SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
WindSight™ - Validation White Paper, March 2011
page: 1/5
(Mesoscale wind flow patterns over New South Wales, Australia)
Validation of WindSight™ : Mesoscale Modelling for Early Stage Wind Assessment
Understanding the wind resources in areas where local measurements are scarce or unavailable
is nowadays possible with state-of-the-art mesoscale numerical weather models and public high
quality global weather databases.
Since 2007, MEGAJOULE has developed
and tested an internal methodology using
mesoscale modeling to assess wind
resources worldwide: WindSight™.
WindSight™ approach was developed
internally with European Community
support and in cooperation with Aveiro
University Physics research department.
WindSigth™ - Concept
Mesoscale modeling is performed using WRF – Weather Research and Forecasting mesoscale’s
numerical model. WRF was developed by the U.S. National Center for Atmospheric Research
(NCAR) as an evolution of the original MM5. It incorporates the latest scientific developments
from the leading research centers, and is the result of decades of research.
A dynamic downscaling of global weather data (such as more than 50 years of Reanalysis
NCEP/NCAR data or 40 years of ERA40 from ECMWF, among other possibilities)
Over the past years, MJ has “tuned” the model configuration for best results in wind assessment.
A baseline parameterization and model configuration was defined, although specific model
configuration is studied for each project in hands.
If available, MJ can assimilate local wind measurements for better results.
WindSight™ - Validation White Paper, March 2011
page: 2/5
(Wind Map over Portugal in Google Earth kmz format)
(Example of Virtual Wind Index performance against other data sets for a site in Poland)
Why no Pre-Calculated Wind Data ?
Mesoscale weather numerical modeling is a complex science and in constant development.
Calculation domain and several model
parameterizations depend on the site’s
characteristics, latitude and general forcing
weather. The WRF model is also in continuous
development.
By not making use of pre-calculated wind maps or
data MJ ensures that our Clients get the best
modeling option available for each case and at
any given time
Typical application from WindSight™
Typically, mesoscale wind assessment is best suited for greenfield or early stage wind
assessments.
Traditional results are :
• Early stage Wind Resource Mapping (flexible output data – GIS, Google Earth, etc…)
• Early stage micrositing and energy estimates (coupling mesoscale results with WAsP or
CFD)
• Preliminary site assessment (detailed IEC wind conditions by coupling mesoscale results
with CFD)
• Virtual Long Term reference wind data (for Long Term extrapolation and MCP)
Other outputs include Extreme wind speed analysis, Cold Climate or Icing conditions, Hot
Climate conditions.
-100%
-50%
0%
50%
100%
Jan-06 Jul-06 Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09 Jan-10
MonthlyWindIndex[%]
NCEP NCAR(1000 mBar) Jasionka Airport(Poland) Local Mast#1 Local Mast#2 Virtual Wind Index
WindSight™ - Validation White Paper, March 2011
page: 3/5
(Example of Wind Rose and Histogram for a Complex/Inland site, WindSight (grey), Observed (blue)))
Validation of Simulated Wind Data Series
During 2010 MJ completed its first comprehensive validation programme for WindSight™
mesoscale modeling.
The validation was based on the 3x3 km resolution simulated wind data series, based on input
data from the global data from NCEP/NCAR Reanalysis I data set. No data assimilation or MOS
was performed, to ensure an independent blind test.
The simulated data was compared against local measurements for 34 sites in Europe (Portugal,
Poland and Romania).
The local measurements were taken at lattice masts used for wind assessment fully compliant
with IEC/MEASNET requirements. The masts are operated by MJ and are not in anyway
