Essential Building Blocks
of a Lean & Efficient Test
Process
This presentation and supporting material is owned by Maveric Systems and is for sole use of intended audience only.
The presentation may contain content that is confidential or proprietary and may not be distributed or copied without the permission of Maveric Systems.
© 2013. Maveric Systems Limited 2
Testing Challenges
Solution to these Challenges
Building Blocks of a Lean & Efficient Test Process
Summary
Agenda
© 2013. Maveric Systems Limited 3
Challenges
Testing Challenges
▸ Large number of applications in production
▸ Lack of test case definitions/obsolete test case definitions for applications
in production
▸ Large number of Change Requests, Enhancements & Production issue
resolutions incorporated into applications in production
▸ Lack of requirements definitions for applications in production
▸ Multiple levels of testing with either overlapping or missing testing coverage
▸ Inadequate impact analysis
▸ Absence of regression test packs based on impact
▸ Up gradation or Replacement of application is required every few years
▸ Cumbersome paperwork/Non-integrated tool set
© 2013. Maveric Systems Limited 4
Agenda
Testing Challenges
Solution to these Challenges
Building Blocks of a Lean & Efficient Test Process
Summary
© 2013. Maveric Systems Limited 5
MTS – Solution to Challenges
Solution
Lean and efficient test process framework (TestSmart)
▸ Provide quality gates across the Application Lifecycle to prevent the problems
faced currently
▸ Incrementally builds the missing requirements and test cases
▸ Improved defect containment resulting in increased customer satisfaction
▸ Reduces overheads and consequently cycle time
© 2013. Maveric Systems Limited 6
Agenda
Testing Challenges
Solution to these Challenges
Building Blocks of a Lean & Efficient Test Process
Summary
© 2013. Maveric Systems Limited 7
Single Stage Tool
Aided Design
Test Cube
Notation
Organization
Level Test
Strategy
Integrated
toolset
Requirements
Taxonomy
Define and use
“Build Quality”
Metrics
Test Organization
aligned with test
strategy
Configuration
Management
across
Application Life
Cycle
Building Blocks of a
Lean & Efficient Test
Process
Building Blocks of a Lean and
Efficient Test Process
© 2013. Maveric Systems Limited 8
Test Organization
aligned with test
strategy
Building Blocks of a Lean and
Efficient Test Process
Define and use
“Build Quality”
Metrics
Configuration
Management across
Application Life
Cycle
Organization Level
Test Strategy
Building Blocks of a
Lean & Efficient Test
Process
Requirements
Taxonomy
Integrated toolset Test Cube Notation
Single Stage Tool
Aided Design
© 2013. Maveric Systems Limited 9
Organization Level Test Strategy
▸ Lack of clarity on the levels, types
of testing that are to be performed
by the vendor/development and
testing teams
▸ Majority of the defects are
detected at the UAT stage
▸ Test effort is not used optimally or
compromised under pressure
Why needed?
▸ Clear identification of test levels
and types applicable and the
responsibility for each of them
▸ Applicability of the various test
types based on size, impact and
criticality of the feature being
changed
▸ Coverage type and coverage
requirements for each test level are
identified
What is addressed?
© 2013. Maveric Systems Limited 10
Test Organization Aligned with
Test Strategy
▸ Testers are not assigned to be
responsible for a test type
▸ Testers do not have the required
skill set for the assigned
test type
Why needed?
▸ Testers perform the intended test
type
▸ Testers skills are assessed and
improved based on the test type
▸ Better quality of testing
What is addressed?
© 2013. Maveric Systems Limited 11
Requirements Taxonomy
▸ Requirements are documented in
word documents and not in a
particular order
▸ Difficult to extract, update
