SlideShare uma empresa Scribd logo
1 de 62
Baixar para ler offline
FORMULARIO No. 4
Hoja 1 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 303-2(1)I UNIDAD: M3
DETALLE: EXCAVACION SIN CLASIFICACION
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
EXCAVADORA 1 40,00 40,00
$ 0,0129 0,516
$
SUBTOTAL M 0,516
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,0129 0,079
$
OP. EXCAVADORA 1 3,40
$ 3,40
$ 0,0129 0,044
$
SUBTOTAL N 0,123
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 0,639
$
INDIRECTOS % 3% 0,019
$
UTILIDAD % 2% 0,013
$
COSTO TOTAL DEL RUBRO 0,671
$
VALOR OFERTADO 0,67
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 2 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 303-2(1)I1 UNIDAD: M3
DETALLE: EXCAVACION SIN CLASIFICACION MANUAL
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 4 3,05
$ 12,20
$ 0,2320 2,830
$
MAESTRO 1 3,40
$ 3,40
$ 0,2320 0,789
$
SUBTOTAL N 3,619
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 3,619
$
INDIRECTOS % 3% 0,109
$
UTILIDAD % 2% 0,075
$
COSTO TOTAL DEL RUBRO 3,802
$
VALOR OFERTADO 3,80
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 3 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 309-(1)E UNIDAD: M3/KM
DETALLE: DESALOJO DE MATERIAL
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CARGADORA 0,2 45,00 9,00
$ 0,0047 0,042
$
VOLQUETA 1 25,00 25,00
$ 0,0047 0,118
$
SUBTOTAL M 0,160
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,0047 0,029
$
OP. CARGADORA 0,2 3,40
$ 0,68
$ 0,0047 0,003
$
CHOFER II 1 4,40
$ 4,40
$ 0,0047 0,021
$
SUBTOTAL N 0,053
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 0,212
$
INDIRECTOS % 3% 0,006
$
UTILIDAD % 2% 0,004
$
COSTO TOTAL DEL RUBRO 0,223
$
VALOR OFERTADO 0,22
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 4 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 304-1(2)E UNIDAD: M3
DETALLE: MATERIAL DE PRESTAMO IMPORTADO (INC. TRANSPORTE)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,0116 0,348
$
TANQUERO 1 25,00 25,00
$ 0,0116 0,290
$
MOTONIVELADORA 1 40,00 40,00
$ 0,0116 0,464
$
SUBTOTAL M 1,102
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,0116 0,035
$
OP. RODILLO 1 3,40
$ 3,40
$ 0,0116 0,039
$
OP. MOTONIVELADORA 1 3,40
$ 3,40
$ 0,0116 0,039
$
CHOFER 1 4,40
$ 4,40
$ 0,0116 0,051
$
SUBTOTAL N 0,165
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
MATERIAL DE MEJORAMIENTO M3 1,3 2,5000 3,25
$
SUBTOTAL O 3,250
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,3 4,0000 5,20
$
SUBTOTAL P 5,20
$
TOTAL COSTO DIRECTO ( M+N+O+P) 9,717
$
INDIRECTOS % 3% 0,292
$
UTILIDAD % 2% 0,200
$
COSTO TOTAL DEL RUBRO 10,209
$
VALOR OFERTADO 10,21
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 5 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 304-1(2)E1 UNIDAD: M3
DETALLE: MATERIAL DE PRESTAMO IMPORTADO MANUAL (INC. TRANSPORTE)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,1673 0,418
$
SUBTOTAL M 0,418
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 4 3,05
$ 12,20
$ 0,1673 2,041
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1673 0,114
$
SUBTOTAL N 2,155
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
MATERIAL DE MEJORAMIENTO M3 1,3 2,5000 3,25
$
SUBTOTAL O 3,250
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,3 4,0000 5,20
$
SUBTOTAL P 5,20
$
TOTAL COSTO DIRECTO ( M+N+O+P) 11,023
$
INDIRECTOS % 3% 0,331
$
UTILIDAD % 2% 0,227
$
COSTO TOTAL DEL RUBRO 11,581
$
VALOR OFERTADO 11,58
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 6 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 404-1E UNIDAD: M3
DETALLE: BASE CLASE 1 (INC. TRANSPORTE)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,0170 0,510
$
TANQUERO 1 25,00 25,00
$ 0,0170 0,425
$
MOTONIVELADORA 1 40,00 40,00
$ 0,0170 0,680
$
SUBTOTAL M 1,615
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,0170 0,052
$
OP. RODILLO 1 3,40
$ 3,40
$ 0,0170 0,058
$
OP. MOTONIVELADORA 1 3,40
$ 3,40
$ 0,0170 0,058
$
CHOFER 1 4,40
$ 4,40
$ 0,0170 0,075
$
SUBTOTAL N 0,242
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
BASE CLASE 1 M3 1,2 11,5000 13,80
$
SUBTOTAL O 13,800
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE BASE M3 1,2 4,0000 4,80
$
SUBTOTAL P 4,80
$
TOTAL COSTO DIRECTO ( M+N+O+P) 20,457
$
INDIRECTOS % 3% 0,614
$
UTILIDAD % 2% 0,421
$
COSTO TOTAL DEL RUBRO 21,492
$
VALOR OFERTADO 21,49
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 7 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 405-5B UNIDAD: M2
DETALLE: CAPA/RODADURA/H. ASFALT. MEZC/PLANTA E=5CM (INC. IMPRIM.)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,0028 0,084
$
RODILLO NEUMATICO 1 30,00 30,00
$ 0,0028 0,084
$
ESCOBA MECANICA AUTOPROPULSADA 1 20,00 20,00
$ 0,0028 0,056
$
DISTRIBUIDOR DE ASFALTO 0,3 20,00 6,00
$ 0,0028 0,017
$
FINISHER 1 35,00 35,00
$ 0,0028 0,098
$
SUBTOTAL M 0,339
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 9 3,05
$ 27,45
$ 0,0028 0,077
$
MAESTRO 1 3,40
$ 3,40
$ 0,0028 0,010
$
OP. DISTRIBUIDOR ASFALTO/RODILLO 3 3,40
$ 10,20
$ 0,0028 0,029
$
OP. FINISHER/ESCOBA MECANICA 1,3 3,40
$ 4,42
$ 0,0028 0,012
$
SUBTOTAL N 0,127
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
DIESEL II GLN 0,3 1,0500 0,32
$
ASFALTO RC-2 GLN 0,25 1,7300 0,43
$
MEZCLA ASFALTICA M3 0,065 77,0000 5,01
$
SUBTOTAL O 5,753
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MEZCLA ASFALTICA M3 0,065 10,0000 0,65
$
SUBTOTAL P 0,65
$
TOTAL COSTO DIRECTO ( M+N+O+P) 6,869
$
INDIRECTOS % 3% 0,206
$
UTILIDAD % 2% 0,141
$
COSTO TOTAL DEL RUBRO 7,216
$
VALOR OFERTADO 7,22
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 8 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 405-5B(I) UNIDAD: M2
DETALLE: CAPA/RODADURA/H. ASFALT. MEZC/PLANTA E=5CM (INC. IMP.)(BACHEO)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,0074 0,222
$
RODILLO NEUMATICO 1 30,00 30,00
$ 0,0074 0,222
$
ESCOBA MECANICA AUTOPROPULSADA 1 20,00 20,00
$ 0,0074 0,148
$
DISTRIBUIDOR DE ASFALTO 0,3 20,00 6,00
$ 0,0074 0,044
$
FINISHER 1 35,00 35,00
$ 0,0074 0,259
$
SUBTOTAL M 0,895
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 9 3,05
$ 27,45
$ 0,0074 0,203
$
MAESTRO 1 3,40
$ 3,40
$ 0,0074 0,025
$
OP. DISTRIBUIDOR ASFALTO/RODILLO 3 3,40
$ 10,20
$ 0,0074 0,075
$
OP. FINISHER/ESCOBA MECANICA 1,3 3,40
$ 4,42
$ 0,0074 0,033
$
SUBTOTAL N 0,336
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
DIESEL II GLN 0,3 1,0500 0,32
$
ASFALTO RC-2 GLN 0,28 1,7300 0,48
$
MEZCLA ASFALTICA M3 0,064 77,0000 4,93
$
SUBTOTAL O 5,727
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MEZCLA ASFALTICA M3 0,064 10,0000 0,64
$
SUBTOTAL P 0,64
$
TOTAL COSTO DIRECTO ( M+N+O+P) 7,599
$
INDIRECTOS % 3% 0,228
$
UTILIDAD % 2% 0,157
$
COSTO TOTAL DEL RUBRO 7,984
$
VALOR OFERTADO 7,98
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 9 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 402-2(A)I UNIDAD: M2
DETALLE: MEJORAMIENTO/SUB-RASANTE/MAT.SELECC.E=0.75M. (BACHEO)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,0235 0,705
$
TANQUERO 1 25,00 25,00
$ 0,0235 0,588
$
RETROEXCAVADORA 1 25,00 25,00
$ 0,0235 0,588
$
SUBTOTAL M 1,880
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,0235 0,072
$
OP. RODILLO 1 3,40
$ 3,40
$ 0,0235 0,080
$
OP. RETROEXCAVADORA 1 3,40
$ 3,40
$ 0,0235 0,080
$
CHOFER 1 4,40
$ 4,40
$ 0,0235 0,103
$
SUBTOTAL N 0,335
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
MATERIAL DE MEJORAMIENTO M3 1 2,5000 2,50
$
SUBTOTAL O 2,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1 4,0000 4,00
$
SUBTOTAL P 4,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 8,715
$
INDIRECTOS % 3% 0,261
$
UTILIDAD % 2% 0,180
$
COSTO TOTAL DEL RUBRO 9,156
$
VALOR OFERTADO 9,16
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 10 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 404-1(A)I UNIDAD: M2
DETALLE: BASE CLASE 1 E=0,15M. (BACHEO)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,0104 0,312
$
TANQUERO 1 25,00 25,00
$ 0,0104 0,260
$
MOTONIVELADORA 1 40,00 40,00
$ 0,0104 0,416
$
SUBTOTAL M 0,988
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,0104 0,063
$
OP. RODILLO 1 3,40
$ 3,40
$ 0,0104 0,035
$
OP. MOTONIVELADORA 1 3,40
$ 3,40
$ 0,0104 0,035
$
CHOFER 1 4,40
$ 4,40
$ 0,0104 0,046
$
SUBTOTAL N 0,180
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
BASE CLASE 1 M3 0,18 11,5000 2,07
$
SUBTOTAL O 2,070
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE BASE M3 0,18 4,0000 0,72
$
SUBTOTAL P 0,72
$
TOTAL COSTO DIRECTO ( M+N+O+P) 3,958
$
INDIRECTOS % 3% 0,119
$
UTILIDAD % 2% 0,082
$
COSTO TOTAL DEL RUBRO 4,158
$
VALOR OFERTADO 4,16
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 11 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 610-(1)1A UNIDAD: ML
DETALLE: BORDILLO CUNETA F'C=280 KG/CM2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
VIBRADOR DE MANGUERA 1 2,50 2,50
$ 0,1615 0,404
$
SUBTOTAL M 0,404
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,1615 1,478
$
ALBAÑIL 2 3,05
$ 6,10
$ 0,1615 0,985
$
CARPINTERO 1 3,05
$ 3,05
$ 0,1615 0,493
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1615 0,110
$
SUBTOTAL N 3,065
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,170 105,0000 17,85
$
ENCOFRADO ML 1,00 4,8200 4,82
$
CURADOR GLN 0,15 6,6000 0,99
$
SUBTOTAL O 23,660
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 27,129
$
INDIRECTOS % 3% 0,814
$
UTILIDAD % 2% 0,559
$
COSTO TOTAL DEL RUBRO 28,502
$
VALOR OFERTADO 28,50
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 12 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 3.40B UNIDAD: ML
DETALLE: CANALETA DE HORMIG. SIMPLE (40X20)CM. F'C=280 KG/CM2 INC. ENLUC
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,1333 1,220
$
ALBAÑIL 2 3,05
$ 6,10
$ 0,1333 0,813
$
CARPINTERO 1 3,05
$ 3,05
$ 0,1333 0,407
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1333 0,091
$
SUBTOTAL N 2,530
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,090 105,0000 9,45
$
ENCOFRADO ML 1,00 3,5800 3,58
$
CURADOR GLN 0,05 6,6000 0,33
$
SUBTOTAL O 13,360
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 15,890
$
INDIRECTOS % 3% 0,477
$
UTILIDAD % 2% 0,327
$
COSTO TOTAL DEL RUBRO 16,694
$
VALOR OFERTADO 16,69
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 13 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 2.3 UNIDAD: M2
DETALLE: HORM. SIMPLE F'C=210 KG/CM2 E=10 CM.
