This paper describes an approach for managing budgets of complex organizations using a methodology and tools that
enable prioritization and optimization of projects and programs at the corporate and division levels.
Corporate Chief Information Officers (CCIO) of large organizations often oversee technology investment programs
across multiple global business and functional units. They depend on complex layers of reporting relationships
(technology, operations and business managers responsible for projects and financials day-to-day within a business,
geographic or product area). In the case described below business unit CIO’s (BCIO’s) are the CCIO‘s representatives
within each line of business; they make the complex task of technology management possible.
Reducing the complexity lies in filtering and aggregating relevant information at each decision making step for the CCIO
and BCIO’s. The CCIO’s influence the degree of investment in programs (unique aggregations of projects) while the
BCIO’s determine which projects to include or exclude in a specific planning period.
The Organization Structure
The BCIO represents the link between the business and the technology group: Identifying, Planning, Implementing and
Managing technology projects and communicating their
value to the line of business and to the CCIO.
BCIO’s work together and in accordance with the
corporate infrastructure and architecture guidelines,
aiming to eliminate duplicative efforts and leverage each
other’s work. Still, each BCIO has the detailed knowledge
and the mandate to independently manage the planning
and the implementation of his/her technology project
portfolio and is accountable to the business management
he/she supports.
The BCIO’s performance is measured by the level of
satisfaction of their business client and the adherence to
financial (and other corporate) objectives. Therefore, the
technology investment decisions that a BCIO makes are
typically driven by the necessity to satisfy business needs
and financial metrics (internal hurdle rates, IRR, ROI, and/
or NPV).
Figure 1: Relationships in a Federated Organizations
<2>
In this environment, the information needs of a BCIO and a CCIO are inherently different. The BCIO is responsible for
key business deliverables, for managing projects “on time, on budget and in scope,” and for supporting the CCIO in
achieving the corporate goals. He/she juggles cost and resource constraints, project scheduling conflicts, and changing
business requirements.
The CCIO focuses on the “big picture”, there is little need for exhaustive detail on hundreds of technology projects.
What is essential, however, is a global portfolio view of all planned investments: including combined strategic value,
total financial spend (both Capital and Direct P&L) and projected benefits. The CCIO needs to be able to influence the
investment to assist the CEO and the board in optimizing the business outcome and increasing the Share Value Added
(SVA).
What is Project Portfolio Management?
Project Portfolio Management (PPM) is a valuable approach and toolset for both CCIO’s and BCIO’s. A two-step
prioritization approach is used iteratively: Binary Optimization for a detailed project-level analysis and Proportional
Optimization for a corporate wide program-level view. Combining the two in a Governance process improves decision
making transparency and effectiveness for planning and budgeting investments and minimizes the emotion in portfolio
selection.
The PPM methodology helps create alignment between IT and business strategy, select an optimized portfolio of
investments, plan, and manage the project portfolio implementation (see chart below including a central repository).
The focus of this article is on the ongoing selection of projects in a portfolio.
UMT’s Portfolio Optimizer, uses a sophisticated mathematical algorithm to calculate each project’s value in a common
currency called: strategic value. The portfolio selection process has several stages that require the active involvement
of business, technology, operations, and finance professionals.
Figure 2: The UMT Approach to the Selection Process
<3>
UMT’s Portfolio Optimizer supports this process by enabling:
• Business driver definition and prioritization
• Impact definition and quantification
• Portfolio prioritization
• Constraint analysis
• Advanced analytics
UMT’s Portfolio Optimizer maximizes the project portfolio strategic value taking into account budgetary and other
constraints ensuring the selected portfolio is aligned with the organizations strategic objectives., The derived strategic
value becomes a powerful addition to the list of financial metrics usually evaluated, and helps alleviate the often
emotionally charged and political IT budgeting processes.
What is Binary Prioritization/Optimization?
Under Binary Optimization, the portfolio selection is based on a “yes” or “no” decision: BCIO’s can choose between
projects based on their strategic value. A “no” decision on a particular project means that investment dollars are cut
completely. The Binary Optimization is best applied at the level in the organization where technology management has
