Scheduling Chapter 16
How  Scheduling  fits the Operations Management Philosophy  Operations As a Competitive  Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling
Scheduling ,[object Object],[object Object],[object Object],[object Object]
Performance Measures ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Gantt Charts ,[object Object],[object Object],[object Object],[object Object]
Gantt Progress Chart Gantt Progress Chart for an Auto Parts Company Plymouth Ford Pontiac Job 4/20 4/22 4/23 4/24 4/25 4/26 4/21 4/17 4/18 4/19 Current date  Scheduled activity time Actual progress Start activity Finish activity Nonproductive time
Gantt Workstation Chart  Gantt Workstation Chart for Hospital Operating Rooms
Scheduling  Customer Demand ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scheduling Employees ,[object Object],[object Object],[object Object],[object Object]
The  Amalgamated Parcel Service  is open 7 days a week. The schedule of requirements is: The manager needs a workforce schedule that provides two consecutive days off and minimizes the amount of total slack capacity. To break ties in the selection of off days, the scheduler gives preference to Saturday and Sunday if it is one of the tied pairs. If not, she selects one of the tied pairs arbitrarily. Workforce Scheduling Example 16.1 Day M T W Th F S Su Number of employees 6 4 8 9 10 3 2 Required employees
Required employees Workforce Scheduling Example 16.1   Steps 1 & 2 Step 1 . Find all the pairs of consecutive days that exclude the maximum daily requirements. Select the unique pair that has the lowest total requirements for the 2 days. Friday contains the maximum requirements (10), and the pair S–Su has the lowest total requirements. Therefore, Employee 1 is scheduled to work Monday through Friday.  Step 2 . If a tie occurs, choose one of the tied pairs or ask the employee to make a choice. Day M T W Th F S Su Number of employees 6 4 8 9  10*  3 2 Employee 1  X X X X X
Required employees Step 3 . Subtract the requirements satisfied by the Employee 1 from the net requirements for each day the employee is to work and repeat step one. Again the pair S–Su has the lowest total requirements. Therefore, Employee 2 is scheduled to work Monday through Friday. Workforce Scheduling Example 16.1   Step 3   Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirements 5 3 7 8 9* 3 2 Employee 2 X X X X X
Required employees Workforce Scheduling Example 16.1   Step 4   Step 4 .  Repeat steps 1 through 3 until all the requirements have been satisfied.  After Employees 1, 2, and 3 have reduced the requirements, the pair with the lowest requirements changes, and Employee 4 will be scheduled for Wednesday through Sunday. Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2
Workforce Scheduling Example 16.1  Step 4   continued Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2 Employee 4 X X X X X Requirement 3 1 4 5 6* 2 1 Employee 5 X X X X X Required employees
Workforce Scheduling Example 16.1   Step 4   continued Day M T W Th F S Su Requirement 2 0 3 4 5* 2 1 Employee 6 X X X X X Requirement 2 0 2 3 4* 1 0 Employee 7 X X X X X Requirement 1 0 1 2 3* 1 0 Employee 8 X X X X X Requirement 0 0 0 1 2* 1 0 Employee 9 X X X X X Requirement 0 0 0 0 1* 0 0 Employee 10 X X X X X Required employees
Workforce Scheduling Example 16.1   Day M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Final Schedule
M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Workforce Scheduling Example 16.1   Final Schedule Capacity,  C 7 8 10 10 10 3 2 50 Requirements,  R 6 4 8 9 10 3 2 42 Slack,  C  –  R 1 4 2 1 0 0 0 8 Total Final Schedule
Operations Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object]
Manufacturing Process Shipping Department Raw Materials Legend: Batch of parts Workstation
Job Shop Dispatching ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],Job Shop Dispatching
[object Object],Job Shop Dispatching S/RO = ((Due date  –  Today’s date) – Total shop time remaining)    Number of operations remaining
