Primavera P6 EPPM Reports Tab Samples
The following are some samples of the standard reports available in the Oracle Primavera P6 EPPM
Reports Tab. This tab is available when P6 is integrated with Oracle Business Intelligence (BI) Publisher.




Ten Six Consulting offer BI Publisher integration services, Bi Publisher training and BI Publisher report
development services. Follow these links for more information.

                                      Integration Services:
http://www.tensixconsulting.com/software-services/primavera-implementation-consulting/primavera-
                                          integration/

                                        BI Publisher Training:
                http://www.tensixconsulting.com/oracle-business-intelligence-publisher/

                                       BI Publisher Services:
                 http://www.tensixconsulting.com/primavera-p6-bi-publisher-services/




                        http://www.tensixconsulting.com
Primavera P6 EPPM Reports Tab BI Publisher Samples


Sample Primavera P6 EPPM (BI Publisher) Reports included in this document are:
Cross Project Relationships - 3

Activity Look Ahead – 4

Duration Analysis – 5

Activity Relationships – 6

Activity Resource Assignments – 7

Schedule Report with Notebooks – 8

Resource Role Skill Sets – 9

Resource Code Assignments – 10

Resource Role Associations – 11

Code Assignments – 12

Project Portfolio Review – 13

Portfolio Counts – 16

Document Assignments – 17

Risk Scoring Report – 18

Project Status Report – 19

Qualitative Risk Report – 20

Project Hierarchy Including Steps – 21

Users – 22

Project Template Management – 23

Portfolio Privileges – 24

Calendar User – 27




             Copyright© Ten Six Consulting, LLC. 2012. All rights reserved. http://www.tensixconsulting.com
                                                           1
City Center Office Building Addition                                                          8/13/2012 23:04 PM

                            Cross Project Relationships

       Project Name / Activity Name (Critical, Relationship Type, Driving, Lag)



Predecessor Projects impacting City Center Office Building Addition
      Haitang Corporate Park / Begin Building Construction (No, Start to Start, No, 0)
      Haitang Corporate Park / Review and Approve Flooring (No, Finish to Start, No, 0)
      Haitang Corporate Park / Foundation Phase Complete (No, Finish to Start, No, 0)
      Haitang Corporate Park / Connect Equipment (No, Finish to Start, Yes, 0)
      Haitang Corporate Park / Structure Complete (No, Finish to Start, Yes, 0)
      Haitang Corporate Park / Finish Carpentry and Millwork (Yes, Finish to Start, Yes, 0)
Successor Projects impacted by City Center Office Building Addition
      Nesbid Building Expansion / Rough-In Phase Begins (No, Finish to Start, Yes, 0)
      Nesbid Building Expansion / Drywall in Offices (Yes, Finish to Start, Yes, 0)
      Nesbid Building Expansion / Award Contract for Flooring (No, Finish to Start, Yes, 0)
      Nesbid Building Expansion / Begin Building Construction (No, Finish to Start, Yes, 0)
      Nesbid Building Expansion / Erect Structural Frame (No, Finish to Start, Yes, 0)
      Nesbid Building Expansion / Floor Decking (No, Finish to Start, Yes, 0)




                                                       1 of 1
City Center Office Building Addition                                                8/13/2012 23:01 PM

                                    Activity Look Ahead
Activity Name(ID)                       Status    Critical   Percent        Start        Finish
                                                             Complete



Prepare and Solicit Bids for        In               N         95       04/04/2011   05/06/2011
Flooring(EC1170)                    Progress
Prepare and Solicit Bids for Heat   In               Y         92       04/14/2011   05/03/2011
Pump(EC1190)                        Progress
Excavation(EC1230)                  Not Started      N          0       05/02/2011   06/02/2011
Review Bids for Heat                Not Started      Y          0       05/03/2011   05/17/2011
Pump(EC1240)
Review Bids for                     Not Started      N          0       05/06/2011   05/27/2011
Flooring(EC1250)
Award Contract for                  In               N          8       04/21/2011   05/05/2011
Brick(EC1260)                       Progress
Deliver Brick(EC1280)               Not Started      N          0       05/05/2011   05/06/2011




                                                   1 of 1
City Center Office Building Addition                                                       8/13/2012 23:00 PM

                                         Duration Analysis
 Activity                                   Planned           Actual     High       Low        Variance %
                                            Duration          Duration   Estimate   Estimate
                                                                         (25%)      (20%)




Set Heat Pump                                  96                0         120        77             0
Rough-In Plumbing/Piping                       19                0          24        15             0
Touch-up and Clean-up                          19                0          24        15             0
Fabricate and Deliver Heat Pump and           3283               0         4104      2627            0
Controls
Install Underground Water Lines                96                0         120        77             0
Form/Pour Concrete Footings                   184                0         230       147             0
Concrete Foundation Walls                     192                0         240       154             0
Erect Structural Frame                        378                0         472       302             0
Floor Decking                                 251                0         314       201             0
Concrete First Floor                          288                0         360       230             0
Install AC Grills and Registers                40                0          50        32             0
Assemble Brick Samples                         0                 0          0         0              0
Assemble and Submit Flooring Samples           0                 0          0         0              0
Start Office Building Addition Project         0                 0          0         0              0
Award Contract for Heat Pump                   48                0          60        38             0
Assemble Technical Data for Heat Pump          58               58          72        46            100
Form and Pour Slab                             88                0         110        70             0
Begin Structural Phase                         0                 0          0         0              0
Concrete Second Floor                         288                0         360       230             0
Install Door and Window Frames                 19                0          24        15             0
Install Exterior Doors and Windows             38                0          48        31             0
Prepare and Solicit Bids for Heat Pump        115               92         144        92            80
Finish Carpentry and Millwork                  96                0         120        77             0
Building Addition Complete                     0                 0          0         0              0
Install Lighting Fixtures                      58                0          72        46             0
Prepare and Solicit Bids for Brick            115               139        144        92            121
Exterior


