107. TUNNEL
CUT & COVER TUNNEL BY BOTTOM UP METHOD
10300 - 21250 mm
Final Ground Level
2000
4000 - 10000 mm
Diaphragm Wall
1000 / 1200 mm
Backfilled Area
Cut & Cover Excavation
5200
Partition Wall
300 mm thk.
Embedment
approx. 5 - 7
Down Up
Line Line
108. STATION
STAGE 1 – DIAPHRAGM WALL & BARRETTE
Diaphragm Walls
constructed as for
tunnels
Approximately 20 - 25 metres
Steel Column plunged
in the bore & filled with
sand @ 8.4 M C/C
4.5 X 1 m Barrette
Cast upto Bottom
Slab level @ 8.4 m c/c
109. STATION
STAGE 2 – STRUTS FIXING & TOP SLAB
Approx
3-4m
114. STATION
STAGE 7 – BACK FILLING
Backfi l l
Concourse Concourse
Pl atform Pl atform
down l i ne up l i ne
115. CHALLANGES
GROUND WATER
UTILITY HANDLING
WATER LINES
ELECTRICAL LINES
TELECOMMUNICATION LINES
SEWAGE LINES
CITY DRAINS
TRAFFIC MANAGEMENT
PRODUCTION IN NIGHT
THIRD PARTY MANAGEMENT