PLANNING AND CONTROL
Sales and Operation Planning
Master Scheduling
Vendor order ManagementProduction Activity Control
Material Requirement Planning
MASTER SCHEDULING
It is a detailed planning process that tracks production output and
matches this output to actual custom orders. For e.g.
Month Demand Production Inventory
January 1500 1500 700
February 2500 2500 700
March 4000 5000 1700
April 5000 6000 2700
Partial sales and operation plan Master Schedule March
Week 1 Week 2 Week 3 Week 4
Demand 200 250 300 350
Push Mowers Production 650 0 650 0
Inventory 200 650 400 750 400
Demand 400 500 600 700
Power Mowers Production 0 1350 0 1350
Inventory 400 0 850 250 900
Demand 100 150 200 250
Lawn tractors Production 250 250 250 250
Inventory 100 250 350 400 400
700
5000
4000
1700
Beginning Invetory
Total Monthly Production
Total Monthly Demand
Ending Inventory
MASTER SCHEDULE RECORD
Most master schedule or Master Production Schedule record track
several key pieces of information as following :
• Forecasted Demand
• Booked Orders
• Projected Inventory Levels
• Production Quantities
• Units still available to meet customer need (available to promise)
Forecasted Demand Vs. Booked
Orders
• In week 45, for instance, the estimated demand for snow blowers
is 150, yet the company already has the confirmed order for 170
• While in the month of December booked orders appear to be
lagging forecasted demand.
Now as there is considerable difference b/w demand and booked
orders. In that case this MSR will help manager to take decision,
whether to cut down the production or lower the price.
Month
Weeks 45 46 47 48 49 50 51 52
Forecasted demand 150 150 150 150 175 175 175 175
Booked Orders 170 165 140 120 85 42 20 0
Master Production schedule 300 0 300 0 350 0 350 0
November Decemeber
MeltoMatic Snow Blower
Projected Ending Inventory
It is a conservative estimate of the inventory position at the end of each week, which
is calculated using formula
• EI(t) = EI(t-1) + MPS(t)- maximum{F(t), OB(t)}
• Where EI(t)=ending inventory in time period (t), EI(t-1)= ending inventory in time
period (t-1)
• MPS(t)=master prod. Schedule quantity available in time period (t),
• F(t)=Forecasted demand for the time period (t) and OB(t)=order booked for the
time period (t)
On-hand inventory at end of week 44 100
Month
Weeks 45 46 47 48 49 50 51 52
Forecasted demand 150 150 150 150 175 175 175 175
Booked Orders 170 165 140 120 85 42 20 0
Projected Ending Inventory 230 65 215 65 240 65 240 65
Master Production schedule 300 0 300 0 350 0 350 0
MeltoMatic Snow Blower
November Decemeber
Available to Promise
It indicates the number of units that are available for sale each week, given those that
have already been promised to customer
• ATP(t) = EI(t) + MPS(t) - ∑OB(t)
• ATP(t)= Available to promise in week ‘t’
• ∑OB(t)= sum of all orders booked from week ‘t’ until week ‘z’
On-hand inventory at end of week 44 100
Month
Weeks 45 46 47 48 49 50 51 52
Forecasted demand 150 150 150 150 175 175 175 175
Booked Orders 170 165 140 120 85 42 20 0
Projected Ending Inventory 230 65 215 65 240 65 240 65
Master Production schedule 300 0 300 0 350 0 350 0
Available to Promise 65 40 223 330
MeltoMatic Snow Blower
November Decemeber
Material Requirement Planning
Simply, calculates the timing and quantities of material orders
needed to support master schedule.
i.e translates the master production schedule into planned orders for
actual parts and components needed to make the ordered product.
• different from single inventory approach (independent inventory)
eg. Amazon
• dependant inventory approach
products and parts dependant on each other for complete
product.
eg. IKEA
MRP is different in managing inventory than EOQ ( Economic Order
Quantity ) i.e economic system in which the inventory is managed
using less space. MRP is based on :
• Bill of Material
• Backward Scheduling
• Explosion of Bill of Material
BILL OF MATERIAL
It is a listing of all the subassemblies, intermediate parts, and raw
materials that go into a parent assembly, showing the quantity of
each required to make an assembly.
• Involves PLANNING LEAD TIME i.e time from when a component
or material is ordered until it arrives and is ready to use
Bill of Materials
Chair
Seat
Back
Assembly
Leg
Assembly
Legs (2) Crossbar
Side rails
(2)
Crossbar
Back Slats
(3)
1 week
1 week
2 week
1 week
2 week 2 week 2 week 2 week 2 week
}Level 0
}Level 1
BACKWARD SCHEDULING
Calculating the deadline by working backward in time so that the
component or material is ready to use in time.
EXPLODING OF BILL OF MATERIAL
The process by which one works backward from master schedule to
determine the quantity and time for receiving all the various
components and sub- assemblies.
MRP RECORD
