National Guard
Black Belt Training
      Module 18

 Theory of Constraints
UNCLASSIFIED / FOUO




CPI Roadmap – Measure
                                                             8-STEP PROCESS
                                                                                                       6. See
   1.Validate          2. Identify           3. Set          4. Determine          5. Develop                           7. Confirm     8. Standardize
                                                                                                      Counter-
      the             Performance         Improvement            Root               Counter-                             Results         Successful
                                                                                                      Measures
    Problem               Gaps              Targets              Cause             Measures                             & Process         Processes
                                                                                                      Through

        Define                Measure                         Analyze                           Improve                        Control


                                                                       TOOLS
                                                                  •Process Mapping
                                    ACTIVITIES
                  •   Map Current Process / Go & See              •Process Cycle Efficiency/TOC
                  •   Identify Key Input, Process, Output Metrics •Little’s Law
                  •   Develop Operational Definitions             •Operational Definitions
                  •   Develop Data Collection Plan                •Data Collection Plan
                  •   Validate Measurement System                 •Statistical Sampling
                  •   Collect Baseline Data                       •Measurement System Analysis
                  •   Identify Performance Gaps                   •TPM
                  •   Estimate Financial/Operational Benefits     •Generic Pull
                  •   Determine Process Stability/Capability      •Setup Reduction
                  •   Complete Measure Tollgate                   •Control Charts
                                                                  •Histograms
                                                                  •Constraint Identification
                                                                  •Process Capability                                                             2


                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive.            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Learning Objectives

          Understand principles of TOC
          Learn and apply the 5 focusing steps
          Analyze Drum – Buffer - Rope
          Differentiate and apply Little’s Law, takt
           time and cycle time
          Use TOC to improve a process



                                                                     3


                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Video: The Goal

         Questions as you watch:
            What are the 5 steps?
            What is step 0?
            Who/what is the bottleneck? Why?
            How is the process fixed?
            What is POOGI?



                    The Goal: A Process of Ongoing Improvement
               Based on the book by Eliyahu Goldratt and Jeff Cox (2004)
                                                                                    4


                                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




What is “Theory of Constraints” (TOC)?
       Basic Principles of TOC:
            – A system must have a goal on which everything in that system is
              evaluated
            – Systems function as chains. Strengthening the weakest link
              benefits the system the most
            – Optimum system performance is NOT equal to the sum of the
              individual process optima
            – Systems operate in an environment of cause and effect. Visible
              problems are usually indicators (undesirable effects or UDE) of
              some critical root cause(s) that must be addressed
            – An optimal solution deteriorates over time. Improvement must be
              continuous.
            – Policy constraints are the most common and most difficult to
              break. Policy constraints offer the most opportunity for system
              improvement.
                                                                                  5


                                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Measures of Progress

      Throughput: The rate at which the system produces
       customer value or generates money


      Inventory: Inventory is all the money invested in buying
       things that will at some time be sold (turned into
       Throughput) or that is tied up in the system (investment).
       Includes costs for raw materials, infrastructure, etc.


      Operating Expense: The costs associated with turning
       Inventory into Throughput. Includes costs for labor,
       utilities, interest, etc.

                                                                         6


                                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Focuses on Constraints

           A constraint is anything that impedes Throughput.

           TOC concentrates on identifying and improving the
            worst impediment

           Identifying constraints
             – Visual identification of WIP (Work in Process)
             – Calculating Throughput for each process step




                                                                             7


                                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Principles
     What are the 5 focusing steps of Theory of
     Constraints?
                                            Step 0: Know the Goal!
               1. Identify the constraint
               2. Exploit the constraint
               3. Subordinate everything else to the constraint
               4. Elevate the constraint
               5. Re-evaluate, go back to step 1
    How can you identify the constraint?
              Piles of WIP or calculate cycle time
                                                                          8


                                                             UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




D-B-R Concept


         Drum –      The speed at which the constraint
                      performs
         Buffer –    A “safety stock” to account for
                      process variation so the constraint
                      doesn’t “starve”
         Rope -      A signal to make sure that correct
                      “number of things in process” put into
                      the system at the appropriate time
                                                                    9


                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Definitions

         Define Work in Process
          WIP - (Work in Process) the “number
          of things in process” at any given time

        Define Exit Rate
         The amount of work completed over a
         given period of time, which should also
         equal customer demand (“completions per
         hour”).
                                                                10


                                                    UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Definitions
   What is Little’s Law and what does it
   represent?
                                Work in Process (WIP)
     Process Cycle Time =
                                     Exit Rate


                      Voice of the process




                                                                    11


                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Definitions

   What is Takt Time and what does it
   represent?
         Time available for work in the given time period
            Customer demand for a given time period


                      Voice of the customer




                                                                  12


                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Definitions
        Define Cycle Time
         Cycle Time: The time it takes a product to
          move (cycle) through a step or a process,
          including queue and move times.