the depth of knowledge and the need for decision making is at the project level.
The binary selection allows the creation of a portfolio Efficient Frontier, visually representing the portfolio strategic
value generated at each level of investment spending.
By prioritizing and selecting a preliminary optimal portfolio for their business unit before submitting funding requests
to the CCIO, the BCIO’s can effectively minimize the number of projects that need to be discussed with their peers and
senior management. Since the selection has already uncovered the projects with the best strategic value to cost ratio,
the overall firm’s planning process will require fewer iterations.
Selected projects can then be aggregated into a manageable number of larger programs that can be reviewed by the
CCIO and the governance committees at the cross-business level.
Figure 3: Binary Optimization
<4>
Why is the binary approach not good for the Corporate CIO?
At the program level the binary approach is no longer a suitable solution. Completely cutting the funding for a
multimillion dollar program is rarely an option. While the CCIO may be looking to rationalize the total technology
spend,, a more appropriate approach would be to lower the spending for certain programs, not completely eliminate it.
UMT’s suggested solution in this case is a Proportional Optimization, the next step in the prioritization process.
What is Proportional Prioritization / Optimization?
The Proportional Optimization approach presents the CCIO with the ability to optimize investment spending and
maximize the strategic value of the project portfolio without under funding whole programs. The Proportional
Optimization allows the identification of programs generating lower strategic value and provides a way to
“squeeze” (but not completely cut) their funding. Rather than applying the same level of cuts across all programs the
investment dollars can be then directed to the programs with higher strategic contribution.
This approach does not eliminate the ability to complete a binary decision but only adds functionality and versatility to
the selection process. Users can still choose to cut programs, or compare the strategic value of multiple projects across
business areas.
Figure 5: Proportional Optimization
Figure 4: PPM Selection Process in a Federated Organization
<5>
How does Proportional Optimization work?
While the Efficient Frontier for a portfolio of binary solutions can be easily derived, the program level approach
requires the definition of a curve for each of the separate programs. UMT has developed a proprietary method of
developing these curves based on their maximum and minimum required spend.
Since the relationship between a program’s requested spend and its strategic value is non-linear, the generated curves
are unique for each considered program. The mathematical program evaluates the slope of each curve and selects the
point where it flattens (the highest possible strategic value generated with the lowest possible spend). The approach
takes into account an entire portfolio view of curves and chooses the optimal point along each for the entire portfolio.
UMT’s Portfolio Optimizer allows the user to define the minimum requested spend for each program, ensuring that the
final dollar allocations do not fall below a critical funding threshold.
Summary
The above provides an overview of a repeatable process for PPM in Federated organizations.
Binary Optimization can be used to streamline the initial projects requests into a manageable portfolio for each
business unit. This enables BCIO’s to select a portfolio that best supports the objectives of each business unit. This is
done prior to funding requests from the CCIO.
Figure 6: Program Level Efficient Frontier
Figure 7: Selected Projects Under Binary Optimization
Proportional Optimization is a compelling addition to Project Portfolio Management because it extends the CCIO’s
ability to influence the proposed portfolio alignment with the organizations objective using a manageable level of
granularity.
Organizations can integrate this methodology and toolset with their existing governance process depending on their
capability maturity. It enables the development of a framework that is both pragmatic and effective,
In the case of organizations with an early stage governance process it is valuable to start with the basics, responding
first to the most urgent pain points. This can be accomplished via installation of a central project repository and
standard business case which enables the review and analysis of all project requests and their rationale in a central
location by organization, type of investment and manager. Once this is accomplished analytics can be applied like the
ones described above as decision support tools, plans can be developed to proactively understand the resource
demand and supply and time dependencies and the portfolio can be tracked for on schedule delivery and for post
implementation benefits.
# # #
1 Battery Park Plaza, 4th Floor, New York, NY 10004, (212) 965-0550, www.umt.com
Figure 8: Program Funding Thresholds (Proportional Optimizations)