                                                     1 of 3
City Center Office Building Addition                                                                 8/13/2012 23:04 PM

                                  Activity Relationships
Activity Name                Responsibility        Activity Status         Start                 Finish


Design Building Addition    MILLS                 Completed                05/01/2011            05/01/2011
                Pred Name                                          Responsibility       Finish
                Start Office Building Addition Project             FOLEY                05/01/2011
                Succ. Name                                         Responsibility       Start
                Review and Approve Designs                         MILLS                05/01/2011
Start Office Building       FOLEY                 Completed                05/01/2011            05/01/2011
Addition Project
                Succ. Name                                         Responsibility       Start
                Design Building Addition                           MILLS                05/01/2011
Review and Approve          MILLS                 Completed                05/01/2011            05/01/2011
Designs
                Pred Name                                          Responsibility       Finish
                Design Building Addition                           MILLS                05/01/2011
                Succ. Name                                         Responsibility       Start
                Assemble Brick Samples                             NOLAN                05/01/2011
                Assemble Technical Data for Heat Pump              MILLS                05/01/2011
                Assemble and Submit Flooring Samples               HARIS                05/01/2011
                Begin Building Construction                        FOLEY                05/01/2011
Assemble Brick Samples      NOLAN                 Completed                05/01/2011            05/01/2011
                Pred Name                                          Responsibility       Finish
                Review and Approve Designs                         MILLS                05/01/2011
                Succ. Name                                         Responsibility       Start
                Review and Approve Brick Samples                   NOLAN                05/01/2011
Assemble Technical Data     MILLS                 Completed                05/01/2011            05/01/2011
for Heat Pump
                Pred Name                                          Responsibility       Finish
                Review and Approve Designs                         MILLS                05/01/2011
                Succ. Name                                         Responsibility       Start
                Review Technical Data on Heat Pumps                MILLS                05/01/2011
Assemble and Submit         HARIS                 Completed                05/01/2011            05/01/2011

                                                         1 of 15
City Center Office Building Addition                                                              8/14/2012 1:41 AM

                         Activity Resource Assignments
 Activity (ID)                                           Duration            Start                Finish


Design Building Addition (EC1000)                       417.6                11/01/2010           01/19/2011
       Resource Name                        Duration            Start                Finish
       Paul Kim                             441.6               11/01/2010           01/19/2011

Start Office Building Addition Project (EC1010)         0                    11/01/2010           11/01/2010

Review and Approve Designs (EC1030)                     172.8                01/17/2011           02/17/2011
       Resource Name                        Duration            Start                Finish
       Paul Kim                             172.8               01/17/2011           02/17/2011

Assemble Brick Samples (EC1040)                         0                    02/17/2011           02/17/2011

Assemble Technical Data for Heat Pump (EC1050)          57.6                 02/16/2011           02/25/2011
       Resource Name                        Duration            Start                Finish
       Paul Kim                             57.6                02/16/2011           02/25/2011

Assemble and Submit Flooring Samples (EC1060)           0                    02/25/2011           02/25/2011

Review and Approve Brick Samples (EC1070)               240                  02/28/2011           04/13/2011
       Resource Name                        Duration            Start                Finish
       Paul Kim                             240                 02/28/2011           04/13/2011

Review and Approve Flooring (EC1080)                    224                  02/25/2011           04/11/2011
       Resource Name                        Duration            Start                Finish
       Paul Kim                             224                 02/25/2011           04/11/2011

Begin Building Construction (EC1090)                    0                    02/28/2011           02/28/2011

Site Preparation (EC1100)                               345.6                02/23/2011           04/18/2011
       Resource Name                        Duration            Start                Finish
       Excavator                            345.6               02/23/2011           04/18/2011

Review Technical Data on Heat Pumps (EC1160)            216                  02/24/2011           04/06/2011
       Resource Name                        Duration            Start                Finish
       Paul Kim                             216                 02/24/2011           04/06/2011

Prepare and Solicit Bids for Flooring (EC1170)          192                  04/04/2011           05/06/2011

                                                    1 of 8
City Center Office Building Addition                                                             8/13/2012 23:05 PM

                        Schedule Report with Notebooks
 Activity                               Activity Status    BL1 Start       Start           BL1 Finish   Finish


Review Bids for Heat                Not Started           04/20/2011      05/03/2011      05/03/2011    05/17/2011
Pump(EC1240)

Review Bids for                     Not Started           04/22/2011      05/06/2011      05/13/2011    05/27/2011
Flooring(EC1250)

Award Contract for                  In Progress           04/29/2011      04/21/2011A     05/06/2011    05/05/2011
Brick(EC1260)

Award Contract for Heat             Not Started           05/04/2011      05/17/2011      05/11/2011    05/25/2011
Pump(EC1270)

Deliver Brick(EC1280)               Not Started           05/06/2011      05/05/2011      05/09/2011    05/06/2011

Fabricate and Deliver Heat          Not Started           05/12/2011      05/25/2011      12/24/2012    01/04/2013
Pump and Controls(EC1290)

Award Contract for                  Not Started           05/13/2011      05/27/2011      05/19/2011    06/03/2011
Flooring(EC1300)

Fabricate and Deliver               Not Started           05/20/2011      06/03/2011      06/13/2012    06/27/2012
Flooring(EC1310)

 Install Underground Water          Not Started           05/20/2011      06/03/2011      06/06/2011    06/20/2011
Lines(EC1320)

                   Notebook Topics:                       Notebook Description:
                   Anticipated Problems
                                                          Grading and soil conditions will slow
                                                          this operation. Check estimate.
                                                          Also, Plumber availability is limited
                                                          for this work.


