Project Delivery
Framework

1

John Napier
Project Delivery Framework - PDF
 To create a common language that can be used across the entire firm for consistent project
interpretation and cross impact project collaboration.
 To provide foundational guidance for newly integrated units to incorporate major processes.
 To enable consistent financial reporting, compilation and aggregation of critical project reporting
and analysis.
 To enable more productive integration of cross-impact and firm-wide processes and tools.
 To enable more effective process development and integration.
 To enable more effective and accurate process analysis, measurement and improvement, in the
future.
 To enable more efficient mobility in the workforce to work in different projects with the same
common understanding and faster startup.

2
Phase Definitions
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

The objective of each phase has been defined to ensure consistency in use of the
phase reference. E.g. When LOBs report a project is in the Requirements phase,
the same kinds of activity are in progress and expectation of the deliverables of that
phase are consistent.
More detailed specific processes will be defined at the LOB level to fit their
organizational construct and governance needs, as well as the firmwide process
requirements.

3
Phase 0.0 Concept
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

•0.0 Concept:
To
 take the ideas and intentions of a group of people and evaluate them to determine if there is
business value for a project and converts them into a formal, planned project request
in a way that
 establishes a convincing business case (cost benefit / strategic need) for the project
 clearly and explicitly defines the business objectives and scope and provides supporting
documentation
 defines the high level business requirements for the project
 gains commitment and approval of the project from the appropriate level of senior management
so that
 a project request can be completed
 the initiation of project scoping and understanding of high level business requirements can
commence by partnering with technology
 project requests can be prioritized based on high level estimated business benefit.

4
Phase 1.0 Initiation
0.0
Concept

1.0
Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

1.0 Initiation:
To
 take a request for a project from the sponsor to define high level scope, plans and estimates
in a way that
 elaborates on the business case (cost benefit / strategic need) for the project
 clearly and explicitly defines the project objectives and scope
 defines a project organization structure which can be used to effectively manage and carry out
the necessary project work
 develops an high level schedule of milestone activities and resources required
 produces tangible measures of success for the product
 gains commitment and approval of the project from the appropriate level of senior management
so that
 a high level plan and refined business case estimate can be developed
 detailed requirements analysis and system design can commence
 the probability of producing a high quality product on budget and on schedule is maximized.
5
Phase 2.0 Requirements
0.0
Concept

1.0 Initiation

2.0
Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

2.0 Requirements
To
 solicit, analyze and validate detail business, technology, and project requirements
 outline a conceptual “to be” process and architecture.
in a way that
 identifies new or modified business process or function requirements
 identifies existing problems that must be solved and constraints to the conceptual strategy
 identifies current system functions that must be retained or altered
so that
 detailed specifications to support product design or new business processes are created
 a high level conceptual solution strategy is defined.

6
Phase 3.0 Design
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0
Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

3.0 Design:
To
 complete a detailed design that fulfills the specified requirements
in a way that
 elaborates on the business case (cost benefit / strategic need) for the project
 provides detailed specifications for product construction, software / hardware selection,
architecture, dependencies, testing, implementation and impacts
so that
 A detailed project plan, business case and estimates are committed to.
 a solution is defined that will provide detail specifications for product development, software
/ hardware selection and testing and implementation.

7
Phase 4.0 Build
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

4.0 Build
To
 build all product components to comply with the requirements and design specifications
 meet required technology and risk controls
in a way that
 produces a functional prototype to demonstrate features and functions (optional)
 ensures the programs / modules compile and integrate
 ensures unit tests are completed and meet expected results
 provides effective test scripts for the testing phase
 enables flexibility for incorporating pilot results
 provides a training plan
so that
 the system is ready for system and user testing
 user documentation and training are ready
 test scripts are ready for test phase.
8
Phase 5.0 Test
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design
Project

4.0
Build
Management

5.0
Test

6.0 Implementation

7.0 Project
Closure

Processes

5.0 Test
To
 perform product testing across all affected applications using prepared test scripts
in a way that
 ensures requirements and design specifications have been met
 determines types and order of tests to be run
so that
 the complete working product is ready for user testing
 the product can be implemented using change management processes.
 stability can be ensured in the production environment

9
Phase 6.0 Implementation
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design
Project

4.0
Build

5.0 Test

Management

6.0
Implementation

7.0 Project
Closure

Processes

6.0 Implementation
To
 prepare for deployment by readying the technical, working and support environments
 validate final production support readiness
in a way that
 enables the end user to utilize the product effectively
 defines tactics to resolve issues that might arise upon implementation
so that
 there is a smooth transition into the production environment and processes
 the product meets strategic results and provides value to the user.

