – how best to engage with stakeholders
© The SABSA Institute 1995 - 2014 3
STAKEHOLDER CONTEXT
Theoretical Foundations for Systems, Services and Stakeholders
© The SABSA Institute 1995 - 2014 4
System of Interest Concept
© The SABSA Institute 1995 - 2014 5
System Environment
System of Interest
Opportunities
& Threats
Strengths &
Vulnerabilities
Logical System Boundary
(not physical)
External Stakeholders with an Interest in the System
Internal Stakeholders
that are part of the System
System means
a combination
of people,
processes &
technology
Stakeholders
can be both of
these
Stakeholders can
be both of these
ISO/IEC/IEEE 42010: Meta Framework
l  Standardisation of Terminology and Language for Architecture Work
l  Conceptual Foundations for Architecture Work
l  Conceptual Model – Architecture Description
l  Conceptual Model – Architecture View
l  Conceptual Model – Architecture Viewpoint
l  Conceptual Model – Stakeholders and Concerns
l  Conformance to ISO/IEC/IEEE 42010
l  Architecture Description
l  Architecture Viewpoint
l  Architecture Framework
l  Architecture Description Language
© The SABSA Institute 1995 - 2014 6
Systems & S/W Engineering: Architecture Description
© The SABSA Institute 1995 - 2014 7
System of
Interest
Architecture
exhibits
⏏
identifies
⏏
Stakeholder
Concern
1 1
1
n
has interests in⏏
has
⏏
n
n
Architecture
Viewpoint
Model Type
Architecture
Description
Architecture
View
Architecture
Model
identifies
⏏
expresses⏏
1
1
1
1
1
1
n
n
frames⏏
represents⏏
n
n
n
n
n
n
nn
n
n
n1
governs
⏏
governs
⏏
conforms to
⏏
conforms to
⏏
represents⏏
populates⏏
1
n
42010
Conceptual
Model
© The SABSA Institute 1995 - 2014 8
System of
Interest
Architecture
exhibits
⏏
identifies
⏏
Stakeholder
Concern
1 1
1
n
has interests in⏏
has
⏏
n
n
Architecture
Viewpoint
Model Type
Architecture
Description
Architecture
View
Architecture
Model
identifies
⏏
expresses⏏
1
1
1
1
1
1
n
n
frames⏏
represents⏏
n
n
n
n
n
n
nn
n
n
n1
governs
⏏
governs
⏏conforms to
⏏
conforms to
⏏
represents⏏
populates⏏
1
n
Our focus
today
E.g.:
Business
Attributes
Profile
Requirements
People,
processes,
technology and
environment
From which the
stakeholder
views the world
E.g.: Detailed
Attributes
Ideas and
concepts
(knowledge)
Documented
concepts
(information)
What the
stakeholder
sees
© The SABSA Institute 1995 - 2014 9
System of
Interest
Architecture
exhibits
⏏
identifies
⏏
Stakeholder
Concern
1 1
1
n
has interests in⏏
has
⏏
n
n
Architecture
Viewpoint
Model Type
Architecture
Description
Architecture
View
Architecture
Model
identifies
⏏
expresses⏏
1
1
1
1
1
1
n
n
frames⏏
represents⏏
n
n
n
n
n
n
nn
n
n
n1
governs
⏏
governs
⏏conforms to
⏏
conforms to
⏏
represents⏏
populates⏏
1
n
WHAT
WHO
&
WHY
HOW,
WHERE
&
WHEN
Assets
BAP as
Proxy-Assets
© The SABSA Institute 1995 - 2014 10
SABSA Asset Ownership, Custody & Use
l  Although in one sense assets are owned by the
enterprise, each asset must have a specific
person assigned as the ‘owner’
l  An owner is empowered to make decisions
about the asset:
l  How much is it worth?
l  How should it be used and by whom?
l  What risks does it face and how should these risks be
treated?
l  Sometimes (often) an owner delegates the
looking after and management of an asset to a
‘custodian’
l  Usually an owner allows (authorises) other
people to use the asset. These people are
called ‘users’
Owner
Custodian
User
Delegates
Authorises
Manages use
according to
authorisations
Everything as a Service (EaaS)
l  Supply & demand model
l  Stakeholder Types
l  Stakeholders are service owners
(service providers)
l  Stakeholders are service
custodians (service providers)
l  Stakeholders are service users
(service consumers)
© The SABSA Institute 1995 - 2014 11
Infrastructure+as+a+Service+(IaaS)+
Pla3orm+as+a+Service+(PaaS)+
So6ware+as+a+Service+(SaaS)+
Business+Services+
Business+Processes+
Business+Value+Chains+
People,+Skills+and+Competencies+
Support+Processes+and++Services+
STAKEHOLDER ENGAGEMENT
PROCESS
Step-by-Step Process
© The SABSA Institute 1995 - 2014 12
© The SABSA Institute 1995 - 2014 13
Stakeholder+engagement+process+
Stakeholder+iden3fica3on+
Stakeholder+intake+
Stakeholder+consulta3on+
Stakeholder+analysis+
Stakeholder+input+valida3on+
Regular+stakeholder+consulta3ons+
along+the+project+3meline+
Internal+publica3on+
of+the+business+analysis++
Project+board+
Architecture+board+
GOVERNANCE
ENGAGEMENT
Governance: Project Board
l  To provide representation of the stakeholder community
l  To provide project steering
l  To monitor the progress of the project against the aims and
objectives set through the stakeholder engagement and
business analysis process
l  To ensure compliance with stakeholder requirements
l  To provide feedback on evolving business requirements
l  To ensure that the stakeholder community is kept informed of
any major issues that might affect the success or outcome of
the project
© The SABSA Institute 1995 - 2014 14
Governance: Architecture Board
l  The purpose of the architecture board is to ensure that architectural standards are
set and that all projects comply with these standards. Specific objectives include:
l  Creation and publication of architecture standards
l  Architecture development processes
l  Reference architectures
l  Maintaining and publishing the architectural artifacts repository
l  Maintaining and publishing the service catalogue for project use
l  Creation and publication of architecture governance processes
l  Project submission process
l  Project approval process
l  Stakeholder engagement process
l  Ultimate control and approval of project budget release
l  Conditional on architectural standards compliance
l  Conditional on compliance with stakeholder requirements
© The SABSA Institute 1995 - 2014 15
STAKEHOLDER IDENTIFICATION
Finding the Stakeholder Viewpoints and Views, Roles & Responsibilities
© The SABSA Institute 1995 - 2014 16
Stakeholder Viewpoints
l  Lifecycle viewpoints
l  Strategic, programme, project, operational
l  Functional viewpoints
l  Business Management, Compliance, Information Management,
Systems Design, Financial Management, Health & Safety; Human
Resources Management, etc…
l  Industry Viewpoints
l  Nuclear Industry, Civil Aviation, Pharmaceuticals, Banking and
Finance, Energy Distribution, Retail, etc…
l  Legislative and Regulatory Viewpoints
l  Food Safety, Transport Safety, Health and Safety at Work, Crime
Prevention, Controlled Drug Use, Building Regulation, etc…
© The SABSA Institute 1995 - 2014 17
Stakeholder Types
l  Internal stakeholders:
l  Business owners
l  Internal Auditors
l  Quality Managers
l  Risk Managers
l  Delivery Managers
l  Application Managers
l  Infrastructure Managers
l  Security Managers
l  Data Managers
l  Architects
l  Development Managers
l  Others as dictated by the
specific context
l  External stakeholders:
l  Customers
l  Service Suppliers
l  Equipment vendors
l  External auditors
l  Others as dictated by the
specific context.
© The SABSA Institute 1995 - 2014 18
STAKEHOLDER INTAKE
Bringing the Stakeholder Community On-board
© The SABSA Institute 1995 - 2014 19
Intake Requirements
l  Making contact with each stakeholder
l  Selling the project and obtaining their buy-in and support
l  Creating stakeholder commitment
l  Arranging the logistics of how they will participate
© The SABSA Institute 1995 - 2014 20
Creating Stakeholder Commitment
l  An initial meeting / workshop is used to kick-start the commitment of
project participants. This will need to be refreshed from time to time.
l  Regular informal dialogues and a regular progress meetings on a
periodic basis are used to attain the commitment of key stakeholders.
l  Commitment of key stakeholders should be maintained by keeping
them informed of all current matters.
l  The governance framework, comprising the Stakeholder Engagement
Process, the Architecture Board and the Project Boards is also a key
mechanism for maintaining and strengthening stakeholder
commitment.
© The SABSA Institute 1995 - 2014 21
Getting the Right Stakeholders
l  Making the approach to stakeholders
l  Selling them the ideas
l  Gaining their commitment, sponsorship and enthusiasm
l  Setting up the steering group (Project Board)
l  Arranging meetings and workshops
l  Dealing with political sensitivities
l  Seniority versus expert knowledge
© The SABSA Institute 1995 - 2014 22
Let’s discuss: How should we do this?
STAKEHOLDER CONSULTATION
The Real Engagement: Psychological Factors
© The SABSA Institute 1995 - 2014 23
The Importance of Language
© The SABSA Institute 1995 - 2014 24
l  Negative Terminology
l  Threat
l  Vulnerability
l  Prevent
l  Loss
l  Impact
l  Mistrust
l  Uncertainty
l  Positive Terminology
l  Opportunity
l  Strength
l  Enable
l  Gain
l  Benefit
l  Trust
l  Assurance
Neuroscience tells us to think positive: it will make you feel better
Get your stakeholders to think positive: they will feel better too
Neuroscience: Nominalisation – How the Human Brain Works
We are hard-wired to ‘feel’ before we ‘think’. Emotions precede thought by about 8 milliseconds
Objectives for Stakeholder Engagement
l  ‘Engaging with’ - not ‘Managing’ the stakeholders
l  Relationship development
l  Hearing stories
l  Gathering and documenting information (the role of the scribe)
l  Validating inputs
l  Increasing stakeholder commitment
© The SABSA Institute 1995 - 2014 25
‘Them & Us’ or ‘We’
l  Social engagement – we’re all people (social animals)
l  Let the meeting settle in
l  Degrees of Intimacy versus Formality
l  Arranging the seating for a meeting
l  Team Building
l  Relationship Building (investment of time)
l  Leadership Styles
l  Power Games and Politics
l  Observer or player?
l  Chance Encounters – the ‘Elevator Pitch’
© The SABSA Institute 1995 - 2014 26
Presentation Styles
l  Failing to plan is planning to fail
l  Plan for unexpected outcomes
l Previous meeting overruns – giving the ‘short version’