Mais conteúdo relacionado

Destaque

Portfolio_Presentation
Portfolio_PresentationPortfolio_Presentation
Portfolio_Presentationpushpak N
 
Operational efficiency and times series changes in taico bank – auto regressi...
Operational efficiency and times series changes in taico bank – auto regressi...Operational efficiency and times series changes in taico bank – auto regressi...
Operational efficiency and times series changes in taico bank – auto regressi...iaemedu
 
AN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATION
AN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATIONAN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATION
AN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATIONLucia Tilio
 
Policy-Based Governance
Policy-Based GovernancePolicy-Based Governance
Policy-Based GovernanceGary Lerude
 
Stratified governance model v9.1 summary
Stratified governance model v9.1 summaryStratified governance model v9.1 summary
Stratified governance model v9.1 summaryAlf Rock
 
Project Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge ManagementProject Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge Managementsubramanian K
 
Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...
Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...
Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...Ofsted
 
Policy governance reviewed
Policy governance reviewedPolicy governance reviewed
Policy governance reviewedSuzanne Benoit
 
Governance as Leadership in Practice
Governance as Leadership in PracticeGovernance as Leadership in Practice
Governance as Leadership in PracticeDebra Beck, Ed.D.
 
Intro to agile portfolio governance v6
Intro to agile portfolio governance   v6Intro to agile portfolio governance   v6
Intro to agile portfolio governance v6Cprime
 
leadership and governance
leadership and governanceleadership and governance
leadership and governanceNicole Brown
 
Intro to Agile Portfolio Governance Presentation
Intro to Agile Portfolio Governance Presentation  Intro to Agile Portfolio Governance Presentation
Intro to Agile Portfolio Governance Presentation Cprime
 
System Theory By Von Bertalanffy
System Theory By Von BertalanffySystem Theory By Von Bertalanffy
System Theory By Von BertalanffyAshis Kumar Behera
 
Separation of powers
Separation of powersSeparation of powers
Separation of powersraj kishor
 

Destaque (20)

Cloud 101 Primer For Busy Executives
Cloud 101 Primer For Busy ExecutivesCloud 101 Primer For Busy Executives
Cloud 101 Primer For Busy Executives
 
Portfolio_Presentation
Portfolio_PresentationPortfolio_Presentation
Portfolio_Presentation
 
Operational efficiency and times series changes in taico bank – auto regressi...
Operational efficiency and times series changes in taico bank – auto regressi...Operational efficiency and times series changes in taico bank – auto regressi...
Operational efficiency and times series changes in taico bank – auto regressi...
 
AN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATION
AN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATIONAN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATION
AN OPERATIONAL MODEL TOWARDS PLAYFUL PUBLIC PARTICIPATION
 
Ntisc
NtiscNtisc
Ntisc
 
Policy-Based Governance
Policy-Based GovernancePolicy-Based Governance
Policy-Based Governance
 
Stratified governance model v9.1 summary
Stratified governance model v9.1 summaryStratified governance model v9.1 summary
Stratified governance model v9.1 summary
 
Project Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge ManagementProject Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge Management
 
Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...
Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...
Delivering and demonstrating strong governance: 2015 Governors’ Conference Me...
 
Policy governance reviewed
Policy governance reviewedPolicy governance reviewed
Policy governance reviewed
 
Governance as Leadership in Practice
Governance as Leadership in PracticeGovernance as Leadership in Practice
Governance as Leadership in Practice
 
Intro to agile portfolio governance v6
Intro to agile portfolio governance   v6Intro to agile portfolio governance   v6
Intro to agile portfolio governance v6
 
leadership and governance
leadership and governanceleadership and governance
leadership and governance
 
Evolution of Theories
Evolution of Theories Evolution of Theories
Evolution of Theories
 
Intro to Agile Portfolio Governance Presentation
Intro to Agile Portfolio Governance Presentation  Intro to Agile Portfolio Governance Presentation
Intro to Agile Portfolio Governance Presentation
 
