郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
guoke1207@hotmail.com
Equipment manufacture and installation
of
12600KVA industrial silicon furnace
Technical documentation
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 1 页
guoke1207@hotmail.com
Contents
F I. Brief introduction of industrial silicon
F .Ⅱ Technical description
F .Ⅲ Design basis
F .Ⅳ Installation specification
F .Ⅴ Deviations on Technical Terms
F .Ⅵ Advantages of project implementation
F .Ⅶ Standard for design and construction
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 2 页
guoke1207@hotmail.com
I. Brief introduction of industrial silicon
1. Brand and usage of industrial silicon
1.1Brand of industrial silicon
According to the current market demand, smelting products is the chemical grade silicon.
The chemical composition should meet to the GB2881-91 requirement, and the industrial
silicon quality should meet table 1-1.
Table 1-1 Industrial Silicon’s chemical composition requirements:
Chemical Composition
Impurity content (%)Brand
Si (%)
Fe Al Ca P
1515级 >99.6% =0.15 — =0.015 =0.004%
2202级 >99.5% =0.2 =0.2 =0.02 =0.004%
2203级 >99.5% =0.2 =0.2 =0.03 =0.004%
2503级 >99.5% =0.2 — =0.03 =0.004%
3103级 >99.4% =0.3 =0.1 =0.03 =0.005%
3303级 >99.3% =0.3 =0.3 =0.03 =0.005%
411级 >99.2% =0.4 0.04— 0.08 =0.1 —
421级 >99.2 % =0.4 0.1— 0.15 =0.1 —
441级 >99.0 % =0.4 =0.4 =0.1 —
553级 >98.5 % =0.5 =0.5 =0.3 —
1.2 Usage of industrial silicon
Industrial silicon (also called crystal silicon) is one of important materials used in
modern industrial production. Industrial silicon is widely used in fields of electronics,
steelmaking, photics, mechanics, automobile manufacture, chemical industry, metallurgy,
medicine, national defense, etc. It is acclaimed as “Industrial monosodium”.
Approximately 50% of industrial silicon is applied to manufacture of aluminum alloy.
Aluminum-silicon alloy has advantages of good heat stability, high abrasive resistance, and
smaller thermal expansion coefficient. Aluminum-silicon alloy is applied to fields of
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 3 页
guoke1207@hotmail.com
automobile manufacture, aviation industry, electric industry, shipbuilding, etc. Industrial
silicon can not only be used as addition agent of nonferrous alloy, but also as alloying agent
of high standard silicon steel. It is necessary deoxidizer in steelmaking and smelting of
nonferrous alloy. In steelmaking industry, 5 kg of industrial silicon is consumed to produce
1 ton of steel. Chemical grade industrial silicon is raw material for polycrystalline silicon
and monocrystalline silicon which are modern high-level technology product needed for
integrated circuit development encouraged by the nation. Industrial silicon can be
processed into raw material for circuit and electrical components. Japan referred steel,
aluminum and semiconductor grade silicon as three main metal materials. Industrial silicon
is applied to production of organic compound such as silicone oil, silicon rubber,
construction preservative, white carbon black, coating for agricultural plastic film,
annexing agent of high quality furniture, annexing agent of decorative painting, annexing
agent of ordinary industrial coating, etc. Industrial silicon is also used as reducing agent of
certain kinds of metal to produce new type of ceramic metal.
Until now, the silicon metal is widely used and still to be studied in new zone, such as
manufacturing the solar cell and manufacturing silicon nitride fiber synthesis and so on.
Solar cell now is the most attentioned green energy industry. The United States, Europe and
Japan all set the policy to precede their development in solar cell. InChina, the government
has passed the RENEW ENERGY LAW on March 2005.These measures has greatly
proceed the solar cell development in China. According to the statistics, the international
solar cell market keep high-speed increase from 1998 to 2007,and the annual increase speed
reach 30%.It is estimated that the increased speed shall be kept 25% after 2010.The
crystalline silicon now is the most mature and widely used material for solar cell that
occupy 85% in photovoltaic industry. Monocrystalline silicon solar cell’s conversion
efficiency is of 15% and the polycrystalline silicon solar cell’s conversion efficiency is of
12%.
In these years, as the demand of silicon metal is greatly increased in international
market, it also Stimulate China’s silicon metal industry’s development and proceed the
equipment suppliers and manufacturers to improve the process technology and devices
manufacturing. As the high technology zone and important base industry’s material for
structure and function, the silicon metal consumption has greatly increased. According to
the British authorities estimate, the demand for silicon metal shall be increased 8~12%
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 4 页
guoke1207@hotmail.com
around the world in these years, of which the chemical silicon has annually increased
12%.The high purity silicon metal can be processed to the monocrystalline silicon after
technology process(the silicon purity percent can reach 99.9999% above).The metal
material product with high technology, like the semi-conductor especially the electronic
components chip, is the technology achievement that promoted by the government.
II.Technical requirement of main raw material
2.1Main raw material
Silica and carbon reductant are the main raw material to smelt the industrial silicon.
(1) Silica (SiO2 over 99%)
Silica particle size requires 8 ~ 80mm, which is less than 20mm and not more than
20%.Qualified particle size requires over 90%.
To deal with the silica raw material, most mechanical crushing work shall be finished
at mine site. Because there will be some loss after crushing work. Some particle after
screening shall be used to manufacture the Quartz sand. The silica size meet the
requirement shall be transported to the plant. Some big size shall be manual crushed and
1~2 person is enough to finish the work.
Using the hexagonal screen or the rotary screen to wash the silica and to pour water from
the entrance. Besides the hexagonal screen or the rotary screen, it also needs infeed and
outfeed belt convey. The simple method is to put the silica into the weighing cart and then
wash it.
Chemical composition of Quartz: SiO2=99%, Fe2O3=0.057%, Al2O3=0.14%,
CaO=0.03%. Other impurities are less than 0.2%.
(2) The reductant for the industrial silicon smelting has the following: anthracite with low
ash, petroleum coke and wood.
Transport the mixed material to the front of furnace, and then use the hand cart and hoist to
transport the material to the second platform.
The productive practice shows that using the automatic charging is difficult to uniform
distribution of the silica and reducing agent, and it cannot meet the smelting process
requirement. Suggest using the manual charging method.
2.2 auxiliary materials
The auxiliary material for the industrial silicon such as the graphite electrode and
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 5 页
guoke1207@hotmail.com
oxygen shall be purchased from the market. The annual consumption of main raw material
and auxiliary material are as the table 2-1 shows.
Annual consumption of main raw material and auxiliary material for 1 set of 12600KVA
industrial silicon furnace (22ton/day, 12 months per year):
Table 2-1
No. Item
Unit
consumption
(t/t)
Day
consumption
(t/day)
Month
consumption
(t/month)
Year
consumption
(t/year)
1 quartz 2.65 58.3 1749 20988
2 petroleum coke 1.2 26.4 792 9504
3
Oxygen
(atmospheric)
35m3/t 770m3/d 23100m3/m 277200m3/a
4 compressed air 140m3/t 3080m3/d 92400m3/m 1108800m3/a
5 Water adding 10 220 6600 79200
6 electrode 0.065 1.43 42.9 514.8
2.3 Raw materials chemical composition and physical performance requirements
(1) Chemical composition of silica
SiO2 Fe2O3 Al2O3 CaO
>99.00% <0.057% <0.14% <0.03%
Silica particle size requires 8 ~ 80mm, which is less than 20mm and no more than
20%.Size pass rate requires over 90%.
(2)Chemical composition of coal
fixed carbon ash volatile component water content
>80% =1% <8.5% <8.5%
Physical state of coal, grain size 6 ~ 10mm, Quantity of coal's grain size smaller than
1mm into the furnace should be less than total quantity’s 20%. Large resistivity in high
temperature, good chemical reactivity, high porosity, qualified particle size is over 90%.
Use the washed coal of proper size.
(3)Chemical composition of petroleum coke
fixed carbon ash volatile component water content
>87% <0.26% <12% <0.74%
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 6 页
guoke1207@hotmail.com
Physical state of petroleum coke, grain size 0 ~ 30mm.Quantity of petroleum coke's size
smaller than 3mm should no more than the total quantity's 20%.Crush it if the it is over than
30mm.
(4)Chemical composition of Wood:
fixed carbon ash volatile component water content
>75% <2% <20% <10%
The physical state of charcoal size: 5 to 100mm.
2.4 Process calculation (by the following formula):
Q=24TPK1K2K3COSf/W
Which:Q— — output of silicon metal furnace(t/y);
24— — operation time per day(24h);
T— — operation time per year(340 day);
P— — Furnace transformer rated capacity,kVA,12600;
COSf — — Electric natural power factor,0.90(after low-voltage compensation);
K1— — Supply voltage fluctuation coefficient,0.98;
K2— — Furnace transformer power utilization factor,1;