l Overlap with previous presenters – ‘stakeholder boredom’
l  Eye contact and body language
l  Telling the story:
l  Tell them what you’ll tell them,
l  Tell them
l  Tell them what you told them
l  Avoid information overload
l  Aim only at areas of interest to the stakeholder(s)
l  Simple key messages, well structured
l  Most important messages first – to get engagement
l  ‘Talking the Talk’ versus ‘Death by PowerPoint’
© The SABSA Institute 1995 - 2014 27
Problem Stakeholders
l  Technical geeks who think they understand the business without
consulting the business people
l  Business people who think they understand the technology without
consulting the technologists
l  “I need encryption” or “but it’s encrypted so everything is OK”
l  Stakeholders who feel threatened by change: job security, status, etc.
l  Architects who live in ivory towers
l  Conflicting stakeholder views requiring resolution
l  Inconsistency in project approval processes depending on random
allocation of individuals
l  Self-important bureaucrats who seek power by blocking progress
l  The security geeks who see themselves as policemen
l  Auditors with checklist mind-sets
l  Project managers who think they are subject matter experts
© The SABSA Institute 1995 - 2014 28
STAKEHOLDER ANALYSIS
Analysing gathered information
© The SABSA Institute 1995 - 2014 29
Objectives
l  Analysis of stakeholder inputs (stories)
l  Cross-reference between inputs of various stakeholders
l  Creation of business drivers, critical success factors (CSFs) and user
stories
l  Prioritization of business drivers, CSFs and user stories
l  Analysis of project risks such as:
l  Resource shortages
l  Untried new technologies being considered
l  Cultural changes required for project success
l  …etc.
© The SABSA Institute 1995 - 2014 30
RACI Modelling
l  A RACI Matrix is widely used to describe the roles and responsibilities
of various teams or people in delivering a project or operating a
process.
l  It is especially useful in clarifying roles and responsibilities in cross-
functional/departmental projects and processes.
l  The acronym stands for:
l  Responsible
l  Accountable
l  Consulted
l  Informed
© The SABSA Institute 1995 - 2014 31
The RACI Matrix is a tool for assigning responsibility types to roles
RACI Matrix Explained
l  Responsible (R)
l  The person or team that perform the tasks to achieve the objectives
l  There may be multiple resources that are responsible for delivery of
these outputs
l  Accountable (A)
l  The person who is ultimately answerable for the correct and thorough
completion of the task. There MUST be EXACTLY ONE A specified for
each task. Accountability implies ‘ownership’.
l  Consulted (C)
l  Those whose [expert] opinions are sought. Two-way communication
l  Informed (I)
l  Those who are kept up-to-date on progress. One-way communication
© The SABSA Institute 1995 - 2014 32
Accountability / Ownership
l  Dealing with Overlaps
l  If more than one resource is identified as being ‘accountable’, or
‘the owner’ there is a problem of overlap.
l  This may be resolved by making an executive decision – which of
the possible candidates is to be held accountable?
l  This may also be solved by drilling down to the next level of
detailed analysis, where perhaps ‘accountability’ splits up into a
number of sub-accountabilities for individual owners.
l  Dealing with Gaps
l  Where no-one is identified as being the owner and held
accountable, someone must be appointed to that role.
© The SABSA Institute 1995 - 2014 33
Accountability requires exactly ONE resource – no gaps, no overlaps
SABSA Extended RACI Roles
l  Communicates (Com)
l  Those who are responsible for initiating and managing communications, either
to ‘consult’ or ‘inform’ others
l  Monitors (M)
l  Those who are responsible for monitoring and reporting on progress, on risk
levels, or on other similar changing parameters
l  Reviews (Rev)
l  Those who are responsible for looking at the work output of others and
commenting and creatively criticising it for quality assurance purposes
l  Verifies (V)
l  Those who check that the work product output from others complies with the
specification and acceptance criteria for that work product
l  Signs off (S)
l  The party who formally approves the V decision
l  At the highest level this is also the same party who holds the A role
© The SABSA Institute 1995 - 2014 34
RACI is just a concept – extend it as you find necessary
RACI Methodology
Step 1: Identify all the stakeholders in the project, process or activity
and define their roles
Step 2: Align each stakeholder / role with one or more of the RACI
responsibility types
Step 3: Ensure that all the RACI responsibility types (and SABSA
extensions) are covered
Step 4: Ensure that there is only ONE single A responsibility for
each project, process or activity
Step 5: Give consideration to where there may be a need for
segregation of responsibility types (e.g. R and V should
usually be segregated)
Step 6: Ensure that everyone knows their responsibility types and is
fully trained and competent to carry out that responsibility
© The SABSA Institute 1995 - 2014 35
Cross-Mapping RACI to Ownership
l  Owner
l  The owner is, in RACI terminology, the one held accountable (A,
plus Com and S)
l  The owner is also possibly responsible to some extent for the
certain work product outputs (can be R, I, C, M, Rev, and V)
l  Custodian
l  The custodian is, in RACI terminology, the one responsible for
producing work on behalf of the owner of the project, process or
activity (can be R, C, I, Com, M, Rev, V and S)
l  User
l  The user is, in RACI terminology, responsible for accepting and
making use of the owner’s and custodian’s work products (can be
R, C, I, M, Rev, V and S)
© The SABSA Institute 1995 - 2014 36
© The SABSA Institute 1995 - 2014 37
Accountable
Consulted
Informed
Verifies
Signsoff
Communicates
..etc
Activity 1.3
Activity 1.1
Activity 1.2
Activity 2.2
Activity 2.1
Risk
Management
Process Steps
Stakeholder RACI Roles
Activity 3.1
…etc
…etc
Activity 3.2
Activity 3.3
Monitors
Reviews
Responsible
Activity
Group 1
Activity
Group 2
Activity
Group 3
Stakeholder
Job
R
oles
Stakeholder Prioritisation (Source: OGC M_o_R page 93)
© The SABSA Institute 1995 - 2014 38
Importance of Stakeholders to Activity
PotentialImpactofActivityonStakeholders
High
High
Medium
Medium
Low
Low
Owners
Custodians
Users
© The SABSA Institute 1995 - 2014 39
RACI and the Enterprise Models
l  Apply RACI modelling at every stage of the Enterprise Lifecycle
l  SABSA Extended RACI Matrix for every:
l Strategy
l Programme
l Project
l Operational process
l  Apply RACI modelling at every level of every domain hierarchy
l  SABSA Extended RACI Matrix for every:
l Business unit
l Business function
l Business process
Apply RACI at every Identified Viewpoint
Stakeholder Mapping: Structure
l  Documenting the stakeholder details
l  Spread-sheet or database
l A directory of all identified stakeholders
l  Columns for stakeholder descriptors
l  Rows per stakeholder
l  Project team resource for project management (not published –
team confidential)
l  Kept up-to-date by a team member
© The SABSA Institute 1995 - 2014 40
Stakeholder Mapping: Content
l  Stakeholder Descriptors
l  Names (individuals or groups) and Job Titles, Roles etc.
l  Contact details (Building & Room number, Phone, Mobile, email, etc.)
l  Reporting structure (up and down in the management hierarchy)
l  Importance of stakeholder activity (high, medium, low)
l  Potential impact of project on stakeholder activities (high, medium, low)
l  Overall stakeholder priority rating and level of influence (A, B, C, D)
l  Stakeholder concerns (cross-reference to detailed documentation)
l  Engagement status – Cross reference to detailed documentation –
meeting notes, records of engagements, planned future engagements,
etc.
l  Comments – for additional notes on each stakeholder
© The SABSA Institute 1995 - 2014 41
Stakeholder Concerns Matrix
l  Matrix mapping between stakeholders and concerns
l  Show clustering of main concerns
l  Populated with extended RACI
© The SABSA Institute 1995 - 2014 42
Concern A Concern B Concern C Concern Z
Stakeholder 1
Stakeholder n
Stakeholder 1
A, S, Com R, M I
C, Rev
Stakeholder Input Validation
l  Presentation of the business drivers, CSFs and user stories
back to the stakeholders from whom they originated to check
that the business analysis is correct.
l  Presentation of the business analysis at the most senior
stakeholder level to ensure that it is consistent with high level
corporate goals and independent of personal agenda.
© The SABSA Institute 1995 - 2014 43
On-going Stakeholder Consultation
l  Regular stakeholder consultations along the project timeline
l  To ensure that evolution of business requirements can be
tracked and reworked into the business analysis on an agile
basis
l To flag up any major changes that will impact downstream
project work
l To keep stakeholders up-to-date on progress and maintain
their confidence in the project
© The SABSA Institute 1995 - 2014 44
Internal Publication
l  Internal publication of the business analysis to stakeholders
and project team members who will use these inputs
l  Providing an intranet publication service for stakeholder and
project team use
l  Ensuring traceability of downstream project work
l  Providing for agile adaptation of requirements as the project
moves forward and requirements evolve over time
l  Providing an up-to-date view of project risks and issues, the plans
for their resolution, progress towards resolution and eventual
closure
© The SABSA Institute 1995 - 2014 45
Sharing the Process Outputs
Action
l  Open discussion on content
l  Open discussion on developing our white paper
l  Recruitment of group members for the white paper
development
© The SABSA Institute 1995 - 2014 46