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,1500 1,373
$
ALBAÑIL 2 3,05
$ 6,10
$ 0,1500 0,915
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1500 0,102
$
SUBTOTAL N 2,390
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=210KG/CM2 M3 0,105 97,0000 10,19
$
ENCOFRADO M2 1 2,0800 2,08
$
CURADOR GLN 0,12 6,6000 0,79
$
SUBTOTAL O 13,057
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 15,447
$
INDIRECTOS % 3% 0,463
$
UTILIDAD % 2% 0,318
$
COSTO TOTAL DEL RUBRO 16,228
$
VALOR OFERTADO 16,23
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 14 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 503(2)1E UNIDAD: M3
DETALLE: HORM.ESTRUCT./CEM.PORTL.CL-B F'C=280KG/CM2 (INC. ENC. CURAD)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
VIBRADOR DE MANGUERA 1 2,50 2,50
$ 2,0293 5,073
$
SUBTOTAL M 5,073
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 5 3,05
$ 15,25
$ 2,0293 30,947
$
ALBAÑIL 2 3,05
$ 6,10
$ 2,0293 12,379
$
CARPINTERO 2 3,05
$ 6,10
$ 2,0293 12,379
$
MAESTRO 0,3 3,40
$ 1,02
$ 2,0293 2,070
$
SUBTOTAL N 57,774
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 1,03 105,0000 108,150
$
ENCOFRADO M2 1,5 18,0000 27,000
$
CURADOR GLN 0,3 6,6000 1,980
$
SUBTOTAL O 137,130
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL M3 1 5,0000 5,00
$
SUBTOTAL P 5,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 204,977
$
INDIRECTOS % 3% 6,149
$
UTILIDAD % 2% 4,223
$
COSTO TOTAL DEL RUBRO 215,349
$
VALOR OFERTADO 215,35
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 15 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 504(1) UNIDAD: KG
DETALLE: ACERO DE REFUERZO EN BARRAS FY =4200 KG/CM2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA-DOBLADORA 1 1,00 1,00
$ 0,0220 0,022
$
SUBTOTAL M 0,022
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,0220 0,201
$
FIERRERO 1 3,05
$ 3,05
$ 0,0220 0,067
$
MAESTRO 0,3 3,40
$ 1,02
$ 0,0220 0,022
$
SUBTOTAL N 0,291
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
ACERO DE REFUERZO EN BARRAS FY=4200KG/CM2 KG 1,02 1,2500 1,28
$
ALAMBRE RECOCIDO # 18 KG 0,24 1,6000 0,38
$
SUBTOTAL O 1,659
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE ACERO DE REFUERZO KG 1,02 0,1000 0,10
$
SUBTOTAL P 0,10
$
TOTAL COSTO DIRECTO ( M+N+O+P) 2,074
$
INDIRECTOS % 3% 0,062
$
UTILIDAD % 2% 0,043
$
COSTO TOTAL DEL RUBRO 2,179
$
VALOR OFERTADO 2,18
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 16 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 5.1A UNIDAD: ML
DETALLE: SUMINISTRO/INSTALACION-TUBO PVC D=6" =160 MM. PERFORADA (DREN)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,1200 0,732
$
GASFITERO 1 3,05
$ 3,05
$ 0,1200 0,366
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1200 0,082
$
SUBTOTAL N 1,180
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUBO PVC CORRUGADA-PERFORADA D=6" M 1 7,5000 7,50
$
KALIPEGA Y ACCESORIOS M 1 0,9500 0,95
$
SUBTOTAL O 8,450
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL ML 1 0,2000 0,20
$
SUBTOTAL P 0,20
$
TOTAL COSTO DIRECTO ( M+N+O+P) 9,830
$
INDIRECTOS % 3% 0,295
$
UTILIDAD % 2% 0,202
$
COSTO TOTAL DEL RUBRO 10,327
$
VALOR OFERTADO 10,33
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 17 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.7A UNIDAD: M3
DETALLE: SUMINISTRO Y COLOCACION DE PIEDRA TRITURADA (SUB-DREN)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,3560 2,172
$
SUBTOTAL N 2,172
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
PIEDRA TRITURADA M3 1 12,0000 12,00
$
SUBTOTAL O 12,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE PIEDRA M3 1 4,0000 4,00
$
SUBTOTAL P 4,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 18,172
$
INDIRECTOS % 3% 0,545
$
UTILIDAD % 2% 0,374
$
COSTO TOTAL DEL RUBRO 19,091
$
VALOR OFERTADO 19,09
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 18 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 511-1(8)E1 UNIDAD: M2
DETALLE: SUMINISTRO E INSTALACION DE GEOTEXTIL NT - 1600
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,0824 0,754
$
MAESTRO 0,5 3,40
$ 1,70
$ 0,0824 0,140
$
SUBTOTAL N 0,894
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
GEOTEXTIL (NO TEJIDO 1600) M2 1,12 1,3000 1,46
$
ALAMBRES, GRAPAS M2 1 0,0500 0,05
$
SUBTOTAL O 1,506
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 2,400
$
INDIRECTOS % 3% 0,072
$
UTILIDAD % 2% 0,049
$
COSTO TOTAL DEL RUBRO 2,521
$
VALOR OFERTADO 2,52
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 19 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 5.2C UNIDAD: ML
DETALLE: SUMINISTRO E INSTALAC. TUBO PVC D= 4" =110 MM. (SUBTERRANEO)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,0157 0,039
$
RETROEXCAVADORA 0,5 25,00 12,50
$ 0,0157 0,196
$
SUBTOTAL M 0,236
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,0157 0,144
$
TUBERO 1 3,05
$ 3,05
$ 0,0157 0,048
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,0157 0,011
$
OP. RETROEXCAVADORA 0,5 3,40
$ 1,70
$ 0,0157 0,027
$
SUBTOTAL N 0,229
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
KALIPEGA Y ACCESORIOS ML 1 0,8000 0,80
$
TUBERIA PVC D=110 MM. ML 1 6,0000 6,00
$
MATERIAL DE MEJORAMIENTO M3 0,5 2,5000 1,25
$
ARENA M3 0,03 12,0000 0,36
$
SUBTOTAL O 8,410
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 0,6 4,0000 2,40
$
TRANSPORTE DE TUBERIA ML 1 0,1500 0,15
$
TRANSPORTE DE ARENA M3 0,03 4,0000 0,12
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,5 4,0000 2,00
$
SUBTOTAL P 4,67
$
TOTAL COSTO DIRECTO ( M+N+O+P) 13,544
$
INDIRECTOS % 3% 0,406
$
UTILIDAD % 2% 0,279
$
COSTO TOTAL DEL RUBRO 14,230
$
VALOR OFERTADO 14,23
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 20 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: R.C-1 UNIDAD: U
DETALLE: REPARACIÓN DE GUIA DE AGUA POTABLE
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 1,2517 3,129
$
SUBTOTAL M 3,129
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 5 3,05
$ 15,25
$ 1,2517 19,088
$
GASFITERO 2 3,05
$ 6,10
$ 1,2517 7,635
$
MAESTRO 0,2 3,40
$ 0,68
$ 1,2517 0,851
$
SUBTOTAL N 27,575
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUBO PEAD 1/2 RÍGIDO (UNIÓN ROSCABLE) M 3 2,0000 6,00
$
UNIÓN PEAD U 1 8,0000 8,00
$
CODOS, NEPLOS, TAPON, ETC. U 1 4,0000 4,00
$
ARENA M3 0,32 12,0000 3,84
$
SUBTOTAL O 21,840
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 52,544
$
INDIRECTOS % 3% 1,576
$
UTILIDAD % 2% 1,082
$
COSTO TOTAL DEL RUBRO 55,203
$
VALOR OFERTADO 55,20
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 21 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 301-3(1)I UNIDAD: M3
DETALLE: REMOCION DE HORMIGON DE CEMENTO PORTLAND
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPRESOR HIDRAULICO NEUMATICO 1 30,00 30,00
$ 0,1937 5,811
$
SUBTOTAL M 5,811
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 4 3,05
$ 12,20
$ 0,1937 2,363
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1937 0,132
$
OP. COMPRESOR 1 3,40
$ 3,40
$ 0,1937 0,659
$
SUBTOTAL N 3,153
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 1,3 4,0000 5,20
$
SUBTOTAL P 5,20
$
TOTAL COSTO DIRECTO ( M+N+O+P) 14,164
$
INDIRECTOS % 3% 0,425
$
UTILIDAD % 2% 0,292
$
COSTO TOTAL DEL RUBRO 14,881
$
VALOR OFERTADO 14,88
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 22 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 5.3H UNIDAD: U
DETALLE: CAJA/DOMICILIARIA REDONDA TIPO I-III D=400 A 600 MM
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 4,8558 29,620
$
ALBAÑIL 1 3,05
$ 3,05
$ 4,8558 14,810
$
MAESTRO 0,2 3,40
$ 0,68
$ 4,8558 3,302
$
SUBTOTAL N 47,733
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=210KG/CM2 M3 0,5 97,0000 48,50
$
ACERO DE REFUERZO EN BARRAS FY=4200KG/CM2 KG 60 1,2500 75,00
$
ENCOFRADO U 1 5,0000 5,00
$
SUBTOTAL O 128,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 176,233
$
INDIRECTOS % 3% 5,287
$
UTILIDAD % 2% 3,630
$
COSTO TOTAL DEL RUBRO 185,150
$
VALOR OFERTADO 185,15
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 23 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 405-5(1)1E UNIDAD: M3
DETALLE: CAPA/RODADURA/H. ASFALT. MEZCLADO/PLANTA (INC. IMPRIM.) MANUAL
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RODILLO LISO VIBRATORIO 1 30,00 30,00
$ 0,1948 5,844
$
RODILLO NEUMATICO 1 30,00 30,00
$ 0,1948 5,844
$
ESCOBA MECANICA AUTOPROPULSADA 1 20,00 20,00
$ 0,1948 3,896
$
DISTRIBUIDOR DE ASFALTO 0,3 20,00 6,00
$ 0,1948 1,169
$
SUBTOTAL M 16,753
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 10 3,05
$ 30,50
$ 0,1948 5,941
$
MAESTRO 1 3,40
$ 3,40
$ 0,1948 0,662
$
OP. DISTRIBUIDOR ASFALTO/RODILLO 3 3,40
$ 10,20
$ 0,1948 1,987
$
OP. ESCOBA MECANICA 0,3 3,40
$ 1,02
$ 0,1948 0,199
$
SUBTOTAL N 8,789
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
DIESEL II GLN 6 1,0500 6,30
$
ASFALTO RC-2 GLN 5 1,7800 8,90
$
MEZCLA ASFALTICA M3 1,3 77,0000 100,10
$
SUBTOTAL O 115,300
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MEZCLA ASFALTICA M3 1,3 10,0000 13,00
$
SUBTOTAL P 13,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 153,842
$
INDIRECTOS % 3% 4,615
$
UTILIDAD % 2% 3,169
$
COSTO TOTAL DEL RUBRO 161,627
$
VALOR OFERTADO 161,63
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 24 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 301-2(23)I UNIDAD: U
DETALLE: LIMPIEZA DE SUMIDEROS
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 1,1437 10,465
$
MAESTRO 0,2 3,40
$ 0,68
$ 1,1437 0,778
$
SUBTOTAL N 11,243
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 11,243
$
INDIRECTOS % 3% 0,337
$
UTILIDAD % 2% 0,232
$
COSTO TOTAL DEL RUBRO 11,811
$
VALOR OFERTADO 11,81
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 25 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 301-2(20)I UNIDAD: U
DETALLE: LIMPIEZA DE CAMARA
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 2,2871 20,927
$
MAESTRO 0,2 3,40
$ 0,68
$ 2,2871 1,555
$
SUBTOTAL N 22,482
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 22,482
$
INDIRECTOS % 3% 0,674
$
UTILIDAD % 2% 0,463
$
COSTO TOTAL DEL RUBRO 23,620
$
VALOR OFERTADO 23,62
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 26 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 2.21 UNIDAD: ML
DETALLE: CORTE LONGITUDINAL DE PAVIMENTO FLEXIBLE
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA DE ASFALTO 1 20,00 20,00
$ 0,0107 0,214
$
SUBTOTAL M 0,214
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,0107 0,065
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,0107 0,007
$
SUBTOTAL N 0,073
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
DISCO DE CORTE PARA ASFALTO U 0,003 330,0000 0,99
$
SUBTOTAL O 0,990
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 1,277
$
INDIRECTOS % 3% 0,038
$
UTILIDAD % 2% 0,026
$
COSTO TOTAL DEL RUBRO 1,341
$
VALOR OFERTADO 1,34
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 27 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 607-(3)1E UNIDAD: U
DETALLE: SUMIDERO SENCILLO DE HORMIGON SIMPLE (INC. REJILLA Y EXCAV.)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 2,9875 18,224
$
ALBAÑIL 1 3,05
$ 3,05
$ 2,9875 9,112
$
CARPINTERO 1 3,05
$ 3,05
$ 2,9875 9,112
$
MAESTRO 0,2 3,40
$ 0,68
$ 2,9875 2,032
$
SUBTOTAL N 38,479
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=210KG/CM2 M3 0,35 97,0000 33,95
$
ENCOFRADO U 1 5,0000 5,00
$
REJILLA/SUMIDERO D=1" U 1 40,0000 40,00
$
SUBTOTAL O 78,950
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 117,429
$
INDIRECTOS % 3% 3,523
$
UTILIDAD % 2% 2,419
$
COSTO TOTAL DEL RUBRO 123,371
$
VALOR OFERTADO 123,37
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 28 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 301-2(24)I UNIDAD: U
DETALLE: LIMPIEZA DE CAJAS DOMICILIARIAS
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,6865 6,281
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,6865 0,467
$
SUBTOTAL N 6,748
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 6,748
$
INDIRECTOS % 3% 0,202
$
UTILIDAD % 2% 0,139
$
COSTO TOTAL DEL RUBRO 7,090
$
VALOR OFERTADO 7,09
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 29 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 608-(2)10E UNIDAD: ML
DETALLE: SUMINISTRO E INSTALACION DE TUBERÍA DE H.S. D=10"
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,1131 0,283
$
RETROEXCAVADORA 1 25,00 25,00
$ 0,1131 2,828
$
SUBTOTAL M 3,110
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,1131 1,035
$
MAESTRO 1 3,40
$ 3,40
$ 0,1131 0,385
$
OP. RETROEXCAVADORA 1 3,40
$ 3,40
$ 0,1131 0,385
$
TOPOGRAFO 0,1 3,40
$ 0,34
$ 0,1131 0,038
$
SUBTOTAL N 1,842
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUB. DE HS D=10" ML 1 18,0000 18,00
$
JUNTA DE NEOPRENO D=10" U 1 3,0000 3,00
$
MATERIAL DE MEJORAMIENTO M3 0,9 2,5000 2,25
$
SUBTOTAL O 23,250
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 0,95 4,0000 3,80
$
TRANSPORTE DE TUBERIA ML 1 1,3000 1,30
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,9 4,0000 3,60
$
SUBTOTAL P 8,70
$
TOTAL COSTO DIRECTO ( M+N+O+P) 36,903
$
INDIRECTOS % 3% 1,107
$
UTILIDAD % 2% 0,760
$
COSTO TOTAL DEL RUBRO 38,770
$
VALOR OFERTADO 38,77
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 30 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 706-(2)1 UNIDAD: U
DETALLE: REUBICACION DE POSTE/H.A. DE ALUMBRADO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
GRUA DE SERVICIO 1 50,00 50,00
$ 0,9118 45,590
$
SUBTOTAL M 45,590
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,9118 5,562
$
ELECTRICISTA 1 3,05
$ 3,05
$ 0,9118 2,781
$
OP. GRUA 1 3,40
$ 3,40
$ 0,9118 3,100
$
SUBTOTAL N 11,443
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=180KG/CM2 M3 0,15 88,0000 13,20
$
SUBTOTAL O 13,200
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 70,233
$
INDIRECTOS % 3% 2,107
$
UTILIDAD % 2% 1,447
$
COSTO TOTAL DEL RUBRO 73,787
$
VALOR OFERTADO 73,79
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 31 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 608-(2)16E UNIDAD: ML
DETALLE: SUMINISTRO E INSTALACION DE TUBERIA DE H.S. D= 16"
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
BOMBA DE AGUA 3" 1 2,50 2,50
$ 0,1896 0,474
$
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,1896 0,474
$
RETROEXCAVADORA 1 25,00 25,00
$ 0,1896 4,740
$
SUBTOTAL M 5,688
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,1896 1,735
$
TUBERO 1 3,05
$ 3,05
$ 0,1896 0,578
$
MAESTRO 1 3,40
$ 3,40
$ 0,1896 0,645
$
OP. RETROEXCAVADORA 1 3,40
$ 3,40
$ 0,1896 0,645
$
TOPOGRAFO 0,2 3,40
$ 0,68
$ 0,1896 0,129
$
SUBTOTAL N 3,731
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUB. DE H.S. D=16" (400 MM.) ML 1 40,0000 40,00
$
JUNTA DE NEOPRENO D=16" U 1 6,0000 6,00
$
MATERIAL DE MEJORAMIENTO M3 1,8 2,5000 4,50
$
SUBTOTAL O 50,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 2,1 4,0000 8,40
$
TRANSPORTE DE TUBERIA ML 1 2,2000 2,20
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,8 4,0000 7,20
$
SUBTOTAL P 17,80
$
TOTAL COSTO DIRECTO ( M+N+O+P) 77,719
$
INDIRECTOS % 3% 2,332
$
UTILIDAD % 2% 1,601
$
COSTO TOTAL DEL RUBRO 81,652
$
VALOR OFERTADO 81,65
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 32 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 601(1A)20E UNIDAD: ML
DETALLE: SUMINISTRO E INSTALACION DE TUBERIA DE H.A. D= 20"
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
BOMBA DE AGUA 3" 1 2,50 2,50
$ 0,2750 0,688
$
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,2750 0,688
$
RETROEXCAVADORA 1 25,00 25,00
$ 0,2750 6,875
$
SUBTOTAL M 8,250
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,2750 2,516
$
TUBERO 1 3,05
$ 3,05
$ 0,2750 0,839
$
MAESTRO 1 3,40
$ 3,40
$ 0,2750 0,935
$
OP. RETROEXCAVADORA 1 3,40
$ 3,40
$ 0,2750 0,935
$
TOPOGRAFO 0,2 3,40
$ 0,68
$ 0,2750 0,187
$
SUBTOTAL N 5,412
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUB. DE H.A. D=20" (500 MM.) ML 1 95,0000 95,00
$
JUNTA DE NEOPRENO D=20" U 1 11,0000 11,00
$
MATERIAL DE MEJORAMIENTO M3 2 2,5000 5,00
$
SUBTOTAL O 111,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 2,3 4,0000 9,20
$
TRANSPORTE DE TUBERIA ML 1 4,0000 4,00
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 2 4,0000 8,00
$
SUBTOTAL P 21,20
$
TOTAL COSTO DIRECTO ( M+N+O+P) 145,862
$
INDIRECTOS % 3% 4,376
$
UTILIDAD % 2% 3,005
$
COSTO TOTAL DEL RUBRO 153,243
$
VALOR OFERTADO 153,24
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 33 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 601(1A)24E UNIDAD: ML
DETALLE: SUMINISTRO E INSTALACION DE TUBERIA DE H.A. D= 24"
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
BOMBA DE AGUA 3" 1 2,50 2,50
$ 0,3602 0,901
$
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,3602 0,901
$
RETROEXCAVADORA 1 25,00 25,00
$ 0,3602 9,005
$
SUBTOTAL M 10,806
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,3602 3,296
$
TUBERO 1 3,05
$ 3,05
$ 0,3602 1,099
$
MAESTRO 1 3,40
$ 3,40
$ 0,3602 1,225
$
OP. EXCAVADORA 1 3,40
$ 3,40
$ 0,3602 1,225
$
TOPOGRAFO 0,2 3,40
$ 0,68
$ 0,3602 0,245