K3— — Furnace operation time utilization factor,0.98;
W— — Product smelting power consumption,12000kWh/t。
Q=24×340×12600×0.98×1×0.98×0.90/12000= 7405.84t/y
Normal daily output is of up to 22t / d or more. Maximum daily output is of up to 28.6 / d.
Maximum annual output of one set furnace can reach 9724t / a.
3. Brief description of the process
3.1 process flowsheet as 5-1.
Industrial silicon production use the continuous smelting operation within a submerged
arc furnace, and the main process is using charcoal/all petroleum coke. Until now, three
methods of the smelting process in China: 1.using charcoal as the reductant; 2.using
charcoal and petroleum coke as the reductant; 3.using coal and woodchip as the reductant.
The following process is the second method introduction.
3.2 process flowsheet (See the attached flowsheet).
3.3 Brief description of the process
Brief description of the process
Industrial Silicon is smelted through electrothermic method and the raw material is
silica and reducing agent such as charcoal and petroleum coke. Wash silica to remove the
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 7 页
guoke1207@hotmail.com
soil and other impurities. To crush the coal and petroleum coke to a certain size. Quartz,
charcoal, petroleum coke and others shall be proportioning and weighing as certain ration.
Suitable proportioning is the precondition to ensure the stabile operation situation of
furnace. The correct weighing must be ensured. The weighing error is not more than
1kg.After suitable proportioning; the material shall be well mixed and then charged into
the furnace.
7 feeding pipes for 1 set furnace to distributing material. The operator starts or stops
the button to feed according to the material situation inside furnace.
Considering the proportioning and charging system takes much area, to save cost,
two set furnace share one proportioning and charging system is the best choice.
Material consumption around furnace core and electrode are quicker than other areas,
so it needs to feed material timely. Material at furnace core should remain full state like
bread.
The industrial silicon is produced in the se-mi closed electric furnace and it is the
continuous working type. The current from the transformer shall go into the hearth
through the graphite electrode. During the smelting process, the current through the
electrode and resistance produce the heat and the electrode arc heat to make the material
up to 2000? .In this temperature, the silicon dioxide is reduced to the liquid silicon and
CO.CO shall be out through batch layer and also heat the material inside furnace. The
smelting process is of continuous type, the electrode has required depth inside furnace and
continues the arcing operation. Using three stocking machine to stock the furnace bottom
and add material timely to keep the material maintain a certain high level as the bread
shape.
During the smelting process, if the material surface become incrusting or the material
feeding asymmetrical, it should use the wheel-distributing stoking machine to stoke the
furnace.
Use the stringer to open the taphole to let the liquid silicon pour into the ladle. When
the liquid silicon’s quantity up to the half level of ladle, the oxygen and air mixture shall
go inside to remove the calcium and aluminum and other impurities. When the liquid
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 8 页
guoke1207@hotmail.com
silicon is nearly finishing, use the mud ball made of electrode paste and coke powder to
close the taphole. Transport the ladle to the casting workshop by electrical cart and cast
the liquid silicon on the ingot mould. It shall become the silicon ingot after quick cooling.
The taphole shall open every 2 to 3 hours. The taphole shall open 3 to 4 times each
working shift (8 hours). Every day it shall produce about 22t metal silicon.
After the silicon ingots get cold, hanging them out by the crane and putting them in
the casting workshop according to the number. Transport them to the finished products
storage by cart. Crush them by manual, grading, weighing, packaging, warehousing, and
storage. Pack them according to the GB/T-5956-1995 technical requirement. Net weight
per bag is 1000 ± 5kg.
Smoke shall go to the gas duct through hood. Agroup of bag dust collector shall be
installed outside the plant. The flue gas emission concentration after treatment shall meet
the national discharge standards.
Furnace cooling water and transformer cooling water shall be supplied by the water
pump. The backwater return to the circulating water pool by difference of water level, and
get cooling by crossflow cooling tower. The cooling water can be used again for the
furnace and transformer. All the cooling water is soft water recycling and it just needs
adds new water to meet the consumption.
The furnace lining material are self-baking carbon brick, clay refractory brick, high
alumina refractory bricks, etc., and use new masonry technology .Furnace mouth use the
new type carbon brick work building.
4. Technology solutions for 12600KVA industrial silicon furnace:
Transformer capacity:4200KVA ×3
Primary Voltage:35KV
Secondary Voltage: 127~ 151~ 175( V)
Secondary side voltage series: 17, differential: 3V
Common Voltage: 151( V)
Secondary current: 48178( A)
Electrode diameter: (F 960mm graphite石 墨 )
:Electrode current density 6.7/cm2
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 9 页
guoke1207@hotmail.com
Power : ~factor 0.9( )after low voltage compensation
Electrode pitch circle Diameter: F 2450mm±100mm
Furnace inner diameter: F6100 (mm)
Furnace shell diameter: F 7858mm
Furnace inner height: 2400mm
Furnace shell height: 4500mm
Low-Hood Height: 2400mm
:Unit area power of Pitch circle 2 ㎡405.4 KW/
: ㎡Unit area power of hearth 388 KW/
:Unit volume power of hearth 161.7W/m3
Electrode stroke: 1600mm
Electrode Lifting Speed: 0.5m/min
Cold Water Consumption: 340t/h
The above specification is for reference.
.Ⅲ design basis
To meet the annual output of 50000 tons metal silicon, it shall need to build 7 set
furnaces of 12600KVA capacity. (1 set furnace can produce 22 tons metal silicon every day.
Annual production is calculated based on 330 days).The furnace needs low-voltage
compensation and the power factor can not less than 0.9.
1. Furnace Shell (Rotary furnace):
Furnace Shell Diameter: f7858mm
Furnace Shell Height: 4500mm
Number of Taphole: 5. (360°average arrangement)
Thickness of Furnace shell plate: 16mm
Bottom thickness: 20mm
Belt and vertical bars: 160mm channel steel
Thickness of bottom-beam: 280mm
Furnace shell is of open-sided split mouth before welding, using E43 of continuous
welding, full welded.
The working level use self-baking carbon brick, size is of 400mm × 400mm ×
400mm,bottom thickness is of 2100mm, furnace wall thickness is of 879mm; carbon brick
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 10 页
guoke1207@hotmail.com
cracks = 1 mm, filled material is of cold ramming paste (no gap between self-baking carbon
brick ) ; furnace wall edge gap = 2mm, filling materials is of cold ramming paste , no
leakage.
Insulating layer use new insulating refractory clay brick and high alumina bricks, furnace
wall is located above the carbon layer. High alumina bricks (Al2O3=65%) are as the
insulating material, size is of 55mm × 113mm × 230mm, the other parts use clay brick and
the size is 55mm×113mm×230mm.The refractory mortar shall be filled between all the
refractory brick, no leakage.
Pound flat layer use mixture of fine silica and slag, the particle size 3 ~
8mm .Requirement: tamping, ramming flat.
Aluminum silicate fiber felt as insulation material, thickness 30 ~ 40mm.
Graphite carbide-Silicon as furnace mouth materials and must be seamless.
Discharging is of circular shape, carbon brick of diversion trench longer 100mm than
steel plate. Furnace shell near furnace mouth use clay brick, a layer brick thick, height is
furnace mouth.
2. Water- :cooled Hood
The hood edges is hexagon and the Hood height is 2400mm. 6 furnace gates for
feeding and ramming. The three large side door’s effective operation space height is
1600mm, furnace gate of Operation hole is hydraulic lifting, side wall with refractory
brick.
As the hood size large span, high structural strength is required. At the same time, the
current through the hood is strong, if it is not dealt properly, large eddy current losses. So
the Cover central area is of 1Gr18Ni9 stainless steel material, steel beam is 20 # channel
steel, and steel plate thickness is of 8mm. The water-cooled cover at the top of hood is of
active structure, easily to be maintained. During Industrial silicon furnace smelting process,
the pitch circle specification is important. During the electrode up-down movement,
seal-oriented devices is made in water-cooled large set in order to prevent electrode is
broken during swing and also prevent the pitch circle specification is changed. Also prevent
the gas escaped from the upper.
During the silicon smelting process, because of reducing agent (charcoal) is of light
weight and low burning point, the smoke gas shall reverse and form the steamer effect if the
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 11 页
guoke1207@hotmail.com
smoke gas is difficult to getout. Thus the reductant shall partial oxidize and reduction effect
shall down. The result is the unit consumption shall increase and the quality shall down.