Mais conteúdo relacionado

Mais procurados

Agile Project management
Agile Project managementAgile Project management
Agile Project managementBabu Appat
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder EngagementDavidMcLachlan1
 
Project governance
Project governanceProject governance
Project governanceGlen Alleman
 
Product Management Certification in Singapore - H. Del Castillo, AIPMM
Product Management Certification in Singapore - H. Del Castillo, AIPMM Product Management Certification in Singapore - H. Del Castillo, AIPMM
Product Management Certification in Singapore - H. Del Castillo, AIPMM Hector Del Castillo, CPM, CPMM
 
Finance and Investment Toolkit - Framework, Best Practices and Templates
Finance and Investment Toolkit - Framework, Best Practices and TemplatesFinance and Investment Toolkit - Framework, Best Practices and Templates
Finance and Investment Toolkit - Framework, Best Practices and TemplatesAurelien Domont, MBA
 
Re-Positioning the value of the architecture practice
Re-Positioning the value of the architecture practiceRe-Positioning the value of the architecture practice
Re-Positioning the value of the architecture practiceCraig Martin
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance StructureSaurabh Sardesai
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 
Agile transformation 1.3
Agile transformation 1.3Agile transformation 1.3
Agile transformation 1.3Krystian Kaczor
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder ManagementRavikanth-BA
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Agus Suhanto
 
What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...Invensis Learning
 
The I Word: Moving Innovation from Research and Development (R&D) to Ideation...
The I Word: Moving Innovation from Research and Development (R&D) to Ideation...The I Word: Moving Innovation from Research and Development (R&D) to Ideation...
The I Word: Moving Innovation from Research and Development (R&D) to Ideation...Alan McSweeney
 
The Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and PortfoliosThe Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and PortfoliosDrew Jemilo
 
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdfoperatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdfddr95827
 
How to Get Started with Lean Portfolio Management
How to Get Started with Lean Portfolio ManagementHow to Get Started with Lean Portfolio Management
How to Get Started with Lean Portfolio ManagementCprime
 
Agile project management
Agile project managementAgile project management
Agile project managementeng100
 

Mais procurados (20)

Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Agile Project management
Agile Project managementAgile Project management
Agile Project management
 
13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement13.2 Plan Stakeholder Engagement
13.2 Plan Stakeholder Engagement
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Project governance
Project governanceProject governance
Project governance
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
 
Product Management Certification in Singapore - H. Del Castillo, AIPMM
Product Management Certification in Singapore - H. Del Castillo, AIPMM Product Management Certification in Singapore - H. Del Castillo, AIPMM
Product Management Certification in Singapore - H. Del Castillo, AIPMM
 
Finance and Investment Toolkit - Framework, Best Practices and Templates
Finance and Investment Toolkit - Framework, Best Practices and TemplatesFinance and Investment Toolkit - Framework, Best Practices and Templates
Finance and Investment Toolkit - Framework, Best Practices and Templates
 
Re-Positioning the value of the architecture practice
Re-Positioning the value of the architecture practiceRe-Positioning the value of the architecture practice
Re-Positioning the value of the architecture practice
 
Program governance Structure
Program governance StructureProgram governance Structure
Program governance Structure
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 
Agile transformation 1.3
Agile transformation 1.3Agile transformation 1.3
Agile transformation 1.3
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...What is Agile Project Management? | Agile Project Management | Invensis Learn...
What is Agile Project Management? | Agile Project Management | Invensis Learn...
 
The I Word: Moving Innovation from Research and Development (R&D) to Ideation...
The I Word: Moving Innovation from Research and Development (R&D) to Ideation...The I Word: Moving Innovation from Research and Development (R&D) to Ideation...
The I Word: Moving Innovation from Research and Development (R&D) to Ideation...
 
The Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and PortfoliosThe Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
The Agile Stakeholder Management Framework for Teams, Programs, and Portfolios
 
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdfoperatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
operatingmodelandorganizationdesigntoolkit-overviewandapproach-211220031125.pdf
 
How to Get Started with Lean Portfolio Management
How to Get Started with Lean Portfolio ManagementHow to Get Started with Lean Portfolio Management
How to Get Started with Lean Portfolio Management
 
Agile project management
Agile project managementAgile project management
Agile project management
 

Destaque

SABSA - Business Attributes Profiling
SABSA - Business Attributes ProfilingSABSA - Business Attributes Profiling
SABSA - Business Attributes ProfilingSABSAcourses
 
A Practical Example to Using SABSA Extended Security-in-Depth Strategy
A Practical Example to Using SABSA Extended Security-in-Depth Strategy A Practical Example to Using SABSA Extended Security-in-Depth Strategy
A Practical Example to Using SABSA Extended Security-in-Depth Strategy Allen Baranov
 
Adaptive Enterprise Security Architecture
Adaptive Enterprise Security ArchitectureAdaptive Enterprise Security Architecture
Adaptive Enterprise Security ArchitectureSABSAcourses
 
Enterprise Security Architecture
Enterprise Security ArchitectureEnterprise Security Architecture
Enterprise Security ArchitectureKris Kimmerle
 
Information Security Architecture: Building Security Into Your Organziation
Information Security Architecture: Building Security Into Your OrganziationInformation Security Architecture: Building Security Into Your Organziation
Information Security Architecture: Building Security Into Your OrganziationSeccuris Inc.
 
Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014
Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014
Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014Ted Eytan, MD, MS, MPH
 
Modeling Enterprise Risk Management and Security with the ArchiMate Language
Modeling Enterprise Risk Management and Security with the ArchiMate LanguageModeling Enterprise Risk Management and Security with the ArchiMate Language
Modeling Enterprise Risk Management and Security with the ArchiMate LanguageIver Band
 
Multi stakeholder approach to Internet governance
Multi stakeholder approach to Internet governanceMulti stakeholder approach to Internet governance
Multi stakeholder approach to Internet governanceDesiree Miloshevic
 
Mcs2453 aniq mc101053-assignment2
Mcs2453 aniq mc101053-assignment2Mcs2453 aniq mc101053-assignment2
Mcs2453 aniq mc101053-assignment2Aniq Eastrarulkhair
 
2 Stakeholder Approach & Environment
2 Stakeholder Approach & Environment2 Stakeholder Approach & Environment
2 Stakeholder Approach & EnvironmentDhimas kasep
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and managementAndre Knipe
 
Visualizing Stakeholder Concerns with Anchored Map
Visualizing Stakeholder Concerns with Anchored MapVisualizing Stakeholder Concerns with Anchored Map
Visualizing Stakeholder Concerns with Anchored MapTakanori Ugai
 
E-RBAC Development - A Risk Based Security Architecture Approach
E-RBAC Development - A Risk Based Security Architecture ApproachE-RBAC Development - A Risk Based Security Architecture Approach
E-RBAC Development - A Risk Based Security Architecture ApproachFemi Ashaye
 
Enterprise Security Architecture
Enterprise Security ArchitectureEnterprise Security Architecture
Enterprise Security ArchitecturePriyanka Aash
 

Destaque (20)

SABSA Implementation(Part I)_ver1-0
SABSA Implementation(Part I)_ver1-0SABSA Implementation(Part I)_ver1-0
SABSA Implementation(Part I)_ver1-0
 
SABSA - Business Attributes Profiling
SABSA - Business Attributes ProfilingSABSA - Business Attributes Profiling
SABSA - Business Attributes Profiling
 
SABSA Implementation(Part VI)_ver1-0
SABSA Implementation(Part VI)_ver1-0SABSA Implementation(Part VI)_ver1-0
SABSA Implementation(Part VI)_ver1-0
 
SABSA overview
SABSA overviewSABSA overview
SABSA overview
 
A Practical Example to Using SABSA Extended Security-in-Depth Strategy
A Practical Example to Using SABSA Extended Security-in-Depth Strategy A Practical Example to Using SABSA Extended Security-in-Depth Strategy
A Practical Example to Using SABSA Extended Security-in-Depth Strategy
 
Adaptive Enterprise Security Architecture
Adaptive Enterprise Security ArchitectureAdaptive Enterprise Security Architecture
Adaptive Enterprise Security Architecture
 
Stakeholder Communication
Stakeholder CommunicationStakeholder Communication
Stakeholder Communication
 
Enterprise Security Architecture
Enterprise Security ArchitectureEnterprise Security Architecture
Enterprise Security Architecture
 
Information Security Architecture: Building Security Into Your Organziation
Information Security Architecture: Building Security Into Your OrganziationInformation Security Architecture: Building Security Into Your Organziation
Information Security Architecture: Building Security Into Your Organziation
 
Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014
Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014
Health is the new HIT - Stanford Biomedical Informatics 207 | July 31 2014
 
Modeling Enterprise Risk Management and Security with the ArchiMate Language
Modeling Enterprise Risk Management and Security with the ArchiMate LanguageModeling Enterprise Risk Management and Security with the ArchiMate Language
Modeling Enterprise Risk Management and Security with the ArchiMate Language
 