         Common synonyms (often used
          interchangeably):
           – Flow Time
           – Lead Time
           – Throughput Time
                                                                   13


                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Example

                         P1           P2          P3          P4
                      12 seconds   10 seconds   5 seconds   8 seconds




    What is the process cycle time?
                        12 + 10 + 5 + 8 = 35 seconds

   If the Takt time is 11 seconds, where is the
   constraint, and why?
                              P1, it exceeds the Takt time
                                                                                    14


                                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




TOC Flow & Pull

        Explain the difference between Push
        and Pull work systems
       Push: Work is pushed into the system or
        process based on forecasts or schedules
       Pull: A customer-driven system that produces
        and moves a product/service only when the
        customer needs it


                                                              15


                                                  UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Knowledge Check

                      TOC is….(pick one)
    A. A new way of getting people to work harder
    B. Strengthening the weakest link (constraint) in a
       system
    C. A fancy scheduling tool meant to confuse workers
    D. Adding extra inspections to get first time quality




                                                                      16


                                                          UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Knowledge Check

                      Lean is….(pick one)
      A. A new weight loss program for employees
      B. A war on Waste
      C. Reducing manning
      D. Adding extra inspections to get first time quality




                                                                     17


                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Knowledge Check

                      Six Sigma is….(pick one)
    A. A new way of using metrics to blame workers
    B. A war on variation
    C. Complicated statistics meant to confuse workers
    D. Adding extra inspections to get first time quality




                                                                    18


                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                                 19


                                     UNCLASSIFIED / FOUO

Mais conteúdo relacionado

Mais procurados

NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution SelectionLeanleaders.org
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of CustomerLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessLeanleaders.org
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventLeanleaders.org
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple RegressionLeanleaders.org
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapLeanleaders.org
 

Mais procurados (19)

NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of Customer
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the Process
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
NG BB 01 Introduction
NG BB 01 IntroductionNG BB 01 Introduction
NG BB 01 Introduction
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement Event
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple Regression
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
NG BB 26 Control Charts
NG BB 26 Control ChartsNG BB 26 Control Charts
NG BB 26 Control Charts
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 

Destaque (20)

The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
 
Oee guide
Oee guideOee guide
Oee guide
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
OEE
OEEOEE
OEE
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
OEE
OEEOEE
OEE
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
OEE
OEEOEE
OEE
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 
Value stream mapping ppt
Value stream mapping pptValue stream mapping ppt
Value stream mapping ppt
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping training
 

Semelhante a NG BB 18 Theory of Constraints

NG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - IntroductionNG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - IntroductionLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeNG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 20 Data Collection
NG BB 20 Data CollectionNG BB 20 Data Collection
NG BB 20 Data CollectionLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisLeanleaders.org
 
NG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousNG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousLeanleaders.org
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized WorkLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabLeanleaders.org
 
NG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixNG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixLeanleaders.org
 
NG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixNG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixLeanleaders.org
 
NG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing BasicsNG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing BasicsLeanleaders.org
 

Semelhante a NG BB 18 Theory of Constraints (20)

NG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - IntroductionNG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - Introduction
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeNG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - Attribute
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 20 Data Collection
NG BB 20 Data CollectionNG BB 20 Data Collection
NG BB 20 Data Collection
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects Analysis
 
NG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousNG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - Continuous
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized Work
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to Minitab
 
NG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixNG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) Matrix
 
NG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) MatrixNG BB 31 Cause and Effect (XY) Matrix
NG BB 31 Cause and Effect (XY) Matrix
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing BasicsNG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing Basics
 

Mais de Leanleaders.org

Mais de Leanleaders.org (20)

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
G04 Root Cause Relationships
G04 Root Cause RelationshipsG04 Root Cause Relationships
G04 Root Cause Relationships
 
15 Deliv template
15 Deliv template15 Deliv template
15 Deliv template
 

Último

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Último (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 