Our company has basically solved this problem after many times communicating with our
customers and obtain good results.
3. Smoke Exhaust System:
(1) Main gas duct: According to the flue gas produced and the amount of semi-closed
furnace nokaze during smelting process, the two gas duct diameter are F2000mm.Because
of the gas high temperature, at the bottom is about 3.5 m high double-layer water to
improve the working conditions. The material is of Q235 and the thickness is of 8mm, and
using two insulating flange connection. Insulation is of HP-5. The remaining is of
single-layer, and the material is Q235 and the thickness is of 6mm.At the top of the gas pipe,
there is a dust collection connector, the connector end is a bell valve and the bell valve is of
hydraulic automatic control.
(2)Accessory chimney flue: including tapping holegas cover and gas duct, and Manual flap
valve. Accessory chimney is connected with Main chimney flue in the third platform.
Tapping hole gas cover brings the gas when discharging. Accessory chimney flue is
insulated with the furnace shell and reliable.
4. Electrode system
( )1 Electrode lifting
Graphite electrode with F960mm diameter, including top carrying cylinder ,bottom
carrying cylinder holder, water cooling large set, Cylinder pressure ring, Conductive
Copper Tube holding device and hanging device. Top carrying cylinder diameter is
F1080mm; materialis Q235 and 10mm thickness. Both Water-cooled large set and bottom
carrying cylinder use stainless steel (1Cr18Ni9Ti) to reduce current losses during smelting
process. Bottom carrying cylinder diameter is F1080mm and 10mm thickness.
Water-cooled large set is of 4, easily to install and remove. Electrode lifting is hydraulic
mechanism, working smoothly. Cylinder in the third tier platform is hanging structure.
Each electrode uses two lift cylinder of F220. Lift height is 1.6 meters and the speed is
0.5m/min. Copper tile Hold mechanism adopts cylinder pressure ring clamps copper tiles.
As each cylinder works independently, thus making each tile can be closely contact with the
electrode to prevent fire between copper tile and electrode which will affect copper tile life,
keeping the current delivered stably, contact resistance is small, and low power loss.
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 12 页
guoke1207@hotmail.com
Pressure ring and water-cooled protection cover are water cooled. No water flow dead
area when design.
( )2 electrode slip
Electrode slip is carried out by three pressure-releases Cylinder of double hydraulic
brake. Diameter of the pressure-release cylinder is F100mm; stroke is 100mm. Hydraulic
brake with disc spring to hold hydraulic to relax, vulcanized rubber brake, 10mm thick of
insulating rubber. Disc spring hold is mechanical hold, which can effectively prevent
electrode decline because of hydraulic and electrical failures, at the same time mechanical
strength can be adjusted. Brake loose, tight and electrode slip is of automatic
control .Electrode slip volume is made as needed.
Method of electrode slipping
1) To pour the hydraulic oil into the upper hydraulic brake, and to overcome the upper
hydraulic brake's spring pressure through oil pressure.
2) Lift the three pressure tanks to the required height, and the upper hydraulic brake shall be
raised to the required height at the same time.
3) The upper hydraulic brake release the oil pressure and the disc spring hold the electrode
again.
4) To pour the hydraulic oil into the lower hydraulic brake, and to overcome the upper
hydraulic brake's disc spring pressure through oil pressure.
5) To low down the three pressure tanks to the required height, and to low down the upper
hydraulic brake to the required height at the same time.
6) The lower hydraulic brake release the oil pressure and the disc spring hold the electrode
again.
5. Hydraulic System
Hydraulic system, including the hydraulic station, accumulator, two oil pumps and two
motors, is the power source of electrode slip, electrode lifting, copper tile clamping, Bell
valve cylinder, furnace gate lifting cylinder and charging control valve cylinder. System
pressure is up to 12MPa, hydraulic stations adds cooling device. The electrode slip device is
of hydraulic brake, and between the two brakes is of nine cylinders with f100mm and
100mm stroke. Hydraulic system piping is designed with insulation.
、6 Short bus bar
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 13 页
guoke1207@hotmail.com
Three single-phase transformers, brass side outlet, outlet terminal is near the
transformer center, each transformer is of 16 outlet terminals, each group in two rows, total
48. Three transformers are installed on the transformer platform, angle of 120 °. Short bus
bar system consists of three single-phase transformers, 48 water-cooled compensator , 48
water-cooled cable , 48 level conductive copper pipe , 48 vertical conductive copper pipe ,
24 forged copper tile . Three single-phase transformers to eliminate the weak-phase of
Short bus bar, making Short bus bar shorter and short bus bar power loss lower. Forging
copper tile height 860mm, thickness 80mm, material T2. Forging copper tile copper is of
high density, good conductivity. Water compensator is of pipe to pipe connections, copper
wire cross section 1600mm2, 800mm length. Water-cooled cable is of dual nut pipe to pipe
connections, copper strands cross section 1600mm2, 1000mm length. Double nut structure
with double cone sets, increasing conductive area, easily installed. At the same time,
2300mm length not only meets the electrodes stroke requirements but also make the
water-cooled cable’s inductive reactance smaller during normal smelting, less power loss.
Conductive copper F70 × 10, material is of T2. After Copper manufacture, two times
insulating paint, wrapped two glass fiber cloths around, and then one time insulating paint.
Short bus bar hanging clamp insulation device, plywood material is 3240, external is
stainless steel plates to reduce eddy current losses. Bar bolt of upper vases for second
insulation.
、7 Water cooling system
Cooling water system is the cooling device to cool the component (including the bus
bar, pressure ring, large sleeve, furnace shell, gas hood, chimney) that working under high
temperature. The water cooling system consists of water segregator, water collecting tank,
pressure meter, valve doors, pipes and hoses, fittings and other components.
Thermocouples and flow meters are installed on the return water pipe.
Pressure ring of the bus bar (including copper pipe inside furnace, water-cooled cables,
copper tiles) has the water drainage device to discharge water during the emergency repair
time.
The cooling water's inlet temperature shall not exceed 30 , return water temperature℃
shall not exceed 50 ,℃ and inlet water pressure should be not less than 0.25MPa.
The water cooling system's forth and back water pipe is 1.5 inch gas pipe. The bus bar
is 24 in and 24 out, the transformer is 6 in and 6 out, the gas pipe is 2 in and 2 out, the low
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 14 页
guoke1207@hotmail.com
gas hood is 16 in and 16 out, the water cooled sleeve is 6 in and 6 out, the pressure ring is 6
in and 6 out, spare is 2 in and 2 out, total 62 waterways.
8、Tapping system:
Including stringer, ladle, cart, cart rail, ingot mold, hanging device and so on.
、9 Electrical Equipment
Electrical equipment for 12600KVA industrial silicon furnace includes high-voltage
power supply system, transformers, low voltage power supply, and control system.
9.1 high voltage supply system
Power supply system for submerged arc furnace includes the switching station,
furnace transformers, bus, other power protection equipment and measuring instruments,
and other distribution facilities.
Submerged arc furnace is allowed to have a power cut in operation shortly, so using a
separate power supply can meet the requirements. Transmission process is that energy from
the high voltage power grid via high voltage bus high-voltage isolating switches and circuit
breaker to the furnace transformer, and then after a short network(bus) to reach the
electrode.
9.1.1 High voltage distribution equipment
Furnace uses 33KV voltage level, its high voltage distribution equipment usually
brings high voltage power into the plant firstly by high pressure power, and then using
underground cables into the plant control room’s the line high-voltage switch cabinet.
Master control room usually has three switch cabinets: One, the line of high voltage is
called switchgear cabinet, with switch, less oil circuit breakers, current transformer, and its
capacity to be sufficient to meet the entire electrical load driven. Two, high voltage
switchgear also known as PT cabinet, with switch, current transformer, voltage transformer,
for connection of the measuring instruments, while the active form, a three-phase ammeter
and voltmeter, and the introduction of the secondary phase voltage. This table has lead to
the front console cabinet in order to manipulate the electrode movements and the amount of
load control. There, high-voltage vacuum switch cabinet also know as outlet, with switch,
vacuum circuit breaker or oil circuit breakers, and the current transformer with compatible
郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090
第 15 页
guoke1207@hotmail.com