Multi stakeholder approach to Internet governance
Multi stakeholder approach to Internet governanceMulti stakeholder approach to Internet governance
Multi stakeholder approach to Internet governance
 
Mcs2453 aniq mc101053-assignment2
Mcs2453 aniq mc101053-assignment2Mcs2453 aniq mc101053-assignment2
Mcs2453 aniq mc101053-assignment2
 
@GRIAusConf_A strategic approach to stakeholder engagment - Dr Leeora Black
@GRIAusConf_A strategic approach to stakeholder engagment - Dr Leeora Black@GRIAusConf_A strategic approach to stakeholder engagment - Dr Leeora Black
@GRIAusConf_A strategic approach to stakeholder engagment - Dr Leeora Black
 
2 Stakeholder Approach & Environment
2 Stakeholder Approach & Environment2 Stakeholder Approach & Environment
2 Stakeholder Approach & Environment
 
Stakeholder engagement and management
Stakeholder engagement and managementStakeholder engagement and management
Stakeholder engagement and management
 
Visualizing Stakeholder Concerns with Anchored Map
Visualizing Stakeholder Concerns with Anchored MapVisualizing Stakeholder Concerns with Anchored Map
Visualizing Stakeholder Concerns with Anchored Map
 
E-RBAC Development - A Risk Based Security Architecture Approach
E-RBAC Development - A Risk Based Security Architecture ApproachE-RBAC Development - A Risk Based Security Architecture Approach
E-RBAC Development - A Risk Based Security Architecture Approach
 
SABSA Implementation(Part IV)_ver1-0
SABSA Implementation(Part IV)_ver1-0SABSA Implementation(Part IV)_ver1-0
SABSA Implementation(Part IV)_ver1-0
 
Enterprise Security Architecture
Enterprise Security ArchitectureEnterprise Security Architecture
Enterprise Security Architecture
 

Semelhante a Practical Stakeholder Engagement

NW BIM 2018 1 TWF
NW BIM 2018 1 TWFNW BIM 2018 1 TWF
NW BIM 2018 1 TWFDavid Owens
 
Getting to know you: User research fundamentals anyone can use
Getting to know you: User research fundamentals anyone can useGetting to know you: User research fundamentals anyone can use
Getting to know you: User research fundamentals anyone can useKaren Bachmann
 
SDNC13 - Membersday - Championing great design to improve lives by John Mathe...
SDNC13 - Membersday - Championing great design to improve lives by John Mathe...SDNC13 - Membersday - Championing great design to improve lives by John Mathe...
SDNC13 - Membersday - Championing great design to improve lives by John Mathe...Service Design Network
 
Member Network Meeting Q1 2014 slide pack
Member Network Meeting Q1 2014  slide packMember Network Meeting Q1 2014  slide pack
Member Network Meeting Q1 2014 slide packJean Stanley
 
Member Network Meeting q1 2014 slide pack
Member Network Meeting q1 2014  slide packMember Network Meeting q1 2014  slide pack
Member Network Meeting q1 2014 slide packJean Stanley
 
D-HOPE Approach for Community-based Entrepreneurship and Rural Development
D-HOPE Approach for Community-based Entrepreneurship and Rural DevelopmentD-HOPE Approach for Community-based Entrepreneurship and Rural Development
D-HOPE Approach for Community-based Entrepreneurship and Rural DevelopmentInstitute for Community Design
 
International Society of Service Innovation Professionals Overview
International Society of Service Innovation Professionals OverviewInternational Society of Service Innovation Professionals Overview
International Society of Service Innovation Professionals OverviewYassi Moghaddam
 
PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015stephen_french
 
Knowledge consultancy
Knowledge consultancyKnowledge consultancy
Knowledge consultancySorab Sadri
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsAli Zeeshan
 
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...OECD Governance
 
HI600 Ch01 text_slides
HI600 Ch01 text_slidesHI600 Ch01 text_slides
HI600 Ch01 text_slidesljmcneill33
 
"Future outlook: are corporate accelerators a long-term viable approach?
"Future outlook: are corporate accelerators a long-term viable approach?"Future outlook: are corporate accelerators a long-term viable approach?
"Future outlook: are corporate accelerators a long-term viable approach?Corporate Startup Summit
 
Peter Johnson's presentation on Sponsorship or applied leadership
Peter Johnson's presentation on Sponsorship or applied leadership Peter Johnson's presentation on Sponsorship or applied leadership
Peter Johnson's presentation on Sponsorship or applied leadership Association for Project Management
 
Research Impact-Make it memorable 10 Dec presentation
Research Impact-Make it memorable 10 Dec presentationResearch Impact-Make it memorable 10 Dec presentation
Research Impact-Make it memorable 10 Dec presentationVertigo Ventures
 
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxFinal Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxGeorgeKabongah2
 
Strategy development of clusters and cluster initiatives
Strategy development of clusters and cluster initiativesStrategy development of clusters and cluster initiatives
Strategy development of clusters and cluster initiativesGerd Meier zu Koecker
 

Semelhante a Practical Stakeholder Engagement (20)

NW BIM 2018 1 TWF
NW BIM 2018 1 TWFNW BIM 2018 1 TWF
NW BIM 2018 1 TWF
 
Getting to know you: User research fundamentals anyone can use
Getting to know you: User research fundamentals anyone can useGetting to know you: User research fundamentals anyone can use
Getting to know you: User research fundamentals anyone can use
 
SDNC13 - Membersday - Championing great design to improve lives by John Mathe...
SDNC13 - Membersday - Championing great design to improve lives by John Mathe...SDNC13 - Membersday - Championing great design to improve lives by John Mathe...
SDNC13 - Membersday - Championing great design to improve lives by John Mathe...
 
Member Network Meeting Q1 2014 slide pack
Member Network Meeting Q1 2014  slide packMember Network Meeting Q1 2014  slide pack
Member Network Meeting Q1 2014 slide pack
 
Member Network Meeting q1 2014 slide pack
Member Network Meeting q1 2014  slide packMember Network Meeting q1 2014  slide pack
Member Network Meeting q1 2014 slide pack
 
D-HOPE Approach for Community-based Entrepreneurship and Rural Development
D-HOPE Approach for Community-based Entrepreneurship and Rural DevelopmentD-HOPE Approach for Community-based Entrepreneurship and Rural Development
D-HOPE Approach for Community-based Entrepreneurship and Rural Development
 
International Society of Service Innovation Professionals Overview
International Society of Service Innovation Professionals OverviewInternational Society of Service Innovation Professionals Overview
International Society of Service Innovation Professionals Overview
 
PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015
 
Knowledge consultancy
Knowledge consultancyKnowledge consultancy
Knowledge consultancy
 
Webinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For ResultsWebinar: Stakeholder Management Engaging The Organisation For Results
Webinar: Stakeholder Management Engaging The Organisation For Results
 
Change Management Series:
Change Management Series: Change Management Series:
Change Management Series:
 
Presentation by M. Salgrāve (English), Regional Conference for Supreme Audit ...
Presentation by M. Salgrāve (English), Regional Conference for Supreme Audit ...Presentation by M. Salgrāve (English), Regional Conference for Supreme Audit ...
Presentation by M. Salgrāve (English), Regional Conference for Supreme Audit ...
 
