Operations Management Session 6 –  Inventory Management & MRP / ERP
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object]
Learning Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Amazon.com ,[object Object],[object Object]
Amazon.com ,[object Object],[object Object],[object Object],[object Object]
Amazon.com ,[object Object],[object Object],[object Object],[object Object]
Inventory ,[object Object],[object Object]
Functions of Inventory ,[object Object],[object Object],[object Object],[object Object]
4 Main Types of Inventory ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Material Flow Cycle Figure 12.1 Input Wait for Wait to Move Wait in queue Setup Run Output inspection be moved time for operator time time Cycle time 95% 5%
Inventory Management ,[object Object],[object Object]
ABC (Or Pareto) Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object]
Control of Service Inventories ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Independent Versus  Dependent Demand ,[object Object],[object Object]
Holding, Ordering, and Setup Costs ,[object Object],[object Object],[object Object]
Inventory Models for Independent Demand ,[object Object],[object Object],[object Object],Need to determine when and how much to order
Basic EOQ Model ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Important assumptions
Inventory Usage Over Time Figure 12.3 Order quantity = Q (maximum inventory level) Usage rate Average inventory on hand Q 2 Minimum inventory Inventory level Time 0
Minimizing Costs Objective is to minimize total costs Table 11.5 Annual cost Order quantity Curve for total cost of holding and setup Holding cost curve Setup (or order) cost curve Minimum total cost Optimal order quantity (Q*)
Reorder Points ,[object Object],[object Object],= d x L ROP = Lead time for a new order in days Demand per day d =  D Number of working days in a year
Reorder Point Curve Figure 12.5 Q* ROP (units) Inventory level (units) Time (days) Lead time = L Slope = units/day = d
Production Order Quantity Model ,[object Object],[object Object]
Production Order Quantity Model Figure 12.6 Inventory level Time Demand part of cycle with no production Part of inventory cycle during which production (and usage) is taking place t Maximum inventory
Probabilistic Models and Safety Stock ,[object Object],[object Object],ROP = d x L + ss Annual stockout costs = the sum of the units short x the probability x the stockout cost/unit  x the number of orders per year
Probabilistic Demand Figure 12.8 Safety stock 16.5 units ROP   Place order Inventory level Time 0 Minimum demand during lead time Maximum demand during lead time Mean demand during lead time Normal distribution probability of demand during lead time Expected demand during lead time (350 kits) ROP = 350 + safety stock of 16.5 = 366.5 Receive order Lead time
Probabilistic Demand Safety stock Probability of no stockout 95% of the time Mean demand 350 ROP = ? kits Quantity Number of  standard deviations 0 z Risk of a stockout (5% of area of normal curve)
Fixed-Period (P) Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Fixed-Period (P) Systems Figure 12.9 On-hand inventory Time Q 1 Q 2 Target quantity (T) P Q 3 Q 4 P P
Fixed-Period Systems ,[object Object],[object Object],[object Object],[object Object],[object Object]
Operations Management Material Requirements  Planning (MRP) and ERP
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object]
Learning Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Learning Objectives ,[object Object],[object Object],[object Object],[object Object]
Wheeled Coach ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Wheeled Coach ,[object Object],[object Object],[object Object],[object Object],[object Object]
Benefits of MRP ,[object Object],[object Object],[object Object],[object Object]
Dependent Demand ,[object Object],[object Object],[object Object],[object Object]
Dependent Demand ,[object Object],[object Object],[object Object],[object Object],[object Object],Effective use of dependent demand inventory models requires the following
Master Production Schedule (MPS) ,[object Object],[object Object],[object Object],[object Object],[object Object]
Master Production Schedule (MPS) ,[object Object],[object Object],[object Object],[object Object],[object Object]
The Planning Process Figure 14.1 Change production plan? Master production schedule Management Return on investment Capital Engineering Design completion Aggregate production plan Procurement Supplier performance Human resources Manpower planning Production Capacity Inventory Marketing Customer demand Finance Cash flow