A record needs to be maintained for the various components and
sub-assemblies.
GROSS REQUIREMENT (GR)
The number of products needed for the order.
Eg. 500 wooden chairs is the gross requirement
This depends on:
• Inventory carried over / closing stock (EI)
• Scheduled receipts / units already on order (SR)
• Planned receipts / new orders
This helps to determine any new orders need to be placed
i.e NET REQUIREMENTS (NR)
NR(t) = GR(t) - EI(t) – SR(t)
ADVANTAGES OF MRP
• Directly tied to the master production and indicates exact timing
and quantity of orders of all components.
• Allows managers to trace every order for lower level items through
all the levels of the BOM.
• Tells precisely to the firm and the supplier what needs to be made
when.
CONSIDERATIONS FOR MRP
• Requires organizational discipline.
• Must have accurate information ( Master schedule, BOM etc. ).
• Must also incorporate uncertainty so as to offer reliable service.
Because a change in a single step can cause drastic effects on the
complete procedure ( MRP nervousness ).
Production Activity Control & Vendor
Order Mgmt. System
• In this emphasis shifts from planning to execution
• Other capabilities of the system
• Route & prioritize jobs going through the supply chain
• Coordinate the flow of goods and materials b/w a facility and other
supply chain partners
• Provide supply chain partners with performance data on operation
and supply chain activities
Job Sequencing
• Job sequencing rules have been used for decades to determine the
order in which job should be processed when resources are limited
and multiple jobs are waiting to done.
• Critical Ratio =(Total task time remaining)/(days until due)
Carlos Restoration Services
Total Task Days Crticial
JOB Step 1 Step 2 Step 3 Time Until Due Ratio
Uptown Gallery 3 2 3.5 8.5 21 0.405
High Museum 5 2 1 8 20 0.400
Chester College 3 2 5 10 10 1.000
Smith 6 4 1 11 15 0.733
Estimated Days
Which is BEST?
First come-first served Days
JOB Start End Start End Start End Late
Uptown Gallery 0 3 3 5 5 8.5 0
High Museum 3 8 8 10 10 11 0
Chester College 8 11 11 13 13 18 8
Smith 11 17 17 21 21 22 7
Average Lateness 3.75
Earliest Due Date Days
JOB Start End Start End Start End Late
Chester College 0 3 3 5 5 10 0
Smith 3 9 9 13 13 14 0
High Museum 9 14 14 16 16 17 0
Uptown Gallery 14 17 17 19 19 22.5 1.5
Average Lateness 0.375
Earliest Due Date Days
JOB Start End Start End Start End Late
Chester College 0 3 3 5 5 10 0
Smith 3 9 9 13 13 14 0
Uptown Gallery 9 12 12 15 15 18.5 0
High Museum 12 17 17 19 19 20 0
Average Lateness 0.000
Step 1 Step 2 Step 3
Step 1 Step 2 Step 3
Step 1 Step 2 Step 3
Monitoring & Tracking Technology
• Recently, Radio Frequency Identification (RFID), bar coding and
online order tracking system have been developed to trace the
movement and location of materials in the supply chain and report
on the progress of specific jobs.
• Beside helping the company to control its operation and supply
chain activities, these system also alert managers to potential
problems.
• For e.g. It could help in provide users with real-time information about
the status of manufacturing jobs and required materials. If a shortage
of materials threatens to delay job, the system flags the problem and
indicates which jobs will be affected.
SYNCHRONISING PLANNING AND CONTROL
ACROSS SUPPLY CHAIN
This is done using:
• Distribution Requirement Planning (DRP)
• KANBAN
 DRP helps to synchronize supply chain partners at the MASTER
SCHEDULE level.
 Kanban helps to synchronize supply chain partners at the
PRODUCTION ACTIVITY CONTROL and VENDOR ORDER
MANAGEMENT level.
SYNCHRONIZINGPLANNINGANDCONTROL
PLANNING AND CONTROL
PRODUCTION ACTIVITY CONTROL (PAC) VENDOR ORDER MANAGEMENT SYSTEM
MATERIAL REQUIREMENT PLANNING
MASTER SCHEDULING
SALES AND OPERATION PLANNING ( S&OP)
DISTRIBUTION REQUIREMENT PLANNING
• Time based planning approach similar to MRP
• Observe planned orders at the point of demand ( warehouse ) to
determine forecaster demand at source level ( plant )
• Uses MRP style logic to feed accurate demand information into
the master schedule
DISTRIBUTION REQUIREMENT PLANNING
KANBAN SYSTEM
Uses cards, containers or visual cues to control the production and
movement in the supply chain
• Production Activity Control
• Vendor Order Management Systems
PRODUCTION ACTIVITY CONTROL
Assures that the in-house manufacturing takes place according to
plan
VENDOR ORDER MANAGEMENT
Assures that the materials ordered from the supply chain partners
are received when needed
KANBAN SYSTEM
Simply a pull system
i.e Actual downstream demand sets off a chain of events that pull
materials through the various process steps.
i.e When a finished product goes out, it pulls the materials from the
previous steps.
Managing production across supply chain