World System Theory
World System TheoryWorld System Theory
World System Theory
 
Good governance in pakistan
Good governance in pakistanGood governance in pakistan
Good governance in pakistan
 
System Theory By Von Bertalanffy
System Theory By Von BertalanffySystem Theory By Von Bertalanffy
System Theory By Von Bertalanffy
 
Separation of powers
Separation of powersSeparation of powers
Separation of powers
 
Good governance
Good governanceGood governance
Good governance
 

Semelhante a Project and Portfolio Management in a Federated Governance Model

Project Planning, Execution And Closure Essay
Project Planning, Execution And Closure EssayProject Planning, Execution And Closure Essay
Project Planning, Execution And Closure EssayJennifer Letterman
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Cognizant
 
Global Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partnerGlobal Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partnerUMT
 
The Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsThe Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsUMT
 
Strategic Cost Optimization: Driving Business Innovation While Reducing IT Costs
Strategic Cost Optimization: Driving Business Innovation While Reducing IT CostsStrategic Cost Optimization: Driving Business Innovation While Reducing IT Costs
Strategic Cost Optimization: Driving Business Innovation While Reducing IT CostsCognizant
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...UMT
 
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...IJECEIAES
 
Benefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperBenefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperAssociation for Project Management
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docxarnoldmeredith47041
 
Optimizing Organizational Performance by Managing Project Benefits
Optimizing Organizational Performance by Managing Project BenefitsOptimizing Organizational Performance by Managing Project Benefits
Optimizing Organizational Performance by Managing Project BenefitsUMT
 
Gartner Magic Quadrant for Corporate Performance Management Suites
Gartner Magic Quadrant for Corporate Performance Management SuitesGartner Magic Quadrant for Corporate Performance Management Suites
Gartner Magic Quadrant for Corporate Performance Management SuitesTagetik
 
The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9led4lgus
 
Integrated Performance Management Scorecard
Integrated Performance Management ScorecardIntegrated Performance Management Scorecard
Integrated Performance Management ScorecardSaravanan Veeraiyan
 
An Integrated Approach to Application Portfolio Rationalization
An Integrated Approach to Application Portfolio RationalizationAn Integrated Approach to Application Portfolio Rationalization
An Integrated Approach to Application Portfolio RationalizationCognizant
 
Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management Arabella Jones
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio ManagementAnand Subramaniam
 
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Ricardo Viana Vargas
 

Semelhante a Project and Portfolio Management in a Federated Governance Model (20)

Project Planning, Execution And Closure Essay
Project Planning, Execution And Closure EssayProject Planning, Execution And Closure Essay
Project Planning, Execution And Closure Essay
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
 
Global Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partnerGlobal Pharma CIO transforms IT into accountable, low risk business partner
Global Pharma CIO transforms IT into accountable, low risk business partner
 
The Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management ImplementationsThe Seven Habits of Highly Effective Portfolio Management Implementations
The Seven Habits of Highly Effective Portfolio Management Implementations
 
Strategic Cost Optimization: Driving Business Innovation While Reducing IT Costs
Strategic Cost Optimization: Driving Business Innovation While Reducing IT CostsStrategic Cost Optimization: Driving Business Innovation While Reducing IT Costs
Strategic Cost Optimization: Driving Business Innovation While Reducing IT Costs
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
 
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
 
Benefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperBenefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paper
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docx
 
BCSITv3.1
BCSITv3.1BCSITv3.1
BCSITv3.1
 
Optimizing Organizational Performance by Managing Project Benefits
Optimizing Organizational Performance by Managing Project BenefitsOptimizing Organizational Performance by Managing Project Benefits
Optimizing Organizational Performance by Managing Project Benefits
 
Gartner Magic Quadrant for Corporate Performance Management Suites
Gartner Magic Quadrant for Corporate Performance Management SuitesGartner Magic Quadrant for Corporate Performance Management Suites
Gartner Magic Quadrant for Corporate Performance Management Suites
 