Mais conteúdo relacionado

Mais procurados

NON FERROUS ALLOYS.
NON FERROUS ALLOYS. NON FERROUS ALLOYS.
NON FERROUS ALLOYS. JadavParth
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceShani Kumar Singh
 
Electrric arc furnace
Electrric arc furnaceElectrric arc furnace
Electrric arc furnaceKerri Zhang
 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportShani Kumar Singh
 
Non-Ferrous Alloys - Brass
Non-Ferrous Alloys - BrassNon-Ferrous Alloys - Brass
Non-Ferrous Alloys - BrassMohanBharathy
 
PRODUCTION OF FERRO ALLOY seminar.pptx
PRODUCTION OF FERRO ALLOY seminar.pptxPRODUCTION OF FERRO ALLOY seminar.pptx
PRODUCTION OF FERRO ALLOY seminar.pptxLiveandletLive3
 
Extraction of magnesium (mg)
Extraction of magnesium (mg)Extraction of magnesium (mg)
Extraction of magnesium (mg)Vikas Barnwal
 
Tin and it’s alloy
Tin and it’s alloyTin and it’s alloy
Tin and it’s alloyAkeem Azeez
 
Blast furnace presentation
Blast furnace presentation Blast furnace presentation
Blast furnace presentation Muzzamil Eatoo
 
Continious casting of steel
Continious casting of steelContinious casting of steel
Continious casting of steelbikiranjan
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing processAshvani Shukla
 
Ferrosilicon production and operation
Ferrosilicon production and operationFerrosilicon production and operation
Ferrosilicon production and operationRadi Nasr
 
Continuous casting of billets
Continuous casting of billetsContinuous casting of billets
Continuous casting of billetsAyaz Akhtar
 

Mais procurados (20)

Non ferrous alloy
Non ferrous alloyNon ferrous alloy
Non ferrous alloy
 
NON FERROUS ALLOYS.
NON FERROUS ALLOYS. NON FERROUS ALLOYS.
NON FERROUS ALLOYS.
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast Furnace
 
Electrric arc furnace
Electrric arc furnaceElectrric arc furnace
Electrric arc furnace
 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training Report
 
Non-Ferrous Alloys - Brass
Non-Ferrous Alloys - BrassNon-Ferrous Alloys - Brass
Non-Ferrous Alloys - Brass
 
8 alumina
8 alumina8 alumina
8 alumina
 
PRODUCTION OF FERRO ALLOY seminar.pptx
PRODUCTION OF FERRO ALLOY seminar.pptxPRODUCTION OF FERRO ALLOY seminar.pptx
PRODUCTION OF FERRO ALLOY seminar.pptx
 
Aluminium Alloys
Aluminium AlloysAluminium Alloys
Aluminium Alloys
 
Extraction of magnesium (mg)
Extraction of magnesium (mg)Extraction of magnesium (mg)
Extraction of magnesium (mg)
 
Tin and it’s alloy
Tin and it’s alloyTin and it’s alloy
Tin and it’s alloy
 
Induction furnace
Induction furnaceInduction furnace
Induction furnace
 
Blast furnace presentation
Blast furnace presentation Blast furnace presentation
Blast furnace presentation
 
Continious casting of steel
Continious casting of steelContinious casting of steel
Continious casting of steel
 
Jindal Steel
Jindal SteelJindal Steel
Jindal Steel
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing process
 
Ferrosilicon production and operation
Ferrosilicon production and operationFerrosilicon production and operation
Ferrosilicon production and operation
 
Steel making process
Steel making processSteel making process
Steel making process
 
Continuous casting of billets
Continuous casting of billetsContinuous casting of billets
Continuous casting of billets
 
Alternative Iron making processess
Alternative Iron making processessAlternative Iron making processess
Alternative Iron making processess
 

Destaque

Proposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction FurnaceProposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction FurnaceGuo ke
 
GW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGuo ke
 
Neuland foundry Presentation 201602new
Neuland foundry Presentation 201602newNeuland foundry Presentation 201602new
Neuland foundry Presentation 201602newSand Casting Supplier
 
Petcoke furnace die casting furnace
Petcoke furnace die casting furnacePetcoke furnace die casting furnace
Petcoke furnace die casting furnacepankaj chauhan
 
Introduction to casting processes by stead fast engineers pvt ltd – part 2
Introduction to casting processes by stead fast engineers pvt ltd – part 2Introduction to casting processes by stead fast engineers pvt ltd – part 2
Introduction to casting processes by stead fast engineers pvt ltd – part 2steadfast123
 
SIRIM FOUNDRY MALAYSIA
SIRIM FOUNDRY MALAYSIASIRIM FOUNDRY MALAYSIA
SIRIM FOUNDRY MALAYSIAamryaya10
 
Main part’s drawing of INDUCTION FURNACE
Main part’s drawing of INDUCTION FURNACEMain part’s drawing of INDUCTION FURNACE
Main part’s drawing of INDUCTION FURNACEBhautik Chheta
 
Comparison Between Imf Eaf
Comparison Between Imf EafComparison Between Imf Eaf
Comparison Between Imf Eafmetudgn
 
ASMUBE Publicidade BrandingIdentidade visual & branding
ASMUBE Publicidade BrandingIdentidade visual  & branding   ASMUBE Publicidade BrandingIdentidade visual  & branding
ASMUBE Publicidade BrandingIdentidade visual & branding BLOG COMUNICAÇÃO
 
Uso do dicionário
Uso do dicionárioUso do dicionário
Uso do dicionárioVitor Abreu
 
Power plant list
Power plant listPower plant list
Power plant listKanda Velan
 

Destaque (20)

Proposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction FurnaceProposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction Furnace
 
Induction Furnace
Induction FurnaceInduction Furnace
Induction Furnace
 
GW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGW-1-750IF Induction Furnace
GW-1-750IF Induction Furnace
 
Neuland foundry Presentation 201602new
Neuland foundry Presentation 201602newNeuland foundry Presentation 201602new
Neuland foundry Presentation 201602new
 
Petcoke furnace die casting furnace
Petcoke furnace die casting furnacePetcoke furnace die casting furnace
Petcoke furnace die casting furnace
 
Introduction to casting processes by stead fast engineers pvt ltd – part 2
Introduction to casting processes by stead fast engineers pvt ltd – part 2Introduction to casting processes by stead fast engineers pvt ltd – part 2
Introduction to casting processes by stead fast engineers pvt ltd – part 2
 
Die casting furnace
Die casting furnaceDie casting furnace
Die casting furnace
 
SIRIM FOUNDRY MALAYSIA
SIRIM FOUNDRY MALAYSIASIRIM FOUNDRY MALAYSIA
SIRIM FOUNDRY MALAYSIA
 
Main part’s drawing of INDUCTION FURNACE
Main part’s drawing of INDUCTION FURNACEMain part’s drawing of INDUCTION FURNACE
Main part’s drawing of INDUCTION FURNACE
 
Comparison Between Imf Eaf
Comparison Between Imf EafComparison Between Imf Eaf
Comparison Between Imf Eaf
 
Casting Furnaces
Casting FurnacesCasting Furnaces
Casting Furnaces
 
ASMUBE Publicidade BrandingIdentidade visual & branding
ASMUBE Publicidade BrandingIdentidade visual  & branding   ASMUBE Publicidade BrandingIdentidade visual  & branding
ASMUBE Publicidade BrandingIdentidade visual & branding
 
NTPC,muzaffarpur
NTPC,muzaffarpurNTPC,muzaffarpur
NTPC,muzaffarpur
 
Uso do dicionário
Uso do dicionárioUso do dicionário
Uso do dicionário
 
Chos 2015 alunos
Chos 2015 alunosChos 2015 alunos
Chos 2015 alunos
 
Casting furnaces
Casting furnacesCasting furnaces
Casting furnaces
 
Excel formulas
Excel formulasExcel formulas
Excel formulas
 
Power plant list
Power plant listPower plant list
Power plant list
 
Formulas_Excel
Formulas_ExcelFormulas_Excel
Formulas_Excel
 
Aula de fórmulas excel
Aula de fórmulas excelAula de fórmulas excel
Aula de fórmulas excel
 

