SlideShare uma empresa Scribd logo
1 de 1
Baixar para ler offline
Ways to Measure Your
PdM Program
PdM Maturity Matrix
ELEMENTS
LEVEL 1
NOT ENGAGED
LEVEL 2
EXPERIMENTING
LEVEL 3
ENLIGHTENED
LEVEL 4
GOOD PRACTICE
LEVEL 5
BEST PRACTICE
PdMMATURITYELEMENTS
Quartile Coverage Spot checks 4th Quartile 3rd Quartile 2nd Quartile 1st Quartile
Expectations Troubleshoot Optimize Run-to-Failure
Strategy Do more PdM Enable Proactive
Workflow Model
Early elimination of defects and
root causes
Employee Certifications and
Qualifications Nothing formal Level I certification by
technology supplier
Level II certification with
written practices
Level III certifications to
International Standard
Certifications plus task
qualification
Standards and Controls Nothing formal
Based on individual motivation
and skills, multiple people
inputting data
Some basic database
standards created with
controlled input
Standards created with
controls to monitor, formal
workflows exist
Advanced standards
created and MOC process
used for changes
Alarming Methods Nothing formal No alarms to overall alarms Alarms present, but are
generic or overall alarms
Alarms present, both standard
and statistical
Alarms present, both
standard and statistical with
review process
Missed Opportunity /
Investment
Limited and
informal RCA
RCA only when prompted,
informal in nature
RCA only required on high
profile failures
RCA activity based
on good triggers
(e.g. Criticality)
RCA on failures of all
monitored equipment
# of PdM Technologies 1 technology 2 or less technologies Minimum of 3 technologies
Minimum of 5 technologies,
fully utilized (e.g. electrical
and mechanical infrared)
Minimum of 5 technologies,
fully utilized with integrated
NDT program
Technology Integration None None Minimal integration Fully integrated (database) Fully integrated (database)
Types of PdM Tools
Vibration pens, spot
radiometers, single
channel analyzer
Simple, free oil analysis,
possible single
channel vibration
Single channel vibration,
airborne ultrasonics, infrared
camera, paid
oil analysis
Motor testing, oil analysis,
medium voltage monitoring
ODS / modal capabilities, online
monitoring of critical equipment
Operations Involvement None
Limited, more interested
in focusing on
missed opportunities
Some buy-in, looking
at PdM metrics but
not utilizing
Good integration,
reviewing Asset Health,
understand importance
Fully integrated,
operations accountable
for reliability efforts
SupportingWorkflowElements
Schedule Compliance Less than 50% Less than 60% Average 60-70% Average 70-80% Average 80-90%
Work Order Creation No PdM work orders Reports created,
limited work orders
Most PdM findings
generate work orders
All PdM findings generate
work orders
All PdM findings generate
work orders
Technology Specific
Workflows Northing formal Nothing formal Exist and are
typically followed
Exist and are
always followed
Exist, refined and
always followed
Metrics / Justification Nothing formal Possibly tracking
production outputs
Tracking availability and
quality (lagging indicators)
OEE, product quality, metrics
are reliable
and accurate
Track lagging and leading
indicators and take
corrective actions
Resource Allocation None
PdM technicians