Install Underground Electric        Not Started           05/20/2011      06/03/2011      06/06/2011    06/20/2011
Conduit(EC1330)

Form/Pour Concrete                  Not Started           06/07/2011      06/21/2011      07/08/2011    07/22/2011
Footings(EC1340)

Concrete Foundation                 Not Started           07/11/2011      07/25/2011      08/11/2011    08/25/2011
Walls(EC1350)


                                                      2 of 5
8/14/2012 1:42 AM

                           Resource Role Skill Sets
 Resource (Role count)

                         Role                       Primary Role   Proficiency


Painter (1)
                         Trades                    Yes             3 - Skilled

Project Managers (1)
                         Management                Yes             3 - Skilled

Paul Kim (1)
                         Management                Yes             3 - Skilled

Dan Sharpe (1)
                         Developer                 Yes             3 - Skilled

Alice Wynn (2)
                         Lean Six Sigma            No              3 - Skilled
                         Specialist
                         Product Tester            Yes             3 - Skilled

Rea Johnson (1)
                         Project Leader            Yes             3 - Skilled

Deepak Singh (2)
                         DBA                       No              3 - Skilled
                         Quality Assurance         Yes             3 - Skilled

Gary Marshall (3)
                         Product Tester            No              3 - Skilled
                         Product Analyst           Yes             3 - Skilled
                         Product Designer          No              3 - Skilled

Larry West (2)
                         Product Manager           Yes             3 - Skilled
                         Product Project Manager   No              3 - Skilled

Sue Baxter (2)


                                               1 of 7
8/14/2012 1:42 AM

                        Resource Code Assignments
 Resource Code
                 Code Value    Resource Name


Classification
                 CONTR        Gary Marshall
                              Conveying Subcontractor
                              Roofing Subcontractor
                              Utilities Subcontractor
                              BPM Consultant 1
                              Millwork Subcontractor
                              Thermal Protection Subcontractor
                              Finishes & Fit-out Subcontractor
                              Fire Suppression Subcontractor
                              IT Consultant
                              Sue Baxter
                              Specialty Metal Fabricator Subcontractor
                              FF&E Specialties
                              BPM Consultant 2
                              Drywall Subcontractor
                              BPM Consultant 3
                              Paul Riley
                              Glass & Glazing Subcontractor
                              Paving & Roadways Subcontractor
                              Pool Installation Subcontractor
                              Landscaping Subcontractor
                              Concrete Foundation Subcontractor


                 PTIC         Molly Abraham
                              Alice Wynn
                              Lori McNeil


                 FTTrade      Operator

                                            1 of 13
8/14/2012 1:46 AM

                             Resource Role Associations
 Role (count)
                  Resource (ID)                             Proficiency     Primary Role



Process Architect (5)
                 Judy Billings (BillingsJ)                 3 - Skilled      Yes
                 Frank Chu (Chuf)                          2 - Expert       Yes
                 Wayne Prescott (PrescottW)                3 - Skilled      Yes
                 Michelle Peterson (PetersonM)             4 - Proficient   No
                 Ben Frost (FrostB)                        2 - Expert       No

Accounting (2)
                 Project Controls (Project Controls)       3 - Skilled      No
                 Administrator (Admin)                     3 - Skilled      No

Business Analyst (4)
                 Ian Vincent (VincentI)                    3 - Skilled      No
                 Jo Wren (WrenJ)                           3 - Skilled      No
                 IT Consultant (ITCon)                     3 - Skilled      Yes
                 Carina Bennett (BennettC)                 3 - Skilled      No

Business Analyst Level 1 (1)
                 Michelle Peterson (PetersonM)             3 - Skilled      Yes

Change Management Coordinator (1)
                 Peter Cooper (CooperP)                    3 - Skilled      Yes

Consultant (4)
                 External Contractors (Contr)              3 - Skilled      Yes
                 BPM Consultant 3 (Bpm003)                 3 - Skilled      Yes
                 BPM Consultant 2 (Bpm002)                 3 - Skilled      Yes
                 BPM Consultant 1 (Bpm001)                 3 - Skilled      Yes

Civil/Structural Crews (0)

DBA (2)

                                                       1 of 6
8/14/2012 1:47 AM

                            Code Assignments
Location
 Europe
 Europe



Katalyst Virtualization
Location
 Russia
 Russia



Project Swordfish
Location
 Europe
 Europe



Zenith Continuity Program
Location
 Latin America
 Latin America



ACH Integration Project
Location
 India
 India



ERP Legacy Merge
Location
 Latin America
 Latin America




                                  2 of 3
Construction Projects                                                                                                         8/14/2012 1:49 AM

                                                    Project Portfolio Review
 Project(ID)                                         Project Manager    Project Location       Current Phase   Planned Start   Data Date




Haitang Corporate Park(EC00501)                     Chen               China                  Development      09/01/2010      05/01/2011
               ISSUE                                                               PRIORITY          STATUS
               qsdfsaf                                                             Normal            Closed
City Center Office Building                         Thomas             Europe                 Design           11/01/2010      05/01/2011
Addition(EC00515)
Nesbid Building Expansion(EC00530)                  Pell               India                  Initiation       07/01/2011      07/01/2011
Harbour Pointe Assisted Living                      Jones              Australia              Development      09/01/2010      05/01/2011
Center(EC00610)
               ISSUE                                                               PRIORITY          STATUS
               Building 2 Subject To Delay                                         High              Closed
               Finish Date Variance (days) is -21d on WBS: Harbour                 Normal            Closed
               Pointe.2.4
               Finish Date Variance (days) is -6d on WBS: Harbour Pointe.1.2       Normal            Closed
               Forecast Overrun                                                    Top               Closed
               Unit Finishes Experiencing Productivity Delays                      High              Closed
               RISK                                                                STATUS            TYPE
               Concrete supply constrained                                         Closed            Threat
               Site access restricted for 2 weeks                                  Closed            Threat
               Weather delay due to hurricane                                      Closed            Threat
               Poor ground conditions                                              Closed            Threat
               Failed electrical inspection                                        Closed            Threat