Semelhante a 12600KVA Metal Silicon Furnace Technical Proposal

IRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular MaterialIRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular MaterialIRJET Journal
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...Global CCS Institute
 
IRJET- Analysis of Diagrid Structures with Plan Irregularity
IRJET- Analysis of Diagrid Structures with Plan IrregularityIRJET- Analysis of Diagrid Structures with Plan Irregularity
IRJET- Analysis of Diagrid Structures with Plan IrregularityIRJET Journal
 
IRJET- Development and Characterization of Borosilicate Particles Reinforced ...
IRJET- Development and Characterization of Borosilicate Particles Reinforced ...IRJET- Development and Characterization of Borosilicate Particles Reinforced ...
IRJET- Development and Characterization of Borosilicate Particles Reinforced ...IRJET Journal
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Global CCS Institute
 
2010 deep research report on china solar grade polysilcon industry
2010 deep research report on china solar grade polysilcon industry2010 deep research report on china solar grade polysilcon industry
2010 deep research report on china solar grade polysilcon industryqyresearch
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industryqyresearch
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industrysmarter2011
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industrysmarter2011
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industrysmarter2011
 
2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industry2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industrysmarter2011
 
2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industry2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industrysmarter2011
 
Concrete-A Great Challenge and Role of Nano-Materials: Crimson Publishers
Concrete-A Great Challenge and Role of Nano-Materials: Crimson PublishersConcrete-A Great Challenge and Role of Nano-Materials: Crimson Publishers
Concrete-A Great Challenge and Role of Nano-Materials: Crimson PublishersCrimsonpublishers-Mechanicalengineering
 
Study of partial replacement of cement by barite powder and silica fume in se...
Study of partial replacement of cement by barite powder and silica fume in se...Study of partial replacement of cement by barite powder and silica fume in se...
Study of partial replacement of cement by barite powder and silica fume in se...IRJET Journal
 
Qyresearch:2012 deep research report on global and china carbon fiber industry
Qyresearch:2012 deep research report on global and china carbon fiber industryQyresearch:2012 deep research report on global and china carbon fiber industry
Qyresearch:2012 deep research report on global and china carbon fiber industrysmarter2011
 
2012 deep research report on global and china mono crystalline silicon pullin...
2012 deep research report on global and china mono crystalline silicon pullin...2012 deep research report on global and china mono crystalline silicon pullin...
2012 deep research report on global and china mono crystalline silicon pullin...smarter2011
 
IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...
IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...
IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...IRJET Journal
 
2012 deep research report on china solar grade polysilicon industry
2012 deep research report on china solar grade polysilicon industry2012 deep research report on china solar grade polysilicon industry
2012 deep research report on china solar grade polysilicon industrysmarter2011
 
Improvement of refractory in nippon steel
Improvement of refractory in nippon steelImprovement of refractory in nippon steel
Improvement of refractory in nippon steelRadi Nasr
 

Semelhante a 12600KVA Metal Silicon Furnace Technical Proposal (20)

IRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular MaterialIRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 
IRJET- Analysis of Diagrid Structures with Plan Irregularity
IRJET- Analysis of Diagrid Structures with Plan IrregularityIRJET- Analysis of Diagrid Structures with Plan Irregularity
IRJET- Analysis of Diagrid Structures with Plan Irregularity
 
IRJET- Development and Characterization of Borosilicate Particles Reinforced ...
IRJET- Development and Characterization of Borosilicate Particles Reinforced ...IRJET- Development and Characterization of Borosilicate Particles Reinforced ...
IRJET- Development and Characterization of Borosilicate Particles Reinforced ...
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
 
2010 deep research report on china solar grade polysilcon industry
2010 deep research report on china solar grade polysilcon industry2010 deep research report on china solar grade polysilcon industry
2010 deep research report on china solar grade polysilcon industry
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry
 
2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry2011 deep research report on china solar grade polysilicon industry
2011 deep research report on china solar grade polysilicon industry
 
2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industry2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industry
 
2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industry2012 deep research report on china ultra fine aluminum hydroxide industry
2012 deep research report on china ultra fine aluminum hydroxide industry
 
Concrete-A Great Challenge and Role of Nano-Materials: Crimson Publishers
Concrete-A Great Challenge and Role of Nano-Materials: Crimson PublishersConcrete-A Great Challenge and Role of Nano-Materials: Crimson Publishers
Concrete-A Great Challenge and Role of Nano-Materials: Crimson Publishers
 
Study of partial replacement of cement by barite powder and silica fume in se...
Study of partial replacement of cement by barite powder and silica fume in se...Study of partial replacement of cement by barite powder and silica fume in se...
Study of partial replacement of cement by barite powder and silica fume in se...
 
Qyresearch:2012 deep research report on global and china carbon fiber industry
Qyresearch:2012 deep research report on global and china carbon fiber industryQyresearch:2012 deep research report on global and china carbon fiber industry
Qyresearch:2012 deep research report on global and china carbon fiber industry
 
Alumiunium casting
Alumiunium castingAlumiunium casting
Alumiunium casting
 
2012 deep research report on global and china mono crystalline silicon pullin...
2012 deep research report on global and china mono crystalline silicon pullin...2012 deep research report on global and china mono crystalline silicon pullin...
2012 deep research report on global and china mono crystalline silicon pullin...
 
IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...
IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...
IRJET- Study on Strength Characteristics of Eco-Friendly Geopolymer Concrete ...
 
2012 deep research report on china solar grade polysilicon industry
2012 deep research report on china solar grade polysilicon industry2012 deep research report on china solar grade polysilicon industry
2012 deep research report on china solar grade polysilicon industry
 
Improvement of refractory in nippon steel
Improvement of refractory in nippon steelImprovement of refractory in nippon steel
Improvement of refractory in nippon steel
 

Mais de Guo ke

40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSALGuo ke
 
Proposal of 200KT PIG IRON PROJECT
Proposal of 200KT PIG IRON PROJECTProposal of 200KT PIG IRON PROJECT
Proposal of 200KT PIG IRON PROJECTGuo ke
 
500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANT500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANTGuo ke
 
Proposal of 1020KVA Anthracite Calcinations Furnace
Proposal of 1020KVA Anthracite Calcinations FurnaceProposal of 1020KVA Anthracite Calcinations Furnace
Proposal of 1020KVA Anthracite Calcinations FurnaceGuo ke
 
1100℃ Bogie Hearth Furnace
1100℃ Bogie Hearth Furnace1100℃ Bogie Hearth Furnace
1100℃ Bogie Hearth FurnaceGuo ke
 
5T Intemediate Frequency Furnace
5T Intemediate Frequency Furnace5T Intemediate Frequency Furnace
5T Intemediate Frequency FurnaceGuo ke
 
2X80m3 FeNi Blast Furnace
2X80m3 FeNi Blast Furnace2X80m3 FeNi Blast Furnace
2X80m3 FeNi Blast FurnaceGuo ke
 

Mais de Guo ke (7)

40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
40KTPA ELECTRODE PASTE PROJECT TECHNICAL PROPOSAL
 
Proposal of 200KT PIG IRON PROJECT
Proposal of 200KT PIG IRON PROJECTProposal of 200KT PIG IRON PROJECT
Proposal of 200KT PIG IRON PROJECT
 
500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANT500 TPD Mn ORE SINTER PLANT
500 TPD Mn ORE SINTER PLANT
 
Proposal of 1020KVA Anthracite Calcinations Furnace
Proposal of 1020KVA Anthracite Calcinations FurnaceProposal of 1020KVA Anthracite Calcinations Furnace
Proposal of 1020KVA Anthracite Calcinations Furnace
 
1100℃ Bogie Hearth Furnace
1100℃ Bogie Hearth Furnace1100℃ Bogie Hearth Furnace
1100℃ Bogie Hearth Furnace
 
5T Intemediate Frequency Furnace
5T Intemediate Frequency Furnace5T Intemediate Frequency Furnace
5T Intemediate Frequency Furnace
 
2X80m3 FeNi Blast Furnace
2X80m3 FeNi Blast Furnace2X80m3 FeNi Blast Furnace
2X80m3 FeNi Blast Furnace
 