frequently pulled off task to
perform maintenance
Dedicated resources
to PdM effort, rarely
pulled off task to
perform maintenance
Dedicated resources, never
pulled off task, beginning
multi-discipline training
Dedicated resources,
multi-discipline trained to
increase effectiveness
Requalification /
Commissioning None Spot check based on request Completed on only high
criticality machines
Completed to established
criteria (e.g. top 75% of
equipment in PdM program)
Completed to established criteria
(e.g. all equipment
in PdM program)
SupportingReliabilityEngineeringElements
Criticality Granularity No formal Criticality
Analysis performed
Informal Criticality Assessment
performed
(little or no granularity)
Formal Criticality
Assessment performed
(good granularity)
Good granularity, could
be used to identify asset
coverage and work priority
Good granularity, could be
used to identify asset coverage
and work priority
Asset Health Reporting None None
Overall Asset Health
exists on high criticality
equipment
Asset Health for all
route-based equipment
Asset Health for all equipment
including Mechanical, Electrical
and Stationary
Failure Mode Analysis None Informal FMEA on limited
equipment types
Formal FMEA performed
on 50% of assets
FMEA utilized on 65%
of assets and used for
program optimization
FMEA performed on 80% of
assets and integrated with Life
Cycle Cost and Weibull Analysis
Analytical Methods None Informal, limited capability
based on experience
Limited but using cost and
work order trending to
develop action lists
Integration of operational
measurements, asset health,
and RCM completed on 50%
of plant systems
Using OEE, Life Cycle Cost,
RCMs completed on 80% of
plant systems
Failure Investigation Informal Investigations rarely happen
and are not documented
Some formal RCA based
on high cost failures, limited
# of employees formerly
trained in RCA
Triggers in place (e.g. cost,
# of failures, operational
involvement, etc.), RCAs are
documented and published
Triggers refined, many
employees including operations
trained in RCA, metrics in place
to measure results, willingness to
incorporate OEM experts
Results/Scorecards
ROI Negative to Zero Minimal to no ROI 4:1 8:1 16:1
% Failure Maintenance >70% >50% <40% <25% <15%
PM/PdM Balance <25% Overall <35% Overall
>50% Overall >65% Overall >80% Overall
15% PdM 25% PdM 45% PdM
35% PM 40% PM 35% PM
Asset Health Not measured Not measured
Exists on critical assets Exists on all assets Exists on all assets
> 65% Green >75% Green >80% Green
Route Adherence Not measured <50% >70% >85% >90%
% PdM Recommendations
Implemented <15% <30% >50% >75% >90%
PDMMATURITYELEMENTSPDMMATURITYELEMENTSSUPPORTINGRELIABILITYENGINEERINGELEMENTSSUPPORTINGRELIABILITYENGINEERINGELEMENTSRESULTS/SCORECARDSRESULTS/SCORECARDS
LEVEL 1
NOT ENGAGED
LEVEL 1
NOT ENGAGED
LEVEL 2
EXPERIMENTING
LEVEL 2
EXPERIMENTING
LEVEL 4
GOOD PRACTICE
LEVEL 4
GOOD PRACTICE
LEVEL 5
BEST PRACTICE
LEVEL 5
BEST PRACTICE
Allied Reliability Inc.
4360 Corporate Rd, Suite 110 | Charleston, SC 29405
o. 888.414.5760 | f. 843.414.5779 | www.alliedreliability.com
Helping companies build wealth and competitive advantage through
world-class reliability across a global manufacturing network.