assimilated in the input global datasets or in the model runs, thus, ensuring fully independent
blind tests.
Measurement height ranges is 60 m above ground level for all site but one, with 49 m.
The test sites range from flat terrain to complex sites and also from coastal (< 10 km to
shoreline) to inland sites.
Results showed a RMSE error in average wind speed of 0.76 m/s and a BIAS of - 0.14 m/s.
The cumulative distribution of results (table 2) showed that for 80 % of cases, average wind
speed difference was below 1.0 m/s and below 0.7 m/s for 50 % of cases.
Global statistics for Average Wind Speed comparison
MAE (m/s) RMSE (m/s) BIAS (m/s)
0.66 0.76 -0.14
0%
5%
10%
15%
20%
N
NNE
ENE
E
ESE
SSE
S
SSW
WSW
W
WNW
NNW
WindSight™ - Validation White Paper, March 2011
page: 4/5
Maximum Mean Absolute Error (MAE) for different frequency levels
Frequency [%] Maximum MAE (m/s)
50% 0.7
80% 1.0
90% 1.2
Estimated Wind Rose were in good agreement with observations. For 87 % of cases at least one
of the 2 predominant wind directions matched the simulated predominant wind directions. For
40 % of the cases, both most predominant wind directions were matched by the simulations.
(figure below shows an example for one site).
Conclusions
The statistics above prove the usefulness of WindSight™ mesoscale wind assessment particularly
for greenfield and early stage wind studies.
For 3x3 resolution it can be assumed that there is a 80 % probability that real average wind
speed will be within +/- 1.0 m/s of simulated average wind speed.
Uncertainty in wind speed means that the WindSight™ approach is most applicable for a
greenfield or early stage viability studies. At these stages, developers should more willing to
take more risk, while benefiting from a pragmatic and comparable approach to wind assessment.
Agreement in Wind Rose and Wind Speed Histogram was sufficiently good to provided a good
base for early stage turbine micrositing and AEP estimates (coupling mesoscale wind data with
micrositing tools and linear or CFD models). This is particularly interesting for projects were
wind farm layout must be defined in very early stages and without any local data.
Early stage wind assessment, while possible with mesoscale modeling, should never substitute
on-site reliable wind measurements for more than 1 year, in order to ensure typical bankable
uncertainty on AEP estimates.
Further Info.:
www.megajoule.pt
www.facebook.com/MEGAJOULE
www.youtube.com/MEGAJOULEConsultants
www.linkedin.com/MEGAJOULE
www.twitter.com/MEGAJOULE
megajoule@megajoule.pt
WindSight™ - Validation White Paper, March 2011
page: 5/5
Annex - List of sample sites
ID Complexity Elevation [m]
Average Wind Speed [m/s]
Deviation [m/s]
Observed Simulated
1 Complex / Inland 698 5.86 6.45 0.59
2 Complex / Inland 777 6.56 7.30 0.74
3 Complex / Inland 890 7.47 7.93 0.46
4 Complex / Inland 892 7.87 7.85 -0.02
5 Complex / Inland 775 6.87 7.58 0.71
6 Complex / Inland 1067 8.97 8.20 -0.77
7 Complex / Inland 993 8.35 8.43 0.08
8 Complex / Inland 456 6.46 6.56 0.10
9 Complex / Coastal 990 8.50 9.05 0.55
10 Complex / Inland 397 8.08 7.16 -0.92
11 Complex / Inland 443 8.93 7.36 -1.57
12 Complex / Coastal 522 8.96 8.30 -0.66
13 Complex / Inland 410 8.00 8.91 0.91
14 Complex / Coastal 567 8.66 8.12 -0.54
15 Flat / Coastal 60 6.07 5.35 -0.72
16 Flat / Inland 67 6.19 5.43 -0.76
17 Flat / Inland 372 7.19 6.60 -0.59
18 Flat / Inland 3 5.40 5.30 -0.10
19 Flat / Coastal 112 6.41 5.68 -0.73
20 Flat / Coastal 204 7.00 5.75 -1.25
21 Flat / Inland 78 6.70 5.63 -1.07
22 Flat / Inland 119 6.01 5.52 -0.49
23 Flat / Coastal 70 6.15 5.88 -0.27
24 Flat / Inland 132 5.97 5.26 -0.71
25 Flat / Inland 273 6.60 6.21 -0.39
26 Flat / Inland 142 6.51 5.58 -0.93
27 Flat / Coastal 162 6.38 5.48 -0.90
28 Flat / Coastal 109 5.78 5.69 -0.09
29 Complex / Inland 393 5.78 7.07 1.29
30 Complex / Inland 445 6.17 7.32 1.15
31 Complex / Inland 435 6.59 7.02 0.43
32 Complex / Inland 575 7.16 6.98 -0.18
33 Flat / Inland 240 6.17 6.93 0.76
34 Complex / Inland 422 5.72 6.86 1.14