The Planning Process Figure 14.1 Is capacity plan being met? Is execution meeting the plan? Change master production schedule? Change capacity? Change requirements? No Execute  material plans Execute capacity plans Yes Realistic? Capacity requirements plan Material requirements plan Master production schedule
Aggregate  Production Plan Figure 14.2 Months January February Aggregate Production Plan 1,500 1,200 (Shows the total quantity of amplifiers) Weeks 1 2 3 4 5 6 7 8 Master Production Schedule (Shows the specific type and quantity of amplifier to be produced 240-watt amplifier 100 100 100 100 150-watt amplifier 500 500 450 450 75-watt amplifier 300 100
Master Production Schedule (MPS) ,[object Object],[object Object],[object Object],Can be expressed in any of the following terms:
Bills of Material ,[object Object],[object Object],[object Object],[object Object]
BOM Example B (2)   Std. 12” Speaker kit C (3) Std. 12” Speaker kit w/ amp-booster 1 E (2) E (2) F (2) Packing box and installation kit of wire, bolts, and screws Std. 12” Speaker booster assembly 2 D (2) 12” Speaker D (2) 12” Speaker G (1) Amp-booster 3 Product structure for “Awesome” (A) A Level 0
Lead Times ,[object Object],[object Object],[object Object]
Time-Phased Product Structure Figure 14.4 | | | | | | | | 1 2 3 4 5 6 7 8 Time in weeks F 2 weeks 3 weeks 1 week A 2 weeks 1 week D E 2 weeks D G 1 week 1 week 2 weeks to produce B C E Start production of D Must have D and E completed here so production can begin on B
MRP Structure Figure 14.5 Output Reports MRP by period report MRP by date report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Data Files Purchasing data BOM Lead times (Item master file) Inventory data Master production schedule Material requirement planning programs (computer and software)
MRP Management ,[object Object],[object Object],[object Object],[object Object],[object Object]
MRP in Services ,[object Object],[object Object],[object Object],[object Object],[object Object]
MRP in Services (a) PRODUCT STRUCTURE TREE Figure 14.10 Uncooked linguini #30004 Sauce #30006 Veal #30005 Chef; Work Center #1 Helper one; Work Center #2 Asst. Chef; Work Center #3 Cooked linguini #20002 Spinach #20004 Prepared veal and sauce #20003 Veal picante #10001
MRP in Services (b) BILL OF MATERIALS Part Number Description Quantity Unit of Measure Unit cost 10001 Veal picante 1 Serving — 20002 Cooked linguini 1 Serving — 20003 Prepared veal and sauce 1 Serving — 20004 Spinach 0.1 Bag 0.94 30004 Uncooked linguini 0.5 Pound — 30005 Veal 1 Serving 2.15 30006 Sauce 1 Serving 0.80
MRP in Services (c) BILL OF LABOR FOR VEAL PICANTE Labor Hours Work Center Operation Labor Type Setup Time Run Time 1 Assemble dish Chef .0069 .0041 2 Cook linguini Helper one .0005 .0022 3 Cook veal  and sauce Assistant Chef .0125 .0500
Distribution Resource Planning (DRP) Using dependent demand techniques through the supply chain ,[object Object],[object Object],[object Object],[object Object]
Enterprise Resource Planning (ERP) ,[object Object],[object Object],[object Object],[object Object],[object Object]
Enterprise Resource Planning (ERP) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
ERP and MRP Figure 14.11
Advantages  of ERP Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Disadvantages  of ERP Systems ,[object Object],[object Object],[object Object],[object Object],[object Object]
SAP’s ERP Modules Figure 14.12 Cash to Cash Covers all financial related activity: Accounts receivable General ledger Cash management Accounts payable Treasury Asset management Dock to Dispatch Covers internal inventory management: Warehousing Forecasting Physical inventory Distribution planning Replenishment planning Material handling Promote to Deliver Covers front-end   customer-oriented    activities: Marketing Quote and order    processing Transportation Documentation and    labeling After sales service Warranty and    guarantees Procure to Pay Covers sourcing  activities: Vendor sourcing Purchase    requisitioning Purchase ordering Purchase contracts Inbound logistics Supplier invoicing/   matching Supplier payment/   settlement Supplier    performance Design to Manufacture Covers internal production activities: Design  Shop floor   engineering    reporting Production  Contract/project   engineering    management Plant  Subcontractor   maintenance    management Recruit to Hire Covers all HR- and payroll-oriented   activity: Time and attendance Payroll Travel and expenses
ERP in the Service Sector ,[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Inventory management in supply chain
Inventory management in supply chain Inventory management in supply chain
Inventory management in supply chain
Sonia Peri
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
jetromarquez
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
Biswajit Ghosh
 