$
SUBTOTAL N 7,089
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUB. DE H.A. D=24" (600 MM.) ML 1 122,0000 122,00
$
JUNTA DE NEOPRENO D=24" U 1 10,5000 10,50
$
MATERIAL DE MEJORAMIENTO M3 2,2 2,5000 5,50
$
SUBTOTAL O 138,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 2,6 4,0000 10,40
$
TRANSPORTE DE TUBERIA ML 1 4,5000 4,50
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 2,2 4,0000 8,80
$
SUBTOTAL P 23,70
$
TOTAL COSTO DIRECTO ( M+N+O+P) 179,595
$
INDIRECTOS % 3% 5,388
$
UTILIDAD % 2% 3,700
$
COSTO TOTAL DEL RUBRO 188,682
$
VALOR OFERTADO 188,68
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 34 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 5.34 UNIDAD: ML
DETALLE: SUMIN. E INSTAL. TUB. PVC 63 MM. CON UNIÓN SELLADO ELASTOMERICO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,0087 0,022
$
RETROEXCAVADORA 0,5 25,00 12,50
$ 0,0087 0,109
$
SUBTOTAL M 0,131
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 4 3,05
$ 12,20
$ 0,0087 0,106
$
GASFITERO 1 3,05
$ 3,05
$ 0,0087 0,027
$
OP. RETROEXCAVADORA 0,5 3,40
$ 1,70
$ 0,0087 0,015
$
SUBTOTAL N 0,147
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUBO PVC UNIÓN Z D=63MM 0.8MPA M 1 5,0000 5,00
$
KALIPEGA Y ACCESORIOS M 1 0,4500 0,45
$
MATERIAL DE MEJORAMIENTO M3 0,3 2,5000 0,75
$
ARENA M3 0,16 12,0000 1,92
$
SUBTOTAL O 8,120
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 0,45 4,0000 1,80
$
TRANSPORTE DE TUBERIA M 1 0,0800 0,08
$
TRANSPORTE DE ARENA M3 0,16 4,0000 0,64
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,3 4,0000 1,20
$
SUBTOTAL P 3,72
$
TOTAL COSTO DIRECTO ( M+N+O+P) 12,118
$
INDIRECTOS % 3% 0,364
$
UTILIDAD % 2% 0,250
$
COSTO TOTAL DEL RUBRO 12,731
$
VALOR OFERTADO 12,73
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 35 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 5.35 UNIDAD: ML
DETALLE: SUMIN. E INSTAL. TUB. PVC 90 MM. CON UNIÓN SELLADO ELASTOMERICO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,0100 0,025
$
RETROEXCAVADORA 0,5 25,00 12,50
$ 0,0100 0,125
$
SUBTOTAL M 0,150
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 4 3,05
$ 12,20
$ 0,0100 0,122
$
GASFITERO 1 3,05
$ 3,05
$ 0,0100 0,031
$
OP. RETROEXCAVADORA 0,5 3,40
$ 1,70
$ 0,0100 0,017
$
SUBTOTAL N 0,170
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUBO PVC UNIÓN Z D=90MM 0.8MPA M 1 7,9300 7,93
$
KALIPEGA Y ACCESORIOS M 1 0,5000 0,50
$
MATERIAL DE MEJORAMIENTO M3 0,2 2,5000 0,50
$
ARENA M3 0,16 12,0000 1,92
$
SUBTOTAL O 10,850
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 0,45 4,0000 1,80
$
TRANSPORTE DE TUBERIA M 1 0,0800 0,08
$
TRANSPORTE DE ARENA M3 0,16 4,0000 0,64
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,2 4,0000 0,80
$
SUBTOTAL P 3,32
$
TOTAL COSTO DIRECTO ( M+N+O+P) 14,490
$
INDIRECTOS % 3% 0,435
$
UTILIDAD % 2% 0,298
$
COSTO TOTAL DEL RUBRO 15,223
$
VALOR OFERTADO 15,22
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 36 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 609-(8)3E UNIDAD: U
DETALLE: ELEVACION DE CAJA DOMICILIARIA TIPO CIRCULAR
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA AUTOP. DISCO/DIAMANTE 0,2 6,00 1,20
$ 1,0054 1,206
$
SUBTOTAL M 1,206
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 1,0054 6,133
$
ALBAÑIL 1 3,05
$ 3,05
$ 1,0054 3,066
$
CARPINTERO 1 3,05
$ 3,05
$ 1,0054 3,066
$
MAESTRO 0,2 3,40
$ 0,68
$ 1,0054 0,684
$
SUBTOTAL N 12,950
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,08 105,0000 8,40
$
ELEMENTOS DE FIJACION U 1 3,6000 3,60
$
SUBTOTAL O 12,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 26,156
$
INDIRECTOS % 3% 0,785
$
UTILIDAD % 2% 0,539
$
COSTO TOTAL DEL RUBRO 27,480
$
VALOR OFERTADO 27,48
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 37 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 609-(8)4E UNIDAD: U
DETALLE: BAJADA DE CAJA DOMICILIARIA TIPO CIRCULAR
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA AUTOP. DISCO/DIAMANTE 0,2 6,00 1,20
$ 0,5470 0,656
$
SUBTOTAL M 0,656
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,5470 3,337
$
ALBAÑIL 1 3,05
$ 3,05
$ 0,5470 1,668
$
CARPINTERO 1 3,05
$ 3,05
$ 0,5470 1,668
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,5470 0,372
$
SUBTOTAL N 7,045
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,08 105,0000 8,40
$
ELEMENTOS DE FIJACION U 1 2,0000 2,00
$
SUBTOTAL O 10,400
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 18,102
$
INDIRECTOS % 3% 0,543
$
UTILIDAD % 2% 0,373
$
COSTO TOTAL DEL RUBRO 19,018
$
VALOR OFERTADO 19,02
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 38 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.35A UNIDAD: U
DETALLE: LETRERO DE OBRA
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 1,0000 6,100
$
MAESTRO 1 3,40
$ 3,40
$ 1,0000 3,400
$
SOLDADOR 1 3,40
$ 3,40
$ 1,0000 3,400
$
SUBTOTAL N 12,900
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
LETRERO DE OBRA U 1 81,6000 81,60
$
ELEMENTOS DE FIJACION U 1 2,0000 2,00
$
SUBTOTAL O 83,600
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 96,500
$
INDIRECTOS % 3% 2,895
$
UTILIDAD % 2% 1,988
$
COSTO TOTAL DEL RUBRO 101,383
$
VALOR OFERTADO 101,38
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 39 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 608-(2)12E UNIDAD: ML
DETALLE: SUMINISTRO E INSTALACION DE TUBERÍA DE H.S. D=12"
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,1600 0,400
$
RETROEXCAVADORA 1 25,00 25,00
$ 0,1600 4,000
$
SUBTOTAL M 4,400
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,1600 1,464
$
MAESTRO 1 3,40
$ 3,40
$ 0,1600 0,544
$
OP. RETROEXCAVADORA 1 3,40
$ 3,40
$ 0,1600 0,544
$
TOPOGRAFO 0,1 3,40
$ 0,34
$ 0,1600 0,054
$
SUBTOTAL N 2,606
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TUB. DE HS D=12" ML 1 39,8900 39,89
$
JUNTA DE NEOPRENO D=12" U 1 3,6000 3,60
$
MATERIAL DE MEJORAMIENTO M3 0,1 2,5000 0,25
$
SUBTOTAL O 43,740
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
DESALOJO DE MATERIAL M3 0,2 4,0000 0,80
$
TRANSPORTE DE TUBERIA ML 1 1,3000 1,30
$
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,1 4,0000 0,40
$
SUBTOTAL P 2,50
$
TOTAL COSTO DIRECTO ( M+N+O+P) 53,246
$
INDIRECTOS % 3% 1,597
$
UTILIDAD % 2% 1,097
$
COSTO TOTAL DEL RUBRO 55,941
$
VALOR OFERTADO 55,94
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 40 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 301-2(1)1 UNIDAD: U
DETALLE: REUBICACION DE ARBOL (MEDIANO)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RETROEXCAVADORA 0,3 25,00 7,50
$ 0,8056 6,042
$
MOTOSIERRA 1 2,50 2,50
$ 0,8056 2,014
$
SUBTOTAL M 8,056
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 3 3,05
$ 9,15
$ 0,8056 7,371
$
JARDINERO 1 3,05
$ 3,05
$ 0,8056 2,457
$
OP. RETROEXCAVADORA 0,3 3,40
$ 1,02
$ 0,8056 0,822
$
SUBTOTAL N 10,650
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
ELEMENTOS DE FIJACION U 1 5,0000 5,00
$
SUBTOTAL O 5,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE ARBOL U 1 10,0000 10,00
$
SUBTOTAL P 10,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 33,706
$
INDIRECTOS % 3% 1,011
$
UTILIDAD % 2% 0,694
$
COSTO TOTAL DEL RUBRO 35,412
$
VALOR OFERTADO 35,41
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 41 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 405-8(1)E UNIDAD: M3
DETALLE: PAVIMENTO HORM.CEM.POR.MOD.ROT.FLEX.4.0MPA/28D.CL-C (RELL.JUN
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA DE HORMIGON 0,25 20,00 5,00
$ 0,3799 1,900
$
VIBRADOR DE MANGUERA 1 2,50 2,50
$ 0,3799 0,950
$
SUBTOTAL M 2,849
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 5 3,05
$ 15,25
$ 0,3799 5,793
$
ALBAÑIL 4 3,05
$ 12,20
$ 0,3799 4,635
$
MAESTRO 1 3,40
$ 3,40
$ 0,3799 1,292
$
SUBTOTAL N 11,720
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
ENCOFRADO ML 0,70 5,0000 3,50
$
CURADOR GLN 0,20 6,6000 1,32
$
HORMIGON PREMEZCLADO MOD.ROT.FLEX 4,0MPA M3 1,02 123,3100 125,78
$
AP-3 GLN 0,05 1,5000 0,08
$
SUBTOTAL O 130,671
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 145,240
$
INDIRECTOS % 3% 4,357
$
UTILIDAD % 2% 2,992
$
COSTO TOTAL DEL RUBRO 152,590
$
VALOR OFERTADO 152,59
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 42 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 307-2(1)1I UNIDAD: M3
DETALLE: EXCAVACION Y RELLENO PARA ESTRUCTURAS MANUAL
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
RETROEXCAVADORA 1 25,00 25,00
$ 0,0103 0,258
$
COMPACTADOR MANUAL 1 2,50 2,50
$ 0,0103 0,026
$
BOMBA DE AGUA 3" 1 2,50 2,50
$ 0,0103 0,026
$
SUBTOTAL M 0,309
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 4 3,05
$ 12,20
$ 0,0103 0,126
$
MAESTRO 0,4 3,40
$ 1,36
$ 0,0103 0,014
$
OP. RETROEXCAVADORA 1 3,40
$ 3,40
$ 0,0103 0,035
$
SUBTOTAL N 0,175
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
MATERIAL DE MEJORAMIENTO M3 1,2 2,5000 3,00
$
TABLAESTACA M2 1 1,0000 1,00
$
SUBTOTAL O 4,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,2 4,0000 4,80
$
SUBTOTAL P 4,80
$
TOTAL COSTO DIRECTO ( M+N+O+P) 9,284
$
INDIRECTOS % 3% 0,279
$
UTILIDAD % 2% 0,191
$
COSTO TOTAL DEL RUBRO 9,753
$
VALOR OFERTADO 9,75
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 43 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 220(3) UNIDAD: U
DETALLE: VOLANTES INFORMATIVAS
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,0090 0,027
$
SUBTOTAL N 0,027
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
VOLANTES INFORMATIVAS U 1 0,0500 0,05
$
SUBTOTAL O 0,050
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 0,077
$
INDIRECTOS % 3% 0,002
$
UTILIDAD % 2% 0,002
$
COSTO TOTAL DEL RUBRO 0,081
$
VALOR OFERTADO 0,08
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 44 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 220(4) UNIDAD: U
DETALLE: REUNION CON LA COMUNIDAD
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 3,9461 24,071
$
CAPACITADOR 1 3,40
$ 3,40
$ 3,9461 13,417
$
SUBTOTAL N 37,488
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HOJAS, MARCADORES, BORRADORES GLB 1 8,0000 8,00
$
SUBTOTAL O 8,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 45,488
$
INDIRECTOS % 3% 1,365
$
UTILIDAD % 2% 0,937
$
COSTO TOTAL DEL RUBRO 47,790
$
VALOR OFERTADO 47,79
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 45 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 205-(1) UNIDAD: M3
DETALLE: AGUA PARA CONTROL DE POLVO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
TANQUERO 1 25,00 25,00
$ 0,0116 0,290
$
SUBTOTAL M 0,290
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,0116 0,035
$
CHOFER 1 4,40
$ 4,40
$ 0,0116 0,051
$
SUBTOTAL N 0,086
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
AGUA M3 1,1 3,0000 3,30
$
SUBTOTAL O 3,300
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 3,676
$
INDIRECTOS % 3% 0,110
$
UTILIDAD % 2% 0,076
$
COSTO TOTAL DEL RUBRO 3,862
$
VALOR OFERTADO 3,86
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 46 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.4B UNIDAD: U/MES
DETALLE: ALQUILER DE BATERIA SANITARIA/SERVICIO PUBLICO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
SUBTOTAL N -
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
BATERIA SANITARIA U/MES 1 117,7500 117,75
$
SUBTOTAL O 117,750
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 117,750
$
INDIRECTOS % 3% 3,533
$
UTILIDAD % 2% 2,426
$
COSTO TOTAL DEL RUBRO 123,708
$
VALOR OFERTADO 123,71
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 47 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 217(1) UNIDAD: ESTAC
DETALLE: CONTROL Y MONITOREO DE RUIDO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SONOMETRO DIGITAL 1 40,00 40,00
$ 0,6022 24,088
$
SUBTOTAL M 24,088
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,6022 3,673
$
TECNICO AMBIENTAL 1 3,40
$ 3,40
$ 0,6022 2,047
$
SUBTOTAL N 5,721
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL GLB 1 9,0000 9,00
$
SUBTOTAL P 9,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 38,809
$
INDIRECTOS % 3% 1,164
$
UTILIDAD % 2% 0,799
$
COSTO TOTAL DEL RUBRO 40,773
$
VALOR OFERTADO 40,77
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 48 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 205(2) UNIDAD: ESTAC
DETALLE: CONTROL Y MONITOREO DE MATERIAL PARTICULADO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
MEDIDOR DE PARTICULAS 1 85,00 85,00
$ 1,3416 114,036
$
SUBTOTAL M 114,036
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 1,3416 8,184
$
TECNICO AMBIENTAL 1 3,40
$ 3,40
$ 1,3416 4,561
$
SUBTOTAL N 12,745
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SUBTOTAL O -
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
TRANSPORTE DE MATERIAL GLB 1 80,0000 80,00
$
SUBTOTAL P 80,00
$
TOTAL COSTO DIRECTO ( M+N+O+P) 206,781
$
INDIRECTOS % 3% 6,203
$
UTILIDAD % 2% 4,260
$
COSTO TOTAL DEL RUBRO 217,244
$
VALOR OFERTADO 217,24
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 49 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.42 UNIDAD: U
DETALLE: TANQUES METALICOS DE 55 GALONES
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 1,4910 4,548
$
SUBTOTAL N 4,548
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TANQUE METALICO DE 55 GALONES U 1 10,0000 10,000
$
ESMALTE VARIOS COLORES GLN 0,1 15,0000 1,500
$
SUBTOTAL O 11,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 16,048
$
INDIRECTOS % 3% 0,481
$
UTILIDAD % 2% 0,331
$
COSTO TOTAL DEL RUBRO 16,860
$
VALOR OFERTADO 16,86
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 50 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.36 UNIDAD: U
DETALLE: PASO DE MADERA PROVISIONAL PARA PEATONES
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CIZALLA 1 0,80 0,80
$ 3,3430 2,674
$
SUBTOTAL M 2,674
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 3,3430 20,392
$
CARPINTERO 1 3,05
$ 3,05
$ 3,3430 10,196
$
MAESTRO 0,2 3,40
$ 0,68
$ 3,3430 2,273
$
SUBTOTAL N 32,862
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
ELEMENTOS DE FIJACION ML 1 20,0000 20,000
$
TABLON DE CHANUL (20 CM. X 1") ML 20 3,5000 70,000
$
CUARTON DE CHANUL 3" X 4" ML 30 4,5000 135,000
$
CUARTON DE CHANUL 3" X 6" ML 10 8,5000 85,000
$
CUARTON DE CHANUL 4" X 4" ML 8 10,5000 84,000
$
SUBTOTAL O 394,000
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 429,536
$
INDIRECTOS % 3% 12,886
$
UTILIDAD % 2% 8,848
$
COSTO TOTAL DEL RUBRO 451,271
$
VALOR OFERTADO 451,27
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 51 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.39 UNIDAD: U
DETALLE: PROTECCION PARA TRABAJADOR
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
SUBTOTAL N -
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
CASCOS U 1 3,0000 3,00
$
BOTAS DE CAUCHO PAR 1 16,5100 16,51
$
GUANTES DE CUERO PAR 1 4,0000 4,00
$
TAPON AURICULAR U 1 0,5000 0,50
$
MASCARILLA DESCARTABLE U 1 0,2500 0,25
$
CHALECO REFLECTIVO U 1 4,0000 4,00
$
SUBTOTAL O 28,260
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 28,260
$
INDIRECTOS % 3% 0,848
$
UTILIDAD % 2% 0,582
$
COSTO TOTAL DEL RUBRO 29,690
$
VALOR OFERTADO 29,69
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 52 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)2 UNIDAD: ML
DETALLE: CINTAS PLASTICAS DE SEGURIDAD (COLOR REFLECTIVO)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,0100 0,031
$
MAESTRO 1 3,40
$ 3,40
$ 0,0100 0,034
$
SUBTOTAL N 0,065
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
CINTA REFLECTIVA M 1,05 0,1200 0,13
$
SUBTOTAL O 0,126
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 0,191
$
INDIRECTOS % 3% 0,006
$
UTILIDAD % 2% 0,004
$
COSTO TOTAL DEL RUBRO 0,200
$
VALOR OFERTADO 0,20
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 53 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)1 UNIDAD: ML
DETALLE: SEÑALES LUMINOSAS DE PREVENCION
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
ELECTRICISTA 1 3,05
$ 3,05
$ 0,8015 2,445
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,8015 0,545
$
SUBTOTAL N 2,990
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
SEÑALES LUMINOSAS DE PREVENCION ML 1 6,5000 6,50
$
SUBTOTAL O 6,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 9,490
$
INDIRECTOS % 3% 0,285
$
UTILIDAD % 2% 0,195
$
COSTO TOTAL DEL RUBRO 9,970
$
VALOR OFERTADO 9,97
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 54 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.40 UNIDAD: U
DETALLE: CONO DE SEGURIDAD
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,2150 0,656
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,2150 0,146
$
SUBTOTAL N 0,802
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
CONOS DEMARCADORES H=50CM U 1 20,5000 20,50
$
SUBTOTAL O 20,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 21,302
$
INDIRECTOS % 3% 0,639
$
UTILIDAD % 2% 0,439
$
COSTO TOTAL DEL RUBRO 22,380
$
VALOR OFERTADO 22,38
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 55 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)3 UNIDAD: U
DETALLE: PARANTE DE MADERA CON DADO DE H.S.