Mais conteúdo relacionado

Mais procurados

Mais procurados (14)

5 ijsrms-02617 (1)
5 ijsrms-02617 (1)5 ijsrms-02617 (1)
5 ijsrms-02617 (1)
 
Gallant_M_GSFC_2016
Gallant_M_GSFC_2016Gallant_M_GSFC_2016
Gallant_M_GSFC_2016
 
ESA_smpehle_16October2015
ESA_smpehle_16October2015ESA_smpehle_16October2015
ESA_smpehle_16October2015
 
Simulating tropical meteorology for air quality studies
Simulating tropical meteorology for air quality studiesSimulating tropical meteorology for air quality studies
Simulating tropical meteorology for air quality studies
 
Typical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsTypical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plants
 
Comparison of ann and mlr models for
Comparison of ann and mlr models forComparison of ann and mlr models for
Comparison of ann and mlr models for
 
Downscaling and its limitation on climate change impact assessments
Downscaling and its limitation on climate change impact assessmentsDownscaling and its limitation on climate change impact assessments
Downscaling and its limitation on climate change impact assessments
 
Convective Heat Transfer Measurements at the Martian Surface
Convective Heat Transfer Measurements at the Martian SurfaceConvective Heat Transfer Measurements at the Martian Surface
Convective Heat Transfer Measurements at the Martian Surface
 
Measuring the benefits of climate forecasts
Measuring the benefits of climate forecastsMeasuring the benefits of climate forecasts
Measuring the benefits of climate forecasts
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
Solar radiation ground measured data quality assessment report
 Solar radiation ground measured data quality assessment report Solar radiation ground measured data quality assessment report
Solar radiation ground measured data quality assessment report
 
Calculating Wind Farm Production in Al-Shihabi (South Of Iraq) Using WASP
Calculating Wind Farm Production in Al-Shihabi (South Of Iraq) Using WASPCalculating Wind Farm Production in Al-Shihabi (South Of Iraq) Using WASP
Calculating Wind Farm Production in Al-Shihabi (South Of Iraq) Using WASP
 
Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...
 
Climate downscaling
Climate downscalingClimate downscaling
Climate downscaling
 

Destaque

Uncertainty for solar products assessment and benchmarking
Uncertainty for solar products assessment and benchmarkingUncertainty for solar products assessment and benchmarking
Uncertainty for solar products assessment and benchmarking
IrSOLaV Pomares
 
Auto da-barca-do-inferno
Auto da-barca-do-inferno Auto da-barca-do-inferno
Auto da-barca-do-inferno
Diógenes Zigar
 
Auto da barca analise completa
Auto da barca   analise completaAuto da barca   analise completa
Auto da barca analise completa
William Ferraz
 
Auto da barca do inferno
Auto da barca do infernoAuto da barca do inferno
Auto da barca do inferno
Maria Rodrigues
 

Destaque (14)

RE.SUN Validation (March 2013)
RE.SUN Validation (March 2013)RE.SUN Validation (March 2013)
RE.SUN Validation (March 2013)
 
Annual Energy Production Estimates Validation of Wind Farms (March 2012)
Annual Energy Production Estimates Validation of Wind Farms (March 2012)Annual Energy Production Estimates Validation of Wind Farms (March 2012)
Annual Energy Production Estimates Validation of Wind Farms (March 2012)
 