requirements and build traceability
(bidirectional and requirements
traceability)
Why needed?
▸ Requirements, Test Cases, Defects
and Incidents are organized based
on the Requirements taxonomy
▸ Facilitates easy traceability,
storage, retrieval and maintenance
▸ Requirements and test cases are
updated on the existing baseline
and rebase lined (not to be
duplicated)
What is addressed?
© 2013. Maveric Systems Limited 12
Single Stage Tool Aided Design
▸ Very little understanding of formal
test design techniques
▸ Difficult to gauge the quality and
coverage of manual test design
▸ Multiple levels of test design
resulting in redundant work and
difficult to maintain artifacts
Why needed?
▸ Quality and coverage is assured
and consistent
▸ Test Design effort can be reduced
by upto 50% (over the applications
life span)
▸ Unified framework for test case
documentation
▸ Significant reduction of test case
maintenance effort
What is addressed?
© 2013. Maveric Systems Limited 13
Test Cube Notation
▸ No defined approach to develop,
use and manage test sets
▸ Testers consider the test set as a
product which arises automatically
when specifying test cases
▸ Switch from “Project” to “BAU”
mode and vice versa resulting in
discrepancy between the
application & the test set
Why needed?
▸ Specify test cases & execute test
cases on the basis of prioritizing
▸ Report progress of test
specification and/or test execution
quickly and adequately
▸ Plan and estimate test projects
accurately
▸ Compose regression test sets
quickly and flexibly
▸ Incorporate changes of the test
object easily in the test set
What is addressed?
© 2013. Maveric Systems Limited 14
Integration of Toolset
▸ Mostly standalone tools used for
Incident Management, Change
Management, Configuration
Management and Test
Management
▸ Toolset is incorrectly configured
correctly
▸ No roadmap for toolset
▸ Same data replicated in multiple
systems with inconsistent data
Why needed?
▸ Single stage data entry
▸ Reduction of data inconsistencies
▸ Better traceability and MIS
▸ Reduced documentation overheads
What is addressed?
© 2013. Maveric Systems Limited 15
Improved Configuration
Management
▸ Traceability missing between
objects tested and objects moved
to production
▸ Requirements/Test set not under
configuration management
resulting in test set becoming
quickly obsolete
▸ Test environments not under
configuration management
resulting in inconsistencies
between production and test
environments
Why needed?
▸ Clear identification of baselines
▸ Build numbers used as a basis to
track the movement of test objects
between development  testing
 production environments
▸ Anytime availability of the latest/
previous baseline requirements/
test set
▸ Clear traceability to the test
environment used reducing
environment related issues
What is addressed?
© 2013. Maveric Systems Limited 16
Define and Use “Build Quality”
Metrics
▸ No mechanism to gauge the quality
of the builds being provided by
development/vendor
▸ Pressure on the organizations
business and testing teams to
ensure timely release to production
leading to a number of
requirements/defect fixes being
deferred
Why needed?
▸ A transparent mechanism to
measure the quality of the builds
▸ Development contracts are
managed better resulting in
decreased need to defer defects
What is addressed?
© 2013. Maveric Systems Limited 17
Agenda
Testing Challenges
Solution to these Challenges
Building Blocks of a Lean & Efficient Test Process
Summary
© 2013. Maveric Systems Limited 18
Summary
How TestSmart maps to lean principles
OrgLevelTest
Strategy
TestOrganization
alignedtotest
strategy
Requirements
Taxonomy
SingleStageTool
AidedDesign
TestCubeNotation
Integrated
toolset
ConfigurationMgmt.
acrossapplicationlife
cycle
Defineanduse“Build
Quality”Metrics
Eliminate waste  
Amplify learning  
Decide as late as
possible
 