Mais conteúdo relacionado

Mais procurados

Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m changeDeepak Sharma
 
An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)abasathab
 
Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01BhimKunwar2
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3ASQ Reliability Division
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisECC International
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceDibyendu De
 
Failure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering FailuresFailure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering FailuresPadmanabhan Krishnan
 
Failure mode
Failure modeFailure mode
Failure modeGia Lara
 
Rcm of compressor
Rcm of compressorRcm of compressor
Rcm of compressorKaram Ali
 
Manual robo kawasaki
Manual robo kawasakiManual robo kawasaki
Manual robo kawasakiAlex Ponciano
 

Mais procurados (20)

Why RCM Doesn't Work?
Why RCM Doesn't Work?Why RCM Doesn't Work?
Why RCM Doesn't Work?
 
Msa 5 day
Msa 5 dayMsa 5 day
Msa 5 day
 
Training module 4 m change
Training module   4 m changeTraining module   4 m change
Training module 4 m change
 
An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)
 
Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01Ppap training-presentation-150311063239-conversion-gate01
Ppap training-presentation-150311063239-conversion-gate01
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
EAM Continuum
EAM ContinuumEAM Continuum
EAM Continuum
 
Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3Fundamentals of reliability engineering and applications part1of3
Fundamentals of reliability engineering and applications part1of3
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Attribute MSA
Attribute MSAAttribute MSA
Attribute MSA
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Abnomality and jishu hozen
Abnomality and jishu hozenAbnomality and jishu hozen
Abnomality and jishu hozen
 
Failure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering FailuresFailure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering Failures
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Dwm overview
Dwm overviewDwm overview
Dwm overview
 
Failure mode
Failure modeFailure mode
Failure mode
 
Rcm of compressor
Rcm of compressorRcm of compressor
Rcm of compressor
 
Advanced Pfmea
Advanced PfmeaAdvanced Pfmea
Advanced Pfmea
 
Manual robo kawasaki
Manual robo kawasakiManual robo kawasaki
Manual robo kawasaki
 

Destaque

Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Ricky Smith CMRP, CMRT
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixReliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixRicky Smith CMRP, CMRT
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanAccendo Reliability
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecardyoan_ariesta
 
Addressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbonAddressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbonZolt Energy
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardRicky Smith CMRP, CMRT
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementOSIsoft, LLC
 
ZED maturity assessment model 28th april 2015
ZED maturity assessment model 28th april 2015ZED maturity assessment model 28th april 2015
ZED maturity assessment model 28th april 2015Chandrashekhar Chauhan
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Results from Optimized Asset Reliability
Results from Optimized Asset ReliabilityResults from Optimized Asset Reliability
Results from Optimized Asset ReliabilityRicky Smith CMRP, CMRT
 
nikon presentation
nikon presentationnikon presentation
nikon presentationnayyer1122
 
Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Ricky Smith CMRP, CMRT
 
SMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVSMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVRicky Smith CMRP, CMRT
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Chad Broussard
 

Destaque (20)

Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling
 
Maintenance Planner Job Description
Maintenance Planner Job DescriptionMaintenance Planner Job Description
Maintenance Planner Job Description
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
World Class Maintenance WebEx Slides
World Class Maintenance WebEx SlidesWorld Class Maintenance WebEx Slides
World Class Maintenance WebEx Slides
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Reliability Engineering Maturity Matrix
Reliability Engineering Maturity MatrixReliability Engineering Maturity Matrix
Reliability Engineering Maturity Matrix
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
 
Maintenance Scorecard
Maintenance ScorecardMaintenance Scorecard
Maintenance Scorecard
 
Addressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbonAddressing sustainable development guidelines cps es efficient_carbon
Addressing sustainable development guidelines cps es efficient_carbon
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced Scorecard
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
 
ZED maturity assessment model 28th april 2015
ZED maturity assessment model 28th april 2015ZED maturity assessment model 28th april 2015
ZED maturity assessment model 28th april 2015
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Results from Optimized Asset Reliability
Results from Optimized Asset ReliabilityResults from Optimized Asset Reliability
Results from Optimized Asset Reliability
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
nikon presentation
nikon presentationnikon presentation
nikon presentation
 
Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
SMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVSMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAV
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
 

Semelhante a Condition Monitoring (PdM) Maturity Matrix - Know Best Practices

creating an effectient internal program (1) (1)
creating an effectient internal program (1) (1)creating an effectient internal program (1) (1)
creating an effectient internal program (1) (1)Jinadu Oluwafemi Mustapha
 
Approach Types Presentation
Approach Types PresentationApproach Types Presentation
Approach Types PresentationPrescott Coleman
 
Two Views of Ops Excellence
Two Views of Ops ExcellenceTwo Views of Ops Excellence
Two Views of Ops ExcellenceWalter Taraska
 
Assessmentsaudit322112 13008159137665-phpapp01
Assessmentsaudit322112 13008159137665-phpapp01Assessmentsaudit322112 13008159137665-phpapp01
Assessmentsaudit322112 13008159137665-phpapp01Ana Maria Dulgheru
 
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
 Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ... Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...Seapine Software
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdfssuser089410
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.pptssuserf2880f
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
Self inspection
Self inspectionSelf inspection
Self inspectionBangaluru
 