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,0886 0,540
$
ALBAÑIL 1 3,05
$ 3,05
$ 0,0886 0,270
$
MAESTRO 0,3 3,40
$ 1,02
$ 0,0886 0,090
$
SUBTOTAL N 0,901
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=180KG/CM2 M3 0,04 88,0000 3,52
$
CAÑA ROLLIZA U 0,5 3,5000 1,75
$
ENCOFRADO U 1 0,2000 0,20
$
LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,05 50,0000 2,50
$
SUBTOTAL O 7,970
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 8,871
$
INDIRECTOS % 3% 0,266
$
UTILIDAD % 2% 0,183
$
COSTO TOTAL DEL RUBRO 9,320
$
VALOR OFERTADO 9,32
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 56 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.42A UNIDAD: U
DETALLE: TANQUES METALICOS DE 55 GALONES CON CINTA REFLECTIVA
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,5085 1,551
$
SUBTOTAL N 1,551
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
TANQUE METALICO DE 55 GALONES U 1 10,0000 10,000
$
ESMALTE VARIOS COLORES GLN 0,1 15,0000 1,500
$
LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,3 50,0000 15,00
$
SUBTOTAL O 26,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 28,051
$
INDIRECTOS % 3% 0,842
$
UTILIDAD % 2% 0,578
$
COSTO TOTAL DEL RUBRO 29,470
$
VALOR OFERTADO 29,47
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 57 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 708-5(1)18 UNIDAD: U
DETALLE: SUMINT. E INSTAL. ELEMENTOS/ SUJECION O FIJACION DE LETRERO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,2033 1,240
$
MAESTRO 1 3,40
$ 3,40
$ 0,2033 0,691
$
SUBTOTAL N 1,931
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
ELEMENTO DE SUJECION O FIJACION U 1 10,5000 10,500
$
SUBTOTAL O 10,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 12,431
$
INDIRECTOS % 3% 0,373
$
UTILIDAD % 2% 0,256
$
COSTO TOTAL DEL RUBRO 13,060
$
VALOR OFERTADO 13,06
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 58 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)4 UNIDAD: M2
DETALLE: CONSTRUCCION E INSTALAC./LETRERO- METAL. REFELECTIV/SEÑAL. SEGUR
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA-DOBLADORA 0,5 1,00 0,50
$ 1,3039 0,652
$
SUBTOTAL M 0,652
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 1,3039 3,977
$
MAESTRO 0,2 3,40
$ 0,68
$ 1,3039 0,887
$
SOLDADOR 1 3,40
$ 3,40
$ 1,3039 4,433
$
SUBTOTAL N 9,297
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
ANTICORROSIVO CROMATO 5 (CO) GLN 0,05 15,0000 0,75
$
ESMALTE VARIOS COLORES GLN 0,05 15,0000 0,75
$
ELEMENTOS DE FIJACION M2 1 15,0000 15,00
$
PLANCHA 1/16" M2 1,02 25,0000 25,50
$
LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,25 50,0000 12,50
$
SUBTOTAL O 54,500
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 64,449
$
INDIRECTOS % 3% 1,933
$
UTILIDAD % 2% 1,328
$
COSTO TOTAL DEL RUBRO 67,710
$
VALOR OFERTADO 67,71
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 59 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)5 UNIDAD: ML
DETALLE: SUMINISTRO E INSTAL/TUBO RECTANGUL.DADO H.S/SEÑAL/SEGUR. PREV
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
CORTADORA-DOBLADORA 0,2 1,00 0,20
$ 0,1529 0,031
$
SUBTOTAL M 0,031
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 1 3,05
$ 3,05
$ 0,1529 0,466
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,1529 0,104
$
SOLDADOR 1 3,40
$ 3,40
$ 0,1529 0,520
$
SUBTOTAL N 1,090
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
HORMIGON PREMEZCLADO F'C=180KG/CM2 M3 0,005 88,0000 0,44
$
ESMALTE VARIOS COLORES GLN 0,01 15,0000 0,15
$
ANTICORROSIVO CROMATO 5 (CO) GLN 0,01 14,0000 0,14
$
ELEMENTOS DE FIJACION ML 1 1,0000 1,00
$
TUBO RECTANGULAR 40X60X2MM ML 1 8,0000 8,00
$
SUBTOTAL O 9,730
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 10,851
$
INDIRECTOS % 3% 0,326
$
UTILIDAD % 2% 0,224
$
COSTO TOTAL DEL RUBRO 11,400
$
VALOR OFERTADO 11,40
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 60 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)7 UNIDAD: U
DETALLE: BARRICADA DE MADERA (2,40 X 1,50)M. C/3 TABL. C/CINTA REFLECT
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 1,0993 6,706
$
CARPINTERO 2 3,05
$ 6,10
$ 1,0993 6,706
$
MAESTRO 0,2 3,40
$ 0,68
$ 1,0993 0,748
$
SUBTOTAL N 14,159
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
PLYWOOD CORRIENTE 4X8X12 C U 0,5 35,0000 17,50
$
CUARTONES DE ENCOFRADO U 1,35 3,5000 4,73
$
ESMALTE VARIOS COLORES GLN 0,12 15,0000 1,80
$
ELEMENTOS DE FIJACION U 1 1,2000 1,20
$
LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,8 50,0000 40,00
$
SUBTOTAL O 65,225
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 79,384
$
INDIRECTOS % 3% 2,382
$
UTILIDAD % 2% 1,635
$
COSTO TOTAL DEL RUBRO 83,401
$
VALOR OFERTADO 83,40
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 61 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)7E UNIDAD: U
DETALLE: BARRICADA DE MADERA (1,20 X 1,50)M. C/3 TABL. C/CINTA REFLECT
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,7046 4,298
$
CARPINTERO 2 3,05
$ 6,10
$ 0,7046 4,298
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,7046 0,479
$
SUBTOTAL N 9,075
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
PLYWOOD CORRIENTE 4X8X12 C U 0,35 35,0000 12,25
$
CUARTONES DE ENCOFRADO U 1,2 3,5000 4,20
$
ESMALTE VARIOS COLORES GLN 0,12 15,0000 1,80
$
ELEMENTOS DE FIJACION U 1 1,2000 1,20
$
LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,4 50,0000 20,00
$
SUBTOTAL O 39,450
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 48,525
$
INDIRECTOS % 3% 1,456
$
UTILIDAD % 2% 1,000
$
COSTO TOTAL DEL RUBRO 50,981
$
VALOR OFERTADO 50,98
$
ESTE PRECIO NO INCLUYE IVA
FORMULARIO No. 4
Hoja 62 de 62
1.5 ANALISIS DE PRECIOS UNITARIOS
RUBRO: 710-(1)7E1 UNIDAD: U
DETALLE: BARRICADA DE MADERA (0,60 X 1,10)M. C/2 TABL. C/CINTA REFLECT
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
SUBTOTAL M -
$
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
PEON 2 3,05
$ 6,10
$ 0,5016 3,060
$
CARPINTERO 2 3,05
$ 6,10
$ 0,5016 3,060
$
MAESTRO 0,2 3,40
$ 0,68
$ 0,5016 0,341
$
SUBTOTAL N 6,461
$
MATERIALES
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
PLYWOOD CORRIENTE 4X8X12 C U 0,25 35,0000 8,75
$
CUARTONES DE ENCOFRADO U 1,1 3,5000 3,85
$
ESMALTE VARIOS COLORES GLN 0,12 15,0000 1,80
$
ELEMENTOS DE FIJACION U 1 1,2000 1,20
$
LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,1 50,0000 5,00
$
SUBTOTAL O 20,600
$
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
SUBTOTAL P -
$
TOTAL COSTO DIRECTO ( M+N+O+P) 27,061
$
INDIRECTOS % 3% 0,812
$
UTILIDAD % 2% 0,557
$
COSTO TOTAL DEL RUBRO 28,430
$
VALOR OFERTADO 28,43
$
ESTE PRECIO NO INCLUYE IVA

Mais conteúdo relacionado

Destaque

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Destaque (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

8046312.pdf

  • 1. FORMULARIO No. 4 Hoja 1 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 303-2(1)I UNIDAD: M3 DETALLE: EXCAVACION SIN CLASIFICACION EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO EXCAVADORA 1 40,00 40,00 $ 0,0129 0,516 $ SUBTOTAL M 0,516 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,0129 0,079 $ OP. EXCAVADORA 1 3,40 $ 3,40 $ 0,0129 0,044 $ SUBTOTAL N 0,123 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 0,639 $ INDIRECTOS % 3% 0,019 $ UTILIDAD % 2% 0,013 $ COSTO TOTAL DEL RUBRO 0,671 $ VALOR OFERTADO 0,67 $ ESTE PRECIO NO INCLUYE IVA
  • 2. FORMULARIO No. 4 Hoja 2 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 303-2(1)I1 UNIDAD: M3 DETALLE: EXCAVACION SIN CLASIFICACION MANUAL EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 4 3,05 $ 12,20 $ 0,2320 2,830 $ MAESTRO 1 3,40 $ 3,40 $ 0,2320 0,789 $ SUBTOTAL N 3,619 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 3,619 $ INDIRECTOS % 3% 0,109 $ UTILIDAD % 2% 0,075 $ COSTO TOTAL DEL RUBRO 3,802 $ VALOR OFERTADO 3,80 $ ESTE PRECIO NO INCLUYE IVA
  • 3. FORMULARIO No. 4 Hoja 3 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 309-(1)E UNIDAD: M3/KM DETALLE: DESALOJO DE MATERIAL EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CARGADORA 0,2 45,00 9,00 $ 0,0047 0,042 $ VOLQUETA 1 25,00 25,00 $ 0,0047 0,118 $ SUBTOTAL M 0,160 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,0047 0,029 $ OP. CARGADORA 0,2 3,40 $ 0,68 $ 0,0047 0,003 $ CHOFER II 1 4,40 $ 4,40 $ 0,0047 0,021 $ SUBTOTAL N 0,053 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 0,212 $ INDIRECTOS % 3% 0,006 $ UTILIDAD % 2% 0,004 $ COSTO TOTAL DEL RUBRO 0,223 $ VALOR OFERTADO 0,22 $ ESTE PRECIO NO INCLUYE IVA
  • 4. FORMULARIO No. 4 Hoja 4 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 304-1(2)E UNIDAD: M3 DETALLE: MATERIAL DE PRESTAMO IMPORTADO (INC. TRANSPORTE) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,0116 0,348 $ TANQUERO 1 25,00 25,00 $ 0,0116 0,290 $ MOTONIVELADORA 1 40,00 40,00 $ 0,0116 0,464 $ SUBTOTAL M 1,102 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,0116 0,035 $ OP. RODILLO 1 3,40 $ 3,40 $ 0,0116 0,039 $ OP. MOTONIVELADORA 1 3,40 $ 3,40 $ 0,0116 0,039 $ CHOFER 1 4,40 $ 4,40 $ 0,0116 0,051 $ SUBTOTAL N 0,165 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO MATERIAL DE MEJORAMIENTO M3 1,3 2,5000 3,25 $ SUBTOTAL O 3,250 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,3 4,0000 5,20 $ SUBTOTAL P 5,20 $ TOTAL COSTO DIRECTO ( M+N+O+P) 9,717 $ INDIRECTOS % 3% 0,292 $ UTILIDAD % 2% 0,200 $ COSTO TOTAL DEL RUBRO 10,209 $ VALOR OFERTADO 10,21 $ ESTE PRECIO NO INCLUYE IVA
  • 5. FORMULARIO No. 4 Hoja 5 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 304-1(2)E1 UNIDAD: M3 DETALLE: MATERIAL DE PRESTAMO IMPORTADO MANUAL (INC. TRANSPORTE) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 0,1673 0,418 $ SUBTOTAL M 0,418 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 4 3,05 $ 12,20 $ 0,1673 2,041 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1673 0,114 $ SUBTOTAL N 2,155 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO MATERIAL DE MEJORAMIENTO M3 1,3 2,5000 3,25 $ SUBTOTAL O 3,250 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,3 4,0000 5,20 $ SUBTOTAL P 5,20 $ TOTAL COSTO DIRECTO ( M+N+O+P) 11,023 $ INDIRECTOS % 3% 0,331 $ UTILIDAD % 2% 0,227 $ COSTO TOTAL DEL RUBRO 11,581 $ VALOR OFERTADO 11,58 $ ESTE PRECIO NO INCLUYE IVA
  • 6. FORMULARIO No. 4 Hoja 6 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 404-1E UNIDAD: M3 DETALLE: BASE CLASE 1 (INC. TRANSPORTE) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,0170 0,510 $ TANQUERO 1 25,00 25,00 $ 0,0170 0,425 $ MOTONIVELADORA 1 40,00 40,00 $ 0,0170 0,680 $ SUBTOTAL M 1,615 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,0170 0,052 $ OP. RODILLO 1 3,40 $ 3,40 $ 0,0170 0,058 $ OP. MOTONIVELADORA 1 3,40 $ 3,40 $ 0,0170 0,058 $ CHOFER 1 4,40 $ 4,40 $ 0,0170 0,075 $ SUBTOTAL N 0,242 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO BASE CLASE 1 M3 1,2 11,5000 13,80 $ SUBTOTAL O 13,800 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE BASE M3 1,2 4,0000 4,80 $ SUBTOTAL P 4,80 $ TOTAL COSTO DIRECTO ( M+N+O+P) 20,457 $ INDIRECTOS % 3% 0,614 $ UTILIDAD % 2% 0,421 $ COSTO TOTAL DEL RUBRO 21,492 $ VALOR OFERTADO 21,49 $ ESTE PRECIO NO INCLUYE IVA