Uncertainty for solar products assessment and benchmarking
Uncertainty for solar products assessment and benchmarkingUncertainty for solar products assessment and benchmarking
Uncertainty for solar products assessment and benchmarking
 
Auto da-barca-do-inferno
Auto da-barca-do-inferno Auto da-barca-do-inferno
Auto da-barca-do-inferno
 
Solar Resource Assessment, Dealing with the uncertainty
Solar Resource Assessment, Dealing with the uncertaintySolar Resource Assessment, Dealing with the uncertainty
Solar Resource Assessment, Dealing with the uncertainty
 
Auto da barca do inferno
Auto da barca do infernoAuto da barca do inferno
Auto da barca do inferno
 
ABI - Personagens
ABI - PersonagensABI - Personagens
ABI - Personagens
 
Auto da barca analise completa
Auto da barca   analise completaAuto da barca   analise completa
Auto da barca analise completa
 
Data requirements
Data requirementsData requirements
Data requirements
 
Auto da barca do inferno
Auto da barca do infernoAuto da barca do inferno
Auto da barca do inferno
 
Dissecting the Differences Between Pyranometer and Reference Cell Irradiance ...
Dissecting the Differences Between Pyranometer and Reference Cell Irradiance ...Dissecting the Differences Between Pyranometer and Reference Cell Irradiance ...
Dissecting the Differences Between Pyranometer and Reference Cell Irradiance ...
 
Uncertainty of the Solargis solar radiation database
Uncertainty of the Solargis solar radiation databaseUncertainty of the Solargis solar radiation database
Uncertainty of the Solargis solar radiation database
 
Exploring Sources of Uncertainties in Solar Resource Measurements
Exploring Sources of Uncertainties in Solar Resource MeasurementsExploring Sources of Uncertainties in Solar Resource Measurements
Exploring Sources of Uncertainties in Solar Resource Measurements
 
O Modo LíRico
O Modo LíRicoO Modo LíRico
O Modo LíRico
 

Semelhante a WindSight Validation (March 2011)

Optimal combinaison of CFD modeling and statistical learning for short-term w...
Optimal combinaison of CFD modeling and statistical learning for short-term w...Optimal combinaison of CFD modeling and statistical learning for short-term w...
Optimal combinaison of CFD modeling and statistical learning for short-term w...
Jean-Claude Meteodyn
 
stouffl_hyo13rapport
stouffl_hyo13rapportstouffl_hyo13rapport
stouffl_hyo13rapport
Loïc Stouff
 
Wind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdf
Wind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdfWind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdf
Wind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdf
Mohamed Salah
 
Machine Learning for Weather Forecasts
Machine Learning for Weather ForecastsMachine Learning for Weather Forecasts
Machine Learning for Weather Forecasts
inside-BigData.com
 
Experimental investigation, optimization and performance prediction of wind t...
Experimental investigation, optimization and performance prediction of wind t...Experimental investigation, optimization and performance prediction of wind t...
Experimental investigation, optimization and performance prediction of wind t...
eSAT Journals
 

Semelhante a WindSight Validation (March 2011) (20)

meteodynWT meso coupling downscaling regional planing
meteodynWT meso coupling downscaling regional planingmeteodynWT meso coupling downscaling regional planing
meteodynWT meso coupling downscaling regional planing
 
Optimal combinaison of CFD modeling and statistical learning for short-term w...
Optimal combinaison of CFD modeling and statistical learning for short-term w...Optimal combinaison of CFD modeling and statistical learning for short-term w...
Optimal combinaison of CFD modeling and statistical learning for short-term w...
 
stouffl_hyo13rapport
stouffl_hyo13rapportstouffl_hyo13rapport
stouffl_hyo13rapport
 
Francisco J. Doblas-Big Data y cambio climático
Francisco J. Doblas-Big Data y cambio climáticoFrancisco J. Doblas-Big Data y cambio climático
Francisco J. Doblas-Big Data y cambio climático
 
Validation of wind resource assessment process based on CFD
Validation of wind resource assessment process based on CFD Validation of wind resource assessment process based on CFD
Validation of wind resource assessment process based on CFD
 
Use of mesoscale modeling to increase the reliability of wind resource assess...
Use of mesoscale modeling to increase the reliability of wind resource assess...Use of mesoscale modeling to increase the reliability of wind resource assess...
Use of mesoscale modeling to increase the reliability of wind resource assess...
 