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
 
HI600 Ch01 text_slides
HI600 Ch01 text_slidesHI600 Ch01 text_slides
HI600 Ch01 text_slides
 
"Future outlook: are corporate accelerators a long-term viable approach?
"Future outlook: are corporate accelerators a long-term viable approach?"Future outlook: are corporate accelerators a long-term viable approach?
"Future outlook: are corporate accelerators a long-term viable approach?
 
Peter Johnson's presentation on Sponsorship or applied leadership
Peter Johnson's presentation on Sponsorship or applied leadership Peter Johnson's presentation on Sponsorship or applied leadership
Peter Johnson's presentation on Sponsorship or applied leadership
 
Intro to NSF I-Corps_6apr15
Intro to NSF I-Corps_6apr15Intro to NSF I-Corps_6apr15
Intro to NSF I-Corps_6apr15
 
Research Impact-Make it memorable 10 Dec presentation
Research Impact-Make it memorable 10 Dec presentationResearch Impact-Make it memorable 10 Dec presentation
Research Impact-Make it memorable 10 Dec presentation
 
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxFinal Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
 
Strategy development of clusters and cluster initiatives
Strategy development of clusters and cluster initiativesStrategy development of clusters and cluster initiatives
Strategy development of clusters and cluster initiatives
 

Último

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 

Último (20)