  • 7. FORMULARIO No. 4 Hoja 7 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 405-5B UNIDAD: M2 DETALLE: CAPA/RODADURA/H. ASFALT. MEZC/PLANTA E=5CM (INC. IMPRIM.) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,0028 0,084 $ RODILLO NEUMATICO 1 30,00 30,00 $ 0,0028 0,084 $ ESCOBA MECANICA AUTOPROPULSADA 1 20,00 20,00 $ 0,0028 0,056 $ DISTRIBUIDOR DE ASFALTO 0,3 20,00 6,00 $ 0,0028 0,017 $ FINISHER 1 35,00 35,00 $ 0,0028 0,098 $ SUBTOTAL M 0,339 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 9 3,05 $ 27,45 $ 0,0028 0,077 $ MAESTRO 1 3,40 $ 3,40 $ 0,0028 0,010 $ OP. DISTRIBUIDOR ASFALTO/RODILLO 3 3,40 $ 10,20 $ 0,0028 0,029 $ OP. FINISHER/ESCOBA MECANICA 1,3 3,40 $ 4,42 $ 0,0028 0,012 $ SUBTOTAL N 0,127 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO DIESEL II GLN 0,3 1,0500 0,32 $ ASFALTO RC-2 GLN 0,25 1,7300 0,43 $ MEZCLA ASFALTICA M3 0,065 77,0000 5,01 $ SUBTOTAL O 5,753 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MEZCLA ASFALTICA M3 0,065 10,0000 0,65 $ SUBTOTAL P 0,65 $ TOTAL COSTO DIRECTO ( M+N+O+P) 6,869 $ INDIRECTOS % 3% 0,206 $ UTILIDAD % 2% 0,141 $ COSTO TOTAL DEL RUBRO 7,216 $ VALOR OFERTADO 7,22 $ ESTE PRECIO NO INCLUYE IVA
  • 8. FORMULARIO No. 4 Hoja 8 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 405-5B(I) UNIDAD: M2 DETALLE: CAPA/RODADURA/H. ASFALT. MEZC/PLANTA E=5CM (INC. IMP.)(BACHEO) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,0074 0,222 $ RODILLO NEUMATICO 1 30,00 30,00 $ 0,0074 0,222 $ ESCOBA MECANICA AUTOPROPULSADA 1 20,00 20,00 $ 0,0074 0,148 $ DISTRIBUIDOR DE ASFALTO 0,3 20,00 6,00 $ 0,0074 0,044 $ FINISHER 1 35,00 35,00 $ 0,0074 0,259 $ SUBTOTAL M 0,895 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 9 3,05 $ 27,45 $ 0,0074 0,203 $ MAESTRO 1 3,40 $ 3,40 $ 0,0074 0,025 $ OP. DISTRIBUIDOR ASFALTO/RODILLO 3 3,40 $ 10,20 $ 0,0074 0,075 $ OP. FINISHER/ESCOBA MECANICA 1,3 3,40 $ 4,42 $ 0,0074 0,033 $ SUBTOTAL N 0,336 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO DIESEL II GLN 0,3 1,0500 0,32 $ ASFALTO RC-2 GLN 0,28 1,7300 0,48 $ MEZCLA ASFALTICA M3 0,064 77,0000 4,93 $ SUBTOTAL O 5,727 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MEZCLA ASFALTICA M3 0,064 10,0000 0,64 $ SUBTOTAL P 0,64 $ TOTAL COSTO DIRECTO ( M+N+O+P) 7,599 $ INDIRECTOS % 3% 0,228 $ UTILIDAD % 2% 0,157 $ COSTO TOTAL DEL RUBRO 7,984 $ VALOR OFERTADO 7,98 $ ESTE PRECIO NO INCLUYE IVA
  • 9. FORMULARIO No. 4 Hoja 9 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 402-2(A)I UNIDAD: M2 DETALLE: MEJORAMIENTO/SUB-RASANTE/MAT.SELECC.E=0.75M. (BACHEO) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,0235 0,705 $ TANQUERO 1 25,00 25,00 $ 0,0235 0,588 $ RETROEXCAVADORA 1 25,00 25,00 $ 0,0235 0,588 $ SUBTOTAL M 1,880 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,0235 0,072 $ OP. RODILLO 1 3,40 $ 3,40 $ 0,0235 0,080 $ OP. RETROEXCAVADORA 1 3,40 $ 3,40 $ 0,0235 0,080 $ CHOFER 1 4,40 $ 4,40 $ 0,0235 0,103 $ SUBTOTAL N 0,335 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO MATERIAL DE MEJORAMIENTO M3 1 2,5000 2,50 $ SUBTOTAL O 2,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1 4,0000 4,00 $ SUBTOTAL P 4,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 8,715 $ INDIRECTOS % 3% 0,261 $ UTILIDAD % 2% 0,180 $ COSTO TOTAL DEL RUBRO 9,156 $ VALOR OFERTADO 9,16 $ ESTE PRECIO NO INCLUYE IVA
  • 10. FORMULARIO No. 4 Hoja 10 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 404-1(A)I UNIDAD: M2 DETALLE: BASE CLASE 1 E=0,15M. (BACHEO) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,0104 0,312 $ TANQUERO 1 25,00 25,00 $ 0,0104 0,260 $ MOTONIVELADORA 1 40,00 40,00 $ 0,0104 0,416 $ SUBTOTAL M 0,988 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,0104 0,063 $ OP. RODILLO 1 3,40 $ 3,40 $ 0,0104 0,035 $ OP. MOTONIVELADORA 1 3,40 $ 3,40 $ 0,0104 0,035 $ CHOFER 1 4,40 $ 4,40 $ 0,0104 0,046 $ SUBTOTAL N 0,180 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO BASE CLASE 1 M3 0,18 11,5000 2,07 $ SUBTOTAL O 2,070 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE BASE M3 0,18 4,0000 0,72 $ SUBTOTAL P 0,72 $ TOTAL COSTO DIRECTO ( M+N+O+P) 3,958 $ INDIRECTOS % 3% 0,119 $ UTILIDAD % 2% 0,082 $ COSTO TOTAL DEL RUBRO 4,158 $ VALOR OFERTADO 4,16 $ ESTE PRECIO NO INCLUYE IVA
  • 11. FORMULARIO No. 4 Hoja 11 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 610-(1)1A UNIDAD: ML DETALLE: BORDILLO CUNETA F'C=280 KG/CM2 EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO VIBRADOR DE MANGUERA 1 2,50 2,50 $ 0,1615 0,404 $ SUBTOTAL M 0,404 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,1615 1,478 $ ALBAÑIL 2 3,05 $ 6,10 $ 0,1615 0,985 $ CARPINTERO 1 3,05 $ 3,05 $ 0,1615 0,493 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1615 0,110 $ SUBTOTAL N 3,065 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,170 105,0000 17,85 $ ENCOFRADO ML 1,00 4,8200 4,82 $ CURADOR GLN 0,15 6,6000 0,99 $ SUBTOTAL O 23,660 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 27,129 $ INDIRECTOS % 3% 0,814 $ UTILIDAD % 2% 0,559 $ COSTO TOTAL DEL RUBRO 28,502 $ VALOR OFERTADO 28,50 $ ESTE PRECIO NO INCLUYE IVA
  • 12. FORMULARIO No. 4 Hoja 12 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 3.40B UNIDAD: ML DETALLE: CANALETA DE HORMIG. SIMPLE (40X20)CM. F'C=280 KG/CM2 INC. ENLUC EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,1333 1,220 $ ALBAÑIL 2 3,05 $ 6,10 $ 0,1333 0,813 $ CARPINTERO 1 3,05 $ 3,05 $ 0,1333 0,407 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1333 0,091 $ SUBTOTAL N 2,530 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,090 105,0000 9,45 $ ENCOFRADO ML 1,00 3,5800 3,58 $ CURADOR GLN 0,05 6,6000 0,33 $ SUBTOTAL O 13,360 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 15,890 $ INDIRECTOS % 3% 0,477 $ UTILIDAD % 2% 0,327 $ COSTO TOTAL DEL RUBRO 16,694 $ VALOR OFERTADO 16,69 $ ESTE PRECIO NO INCLUYE IVA
  • 13. FORMULARIO No. 4 Hoja 13 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 2.3 UNIDAD: M2 DETALLE: HORM. SIMPLE F'C=210 KG/CM2 E=10 CM. EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,1500 1,373 $ ALBAÑIL 2 3,05 $ 6,10 $ 0,1500 0,915 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1500 0,102 $ SUBTOTAL N 2,390 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=210KG/CM2 M3 0,105 97,0000 10,19 $ ENCOFRADO M2 1 2,0800 2,08 $ CURADOR GLN 0,12 6,6000 0,79 $ SUBTOTAL O 13,057 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 15,447 $ INDIRECTOS % 3% 0,463 $ UTILIDAD % 2% 0,318 $ COSTO TOTAL DEL RUBRO 16,228 $ VALOR OFERTADO 16,23 $ ESTE PRECIO NO INCLUYE IVA
  • 14. FORMULARIO No. 4 Hoja 14 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 503(2)1E UNIDAD: M3 DETALLE: HORM.ESTRUCT./CEM.PORTL.CL-B F'C=280KG/CM2 (INC. ENC. CURAD) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO VIBRADOR DE MANGUERA 1 2,50 2,50 $ 2,0293 5,073 $ SUBTOTAL M 5,073 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 5 3,05 $ 15,25 $ 2,0293 30,947 $ ALBAÑIL 2 3,05 $ 6,10 $ 2,0293 12,379 $ CARPINTERO 2 3,05 $ 6,10 $ 2,0293 12,379 $ MAESTRO 0,3 3,40 $ 1,02 $ 2,0293 2,070 $ SUBTOTAL N 57,774 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 1,03 105,0000 108,150 $ ENCOFRADO M2 1,5 18,0000 27,000 $ CURADOR GLN 0,3 6,6000 1,980 $ SUBTOTAL O 137,130 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL M3 1 5,0000 5,00 $ SUBTOTAL P 5,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 204,977 $ INDIRECTOS % 3% 6,149 $ UTILIDAD % 2% 4,223 $ COSTO TOTAL DEL RUBRO 215,349 $ VALOR OFERTADO 215,35 $ ESTE PRECIO NO INCLUYE IVA
  • 15. FORMULARIO No. 4 Hoja 15 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 504(1) UNIDAD: KG DETALLE: ACERO DE REFUERZO EN BARRAS FY =4200 KG/CM2 EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA-DOBLADORA 1 1,00 1,00 $ 0,0220 0,022 $ SUBTOTAL M 0,022 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,0220 0,201 $ FIERRERO 1 3,05 $ 3,05 $ 0,0220 0,067 $ MAESTRO 0,3 3,40 $ 1,02 $ 0,0220 0,022 $ SUBTOTAL N 0,291 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO ACERO DE REFUERZO EN BARRAS FY=4200KG/CM2 KG 1,02 1,2500 1,28 $ ALAMBRE RECOCIDO # 18 KG 0,24 1,6000 0,38 $ SUBTOTAL O 1,659 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE ACERO DE REFUERZO KG 1,02 0,1000 0,10 $ SUBTOTAL P 0,10 $ TOTAL COSTO DIRECTO ( M+N+O+P) 2,074 $ INDIRECTOS % 3% 0,062 $ UTILIDAD % 2% 0,043 $ COSTO TOTAL DEL RUBRO 2,179 $ VALOR OFERTADO 2,18 $ ESTE PRECIO NO INCLUYE IVA
  • 16. FORMULARIO No. 4 Hoja 16 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 5.1A UNIDAD: ML DETALLE: SUMINISTRO/INSTALACION-TUBO PVC D=6" =160 MM. PERFORADA (DREN) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,1200 0,732 $ GASFITERO 1 3,05 $ 3,05 $ 0,1200 0,366 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1200 0,082 $ SUBTOTAL N 1,180 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUBO PVC CORRUGADA-PERFORADA D=6" M 1 7,5000 7,50 $ KALIPEGA Y ACCESORIOS M 1 0,9500 0,95 $ SUBTOTAL O 8,450 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL ML 1 0,2000 0,20 $ SUBTOTAL P 0,20 $ TOTAL COSTO DIRECTO ( M+N+O+P) 9,830 $ INDIRECTOS % 3% 0,295 $ UTILIDAD % 2% 0,202 $ COSTO TOTAL DEL RUBRO 10,327 $ VALOR OFERTADO 10,33 $ ESTE PRECIO NO INCLUYE IVA
  • 17. FORMULARIO No. 4 Hoja 17 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.7A UNIDAD: M3 DETALLE: SUMINISTRO Y COLOCACION DE PIEDRA TRITURADA (SUB-DREN) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,3560 2,172 $ SUBTOTAL N 2,172 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO PIEDRA TRITURADA M3 1 12,0000 12,00 $ SUBTOTAL O 12,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE PIEDRA M3 1 4,0000 4,00 $ SUBTOTAL P 4,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 18,172 $ INDIRECTOS % 3% 0,545 $ UTILIDAD % 2% 0,374 $ COSTO TOTAL DEL RUBRO 19,091 $ VALOR OFERTADO 19,09 $ ESTE PRECIO NO INCLUYE IVA
  • 18. FORMULARIO No. 4 Hoja 18 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 511-1(8)E1 UNIDAD: M2 DETALLE: SUMINISTRO E INSTALACION DE GEOTEXTIL NT - 1600 EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,0824 0,754 $ MAESTRO 0,5 3,40 $ 1,70 $ 0,0824 0,140 $ SUBTOTAL N 0,894 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO GEOTEXTIL (NO TEJIDO 1600) M2 1,12 1,3000 1,46 $ ALAMBRES, GRAPAS M2 1 0,0500 0,05 $ SUBTOTAL O 1,506 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 2,400 $ INDIRECTOS % 3% 0,072 $ UTILIDAD % 2% 0,049 $ COSTO TOTAL DEL RUBRO 2,521 $ VALOR OFERTADO 2,52 $ ESTE PRECIO NO INCLUYE IVA
  • 19. FORMULARIO No. 4 Hoja 19 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 5.2C UNIDAD: ML DETALLE: SUMINISTRO E INSTALAC. TUBO PVC D= 4" =110 MM. (SUBTERRANEO) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 0,0157 0,039 $ RETROEXCAVADORA 0,5 25,00 12,50 $ 0,0157 0,196 $ SUBTOTAL M 0,236 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,0157 0,144 $ TUBERO 1 3,05 $ 3,05 $ 0,0157 0,048 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,0157 0,011 $ OP. RETROEXCAVADORA 0,5 3,40 $ 1,70 $ 0,0157 0,027 $ SUBTOTAL N 0,229 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO KALIPEGA Y ACCESORIOS ML 1 0,8000 0,80 $ TUBERIA PVC D=110 MM. ML 1 6,0000 6,00 $ MATERIAL DE MEJORAMIENTO M3 0,5 2,5000 1,25 $ ARENA M3 0,03 12,0000 0,36 $ SUBTOTAL O 8,410 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 0,6 4,0000 2,40 $ TRANSPORTE DE TUBERIA ML 1 0,1500 0,15 $ TRANSPORTE DE ARENA M3 0,03 4,0000 0,12 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,5 4,0000 2,00 $ SUBTOTAL P 4,67 $ TOTAL COSTO DIRECTO ( M+N+O+P) 13,544 $ INDIRECTOS % 3% 0,406 $ UTILIDAD % 2% 0,279 $ COSTO TOTAL DEL RUBRO 14,230 $ VALOR OFERTADO 14,23 $ ESTE PRECIO NO INCLUYE IVA