Deliver as fast as
possible
  
Empower the team  
Build integrity in   
See the whole 
© 2013. Maveric Systems Limited
Thank You
haribabut@maveric-systems.com

Mais conteúdo relacionado

Mais procurados

Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...TEST Huddle
 
Software Testing Capability doc
Software Testing Capability doc Software Testing Capability doc
Software Testing Capability doc PM Venkatesha Babu
 
Test Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric SystemsTest Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric SystemsMaveric Systems
 
Nisha Varghese_Senior Test lead & Tester
Nisha Varghese_Senior Test lead & TesterNisha Varghese_Senior Test lead & Tester
Nisha Varghese_Senior Test lead & TesterNisha Varghese
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceTechWell
 
Testing Centralization
Testing CentralizationTesting Centralization
Testing CentralizationCognizant
 
What is (tcoe) testing center of excellence
What is (tcoe) testing center of excellenceWhat is (tcoe) testing center of excellence
What is (tcoe) testing center of excellenceMaveric Systems
 
Test management
Test managementTest management
Test managementOana Feidi
 
360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellenceguestf2e1db
 
Sap test center of excellence
Sap test center of excellenceSap test center of excellence
Sap test center of excellenceInfosys
 
Testing as a Managed Service using SLAs and KPIs
Testing as a Managed Service using SLAs and KPIsTesting as a Managed Service using SLAs and KPIs
Testing as a Managed Service using SLAs and KPIsProlifics
 
Maveric - Automation of Release & Deployment Management
Maveric -  Automation of Release & Deployment ManagementMaveric -  Automation of Release & Deployment Management
Maveric - Automation of Release & Deployment ManagementMaveric Systems
 
Dineshkumar_Automation tester_6.5years
Dineshkumar_Automation tester_6.5yearsDineshkumar_Automation tester_6.5years
Dineshkumar_Automation tester_6.5yearsdineshkumar selvaraj
 
Testing Factory Nexion En
Testing Factory Nexion EnTesting Factory Nexion En
Testing Factory Nexion Enppdeazul
 
Mindtree risk based testing offerings.
Mindtree risk based testing offerings.Mindtree risk based testing offerings.
Mindtree risk based testing offerings.Mindtree Ltd.
 

Mais procurados (20)

Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...
 
Industrialization of testing
Industrialization of testing Industrialization of testing
Industrialization of testing
 
Software Testing Capability doc
Software Testing Capability doc Software Testing Capability doc
Software Testing Capability doc
 
Test Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric SystemsTest Process Consulting Services - Maveric Systems
Test Process Consulting Services - Maveric Systems
 
Nisha Varghese_Senior Test lead & Tester
Nisha Varghese_Senior Test lead & TesterNisha Varghese_Senior Test lead & Tester
Nisha Varghese_Senior Test lead & Tester
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of Excellence
 
Testing Centralization
Testing CentralizationTesting Centralization
Testing Centralization
 
Online testing strategy
Online testing strategyOnline testing strategy
Online testing strategy
 
What is (tcoe) testing center of excellence
What is (tcoe) testing center of excellenceWhat is (tcoe) testing center of excellence
What is (tcoe) testing center of excellence
 
Test management
Test managementTest management
Test management
 
360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence
 
CDGRES201602
CDGRES201602CDGRES201602
CDGRES201602
 
Sap test center of excellence
Sap test center of excellenceSap test center of excellence
Sap test center of excellence
 
Testing as a Managed Service using SLAs and KPIs
Testing as a Managed Service using SLAs and KPIsTesting as a Managed Service using SLAs and KPIs
Testing as a Managed Service using SLAs and KPIs
 
Maveric - Automation of Release & Deployment Management
Maveric -  Automation of Release & Deployment ManagementMaveric -  Automation of Release & Deployment Management
Maveric - Automation of Release & Deployment Management
 
PROACTVE
PROACTVEPROACTVE
PROACTVE
 
Dineshkumar_Automation tester_6.5years
Dineshkumar_Automation tester_6.5yearsDineshkumar_Automation tester_6.5years
Dineshkumar_Automation tester_6.5years
 
Testing Factory Nexion En
Testing Factory Nexion EnTesting Factory Nexion En
Testing Factory Nexion En
 
Mindtree risk based testing offerings.
Mindtree risk based testing offerings.Mindtree risk based testing offerings.
Mindtree risk based testing offerings.
 
Tcoe team
Tcoe teamTcoe team
Tcoe team
 

Destaque

Lean Principles In Case Management
Lean Principles In Case ManagementLean Principles In Case Management
Lean Principles In Case Managementbjornvisser
 
Apresentação MBA Toc Teoria das Restrições
Apresentação MBA Toc Teoria das RestriçõesApresentação MBA Toc Teoria das Restrições
Apresentação MBA Toc Teoria das RestriçõesCLT Valuebased Services
 
Apresentação fatec inteiro
Apresentação fatec   inteiroApresentação fatec   inteiro
Apresentação fatec inteiroPaulo Bandeira
 
Seminário Aese - Conceitos teóricos do LSS
Seminário Aese - Conceitos teóricos do LSSSeminário Aese - Conceitos teóricos do LSS
Seminário Aese - Conceitos teóricos do LSSPedrodosSantos
 
Lean forward case study at Cisco
Lean forward case study at CiscoLean forward case study at Cisco
Lean forward case study at CiscoMudit Agarwal
 
Case Votorantim
Case VotorantimCase Votorantim
Case VotorantimLinkedIn
 

Destaque (10)

