WELCOME TO THE PRESENTATION
ON
APPLICATIONS OF
LEAN APPROACH
IN
MANUFACTURING
COURSE NAME: Business Communication Seminar
COURSE NO: IPE-326
PRESENTED BY
MEMBER’S NAME REG NO:
Ismam Ahmed 2012334062
Musaddeque Hossain 2012334063
Reduan Islam Hridoy 2012334065
Sabbir Ahmed 2012334064
DEPARTMENT OF INDUSTRIAL AND PRODUCTION ENGINEERING
SHAHJALAL UNIVERSITY OF SCIENCE &TECHNOLOGY, SYLHET
CONTENTS What is lean?
Component of lean manufacturing
7 types of wastes
Origin of lean
5S
Batch size reduction
Kanban
Kaizan
Visual contents(Andon,Footprint,Signage)
Cellular plant
Lean in Bangladesh
1
It is a comprehensive set of techniques that are
used to identification and stady elimination of
wastes,improvement of quality,reduction of
production and cost
What is lean
Elimination of waste
Improve of quality
Identification
Reduction cost
2
TPS Definitions of Waste(7 types)
1. Overproduction
2. Waiting, including time in
queue
3. Transportation (between
workstations, or between
supplier and customer)
4. Non-value-adding activities
5. Inventory
6. Waste motion
7. Cost of poor quality: scrap,
rework, and inspection
“Anything that adds Cost to the product without adding Value”
3
Team work
Origin of Lean
Statiscal Process
Control
Plan-Do-Check-Act
cycle
Assembly
line
StandardizedWork
Timestudy
Interchangeable parts
Work
Division
“Doing more with
less”
JIT
Jidoka
Kaizen
SMED
Pull system
4
Waste is Often Built Into Jobs
Gilbreth study on brick setup
Need 7-8 sec to setup a single brick Need 2-3 sec to setup a single brick
5
Lean Tools
Workplace Organization: 5S
Lean
Tools
Kanban
Kaizen
Work balancing (TAKT Time)
Visual Management
Set-up Eeduction (SMED)
Heijunka
Batch Size Reduction
Standardized Work
Error-Proofing (Poka-Yoke)
Total Productive Maintenance (TPM)
Jidoka (autonomotion)
6
Inventory level
 Delivering smaller quantities can reduce inventory levels
Inventory level
Batch Size Reduction
Lower Scrap
Lower holding cost
Space utilization
Higher productivity
7
Jidoka(Autonomation)
Autonomation
Automation
+
Human
intelligence
A level of human intelligence is transferred into automated machinery
Practice of stopping a manual line or process automatically
Frees the operator from watching the machine
8
Jidoka(Autonomation)
9
Before
JIDOKA
After
Jidoda
SUSTIPE
Stopped
10
SIGNBOARD
KAN
署名する
BAN
ボード
+
=
KANBAN
Pigon hole Signal Sticky notes box
11
KANBAN
Pending Analysis Development Test
Doing Done Doing Done
p11
p4
p12
p14
p13
p5
p8
p2
p9
p10
p7
p1
p3
p6
Where is Product-3 now?
Search the hole
plant?
Check Kanban list?
12
p1 p2 p3 p4 p5 p6 p7 p8 p9 p10 p10 p11 p12 p13 p14
5S (Workplace Organization)
Organisation/
Sort out
SEIRI
Orderliness/
Systemize
SEITON
Standardize
SEIKETSU
Sustain/
Discipline
SHITSUKE
The Cleaning/
Shining
SEISO
 Developed by the Japanese
 Housekeeping System
 Helps Create a Better Working Environment and a Consistently High Quality Process
 Make faster assembly plant
13
5S Effect on Office
Clean top
Similar
papers in
files
Paper
arranged
SEIRI SEITON SEISO SEIKETSU SHITSUKE
14
VISUAL CONTROL
lighting
System
Floor
painting
Picture
Diagram
Color
coded
tool
Andons SignageFootprint
15
Types of Andon
Coded signal lightsText Graphics
Visual Andon
Green - no problems
Yellow - situation requires
attention, production flow at risk
Red - PRODUCTION STOPPAGE:
IMMEDIATE ASSISTANCE
REQUIRED
1
 Display production data in
real time.
 Calculate shift efficiencies
and production targets.
 Ideal for STOP /
WAIT / GO signaling
in busy factories
 Boost health and
safety.
Coded
Tones
Coded
Tunes
Prerecorded
Messages
Buzzers
/ Alarms
Audio Andon
2
ANDON
16
FOOT-PRINT
 avoids employees wasting time looking for things
 The workplace becomes clean and better organized.
 Operation on the shop floor and office become easier and safer
Use colours as a guideline :
Light Blue - Raw parts/material
Black - Finished good/parts
Red - Non-conforming/KIV parts/material
White - Other than parts/material
Yellow – Border of work area
17
SIGNAGE
Provide information about:
•hazardous and risky areas & installation
• materials
• safety measures
• emergency exits, etc.
Signage
Displays Control
18
KAIZEN
ACT
Check
Do
Plan
Customar
Need
Kaizen
• is a tool to rapidly improve work as part of the PDCA cycle
• is a tool for Continuos process
• goals must align with the business objectives
KAI ZEN = Change for the better
19
Cellular Layout
• Produces families of parts within a single line
• Reduce cycle time
• Reduce time wastes
Storage
Drilling
joint
Threading Turning
Packing
Data
45
%
65
%
Assembly
check
Quality
20
Functional layoutCelluar Layout
© Siemens Power Generation Systems
21
Reduction in unit production cost
Company Name Before
Lean
($)
After
Lean
($)
Reduction
($)
As a %
1. Fashion Point Ltd.
2. Texas Fashion Ltd.
3. Beximco Fashions Ltd.
4. Shanta Industries Ltd.
5. DADA (Savar) Ltd.
6. Shata WashWorks Ltd.
7. Armana Fashions Ltd.
8. Shanta Denims Ltd.
9. PAXAR Bangladesh Ltd.
8.50
11.0
4.40
10.0
1.40
3.50
0.87
-
4.50
7.00
9.00
3.20
8.00
1.30
3.00
0.84
-
3.00
1.50
2.00
1.20
2.00
0.10
0.50
0.03
-
1.50
17.6
18.1
27.2
20.0
7.1
14.2
3.4
-
33.3
Application of lean in Bangladeshi companies
22
 Removes unnecessary activities
 Removes in-plant inventory
 Removes in-transit inventory
 Improves quality and reliability
JUST IN TIME (JIT)
23
Traditional approach
JIT approach
stage A
orders
deliveries
orders
deliveries
JIT material flow
buffer
inventory
stage B
buffer
inventory
stage
C
stage A stage Cstage B
24
POKA-YOKE(ERROR PROOF)
POKA-YOKE is part of the Just-in-time philosophy
POKA-YOKE reduces the defect rate that is part of the OEE rate
 Weight
 Dimensions
 Shape
Suggested Methods:
25
Examples of POKE-YOKE
26
THANK
YOU
ANY
QUESTIONS?