                                                                       1 of 3
Construction Projects                                                                                                              8/14/2012 1:49 AM

                                                 Project Portfolio Review
Project(ID)                                       Project Manager    Project Location     Current Phase           Planned Start     Data Date


              Interior design changes                                         Closed            Threat
              Contractor financial instability                                Closed            Threat
              Permit delay                                                    Closed            Threat
              Window manufacturing delay                                      Closed            Threat
              Weather delay due to unusually wet weather                      Closed            Threat
              New roof coating cuts roof install time                         Closed            Opportunity
              NOTEBOOK TOPIC                                                  NOTEBOOK DESCRIPTION
              Recent Accomplishments
                                                                              Recently past strucutral and traffic inspection. No weather delays in
                                                                              the past month allowed us to pull in finish date by a week. We
                                                                              successfully accomplsihed some work that had risk identified. The
                                                                              risks did not occur and we can now release 100k in contingency
                                                                              funds.
              Sponsor Feedback
                                                                              Owner is happy with progress and completed a walk through during
                                                                              the month. They do anticipate a few changes, primarily around the
                                                                              curbing and the reception area.
Juniper Nursing Home(EC00620)                    Cortez             Latin America        Design                  11/01/2010        05/01/2011
              ISSUE                                                           PRIORITY          STATUS
              Building 2 Subject To Delay                                     High              Closed
              Finish Date Variance (days) is -21d on WBS: Harbour             Normal            Closed
              Pointe.2.3
              Finish Date Variance (days) is -21d on WBS: Harbour             Normal            Closed
              Pointe.2.4

                                                                    2 of 3
Construction Projects                                                                                                     8/14/2012 1:49 AM

                                               Project Portfolio Review
Project(ID)                                     Project Manager      Project Location     Current Phase   Planned Start   Data Date


              Finish Date Variance (days) is -21d on WBS: Harbour             Normal            Closed
              Pointe.2.5
              Finish Date Variance (days) is -26d on WBS: Harbour Pointe.8    Normal            Closed
              Finish Date Variance (days) is -36d on WBS: Harbour Pointe.5    Normal            Closed
              Finish Date Variance (days) is -6d on WBS: Harbour Pointe.1.2   Normal            Closed
              Forecast Overrun                                                High              Closed
              Unit Finishes Experiencing Productivity Delays                  High              Closed
Saratoga Senior Community(EC00630)             Jones                North America        Initiation       06/01/2011      06/01/2011
              ISSUE                                                           PRIORITY          STATUS
              Building 2 Subject To Delay                                     High              Closed
              Finish Date Variance (days) is -21d on WBS: Harbour             Normal            Closed
              Pointe.2.3
              Finish Date Variance (days) is -21d on WBS: Harbour             Normal            Closed
              Pointe.2.4
              Finish Date Variance (days) is -21d on WBS: Harbour             Normal            Closed
              Pointe.2.5
              Finish Date Variance (days) is -26d on WBS: Harbour Pointe.8    Normal            Closed
              Finish Date Variance (days) is -36d on WBS: Harbour Pointe.5    Normal            Closed
              Finish Date Variance (days) is -6d on WBS: Harbour Pointe.1.2   Normal            Closed
              Forecast Overrun                                                High              Closed
              Unit Finishes Experiencing Productivity Delays                  High              Closed



                                                                    3 of 3
Construction Projects                                                        8/14/2012 1:49 AM

                                  Portfolio Counts

Project Count: 6
Activity Count: 608

                         Issues                                      Risks
Open: 24                                        Opportunity:1
                                                Threat:10




                                                                     9.091%




                                                                               Opportunity
                                     Open
                                                                               Threat




                                                            90.91%
                         100.0%




                                            1 of 1
City Center Office Building Addition                                                                      8/14/2012 1:52 AM

                                               Document Assignments
 Document Category
        Activity Name



Detailed Design Specifications

       Assemble Technical Data for Heat Pump
       Document Title                             Deliverable      Work Product   WBS Name
       Detailed Design Specification                   N                 N        Design and Engineering



       Design Building Addition
       Document Title                             Deliverable      Work Product   WBS Name
       Detailed Design Specification                   N                 N        Design and Engineering



       Assemble Technical Data for Heat Pump
       Document Title                             Deliverable      Work Product   WBS Name
       Design                                          N                 N        Design and Engineering



       Design Building Addition
       Document Title                             Deliverable      Work Product   WBS Name
       Design                                          N                 N        Design and Engineering



                                                                1 of 3
Risk Scoring Report
                                                                                                             8/14/2012 1:53 AM
                                                                                            City Center Office Building Addition

                                                     Project Summary

Project ID: EC00515                                        Data Date: 05/01/2011
Project Name: City Center Office Building Addition         Finish: 07/03/2013
Total Activities: 71                                       At Completion Cost: $745,786
Completed: 13                                              Actual Cost to Date: $124,028
In Progress: 3                                             Remaining Total Cost: $621,758

                                                      Risk Summary

Report Date:                                                 Open Risks:
Total Risks:                                                 Active Risks:
Threats:                                                     Rejected (Closed):
Opportunities:                                               Managed (Closed):
Proposed Risks:                                              Impacted (Closed):

Risk by Tolerance Threshold

Probability

Impacts

Schedule
Cost

Tolerance


Probability and Impact Scoring (PID)
Risk Score is based on: Highest Impact
             Impact
             Severity 1 Severity 2 Severity 3


Key
As of: 05/01/2011

                          Project Status Report for: City Center Office Building Addition (EC00515)