  • 20. FORMULARIO No. 4 Hoja 20 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: R.C-1 UNIDAD: U DETALLE: REPARACIÓN DE GUIA DE AGUA POTABLE EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 1,2517 3,129 $ SUBTOTAL M 3,129 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 5 3,05 $ 15,25 $ 1,2517 19,088 $ GASFITERO 2 3,05 $ 6,10 $ 1,2517 7,635 $ MAESTRO 0,2 3,40 $ 0,68 $ 1,2517 0,851 $ SUBTOTAL N 27,575 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUBO PEAD 1/2 RÍGIDO (UNIÓN ROSCABLE) M 3 2,0000 6,00 $ UNIÓN PEAD U 1 8,0000 8,00 $ CODOS, NEPLOS, TAPON, ETC. U 1 4,0000 4,00 $ ARENA M3 0,32 12,0000 3,84 $ SUBTOTAL O 21,840 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 52,544 $ INDIRECTOS % 3% 1,576 $ UTILIDAD % 2% 1,082 $ COSTO TOTAL DEL RUBRO 55,203 $ VALOR OFERTADO 55,20 $ ESTE PRECIO NO INCLUYE IVA
  • 21. FORMULARIO No. 4 Hoja 21 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 301-3(1)I UNIDAD: M3 DETALLE: REMOCION DE HORMIGON DE CEMENTO PORTLAND EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPRESOR HIDRAULICO NEUMATICO 1 30,00 30,00 $ 0,1937 5,811 $ SUBTOTAL M 5,811 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 4 3,05 $ 12,20 $ 0,1937 2,363 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1937 0,132 $ OP. COMPRESOR 1 3,40 $ 3,40 $ 0,1937 0,659 $ SUBTOTAL N 3,153 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 1,3 4,0000 5,20 $ SUBTOTAL P 5,20 $ TOTAL COSTO DIRECTO ( M+N+O+P) 14,164 $ INDIRECTOS % 3% 0,425 $ UTILIDAD % 2% 0,292 $ COSTO TOTAL DEL RUBRO 14,881 $ VALOR OFERTADO 14,88 $ ESTE PRECIO NO INCLUYE IVA
  • 22. FORMULARIO No. 4 Hoja 22 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 5.3H UNIDAD: U DETALLE: CAJA/DOMICILIARIA REDONDA TIPO I-III D=400 A 600 MM EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 4,8558 29,620 $ ALBAÑIL 1 3,05 $ 3,05 $ 4,8558 14,810 $ MAESTRO 0,2 3,40 $ 0,68 $ 4,8558 3,302 $ SUBTOTAL N 47,733 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=210KG/CM2 M3 0,5 97,0000 48,50 $ ACERO DE REFUERZO EN BARRAS FY=4200KG/CM2 KG 60 1,2500 75,00 $ ENCOFRADO U 1 5,0000 5,00 $ SUBTOTAL O 128,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 176,233 $ INDIRECTOS % 3% 5,287 $ UTILIDAD % 2% 3,630 $ COSTO TOTAL DEL RUBRO 185,150 $ VALOR OFERTADO 185,15 $ ESTE PRECIO NO INCLUYE IVA
  • 23. FORMULARIO No. 4 Hoja 23 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 405-5(1)1E UNIDAD: M3 DETALLE: CAPA/RODADURA/H. ASFALT. MEZCLADO/PLANTA (INC. IMPRIM.) MANUAL EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RODILLO LISO VIBRATORIO 1 30,00 30,00 $ 0,1948 5,844 $ RODILLO NEUMATICO 1 30,00 30,00 $ 0,1948 5,844 $ ESCOBA MECANICA AUTOPROPULSADA 1 20,00 20,00 $ 0,1948 3,896 $ DISTRIBUIDOR DE ASFALTO 0,3 20,00 6,00 $ 0,1948 1,169 $ SUBTOTAL M 16,753 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 10 3,05 $ 30,50 $ 0,1948 5,941 $ MAESTRO 1 3,40 $ 3,40 $ 0,1948 0,662 $ OP. DISTRIBUIDOR ASFALTO/RODILLO 3 3,40 $ 10,20 $ 0,1948 1,987 $ OP. ESCOBA MECANICA 0,3 3,40 $ 1,02 $ 0,1948 0,199 $ SUBTOTAL N 8,789 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO DIESEL II GLN 6 1,0500 6,30 $ ASFALTO RC-2 GLN 5 1,7800 8,90 $ MEZCLA ASFALTICA M3 1,3 77,0000 100,10 $ SUBTOTAL O 115,300 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MEZCLA ASFALTICA M3 1,3 10,0000 13,00 $ SUBTOTAL P 13,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 153,842 $ INDIRECTOS % 3% 4,615 $ UTILIDAD % 2% 3,169 $ COSTO TOTAL DEL RUBRO 161,627 $ VALOR OFERTADO 161,63 $ ESTE PRECIO NO INCLUYE IVA
  • 24. FORMULARIO No. 4 Hoja 24 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 301-2(23)I UNIDAD: U DETALLE: LIMPIEZA DE SUMIDEROS EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 1,1437 10,465 $ MAESTRO 0,2 3,40 $ 0,68 $ 1,1437 0,778 $ SUBTOTAL N 11,243 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 11,243 $ INDIRECTOS % 3% 0,337 $ UTILIDAD % 2% 0,232 $ COSTO TOTAL DEL RUBRO 11,811 $ VALOR OFERTADO 11,81 $ ESTE PRECIO NO INCLUYE IVA
  • 25. FORMULARIO No. 4 Hoja 25 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 301-2(20)I UNIDAD: U DETALLE: LIMPIEZA DE CAMARA EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 2,2871 20,927 $ MAESTRO 0,2 3,40 $ 0,68 $ 2,2871 1,555 $ SUBTOTAL N 22,482 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 22,482 $ INDIRECTOS % 3% 0,674 $ UTILIDAD % 2% 0,463 $ COSTO TOTAL DEL RUBRO 23,620 $ VALOR OFERTADO 23,62 $ ESTE PRECIO NO INCLUYE IVA
  • 26. FORMULARIO No. 4 Hoja 26 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 2.21 UNIDAD: ML DETALLE: CORTE LONGITUDINAL DE PAVIMENTO FLEXIBLE EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA DE ASFALTO 1 20,00 20,00 $ 0,0107 0,214 $ SUBTOTAL M 0,214 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,0107 0,065 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,0107 0,007 $ SUBTOTAL N 0,073 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO DISCO DE CORTE PARA ASFALTO U 0,003 330,0000 0,99 $ SUBTOTAL O 0,990 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 1,277 $ INDIRECTOS % 3% 0,038 $ UTILIDAD % 2% 0,026 $ COSTO TOTAL DEL RUBRO 1,341 $ VALOR OFERTADO 1,34 $ ESTE PRECIO NO INCLUYE IVA
  • 27. FORMULARIO No. 4 Hoja 27 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 607-(3)1E UNIDAD: U DETALLE: SUMIDERO SENCILLO DE HORMIGON SIMPLE (INC. REJILLA Y EXCAV.) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 2,9875 18,224 $ ALBAÑIL 1 3,05 $ 3,05 $ 2,9875 9,112 $ CARPINTERO 1 3,05 $ 3,05 $ 2,9875 9,112 $ MAESTRO 0,2 3,40 $ 0,68 $ 2,9875 2,032 $ SUBTOTAL N 38,479 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=210KG/CM2 M3 0,35 97,0000 33,95 $ ENCOFRADO U 1 5,0000 5,00 $ REJILLA/SUMIDERO D=1" U 1 40,0000 40,00 $ SUBTOTAL O 78,950 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 117,429 $ INDIRECTOS % 3% 3,523 $ UTILIDAD % 2% 2,419 $ COSTO TOTAL DEL RUBRO 123,371 $ VALOR OFERTADO 123,37 $ ESTE PRECIO NO INCLUYE IVA
  • 28. FORMULARIO No. 4 Hoja 28 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 301-2(24)I UNIDAD: U DETALLE: LIMPIEZA DE CAJAS DOMICILIARIAS EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,6865 6,281 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,6865 0,467 $ SUBTOTAL N 6,748 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 6,748 $ INDIRECTOS % 3% 0,202 $ UTILIDAD % 2% 0,139 $ COSTO TOTAL DEL RUBRO 7,090 $ VALOR OFERTADO 7,09 $ ESTE PRECIO NO INCLUYE IVA
  • 29. FORMULARIO No. 4 Hoja 29 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 608-(2)10E UNIDAD: ML DETALLE: SUMINISTRO E INSTALACION DE TUBERÍA DE H.S. D=10" EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 0,1131 0,283 $ RETROEXCAVADORA 1 25,00 25,00 $ 0,1131 2,828 $ SUBTOTAL M 3,110 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,1131 1,035 $ MAESTRO 1 3,40 $ 3,40 $ 0,1131 0,385 $ OP. RETROEXCAVADORA 1 3,40 $ 3,40 $ 0,1131 0,385 $ TOPOGRAFO 0,1 3,40 $ 0,34 $ 0,1131 0,038 $ SUBTOTAL N 1,842 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUB. DE HS D=10" ML 1 18,0000 18,00 $ JUNTA DE NEOPRENO D=10" U 1 3,0000 3,00 $ MATERIAL DE MEJORAMIENTO M3 0,9 2,5000 2,25 $ SUBTOTAL O 23,250 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 0,95 4,0000 3,80 $ TRANSPORTE DE TUBERIA ML 1 1,3000 1,30 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,9 4,0000 3,60 $ SUBTOTAL P 8,70 $ TOTAL COSTO DIRECTO ( M+N+O+P) 36,903 $ INDIRECTOS % 3% 1,107 $ UTILIDAD % 2% 0,760 $ COSTO TOTAL DEL RUBRO 38,770 $ VALOR OFERTADO 38,77 $ ESTE PRECIO NO INCLUYE IVA
  • 30. FORMULARIO No. 4 Hoja 30 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 706-(2)1 UNIDAD: U DETALLE: REUBICACION DE POSTE/H.A. DE ALUMBRADO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO GRUA DE SERVICIO 1 50,00 50,00 $ 0,9118 45,590 $ SUBTOTAL M 45,590 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,9118 5,562 $ ELECTRICISTA 1 3,05 $ 3,05 $ 0,9118 2,781 $ OP. GRUA 1 3,40 $ 3,40 $ 0,9118 3,100 $ SUBTOTAL N 11,443 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=180KG/CM2 M3 0,15 88,0000 13,20 $ SUBTOTAL O 13,200 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 70,233 $ INDIRECTOS % 3% 2,107 $ UTILIDAD % 2% 1,447 $ COSTO TOTAL DEL RUBRO 73,787 $ VALOR OFERTADO 73,79 $ ESTE PRECIO NO INCLUYE IVA
  • 31. FORMULARIO No. 4 Hoja 31 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 608-(2)16E UNIDAD: ML DETALLE: SUMINISTRO E INSTALACION DE TUBERIA DE H.S. D= 16" EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO BOMBA DE AGUA 3" 1 2,50 2,50 $ 0,1896 0,474 $ COMPACTADOR MANUAL 1 2,50 2,50 $ 0,1896 0,474 $ RETROEXCAVADORA 1 25,00 25,00 $ 0,1896 4,740 $ SUBTOTAL M 5,688 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,1896 1,735 $ TUBERO 1 3,05 $ 3,05 $ 0,1896 0,578 $ MAESTRO 1 3,40 $ 3,40 $ 0,1896 0,645 $ OP. RETROEXCAVADORA 1 3,40 $ 3,40 $ 0,1896 0,645 $ TOPOGRAFO 0,2 3,40 $ 0,68 $ 0,1896 0,129 $ SUBTOTAL N 3,731 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUB. DE H.S. D=16" (400 MM.) ML 1 40,0000 40,00 $ JUNTA DE NEOPRENO D=16" U 1 6,0000 6,00 $ MATERIAL DE MEJORAMIENTO M3 1,8 2,5000 4,50 $ SUBTOTAL O 50,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 2,1 4,0000 8,40 $ TRANSPORTE DE TUBERIA ML 1 2,2000 2,20 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,8 4,0000 7,20 $ SUBTOTAL P 17,80 $ TOTAL COSTO DIRECTO ( M+N+O+P) 77,719 $ INDIRECTOS % 3% 2,332 $ UTILIDAD % 2% 1,601 $ COSTO TOTAL DEL RUBRO 81,652 $ VALOR OFERTADO 81,65 $ ESTE PRECIO NO INCLUYE IVA
  • 32. FORMULARIO No. 4 Hoja 32 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 601(1A)20E UNIDAD: ML DETALLE: SUMINISTRO E INSTALACION DE TUBERIA DE H.A. D= 20" EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO BOMBA DE AGUA 3" 1 2,50 2,50 $ 0,2750 0,688 $ COMPACTADOR MANUAL 1 2,50 2,50 $ 0,2750 0,688 $ RETROEXCAVADORA 1 25,00 25,00 $ 0,2750 6,875 $ SUBTOTAL M 8,250 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,2750 2,516 $ TUBERO 1 3,05 $ 3,05 $ 0,2750 0,839 $ MAESTRO 1 3,40 $ 3,40 $ 0,2750 0,935 $ OP. RETROEXCAVADORA 1 3,40 $ 3,40 $ 0,2750 0,935 $ TOPOGRAFO 0,2 3,40 $ 0,68 $ 0,2750 0,187 $ SUBTOTAL N 5,412 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUB. DE H.A. D=20" (500 MM.) ML 1 95,0000 95,00 $ JUNTA DE NEOPRENO D=20" U 1 11,0000 11,00 $ MATERIAL DE MEJORAMIENTO M3 2 2,5000 5,00 $ SUBTOTAL O 111,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 2,3 4,0000 9,20 $ TRANSPORTE DE TUBERIA ML 1 4,0000 4,00 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 2 4,0000 8,00 $ SUBTOTAL P 21,20 $ TOTAL COSTO DIRECTO ( M+N+O+P) 145,862 $ INDIRECTOS % 3% 4,376 $ UTILIDAD % 2% 3,005 $ COSTO TOTAL DEL RUBRO 153,243 $ VALOR OFERTADO 153,24 $ ESTE PRECIO NO INCLUYE IVA
  • 33. FORMULARIO No. 4 Hoja 33 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 601(1A)24E UNIDAD: ML DETALLE: SUMINISTRO E INSTALACION DE TUBERIA DE H.A. D= 24" EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO BOMBA DE AGUA 3" 1 2,50 2,50 $ 0,3602 0,901 $ COMPACTADOR MANUAL 1 2,50 2,50 $ 0,3602 0,901 $ RETROEXCAVADORA 1 25,00 25,00 $ 0,3602 9,005 $ SUBTOTAL M 10,806 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,3602 3,296 $ TUBERO 1 3,05 $ 3,05 $ 0,3602 1,099 $ MAESTRO 1 3,40 $ 3,40 $ 0,3602 1,225 $ OP. EXCAVADORA 1 3,40 $ 3,40 $ 0,3602 1,225 $ TOPOGRAFO 0,2 3,40 $ 0,68 $ 0,3602 0,245 $ SUBTOTAL N 7,089 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUB. DE H.A. D=24" (600 MM.) ML 1 122,0000 122,00 $ JUNTA DE NEOPRENO D=24" U 1 10,5000 10,50 $ MATERIAL DE MEJORAMIENTO M3 2,2 2,5000 5,50 $ SUBTOTAL O 138,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 2,6 4,0000 10,40 $ TRANSPORTE DE TUBERIA ML 1 4,5000 4,50 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 2,2 4,0000 8,80 $ SUBTOTAL P 23,70 $ TOTAL COSTO DIRECTO ( M+N+O+P) 179,595 $ INDIRECTOS % 3% 5,388 $ UTILIDAD % 2% 3,700 $ COSTO TOTAL DEL RUBRO 188,682 $ VALOR OFERTADO 188,68 $ ESTE PRECIO NO INCLUYE IVA