Mais conteúdo relacionado

Mais procurados (20)

Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
Jit
JitJit
Jit
 
Visual control
Visual controlVisual control
Visual control
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Heijunka
HeijunkaHeijunka
Heijunka
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 

Destaque

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Build Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean WayBuild Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean WayNascenia IT
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
1. introduction to process & process management
1. introduction to process & process management1. introduction to process & process management
1. introduction to process & process managementHakeem-Ur- Rehman
 
Evolution of lean tps - November 2016
Evolution of lean   tps - November 2016Evolution of lean   tps - November 2016
Evolution of lean tps - November 2016W3 Group Canada Inc.
 
Quality kpi examples
Quality kpi examplesQuality kpi examples
Quality kpi examplesgallasbrows
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
Quality Metrics
Quality Metrics Quality Metrics
Quality Metrics Haroon Abbu
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Yadhu Gopinath
 
Key performance indicators 2010
Key performance indicators 2010Key performance indicators 2010
Key performance indicators 2010Hj Arriffin Mansor
 
Quality Control and Improvement in Manufacturing
Quality Control and Improvement in ManufacturingQuality Control and Improvement in Manufacturing
Quality Control and Improvement in ManufacturingSSA KPI
 
Qc manager kpi
Qc manager kpiQc manager kpi
Qc manager kpipovitjom
 

Destaque (20)

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
Tps tools
Tps toolsTps tools
Tps tools
 
Build Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean WayBuild Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean Way
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
1. introduction to process & process management
1. introduction to process & process management1. introduction to process & process management
1. introduction to process & process management
 
Evolution of lean tps - November 2016
Evolution of lean   tps - November 2016Evolution of lean   tps - November 2016
Evolution of lean tps - November 2016
 
Quality kpi examples
Quality kpi examplesQuality kpi examples
Quality kpi examples
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
Kpi quality assurance
Kpi quality assuranceKpi quality assurance
Kpi quality assurance
 
Wiring harness
Wiring harnessWiring harness
Wiring harness
 
Quality Metrics
Quality Metrics Quality Metrics
Quality Metrics
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
 
5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology 5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology
 
Key performance indicators 2010
Key performance indicators 2010Key performance indicators 2010
Key performance indicators 2010
 
Lean System
Lean SystemLean System
Lean System
 
Quality Control and Improvement in Manufacturing
Quality Control and Improvement in ManufacturingQuality Control and Improvement in Manufacturing
Quality Control and Improvement in Manufacturing
 