10
Phase 7.0 Project Closure
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design
Project

4.0
Build

5.0 Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

7.0 Project Closure
To
 formally evaluate project processes and close out the project
in a way that
 establishes mechanisms for the continued development or improvement of the final product
 improves the standard process for this type of project
 enhances the estimating model for this type of project
so that
 project resources can be re-deployed
 processes can be continuously improved for more effective project management in the future.

11
Phase Project Management Processes
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design

Project

4.0
Build

5.0 Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

Project Management Processes (continuous throughout the life cycle)

To
 ensure project success by applying effective project management methodologies and
practices
in a way that
 enables effective project progress monitoring and control
 establishes regular checkpoints involving the project team and formal reviews
 controls the quality of products in the project
 manages change and risk to the project
 addresses and tracks issues that arise during the course of the project
so that
 the project is delivered to the satisfaction of the requestor
 requirements and changes are managed and controlled throughout the project.

12

Mais conteúdo relacionado

Mais procurados

Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areasguestfe6ad
 
Project Management for the Non-Project Manager
Project Management for the Non-Project ManagerProject Management for the Non-Project Manager
Project Management for the Non-Project ManagerGary Gelb
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMOfficers PMOAcademy
 
TBO PMO Model
TBO PMO ModelTBO PMO Model
TBO PMO Modeltholtz11
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
The Need For Effective Early Engagement In Solution Architecture And Design
The Need For Effective Early Engagement In Solution Architecture And DesignThe Need For Effective Early Engagement In Solution Architecture And Design
The Need For Effective Early Engagement In Solution Architecture And DesignAlan McSweeney
 
Digital Transformation And Solution Architecture
Digital Transformation And Solution ArchitectureDigital Transformation And Solution Architecture
Digital Transformation And Solution ArchitectureAlan McSweeney
 
Software Project Management: Project Initiation
Software Project Management: Project InitiationSoftware Project Management: Project Initiation
Software Project Management: Project InitiationMinhas Kamal
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOKArief Rahmana
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication ManagementBhuWan Khadka
 
Governance - Project Management Office Professional Services
Governance - Project Management Office Professional ServicesGovernance - Project Management Office Professional Services
Governance - Project Management Office Professional ServicesMark S. Mahre
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
PC 2012 PMO plan
PC 2012 PMO planPC 2012 PMO plan
PC 2012 PMO plandrewboy07
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management BhuWan Khadka
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentalsshantdey
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 

Mais procurados (20)

Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
Project Management for the Non-Project Manager
Project Management for the Non-Project ManagerProject Management for the Non-Project Manager
Project Management for the Non-Project Manager
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
TBO PMO Model
TBO PMO ModelTBO PMO Model
TBO PMO Model
 
Solution Architecture
Solution ArchitectureSolution Architecture
Solution Architecture
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
The Need For Effective Early Engagement In Solution Architecture And Design
The Need For Effective Early Engagement In Solution Architecture And DesignThe Need For Effective Early Engagement In Solution Architecture And Design
The Need For Effective Early Engagement In Solution Architecture And Design
 
Digital Transformation And Solution Architecture
Digital Transformation And Solution ArchitectureDigital Transformation And Solution Architecture
Digital Transformation And Solution Architecture
 
Software Project Management: Project Initiation
Software Project Management: Project InitiationSoftware Project Management: Project Initiation
Software Project Management: Project Initiation
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOK
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication Management
 
Governance - Project Management Office Professional Services
Governance - Project Management Office Professional ServicesGovernance - Project Management Office Professional Services
Governance - Project Management Office Professional Services
 
Project management office value
Project management office valueProject management office value
Project management office value
 
PC 2012 PMO plan
PC 2012 PMO planPC 2012 PMO plan
PC 2012 PMO plan
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 
Project governance
Project governanceProject governance
Project governance
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentals
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 

Destaque

Project delivery, what good looks like
Project delivery, what good looks likeProject delivery, what good looks like
Project delivery, what good looks likeMatthew Rees
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery MethodsStacy Abernathy
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectDon Cook
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectDon Cook
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project DeliveryKen Ede
 