inventory management ppt
inventory management pptinventory management ppt
inventory management ppt
Mayank Baheti
 

Mais procurados (20)

Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Basic Concept of Inventory Control, Safety Stock
Basic Concept of Inventory Control, Safety StockBasic Concept of Inventory Control, Safety Stock
Basic Concept of Inventory Control, Safety Stock
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management in supply chain
Inventory management in supply chain Inventory management in supply chain
Inventory management in supply chain
 
Inventory control
Inventory controlInventory control
Inventory control
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
Inventory management
Inventory managementInventory management
Inventory management
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Inventory and lead time
Inventory and lead timeInventory and lead time
Inventory and lead time
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Slow Or Non Moving Inventory, Dispose Off Or
Slow Or Non Moving Inventory, Dispose Off OrSlow Or Non Moving Inventory, Dispose Off Or
Slow Or Non Moving Inventory, Dispose Off Or
 
Inventory management
 Inventory management Inventory management
Inventory management
 
Importance of inventory management
Importance of inventory management Importance of inventory management
Importance of inventory management
 
inventory management ppt
inventory management pptinventory management ppt
inventory management ppt
 
INVENTORY MANAGEMENT
INVENTORY MANAGEMENTINVENTORY MANAGEMENT
INVENTORY MANAGEMENT
 
What is reorder point and reorder point formula
What is reorder point and reorder point formulaWhat is reorder point and reorder point formula
What is reorder point and reorder point formula
 
The "Bullwhip" Effect
The "Bullwhip" EffectThe "Bullwhip" Effect
The "Bullwhip" Effect
 
Inventory management -Aparna Lakshmanan
Inventory management  -Aparna LakshmananInventory management  -Aparna Lakshmanan
Inventory management -Aparna Lakshmanan
 

Semelhante a Inventory Management And Mrp Erp

LOGISTICAL MANAGMENT
LOGISTICAL MANAGMENTLOGISTICAL MANAGMENT
LOGISTICAL MANAGMENT
Vijay Singh
 
Chapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docxChapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docx
christinemaritza
 
DSCI-303Operations Management1Sessions 15 & 16.docx
DSCI-303Operations Management1Sessions 15 & 16.docxDSCI-303Operations Management1Sessions 15 & 16.docx
DSCI-303Operations Management1Sessions 15 & 16.docx
jacksnathalie
 
Operations Int 2
Operations Int 2Operations Int 2
Operations Int 2
Marcus9000
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
hakimizaki
 
Purchasing & Stock Slides
Purchasing & Stock SlidesPurchasing & Stock Slides
Purchasing & Stock Slides
RobbieA
 

Semelhante a Inventory Management And Mrp Erp (20)

MGT366 Ch12
MGT366 Ch12MGT366 Ch12
MGT366 Ch12
 
Inventory planning & control
Inventory planning & controlInventory planning & control
Inventory planning & control
 
Rsh qam11 ch06 ge
Rsh qam11 ch06 geRsh qam11 ch06 ge
Rsh qam11 ch06 ge
 
Inventory management ppt @ bec doms
Inventory management ppt @ bec domsInventory management ppt @ bec doms
Inventory management ppt @ bec doms
 
Inventory
InventoryInventory
Inventory
 
DOC-20211104-WA0015..pptx
DOC-20211104-WA0015..pptxDOC-20211104-WA0015..pptx
DOC-20211104-WA0015..pptx
 
Inventory & Inventory Management ( By BU AIS 2nd Batch)
Inventory & Inventory Management ( By BU AIS 2nd Batch)Inventory & Inventory Management ( By BU AIS 2nd Batch)
Inventory & Inventory Management ( By BU AIS 2nd Batch)
 
LOGISTICAL MANAGMENT
LOGISTICAL MANAGMENTLOGISTICAL MANAGMENT
LOGISTICAL MANAGMENT
 
Chapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docxChapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docx
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Inventory
InventoryInventory
Inventory
 