Quality Metrics
Quality MetricsQuality Metrics
Quality Metrics
 
Qc manager kpi
Qc manager kpiQc manager kpi
Qc manager kpi
 

Semelhante a Applications of lean manufacturing tools

Application of lean Approach in Manufacturing Sector.
Application of lean Approach in Manufacturing Sector.   Application of lean Approach in Manufacturing Sector.
Application of lean Approach in Manufacturing Sector. Mosaddik Hossain
 
Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industrypraaditya2020
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011LCI1998
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturingNouman Ali
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six SigmaIRJET Journal
 
Mistake Proofing and Poka-Yoke.ppt
Mistake Proofing and Poka-Yoke.pptMistake Proofing and Poka-Yoke.ppt
Mistake Proofing and Poka-Yoke.pptManish Pathak
 
Presentation - Productivity Improvement via Lean Management
Presentation - Productivity Improvement via Lean ManagementPresentation - Productivity Improvement via Lean Management
Presentation - Productivity Improvement via Lean ManagementSyed Zeeshan Arshad
 
Cindy Novak Quality Expo 092209 Presentation
Cindy Novak Quality Expo 092209 PresentationCindy Novak Quality Expo 092209 Presentation
Cindy Novak Quality Expo 092209 PresentationCindy Novak
 
Business process innovation for entrepreneurs
Business process innovation for entrepreneursBusiness process innovation for entrepreneurs
Business process innovation for entrepreneursJorge Saguinsin
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsTanuj Kujur
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)Arunnima B S
 
Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)STAY CURIOUS
 
Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 

Semelhante a Applications of lean manufacturing tools (20)

Application of lean Approach in Manufacturing Sector.
Application of lean Approach in Manufacturing Sector.   Application of lean Approach in Manufacturing Sector.
Application of lean Approach in Manufacturing Sector.
 
Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industry
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Mistake Proofing and Poka-Yoke.ppt
Mistake Proofing and Poka-Yoke.pptMistake Proofing and Poka-Yoke.ppt
Mistake Proofing and Poka-Yoke.ppt
 
Presentation - Productivity Improvement via Lean Management
Presentation - Productivity Improvement via Lean ManagementPresentation - Productivity Improvement via Lean Management
Presentation - Productivity Improvement via Lean Management
 
Cindy Novak Quality Expo 092209 Presentation
Cindy Novak Quality Expo 092209 PresentationCindy Novak Quality Expo 092209 Presentation
Cindy Novak Quality Expo 092209 Presentation
 
Business process innovation for entrepreneurs
Business process innovation for entrepreneursBusiness process innovation for entrepreneurs
Business process innovation for entrepreneurs
 
Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 

Último

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Último (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 