Lean na JMF - Eng Luis Cristovao
Lean na JMF - Eng Luis Cristovao Lean na JMF - Eng Luis Cristovao
Lean na JMF - Eng Luis Cristovao
 
Lean Principles In Case Management
Lean Principles In Case ManagementLean Principles In Case Management
Lean Principles In Case Management
 
Apresentação MBA Toc Teoria das Restrições
Apresentação MBA Toc Teoria das RestriçõesApresentação MBA Toc Teoria das Restrições
Apresentação MBA Toc Teoria das Restrições
 
Apresentação fatec inteiro
Apresentação fatec   inteiroApresentação fatec   inteiro
Apresentação fatec inteiro
 
Seminário Aese - Conceitos teóricos do LSS
Seminário Aese - Conceitos teóricos do LSSSeminário Aese - Conceitos teóricos do LSS
Seminário Aese - Conceitos teóricos do LSS
 
Lean forward case study at Cisco
Lean forward case study at CiscoLean forward case study at Cisco
Lean forward case study at Cisco
 
Lean Healthcare
Lean HealthcareLean Healthcare
Lean Healthcare
 
Case Votorantim
Case VotorantimCase Votorantim
Case Votorantim
 
Apresentação Friboi CEO Fórum 2012
Apresentação Friboi CEO Fórum 2012Apresentação Friboi CEO Fórum 2012
Apresentação Friboi CEO Fórum 2012
 
Honda Case Study
Honda Case StudyHonda Case Study
Honda Case Study
 

Semelhante a Essential building blocks of a lean and efficient test process

Requirements Practice - Maveric Systems
Requirements Practice - Maveric SystemsRequirements Practice - Maveric Systems
Requirements Practice - Maveric SystemsMaveric Systems
 
Managed Test Services - Maveric Systems
Managed Test Services - Maveric SystemsManaged Test Services - Maveric Systems
Managed Test Services - Maveric SystemsMaveric Systems
 
Everything You Need to Know About Regression Testing Automation.pdf
Everything You Need to Know About Regression Testing Automation.pdfEverything You Need to Know About Regression Testing Automation.pdf
Everything You Need to Know About Regression Testing Automation.pdfRohitBhandari66
 
Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02Dr. Pierpaolo Mangeruga
 
Essential Test Management
Essential Test ManagementEssential Test Management
Essential Test ManagementTechWell
 
Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".
Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".
Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".Emerasoft, solutions to collaborate
 
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...Emtec Inc.
 
Essential Test Management and Planning
Essential Test Management and PlanningEssential Test Management and Planning
Essential Test Management and PlanningTechWell
 
Critical functionality testing
Critical functionality testingCritical functionality testing
Critical functionality testingMaveric Systems
 
Top Challenges in Functional Testing and How to Overcome Them.pdf
Top Challenges in Functional Testing and How to Overcome Them.pdfTop Challenges in Functional Testing and How to Overcome Them.pdf
Top Challenges in Functional Testing and How to Overcome Them.pdfAlpha BOLD
 
Importance of Business Process Test Automation - Bahaa Al Zubaidi.pdf
Importance of Business Process Test Automation - Bahaa Al Zubaidi.pdfImportance of Business Process Test Automation - Bahaa Al Zubaidi.pdf
Importance of Business Process Test Automation - Bahaa Al Zubaidi.pdfBahaa Al Zubaidi
 
Creating and managing test environments best practices for test infrastructur...
Creating and managing test environments best practices for test infrastructur...Creating and managing test environments best practices for test infrastructur...
Creating and managing test environments best practices for test infrastructur...Knoldus Inc.
 
Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)Ravindra Kushwaha
 
#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...
#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...
#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...Agile Testing Alliance
 
Test Case Prioritization Techniques
Test Case Prioritization TechniquesTest Case Prioritization Techniques
Test Case Prioritization TechniquesKanoah
 
Comparison of automation and manual testing pixel values technolabs
Comparison of automation and manual testing pixel values technolabsComparison of automation and manual testing pixel values technolabs
Comparison of automation and manual testing pixel values technolabsPixel Values Technolabs
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfkalichargn70th171
 

Semelhante a Essential building blocks of a lean and efficient test process (20)