Case Study - Project Management
Case Study - Project Management Case Study - Project Management
Case Study - Project Management Jimmy Horn
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMOJack Brown
 
Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryAXELOS Global Best Practice
 
Use Of I.T. In Agriculture
Use Of I.T. In AgricultureUse Of I.T. In Agriculture
Use Of I.T. In AgriculturePARTH THAKAR
 

Destaque (11)

Project delivery, what good looks like
Project delivery, what good looks likeProject delivery, what good looks like
Project delivery, what good looks like
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change Project
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change Project
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project Delivery
 
Case Study - Project Management
Case Study - Project Management Case Study - Project Management
Case Study - Project Management
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO
 
Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project delivery
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Use Of I.T. In Agriculture
Use Of I.T. In AgricultureUse Of I.T. In Agriculture
Use Of I.T. In Agriculture
 

Semelhante a Implementing a project delivery framework

3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.pptGoharSaeed6
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1reddvise
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodologyray biztech
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagementFahad Saleem
 
Corporate project management model
Corporate project management modelCorporate project management model
Corporate project management modelLatte Media
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...Arlene Smith
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_managementSAJID ALI RUK
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Logitrain: New Zealand
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementHisham Ali,PMP
 
DevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - DatasheetDevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - DatasheetTodd Erskine
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxwkyra78
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakathPMI_IREP_TP
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsRaja Bavani
 

Semelhante a Implementing a project delivery framework (20)

3&4. project scope management at project.ppt
3&4. project scope management at project.ppt3&4. project scope management at project.ppt
3&4. project scope management at project.ppt
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagement
 
Corporate project management model
Corporate project management modelCorporate project management model
Corporate project management model
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_management
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
 
Prince I Iand Babok Ver1 0
Prince I Iand Babok Ver1 0Prince I Iand Babok Ver1 0
Prince I Iand Babok Ver1 0
 
DevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - DatasheetDevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - Datasheet
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakath
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
IT Operations and Maintenance
IT Operations and MaintenanceIT Operations and Maintenance
IT Operations and Maintenance
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Entra lecture6 PM1.pdf
Entra lecture6 PM1.pdfEntra lecture6 PM1.pdf
Entra lecture6 PM1.pdf
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 

Mais de John Napier

JP Morgan Remote to Core Implementation
JP Morgan Remote to Core ImplementationJP Morgan Remote to Core Implementation
JP Morgan Remote to Core ImplementationJohn Napier
 
JP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core JustificationJP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core JustificationJohn Napier
 
John Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration ProjectsJohn Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration ProjectsJohn Napier
 
Information security trends and concerns
Information security trends and concernsInformation security trends and concerns
Information security trends and concernsJohn Napier
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoffJohn Napier
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008John Napier
 
Bio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growthBio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growthJohn Napier
 
Lurie children’s hospital opening day
Lurie children’s hospital opening dayLurie children’s hospital opening day
Lurie children’s hospital opening dayJohn Napier
 

Mais de John Napier (8)

JP Morgan Remote to Core Implementation
JP Morgan Remote to Core ImplementationJP Morgan Remote to Core Implementation
JP Morgan Remote to Core Implementation
 
JP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core JustificationJP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core Justification
 
John Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration ProjectsJohn Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration Projects
 
Information security trends and concerns
Information security trends and concernsInformation security trends and concerns
Information security trends and concerns
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008
 
Bio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growthBio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growth
 
Lurie children’s hospital opening day
Lurie children’s hospital opening dayLurie children’s hospital opening day
Lurie children’s hospital opening day
 

Último

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 

Último (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Implementing a project delivery framework

