To produce a concrete mix containing 10% cement, the contractor needs to mix 5 bags of 24% cement with a certain number of bags containing 5% cement. The solution is that mixing 5 bags of 24% cement with 14 bags of 5% cement will produce a concrete mix that is 10% cement overall.