Requirements Practice - Maveric Systems
Requirements Practice - Maveric SystemsRequirements Practice - Maveric Systems
Requirements Practice - Maveric Systems
 
Managed Test Services - Maveric Systems
Managed Test Services - Maveric SystemsManaged Test Services - Maveric Systems
Managed Test Services - Maveric Systems
 
Model based testing
Model based testingModel based testing
Model based testing
 
Everything You Need to Know About Regression Testing Automation.pdf
Everything You Need to Know About Regression Testing Automation.pdfEverything You Need to Know About Regression Testing Automation.pdf
Everything You Need to Know About Regression Testing Automation.pdf
 
Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02Independent verification & validation presented by Maneat v02
Independent verification & validation presented by Maneat v02
 
Essential Test Management
Essential Test ManagementEssential Test Management
Essential Test Management
 
Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".
Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".
Webinar: "5 semplici passi per migliorare la Quality e i processi di Test".
 
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
 
Essential Test Management and Planning
Essential Test Management and PlanningEssential Test Management and Planning
Essential Test Management and Planning
 
Critical functionality testing
Critical functionality testingCritical functionality testing
Critical functionality testing
 
Top Challenges in Functional Testing and How to Overcome Them.pdf
Top Challenges in Functional Testing and How to Overcome Them.pdfTop Challenges in Functional Testing and How to Overcome Them.pdf
Top Challenges in Functional Testing and How to Overcome Them.pdf
 
Importance of Business Process Test Automation - Bahaa Al Zubaidi.pdf
Importance of Business Process Test Automation - Bahaa Al Zubaidi.pdfImportance of Business Process Test Automation - Bahaa Al Zubaidi.pdf
Importance of Business Process Test Automation - Bahaa Al Zubaidi.pdf
 
Creating and managing test environments best practices for test infrastructur...
Creating and managing test environments best practices for test infrastructur...Creating and managing test environments best practices for test infrastructur...
Creating and managing test environments best practices for test infrastructur...
 
Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)
 
#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...
#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...
#Interactive Session by Sudhir Upadhyay and Ashish Kumar, "Strengthening Test...
 
Test Case Prioritization Techniques
Test Case Prioritization TechniquesTest Case Prioritization Techniques
Test Case Prioritization Techniques
 
Sta unit 5(abimanyu)
Sta unit 5(abimanyu)Sta unit 5(abimanyu)
Sta unit 5(abimanyu)
 
Jack Duncan CV
Jack Duncan CVJack Duncan CV
Jack Duncan CV
 
Comparison of automation and manual testing pixel values technolabs
Comparison of automation and manual testing pixel values technolabsComparison of automation and manual testing pixel values technolabs
Comparison of automation and manual testing pixel values technolabs
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 

Mais de Maveric Systems

Standards models for setting up a robust t co-e
Standards models for setting up a robust t co-eStandards models for setting up a robust t co-e
Standards models for setting up a robust t co-eMaveric Systems
 
Agile & pmi project management mapping maveric systems
Agile & pmi project management mapping   maveric systemsAgile & pmi project management mapping   maveric systems
Agile & pmi project management mapping maveric systemsMaveric Systems
 
Transformation Assurance
Transformation AssuranceTransformation Assurance
Transformation AssuranceMaveric Systems
 
Standards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric SystemsStandards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric SystemsMaveric Systems
 
Automation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - MavericAutomation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - MavericMaveric Systems
 
Importance of program health checks
Importance of program health checksImportance of program health checks
Importance of program health checksMaveric Systems
 
Critical success factors for successful requirements manangement
Critical success factors for successful requirements manangementCritical success factors for successful requirements manangement
Critical success factors for successful requirements manangementMaveric Systems
 
Importance of requirement assurance in product selection
Importance of requirement assurance in product selectionImportance of requirement assurance in product selection
Importance of requirement assurance in product selectionMaveric Systems
 
Importance of early project requirements definition
Importance of early project requirements definitionImportance of early project requirements definition
Importance of early project requirements definitionMaveric Systems
 

Mais de Maveric Systems (11)

Maveric Systems
Maveric Systems Maveric Systems
Maveric Systems
 
Standards models for setting up a robust t co-e
Standards models for setting up a robust t co-eStandards models for setting up a robust t co-e
Standards models for setting up a robust t co-e
 