[object Object],[object Object],[object Object],Scheduling Jobs for  One Workstation
[object Object],[object Object],[object Object],[object Object],Example 16.2 Single-Dimension Rule Sequencing
Average hours early = 0.6 hour Example 16.2 Single-Dimension Rule  –  EDD Average job flow time = 23 hours Average hours past due = 7.2 hours Average WIP = 2.61 blocks Average total inventory = 2.68 engine blocks 8 + 14 + 17 + 32 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 8 10 2 17 + = 32 32 12 8 + = 14 14 2 14 + = 17 18 1 32 + = 44 44 22 Average total inventory = 10 + 14 + 18 + 32 + 44 44
Average hours early = 3.6 hour Example 16.2 Single-Dimension Rule  –  SPT Average job flow time =   20.4 hours Average hours past due = 7.6 hours Average WIP = 2.32 blocks Average total inventory = 2.73 engine blocks Econoline 150 Explorer Ranger Thunderbird Bronco 0 3 9 17 29 3 6 8 12 15 18 12 10 22 20 3 + 9 + 17 + 29 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 3 18 15 17 + = 29 29   7 8 + = 9 12   14 + = 17 17 3 7 29 + = 44 44   24 Average total inventory = 18 + 12 + 17 + 20 + 44 44
Comparing the  EDD and SPT Rules Using the previous example, a comparison of the EDD and SPT sequencing is shown below. ,[object Object],[object Object],[object Object],EDD SPT Average job flow time 23.00 20.40 Average hours early 0.60 3.60 Average hours past due 7.20 7.60 Average WIP 2.61 2.32 Average total inventory 2.68 2.73
Example 16.3 Multiple-Dimension Rule –  CR 1 2.3 15 10 6.1 2.46 2 10.5 10 2 7.8 1.28 3 6.2 20 12 14.5 1.38 4 15.6 8 5 10.2 .78 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR   =  Time remaining to due date Shop time remaining
Example 16.3 Multiple-Dimension Rule –  S/RO 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO S/RO  =  Time remaining to due date  –  Shop time remaining Number of operations remaining
Comparing the  CR  and  S/RO  Rules 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR Sequence =  4  – 2 – 3 – 1 S/RO Sequence =  4  – 3 – 1 – 2 CR Sequence =
Priority Rule Summary FCFS = 1 – 2 – 3 – 4 SPT = 1 – 3 – 2 – 4 EDD = 4 – 2 – 1 – 3 CR = 4 – 2 – 3 – 1 S/RO = 4 – 3 – 1 – 2 ,[object Object],[object Object],© 2007 Pearson Education Avg Flow Time 17.175 16.100 26.175 27.150 24.025 Avg Early Time 3.425 6.050 0 0 0 Avg Past Due 7.350 8.900 12.925 13.900 10.775 Avg WIP 1.986 1.861 3.026 3.129 2.777 Avg Total Inv 2.382 2.561 3.026 3.129 2.777 Shortest Slack per Processing Earliest Critical Remaining FCFS Time Due Date Ratio Operation
Scheduling Jobs for  Multiple Workstations ,[object Object],[object Object],[object Object],[object Object],[object Object]
Johnson’s Rule ,[object Object],[object Object],[object Object],[object Object]
Example 16.5   Johnson’s Rule   at the  Morris Machine Co.   Sequence  =  M1 M2 M3 M4 M5 Eliminate M3 from consideration. The next shortest time is M2 at Workstation 1, so schedule M2 first. Eliminate M5 from consideration. The next shortest time is M1 at workstation #1, so schedule M1 next. Eliminate M1 and the only job remaining to be scheduled is M4. Time (hr) Motor Workstation 1 Workstation 2 M1 12 22 M2 4 5 M3 5 3 M4 15 16 M5 10 8 Shortest time is 3 hours at workstation 2, so schedule job M3 last.  Eliminate M2 from consideration. The next shortest time is M5 at workstation #2, so schedule M5 next to last.
The schedule minimizes the idle time of workstation 2 and gives the fastest repair time for all five motors. No other sequence will produce a lower makespan. Example 16.5   Johnson’s Rule   at the  Morris Machine Co.   Workstation M2  (4) M1  (12) M4  (15) M5  (10) M3  (5) Idle—available  for further work 0 5 10 15 20 25 30 Day 35 40 45 50 55 60 65 Idle 2 M2  (5) M1  (22) M4  (16) M5  (8) M3  (3) Idle 1 Gantt Chart for the Morris Machine Company Repair Schedule
Labor-limited Environments ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Linking Operations  Scheduling to the Supply Chain ,[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
Biswajit Ghosh
 