 SPONSOR                      BUSINESS SEGMENT               PROJECT MANAGER                 CURRENT PHASE                   LOCATION
            Forsyth                      1004050                     Thomas                           Design                            Europe
 DESCRIPTION
 Project is for the addition to the office building in center city. This includes design and construct work.
                         FINISH
 START                                             TARGET FINISH          % COMPLETE                  ACTIVITIES COMPLETED       PROJECT SCORE
         11/01/2010               07/03/2013            06/19/2013                14.88%                     13 of 71                      80
 APPROVED BUDGET         COST TO DATE              AT COMPLETION          COST VARIANCE               LABOR TO DATE              LABOR VARIANCE
         $734,195                 $124,028               $745,786                -$11,591                    2038 h                      -201.4 h

PRIORITY ISSUES                                                          OPEN RISKS
0 priority of 0 issues                                                   0 open of 0 risks




NOTEBOOKS                                                                MILESTONES

                                                                                                                               Date         Status
                                                                          Assemble Brick Samples                         2/15/2011        Completed
                                                                          Assemble and Submit Flooring Samples           2/15/2011        Completed
                                                                          Begin Building Construction                    2/15/2011        Completed
                                                                          Begin Structural Phase                         11/10/2011       Not Started
                                                                          Building Addition Complete                     6/19/2013        Not Started
Qualitative Risk Report
                                                                                               8/14/2012 1:54 AM
                                                                              City Center Office Building Addition


                                                 Project Summary
Project ID         EC00515                             Data Date
Project Name       City Center Office Building         Finish
                   Addition
Total Activities   71                                  At Completion Cost
Completed          13                                  Actual Cost to Date      $124,028
In Progress        3                                   Remaining Total Cost


                                                  Risk Summary


                                          Risks by Tolerance Threshold
City Center Office Building Addition                                                       8/14/2012 1:55 AM

                     Project Hierarchy Including Steps
WBS Code        WBS Code Name
                Activity Name(ID)                               Status       Start            Finish


Interior       Interior Finishes
Finishes
               Drywall in Offices (EC1700)                     Not Started   02/05/2013      03/27/2013
               Touch-up and Clean-up (EC1820)                  Not Started   06/19/2013      06/21/2013
               Finishes Complete (EC1840)                      Not Started   06/26/2013      06/26/2013
               Punch List (EC1850)                             Not Started   06/26/2013      07/03/2013
               Building Addition Complete (EC1860)             Not Started   07/03/2013      07/03/2013

               Exterior Finishes
               Close-In Phase Begins (EC1590)                  Not Started   05/15/2012      05/15/2012
               Building Enclosed (EC1620)                      Not Started   06/18/2012      06/18/2012

               Foundation
               Begin Building Construction (EC1090)            Completed     02/28/2011A     02/28/2011A
               Site Preparation (EC1100)                       Completed     02/23/2011A     04/18/2011A
               Excavation (EC1230)                             Not Started   05/02/2011      06/02/2011
               Install Underground Water Lines (EC1320)        Not Started   06/03/2011      06/20/2011
               Install Underground Electric Conduit            Not Started   06/03/2011      06/20/2011
               (EC1330)
               Form/Pour Concrete Footings (EC1340)            Not Started   06/21/2011      07/22/2011
               Concrete Foundation Walls (EC1350)              Not Started   07/25/2011      08/25/2011
               Form and Pour Slab (EC1360)                     Not Started   08/26/2011      09/12/2011
               Backfill and Compact Walls (EC1370)             Not Started   09/13/2011      09/19/2011
               Foundation Phase Complete (EC1380)              Not Started   09/19/2011      09/19/2011

               Structure
               Erect Structural Frame (EC1390)                 Not Started   09/19/2011      11/24/2011
               Begin Structural Phase (EC1410)                 Not Started   11/24/2011      11/24/2011
               Floor Decking (EC1420)                          Not Started   11/24/2011      01/11/2012
               Concrete First Floor (EC1430)                   Not Started   01/11/2012      03/01/2012
               Erect Stairwell and Elevator Walls (EC1460)     Not Started   03/01/2012      04/04/2012
               Concrete Basement Slab (EC1470)                 Not Started   03/01/2012      04/04/2012

                                                      1 of 4
8/14/2012 2:05 AM

                               Users
Login Name   Personal Name   Resource      Global Profile

admin        admin           MathisL       <Admin Superuser>
biadmin      biadmin         Trades        <Admin Superuser>
user01       user01          Product Dev   <Admin Superuser>
user02       user02                        <Admin Superuser>




                                                                Page 1 of 1
8/14/2012 2:06 AM

                           Project Template Management
Template Name                         Division   Added By   Date Added

Business Process Template                        admin      8/12/2010
Assisted Living Facility                         admin1     9/7/2010
IT Template                                      admin      8/12/2010
Product Development Template                     admin      8/12/2010




                                       1 of 1
8/14/2012 2:06 AM

                                      Profile Privileges
Profile Scope
  Security Profile
      Security Privilege

GLOBAL
 <No Global Privileges>


 Administrator
     Add Global Activity Codes
     Add Global Issue Codes
     Add Project Codes
     Add Resource Codes
     Add Resources
     Add/Delete Secure Codes
     Add/Edit/Delete Activity Step Templates
     Add/Edit/Delete Categories and Overhead Codes
     Add/Edit/Delete Cost Accounts
     Add/Edit/Delete Currencies
     Add/Edit/Delete Financial Period Dates
     Add/Edit/Delete Funding Sources
     Add/Edit/Delete Global Activity and Assignment Layouts, Views and Filters
     Add/Edit/Delete Global Calendars
     Add/Edit/Delete Global Dashboards
     Add/Edit/Delete Global Portfolios
     Add/Edit/Delete Global Project, WBS and Portfolio Layouts, Views and Filters
     Add/Edit/Delete Global Reports
     Add/Edit/Delete Global Resource and Role Teams
     Add/Edit/Delete Global Scenarios
     Add/Edit/Delete Issue Forms
     Add/Edit/Delete Microsoft Project Templates
     Add/Edit/Delete OBS
     Add/Edit/Delete Project Templates
     Add/Edit/Delete Rate Types and Units of Measure
     Add/Edit/Delete Resource Calendars
                                                   1 of 14
8/14/2012 2:06 AM