DSCI-303Operations Management1Sessions 15 & 16.docx
DSCI-303Operations Management1Sessions 15 & 16.docxDSCI-303Operations Management1Sessions 15 & 16.docx
DSCI-303Operations Management1Sessions 15 & 16.docx
 
Ch161 inv1
Ch161 inv1Ch161 inv1
Ch161 inv1
 
Inventry Management
Inventry ManagementInventry Management
Inventry Management
 
Ch161 inv1
Ch161 inv1Ch161 inv1
Ch161 inv1
 
Operations Int 2
Operations Int 2Operations Int 2
Operations Int 2
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
Inventory mgmt
Inventory mgmtInventory mgmt
Inventory mgmt
 
Purchasing & Stock Slides
Purchasing & Stock SlidesPurchasing & Stock Slides
Purchasing & Stock Slides
 

Mais de Joanmaines

Direcció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema IDirecció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema I
Joanmaines
 
Direcció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema IiDirecció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema Ii
Joanmaines
 
Direcció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema IiiDirecció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema Iii
Joanmaines
 
Direcció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema IvDirecció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema Iv
Joanmaines
 
Direcció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema VDirecció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema V
Joanmaines
 
Direcció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema ViDirecció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema Vi
Joanmaines
 
Direcció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema ViiiDirecció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema Viii
Joanmaines
 

Mais de Joanmaines (17)

Video Case 3 2
Video Case 3 2Video Case 3 2
Video Case 3 2
 
Video Case 4
Video Case 4Video Case 4
Video Case 4
 
Video Case 6 2
Video Case 6 2Video Case 6 2
Video Case 6 2
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Location Strategy
Location StrategyLocation Strategy
Location Strategy
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout Strategies
 
Forecasting And Aggregate Planning
Forecasting And Aggregate PlanningForecasting And Aggregate Planning
Forecasting And Aggregate Planning
 
Operations Strategy
Operations StrategyOperations Strategy
Operations Strategy
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
Direcció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema IDirecció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema I
 
Direcció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema IiDirecció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema Ii
 
Direcció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema IiiDirecció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema Iii
 
Direcció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema IvDirecció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema Iv
 
Direcció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema VDirecció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema V
 
Direcció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema ViDirecció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema Vi
 
Direcció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema ViiiDirecció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema Viii
 

Último

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Último (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