Internal Process Audit
Internal Process AuditInternal Process Audit
Internal Process Auditintellisenseit
 
Iso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistIso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistCinthiia Akamii
 

Semelhante a Condition Monitoring (PdM) Maturity Matrix - Know Best Practices (20)

Internal audit
Internal auditInternal audit
Internal audit
 
creating an effectient internal program (1) (1)
creating an effectient internal program (1) (1)creating an effectient internal program (1) (1)
creating an effectient internal program (1) (1)
 
Approach Types Presentation
Approach Types PresentationApproach Types Presentation
Approach Types Presentation
 
Two Views of Ops Excellence
Two Views of Ops ExcellenceTwo Views of Ops Excellence
Two Views of Ops Excellence
 
Super factory
Super factorySuper factory
Super factory
 
Assessmentsaudit322112 13008159137665-phpapp01
Assessmentsaudit322112 13008159137665-phpapp01Assessmentsaudit322112 13008159137665-phpapp01
Assessmentsaudit322112 13008159137665-phpapp01
 
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
 Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ... Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
Use the Windshield, Not the Mirror Predictive Metrics that Drive Successful ...
 
Quality Assurance
Quality AssuranceQuality Assurance
Quality Assurance
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 
Root Cause Analysis.pdf
Root Cause Analysis.pdfRoot Cause Analysis.pdf
Root Cause Analysis.pdf
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
June2008 Hdi Quality Presentation
June2008   Hdi Quality PresentationJune2008   Hdi Quality Presentation
June2008 Hdi Quality Presentation
 
Self inspection
Self inspectionSelf inspection
Self inspection
 
Internal Process Audit
Internal Process AuditInternal Process Audit
Internal Process Audit
 
Spice
SpiceSpice
Spice
 
Spice
SpiceSpice
Spice
 
Iso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistIso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklist
 

Mais de Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramRicky Smith CMRP, CMRT
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 