NG BB 18 Theory of Constraints

  • 1. National Guard Black Belt Training Module 18 Theory of Constraints
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Measure 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control TOOLS •Process Mapping ACTIVITIES • Map Current Process / Go & See •Process Cycle Efficiency/TOC • Identify Key Input, Process, Output Metrics •Little’s Law • Develop Operational Definitions •Operational Definitions • Develop Data Collection Plan •Data Collection Plan • Validate Measurement System •Statistical Sampling • Collect Baseline Data •Measurement System Analysis • Identify Performance Gaps •TPM • Estimate Financial/Operational Benefits •Generic Pull • Determine Process Stability/Capability •Setup Reduction • Complete Measure Tollgate •Control Charts •Histograms •Constraint Identification •Process Capability 2 Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO
  • 3. UNCLASSIFIED / FOUO Learning Objectives  Understand principles of TOC  Learn and apply the 5 focusing steps  Analyze Drum – Buffer - Rope  Differentiate and apply Little’s Law, takt time and cycle time  Use TOC to improve a process 3 UNCLASSIFIED / FOUO
  • 4. UNCLASSIFIED / FOUO Video: The Goal Questions as you watch:  What are the 5 steps?  What is step 0?  Who/what is the bottleneck? Why?  How is the process fixed?  What is POOGI? The Goal: A Process of Ongoing Improvement Based on the book by Eliyahu Goldratt and Jeff Cox (2004) 4 UNCLASSIFIED / FOUO
  • 5. UNCLASSIFIED / FOUO What is “Theory of Constraints” (TOC)?  Basic Principles of TOC: – A system must have a goal on which everything in that system is evaluated – Systems function as chains. Strengthening the weakest link benefits the system the most – Optimum system performance is NOT equal to the sum of the individual process optima – Systems operate in an environment of cause and effect. Visible problems are usually indicators (undesirable effects or UDE) of some critical root cause(s) that must be addressed – An optimal solution deteriorates over time. Improvement must be continuous. – Policy constraints are the most common and most difficult to break. Policy constraints offer the most opportunity for system improvement. 5 UNCLASSIFIED / FOUO
  • 6. UNCLASSIFIED / FOUO TOC Measures of Progress  Throughput: The rate at which the system produces customer value or generates money  Inventory: Inventory is all the money invested in buying things that will at some time be sold (turned into Throughput) or that is tied up in the system (investment). Includes costs for raw materials, infrastructure, etc.  Operating Expense: The costs associated with turning Inventory into Throughput. Includes costs for labor, utilities, interest, etc. 6 UNCLASSIFIED / FOUO
  • 7. UNCLASSIFIED / FOUO TOC Focuses on Constraints  A constraint is anything that impedes Throughput.  TOC concentrates on identifying and improving the worst impediment  Identifying constraints – Visual identification of WIP (Work in Process) – Calculating Throughput for each process step 7 UNCLASSIFIED / FOUO
  • 8. UNCLASSIFIED / FOUO TOC Principles What are the 5 focusing steps of Theory of Constraints? Step 0: Know the Goal! 1. Identify the constraint 2. Exploit the constraint 3. Subordinate everything else to the constraint 4. Elevate the constraint 5. Re-evaluate, go back to step 1 How can you identify the constraint? Piles of WIP or calculate cycle time 8 UNCLASSIFIED / FOUO
  • 9. UNCLASSIFIED / FOUO D-B-R Concept  Drum – The speed at which the constraint performs  Buffer – A “safety stock” to account for process variation so the constraint doesn’t “starve”  Rope - A signal to make sure that correct “number of things in process” put into the system at the appropriate time 9 UNCLASSIFIED / FOUO
  • 10. UNCLASSIFIED / FOUO TOC Definitions Define Work in Process WIP - (Work in Process) the “number of things in process” at any given time Define Exit Rate The amount of work completed over a given period of time, which should also equal customer demand (“completions per hour”). 10 UNCLASSIFIED / FOUO
  • 11. UNCLASSIFIED / FOUO TOC Definitions What is Little’s Law and what does it represent? Work in Process (WIP) Process Cycle Time = Exit Rate Voice of the process 11 UNCLASSIFIED / FOUO
  • 12. UNCLASSIFIED / FOUO TOC Definitions What is Takt Time and what does it represent? Time available for work in the given time period Customer demand for a given time period Voice of the customer 12 UNCLASSIFIED / FOUO
  • 13. UNCLASSIFIED / FOUO TOC Definitions Define Cycle Time  Cycle Time: The time it takes a product to move (cycle) through a step or a process, including queue and move times.  Common synonyms (often used interchangeably): – Flow Time – Lead Time – Throughput Time 13 UNCLASSIFIED / FOUO
  • 14. UNCLASSIFIED / FOUO TOC Example P1 P2 P3 P4 12 seconds 10 seconds 5 seconds 8 seconds What is the process cycle time? 12 + 10 + 5 + 8 = 35 seconds If the Takt time is 11 seconds, where is the constraint, and why? P1, it exceeds the Takt time 14 UNCLASSIFIED / FOUO
  • 15. UNCLASSIFIED / FOUO TOC Flow & Pull Explain the difference between Push and Pull work systems  Push: Work is pushed into the system or process based on forecasts or schedules  Pull: A customer-driven system that produces and moves a product/service only when the customer needs it 15 UNCLASSIFIED / FOUO
  • 16. UNCLASSIFIED / FOUO Knowledge Check TOC is….(pick one) A. A new way of getting people to work harder B. Strengthening the weakest link (constraint) in a system C. A fancy scheduling tool meant to confuse workers D. Adding extra inspections to get first time quality 16 UNCLASSIFIED / FOUO
  • 17. UNCLASSIFIED / FOUO Knowledge Check Lean is….(pick one) A. A new weight loss program for employees B. A war on Waste C. Reducing manning D. Adding extra inspections to get first time quality 17 UNCLASSIFIED / FOUO
  • 18. UNCLASSIFIED / FOUO Knowledge Check Six Sigma is….(pick one) A. A new way of using metrics to blame workers B. A war on variation C. Complicated statistics meant to confuse workers D. Adding extra inspections to get first time quality 18 UNCLASSIFIED / FOUO
  • 19. UNCLASSIFIED / FOUO What other comments or questions do you have? 19 UNCLASSIFIED / FOUO