Applications of lean manufacturing tools

  • 1. WELCOME TO THE PRESENTATION ON APPLICATIONS OF LEAN APPROACH IN MANUFACTURING
  • 2. COURSE NAME: Business Communication Seminar COURSE NO: IPE-326 PRESENTED BY MEMBER’S NAME REG NO: Ismam Ahmed 2012334062 Musaddeque Hossain 2012334063 Reduan Islam Hridoy 2012334065 Sabbir Ahmed 2012334064 DEPARTMENT OF INDUSTRIAL AND PRODUCTION ENGINEERING SHAHJALAL UNIVERSITY OF SCIENCE &TECHNOLOGY, SYLHET
  • 3. CONTENTS What is lean? Component of lean manufacturing 7 types of wastes Origin of lean 5S Batch size reduction Kanban Kaizan Visual contents(Andon,Footprint,Signage) Cellular plant Lean in Bangladesh 1
  • 4. It is a comprehensive set of techniques that are used to identification and stady elimination of wastes,improvement of quality,reduction of production and cost What is lean Elimination of waste Improve of quality Identification Reduction cost 2
  • 5. TPS Definitions of Waste(7 types) 1. Overproduction 2. Waiting, including time in queue 3. Transportation (between workstations, or between supplier and customer) 4. Non-value-adding activities 5. Inventory 6. Waste motion 7. Cost of poor quality: scrap, rework, and inspection “Anything that adds Cost to the product without adding Value” 3
  • 6. Team work Origin of Lean Statiscal Process Control Plan-Do-Check-Act cycle Assembly line StandardizedWork Timestudy Interchangeable parts Work Division “Doing more with less” JIT Jidoka Kaizen SMED Pull system 4
  • 7. Waste is Often Built Into Jobs Gilbreth study on brick setup Need 7-8 sec to setup a single brick Need 2-3 sec to setup a single brick 5
  • 8. Lean Tools Workplace Organization: 5S Lean Tools Kanban Kaizen Work balancing (TAKT Time) Visual Management Set-up Eeduction (SMED) Heijunka Batch Size Reduction Standardized Work Error-Proofing (Poka-Yoke) Total Productive Maintenance (TPM) Jidoka (autonomotion) 6
  • 9. Inventory level  Delivering smaller quantities can reduce inventory levels Inventory level Batch Size Reduction Lower Scrap Lower holding cost Space utilization Higher productivity 7
  • 10. Jidoka(Autonomation) Autonomation Automation + Human intelligence A level of human intelligence is transferred into automated machinery Practice of stopping a manual line or process automatically Frees the operator from watching the machine 8
  • 14. KANBAN Pending Analysis Development Test Doing Done Doing Done p11 p4 p12 p14 p13 p5 p8 p2 p9 p10 p7 p1 p3 p6 Where is Product-3 now? Search the hole plant? Check Kanban list? 12 p1 p2 p3 p4 p5 p6 p7 p8 p9 p10 p10 p11 p12 p13 p14
  • 15. 5S (Workplace Organization) Organisation/ Sort out SEIRI Orderliness/ Systemize SEITON Standardize SEIKETSU Sustain/ Discipline SHITSUKE The Cleaning/ Shining SEISO  Developed by the Japanese  Housekeeping System  Helps Create a Better Working Environment and a Consistently High Quality Process  Make faster assembly plant 13
  • 16. 5S Effect on Office Clean top Similar papers in files Paper arranged SEIRI SEITON SEISO SEIKETSU SHITSUKE 14
  • 18. Types of Andon Coded signal lightsText Graphics Visual Andon Green - no problems Yellow - situation requires attention, production flow at risk Red - PRODUCTION STOPPAGE: IMMEDIATE ASSISTANCE REQUIRED 1  Display production data in real time.  Calculate shift efficiencies and production targets.  Ideal for STOP / WAIT / GO signaling in busy factories  Boost health and safety. Coded Tones Coded Tunes Prerecorded Messages Buzzers / Alarms Audio Andon 2 ANDON 16
  • 19. FOOT-PRINT  avoids employees wasting time looking for things  The workplace becomes clean and better organized.  Operation on the shop floor and office become easier and safer Use colours as a guideline : Light Blue - Raw parts/material Black - Finished good/parts Red - Non-conforming/KIV parts/material White - Other than parts/material Yellow – Border of work area 17
  • 20. SIGNAGE Provide information about: •hazardous and risky areas & installation • materials • safety measures • emergency exits, etc. Signage Displays Control 18
  • 21. KAIZEN ACT Check Do Plan Customar Need Kaizen • is a tool to rapidly improve work as part of the PDCA cycle • is a tool for Continuos process • goals must align with the business objectives KAI ZEN = Change for the better 19
  • 22. Cellular Layout • Produces families of parts within a single line • Reduce cycle time • Reduce time wastes Storage Drilling joint Threading Turning Packing Data 45 % 65 % Assembly check Quality 20
  • 23. Functional layoutCelluar Layout © Siemens Power Generation Systems 21
  • 24. Reduction in unit production cost Company Name Before Lean ($) After Lean ($) Reduction ($) As a % 1. Fashion Point Ltd. 2. Texas Fashion Ltd. 3. Beximco Fashions Ltd. 4. Shanta Industries Ltd. 5. DADA (Savar) Ltd. 6. Shata WashWorks Ltd. 7. Armana Fashions Ltd. 8. Shanta Denims Ltd. 9. PAXAR Bangladesh Ltd. 8.50 11.0 4.40 10.0 1.40 3.50 0.87 - 4.50 7.00 9.00 3.20 8.00 1.30 3.00 0.84 - 3.00 1.50 2.00 1.20 2.00 0.10 0.50 0.03 - 1.50 17.6 18.1 27.2 20.0 7.1 14.2 3.4 - 33.3 Application of lean in Bangladeshi companies 22
  • 25.  Removes unnecessary activities  Removes in-plant inventory  Removes in-transit inventory  Improves quality and reliability JUST IN TIME (JIT) 23
  • 26. Traditional approach JIT approach stage A orders deliveries orders deliveries JIT material flow buffer inventory stage B buffer inventory stage C stage A stage Cstage B 24
  • 27. POKA-YOKE(ERROR PROOF) POKA-YOKE is part of the Just-in-time philosophy POKA-YOKE reduces the defect rate that is part of the OEE rate  Weight  Dimensions  Shape Suggested Methods: 25

Notas do Editor

  1. Hello everyone I am ishmam ahmed My registration number is 2012334062 The topic of our presentation is “application of lean approach in manufacturing
  2. Our group consists of four members
  3. Here is the contents of our presentation Basically it contains about lean, lean tools and their applications Hope it will make a clear understanding about “Lean Processing”
  4. If Jidoka is not practiced then you can not attain a very high level quality and productivity will suffer since you are not catching problems.” Mr. Tomo Harada, 35 years with Toyota Motor Corporation in a variety of management positions