  • 34. FORMULARIO No. 4 Hoja 34 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 5.34 UNIDAD: ML DETALLE: SUMIN. E INSTAL. TUB. PVC 63 MM. CON UNIÓN SELLADO ELASTOMERICO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 0,0087 0,022 $ RETROEXCAVADORA 0,5 25,00 12,50 $ 0,0087 0,109 $ SUBTOTAL M 0,131 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 4 3,05 $ 12,20 $ 0,0087 0,106 $ GASFITERO 1 3,05 $ 3,05 $ 0,0087 0,027 $ OP. RETROEXCAVADORA 0,5 3,40 $ 1,70 $ 0,0087 0,015 $ SUBTOTAL N 0,147 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUBO PVC UNIÓN Z D=63MM 0.8MPA M 1 5,0000 5,00 $ KALIPEGA Y ACCESORIOS M 1 0,4500 0,45 $ MATERIAL DE MEJORAMIENTO M3 0,3 2,5000 0,75 $ ARENA M3 0,16 12,0000 1,92 $ SUBTOTAL O 8,120 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 0,45 4,0000 1,80 $ TRANSPORTE DE TUBERIA M 1 0,0800 0,08 $ TRANSPORTE DE ARENA M3 0,16 4,0000 0,64 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,3 4,0000 1,20 $ SUBTOTAL P 3,72 $ TOTAL COSTO DIRECTO ( M+N+O+P) 12,118 $ INDIRECTOS % 3% 0,364 $ UTILIDAD % 2% 0,250 $ COSTO TOTAL DEL RUBRO 12,731 $ VALOR OFERTADO 12,73 $ ESTE PRECIO NO INCLUYE IVA
  • 35. FORMULARIO No. 4 Hoja 35 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 5.35 UNIDAD: ML DETALLE: SUMIN. E INSTAL. TUB. PVC 90 MM. CON UNIÓN SELLADO ELASTOMERICO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 0,0100 0,025 $ RETROEXCAVADORA 0,5 25,00 12,50 $ 0,0100 0,125 $ SUBTOTAL M 0,150 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 4 3,05 $ 12,20 $ 0,0100 0,122 $ GASFITERO 1 3,05 $ 3,05 $ 0,0100 0,031 $ OP. RETROEXCAVADORA 0,5 3,40 $ 1,70 $ 0,0100 0,017 $ SUBTOTAL N 0,170 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUBO PVC UNIÓN Z D=90MM 0.8MPA M 1 7,9300 7,93 $ KALIPEGA Y ACCESORIOS M 1 0,5000 0,50 $ MATERIAL DE MEJORAMIENTO M3 0,2 2,5000 0,50 $ ARENA M3 0,16 12,0000 1,92 $ SUBTOTAL O 10,850 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 0,45 4,0000 1,80 $ TRANSPORTE DE TUBERIA M 1 0,0800 0,08 $ TRANSPORTE DE ARENA M3 0,16 4,0000 0,64 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,2 4,0000 0,80 $ SUBTOTAL P 3,32 $ TOTAL COSTO DIRECTO ( M+N+O+P) 14,490 $ INDIRECTOS % 3% 0,435 $ UTILIDAD % 2% 0,298 $ COSTO TOTAL DEL RUBRO 15,223 $ VALOR OFERTADO 15,22 $ ESTE PRECIO NO INCLUYE IVA
  • 36. FORMULARIO No. 4 Hoja 36 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 609-(8)3E UNIDAD: U DETALLE: ELEVACION DE CAJA DOMICILIARIA TIPO CIRCULAR EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA AUTOP. DISCO/DIAMANTE 0,2 6,00 1,20 $ 1,0054 1,206 $ SUBTOTAL M 1,206 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 1,0054 6,133 $ ALBAÑIL 1 3,05 $ 3,05 $ 1,0054 3,066 $ CARPINTERO 1 3,05 $ 3,05 $ 1,0054 3,066 $ MAESTRO 0,2 3,40 $ 0,68 $ 1,0054 0,684 $ SUBTOTAL N 12,950 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,08 105,0000 8,40 $ ELEMENTOS DE FIJACION U 1 3,6000 3,60 $ SUBTOTAL O 12,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 26,156 $ INDIRECTOS % 3% 0,785 $ UTILIDAD % 2% 0,539 $ COSTO TOTAL DEL RUBRO 27,480 $ VALOR OFERTADO 27,48 $ ESTE PRECIO NO INCLUYE IVA
  • 37. FORMULARIO No. 4 Hoja 37 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 609-(8)4E UNIDAD: U DETALLE: BAJADA DE CAJA DOMICILIARIA TIPO CIRCULAR EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA AUTOP. DISCO/DIAMANTE 0,2 6,00 1,20 $ 0,5470 0,656 $ SUBTOTAL M 0,656 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,5470 3,337 $ ALBAÑIL 1 3,05 $ 3,05 $ 0,5470 1,668 $ CARPINTERO 1 3,05 $ 3,05 $ 0,5470 1,668 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,5470 0,372 $ SUBTOTAL N 7,045 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=280KG/CM2 M3 0,08 105,0000 8,40 $ ELEMENTOS DE FIJACION U 1 2,0000 2,00 $ SUBTOTAL O 10,400 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 18,102 $ INDIRECTOS % 3% 0,543 $ UTILIDAD % 2% 0,373 $ COSTO TOTAL DEL RUBRO 19,018 $ VALOR OFERTADO 19,02 $ ESTE PRECIO NO INCLUYE IVA
  • 38. FORMULARIO No. 4 Hoja 38 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.35A UNIDAD: U DETALLE: LETRERO DE OBRA EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 1,0000 6,100 $ MAESTRO 1 3,40 $ 3,40 $ 1,0000 3,400 $ SOLDADOR 1 3,40 $ 3,40 $ 1,0000 3,400 $ SUBTOTAL N 12,900 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO LETRERO DE OBRA U 1 81,6000 81,60 $ ELEMENTOS DE FIJACION U 1 2,0000 2,00 $ SUBTOTAL O 83,600 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 96,500 $ INDIRECTOS % 3% 2,895 $ UTILIDAD % 2% 1,988 $ COSTO TOTAL DEL RUBRO 101,383 $ VALOR OFERTADO 101,38 $ ESTE PRECIO NO INCLUYE IVA
  • 39. FORMULARIO No. 4 Hoja 39 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 608-(2)12E UNIDAD: ML DETALLE: SUMINISTRO E INSTALACION DE TUBERÍA DE H.S. D=12" EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO COMPACTADOR MANUAL 1 2,50 2,50 $ 0,1600 0,400 $ RETROEXCAVADORA 1 25,00 25,00 $ 0,1600 4,000 $ SUBTOTAL M 4,400 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,1600 1,464 $ MAESTRO 1 3,40 $ 3,40 $ 0,1600 0,544 $ OP. RETROEXCAVADORA 1 3,40 $ 3,40 $ 0,1600 0,544 $ TOPOGRAFO 0,1 3,40 $ 0,34 $ 0,1600 0,054 $ SUBTOTAL N 2,606 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TUB. DE HS D=12" ML 1 39,8900 39,89 $ JUNTA DE NEOPRENO D=12" U 1 3,6000 3,60 $ MATERIAL DE MEJORAMIENTO M3 0,1 2,5000 0,25 $ SUBTOTAL O 43,740 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO DESALOJO DE MATERIAL M3 0,2 4,0000 0,80 $ TRANSPORTE DE TUBERIA ML 1 1,3000 1,30 $ TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 0,1 4,0000 0,40 $ SUBTOTAL P 2,50 $ TOTAL COSTO DIRECTO ( M+N+O+P) 53,246 $ INDIRECTOS % 3% 1,597 $ UTILIDAD % 2% 1,097 $ COSTO TOTAL DEL RUBRO 55,941 $ VALOR OFERTADO 55,94 $ ESTE PRECIO NO INCLUYE IVA
  • 40. FORMULARIO No. 4 Hoja 40 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 301-2(1)1 UNIDAD: U DETALLE: REUBICACION DE ARBOL (MEDIANO) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RETROEXCAVADORA 0,3 25,00 7,50 $ 0,8056 6,042 $ MOTOSIERRA 1 2,50 2,50 $ 0,8056 2,014 $ SUBTOTAL M 8,056 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 3 3,05 $ 9,15 $ 0,8056 7,371 $ JARDINERO 1 3,05 $ 3,05 $ 0,8056 2,457 $ OP. RETROEXCAVADORA 0,3 3,40 $ 1,02 $ 0,8056 0,822 $ SUBTOTAL N 10,650 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO ELEMENTOS DE FIJACION U 1 5,0000 5,00 $ SUBTOTAL O 5,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE ARBOL U 1 10,0000 10,00 $ SUBTOTAL P 10,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 33,706 $ INDIRECTOS % 3% 1,011 $ UTILIDAD % 2% 0,694 $ COSTO TOTAL DEL RUBRO 35,412 $ VALOR OFERTADO 35,41 $ ESTE PRECIO NO INCLUYE IVA
  • 41. FORMULARIO No. 4 Hoja 41 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 405-8(1)E UNIDAD: M3 DETALLE: PAVIMENTO HORM.CEM.POR.MOD.ROT.FLEX.4.0MPA/28D.CL-C (RELL.JUN EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA DE HORMIGON 0,25 20,00 5,00 $ 0,3799 1,900 $ VIBRADOR DE MANGUERA 1 2,50 2,50 $ 0,3799 0,950 $ SUBTOTAL M 2,849 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 5 3,05 $ 15,25 $ 0,3799 5,793 $ ALBAÑIL 4 3,05 $ 12,20 $ 0,3799 4,635 $ MAESTRO 1 3,40 $ 3,40 $ 0,3799 1,292 $ SUBTOTAL N 11,720 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO ENCOFRADO ML 0,70 5,0000 3,50 $ CURADOR GLN 0,20 6,6000 1,32 $ HORMIGON PREMEZCLADO MOD.ROT.FLEX 4,0MPA M3 1,02 123,3100 125,78 $ AP-3 GLN 0,05 1,5000 0,08 $ SUBTOTAL O 130,671 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 145,240 $ INDIRECTOS % 3% 4,357 $ UTILIDAD % 2% 2,992 $ COSTO TOTAL DEL RUBRO 152,590 $ VALOR OFERTADO 152,59 $ ESTE PRECIO NO INCLUYE IVA
  • 42. FORMULARIO No. 4 Hoja 42 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 307-2(1)1I UNIDAD: M3 DETALLE: EXCAVACION Y RELLENO PARA ESTRUCTURAS MANUAL EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO RETROEXCAVADORA 1 25,00 25,00 $ 0,0103 0,258 $ COMPACTADOR MANUAL 1 2,50 2,50 $ 0,0103 0,026 $ BOMBA DE AGUA 3" 1 2,50 2,50 $ 0,0103 0,026 $ SUBTOTAL M 0,309 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 4 3,05 $ 12,20 $ 0,0103 0,126 $ MAESTRO 0,4 3,40 $ 1,36 $ 0,0103 0,014 $ OP. RETROEXCAVADORA 1 3,40 $ 3,40 $ 0,0103 0,035 $ SUBTOTAL N 0,175 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO MATERIAL DE MEJORAMIENTO M3 1,2 2,5000 3,00 $ TABLAESTACA M2 1 1,0000 1,00 $ SUBTOTAL O 4,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL DE MEJORAMIENTO M3 1,2 4,0000 4,80 $ SUBTOTAL P 4,80 $ TOTAL COSTO DIRECTO ( M+N+O+P) 9,284 $ INDIRECTOS % 3% 0,279 $ UTILIDAD % 2% 0,191 $ COSTO TOTAL DEL RUBRO 9,753 $ VALOR OFERTADO 9,75 $ ESTE PRECIO NO INCLUYE IVA
  • 43. FORMULARIO No. 4 Hoja 43 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 220(3) UNIDAD: U DETALLE: VOLANTES INFORMATIVAS EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,0090 0,027 $ SUBTOTAL N 0,027 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO VOLANTES INFORMATIVAS U 1 0,0500 0,05 $ SUBTOTAL O 0,050 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 0,077 $ INDIRECTOS % 3% 0,002 $ UTILIDAD % 2% 0,002 $ COSTO TOTAL DEL RUBRO 0,081 $ VALOR OFERTADO 0,08 $ ESTE PRECIO NO INCLUYE IVA
  • 44. FORMULARIO No. 4 Hoja 44 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 220(4) UNIDAD: U DETALLE: REUNION CON LA COMUNIDAD EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 3,9461 24,071 $ CAPACITADOR 1 3,40 $ 3,40 $ 3,9461 13,417 $ SUBTOTAL N 37,488 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HOJAS, MARCADORES, BORRADORES GLB 1 8,0000 8,00 $ SUBTOTAL O 8,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 45,488 $ INDIRECTOS % 3% 1,365 $ UTILIDAD % 2% 0,937 $ COSTO TOTAL DEL RUBRO 47,790 $ VALOR OFERTADO 47,79 $ ESTE PRECIO NO INCLUYE IVA
  • 45. FORMULARIO No. 4 Hoja 45 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 205-(1) UNIDAD: M3 DETALLE: AGUA PARA CONTROL DE POLVO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO TANQUERO 1 25,00 25,00 $ 0,0116 0,290 $ SUBTOTAL M 0,290 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,0116 0,035 $ CHOFER 1 4,40 $ 4,40 $ 0,0116 0,051 $ SUBTOTAL N 0,086 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO AGUA M3 1,1 3,0000 3,30 $ SUBTOTAL O 3,300 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 3,676 $ INDIRECTOS % 3% 0,110 $ UTILIDAD % 2% 0,076 $ COSTO TOTAL DEL RUBRO 3,862 $ VALOR OFERTADO 3,86 $ ESTE PRECIO NO INCLUYE IVA
  • 46. FORMULARIO No. 4 Hoja 46 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.4B UNIDAD: U/MES DETALLE: ALQUILER DE BATERIA SANITARIA/SERVICIO PUBLICO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO SUBTOTAL N - $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO BATERIA SANITARIA U/MES 1 117,7500 117,75 $ SUBTOTAL O 117,750 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 117,750 $ INDIRECTOS % 3% 3,533 $ UTILIDAD % 2% 2,426 $ COSTO TOTAL DEL RUBRO 123,708 $ VALOR OFERTADO 123,71 $ ESTE PRECIO NO INCLUYE IVA
  • 47. FORMULARIO No. 4 Hoja 47 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 217(1) UNIDAD: ESTAC DETALLE: CONTROL Y MONITOREO DE RUIDO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SONOMETRO DIGITAL 1 40,00 40,00 $ 0,6022 24,088 $ SUBTOTAL M 24,088 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,6022 3,673 $ TECNICO AMBIENTAL 1 3,40 $ 3,40 $ 0,6022 2,047 $ SUBTOTAL N 5,721 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL GLB 1 9,0000 9,00 $ SUBTOTAL P 9,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 38,809 $ INDIRECTOS % 3% 1,164 $ UTILIDAD % 2% 0,799 $ COSTO TOTAL DEL RUBRO 40,773 $ VALOR OFERTADO 40,77 $ ESTE PRECIO NO INCLUYE IVA