Mais conteúdo relacionado

Mais procurados

Operations scheduling
Operations schedulingOperations scheduling
Operations schedulingRajThakuri
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planningjetromarquez
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop schedulingSujeet TAMBE
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)Dipesh Pandey
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1Dr. Mahmoud Al-Naimi
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production scheduleMRPeasy
 
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิตบทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิตTeetut Tresirichod
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Models of inventory control
Models of inventory controlModels of inventory control
Models of inventory controlPriyanka Mangla
 
types of production system
types of production systemtypes of production system
types of production systempakkiaarzoo
 
Applications of linear Programming
Applications of linear ProgrammingApplications of linear Programming
Applications of linear ProgrammingAlmaszabeen Badekhan
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production schedulingmrinalmanik64
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning3abooodi
 
Inventory model (operation research)
Inventory model (operation research)Inventory model (operation research)
Inventory model (operation research)Amrita Gharti
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 

Mais procurados (20)

Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Ch17 Mrp
Ch17  MrpCh17  Mrp
Ch17 Mrp
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิตบทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Models of inventory control
Models of inventory controlModels of inventory control
Models of inventory control
 
types of production system
types of production systemtypes of production system
types of production system
 
Applications of linear Programming
Applications of linear ProgrammingApplications of linear Programming
Applications of linear Programming
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
 
Inventory model (operation research)
Inventory model (operation research)Inventory model (operation research)
Inventory model (operation research)
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 

Destaque

Destaque (14)

MRP Systems
MRP SystemsMRP Systems
MRP Systems
 
MRP, MPS, Bill of Material, Numericals
MRP, MPS, Bill of Material, NumericalsMRP, MPS, Bill of Material, Numericals
MRP, MPS, Bill of Material, Numericals
 
Pom intro
Pom introPom intro
Pom intro
 
Inventory control and management
Inventory control and managementInventory control and management
Inventory control and management
 
Production Change Management
Production Change ManagementProduction Change Management
Production Change Management
 
Capc & computer monitoring
Capc & computer monitoringCapc & computer monitoring
Capc & computer monitoring
 
current global trade scenario .
current global trade scenario .current global trade scenario .
current global trade scenario .
 