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 

Practical Stakeholder Engagement

  • 1. Practical Stakeholder Engagement John Sherwood COSAC 2014 © The SABSA Institute 1995 - 2014
  • 2. 1 Objectives for this Session l  Use this session as a workshop l  Present some ideas l  Discuss the ideas l  Capture new ideas l  Recruit a team to take the work forward l  Develop a white paper by iterating and critiquing drafts l  Publish the White Paper under The SABSA Institute with joint authorship Creating a New White Paper © The SABSA Institute 1995 - 2014
  • 3. Action l Appoint a scribe to capture the ideas l Can be more than one scribe © The SABSA Institute 1995 - 2014 2
  • 4. Agenda l  Stakeholder context – theoretical models l  Step-by-step stakeholder engagement process l  Stakeholder identification: viewpoints and views l  Stakeholder intake – getting them on board l  Stakeholder consultation – psychological factors l  Stakeholder analysis l  RACI mapping l  Concerns, prioritisation l  Input validation l  On-going stakeholder engagement l  Internal publication l  Open discussion – how best to engage with stakeholders © The SABSA Institute 1995 - 2014 3
  • 5. STAKEHOLDER CONTEXT Theoretical Foundations for Systems, Services and Stakeholders © The SABSA Institute 1995 - 2014 4
  • 6. System of Interest Concept © The SABSA Institute 1995 - 2014 5 System Environment System of Interest Opportunities & Threats Strengths & Vulnerabilities Logical System Boundary (not physical) External Stakeholders with an Interest in the System Internal Stakeholders that are part of the System System means a combination of people, processes & technology Stakeholders can be both of these Stakeholders can be both of these
  • 7. ISO/IEC/IEEE 42010: Meta Framework l  Standardisation of Terminology and Language for Architecture Work l  Conceptual Foundations for Architecture Work l  Conceptual Model – Architecture Description l  Conceptual Model – Architecture View l  Conceptual Model – Architecture Viewpoint l  Conceptual Model – Stakeholders and Concerns l  Conformance to ISO/IEC/IEEE 42010 l  Architecture Description l  Architecture Viewpoint l  Architecture Framework l  Architecture Description Language © The SABSA Institute 1995 - 2014 6 Systems & S/W Engineering: Architecture Description
  • 8. © The SABSA Institute 1995 - 2014 7 System of Interest Architecture exhibits ⏏ identifies ⏏ Stakeholder Concern 1 1 1 n has interests in⏏ has ⏏ n n Architecture Viewpoint Model Type Architecture Description Architecture View Architecture Model identifies ⏏ expresses⏏ 1 1 1 1 1 1 n n frames⏏ represents⏏ n n n n n n nn n n n1 governs ⏏ governs ⏏ conforms to ⏏ conforms to ⏏ represents⏏ populates⏏ 1 n 42010 Conceptual Model
  • 9. © The SABSA Institute 1995 - 2014 8 System of Interest Architecture exhibits ⏏ identifies ⏏ Stakeholder Concern 1 1 1 n has interests in⏏ has ⏏ n n Architecture Viewpoint Model Type Architecture Description Architecture View Architecture Model identifies ⏏ expresses⏏ 1 1 1 1 1 1 n n frames⏏ represents⏏ n n n n n n nn n n n1 governs ⏏ governs ⏏conforms to ⏏ conforms to ⏏ represents⏏ populates⏏ 1 n Our focus today E.g.: Business Attributes Profile Requirements People, processes, technology and environment From which the stakeholder views the world E.g.: Detailed Attributes Ideas and concepts (knowledge) Documented concepts (information) What the stakeholder sees
  • 10. © The SABSA Institute 1995 - 2014 9 System of Interest Architecture exhibits ⏏ identifies ⏏ Stakeholder Concern 1 1 1 n has interests in⏏ has ⏏ n n Architecture Viewpoint Model Type Architecture Description Architecture View Architecture Model identifies ⏏ expresses⏏ 1 1 1 1 1 1 n n frames⏏ represents⏏ n n n n n n nn n n n1 governs ⏏ governs ⏏conforms to ⏏ conforms to ⏏ represents⏏ populates⏏ 1 n WHAT WHO & WHY HOW, WHERE & WHEN Assets BAP as Proxy-Assets
  • 11. © The SABSA Institute 1995 - 2014 10 SABSA Asset Ownership, Custody & Use l  Although in one sense assets are owned by the enterprise, each asset must have a specific person assigned as the ‘owner’ l  An owner is empowered to make decisions about the asset: l  How much is it worth? l  How should it be used and by whom? l  What risks does it face and how should these risks be treated? l  Sometimes (often) an owner delegates the looking after and management of an asset to a ‘custodian’ l  Usually an owner allows (authorises) other people to use the asset. These people are called ‘users’ Owner Custodian User Delegates Authorises Manages use according to authorisations
  • 12. Everything as a Service (EaaS) l  Supply & demand model l  Stakeholder Types l  Stakeholders are service owners (service providers) l  Stakeholders are service custodians (service providers) l  Stakeholders are service users (service consumers) © The SABSA Institute 1995 - 2014 11 Infrastructure+as+a+Service+(IaaS)+ Pla3orm+as+a+Service+(PaaS)+ So6ware+as+a+Service+(SaaS)+ Business+Services+ Business+Processes+ Business+Value+Chains+ People,+Skills+and+Competencies+ Support+Processes+and++Services+
  • 13. STAKEHOLDER ENGAGEMENT PROCESS Step-by-Step Process © The SABSA Institute 1995 - 2014 12
  • 14. © The SABSA Institute 1995 - 2014 13 Stakeholder+engagement+process+ Stakeholder+iden3fica3on+ Stakeholder+intake+ Stakeholder+consulta3on+ Stakeholder+analysis+ Stakeholder+input+valida3on+ Regular+stakeholder+consulta3ons+ along+the+project+3meline+ Internal+publica3on+ of+the+business+analysis++ Project+board+ Architecture+board+ GOVERNANCE ENGAGEMENT
  • 15. Governance: Project Board l  To provide representation of the stakeholder community l  To provide project steering l  To monitor the progress of the project against the aims and objectives set through the stakeholder engagement and business analysis process l  To ensure compliance with stakeholder requirements l  To provide feedback on evolving business requirements l  To ensure that the stakeholder community is kept informed of any major issues that might affect the success or outcome of the project © The SABSA Institute 1995 - 2014 14
  • 16. Governance: Architecture Board l  The purpose of the architecture board is to ensure that architectural standards are set and that all projects comply with these standards. Specific objectives include: l  Creation and publication of architecture standards l  Architecture development processes l  Reference architectures l  Maintaining and publishing the architectural artifacts repository l  Maintaining and publishing the service catalogue for project use l  Creation and publication of architecture governance processes l  Project submission process l  Project approval process l  Stakeholder engagement process l  Ultimate control and approval of project budget release l  Conditional on architectural standards compliance l  Conditional on compliance with stakeholder requirements © The SABSA Institute 1995 - 2014 15
  • 17. STAKEHOLDER IDENTIFICATION Finding the Stakeholder Viewpoints and Views, Roles & Responsibilities © The SABSA Institute 1995 - 2014 16
  • 18. Stakeholder Viewpoints l  Lifecycle viewpoints l  Strategic, programme, project, operational l  Functional viewpoints l  Business Management, Compliance, Information Management, Systems Design, Financial Management, Health & Safety; Human Resources Management, etc… l  Industry Viewpoints l  Nuclear Industry, Civil Aviation, Pharmaceuticals, Banking and Finance, Energy Distribution, Retail, etc… l  Legislative and Regulatory Viewpoints l  Food Safety, Transport Safety, Health and Safety at Work, Crime Prevention, Controlled Drug Use, Building Regulation, etc… © The SABSA Institute 1995 - 2014 17
  • 19. Stakeholder Types l  Internal stakeholders: l  Business owners l  Internal Auditors l  Quality Managers l  Risk Managers l  Delivery Managers l  Application Managers l  Infrastructure Managers l  Security Managers l  Data Managers l  Architects l  Development Managers l  Others as dictated by the specific context l  External stakeholders: l  Customers l  Service Suppliers l  Equipment vendors l  External auditors l  Others as dictated by the specific context. © The SABSA Institute 1995 - 2014 18
  • 20. STAKEHOLDER INTAKE Bringing the Stakeholder Community On-board © The SABSA Institute 1995 - 2014 19
  • 21. Intake Requirements l  Making contact with each stakeholder l  Selling the project and obtaining their buy-in and support l  Creating stakeholder commitment l  Arranging the logistics of how they will participate © The SABSA Institute 1995 - 2014 20
  • 22. Creating Stakeholder Commitment l  An initial meeting / workshop is used to kick-start the commitment of project participants. This will need to be refreshed from time to time. l  Regular informal dialogues and a regular progress meetings on a periodic basis are used to attain the commitment of key stakeholders. l  Commitment of key stakeholders should be maintained by keeping them informed of all current matters. l  The governance framework, comprising the Stakeholder Engagement Process, the Architecture Board and the Project Boards is also a key mechanism for maintaining and strengthening stakeholder commitment. © The SABSA Institute 1995 - 2014 21
  • 23. Getting the Right Stakeholders l  Making the approach to stakeholders l  Selling them the ideas l  Gaining their commitment, sponsorship and enthusiasm l  Setting up the steering group (Project Board) l  Arranging meetings and workshops l  Dealing with political sensitivities l  Seniority versus expert knowledge © The SABSA Institute 1995 - 2014 22 Let’s discuss: How should we do this?
  • 24. STAKEHOLDER CONSULTATION The Real Engagement: Psychological Factors © The SABSA Institute 1995 - 2014 23
  • 25. The Importance of Language © The SABSA Institute 1995 - 2014 24 l  Negative Terminology l  Threat l  Vulnerability l  Prevent l  Loss l  Impact l  Mistrust l  Uncertainty l  Positive Terminology l  Opportunity l  Strength l  Enable l  Gain l  Benefit l  Trust l  Assurance Neuroscience tells us to think positive: it will make you feel better Get your stakeholders to think positive: they will feel better too Neuroscience: Nominalisation – How the Human Brain Works We are hard-wired to ‘feel’ before we ‘think’. Emotions precede thought by about 8 milliseconds
  • 26. Objectives for Stakeholder Engagement l  ‘Engaging with’ - not ‘Managing’ the stakeholders l  Relationship development l  Hearing stories l  Gathering and documenting information (the role of the scribe) l  Validating inputs l  Increasing stakeholder commitment © The SABSA Institute 1995 - 2014 25