                                      Profile Privileges
Profile Scope
  Security Profile
      Security Privilege

     Add/Edit/Delete Resource Curves
     Add/Edit/Delete Risk Categories, Matrices, and Thresholds
     Add/Edit/Delete Roles
     Add/Edit/Delete Security Profiles
     Add/Edit/Delete Timesheet Period Dates
     Add/Edit/Delete User Defined Fields
     Add/Edit/Delete User Interface Views
     Add/Edit/Delete Users
     Administer Global External Applications
     Administer Scheduled Services
     Approve Resource Timesheets
     Assign Secure Codes
     Delete Global Activity Codes
     Delete Global Issue Codes
     Delete Project Codes
     Delete Resource Codes
     Delete Resources
     Edit Application Settings
     Edit Global Activity Codes
     Edit Global Change Definitions
     Edit Global Issue Codes
     Edit Global Tracking Layouts
     Edit Project Codes
     Edit Projects from Scorecards
     Edit Resource Codes
     Edit Resources
     Edit Secure Codes
     Import Project Management XER, MPP, MPX, and P3
     Import XLS
     Import XML
                                                 2 of 14
8/14/2012 2:06 AM

                                      Profile Privileges
Profile Scope
  Security Profile
      Security Privilege

     Provision Users from LDAP
     View All Global/Project Data via SDK
     View Resource Role Proficiency
     View Resource and Role Costs/Financials
     View Secure Codes




 Executive / Stakeholder
     Add Project Codes
     Add Resource Codes
     Add/Delete Secure Codes
     Add/Edit/Delete Funding Sources
     Add/Edit/Delete Global Activity and Assignment Layouts, Views and Filters
     Add/Edit/Delete Global Portfolios
     Add/Edit/Delete Global Project, WBS and Portfolio Layouts, Views and Filters
     Add/Edit/Delete Global Resource and Role Teams
     Add/Edit/Delete Resource Curves
     Add/Edit/Delete Security Profiles
     Add/Edit/Delete User Defined Fields
     Add/Edit/Delete Users
     Approve Resource Timesheets
     Assign Secure Codes
     Delete Project Codes
     Delete Resource Codes
     Edit Global Tracking Layouts
     Edit Project Codes
     Edit Projects from Scorecards
     Edit Resource Codes
     Edit Secure Codes

                                                  3 of 14
8/14/2012 2:17 AM

                                          Calendar Use
 Calendar Name


Corporate - Standard Full Time (Default Calendar)
   Project ID     Project Name                                Resource ID   Resource Name
   CORP00591      Order Management Redesign                   AndersonG     Glen Anderson, VP
                                                                            Development

   CORP00424      Lead Qualification Project
                                                              VincentI      Ian Vincent

   CORP00307      Online Invoice Generation Project
                                                              CharlesM      Mandy Charles, VP IT
                                                                            Ops
   CORP00103      Order Fullfillment Phase II

                                                              ZhuS          Shannon Zhu
   CORP00768      Logistics Reengineering Program

                                                              LaffertyV     Vanessa Lafferty
   CORP00118      GIS Interface Project

                                                              BennettC      Carina Bennett
   CORP00712      Cash Flow BI Project

                                                              PaxsonD       Dan Paxson
   CORP00595      Nexus Project

                                                              SinghD        Deepak Singh
   CORP00852      eBusiness Transformation Program

                                                              SharpeD       Dan Sharpe
   CORP00384      Alliance Portal Integration Project

                                                              ITCon         IT Consultant
   PROD00914      Project Nano

                                                              LiR           Roy Li
   PROD00414      4G Tablet Project

                                                              RiceB         Barbara Rice, PMO
   PROD00111      Magna Pad Product Test                                    Director


   PROD00228      Xstar Release II                            ChopraA       Amit Chopra


                                                              AbrahamM      Molly Abraham
                                                    2 of 10

Mais conteúdo relacionado

Mais procurados

Construction delays
Construction delaysConstruction delays
Construction delaysSaida Njim
 
Smart Goal Setting and Project Planning
Smart Goal Setting and Project PlanningSmart Goal Setting and Project Planning
Smart Goal Setting and Project PlanningOrangescrum
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesThe Vertex Companies, LLC
 
Primavera - Tutorial
Primavera - TutorialPrimavera - Tutorial
Primavera - TutorialRajeev Sharma
 
Primavera P6 manual
Primavera P6 manual Primavera P6 manual
Primavera P6 manual Abbas Tahir
 
Lean planning with Oracle Primavera Cloud
Lean planning  with Oracle Primavera CloudLean planning  with Oracle Primavera Cloud
Lean planning with Oracle Primavera CloudPRMYAZILIM
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationRAMESH PANIGRAHI PMP
 
Project Control Practical Way by Herve Baron
Project Control Practical Way by Herve BaronProject Control Practical Way by Herve Baron
Project Control Practical Way by Herve Baronignitetribes
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentationKunal Gudwani
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation Omar Selim
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)Sandip Kumar Verma
 
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...Project Controls Expo
 

Mais procurados (20)

Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
 
Construction delays
Construction delaysConstruction delays
Construction delays
 
Smart Goal Setting and Project Planning
Smart Goal Setting and Project PlanningSmart Goal Setting and Project Planning
Smart Goal Setting and Project Planning
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule Analyses
 
Primavera - Tutorial
Primavera - TutorialPrimavera - Tutorial
Primavera - Tutorial
 
Scope creep - cylfe campain
Scope creep - cylfe campainScope creep - cylfe campain
Scope creep - cylfe campain
 