Facility location and layout planning
Facility location and layout planningFacility location and layout planning
Facility location and layout planning
Birodh Adhikari
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balance
Sudhir Reddy
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
MOHD ARISH
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
senthil.G
 

Mais procurados (20)

Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Types of loading, production & operations management
Types of loading, production & operations managementTypes of loading, production & operations management
Types of loading, production & operations management
 
Facility location and layout planning
Facility location and layout planningFacility location and layout planning
Facility location and layout planning
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balance
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
the global environment and operations strategy Operation management
 the global environment and operations strategy Operation management the global environment and operations strategy Operation management
the global environment and operations strategy Operation management
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
layout planning
layout planninglayout planning
layout planning
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
9Johnson's Rule.ppt
9Johnson's Rule.ppt9Johnson's Rule.ppt
9Johnson's Rule.ppt
 
Chapter 8 aggregate planning in a supply chain
Chapter 8 aggregate planning in a supply chainChapter 8 aggregate planning in a supply chain
Chapter 8 aggregate planning in a supply chain
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
MRP CASE STUDY
MRP CASE STUDYMRP CASE STUDY
MRP CASE STUDY
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 

Destaque

MB0038 – Management Process and Organization Behavior
 MB0038 – Management Process and Organization Behavior MB0038 – Management Process and Organization Behavior
MB0038 – Management Process and Organization Behavior
swejs
 
Bus 606 operations analysis project - rip curl
Bus 606   operations analysis project - rip curlBus 606   operations analysis project - rip curl
Bus 606 operations analysis project - rip curl
RipCurlTeamPhotos
 
Intern operations project
Intern operations projectIntern operations project
Intern operations project
Kidd Khazini
 
Aggregat planning stevenson
Aggregat planning stevensonAggregat planning stevenson
Aggregat planning stevenson
Piyush Vanjani
 

Destaque (20)

Chapter 14
Chapter 14Chapter 14
Chapter 14
 
Scheduling
SchedulingScheduling
Scheduling
 
VBA API for scriptDB primer
VBA API for scriptDB primerVBA API for scriptDB primer
VBA API for scriptDB primer
 
Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...
 
job shop 111
job shop 111job shop 111
job shop 111
 
Ch17
Ch17Ch17
Ch17
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Javascript like objects and JSON processing in VBA
Javascript like objects and JSON processing in VBAJavascript like objects and JSON processing in VBA
Javascript like objects and JSON processing in VBA
 
GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1
 
Improve Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldImprove Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon Tredgold
 
BRASS MBA in a Day
BRASS MBA in a DayBRASS MBA in a Day
BRASS MBA in a Day
 
MB0038 – Management Process and Organization Behavior
 MB0038 – Management Process and Organization Behavior MB0038 – Management Process and Organization Behavior
MB0038 – Management Process and Organization Behavior
 
Energy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryEnergy Management by Food&Beverage Industry
Energy Management by Food&Beverage Industry
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air Permitting
 
Bus 606 operations analysis project - rip curl
Bus 606   operations analysis project - rip curlBus 606   operations analysis project - rip curl
Bus 606 operations analysis project - rip curl
 
Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Commercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler OptimizaitonCommercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler Optimizaiton
 
Project work efficiency of boilers
Project work   efficiency of boilersProject work   efficiency of boilers
Project work efficiency of boilers
 
Aggregat planning stevenson
Aggregat planning stevensonAggregat planning stevenson
Aggregat planning stevenson
 

Semelhante a Scheduling

Chap017 Scheduling Edit
Chap017 Scheduling EditChap017 Scheduling Edit
Chap017 Scheduling Edit
Ricky Muchtar
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
pikuoec
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentation
tracksoftware
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 

Semelhante a Scheduling (20)

chapter16.ppt
chapter16.pptchapter16.ppt
chapter16.ppt
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Chap017 Scheduling Edit
Chap017 Scheduling EditChap017 Scheduling Edit
Chap017 Scheduling Edit
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
Scheduling
SchedulingScheduling
Scheduling
 
scheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptxscheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptx
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
Om chapter 14
Om chapter 14Om chapter 14
Om chapter 14
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentation
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
 