WindResourceAndSiteAssessment.pdf
WindResourceAndSiteAssessment.pdfWindResourceAndSiteAssessment.pdf
WindResourceAndSiteAssessment.pdf
 
MPE data validation
MPE data validationMPE data validation
MPE data validation
 
Advanced weather forecasting for RES applications: Smart4RES developments tow...
Advanced weather forecasting for RES applications: Smart4RES developments tow...Advanced weather forecasting for RES applications: Smart4RES developments tow...
Advanced weather forecasting for RES applications: Smart4RES developments tow...
 
Upcoming Datasets: Global wind map, Jake Badger ( Risoe DTU)
Upcoming Datasets: Global wind map, Jake Badger ( Risoe DTU)Upcoming Datasets: Global wind map, Jake Badger ( Risoe DTU)
Upcoming Datasets: Global wind map, Jake Badger ( Risoe DTU)
 
Technical Considerations of Adopting AERMOD into Australia and New Zealand
Technical Considerations of Adopting AERMOD into Australia and New Zealand Technical Considerations of Adopting AERMOD into Australia and New Zealand
Technical Considerations of Adopting AERMOD into Australia and New Zealand
 
Ijcet 06 07_003
Ijcet 06 07_003Ijcet 06 07_003
Ijcet 06 07_003
 
Wind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdf
Wind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdfWind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdf
Wind_resource_assessment_using_the_WAsP_software_DTU_Wind_Energy_E_0174_.pdf
 
Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...
 
03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final
03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final
03 solargis uncertainty_albuquerque_pvp_mws_2017-05_final
 
Machine Learning for Weather Forecasts
Machine Learning for Weather ForecastsMachine Learning for Weather Forecasts
Machine Learning for Weather Forecasts
 
Experimental investigation, optimization and performance prediction of wind t...
Experimental investigation, optimization and performance prediction of wind t...Experimental investigation, optimization and performance prediction of wind t...
Experimental investigation, optimization and performance prediction of wind t...
 
Experimental investigation, optimization and performance prediction of wind t...
Experimental investigation, optimization and performance prediction of wind t...Experimental investigation, optimization and performance prediction of wind t...
Experimental investigation, optimization and performance prediction of wind t...
 
DEEP LEARNING BASED MULTIPLE REGRESSION TO PREDICT TOTAL COLUMN WATER VAPOR (...
DEEP LEARNING BASED MULTIPLE REGRESSION TO PREDICT TOTAL COLUMN WATER VAPOR (...DEEP LEARNING BASED MULTIPLE REGRESSION TO PREDICT TOTAL COLUMN WATER VAPOR (...
DEEP LEARNING BASED MULTIPLE REGRESSION TO PREDICT TOTAL COLUMN WATER VAPOR (...
 
Potential Benefits and Implementation of MM5 and RUC2 Data with the CALPUFF A...
Potential Benefits and Implementation of MM5 and RUC2 Data with the CALPUFF A...Potential Benefits and Implementation of MM5 and RUC2 Data with the CALPUFF A...
Potential Benefits and Implementation of MM5 and RUC2 Data with the CALPUFF A...
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 

WindSight Validation (March 2011)