Chapt12
Chapt12Chapt12
Chapt12
 
S ch6
S ch6S ch6
S ch6
 
Global strategy
Global strategyGlobal strategy
Global strategy
 
1.introduction to global strategy
1.introduction to global strategy1.introduction to global strategy
1.introduction to global strategy
 
IKEA Supply Chain Mangament
IKEA Supply Chain MangamentIKEA Supply Chain Mangament
IKEA Supply Chain Mangament
 
The role of procurement
The role of procurementThe role of procurement
The role of procurement
 
Service Operation Processes
Service Operation ProcessesService Operation Processes
Service Operation Processes
 

Semelhante a Managing production across supply chain

Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply ChainSushovan Bej
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aRai University
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdfJOHN PAUL ROBERTO
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingRootstock Software
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
 
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxGulaHangus
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Session 5
Session 5Session 5
Session 5thangv
 
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptxAminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptxAminullah Assagaf
 
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...Rootstock Software
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaainfinitepestcontrol
 

Semelhante a Managing production across supply chain (20)

Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply Chain
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp a
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of Manufacturing
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptx
 
5089529.ppt
5089529.ppt5089529.ppt
5089529.ppt
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Session 5
Session 5Session 5
Session 5
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptxAminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
Aminullah Assagaf_P12-Ch.15_Resources Planning-32.pptx
 
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
ERP 101 : Shop Floor – See how scheduling the Shop Floor through ERP controls...
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
MRP MPS.ppt
MRP MPS.pptMRP MPS.ppt
MRP MPS.ppt
 

Mais de Sushant Kumar Sinha

Mais de Sushant Kumar Sinha (15)

Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulation
 
Ash handling and utilization
Ash handling and utilizationAsh handling and utilization
Ash handling and utilization
 
Models for energy efficiency project financing
Models for energy efficiency project financingModels for energy efficiency project financing
Models for energy efficiency project financing
 
Case tools
Case toolsCase tools
Case tools
 
Working capital & cost management
Working capital & cost managementWorking capital & cost management
Working capital & cost management
 
Changing the role of top management
Changing the role of top managementChanging the role of top management
Changing the role of top management
 
Clearance required for setting up thermal power plant
Clearance required for setting up thermal power plantClearance required for setting up thermal power plant
Clearance required for setting up thermal power plant
 
Strategy under uncertainty
Strategy under uncertaintyStrategy under uncertainty
Strategy under uncertainty
 
At&c losses and remedies
At&c losses and remediesAt&c losses and remedies
At&c losses and remedies
 
Restructuring and Privatization
Restructuring and PrivatizationRestructuring and Privatization
Restructuring and Privatization
 
Power Market regulation
Power Market regulationPower Market regulation
Power Market regulation
 
SCADA
SCADASCADA
SCADA
 
Reliablity and Validity
Reliablity and ValidityReliablity and Validity
Reliablity and Validity
 
AMR & EMS- Automated Meter Reading and Energy Management System
AMR & EMS- Automated Meter Reading and Energy Management SystemAMR & EMS- Automated Meter Reading and Energy Management System
AMR & EMS- Automated Meter Reading and Energy Management System
 
Royal Enfield Marketing
Royal Enfield MarketingRoyal Enfield Marketing
Royal Enfield Marketing
 

Último

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Último (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