  • 2. Project Delivery Framework - PDF  To create a common language that can be used across the entire firm for consistent project interpretation and cross impact project collaboration.  To provide foundational guidance for newly integrated units to incorporate major processes.  To enable consistent financial reporting, compilation and aggregation of critical project reporting and analysis.  To enable more productive integration of cross-impact and firm-wide processes and tools.  To enable more effective process development and integration.  To enable more effective and accurate process analysis, measurement and improvement, in the future.  To enable more efficient mobility in the workforce to work in different projects with the same common understanding and faster startup. 2
  • 3. Phase Definitions 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes The objective of each phase has been defined to ensure consistency in use of the phase reference. E.g. When LOBs report a project is in the Requirements phase, the same kinds of activity are in progress and expectation of the deliverables of that phase are consistent. More detailed specific processes will be defined at the LOB level to fit their organizational construct and governance needs, as well as the firmwide process requirements. 3
  • 4. Phase 0.0 Concept 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes •0.0 Concept: To  take the ideas and intentions of a group of people and evaluate them to determine if there is business value for a project and converts them into a formal, planned project request in a way that  establishes a convincing business case (cost benefit / strategic need) for the project  clearly and explicitly defines the business objectives and scope and provides supporting documentation  defines the high level business requirements for the project  gains commitment and approval of the project from the appropriate level of senior management so that  a project request can be completed  the initiation of project scoping and understanding of high level business requirements can commence by partnering with technology  project requests can be prioritized based on high level estimated business benefit. 4
  • 5. Phase 1.0 Initiation 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 1.0 Initiation: To  take a request for a project from the sponsor to define high level scope, plans and estimates in a way that  elaborates on the business case (cost benefit / strategic need) for the project  clearly and explicitly defines the project objectives and scope  defines a project organization structure which can be used to effectively manage and carry out the necessary project work  develops an high level schedule of milestone activities and resources required  produces tangible measures of success for the product  gains commitment and approval of the project from the appropriate level of senior management so that  a high level plan and refined business case estimate can be developed  detailed requirements analysis and system design can commence  the probability of producing a high quality product on budget and on schedule is maximized. 5
  • 6. Phase 2.0 Requirements 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 2.0 Requirements To  solicit, analyze and validate detail business, technology, and project requirements  outline a conceptual “to be” process and architecture. in a way that  identifies new or modified business process or function requirements  identifies existing problems that must be solved and constraints to the conceptual strategy  identifies current system functions that must be retained or altered so that  detailed specifications to support product design or new business processes are created  a high level conceptual solution strategy is defined. 6
  • 7. Phase 3.0 Design 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 3.0 Design: To  complete a detailed design that fulfills the specified requirements in a way that  elaborates on the business case (cost benefit / strategic need) for the project  provides detailed specifications for product construction, software / hardware selection, architecture, dependencies, testing, implementation and impacts so that  A detailed project plan, business case and estimates are committed to.  a solution is defined that will provide detail specifications for product development, software / hardware selection and testing and implementation. 7
  • 8. Phase 4.0 Build 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 4.0 Build To  build all product components to comply with the requirements and design specifications  meet required technology and risk controls in a way that  produces a functional prototype to demonstrate features and functions (optional)  ensures the programs / modules compile and integrate  ensures unit tests are completed and meet expected results  provides effective test scripts for the testing phase  enables flexibility for incorporating pilot results  provides a training plan so that  the system is ready for system and user testing  user documentation and training are ready  test scripts are ready for test phase. 8
  • 9. Phase 5.0 Test 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build Management 5.0 Test 6.0 Implementation 7.0 Project Closure Processes 5.0 Test To  perform product testing across all affected applications using prepared test scripts in a way that  ensures requirements and design specifications have been met  determines types and order of tests to be run so that  the complete working product is ready for user testing  the product can be implemented using change management processes.  stability can be ensured in the production environment 9
  • 10. Phase 6.0 Implementation 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 6.0 Implementation To  prepare for deployment by readying the technical, working and support environments  validate final production support readiness in a way that  enables the end user to utilize the product effectively  defines tactics to resolve issues that might arise upon implementation so that  there is a smooth transition into the production environment and processes  the product meets strategic results and provides value to the user. 10
  • 11. Phase 7.0 Project Closure 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 7.0 Project Closure To  formally evaluate project processes and close out the project in a way that  establishes mechanisms for the continued development or improvement of the final product  improves the standard process for this type of project  enhances the estimating model for this type of project so that  project resources can be re-deployed  processes can be continuously improved for more effective project management in the future. 11
  • 12. Phase Project Management Processes 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes Project Management Processes (continuous throughout the life cycle) To  ensure project success by applying effective project management methodologies and practices in a way that  enables effective project progress monitoring and control  establishes regular checkpoints involving the project team and formal reviews  controls the quality of products in the project  manages change and risk to the project  addresses and tracks issues that arise during the course of the project so that  the project is delivered to the satisfaction of the requestor  requirements and changes are managed and controlled throughout the project. 12