Agile & pmi project management mapping maveric systems
Agile & pmi project management mapping   maveric systemsAgile & pmi project management mapping   maveric systems
Agile & pmi project management mapping maveric systems
 
Assurance
AssuranceAssurance
Assurance
 
Transformation Assurance
Transformation AssuranceTransformation Assurance
Transformation Assurance
 
Standards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric SystemsStandards / Models for Setting Up a Robust TCoE - Maveric Systems
Standards / Models for Setting Up a Robust TCoE - Maveric Systems
 
Automation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - MavericAutomation of Release and Deployment Management - Maveric
Automation of Release and Deployment Management - Maveric
 
Importance of program health checks
Importance of program health checksImportance of program health checks
Importance of program health checks
 
Critical success factors for successful requirements manangement
Critical success factors for successful requirements manangementCritical success factors for successful requirements manangement
Critical success factors for successful requirements manangement
 
Importance of requirement assurance in product selection
Importance of requirement assurance in product selectionImportance of requirement assurance in product selection
Importance of requirement assurance in product selection
 
Importance of early project requirements definition
Importance of early project requirements definitionImportance of early project requirements definition
Importance of early project requirements definition
 

Último

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Último (20)

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 

Essential building blocks of a lean and efficient test process

  • 1. © 2013. Maveric Systems Limited Hari Babu T Principal, Test Process Consulting Essential Building Blocks of a Lean & Efficient Test Process This presentation and supporting material is owned by Maveric Systems and is for sole use of intended audience only. The presentation may contain content that is confidential or proprietary and may not be distributed or copied without the permission of Maveric Systems.
  • 2. © 2013. Maveric Systems Limited 2 Testing Challenges Solution to these Challenges Building Blocks of a Lean & Efficient Test Process Summary Agenda
  • 3. © 2013. Maveric Systems Limited 3 Challenges Testing Challenges ▸ Large number of applications in production ▸ Lack of test case definitions/obsolete test case definitions for applications in production ▸ Large number of Change Requests, Enhancements & Production issue resolutions incorporated into applications in production ▸ Lack of requirements definitions for applications in production ▸ Multiple levels of testing with either overlapping or missing testing coverage ▸ Inadequate impact analysis ▸ Absence of regression test packs based on impact ▸ Up gradation or Replacement of application is required every few years ▸ Cumbersome paperwork/Non-integrated tool set
  • 4. © 2013. Maveric Systems Limited 4 Agenda Testing Challenges Solution to these Challenges Building Blocks of a Lean & Efficient Test Process Summary
  • 5. © 2013. Maveric Systems Limited 5 MTS – Solution to Challenges Solution Lean and efficient test process framework (TestSmart) ▸ Provide quality gates across the Application Lifecycle to prevent the problems faced currently ▸ Incrementally builds the missing requirements and test cases ▸ Improved defect containment resulting in increased customer satisfaction ▸ Reduces overheads and consequently cycle time
  • 6. © 2013. Maveric Systems Limited 6 Agenda Testing Challenges Solution to these Challenges Building Blocks of a Lean & Efficient Test Process Summary
  • 7. © 2013. Maveric Systems Limited 7 Single Stage Tool Aided Design Test Cube Notation Organization Level Test Strategy Integrated toolset Requirements Taxonomy Define and use “Build Quality” Metrics Test Organization aligned with test strategy Configuration Management across Application Life Cycle Building Blocks of a Lean & Efficient Test Process Building Blocks of a Lean and Efficient Test Process
  • 8. © 2013. Maveric Systems Limited 8 Test Organization aligned with test strategy Building Blocks of a Lean and Efficient Test Process Define and use “Build Quality” Metrics Configuration Management across Application Life Cycle Organization Level Test Strategy Building Blocks of a Lean & Efficient Test Process Requirements Taxonomy Integrated toolset Test Cube Notation Single Stage Tool Aided Design
  • 9. © 2013. Maveric Systems Limited 9 Organization Level Test Strategy ▸ Lack of clarity on the levels, types of testing that are to be performed by the vendor/development and testing teams ▸ Majority of the defects are detected at the UAT stage ▸ Test effort is not used optimally or compromised under pressure Why needed? ▸ Clear identification of test levels and types applicable and the responsibility for each of them ▸ Applicability of the various test types based on size, impact and criticality of the feature being changed ▸ Coverage type and coverage requirements for each test level are identified What is addressed?