12600KVA Metal Silicon Furnace Technical Proposal

  • 1. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 guoke1207@hotmail.com Equipment manufacture and installation of 12600KVA industrial silicon furnace Technical documentation
  • 2. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 1 页 guoke1207@hotmail.com Contents F I. Brief introduction of industrial silicon F .Ⅱ Technical description F .Ⅲ Design basis F .Ⅳ Installation specification F .Ⅴ Deviations on Technical Terms F .Ⅵ Advantages of project implementation F .Ⅶ Standard for design and construction
  • 3. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 2 页 guoke1207@hotmail.com I. Brief introduction of industrial silicon 1. Brand and usage of industrial silicon 1.1Brand of industrial silicon According to the current market demand, smelting products is the chemical grade silicon. The chemical composition should meet to the GB2881-91 requirement, and the industrial silicon quality should meet table 1-1. Table 1-1 Industrial Silicon’s chemical composition requirements: Chemical Composition Impurity content (%)Brand Si (%) Fe Al Ca P 1515级 >99.6% =0.15 — =0.015 =0.004% 2202级 >99.5% =0.2 =0.2 =0.02 =0.004% 2203级 >99.5% =0.2 =0.2 =0.03 =0.004% 2503级 >99.5% =0.2 — =0.03 =0.004% 3103级 >99.4% =0.3 =0.1 =0.03 =0.005% 3303级 >99.3% =0.3 =0.3 =0.03 =0.005% 411级 >99.2% =0.4 0.04— 0.08 =0.1 — 421级 >99.2 % =0.4 0.1— 0.15 =0.1 — 441级 >99.0 % =0.4 =0.4 =0.1 — 553级 >98.5 % =0.5 =0.5 =0.3 — 1.2 Usage of industrial silicon Industrial silicon (also called crystal silicon) is one of important materials used in modern industrial production. Industrial silicon is widely used in fields of electronics, steelmaking, photics, mechanics, automobile manufacture, chemical industry, metallurgy, medicine, national defense, etc. It is acclaimed as “Industrial monosodium”. Approximately 50% of industrial silicon is applied to manufacture of aluminum alloy. Aluminum-silicon alloy has advantages of good heat stability, high abrasive resistance, and smaller thermal expansion coefficient. Aluminum-silicon alloy is applied to fields of
  • 4. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 3 页 guoke1207@hotmail.com automobile manufacture, aviation industry, electric industry, shipbuilding, etc. Industrial silicon can not only be used as addition agent of nonferrous alloy, but also as alloying agent of high standard silicon steel. It is necessary deoxidizer in steelmaking and smelting of nonferrous alloy. In steelmaking industry, 5 kg of industrial silicon is consumed to produce 1 ton of steel. Chemical grade industrial silicon is raw material for polycrystalline silicon and monocrystalline silicon which are modern high-level technology product needed for integrated circuit development encouraged by the nation. Industrial silicon can be processed into raw material for circuit and electrical components. Japan referred steel, aluminum and semiconductor grade silicon as three main metal materials. Industrial silicon is applied to production of organic compound such as silicone oil, silicon rubber, construction preservative, white carbon black, coating for agricultural plastic film, annexing agent of high quality furniture, annexing agent of decorative painting, annexing agent of ordinary industrial coating, etc. Industrial silicon is also used as reducing agent of certain kinds of metal to produce new type of ceramic metal. Until now, the silicon metal is widely used and still to be studied in new zone, such as manufacturing the solar cell and manufacturing silicon nitride fiber synthesis and so on. Solar cell now is the most attentioned green energy industry. The United States, Europe and Japan all set the policy to precede their development in solar cell. InChina, the government has passed the RENEW ENERGY LAW on March 2005.These measures has greatly proceed the solar cell development in China. According to the statistics, the international solar cell market keep high-speed increase from 1998 to 2007,and the annual increase speed reach 30%.It is estimated that the increased speed shall be kept 25% after 2010.The crystalline silicon now is the most mature and widely used material for solar cell that occupy 85% in photovoltaic industry. Monocrystalline silicon solar cell’s conversion efficiency is of 15% and the polycrystalline silicon solar cell’s conversion efficiency is of 12%. In these years, as the demand of silicon metal is greatly increased in international market, it also Stimulate China’s silicon metal industry’s development and proceed the equipment suppliers and manufacturers to improve the process technology and devices manufacturing. As the high technology zone and important base industry’s material for structure and function, the silicon metal consumption has greatly increased. According to the British authorities estimate, the demand for silicon metal shall be increased 8~12%
  • 5. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 4 页 guoke1207@hotmail.com around the world in these years, of which the chemical silicon has annually increased 12%.The high purity silicon metal can be processed to the monocrystalline silicon after technology process(the silicon purity percent can reach 99.9999% above).The metal material product with high technology, like the semi-conductor especially the electronic components chip, is the technology achievement that promoted by the government. II.Technical requirement of main raw material 2.1Main raw material Silica and carbon reductant are the main raw material to smelt the industrial silicon. (1) Silica (SiO2 over 99%) Silica particle size requires 8 ~ 80mm, which is less than 20mm and not more than 20%.Qualified particle size requires over 90%. To deal with the silica raw material, most mechanical crushing work shall be finished at mine site. Because there will be some loss after crushing work. Some particle after screening shall be used to manufacture the Quartz sand. The silica size meet the requirement shall be transported to the plant. Some big size shall be manual crushed and 1~2 person is enough to finish the work. Using the hexagonal screen or the rotary screen to wash the silica and to pour water from the entrance. Besides the hexagonal screen or the rotary screen, it also needs infeed and outfeed belt convey. The simple method is to put the silica into the weighing cart and then wash it. Chemical composition of Quartz: SiO2=99%, Fe2O3=0.057%, Al2O3=0.14%, CaO=0.03%. Other impurities are less than 0.2%. (2) The reductant for the industrial silicon smelting has the following: anthracite with low ash, petroleum coke and wood. Transport the mixed material to the front of furnace, and then use the hand cart and hoist to transport the material to the second platform. The productive practice shows that using the automatic charging is difficult to uniform distribution of the silica and reducing agent, and it cannot meet the smelting process requirement. Suggest using the manual charging method. 2.2 auxiliary materials The auxiliary material for the industrial silicon such as the graphite electrode and
  • 6. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 5 页 guoke1207@hotmail.com oxygen shall be purchased from the market. The annual consumption of main raw material and auxiliary material are as the table 2-1 shows. Annual consumption of main raw material and auxiliary material for 1 set of 12600KVA industrial silicon furnace (22ton/day, 12 months per year): Table 2-1 No. Item Unit consumption (t/t) Day consumption (t/day) Month consumption (t/month) Year consumption (t/year) 1 quartz 2.65 58.3 1749 20988 2 petroleum coke 1.2 26.4 792 9504 3 Oxygen (atmospheric) 35m3/t 770m3/d 23100m3/m 277200m3/a 4 compressed air 140m3/t 3080m3/d 92400m3/m 1108800m3/a 5 Water adding 10 220 6600 79200 6 electrode 0.065 1.43 42.9 514.8 2.3 Raw materials chemical composition and physical performance requirements (1) Chemical composition of silica SiO2 Fe2O3 Al2O3 CaO >99.00% <0.057% <0.14% <0.03% Silica particle size requires 8 ~ 80mm, which is less than 20mm and no more than 20%.Size pass rate requires over 90%. (2)Chemical composition of coal fixed carbon ash volatile component water content >80% =1% <8.5% <8.5% Physical state of coal, grain size 6 ~ 10mm, Quantity of coal's grain size smaller than 1mm into the furnace should be less than total quantity’s 20%. Large resistivity in high temperature, good chemical reactivity, high porosity, qualified particle size is over 90%. Use the washed coal of proper size. (3)Chemical composition of petroleum coke fixed carbon ash volatile component water content >87% <0.26% <12% <0.74%