  • 1. WindSight™ - Validation White Paper, March 2011 page: 1/5 (Mesoscale wind flow patterns over New South Wales, Australia) Validation of WindSight™ : Mesoscale Modelling for Early Stage Wind Assessment Understanding the wind resources in areas where local measurements are scarce or unavailable is nowadays possible with state-of-the-art mesoscale numerical weather models and public high quality global weather databases. Since 2007, MEGAJOULE has developed and tested an internal methodology using mesoscale modeling to assess wind resources worldwide: WindSight™. WindSight™ approach was developed internally with European Community support and in cooperation with Aveiro University Physics research department. WindSigth™ - Concept Mesoscale modeling is performed using WRF – Weather Research and Forecasting mesoscale’s numerical model. WRF was developed by the U.S. National Center for Atmospheric Research (NCAR) as an evolution of the original MM5. It incorporates the latest scientific developments from the leading research centers, and is the result of decades of research. A dynamic downscaling of global weather data (such as more than 50 years of Reanalysis NCEP/NCAR data or 40 years of ERA40 from ECMWF, among other possibilities) Over the past years, MJ has “tuned” the model configuration for best results in wind assessment. A baseline parameterization and model configuration was defined, although specific model configuration is studied for each project in hands. If available, MJ can assimilate local wind measurements for better results.
  • 2. WindSight™ - Validation White Paper, March 2011 page: 2/5 (Wind Map over Portugal in Google Earth kmz format) (Example of Virtual Wind Index performance against other data sets for a site in Poland) Why no Pre-Calculated Wind Data ? Mesoscale weather numerical modeling is a complex science and in constant development. Calculation domain and several model parameterizations depend on the site’s characteristics, latitude and general forcing weather. The WRF model is also in continuous development. By not making use of pre-calculated wind maps or data MJ ensures that our Clients get the best modeling option available for each case and at any given time Typical application from WindSight™ Typically, mesoscale wind assessment is best suited for greenfield or early stage wind assessments. Traditional results are : • Early stage Wind Resource Mapping (flexible output data – GIS, Google Earth, etc…) • Early stage micrositing and energy estimates (coupling mesoscale results with WAsP or CFD) • Preliminary site assessment (detailed IEC wind conditions by coupling mesoscale results with CFD) • Virtual Long Term reference wind data (for Long Term extrapolation and MCP) Other outputs include Extreme wind speed analysis, Cold Climate or Icing conditions, Hot Climate conditions. -100% -50% 0% 50% 100% Jan-06 Jul-06 Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09 Jan-10 MonthlyWindIndex[%] NCEP NCAR(1000 mBar) Jasionka Airport(Poland) Local Mast#1 Local Mast#2 Virtual Wind Index
  • 3. WindSight™ - Validation White Paper, March 2011 page: 3/5 (Example of Wind Rose and Histogram for a Complex/Inland site, WindSight (grey), Observed (blue))) Validation of Simulated Wind Data Series During 2010 MJ completed its first comprehensive validation programme for WindSight™ mesoscale modeling. The validation was based on the 3x3 km resolution simulated wind data series, based on input data from the global data from NCEP/NCAR Reanalysis I data set. No data assimilation or MOS was performed, to ensure an independent blind test. The simulated data was compared against local measurements for 34 sites in Europe (Portugal, Poland and Romania). The local measurements were taken at lattice masts used for wind assessment fully compliant with IEC/MEASNET requirements. The masts are operated by MJ and are not in anyway assimilated in the input global datasets or in the model runs, thus, ensuring