The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9
 
PRINCE2_for_Fed_Gov_Projects
PRINCE2_for_Fed_Gov_ProjectsPRINCE2_for_Fed_Gov_Projects
PRINCE2_for_Fed_Gov_Projects
 
Integrated Performance Management Scorecard
Integrated Performance Management ScorecardIntegrated Performance Management Scorecard
Integrated Performance Management Scorecard
 
An Integrated Approach to Application Portfolio Rationalization
An Integrated Approach to Application Portfolio RationalizationAn Integrated Approach to Application Portfolio Rationalization
An Integrated Approach to Application Portfolio Rationalization
 
Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management
 
Project, Program & Portfolio Management
Project, Program & Portfolio ManagementProject, Program & Portfolio Management
Project, Program & Portfolio Management
 
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
 
Document
DocumentDocument
Document
 

Mais de UMT

Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...
Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...
Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...UMT
 
Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...
Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...
Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...UMT
 
How a hospital CIO improved PMO to make a difference in the lives of children
How a hospital CIO improved PMO to make a difference in the lives of childrenHow a hospital CIO improved PMO to make a difference in the lives of children
How a hospital CIO improved PMO to make a difference in the lives of childrenUMT
 
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROIBen Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROIUMT
 
Dianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning ProcessDianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning ProcessUMT
 
Carl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the FenceCarl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the FenceUMT
 
Baird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentBaird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentUMT
 
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...UMT
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT
 
Bridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionBridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionUMT
 
UMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM UMT
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...UMT
 
IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...UMT
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...UMT
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 UMT
 
Planning with Competencies
Planning with CompetenciesPlanning with Competencies
Planning with CompetenciesUMT
 
Enterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionEnterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionUMT
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionUMT
 

Mais de UMT (20)

Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...
Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...
Tricks of the Transformation Trade: Disruptive Disintermediation, Agility Age...
 
Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...
Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...
Portfolio Agility– From Elusive Imperative to Practical Reality: Seven Dimens...
 
How a hospital CIO improved PMO to make a difference in the lives of children
How a hospital CIO improved PMO to make a difference in the lives of childrenHow a hospital CIO improved PMO to make a difference in the lives of children
How a hospital CIO improved PMO to make a difference in the lives of children
 
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROIBen Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
Ben Chamberlain, UMT360: PPM + Financial Intelligence = Greater ROI
 
Dianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning ProcessDianne Wyllie, Brocade: Transforming the Annual Planning Process
Dianne Wyllie, Brocade: Transforming the Annual Planning Process
 
Carl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the FenceCarl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
Carl Souchereau, SNC Lavalin T&D: Both Sides of the Fence
 
Baird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State GovernmentBaird Miller, DOL: IT Portfolio Management in State Government
Baird Miller, DOL: IT Portfolio Management in State Government
 
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
Transalta: How a Power Company Saved Time and Reduced Capital Expenses Throug...
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
 
UMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio ManagementUMT Webinar: Effective Portfolio Management
UMT Webinar: Effective Portfolio Management
 
Bridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and ExecutionBridging the Gap Between Strategy and Execution
Bridging the Gap Between Strategy and Execution
 
UMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment StatusUMT Federal Webinar Series Part 4: Communicating Investment Status
UMT Federal Webinar Series Part 4: Communicating Investment Status
 
PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM PPM 2.0 - What’s Missing from Today’s PPM
PPM 2.0 - What’s Missing from Today’s PPM
 
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
IT Financial Management Series - Part 3: Drive Financial Transparency Across ...
 
IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...IT Financial Management Series - Part 2: Drive financial transparency across ...
IT Financial Management Series - Part 2: Drive financial transparency across ...
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013
 
Planning with Competencies
Planning with CompetenciesPlanning with Competencies
Planning with Competencies
 
Enterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the RevolutionEnterprise Project and Portfolio Management: Managing the Revolution
Enterprise Project and Portfolio Management: Managing the Revolution
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio Selection
 

Último

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptxnandhinijagan9867
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Último (20)

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Project and Portfolio Management in a Federated Governance Model

  • 1. Project and Portfolio Management in a Federated Governance Model A UMT White Paper This paper describes an approach for managing budgets of complex organizations using a methodology and tools that enable prioritization and optimization of projects and programs at the corporate and division levels. Corporate Chief Information Officers (CCIO) of large organizations often oversee technology investment programs across multiple global business and functional units. They depend on complex layers of reporting relationships (technology, operations and business managers responsible for projects and financials day-to-day within a business, geographic or product area). In the case described below business unit CIO’s (BCIO’s) are the CCIO‘s representatives within each line of business; they make the complex task of technology management possible. Reducing the complexity lies in filtering and aggregating relevant information at each decision making step for the CCIO and BCIO’s. The CCIO’s influence the degree of investment in programs (unique aggregations of projects) while the BCIO’s determine which projects to include or exclude in a specific planning period. The Organization Structure The BCIO represents the link between the business and the technology group: Identifying, Planning, Implementing and Managing technology projects and communicating their value to the line of business and to the CCIO. BCIO’s work together and in accordance with the corporate infrastructure and architecture guidelines, aiming to eliminate duplicative efforts and leverage each other’s work. Still, each BCIO has the detailed knowledge and the mandate to independently manage the planning and the implementation of his/her technology project portfolio and is accountable to the business management he/she supports. The BCIO’s performance is measured by the level of satisfaction of their business client and the adherence to financial (and other corporate) objectives. Therefore, the technology investment decisions that a BCIO makes are typically driven by the necessity to satisfy business needs and financial metrics (internal hurdle rates, IRR, ROI, and/ or NPV). Figure 1: Relationships in a Federated Organizations
  • 2. <2> In this environment, the information needs of a BCIO and a CCIO are inherently different. The BCIO is responsible for key business deliverables, for managing projects “on time, on budget and in scope,” and for supporting the CCIO in achieving the corporate goals. He/she juggles cost and resource constraints, project scheduling conflicts, and changing business requirements. The CCIO focuses on the “big picture”, there is little need for exhaustive detail on hundreds of technology projects. What is essential, however, is a global portfolio view of all planned investments: including combined strategic value, total financial spend (both Capital and Direct P&L) and projected benefits. The CCIO needs to be able to influence the investment to assist the CEO and the board in optimizing the business outcome and increasing the Share Value Added (SVA). What is Project Portfolio Management? Project Portfolio Management (PPM) is a valuable approach and toolset for both CCIO’s and BCIO’s. A two-step prioritization approach is used iteratively: Binary Optimization for a detailed project-level analysis and Proportional Optimization for a corporate wide program-level view. Combining the two in a Governance process improves decision making transparency and effectiveness for planning and budgeting investments and minimizes the emotion in portfolio selection. The PPM methodology helps create alignment between IT and business strategy, select an optimized portfolio of investments, plan, and manage the project portfolio implementation (see chart below including a central repository). The focus of this article is on the ongoing selection of projects in a portfolio. UMT’s Portfolio Optimizer, uses a sophisticated mathematical algorithm to calculate each project’s value in a common currency called: strategic value. The portfolio selection process has several stages that require the active involvement of business, technology, operations, and finance professionals. Figure 2: The UMT Approach to the Selection Process