  • 10. © 2013. Maveric Systems Limited 10 Test Organization Aligned with Test Strategy ▸ Testers are not assigned to be responsible for a test type ▸ Testers do not have the required skill set for the assigned test type Why needed? ▸ Testers perform the intended test type ▸ Testers skills are assessed and improved based on the test type ▸ Better quality of testing What is addressed?
  • 11. © 2013. Maveric Systems Limited 11 Requirements Taxonomy ▸ Requirements are documented in word documents and not in a particular order ▸ Difficult to extract, update requirements and build traceability (bidirectional and requirements traceability) Why needed? ▸ Requirements, Test Cases, Defects and Incidents are organized based on the Requirements taxonomy ▸ Facilitates easy traceability, storage, retrieval and maintenance ▸ Requirements and test cases are updated on the existing baseline and rebase lined (not to be duplicated) What is addressed?
  • 12. © 2013. Maveric Systems Limited 12 Single Stage Tool Aided Design ▸ Very little understanding of formal test design techniques ▸ Difficult to gauge the quality and coverage of manual test design ▸ Multiple levels of test design resulting in redundant work and difficult to maintain artifacts Why needed? ▸ Quality and coverage is assured and consistent ▸ Test Design effort can be reduced by upto 50% (over the applications life span) ▸ Unified framework for test case documentation ▸ Significant reduction of test case maintenance effort What is addressed?
  • 13. © 2013. Maveric Systems Limited 13 Test Cube Notation ▸ No defined approach to develop, use and manage test sets ▸ Testers consider the test set as a product which arises automatically when specifying test cases ▸ Switch from “Project” to “BAU” mode and vice versa resulting in discrepancy between the application & the test set Why needed? ▸ Specify test cases & execute test cases on the basis of prioritizing ▸ Report progress of test specification and/or test execution quickly and adequately ▸ Plan and estimate test projects accurately ▸ Compose regression test sets quickly and flexibly ▸ Incorporate changes of the test object easily in the test set What is addressed?
  • 14. © 2013. Maveric Systems Limited 14 Integration of Toolset ▸ Mostly standalone tools used for Incident Management, Change Management, Configuration Management and Test Management ▸ Toolset is incorrectly configured correctly ▸ No roadmap for toolset ▸ Same data replicated in multiple systems with inconsistent data Why needed? ▸ Single stage data entry ▸ Reduction of data inconsistencies ▸ Better traceability and MIS ▸ Reduced documentation overheads What is addressed?
  • 15. © 2013. Maveric Systems Limited 15 Improved Configuration Management ▸ Traceability missing between objects tested and objects moved to production ▸ Requirements/Test set not under configuration management resulting in test set becoming quickly obsolete ▸ Test environments not under configuration management resulting in inconsistencies between production and test environments Why needed? ▸ Clear identification of baselines ▸ Build numbers used as a basis to track the movement of test objects between development  testing  production environments ▸ Anytime availability of the latest/ previous baseline requirements/ test set ▸ Clear traceability to the test environment used reducing environment related issues What is addressed?
  • 16. © 2013. Maveric Systems Limited 16 Define and Use “Build Quality” Metrics ▸ No mechanism to gauge the quality of the builds being provided by development/vendor ▸ Pressure on the organizations business and testing teams to ensure timely release to production leading to a number of requirements/defect fixes being deferred Why needed? ▸ A transparent mechanism to measure the quality of the builds ▸ Development contracts are managed better resulting in decreased need to defer defects What is addressed?
  • 17. © 2013. Maveric Systems Limited 17 Agenda Testing Challenges Solution to these Challenges Building Blocks of a Lean & Efficient Test Process Summary
  • 18. © 2013. Maveric Systems Limited 18 Summary How TestSmart maps to lean principles OrgLevelTest Strategy TestOrganization alignedtotest strategy Requirements Taxonomy SingleStageTool AidedDesign TestCubeNotation Integrated toolset ConfigurationMgmt. acrossapplicationlife cycle Defineanduse“Build Quality”Metrics Eliminate waste   Amplify learning   Decide as late as possible   Deliver as fast as possible    Empower the team   Build integrity in    See the whole 
  • 19. © 2013. Maveric Systems Limited Thank You haribabut@maveric-systems.com