Managing production across supply chain

  • 1. MANAGING PRODUCTIONS ACROSS SUPPLY CHAIN SUSHANT SINHA SUSHOVAN BEJ
  • 2. PLANNING AND CONTROL Sales and Operation Planning Master Scheduling Vendor order ManagementProduction Activity Control Material Requirement Planning
  • 3. MASTER SCHEDULING It is a detailed planning process that tracks production output and matches this output to actual custom orders. For e.g. Month Demand Production Inventory January 1500 1500 700 February 2500 2500 700 March 4000 5000 1700 April 5000 6000 2700 Partial sales and operation plan Master Schedule March Week 1 Week 2 Week 3 Week 4 Demand 200 250 300 350 Push Mowers Production 650 0 650 0 Inventory 200 650 400 750 400 Demand 400 500 600 700 Power Mowers Production 0 1350 0 1350 Inventory 400 0 850 250 900 Demand 100 150 200 250 Lawn tractors Production 250 250 250 250 Inventory 100 250 350 400 400 700 5000 4000 1700 Beginning Invetory Total Monthly Production Total Monthly Demand Ending Inventory
  • 4. MASTER SCHEDULE RECORD Most master schedule or Master Production Schedule record track several key pieces of information as following : • Forecasted Demand • Booked Orders • Projected Inventory Levels • Production Quantities • Units still available to meet customer need (available to promise)
  • 5. Forecasted Demand Vs. Booked Orders • In week 45, for instance, the estimated demand for snow blowers is 150, yet the company already has the confirmed order for 170 • While in the month of December booked orders appear to be lagging forecasted demand. Now as there is considerable difference b/w demand and booked orders. In that case this MSR will help manager to take decision, whether to cut down the production or lower the price. Month Weeks 45 46 47 48 49 50 51 52 Forecasted demand 150 150 150 150 175 175 175 175 Booked Orders 170 165 140 120 85 42 20 0 Master Production schedule 300 0 300 0 350 0 350 0 November Decemeber MeltoMatic Snow Blower
  • 6. Projected Ending Inventory It is a conservative estimate of the inventory position at the end of each week, which is calculated using formula • EI(t) = EI(t-1) + MPS(t)- maximum{F(t), OB(t)} • Where EI(t)=ending inventory in time period (t), EI(t-1)= ending inventory in time period (t-1) • MPS(t)=master prod. Schedule quantity available in time period (t), • F(t)=Forecasted demand for the time period (t) and OB(t)=order booked for the time period (t) On-hand inventory at end of week 44 100 Month Weeks 45 46 47 48 49 50 51 52 Forecasted demand 150 150 150 150 175 175 175 175 Booked Orders 170 165 140 120 85 42 20 0 Projected Ending Inventory 230 65 215 65 240 65 240 65 Master Production schedule 300 0 300 0 350 0 350 0 MeltoMatic Snow Blower November Decemeber
  • 7. Available to Promise It indicates the number of units that are available for sale each week, given those that have already been promised to customer • ATP(t) = EI(t) + MPS(t) - ∑OB(t) • ATP(t)= Available to promise in week ‘t’ • ∑OB(t)= sum of all orders booked from week ‘t’ until week ‘z’ On-hand inventory at end of week 44 100 Month Weeks 45 46 47 48 49 50 51 52 Forecasted demand 150 150 150 150 175 175 175 175 Booked Orders 170 165 140 120 85 42 20 0 Projected Ending Inventory 230 65 215 65 240 65 240 65 Master Production schedule 300 0 300 0 350 0 350 0 Available to Promise 65 40 223 330 MeltoMatic Snow Blower November Decemeber
  • 8. Material Requirement Planning Simply, calculates the timing and quantities of material orders needed to support master schedule. i.e translates the master production schedule into planned orders for actual parts and components needed to make the ordered product. • different from single inventory approach (independent inventory) eg. Amazon • dependant inventory approach products and parts dependant on each other for complete product. eg. IKEA
  • 9. MRP is different in managing inventory than EOQ ( Economic Order Quantity ) i.e economic system in which the inventory is managed using less space. MRP is based on : • Bill of Material • Backward Scheduling • Explosion of Bill of Material BILL OF MATERIAL It is a listing of all the subassemblies, intermediate parts, and raw materials that go into a parent assembly, showing the quantity of each required to make an assembly. • Involves PLANNING LEAD TIME i.e time from when a component or material is ordered until it arrives and is ready to use
  • 10. Bill of Materials Chair Seat Back Assembly Leg Assembly Legs (2) Crossbar Side rails (2) Crossbar Back Slats (3) 1 week 1 week 2 week 1 week 2 week 2 week 2 week 2 week 2 week }Level 0 }Level 1
  • 11. BACKWARD SCHEDULING Calculating the deadline by working backward in time so that the component or material is ready to use in time. EXPLODING OF BILL OF MATERIAL The process by which one works backward from master schedule to determine the quantity and time for receiving all the various components and sub- assemblies.