  • 3. <3> UMT’s Portfolio Optimizer supports this process by enabling: • Business driver definition and prioritization • Impact definition and quantification • Portfolio prioritization • Constraint analysis • Advanced analytics UMT’s Portfolio Optimizer maximizes the project portfolio strategic value taking into account budgetary and other constraints ensuring the selected portfolio is aligned with the organizations strategic objectives., The derived strategic value becomes a powerful addition to the list of financial metrics usually evaluated, and helps alleviate the often emotionally charged and political IT budgeting processes. What is Binary Prioritization/Optimization? Under Binary Optimization, the portfolio selection is based on a “yes” or “no” decision: BCIO’s can choose between projects based on their strategic value. A “no” decision on a particular project means that investment dollars are cut completely. The Binary Optimization is best applied at the level in the organization where technology management has the depth of knowledge and the need for decision making is at the project level. The binary selection allows the creation of a portfolio Efficient Frontier, visually representing the portfolio strategic value generated at each level of investment spending. By prioritizing and selecting a preliminary optimal portfolio for their business unit before submitting funding requests to the CCIO, the BCIO’s can effectively minimize the number of projects that need to be discussed with their peers and senior management. Since the selection has already uncovered the projects with the best strategic value to cost ratio, the overall firm’s planning process will require fewer iterations. Selected projects can then be aggregated into a manageable number of larger programs that can be reviewed by the CCIO and the governance committees at the cross-business level. Figure 3: Binary Optimization
  • 4. <4> Why is the binary approach not good for the Corporate CIO? At the program level the binary approach is no longer a suitable solution. Completely cutting the funding for a multimillion dollar program is rarely an option. While the CCIO may be looking to rationalize the total technology spend,, a more appropriate approach would be to lower the spending for certain programs, not completely eliminate it. UMT’s suggested solution in this case is a Proportional Optimization, the next step in the prioritization process. What is Proportional Prioritization / Optimization? The Proportional Optimization approach presents the CCIO with the ability to optimize investment spending and maximize the strategic value of the project portfolio without under funding whole programs. The Proportional Optimization allows the identification of programs generating lower strategic value and provides a way to “squeeze” (but not completely cut) their funding. Rather than applying the same level of cuts across all programs the investment dollars can be then directed to the programs with higher strategic contribution. This approach does not eliminate the ability to complete a binary decision but only adds functionality and versatility to the selection process. Users can still choose to cut programs, or compare the strategic value of multiple projects across business areas. Figure 5: Proportional Optimization Figure 4: PPM Selection Process in a Federated Organization
  • 5. <5> How does Proportional Optimization work? While the Efficient Frontier for a portfolio of binary solutions can be easily derived, the program level approach requires the definition of a curve for each of the separate programs. UMT has developed a proprietary method of developing these curves based on their maximum and minimum required spend. Since the relationship between a program’s requested spend and its strategic value is non-linear, the generated curves are unique for each considered program. The mathematical program evaluates the slope of each curve and selects the point where it flattens (the highest possible strategic value generated with the lowest possible spend). The approach takes into account an entire portfolio view of curves and chooses the optimal point along each for the entire portfolio. UMT’s Portfolio Optimizer allows the user to define the minimum requested spend for each program, ensuring that the final dollar allocations do not fall below a critical funding threshold. Summary The above provides an overview of a repeatable process for PPM in Federated organizations. Binary Optimization can be used to streamline the initial projects requests into a manageable portfolio for each business unit. This enables BCIO’s to select a portfolio that best supports the objectives of each business unit. This is done prior to funding requests from the CCIO. Figure 6: Program Level Efficient Frontier Figure 7: Selected Projects Under Binary Optimization
  • 6. Proportional Optimization is a compelling addition to Project Portfolio Management because it extends the CCIO’s ability to influence the proposed portfolio alignment with the organizations objective using a manageable level of granularity. Organizations can integrate this methodology and toolset with their existing governance process depending on their capability maturity. It enables the development of a framework that is both pragmatic and effective, In the case of organizations with an early stage governance process it is valuable to start with the basics, responding first to the most urgent pain points. This can be accomplished via installation of a central project repository and standard business case which enables the review and analysis of all project requests and their rationale in a central location by organization, type of investment and manager. Once this is accomplished analytics can be applied like the ones described above as decision support tools, plans can be developed to proactively understand the resource demand and supply and time dependencies and the portfolio can be tracked for on schedule delivery and for post implementation benefits. # # # 1 Battery Park Plaza, 4th Floor, New York, NY 10004, (212) 965-0550, www.umt.com Figure 8: Program Funding Thresholds (Proportional Optimizations)