Inventory Management And Mrp Erp

  • 1. Operations Management Session 6 – Inventory Management & MRP / ERP
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. The Material Flow Cycle Figure 12.1 Input Wait for Wait to Move Wait in queue Setup Run Output inspection be moved time for operator time time Cycle time 95% 5%
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. Inventory Usage Over Time Figure 12.3 Order quantity = Q (maximum inventory level) Usage rate Average inventory on hand Q 2 Minimum inventory Inventory level Time 0
  • 22. Minimizing Costs Objective is to minimize total costs Table 11.5 Annual cost Order quantity Curve for total cost of holding and setup Holding cost curve Setup (or order) cost curve Minimum total cost Optimal order quantity (Q*)
  • 23.
  • 24. Reorder Point Curve Figure 12.5 Q* ROP (units) Inventory level (units) Time (days) Lead time = L Slope = units/day = d
  • 25.
  • 26. Production Order Quantity Model Figure 12.6 Inventory level Time Demand part of cycle with no production Part of inventory cycle during which production (and usage) is taking place t Maximum inventory
  • 27.
  • 28. Probabilistic Demand Figure 12.8 Safety stock 16.5 units ROP  Place order Inventory level Time 0 Minimum demand during lead time Maximum demand during lead time Mean demand during lead time Normal distribution probability of demand during lead time Expected demand during lead time (350 kits) ROP = 350 + safety stock of 16.5 = 366.5 Receive order Lead time
  • 29. Probabilistic Demand Safety stock Probability of no stockout 95% of the time Mean demand 350 ROP = ? kits Quantity Number of standard deviations 0 z Risk of a stockout (5% of area of normal curve)
  • 30.
  • 31. Fixed-Period (P) Systems Figure 12.9 On-hand inventory Time Q 1 Q 2 Target quantity (T) P Q 3 Q 4 P P
  • 32.
  • 33. Operations Management Material Requirements Planning (MRP) and ERP
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46. The Planning Process Figure 14.1 Change production plan? Master production schedule Management Return on investment Capital Engineering Design completion Aggregate production plan Procurement Supplier performance Human resources Manpower planning Production Capacity Inventory Marketing Customer demand Finance Cash flow
  • 47. The Planning Process Figure 14.1 Is capacity plan being met? Is execution meeting the plan? Change master production schedule? Change capacity? Change requirements? No Execute material plans Execute capacity plans Yes Realistic? Capacity requirements plan Material requirements plan Master production schedule
  • 48. Aggregate Production Plan Figure 14.2 Months January February Aggregate Production Plan 1,500 1,200 (Shows the total quantity of amplifiers) Weeks 1 2 3 4 5 6 7 8 Master Production Schedule (Shows the specific type and quantity of amplifier to be produced 240-watt amplifier 100 100 100 100 150-watt amplifier 500 500 450 450 75-watt amplifier 300 100
  • 49.
  • 50.
  • 51. BOM Example B (2) Std. 12” Speaker kit C (3) Std. 12” Speaker kit w/ amp-booster 1 E (2) E (2) F (2) Packing box and installation kit of wire, bolts, and screws Std. 12” Speaker booster assembly 2 D (2) 12” Speaker D (2) 12” Speaker G (1) Amp-booster 3 Product structure for “Awesome” (A) A Level 0
  • 52.
  • 53. Time-Phased Product Structure Figure 14.4 | | | | | | | | 1 2 3 4 5 6 7 8 Time in weeks F 2 weeks 3 weeks 1 week A 2 weeks 1 week D E 2 weeks D G 1 week 1 week 2 weeks to produce B C E Start production of D Must have D and E completed here so production can begin on B
  • 54. MRP Structure Figure 14.5 Output Reports MRP by period report MRP by date report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Data Files Purchasing data BOM Lead times (Item master file) Inventory data Master production schedule Material requirement planning programs (computer and software)
  • 55.
  • 56.
  • 57. MRP in Services (a) PRODUCT STRUCTURE TREE Figure 14.10 Uncooked linguini #30004 Sauce #30006 Veal #30005 Chef; Work Center #1 Helper one; Work Center #2 Asst. Chef; Work Center #3 Cooked linguini #20002 Spinach #20004 Prepared veal and sauce #20003 Veal picante #10001
  • 58. MRP in Services (b) BILL OF MATERIALS Part Number Description Quantity Unit of Measure Unit cost 10001 Veal picante 1 Serving — 20002 Cooked linguini 1 Serving — 20003 Prepared veal and sauce 1 Serving — 20004 Spinach 0.1 Bag 0.94 30004 Uncooked linguini 0.5 Pound — 30005 Veal 1 Serving 2.15 30006 Sauce 1 Serving 0.80
  • 59. MRP in Services (c) BILL OF LABOR FOR VEAL PICANTE Labor Hours Work Center Operation Labor Type Setup Time Run Time 1 Assemble dish Chef .0069 .0041 2 Cook linguini Helper one .0005 .0022 3 Cook veal and sauce Assistant Chef .0125 .0500
  • 60.
  • 61.
  • 62.
  • 63. ERP and MRP Figure 14.11
  • 64.
  • 65.
  • 66. SAP’s ERP Modules Figure 14.12 Cash to Cash Covers all financial related activity: Accounts receivable General ledger Cash management Accounts payable Treasury Asset management Dock to Dispatch Covers internal inventory management: Warehousing Forecasting Physical inventory Distribution planning Replenishment planning Material handling Promote to Deliver Covers front-end customer-oriented activities: Marketing Quote and order processing Transportation Documentation and labeling After sales service Warranty and guarantees Procure to Pay Covers sourcing activities: Vendor sourcing Purchase requisitioning Purchase ordering Purchase contracts Inbound logistics Supplier invoicing/ matching Supplier payment/ settlement Supplier performance Design to Manufacture Covers internal production activities: Design Shop floor engineering reporting Production Contract/project engineering management Plant Subcontractor maintenance management Recruit to Hire Covers all HR- and payroll-oriented activity: Time and attendance Payroll Travel and expenses
  • 67.