C0362015022
C0362015022C0362015022
C0362015022
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.ppt
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 

Último

Último (20)

Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
 
Server-Driven User Interface (SDUI) at Priceline
Server-Driven User Interface (SDUI) at PricelineServer-Driven User Interface (SDUI) at Priceline
Server-Driven User Interface (SDUI) at Priceline
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 

Scheduling

  • 2. How Scheduling fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling
  • 3.
  • 4.
  • 5.
  • 6. Gantt Progress Chart Gantt Progress Chart for an Auto Parts Company Plymouth Ford Pontiac Job 4/20 4/22 4/23 4/24 4/25 4/26 4/21 4/17 4/18 4/19 Current date Scheduled activity time Actual progress Start activity Finish activity Nonproductive time
  • 7. Gantt Workstation Chart Gantt Workstation Chart for Hospital Operating Rooms
  • 8.
  • 9.
  • 10. The Amalgamated Parcel Service is open 7 days a week. The schedule of requirements is: The manager needs a workforce schedule that provides two consecutive days off and minimizes the amount of total slack capacity. To break ties in the selection of off days, the scheduler gives preference to Saturday and Sunday if it is one of the tied pairs. If not, she selects one of the tied pairs arbitrarily. Workforce Scheduling Example 16.1 Day M T W Th F S Su Number of employees 6 4 8 9 10 3 2 Required employees
  • 11. Required employees Workforce Scheduling Example 16.1 Steps 1 & 2 Step 1 . Find all the pairs of consecutive days that exclude the maximum daily requirements. Select the unique pair that has the lowest total requirements for the 2 days. Friday contains the maximum requirements (10), and the pair S–Su has the lowest total requirements. Therefore, Employee 1 is scheduled to work Monday through Friday. Step 2 . If a tie occurs, choose one of the tied pairs or ask the employee to make a choice. Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X
  • 12. Required employees Step 3 . Subtract the requirements satisfied by the Employee 1 from the net requirements for each day the employee is to work and repeat step one. Again the pair S–Su has the lowest total requirements. Therefore, Employee 2 is scheduled to work Monday through Friday. Workforce Scheduling Example 16.1 Step 3 Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirements 5 3 7 8 9* 3 2 Employee 2 X X X X X
  • 13. Required employees Workforce Scheduling Example 16.1 Step 4 Step 4 . Repeat steps 1 through 3 until all the requirements have been satisfied. After Employees 1, 2, and 3 have reduced the requirements, the pair with the lowest requirements changes, and Employee 4 will be scheduled for Wednesday through Sunday. Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2
  • 14. Workforce Scheduling Example 16.1 Step 4 continued Day M T W Th F S Su Number of employees 6 4 8 9 10* 3 2 Employee 1 X X X X X Requirement 5 3 7 8 9* 3 2 Employee 2 X X X X X Requirement 4 2 6 7 8* 3 2 Employee 3 X X X X X Requirement 3 1 5 6 7* 3 2 Employee 4 X X X X X Requirement 3 1 4 5 6* 2 1 Employee 5 X X X X X Required employees
  • 15. Workforce Scheduling Example 16.1 Step 4 continued Day M T W Th F S Su Requirement 2 0 3 4 5* 2 1 Employee 6 X X X X X Requirement 2 0 2 3 4* 1 0 Employee 7 X X X X X Requirement 1 0 1 2 3* 1 0 Employee 8 X X X X X Requirement 0 0 0 1 2* 1 0 Employee 9 X X X X X Requirement 0 0 0 0 1* 0 0 Employee 10 X X X X X Required employees
  • 16. Workforce Scheduling Example 16.1 Day M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Final Schedule
