LEAN MANAGEMENT
WHY LEAN MANAGEMENT? 
 Economic slowdown 
 Mounting costs of crude oil and competition 
 Need to improve productivity, response time and cut costs 
So Japanese manufacturers developed a set of tools and techniques 
that addressed many of these requirements- collectively known as 
Lean Management techniques.
WHAT IS LEAN MANAGEMENT? 
It is the process by which the continuous efforts of all concerned 
parties enable an organization to create a value stream by 
eliminating waste from the system. 
JIT (waste elimination) 
Highly effective in reducing 
inventory levels. Improves 
cash flow and reduces 
space requirements. 
KANBAN 
method of regulating the flow 
of goods based on automatic 
replenishment through signal 
cards that indicate when more 
goods are needed.
WASTE ELIMINATION AS A CORE LOGIC OF JIT 
WATER-FLOW ANALOGY OF A MANUFACTURING SYSTEM 
BEHAVIOURAL DEFECTIVE MATERIAL CONSTRAINTS 
UNREALISTIC SCHEDULES 
LACK OF TRAINING 
MACHINE BREAKDOWN 
POOR QUALITY 
BOTTLENECKS 
INADEQUATE INFORMATION
PULL LOGIC OF LEAN MANAGEMENT 
 Pull-type manufacturing means “make to order”. 
 Actual demand is a trigger for pull manufacturing. 
 It works with the supermarket logic, as 
Nothing will be produced until it is needed 
Need is created by an actual demand 
When an item is sold the market pulls a replacement from the last 
position in the system 
This triggers an order to the production line 
Hence production starts.
KANBAN 
 In the traditional Kanban method, operators use visual signals to determine 
how much they run, and when to stop or change over, informs staff of problems 
and who they can help. 
 The process replaces forecasted usage with actual usage so that there is very 
little work-in-progress (WIP) material. 
TWO TYPES OF CARDS: 
1. P-KANBAN-serves 
as the authorization for production of the no. of item indicated in the 
kanban. 
2. C-KANBAN-serves 
as the authorization to move from one process to another.
CASE STUDY 
LEAN MANUFATURING 
In JAGUAR ( foRd cAR )
INTRODUCTION 
Case study focuses on the way in which Jaguar(ford), 
one of the world’s most prestigious car manufacturers , 
has employed lean manufacturing of Jaguar S-Type production line 
at its Castle Bromwich factory in Birmingham. 
The existing system included: 
A hierarchical approach with one supervisor taking responsibility 
of 30 production line workers. 
‘Tell and do’ approach
NEW SYSTEM
VISBLE MANAGEMENT / VISUAL FACTORY 
A system of ‘visible management’ has been introduced at Castle Bromwich to 
enable everyone involved in the process to understand how individual parts 
of the plant are performing so they can contribute to meeting 
performance requirements.
CONTROL BOARDS 
reveals the daily production target 
for each production line and the 
performance against this target 
At any one time anyone on the 
production line can see where 
they are in relation to target 
each line worker completes their 
specialist tasks to the highest quality 
before the car moves to the next 
position on the line. 
If a worker is having a problem they 
pull a cord which alerts their team 
leader who will provide assistance 
However, if the problem cannot be 
immediately solved the whole line 
will halt and then wait while the 
problem is solved. 
The running total is recorded on 
Control boards indicating the 
performance of each line.
OPEN INFORMATION 
CENTERS
OWNERSHIP OF 
WORK 
The responsibility of each worker is outlined in a series of work elements which are 
Shown in a vertical column on a Yamazumi board which is a flat white screen 
The value added activities of each employee are shown in green and non-value 
added activities in red 
The height of each vertical element represents the amount of time needed to carry 
out the element e.g. nine seconds.
Matching supply to demand 
JUST IN TIME 
Traditional way 
groups of employees 
had focused on set 
processes in the 
production of Jaguar 
cars using batches of 
components. 
cramped working environment and 
less floor space. 
New way 
cut down stocks of 
components in the 
workspace to the 
numbers required to 
keep production 
flowing smoothly 
Teams press a signal 
button to call for 
fresh stocks when 
they are required. 
A quick response from a 
central store enables new 
parts to arrive at work 
stations ‘just-in-time’ for 
them to be used
BENEFITS OF JIT
CONCLUSION 
Lean production has enabled Jaguar to cut out waste in the 
production of the Jaguar S-type at Castle Bromwich. 
This involves working more effectively with TAKT time (the time 
available to produce each car). 
It has enabled jaguar to effectively develop cars with less resources, 
time and wastes.
THANK YOU 
RACHITA KOCHHAR 
12BBS0061