  • 12. MRP RECORD A record needs to be maintained for the various components and sub-assemblies. GROSS REQUIREMENT (GR) The number of products needed for the order. Eg. 500 wooden chairs is the gross requirement This depends on: • Inventory carried over / closing stock (EI) • Scheduled receipts / units already on order (SR) • Planned receipts / new orders This helps to determine any new orders need to be placed i.e NET REQUIREMENTS (NR) NR(t) = GR(t) - EI(t) – SR(t)
  • 13. ADVANTAGES OF MRP • Directly tied to the master production and indicates exact timing and quantity of orders of all components. • Allows managers to trace every order for lower level items through all the levels of the BOM. • Tells precisely to the firm and the supplier what needs to be made when.
  • 14. CONSIDERATIONS FOR MRP • Requires organizational discipline. • Must have accurate information ( Master schedule, BOM etc. ). • Must also incorporate uncertainty so as to offer reliable service. Because a change in a single step can cause drastic effects on the complete procedure ( MRP nervousness ).
  • 15. Production Activity Control & Vendor Order Mgmt. System • In this emphasis shifts from planning to execution • Other capabilities of the system • Route & prioritize jobs going through the supply chain • Coordinate the flow of goods and materials b/w a facility and other supply chain partners • Provide supply chain partners with performance data on operation and supply chain activities
  • 16. Job Sequencing • Job sequencing rules have been used for decades to determine the order in which job should be processed when resources are limited and multiple jobs are waiting to done. • Critical Ratio =(Total task time remaining)/(days until due) Carlos Restoration Services Total Task Days Crticial JOB Step 1 Step 2 Step 3 Time Until Due Ratio Uptown Gallery 3 2 3.5 8.5 21 0.405 High Museum 5 2 1 8 20 0.400 Chester College 3 2 5 10 10 1.000 Smith 6 4 1 11 15 0.733 Estimated Days
  • 17. Which is BEST? First come-first served Days JOB Start End Start End Start End Late Uptown Gallery 0 3 3 5 5 8.5 0 High Museum 3 8 8 10 10 11 0 Chester College 8 11 11 13 13 18 8 Smith 11 17 17 21 21 22 7 Average Lateness 3.75 Earliest Due Date Days JOB Start End Start End Start End Late Chester College 0 3 3 5 5 10 0 Smith 3 9 9 13 13 14 0 High Museum 9 14 14 16 16 17 0 Uptown Gallery 14 17 17 19 19 22.5 1.5 Average Lateness 0.375 Earliest Due Date Days JOB Start End Start End Start End Late Chester College 0 3 3 5 5 10 0 Smith 3 9 9 13 13 14 0 Uptown Gallery 9 12 12 15 15 18.5 0 High Museum 12 17 17 19 19 20 0 Average Lateness 0.000 Step 1 Step 2 Step 3 Step 1 Step 2 Step 3 Step 1 Step 2 Step 3
  • 18. Monitoring & Tracking Technology • Recently, Radio Frequency Identification (RFID), bar coding and online order tracking system have been developed to trace the movement and location of materials in the supply chain and report on the progress of specific jobs. • Beside helping the company to control its operation and supply chain activities, these system also alert managers to potential problems. • For e.g. It could help in provide users with real-time information about the status of manufacturing jobs and required materials. If a shortage of materials threatens to delay job, the system flags the problem and indicates which jobs will be affected.
  • 19. SYNCHRONISING PLANNING AND CONTROL ACROSS SUPPLY CHAIN This is done using: • Distribution Requirement Planning (DRP) • KANBAN  DRP helps to synchronize supply chain partners at the MASTER SCHEDULE level.  Kanban helps to synchronize supply chain partners at the PRODUCTION ACTIVITY CONTROL and VENDOR ORDER MANAGEMENT level.
  • 20. SYNCHRONIZINGPLANNINGANDCONTROL PLANNING AND CONTROL PRODUCTION ACTIVITY CONTROL (PAC) VENDOR ORDER MANAGEMENT SYSTEM MATERIAL REQUIREMENT PLANNING MASTER SCHEDULING SALES AND OPERATION PLANNING ( S&OP)
  • 21. DISTRIBUTION REQUIREMENT PLANNING • Time based planning approach similar to MRP • Observe planned orders at the point of demand ( warehouse ) to determine forecaster demand at source level ( plant ) • Uses MRP style logic to feed accurate demand information into the master schedule
  • 23. KANBAN SYSTEM Uses cards, containers or visual cues to control the production and movement in the supply chain • Production Activity Control • Vendor Order Management Systems PRODUCTION ACTIVITY CONTROL Assures that the in-house manufacturing takes place according to plan VENDOR ORDER MANAGEMENT Assures that the materials ordered from the supply chain partners are received when needed
  • 24. KANBAN SYSTEM Simply a pull system i.e Actual downstream demand sets off a chain of events that pull materials through the various process steps. i.e When a finished product goes out, it pulls the materials from the previous steps.