fully independent blind tests. Measurement height ranges is 60 m above ground level for all site but one, with 49 m. The test sites range from flat terrain to complex sites and also from coastal (< 10 km to shoreline) to inland sites. Results showed a RMSE error in average wind speed of 0.76 m/s and a BIAS of - 0.14 m/s. The cumulative distribution of results (table 2) showed that for 80 % of cases, average wind speed difference was below 1.0 m/s and below 0.7 m/s for 50 % of cases. Global statistics for Average Wind Speed comparison MAE (m/s) RMSE (m/s) BIAS (m/s) 0.66 0.76 -0.14 0% 5% 10% 15% 20% N NNE ENE E ESE SSE S SSW WSW W WNW NNW
  • 4. WindSight™ - Validation White Paper, March 2011 page: 4/5 Maximum Mean Absolute Error (MAE) for different frequency levels Frequency [%] Maximum MAE (m/s) 50% 0.7 80% 1.0 90% 1.2 Estimated Wind Rose were in good agreement with observations. For 87 % of cases at least one of the 2 predominant wind directions matched the simulated predominant wind directions. For 40 % of the cases, both most predominant wind directions were matched by the simulations. (figure below shows an example for one site). Conclusions The statistics above prove the usefulness of WindSight™ mesoscale wind assessment particularly for greenfield and early stage wind studies. For 3x3 resolution it can be assumed that there is a 80 % probability that real average wind speed will be within +/- 1.0 m/s of simulated average wind speed. Uncertainty in wind speed means that the WindSight™ approach is most applicable for a greenfield or early stage viability studies. At these stages, developers should more willing to take more risk, while benefiting from a pragmatic and comparable approach to wind assessment. Agreement in Wind Rose and Wind Speed Histogram was sufficiently good to provided a good base for early stage turbine micrositing and AEP estimates (coupling mesoscale wind data with micrositing tools and linear or CFD models). This is particularly interesting for projects were wind farm layout must be defined in very early stages and without any local data. Early stage wind assessment, while possible with mesoscale modeling, should never substitute on-site reliable wind measurements for more than 1 year, in order to ensure typical bankable uncertainty on AEP estimates. Further Info.: www.megajoule.pt www.facebook.com/MEGAJOULE www.youtube.com/MEGAJOULEConsultants www.linkedin.com/MEGAJOULE www.twitter.com/MEGAJOULE megajoule@megajoule.pt
  • 5. WindSight™ - Validation White Paper, March 2011 page: 5/5 Annex - List of sample sites ID Complexity Elevation [m] Average Wind Speed [m/s] Deviation [m/s] Observed Simulated 1 Complex / Inland 698 5.86 6.45 0.59 2 Complex / Inland 777 6.56 7.30 0.74 3 Complex / Inland 890 7.47 7.93 0.46 4 Complex / Inland 892 7.87 7.85 -0.02 5 Complex / Inland 775 6.87 7.58 0.71 6 Complex / Inland 1067 8.97 8.20 -0.77 7 Complex / Inland 993 8.35 8.43 0.08 8 Complex / Inland 456 6.46 6.56 0.10 9 Complex / Coastal 990 8.50 9.05 0.55 10 Complex / Inland 397 8.08 7.16 -0.92 11 Complex / Inland 443 8.93 7.36 -1.57 12 Complex / Coastal 522 8.96 8.30 -0.66 13 Complex / Inland 410 8.00 8.91 0.91 14 Complex / Coastal 567 8.66 8.12 -0.54 15 Flat / Coastal 60 6.07 5.35 -0.72 16 Flat / Inland 67 6.19 5.43 -0.76 17 Flat / Inland 372 7.19 6.60 -0.59 18 Flat / Inland 3 5.40 5.30 -0.10 19 Flat / Coastal 112 6.41 5.68 -0.73 20 Flat / Coastal 204 7.00 5.75 -1.25 21 Flat / Inland 78 6.70 5.63 -1.07 22 Flat / Inland 119 6.01 5.52 -0.49 23 Flat / Coastal 70 6.15 5.88 -0.27 24 Flat / Inland 132 5.97 5.26 -0.71 25 Flat / Inland 273 6.60 6.21 -0.39 26 Flat / Inland 142 6.51 5.58 -0.93 27 Flat / Coastal 162 6.38 5.48 -0.90 28 Flat / Coastal 109 5.78 5.69 -0.09 29 Complex / Inland 393 5.78 7.07 1.29 30 Complex / Inland 445 6.17 7.32 1.15 31 Complex / Inland 435 6.59 7.02 0.43 32 Complex / Inland 575 7.16 6.98 -0.18 33 Flat / Inland 240 6.17 6.93 0.76 34 Complex / Inland 422 5.72 6.86 1.14