Primavera P6 manual
Primavera P6 manual Primavera P6 manual
Primavera P6 manual
 
Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes
 
Lean planning with Oracle Primavera Cloud
Lean planning  with Oracle Primavera CloudLean planning  with Oracle Primavera Cloud
Lean planning with Oracle Primavera Cloud
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
pRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - SubstationpRIMAVERA - Progress report checklist - Substation
pRIMAVERA - Progress report checklist - Substation
 
Project Control Practical Way by Herve Baron
Project Control Practical Way by Herve BaronProject Control Practical Way by Herve Baron
Project Control Practical Way by Herve Baron
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentation
 
Primavera Training P6
Primavera Training P6Primavera Training P6
Primavera Training P6
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
Advanced Work Packaging: Implementation Challenges
Advanced Work Packaging: Implementation ChallengesAdvanced Work Packaging: Implementation Challenges
Advanced Work Packaging: Implementation Challenges
 
Introduction To Primavera (P6)
Introduction To Primavera (P6)Introduction To Primavera (P6)
Introduction To Primavera (P6)
 
BIM Execution plan
BIM  Execution  planBIM  Execution  plan
BIM Execution plan
 
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...
Project Controls Expo 18th Nov 2014 - "PACING DELAY The Practical Effect on C...
 

Destaque

Primavera project planner
Primavera project plannerPrimavera project planner
Primavera project plannerRahul
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14p6academy
 
Primavera Project Management
Primavera Project ManagementPrimavera Project Management
Primavera Project ManagementTotalSoft
 
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...p6academy
 
Canadian Institute of Actuaries - Success at the 2014 ASNA Convention
Canadian Institute of Actuaries - Success at the 2014 ASNA ConventionCanadian Institute of Actuaries - Success at the 2014 ASNA Convention
Canadian Institute of Actuaries - Success at the 2014 ASNA ConventionLambert Leduc
 
P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14
P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14
P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14p6academy
 
Metodologia six sigma
Metodologia  six sigmaMetodologia  six sigma
Metodologia six sigmatakabu
 
Business intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics pptBusiness intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics pptp6academy
 
P6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsP6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsInSync Conference
 
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Plan Academy - Online Primavera P6 Training
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Charlie Jackson
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricksp6academy
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIsQuang Ngoc
 

Destaque (16)

Primavera project planner
Primavera project plannerPrimavera project planner
Primavera project planner
 
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
Managing cash flow in Primavera P6 - Oracle Primavera P6 Collaborate 14
 
Primavera Project Management
Primavera Project ManagementPrimavera Project Management
Primavera Project Management
 
Primavera Training
Primavera TrainingPrimavera Training
Primavera Training
 
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
Leveraging P6 and Unifier combined strengths - Oracle Primavera P6 Collaborat...
 
Canadian Institute of Actuaries - Success at the 2014 ASNA Convention
Canadian Institute of Actuaries - Success at the 2014 ASNA ConventionCanadian Institute of Actuaries - Success at the 2014 ASNA Convention
Canadian Institute of Actuaries - Success at the 2014 ASNA Convention
 
P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14
P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14
P6 analytics product roadmap and overview - Oracle Primavera P6 Collaborate 14
 
Metodologia six sigma
Metodologia  six sigmaMetodologia  six sigma
Metodologia six sigma
 
Business intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics pptBusiness intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics ppt
 
P6 Version 7 Tricks and Traps
P6 Version 7 Tricks and TrapsP6 Version 7 Tricks and Traps
P6 Version 7 Tricks and Traps
 
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
Hacking Primavera P6 - Creative Solutions to Common Problems From the Primave...
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricks
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 

Semelhante a Primavera P6 Reports Tab Samples

Budget estimate quantified framework richardson villa 21.3.01 for issue
Budget estimate quantified framework   richardson villa 21.3.01 for issueBudget estimate quantified framework   richardson villa 21.3.01 for issue
Budget estimate quantified framework richardson villa 21.3.01 for issueyogoal
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportNatalie Reid
 
Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)Thailand Science Park
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15Ptpg Stuc
 
Flat roofs collapses due to snow in belgium & some ideas about climatic changes.
Flat roofs collapses due to snow in belgium & some ideas about climatic changes.Flat roofs collapses due to snow in belgium & some ideas about climatic changes.
Flat roofs collapses due to snow in belgium & some ideas about climatic changes.Benoit Parmentier
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner SampleHai Nguyen
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Allan Leyte
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary ReportNatalie Reid
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016Sean Mason
 
Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner
 
New Bong Escape PH gantt
New Bong Escape PH ganttNew Bong Escape PH gantt
New Bong Escape PH ganttBob Clarke
 
Itt 1.4 20124-010-sr-4110-801-a
Itt 1.4   20124-010-sr-4110-801-aItt 1.4   20124-010-sr-4110-801-a
Itt 1.4 20124-010-sr-4110-801-aDanil Babash
 

Semelhante a Primavera P6 Reports Tab Samples (16)

Budget estimate quantified framework richardson villa 21.3.01 for issue
Budget estimate quantified framework   richardson villa 21.3.01 for issueBudget estimate quantified framework   richardson villa 21.3.01 for issue
Budget estimate quantified framework richardson villa 21.3.01 for issue
 
Schedule of Works Cost Summary Report
Schedule of Works Cost Summary ReportSchedule of Works Cost Summary Report
Schedule of Works Cost Summary Report
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)Tsp 2010 2011 report for ex-club (31012011)
Tsp 2010 2011 report for ex-club (31012011)
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15
 
REVIT MEP
REVIT MEP REVIT MEP
REVIT MEP
 
Flat roofs collapses due to snow in belgium & some ideas about climatic changes.
Flat roofs collapses due to snow in belgium & some ideas about climatic changes.Flat roofs collapses due to snow in belgium & some ideas about climatic changes.
Flat roofs collapses due to snow in belgium & some ideas about climatic changes.
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016
 
Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...
 