  • 7. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 6 页 guoke1207@hotmail.com Physical state of petroleum coke, grain size 0 ~ 30mm.Quantity of petroleum coke's size smaller than 3mm should no more than the total quantity's 20%.Crush it if the it is over than 30mm. (4)Chemical composition of Wood: fixed carbon ash volatile component water content >75% <2% <20% <10% The physical state of charcoal size: 5 to 100mm. 2.4 Process calculation (by the following formula): Q=24TPK1K2K3COSf/W Which:Q— — output of silicon metal furnace(t/y); 24— — operation time per day(24h); T— — operation time per year(340 day); P— — Furnace transformer rated capacity,kVA,12600; COSf — — Electric natural power factor,0.90(after low-voltage compensation); K1— — Supply voltage fluctuation coefficient,0.98; K2— — Furnace transformer power utilization factor,1; K3— — Furnace operation time utilization factor,0.98; W— — Product smelting power consumption,12000kWh/t。 Q=24×340×12600×0.98×1×0.98×0.90/12000= 7405.84t/y Normal daily output is of up to 22t / d or more. Maximum daily output is of up to 28.6 / d. Maximum annual output of one set furnace can reach 9724t / a. 3. Brief description of the process 3.1 process flowsheet as 5-1. Industrial silicon production use the continuous smelting operation within a submerged arc furnace, and the main process is using charcoal/all petroleum coke. Until now, three methods of the smelting process in China: 1.using charcoal as the reductant; 2.using charcoal and petroleum coke as the reductant; 3.using coal and woodchip as the reductant. The following process is the second method introduction. 3.2 process flowsheet (See the attached flowsheet). 3.3 Brief description of the process Brief description of the process Industrial Silicon is smelted through electrothermic method and the raw material is silica and reducing agent such as charcoal and petroleum coke. Wash silica to remove the
  • 8. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 7 页 guoke1207@hotmail.com soil and other impurities. To crush the coal and petroleum coke to a certain size. Quartz, charcoal, petroleum coke and others shall be proportioning and weighing as certain ration. Suitable proportioning is the precondition to ensure the stabile operation situation of furnace. The correct weighing must be ensured. The weighing error is not more than 1kg.After suitable proportioning; the material shall be well mixed and then charged into the furnace. 7 feeding pipes for 1 set furnace to distributing material. The operator starts or stops the button to feed according to the material situation inside furnace. Considering the proportioning and charging system takes much area, to save cost, two set furnace share one proportioning and charging system is the best choice. Material consumption around furnace core and electrode are quicker than other areas, so it needs to feed material timely. Material at furnace core should remain full state like bread. The industrial silicon is produced in the se-mi closed electric furnace and it is the continuous working type. The current from the transformer shall go into the hearth through the graphite electrode. During the smelting process, the current through the electrode and resistance produce the heat and the electrode arc heat to make the material up to 2000? .In this temperature, the silicon dioxide is reduced to the liquid silicon and CO.CO shall be out through batch layer and also heat the material inside furnace. The smelting process is of continuous type, the electrode has required depth inside furnace and continues the arcing operation. Using three stocking machine to stock the furnace bottom and add material timely to keep the material maintain a certain high level as the bread shape. During the smelting process, if the material surface become incrusting or the material feeding asymmetrical, it should use the wheel-distributing stoking machine to stoke the furnace. Use the stringer to open the taphole to let the liquid silicon pour into the ladle. When the liquid silicon’s quantity up to the half level of ladle, the oxygen and air mixture shall go inside to remove the calcium and aluminum and other impurities. When the liquid
  • 9. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 8 页 guoke1207@hotmail.com silicon is nearly finishing, use the mud ball made of electrode paste and coke powder to close the taphole. Transport the ladle to the casting workshop by electrical cart and cast the liquid silicon on the ingot mould. It shall become the silicon ingot after quick cooling. The taphole shall open every 2 to 3 hours. The taphole shall open 3 to 4 times each working shift (8 hours). Every day it shall produce about 22t metal silicon. After the silicon ingots get cold, hanging them out by the crane and putting them in the casting workshop according to the number. Transport them to the finished products storage by cart. Crush them by manual, grading, weighing, packaging, warehousing, and storage. Pack them according to the GB/T-5956-1995 technical requirement. Net weight per bag is 1000 ± 5kg. Smoke shall go to the gas duct through hood. Agroup of bag dust collector shall be installed outside the plant. The flue gas emission concentration after treatment shall meet the national discharge standards. Furnace cooling water and transformer cooling water shall be supplied by the water pump. The backwater return to the circulating water pool by difference of water level, and get cooling by crossflow cooling tower. The cooling water can be used again for the furnace and transformer. All the cooling water is soft water recycling and it just needs adds new water to meet the consumption. The furnace lining material are self-baking carbon brick, clay refractory brick, high alumina refractory bricks, etc., and use new masonry technology .Furnace mouth use the new type carbon brick work building. 4. Technology solutions for 12600KVA industrial silicon furnace: Transformer capacity:4200KVA ×3 Primary Voltage:35KV Secondary Voltage: 127~ 151~ 175( V) Secondary side voltage series: 17, differential: 3V Common Voltage: 151( V) Secondary current: 48178( A) Electrode diameter: (F 960mm graphite石 墨 ) :Electrode current density 6.7/cm2
  • 10. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 9 页 guoke1207@hotmail.com Power : ~factor 0.9( )after low voltage compensation Electrode pitch circle Diameter: F 2450mm±100mm Furnace inner diameter: F6100 (mm) Furnace shell diameter: F 7858mm Furnace inner height: 2400mm Furnace shell height: 4500mm Low-Hood Height: 2400mm :Unit area power of Pitch circle 2 ㎡405.4 KW/ : ㎡Unit area power of hearth 388 KW/ :Unit volume power of hearth 161.7W/m3 Electrode stroke: 1600mm Electrode Lifting Speed: 0.5m/min Cold Water Consumption: 340t/h The above specification is for reference. .Ⅲ design basis To meet the annual output of 50000 tons metal silicon, it shall need to build 7 set furnaces of 12600KVA capacity. (1 set furnace can produce 22 tons metal silicon every day. Annual production is calculated based on 330 days).The furnace needs low-voltage compensation and the power factor can not less than 0.9. 1. Furnace Shell (Rotary furnace): Furnace Shell Diameter: f7858mm Furnace Shell Height: 4500mm Number of Taphole: 5. (360°average arrangement) Thickness of Furnace shell plate: 16mm Bottom thickness: 20mm Belt and vertical bars: 160mm channel steel Thickness of bottom-beam: 280mm Furnace shell is of open-sided split mouth before welding, using E43 of continuous welding, full welded. The working level use self-baking carbon brick, size is of 400mm × 400mm × 400mm,bottom thickness is of 2100mm, furnace wall thickness is of 879mm; carbon brick
  • 11. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 10 页 guoke1207@hotmail.com cracks = 1 mm, filled material is of cold ramming paste (no gap between self-baking carbon brick ) ; furnace wall edge gap = 2mm, filling materials is of cold ramming paste , no leakage. Insulating layer use new insulating refractory clay brick and high alumina bricks, furnace wall is located above the carbon layer. High alumina bricks (Al2O3=65%) are as the insulating material, size is of 55mm × 113mm × 230mm, the other parts use clay brick and the size is 55mm×113mm×230mm.The refractory mortar shall be filled between all the refractory brick, no leakage. Pound flat layer use mixture of fine silica and slag, the particle size 3 ~ 8mm .Requirement: tamping, ramming flat. Aluminum silicate fiber felt as insulation material, thickness 30 ~ 40mm. Graphite carbide-Silicon as furnace mouth materials and must be seamless. Discharging is of circular shape, carbon brick of diversion trench longer 100mm than steel plate. Furnace shell near furnace mouth use clay brick, a layer brick thick, height is furnace mouth. 2. Water- :cooled Hood The hood edges is hexagon and the Hood height is 2400mm. 6 furnace gates for feeding and ramming. The three large side door’s effective operation space height is 1600mm, furnace gate of Operation hole is hydraulic lifting, side wall with refractory brick. As the hood size large span, high structural strength is required. At the same time, the current through the hood is strong, if it is not dealt properly, large eddy current losses. So the Cover central area is of 1Gr18Ni9 stainless steel material, steel beam is 20 # channel steel, and steel plate thickness is of 8mm. The water-cooled cover at the top of hood is of active structure, easily to be maintained. During Industrial silicon furnace smelting process, the pitch circle specification is important. During the electrode up-down movement, seal-oriented devices is made in water-cooled large set in order to prevent electrode is broken during swing and also prevent the pitch circle specification is changed. Also prevent the gas escaped from the upper. During the silicon smelting process, because of reducing agent (charcoal) is of light weight and low burning point, the smoke gas shall reverse and form the steamer effect if the