  • 27. ‘Them & Us’ or ‘We’ l  Social engagement – we’re all people (social animals) l  Let the meeting settle in l  Degrees of Intimacy versus Formality l  Arranging the seating for a meeting l  Team Building l  Relationship Building (investment of time) l  Leadership Styles l  Power Games and Politics l  Observer or player? l  Chance Encounters – the ‘Elevator Pitch’ © The SABSA Institute 1995 - 2014 26
  • 28. Presentation Styles l  Failing to plan is planning to fail l  Plan for unexpected outcomes l Previous meeting overruns – giving the ‘short version’ l Overlap with previous presenters – ‘stakeholder boredom’ l  Eye contact and body language l  Telling the story: l  Tell them what you’ll tell them, l  Tell them l  Tell them what you told them l  Avoid information overload l  Aim only at areas of interest to the stakeholder(s) l  Simple key messages, well structured l  Most important messages first – to get engagement l  ‘Talking the Talk’ versus ‘Death by PowerPoint’ © The SABSA Institute 1995 - 2014 27
  • 29. Problem Stakeholders l  Technical geeks who think they understand the business without consulting the business people l  Business people who think they understand the technology without consulting the technologists l  “I need encryption” or “but it’s encrypted so everything is OK” l  Stakeholders who feel threatened by change: job security, status, etc. l  Architects who live in ivory towers l  Conflicting stakeholder views requiring resolution l  Inconsistency in project approval processes depending on random allocation of individuals l  Self-important bureaucrats who seek power by blocking progress l  The security geeks who see themselves as policemen l  Auditors with checklist mind-sets l  Project managers who think they are subject matter experts © The SABSA Institute 1995 - 2014 28
  • 30. STAKEHOLDER ANALYSIS Analysing gathered information © The SABSA Institute 1995 - 2014 29
  • 31. Objectives l  Analysis of stakeholder inputs (stories) l  Cross-reference between inputs of various stakeholders l  Creation of business drivers, critical success factors (CSFs) and user stories l  Prioritization of business drivers, CSFs and user stories l  Analysis of project risks such as: l  Resource shortages l  Untried new technologies being considered l  Cultural changes required for project success l  …etc. © The SABSA Institute 1995 - 2014 30
  • 32. RACI Modelling l  A RACI Matrix is widely used to describe the roles and responsibilities of various teams or people in delivering a project or operating a process. l  It is especially useful in clarifying roles and responsibilities in cross- functional/departmental projects and processes. l  The acronym stands for: l  Responsible l  Accountable l  Consulted l  Informed © The SABSA Institute 1995 - 2014 31 The RACI Matrix is a tool for assigning responsibility types to roles
  • 33. RACI Matrix Explained l  Responsible (R) l  The person or team that perform the tasks to achieve the objectives l  There may be multiple resources that are responsible for delivery of these outputs l  Accountable (A) l  The person who is ultimately answerable for the correct and thorough completion of the task. There MUST be EXACTLY ONE A specified for each task. Accountability implies ‘ownership’. l  Consulted (C) l  Those whose [expert] opinions are sought. Two-way communication l  Informed (I) l  Those who are kept up-to-date on progress. One-way communication © The SABSA Institute 1995 - 2014 32
  • 34. Accountability / Ownership l  Dealing with Overlaps l  If more than one resource is identified as being ‘accountable’, or ‘the owner’ there is a problem of overlap. l  This may be resolved by making an executive decision – which of the possible candidates is to be held accountable? l  This may also be solved by drilling down to the next level of detailed analysis, where perhaps ‘accountability’ splits up into a number of sub-accountabilities for individual owners. l  Dealing with Gaps l  Where no-one is identified as being the owner and held accountable, someone must be appointed to that role. © The SABSA Institute 1995 - 2014 33 Accountability requires exactly ONE resource – no gaps, no overlaps
  • 35. SABSA Extended RACI Roles l  Communicates (Com) l  Those who are responsible for initiating and managing communications, either to ‘consult’ or ‘inform’ others l  Monitors (M) l  Those who are responsible for monitoring and reporting on progress, on risk levels, or on other similar changing parameters l  Reviews (Rev) l  Those who are responsible for looking at the work output of others and commenting and creatively criticising it for quality assurance purposes l  Verifies (V) l  Those who check that the work product output from others complies with the specification and acceptance criteria for that work product l  Signs off (S) l  The party who formally approves the V decision l  At the highest level this is also the same party who holds the A role © The SABSA Institute 1995 - 2014 34 RACI is just a concept – extend it as you find necessary
  • 36. RACI Methodology Step 1: Identify all the stakeholders in the project, process or activity and define their roles Step 2: Align each stakeholder / role with one or more of the RACI responsibility types Step 3: Ensure that all the RACI responsibility types (and SABSA extensions) are covered Step 4: Ensure that there is only ONE single A responsibility for each project, process or activity Step 5: Give consideration to where there may be a need for segregation of responsibility types (e.g. R and V should usually be segregated) Step 6: Ensure that everyone knows their responsibility types and is fully trained and competent to carry out that responsibility © The SABSA Institute 1995 - 2014 35
  • 37. Cross-Mapping RACI to Ownership l  Owner l  The owner is, in RACI terminology, the one held accountable (A, plus Com and S) l  The owner is also possibly responsible to some extent for the certain work product outputs (can be R, I, C, M, Rev, and V) l  Custodian l  The custodian is, in RACI terminology, the one responsible for producing work on behalf of the owner of the project, process or activity (can be R, C, I, Com, M, Rev, V and S) l  User l  The user is, in RACI terminology, responsible for accepting and making use of the owner’s and custodian’s work products (can be R, C, I, M, Rev, V and S) © The SABSA Institute 1995 - 2014 36
  • 38. © The SABSA Institute 1995 - 2014 37 Accountable Consulted Informed Verifies Signsoff Communicates ..etc Activity 1.3 Activity 1.1 Activity 1.2 Activity 2.2 Activity 2.1 Risk Management Process Steps Stakeholder RACI Roles Activity 3.1 …etc …etc Activity 3.2 Activity 3.3 Monitors Reviews Responsible Activity Group 1 Activity Group 2 Activity Group 3 Stakeholder Job R oles
  • 39. Stakeholder Prioritisation (Source: OGC M_o_R page 93) © The SABSA Institute 1995 - 2014 38 Importance of Stakeholders to Activity PotentialImpactofActivityonStakeholders High High Medium Medium Low Low Owners Custodians Users
  • 40. © The SABSA Institute 1995 - 2014 39 RACI and the Enterprise Models l  Apply RACI modelling at every stage of the Enterprise Lifecycle l  SABSA Extended RACI Matrix for every: l Strategy l Programme l Project l Operational process l  Apply RACI modelling at every level of every domain hierarchy l  SABSA Extended RACI Matrix for every: l Business unit l Business function l Business process Apply RACI at every Identified Viewpoint
  • 41. Stakeholder Mapping: Structure l  Documenting the stakeholder details l  Spread-sheet or database l A directory of all identified stakeholders l  Columns for stakeholder descriptors l  Rows per stakeholder l  Project team resource for project management (not published – team confidential) l  Kept up-to-date by a team member © The SABSA Institute 1995 - 2014 40
  • 42. Stakeholder Mapping: Content l  Stakeholder Descriptors l  Names (individuals or groups) and Job Titles, Roles etc. l  Contact details (Building & Room number, Phone, Mobile, email, etc.) l  Reporting structure (up and down in the management hierarchy) l  Importance of stakeholder activity (high, medium, low) l  Potential impact of project on stakeholder activities (high, medium, low) l  Overall stakeholder priority rating and level of influence (A, B, C, D) l  Stakeholder concerns (cross-reference to detailed documentation) l  Engagement status – Cross reference to detailed documentation – meeting notes, records of engagements, planned future engagements, etc. l  Comments – for additional notes on each stakeholder © The SABSA Institute 1995 - 2014 41
  • 43. Stakeholder Concerns Matrix l  Matrix mapping between stakeholders and concerns l  Show clustering of main concerns l  Populated with extended RACI © The SABSA Institute 1995 - 2014 42 Concern A Concern B Concern C Concern Z Stakeholder 1 Stakeholder n Stakeholder 1 A, S, Com R, M I C, Rev
  • 44. Stakeholder Input Validation l  Presentation of the business drivers, CSFs and user stories back to the stakeholders from whom they originated to check that the business analysis is correct. l  Presentation of the business analysis at the most senior stakeholder level to ensure that it is consistent with high level corporate goals and independent of personal agenda. © The SABSA Institute 1995 - 2014 43
  • 45. On-going Stakeholder Consultation l  Regular stakeholder consultations along the project timeline l  To ensure that evolution of business requirements can be tracked and reworked into the business analysis on an agile basis l To flag up any major changes that will impact downstream project work l To keep stakeholders up-to-date on progress and maintain their confidence in the project © The SABSA Institute 1995 - 2014 44
  • 46. Internal Publication l  Internal publication of the business analysis to stakeholders and project team members who will use these inputs l  Providing an intranet publication service for stakeholder and project team use l  Ensuring traceability of downstream project work l  Providing for agile adaptation of requirements as the project moves forward and requirements evolve over time l  Providing an up-to-date view of project risks and issues, the plans for their resolution, progress towards resolution and eventual closure © The SABSA Institute 1995 - 2014 45 Sharing the Process Outputs
  • 47. Action l  Open discussion on content l  Open discussion on developing our white paper l  Recruitment of group members for the white paper development © The SABSA Institute 1995 - 2014 46