2. Dube TradePort
Dube TradePort is Southern Africa's premier air logistics platform, and is situated within a
30-minute drive from the city centre of Durban, KwaZulu-Natal, South Africa.
Dube TradePort is home to King Shaka International Airport and houses South Africa's first 4
flexible cargo stands to serve the Dube TradePort Cargo Terminal.
The tradeport has a 60-year masterplan, utilising a 2 840-hectare greenfield site, and offers a high
degree of certainty for regulated and sustainable expansion over that period. The first phase of
the development has been completed by the KwaZulu-Natal Provincial Government and the
Airports Company South Africa (ACSA), with an investment of R8-billion.
Dube TradePort is stimulating transit-orientated development around the airport and is fast
becoming the catalyst for global business and trade by providing a platform for integrating
supply chains, accelerating efficiencies and offering business the agility to compete globally.
The Dube TradePort Corporation is a wholly-owned government company and is mandated to
drive the development of:
• A Cargo Terminal: the most secure and fully-automated facility, directly linked to
Dube TradeZone.
• A TradeZone: a 77-hectare specialist precinct, providing airside access to
manufacturers, assemblers and distributors.
• An AgriZone: the most sophisticated agricultural growing, packing and distribution
facility in Africa, with its own modern plant tissue culture facility, Dube Agrilab.
• Dube City: 12 hectares of premium office, retail, hospitality and leisure space, all
located in an urban green precinct.
• All the zones are supported by Dube iConnect, Dube TradePort's dedicated IT and
telecoms provider, delivering global connectivity.
3. 2840
HECTARES THE LARGEST GREENFIELD AIRPORT DEVELOPMENT IN AFRICA
30
MINUTE
DRIVE FROM DURBAN CBD
3.7
FIRST
BUILT
KM
16 527EMPLOYMENT
THE MASTERPLAN FOR
03 MIN FROM DUBE CITY TO KING SHAKA INTERNATIONAL
1GOAL TO MOVE YOUR BUSINESS FORWARD
SINCE 2007
01PURPOSE-AIRPORT
CITY
IN AFRICA
THE LONGEST SEA-LEVEL
RUNWAY IN THE COUNTRY
DIRECT
OPPORTUNITIES
DTP 701 KWP
CAPACITY TO GENERATE ENERGY BY
SOLAR PANELS AT DUBE AGRIZONE
DISTANCE FROM CBD: 30 MINS
TO UMHLANGA: 20 MINS
TO BALLITO: 15 MINS
60DUBE TRADEPORT
DEVELOPMENT
YEARS
3500
LEARNERS
BENEFITED FROM CSI PROGRAMME
4. 1
03
MINUTES FROM AN OFFICE AT DUBE CITY TO
KING SHAKA INTERNATIONAL AIRPORT
300
3 COMING SOON
120 000SQM
OF BULK TO DEVELOP
FULLY EQUIPPED
CONFERENCE CENTRE
30 MINUTES
FROM DURBAN
SEATER
60 & RESTAURANT
YEAR
HOTEL
CBD 10BLOCKS
TO DEVELOP
MASTER
PLAN
ZONED FOR
BUSINESS
RETAIL AND HOSPITALITY
1GOAL TO MOVE YOUR BUSINESS FORWARD
5. 2
16 HECTARES GLASS HOUSE GROWING AREA AT DUBE AGRIZONE
80%
OF AGRIZONE
GREENHOUSE
WATER DEMAND IS
RAIN-WATER HARVESTED
ANNUAL PLANTLET
PRODUCTION
& SUPPLY CAPACITY 5
MILLION
THE ONLY COMMERCIAL
TISSUE CULTURE
01LAB IN KZN AND DISTRIBUTION
ON-SITE PACKING
1MILLION
FACILITY
AGRILAB
FARMWISE
90 HECTARES
AVAILABLE FOR INVESTORS AND TENANTS PHASE 2
YEARLY FLOWER POT
GROWING CAPACITY 40TONNES
OF FRESH PRODUCE GROWN WEEKLY
1GOAL TO MOVE YOUR BUSINESS FORWARD
7. 45 KILOMETRES THE DISTANCE FROM DUBE TRADEPORT
TO DURBAN HARBOUR, AFRICA’S BUSIEST CARGO PORT
CARGO TERMINAL
OPERATIONAL 24/7
4ON-SITE STATE
REGULATORY AGENTS
CARGO0%
LOSS
CONNECTIVITY TO SA’S
DUBE TRADEPORT
RICHARDS BAY
MORE THAN
120
GLOBAL
DESTINATIONS
ON DAILY
DBN-DUBAI
TERMINAL
777
EMIRATES BOEING
WITH 50% EXTRA CARGO CAPACITY
320MFULLY AUTOMATED
GOAL TO ADD VALUE TO YOUR SUPPLY CHAIN
1
AIROAD
INTEGRATED ROAD
MAJOR COMMERCIAL CENTRES
100 000
TONNES:
ANNUAL CARGO
HANDLING CAPACITY
DURBAN
KZN
AIR BRIDGE
2 000 000 EXPECTED ANNUAL CARGO CAPACITY BY 2060
TONNES
4
8. 5
77 HECTARES OF INDUSTRIAL LAND WITHIN 1 MIN OF DUBE CARGO TERMINAL
51HECTARES
AVAILABLE IN 2015
PHASE 2
OF INDUSTRIAL LAND
HIGH AVAILABILITY
IT INFRASTRUCTURE
200 FROM TRADEZONE TO
METRES
CARGO TERMINAL
1GOAL TO ADD VALUE TO YOUR SUPPLY CHAIN