Mais conteúdo relacionado

Mais procurados

Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations ManagementGargi Kapadia
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Exampleshekhar619
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTnishu tyagi
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningRaju Pegada
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations ManagementNishant Agrawal
 
Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]Hany G. Amer
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)Arunnima B S
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular ManufacturingSagar Kurde
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemYash Dave
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean productionهشام جملة
 
Jidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation SlidesJidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation SlidesSlideTeam
 

Mais procurados (20)

Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
Ch12pp
Ch12ppCh12pp
Ch12pp
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
 
Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]Lean manufacturing [History & Types ]
Lean manufacturing [History & Types ]
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular Manufacturing
 
WORLD CLASS MANUFACTURING
WORLD CLASS MANUFACTURINGWORLD CLASS MANUFACTURING
WORLD CLASS MANUFACTURING
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) system
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Line balancing
Line balancingLine balancing
Line balancing
 
Jidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation SlidesJidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation Slides
 

Destaque

Destaque (20)

Group's Presentation FINAL
Group's Presentation FINALGroup's Presentation FINAL
Group's Presentation FINAL
 
Total quality management report
Total quality management reportTotal quality management report
Total quality management report
 
Lean Management by Bearing Point
Lean Management by Bearing PointLean Management by Bearing Point
Lean Management by Bearing Point
 
Toyota
ToyotaToyota
Toyota
 
Toyota's TQM
Toyota's TQMToyota's TQM
Toyota's TQM
 
Lean software management bbc worldwide case study nov less 2011
Lean software management bbc worldwide case study nov less  2011Lean software management bbc worldwide case study nov less  2011
Lean software management bbc worldwide case study nov less 2011
 
Tqm chaos and complexity
Tqm chaos and complexityTqm chaos and complexity
Tqm chaos and complexity
 
Case Study McDonalds
Case Study McDonaldsCase Study McDonalds
Case Study McDonalds
 
Case study zara inditex
Case study zara inditexCase study zara inditex
Case study zara inditex
 
Case Study Lean Scm Dell
Case Study Lean Scm DellCase Study Lean Scm Dell
Case Study Lean Scm Dell
 
Hrm Quality Circles Tqm
Hrm Quality Circles TqmHrm Quality Circles Tqm
Hrm Quality Circles Tqm
 
A Lean Case Study
A Lean Case StudyA Lean Case Study
A Lean Case Study
 
DHL Case Study
DHL Case StudyDHL Case Study
DHL Case Study
 
Lean Management Methods in Product Development – A Case Study
Lean Management Methods in Product Development – A Case Study Lean Management Methods in Product Development – A Case Study
Lean Management Methods in Product Development – A Case Study
 
Total Quality Management TQM
Total Quality Management TQMTotal Quality Management TQM
Total Quality Management TQM
 
Tqm practices in Tata Steel
Tqm practices in Tata SteelTqm practices in Tata Steel
Tqm practices in Tata Steel
 
Hul tqm case ppt
Hul tqm case pptHul tqm case ppt
Hul tqm case ppt
 
TQM at TATA Steel
TQM at TATA SteelTQM at TATA Steel
TQM at TATA Steel
 
28328395 total-quality-management
28328395 total-quality-management28328395 total-quality-management
28328395 total-quality-management
 
Lean management ppt @ bec doms
Lean management ppt @ bec domsLean management ppt @ bec doms
Lean management ppt @ bec doms
 

Semelhante a lean management- case study on jaguar

Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory managementiWriteEssays
 
Just in time Manufacturing
Just in time ManufacturingJust in time Manufacturing
Just in time ManufacturingKiran Girase
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationLaukik Raut
 
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Yamini Kahaliya
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
Implementation of just in time production through kanban system
Implementation of just in time production through kanban systemImplementation of just in time production through kanban system
Implementation of just in time production through kanban systemAlexander Decker
 

Semelhante a lean management- case study on jaguar (20)

Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 
Just in time Manufacturing
Just in time ManufacturingJust in time Manufacturing
Just in time Manufacturing
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean Manufacturing(2)
Lean Manufacturing(2)Lean Manufacturing(2)
Lean Manufacturing(2)
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean Manufacturing(2)
Lean Manufacturing(2)Lean Manufacturing(2)
Lean Manufacturing(2)
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its Implementation
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
Supply Chain Management Assignment on Lean manufacturing wit real life Exampl...
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Production methods
Production methodsProduction methods
Production methods
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
13. lean production system pgp
13. lean production system pgp13. lean production system pgp
13. lean production system pgp
 