Mais de Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 

Último

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 

Último (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 

Condition Monitoring (PdM) Maturity Matrix - Know Best Practices

  • 1. Ways to Measure Your PdM Program PdM Maturity Matrix ELEMENTS LEVEL 1 NOT ENGAGED LEVEL 2 EXPERIMENTING LEVEL 3 ENLIGHTENED LEVEL 4 GOOD PRACTICE LEVEL 5 BEST PRACTICE PdMMATURITYELEMENTS Quartile Coverage Spot checks 4th Quartile 3rd Quartile 2nd Quartile 1st Quartile Expectations Troubleshoot Optimize Run-to-Failure Strategy Do more PdM Enable Proactive Workflow Model Early elimination of defects and root causes Employee Certifications and Qualifications Nothing formal Level I certification by technology supplier Level II certification with written practices Level III certifications to International Standard Certifications plus task qualification Standards and Controls Nothing formal Based on individual motivation and skills, multiple people inputting data Some basic database standards created with controlled input Standards created with controls to monitor, formal workflows exist Advanced standards created and MOC process used for changes Alarming Methods Nothing formal No alarms to overall alarms Alarms present, but are generic or overall alarms Alarms present, both standard and statistical Alarms present, both standard and statistical with review process Missed Opportunity / Investment Limited and informal RCA RCA only when prompted, informal in nature RCA only required on high profile failures RCA activity based on good triggers (e.g. Criticality) RCA on failures of all monitored equipment # of PdM Technologies 1 technology 2 or less technologies Minimum of 3 technologies Minimum of 5 technologies, fully utilized (e.g. electrical and mechanical infrared) Minimum of 5 technologies, fully utilized with integrated NDT program Technology Integration None None Minimal integration Fully integrated (database) Fully integrated (database) Types of PdM Tools Vibration pens, spot radiometers, single channel analyzer Simple, free oil analysis, possible single channel vibration Single channel vibration, airborne ultrasonics, infrared camera, paid oil analysis Motor testing, oil analysis, medium voltage monitoring ODS / modal capabilities, online monitoring of critical equipment Operations Involvement None Limited, more interested in focusing on missed opportunities Some buy-in, looking at PdM metrics but not utilizing Good integration, reviewing Asset Health, understand importance Fully integrated, operations accountable for reliability efforts SupportingWorkflowElements Schedule Compliance Less than 50% Less than 60% Average 60-70% Average 70-80% Average 80-90% Work Order Creation No PdM work orders Reports created, limited work orders Most PdM findings generate work orders All PdM findings generate work orders All PdM findings generate work orders Technology Specific Workflows Northing formal Nothing formal Exist and are typically followed Exist and are always followed Exist, refined and always followed Metrics / Justification Nothing formal Possibly tracking production outputs Tracking availability and quality (lagging indicators) OEE, product quality, metrics are reliable and accurate Track lagging and leading indicators and take corrective actions Resource Allocation None PdM technicians frequently pulled off task to perform maintenance Dedicated resources to PdM effort, rarely pulled off task to perform maintenance Dedicated resources, never pulled off task, beginning multi-discipline training Dedicated resources, multi-discipline trained to increase effectiveness Requalification / Commissioning None Spot check based on request Completed on only high criticality machines Completed to established criteria (e.g. top 75% of equipment in PdM program) Completed to established criteria (e.g. all equipment in PdM program) SupportingReliabilityEngineeringElements Criticality Granularity No formal Criticality Analysis performed Informal Criticality Assessment performed (little or no granularity) Formal Criticality Assessment performed (good granularity) Good granularity, could be used to identify asset coverage and work priority Good granularity, could be used to identify asset coverage and work priority Asset Health Reporting None None Overall Asset Health exists on high criticality equipment Asset Health for all route-based equipment Asset Health for all equipment including Mechanical, Electrical and Stationary Failure Mode Analysis None Informal FMEA on limited equipment types Formal FMEA performed on 50% of assets FMEA utilized on 65% of assets and used for program optimization FMEA performed on 80% of assets and integrated with Life Cycle Cost and Weibull Analysis Analytical Methods None Informal, limited capability based on experience Limited but using cost and work order trending to develop action lists Integration of operational measurements, asset health, and RCM completed on 50% of plant systems Using OEE, Life Cycle Cost, RCMs completed on 80% of plant systems Failure Investigation Informal Investigations rarely happen and are not documented Some formal RCA based on high cost failures, limited # of employees formerly trained in RCA Triggers in place (e.g. cost, # of failures, operational involvement, etc.), RCAs are documented and published Triggers refined, many employees including operations trained in RCA, metrics in place to measure results, willingness to incorporate OEM experts Results/Scorecards ROI Negative to Zero Minimal to no ROI 4:1 8:1 16:1 % Failure Maintenance >70% >50% <40% <25% <15% PM/PdM Balance <25% Overall <35% Overall >50% Overall >65% Overall >80% Overall 15% PdM 25% PdM 45% PdM 35% PM 40% PM 35% PM Asset Health Not measured Not measured Exists on critical assets Exists on all assets Exists on all assets > 65% Green >75% Green >80% Green Route Adherence Not measured <50% >70% >85% >90% % PdM Recommendations Implemented <15% <30% >50% >75% >90% PDMMATURITYELEMENTSPDMMATURITYELEMENTSSUPPORTINGRELIABILITYENGINEERINGELEMENTSSUPPORTINGRELIABILITYENGINEERINGELEMENTSRESULTS/SCORECARDSRESULTS/SCORECARDS LEVEL 1 NOT ENGAGED LEVEL 1 NOT ENGAGED LEVEL 2 EXPERIMENTING LEVEL 2 EXPERIMENTING LEVEL 4 GOOD PRACTICE LEVEL 4 GOOD PRACTICE LEVEL 5 BEST PRACTICE LEVEL 5 BEST PRACTICE Allied Reliability Inc. 4360 Corporate Rd, Suite 110 | Charleston, SC 29405 o. 888.414.5760 | f. 843.414.5779 | www.alliedreliability.com Helping companies build wealth and competitive advantage through world-class reliability across a global manufacturing network.