  • 17. M T W Th F S Su Employee 1 X X X X X off off Employee 2 X X X X X off off Employee 3 X X X X X off off Employee 4 off off X X X X X Employee 5 X X X X X off off Employee 6 off off X X X X X Employee 7 X X X X X off off Employee 8 X X X X X off off Employee 9 off X X X X X off Employee 10 X X X X X off off Workforce Scheduling Example 16.1 Final Schedule Capacity, C 7 8 10 10 10 3 2 50 Requirements, R 6 4 8 9 10 3 2 42 Slack, C – R 1 4 2 1 0 0 0 8 Total Final Schedule
  • 18.
  • 19. Manufacturing Process Shipping Department Raw Materials Legend: Batch of parts Workstation
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Average hours early = 0.6 hour Example 16.2 Single-Dimension Rule – EDD Average job flow time = 23 hours Average hours past due = 7.2 hours Average WIP = 2.61 blocks Average total inventory = 2.68 engine blocks 8 + 14 + 17 + 32 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 8 10 2 17 + = 32 32 12 8 + = 14 14 2 14 + = 17 18 1 32 + = 44 44 22 Average total inventory = 10 + 14 + 18 + 32 + 44 44
  • 26. Average hours early = 3.6 hour Example 16.2 Single-Dimension Rule – SPT Average job flow time = 20.4 hours Average hours past due = 7.6 hours Average WIP = 2.32 blocks Average total inventory = 2.73 engine blocks Econoline 150 Explorer Ranger Thunderbird Bronco 0 3 9 17 29 3 6 8 12 15 18 12 10 22 20 3 + 9 + 17 + 29 + 44 44 Job Scheduled Actual Engine Processing Flow Customer Customer Hours Block Begin Time Time Pickup Pickup Hours Past Sequence Work (hr) (hr) Time Time Early Due Ranger 8 10 Explorer 6 12 Econoline 150 3 18 Bronco 15 20 Thunderbird 12 22 0 + = 3 18 15 17 + = 29 29 7 8 + = 9 12 14 + = 17 17 3 7 29 + = 44 44 24 Average total inventory = 18 + 12 + 17 + 20 + 44 44
  • 27.
  • 28. Example 16.3 Multiple-Dimension Rule – CR 1 2.3 15 10 6.1 2.46 2 10.5 10 2 7.8 1.28 3 6.2 20 12 14.5 1.38 4 15.6 8 5 10.2 .78 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR = Time remaining to due date Shop time remaining
  • 29. Example 16.3 Multiple-Dimension Rule – S/RO 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO S/RO = Time remaining to due date – Shop time remaining Number of operations remaining
  • 30. Comparing the CR and S/RO Rules 1 2.3 15 10 6.1 2.46 0.89 2 10.5 10 2 7.8 1.28 1.10 3 6.2 20 12 14.5 1.38 0.46 4 15.6 8 5 10.2 .78 – 0.44 Operation Time Time at Remaining Number of Engine to Due Date Operations Shop Time Job Lathe (hr) (Days) Remaining Remaining CR S/RO CR Sequence = 4 – 2 – 3 – 1 S/RO Sequence = 4 – 3 – 1 – 2 CR Sequence =
  • 31.
  • 32.
  • 33.
  • 34. Example 16.5 Johnson’s Rule at the Morris Machine Co. Sequence = M1 M2 M3 M4 M5 Eliminate M3 from consideration. The next shortest time is M2 at Workstation 1, so schedule M2 first. Eliminate M5 from consideration. The next shortest time is M1 at workstation #1, so schedule M1 next. Eliminate M1 and the only job remaining to be scheduled is M4. Time (hr) Motor Workstation 1 Workstation 2 M1 12 22 M2 4 5 M3 5 3 M4 15 16 M5 10 8 Shortest time is 3 hours at workstation 2, so schedule job M3 last. Eliminate M2 from consideration. The next shortest time is M5 at workstation #2, so schedule M5 next to last.
  • 35. The schedule minimizes the idle time of workstation 2 and gives the fastest repair time for all five motors. No other sequence will produce a lower makespan. Example 16.5 Johnson’s Rule at the Morris Machine Co. Workstation M2 (4) M1 (12) M4 (15) M5 (10) M3 (5) Idle—available for further work 0 5 10 15 20 25 30 Day 35 40 45 50 55 60 65 Idle 2 M2 (5) M1 (22) M4 (16) M5 (8) M3 (3) Idle 1 Gantt Chart for the Morris Machine Company Repair Schedule
  • 36.
  • 37.

Notas do Editor

  1. 1
  2. 6
  3. 10
  4. 90
  5. 91
  6. 93
  7. 97
  8. 100
  9. 106
  10. 107
  11. 107
  12. 2
  13. 12
  14. 12
  15. 34
  16. 34
  17. 34
  18. 61
  19. 88