What is-six-sigma69
What is-six-sigma69What is-six-sigma69
What is-six-sigma69
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
Implementation of just in time production through kanban system
Implementation of just in time production through kanban systemImplementation of just in time production through kanban system
Implementation of just in time production through kanban system
 

Último

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Último (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

lean management- case study on jaguar

  • 2. WHY LEAN MANAGEMENT?  Economic slowdown  Mounting costs of crude oil and competition  Need to improve productivity, response time and cut costs So Japanese manufacturers developed a set of tools and techniques that addressed many of these requirements- collectively known as Lean Management techniques.
  • 3. WHAT IS LEAN MANAGEMENT? It is the process by which the continuous efforts of all concerned parties enable an organization to create a value stream by eliminating waste from the system. JIT (waste elimination) Highly effective in reducing inventory levels. Improves cash flow and reduces space requirements. KANBAN method of regulating the flow of goods based on automatic replenishment through signal cards that indicate when more goods are needed.
  • 4. WASTE ELIMINATION AS A CORE LOGIC OF JIT WATER-FLOW ANALOGY OF A MANUFACTURING SYSTEM BEHAVIOURAL DEFECTIVE MATERIAL CONSTRAINTS UNREALISTIC SCHEDULES LACK OF TRAINING MACHINE BREAKDOWN POOR QUALITY BOTTLENECKS INADEQUATE INFORMATION
  • 5. PULL LOGIC OF LEAN MANAGEMENT  Pull-type manufacturing means “make to order”.  Actual demand is a trigger for pull manufacturing.  It works with the supermarket logic, as Nothing will be produced until it is needed Need is created by an actual demand When an item is sold the market pulls a replacement from the last position in the system This triggers an order to the production line Hence production starts.
  • 6. KANBAN  In the traditional Kanban method, operators use visual signals to determine how much they run, and when to stop or change over, informs staff of problems and who they can help.  The process replaces forecasted usage with actual usage so that there is very little work-in-progress (WIP) material. TWO TYPES OF CARDS: 1. P-KANBAN-serves as the authorization for production of the no. of item indicated in the kanban. 2. C-KANBAN-serves as the authorization to move from one process to another.
  • 7. CASE STUDY LEAN MANUFATURING In JAGUAR ( foRd cAR )
  • 8. INTRODUCTION Case study focuses on the way in which Jaguar(ford), one of the world’s most prestigious car manufacturers , has employed lean manufacturing of Jaguar S-Type production line at its Castle Bromwich factory in Birmingham. The existing system included: A hierarchical approach with one supervisor taking responsibility of 30 production line workers. ‘Tell and do’ approach
  • 10. VISBLE MANAGEMENT / VISUAL FACTORY A system of ‘visible management’ has been introduced at Castle Bromwich to enable everyone involved in the process to understand how individual parts of the plant are performing so they can contribute to meeting performance requirements.
  • 11. CONTROL BOARDS reveals the daily production target for each production line and the performance against this target At any one time anyone on the production line can see where they are in relation to target each line worker completes their specialist tasks to the highest quality before the car moves to the next position on the line. If a worker is having a problem they pull a cord which alerts their team leader who will provide assistance However, if the problem cannot be immediately solved the whole line will halt and then wait while the problem is solved. The running total is recorded on Control boards indicating the performance of each line.
  • 13. OWNERSHIP OF WORK The responsibility of each worker is outlined in a series of work elements which are Shown in a vertical column on a Yamazumi board which is a flat white screen The value added activities of each employee are shown in green and non-value added activities in red The height of each vertical element represents the amount of time needed to carry out the element e.g. nine seconds.
  • 14. Matching supply to demand JUST IN TIME Traditional way groups of employees had focused on set processes in the production of Jaguar cars using batches of components. cramped working environment and less floor space. New way cut down stocks of components in the workspace to the numbers required to keep production flowing smoothly Teams press a signal button to call for fresh stocks when they are required. A quick response from a central store enables new parts to arrive at work stations ‘just-in-time’ for them to be used
  • 16. CONCLUSION Lean production has enabled Jaguar to cut out waste in the production of the Jaguar S-type at Castle Bromwich. This involves working more effectively with TAKT time (the time available to produce each car). It has enabled jaguar to effectively develop cars with less resources, time and wastes.
  • 17. THANK YOU RACHITA KOCHHAR 12BBS0061