  • 12. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 11 页 guoke1207@hotmail.com smoke gas is difficult to getout. Thus the reductant shall partial oxidize and reduction effect shall down. The result is the unit consumption shall increase and the quality shall down. Our company has basically solved this problem after many times communicating with our customers and obtain good results. 3. Smoke Exhaust System: (1) Main gas duct: According to the flue gas produced and the amount of semi-closed furnace nokaze during smelting process, the two gas duct diameter are F2000mm.Because of the gas high temperature, at the bottom is about 3.5 m high double-layer water to improve the working conditions. The material is of Q235 and the thickness is of 8mm, and using two insulating flange connection. Insulation is of HP-5. The remaining is of single-layer, and the material is Q235 and the thickness is of 6mm.At the top of the gas pipe, there is a dust collection connector, the connector end is a bell valve and the bell valve is of hydraulic automatic control. (2)Accessory chimney flue: including tapping holegas cover and gas duct, and Manual flap valve. Accessory chimney is connected with Main chimney flue in the third platform. Tapping hole gas cover brings the gas when discharging. Accessory chimney flue is insulated with the furnace shell and reliable. 4. Electrode system ( )1 Electrode lifting Graphite electrode with F960mm diameter, including top carrying cylinder ,bottom carrying cylinder holder, water cooling large set, Cylinder pressure ring, Conductive Copper Tube holding device and hanging device. Top carrying cylinder diameter is F1080mm; materialis Q235 and 10mm thickness. Both Water-cooled large set and bottom carrying cylinder use stainless steel (1Cr18Ni9Ti) to reduce current losses during smelting process. Bottom carrying cylinder diameter is F1080mm and 10mm thickness. Water-cooled large set is of 4, easily to install and remove. Electrode lifting is hydraulic mechanism, working smoothly. Cylinder in the third tier platform is hanging structure. Each electrode uses two lift cylinder of F220. Lift height is 1.6 meters and the speed is 0.5m/min. Copper tile Hold mechanism adopts cylinder pressure ring clamps copper tiles. As each cylinder works independently, thus making each tile can be closely contact with the electrode to prevent fire between copper tile and electrode which will affect copper tile life, keeping the current delivered stably, contact resistance is small, and low power loss.
  • 13. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 12 页 guoke1207@hotmail.com Pressure ring and water-cooled protection cover are water cooled. No water flow dead area when design. ( )2 electrode slip Electrode slip is carried out by three pressure-releases Cylinder of double hydraulic brake. Diameter of the pressure-release cylinder is F100mm; stroke is 100mm. Hydraulic brake with disc spring to hold hydraulic to relax, vulcanized rubber brake, 10mm thick of insulating rubber. Disc spring hold is mechanical hold, which can effectively prevent electrode decline because of hydraulic and electrical failures, at the same time mechanical strength can be adjusted. Brake loose, tight and electrode slip is of automatic control .Electrode slip volume is made as needed. Method of electrode slipping 1) To pour the hydraulic oil into the upper hydraulic brake, and to overcome the upper hydraulic brake's spring pressure through oil pressure. 2) Lift the three pressure tanks to the required height, and the upper hydraulic brake shall be raised to the required height at the same time. 3) The upper hydraulic brake release the oil pressure and the disc spring hold the electrode again. 4) To pour the hydraulic oil into the lower hydraulic brake, and to overcome the upper hydraulic brake's disc spring pressure through oil pressure. 5) To low down the three pressure tanks to the required height, and to low down the upper hydraulic brake to the required height at the same time. 6) The lower hydraulic brake release the oil pressure and the disc spring hold the electrode again. 5. Hydraulic System Hydraulic system, including the hydraulic station, accumulator, two oil pumps and two motors, is the power source of electrode slip, electrode lifting, copper tile clamping, Bell valve cylinder, furnace gate lifting cylinder and charging control valve cylinder. System pressure is up to 12MPa, hydraulic stations adds cooling device. The electrode slip device is of hydraulic brake, and between the two brakes is of nine cylinders with f100mm and 100mm stroke. Hydraulic system piping is designed with insulation. 、6 Short bus bar
  • 14. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 13 页 guoke1207@hotmail.com Three single-phase transformers, brass side outlet, outlet terminal is near the transformer center, each transformer is of 16 outlet terminals, each group in two rows, total 48. Three transformers are installed on the transformer platform, angle of 120 °. Short bus bar system consists of three single-phase transformers, 48 water-cooled compensator , 48 water-cooled cable , 48 level conductive copper pipe , 48 vertical conductive copper pipe , 24 forged copper tile . Three single-phase transformers to eliminate the weak-phase of Short bus bar, making Short bus bar shorter and short bus bar power loss lower. Forging copper tile height 860mm, thickness 80mm, material T2. Forging copper tile copper is of high density, good conductivity. Water compensator is of pipe to pipe connections, copper wire cross section 1600mm2, 800mm length. Water-cooled cable is of dual nut pipe to pipe connections, copper strands cross section 1600mm2, 1000mm length. Double nut structure with double cone sets, increasing conductive area, easily installed. At the same time, 2300mm length not only meets the electrodes stroke requirements but also make the water-cooled cable’s inductive reactance smaller during normal smelting, less power loss. Conductive copper F70 × 10, material is of T2. After Copper manufacture, two times insulating paint, wrapped two glass fiber cloths around, and then one time insulating paint. Short bus bar hanging clamp insulation device, plywood material is 3240, external is stainless steel plates to reduce eddy current losses. Bar bolt of upper vases for second insulation. 、7 Water cooling system Cooling water system is the cooling device to cool the component (including the bus bar, pressure ring, large sleeve, furnace shell, gas hood, chimney) that working under high temperature. The water cooling system consists of water segregator, water collecting tank, pressure meter, valve doors, pipes and hoses, fittings and other components. Thermocouples and flow meters are installed on the return water pipe. Pressure ring of the bus bar (including copper pipe inside furnace, water-cooled cables, copper tiles) has the water drainage device to discharge water during the emergency repair time. The cooling water's inlet temperature shall not exceed 30 , return water temperature℃ shall not exceed 50 ,℃ and inlet water pressure should be not less than 0.25MPa. The water cooling system's forth and back water pipe is 1.5 inch gas pipe. The bus bar is 24 in and 24 out, the transformer is 6 in and 6 out, the gas pipe is 2 in and 2 out, the low
  • 15. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 14 页 guoke1207@hotmail.com gas hood is 16 in and 16 out, the water cooled sleeve is 6 in and 6 out, the pressure ring is 6 in and 6 out, spare is 2 in and 2 out, total 62 waterways. 8、Tapping system: Including stringer, ladle, cart, cart rail, ingot mold, hanging device and so on. 、9 Electrical Equipment Electrical equipment for 12600KVA industrial silicon furnace includes high-voltage power supply system, transformers, low voltage power supply, and control system. 9.1 high voltage supply system Power supply system for submerged arc furnace includes the switching station, furnace transformers, bus, other power protection equipment and measuring instruments, and other distribution facilities. Submerged arc furnace is allowed to have a power cut in operation shortly, so using a separate power supply can meet the requirements. Transmission process is that energy from the high voltage power grid via high voltage bus high-voltage isolating switches and circuit breaker to the furnace transformer, and then after a short network(bus) to reach the electrode. 9.1.1 High voltage distribution equipment Furnace uses 33KV voltage level, its high voltage distribution equipment usually brings high voltage power into the plant firstly by high pressure power, and then using underground cables into the plant control room’s the line high-voltage switch cabinet. Master control room usually has three switch cabinets: One, the line of high voltage is called switchgear cabinet, with switch, less oil circuit breakers, current transformer, and its capacity to be sufficient to meet the entire electrical load driven. Two, high voltage switchgear also known as PT cabinet, with switch, current transformer, voltage transformer, for connection of the measuring instruments, while the active form, a three-phase ammeter and voltmeter, and the introduction of the secondary phase voltage. This table has lead to the front console cabinet in order to manipulate the electrode movements and the amount of load control. There, high-voltage vacuum switch cabinet also know as outlet, with switch, vacuum circuit breaker or oil circuit breakers, and the current transformer with compatible
  • 16. 郭珂/Guo ke +86 132 9904 2234 Skype: guoke896884090 第 15 页 guoke1207@hotmail.com