  • 48. FORMULARIO No. 4 Hoja 48 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 205(2) UNIDAD: ESTAC DETALLE: CONTROL Y MONITOREO DE MATERIAL PARTICULADO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO MEDIDOR DE PARTICULAS 1 85,00 85,00 $ 1,3416 114,036 $ SUBTOTAL M 114,036 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 1,3416 8,184 $ TECNICO AMBIENTAL 1 3,40 $ 3,40 $ 1,3416 4,561 $ SUBTOTAL N 12,745 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SUBTOTAL O - $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO TRANSPORTE DE MATERIAL GLB 1 80,0000 80,00 $ SUBTOTAL P 80,00 $ TOTAL COSTO DIRECTO ( M+N+O+P) 206,781 $ INDIRECTOS % 3% 6,203 $ UTILIDAD % 2% 4,260 $ COSTO TOTAL DEL RUBRO 217,244 $ VALOR OFERTADO 217,24 $ ESTE PRECIO NO INCLUYE IVA
  • 49. FORMULARIO No. 4 Hoja 49 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.42 UNIDAD: U DETALLE: TANQUES METALICOS DE 55 GALONES EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 1,4910 4,548 $ SUBTOTAL N 4,548 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TANQUE METALICO DE 55 GALONES U 1 10,0000 10,000 $ ESMALTE VARIOS COLORES GLN 0,1 15,0000 1,500 $ SUBTOTAL O 11,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 16,048 $ INDIRECTOS % 3% 0,481 $ UTILIDAD % 2% 0,331 $ COSTO TOTAL DEL RUBRO 16,860 $ VALOR OFERTADO 16,86 $ ESTE PRECIO NO INCLUYE IVA
  • 50. FORMULARIO No. 4 Hoja 50 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.36 UNIDAD: U DETALLE: PASO DE MADERA PROVISIONAL PARA PEATONES EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CIZALLA 1 0,80 0,80 $ 3,3430 2,674 $ SUBTOTAL M 2,674 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 3,3430 20,392 $ CARPINTERO 1 3,05 $ 3,05 $ 3,3430 10,196 $ MAESTRO 0,2 3,40 $ 0,68 $ 3,3430 2,273 $ SUBTOTAL N 32,862 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO ELEMENTOS DE FIJACION ML 1 20,0000 20,000 $ TABLON DE CHANUL (20 CM. X 1") ML 20 3,5000 70,000 $ CUARTON DE CHANUL 3" X 4" ML 30 4,5000 135,000 $ CUARTON DE CHANUL 3" X 6" ML 10 8,5000 85,000 $ CUARTON DE CHANUL 4" X 4" ML 8 10,5000 84,000 $ SUBTOTAL O 394,000 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 429,536 $ INDIRECTOS % 3% 12,886 $ UTILIDAD % 2% 8,848 $ COSTO TOTAL DEL RUBRO 451,271 $ VALOR OFERTADO 451,27 $ ESTE PRECIO NO INCLUYE IVA
  • 51. FORMULARIO No. 4 Hoja 51 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.39 UNIDAD: U DETALLE: PROTECCION PARA TRABAJADOR EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO SUBTOTAL N - $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO CASCOS U 1 3,0000 3,00 $ BOTAS DE CAUCHO PAR 1 16,5100 16,51 $ GUANTES DE CUERO PAR 1 4,0000 4,00 $ TAPON AURICULAR U 1 0,5000 0,50 $ MASCARILLA DESCARTABLE U 1 0,2500 0,25 $ CHALECO REFLECTIVO U 1 4,0000 4,00 $ SUBTOTAL O 28,260 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 28,260 $ INDIRECTOS % 3% 0,848 $ UTILIDAD % 2% 0,582 $ COSTO TOTAL DEL RUBRO 29,690 $ VALOR OFERTADO 29,69 $ ESTE PRECIO NO INCLUYE IVA
  • 52. FORMULARIO No. 4 Hoja 52 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)2 UNIDAD: ML DETALLE: CINTAS PLASTICAS DE SEGURIDAD (COLOR REFLECTIVO) EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,0100 0,031 $ MAESTRO 1 3,40 $ 3,40 $ 0,0100 0,034 $ SUBTOTAL N 0,065 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO CINTA REFLECTIVA M 1,05 0,1200 0,13 $ SUBTOTAL O 0,126 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 0,191 $ INDIRECTOS % 3% 0,006 $ UTILIDAD % 2% 0,004 $ COSTO TOTAL DEL RUBRO 0,200 $ VALOR OFERTADO 0,20 $ ESTE PRECIO NO INCLUYE IVA
  • 53. FORMULARIO No. 4 Hoja 53 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)1 UNIDAD: ML DETALLE: SEÑALES LUMINOSAS DE PREVENCION EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO ELECTRICISTA 1 3,05 $ 3,05 $ 0,8015 2,445 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,8015 0,545 $ SUBTOTAL N 2,990 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO SEÑALES LUMINOSAS DE PREVENCION ML 1 6,5000 6,50 $ SUBTOTAL O 6,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 9,490 $ INDIRECTOS % 3% 0,285 $ UTILIDAD % 2% 0,195 $ COSTO TOTAL DEL RUBRO 9,970 $ VALOR OFERTADO 9,97 $ ESTE PRECIO NO INCLUYE IVA
  • 54. FORMULARIO No. 4 Hoja 54 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.40 UNIDAD: U DETALLE: CONO DE SEGURIDAD EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,2150 0,656 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,2150 0,146 $ SUBTOTAL N 0,802 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO CONOS DEMARCADORES H=50CM U 1 20,5000 20,50 $ SUBTOTAL O 20,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 21,302 $ INDIRECTOS % 3% 0,639 $ UTILIDAD % 2% 0,439 $ COSTO TOTAL DEL RUBRO 22,380 $ VALOR OFERTADO 22,38 $ ESTE PRECIO NO INCLUYE IVA
  • 55. FORMULARIO No. 4 Hoja 55 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)3 UNIDAD: U DETALLE: PARANTE DE MADERA CON DADO DE H.S. EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,0886 0,540 $ ALBAÑIL 1 3,05 $ 3,05 $ 0,0886 0,270 $ MAESTRO 0,3 3,40 $ 1,02 $ 0,0886 0,090 $ SUBTOTAL N 0,901 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=180KG/CM2 M3 0,04 88,0000 3,52 $ CAÑA ROLLIZA U 0,5 3,5000 1,75 $ ENCOFRADO U 1 0,2000 0,20 $ LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,05 50,0000 2,50 $ SUBTOTAL O 7,970 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 8,871 $ INDIRECTOS % 3% 0,266 $ UTILIDAD % 2% 0,183 $ COSTO TOTAL DEL RUBRO 9,320 $ VALOR OFERTADO 9,32 $ ESTE PRECIO NO INCLUYE IVA
  • 56. FORMULARIO No. 4 Hoja 56 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 1.42A UNIDAD: U DETALLE: TANQUES METALICOS DE 55 GALONES CON CINTA REFLECTIVA EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,5085 1,551 $ SUBTOTAL N 1,551 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO TANQUE METALICO DE 55 GALONES U 1 10,0000 10,000 $ ESMALTE VARIOS COLORES GLN 0,1 15,0000 1,500 $ LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,3 50,0000 15,00 $ SUBTOTAL O 26,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 28,051 $ INDIRECTOS % 3% 0,842 $ UTILIDAD % 2% 0,578 $ COSTO TOTAL DEL RUBRO 29,470 $ VALOR OFERTADO 29,47 $ ESTE PRECIO NO INCLUYE IVA
  • 57. FORMULARIO No. 4 Hoja 57 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 708-5(1)18 UNIDAD: U DETALLE: SUMINT. E INSTAL. ELEMENTOS/ SUJECION O FIJACION DE LETRERO EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,2033 1,240 $ MAESTRO 1 3,40 $ 3,40 $ 0,2033 0,691 $ SUBTOTAL N 1,931 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO ELEMENTO DE SUJECION O FIJACION U 1 10,5000 10,500 $ SUBTOTAL O 10,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 12,431 $ INDIRECTOS % 3% 0,373 $ UTILIDAD % 2% 0,256 $ COSTO TOTAL DEL RUBRO 13,060 $ VALOR OFERTADO 13,06 $ ESTE PRECIO NO INCLUYE IVA
  • 58. FORMULARIO No. 4 Hoja 58 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)4 UNIDAD: M2 DETALLE: CONSTRUCCION E INSTALAC./LETRERO- METAL. REFELECTIV/SEÑAL. SEGUR EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA-DOBLADORA 0,5 1,00 0,50 $ 1,3039 0,652 $ SUBTOTAL M 0,652 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 1,3039 3,977 $ MAESTRO 0,2 3,40 $ 0,68 $ 1,3039 0,887 $ SOLDADOR 1 3,40 $ 3,40 $ 1,3039 4,433 $ SUBTOTAL N 9,297 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO ANTICORROSIVO CROMATO 5 (CO) GLN 0,05 15,0000 0,75 $ ESMALTE VARIOS COLORES GLN 0,05 15,0000 0,75 $ ELEMENTOS DE FIJACION M2 1 15,0000 15,00 $ PLANCHA 1/16" M2 1,02 25,0000 25,50 $ LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,25 50,0000 12,50 $ SUBTOTAL O 54,500 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 64,449 $ INDIRECTOS % 3% 1,933 $ UTILIDAD % 2% 1,328 $ COSTO TOTAL DEL RUBRO 67,710 $ VALOR OFERTADO 67,71 $ ESTE PRECIO NO INCLUYE IVA
  • 59. FORMULARIO No. 4 Hoja 59 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)5 UNIDAD: ML DETALLE: SUMINISTRO E INSTAL/TUBO RECTANGUL.DADO H.S/SEÑAL/SEGUR. PREV EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO CORTADORA-DOBLADORA 0,2 1,00 0,20 $ 0,1529 0,031 $ SUBTOTAL M 0,031 $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 1 3,05 $ 3,05 $ 0,1529 0,466 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,1529 0,104 $ SOLDADOR 1 3,40 $ 3,40 $ 0,1529 0,520 $ SUBTOTAL N 1,090 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO HORMIGON PREMEZCLADO F'C=180KG/CM2 M3 0,005 88,0000 0,44 $ ESMALTE VARIOS COLORES GLN 0,01 15,0000 0,15 $ ANTICORROSIVO CROMATO 5 (CO) GLN 0,01 14,0000 0,14 $ ELEMENTOS DE FIJACION ML 1 1,0000 1,00 $ TUBO RECTANGULAR 40X60X2MM ML 1 8,0000 8,00 $ SUBTOTAL O 9,730 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 10,851 $ INDIRECTOS % 3% 0,326 $ UTILIDAD % 2% 0,224 $ COSTO TOTAL DEL RUBRO 11,400 $ VALOR OFERTADO 11,40 $ ESTE PRECIO NO INCLUYE IVA
  • 60. FORMULARIO No. 4 Hoja 60 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)7 UNIDAD: U DETALLE: BARRICADA DE MADERA (2,40 X 1,50)M. C/3 TABL. C/CINTA REFLECT EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 1,0993 6,706 $ CARPINTERO 2 3,05 $ 6,10 $ 1,0993 6,706 $ MAESTRO 0,2 3,40 $ 0,68 $ 1,0993 0,748 $ SUBTOTAL N 14,159 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO PLYWOOD CORRIENTE 4X8X12 C U 0,5 35,0000 17,50 $ CUARTONES DE ENCOFRADO U 1,35 3,5000 4,73 $ ESMALTE VARIOS COLORES GLN 0,12 15,0000 1,80 $ ELEMENTOS DE FIJACION U 1 1,2000 1,20 $ LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,8 50,0000 40,00 $ SUBTOTAL O 65,225 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 79,384 $ INDIRECTOS % 3% 2,382 $ UTILIDAD % 2% 1,635 $ COSTO TOTAL DEL RUBRO 83,401 $ VALOR OFERTADO 83,40 $ ESTE PRECIO NO INCLUYE IVA
  • 61. FORMULARIO No. 4 Hoja 61 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)7E UNIDAD: U DETALLE: BARRICADA DE MADERA (1,20 X 1,50)M. C/3 TABL. C/CINTA REFLECT EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,7046 4,298 $ CARPINTERO 2 3,05 $ 6,10 $ 0,7046 4,298 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,7046 0,479 $ SUBTOTAL N 9,075 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO PLYWOOD CORRIENTE 4X8X12 C U 0,35 35,0000 12,25 $ CUARTONES DE ENCOFRADO U 1,2 3,5000 4,20 $ ESMALTE VARIOS COLORES GLN 0,12 15,0000 1,80 $ ELEMENTOS DE FIJACION U 1 1,2000 1,20 $ LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,4 50,0000 20,00 $ SUBTOTAL O 39,450 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 48,525 $ INDIRECTOS % 3% 1,456 $ UTILIDAD % 2% 1,000 $ COSTO TOTAL DEL RUBRO 50,981 $ VALOR OFERTADO 50,98 $ ESTE PRECIO NO INCLUYE IVA
  • 62. FORMULARIO No. 4 Hoja 62 de 62 1.5 ANALISIS DE PRECIOS UNITARIOS RUBRO: 710-(1)7E1 UNIDAD: U DETALLE: BARRICADA DE MADERA (0,60 X 1,10)M. C/2 TABL. C/CINTA REFLECT EQUIPOS DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO SUBTOTAL M - $ MANO DE OBRA DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO PEON 2 3,05 $ 6,10 $ 0,5016 3,060 $ CARPINTERO 2 3,05 $ 6,10 $ 0,5016 3,060 $ MAESTRO 0,2 3,40 $ 0,68 $ 0,5016 0,341 $ SUBTOTAL N 6,461 $ MATERIALES DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO PLYWOOD CORRIENTE 4X8X12 C U 0,25 35,0000 8,75 $ CUARTONES DE ENCOFRADO U 1,1 3,5000 3,85 $ ESMALTE VARIOS COLORES GLN 0,12 15,0000 1,80 $ ELEMENTOS DE FIJACION U 1 1,2000 1,20 $ LAMINA VINYL REFLECTIVA GRADO INGENIERIA M2 0,1 50,0000 5,00 $ SUBTOTAL O 20,600 $ TRANSPORTE DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO SUBTOTAL P - $ TOTAL COSTO DIRECTO ( M+N+O+P) 27,061 $ INDIRECTOS % 3% 0,812 $ UTILIDAD % 2% 0,557 $ COSTO TOTAL DEL RUBRO 28,430 $ VALOR OFERTADO 28,43 $ ESTE PRECIO NO INCLUYE IVA