New Bong Escape PH gantt
New Bong Escape PH ganttNew Bong Escape PH gantt
New Bong Escape PH gantt
 
Itt 1.4 20124-010-sr-4110-801-a
Itt 1.4   20124-010-sr-4110-801-aItt 1.4   20124-010-sr-4110-801-a
Itt 1.4 20124-010-sr-4110-801-a
 

Mais de Ten Six Consulting

Primavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingPrimavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingTen Six Consulting
 
Primavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingPrimavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingTen Six Consulting
 
Primavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingPrimavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingTen Six Consulting
 
Deltek Cobra Advanced Training
Deltek Cobra Advanced TrainingDeltek Cobra Advanced Training
Deltek Cobra Advanced TrainingTen Six Consulting
 
Difficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperDifficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperTen Six Consulting
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics trainingTen Six Consulting
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsTen Six Consulting
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsTen Six Consulting
 
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Ten Six Consulting
 
Installing Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneInstalling Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneTen Six Consulting
 
Primavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetPrimavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetTen Six Consulting
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexTen Six Consulting
 
Primavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapPrimavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapTen Six Consulting
 
Measurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidMeasurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidTen Six Consulting
 
Earned Value Management Variance
Earned Value Management VarianceEarned Value Management Variance
Earned Value Management VarianceTen Six Consulting
 
Primavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapPrimavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapTen Six Consulting
 
Integrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingIntegrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingTen Six Consulting
 

Mais de Ten Six Consulting (20)

Primavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingPrimavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals Training
 
Primavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingPrimavera P6 Professional Advanced Training
Primavera P6 Professional Advanced Training
 
Primavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingPrimavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator Training
 
Deltek Cobra Advanced Training
Deltek Cobra Advanced TrainingDeltek Cobra Advanced Training
Deltek Cobra Advanced Training
 
Difficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperDifficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White Paper
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics training
 
Management Reserve
Management ReserveManagement Reserve
Management Reserve
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation Instructions
 
Advanced evm workshop
Advanced evm workshopAdvanced evm workshop
Advanced evm workshop
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructions
 
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
 
Installing Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneInstalling Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standalone
 
Primavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetPrimavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheet
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets Index
 
Primavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapPrimavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar Map
 
Measurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidMeasurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to Avoid
 
Earned Value Management Variance
Earned Value Management VarianceEarned Value Management Variance
Earned Value Management Variance
 
Primavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapPrimavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar Map
 
Integrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingIntegrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) Training
 
Primavera P6 Hot Keys
Primavera P6 Hot KeysPrimavera P6 Hot Keys
Primavera P6 Hot Keys
 

Último

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 

Último (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Primavera P6 Reports Tab Samples

  • 1. Primavera P6 EPPM Reports Tab Samples The following are some samples of the standard reports available in the Oracle Primavera P6 EPPM Reports Tab. This tab is available when P6 is integrated with Oracle Business Intelligence (BI) Publisher. Ten Six Consulting offer BI Publisher integration services, Bi Publisher training and BI Publisher report development services. Follow these links for more information. Integration Services: http://www.tensixconsulting.com/software-services/primavera-implementation-consulting/primavera- integration/ BI Publisher Training: http://www.tensixconsulting.com/oracle-business-intelligence-publisher/ BI Publisher Services: http://www.tensixconsulting.com/primavera-p6-bi-publisher-services/ http://www.tensixconsulting.com
  • 2. Primavera P6 EPPM Reports Tab BI Publisher Samples Sample Primavera P6 EPPM (BI Publisher) Reports included in this document are: Cross Project Relationships - 3 Activity Look Ahead – 4 Duration Analysis – 5 Activity Relationships – 6 Activity Resource Assignments – 7 Schedule Report with Notebooks – 8 Resource Role Skill Sets – 9 Resource Code Assignments – 10 Resource Role Associations – 11 Code Assignments – 12 Project Portfolio Review – 13 Portfolio Counts – 16 Document Assignments – 17 Risk Scoring Report – 18 Project Status Report – 19 Qualitative Risk Report – 20 Project Hierarchy Including Steps – 21 Users – 22 Project Template Management – 23 Portfolio Privileges – 24 Calendar User – 27 Copyright© Ten Six Consulting, LLC. 2012. All rights reserved. http://www.tensixconsulting.com 1
  • 3. City Center Office Building Addition 8/13/2012 23:04 PM Cross Project Relationships Project Name / Activity Name (Critical, Relationship Type, Driving, Lag) Predecessor Projects impacting City Center Office Building Addition Haitang Corporate Park / Begin Building Construction (No, Start to Start, No, 0) Haitang Corporate Park / Review and Approve Flooring (No, Finish to Start, No, 0) Haitang Corporate Park / Foundation Phase Complete (No, Finish to Start, No, 0) Haitang Corporate Park / Connect Equipment (No, Finish to Start, Yes, 0) Haitang Corporate Park / Structure Complete (No, Finish to Start, Yes, 0) Haitang Corporate Park / Finish Carpentry and Millwork (Yes, Finish to Start, Yes, 0) Successor Projects impacted by City Center Office Building Addition Nesbid Building Expansion / Rough-In Phase Begins (No, Finish to Start, Yes, 0) Nesbid Building Expansion / Drywall in Offices (Yes, Finish to Start, Yes, 0) Nesbid Building Expansion / Award Contract for Flooring (No, Finish to Start, Yes, 0) Nesbid Building Expansion / Begin Building Construction (No, Finish to Start, Yes, 0) Nesbid Building Expansion / Erect Structural Frame (No, Finish to Start, Yes, 0) Nesbid Building Expansion / Floor Decking (No, Finish to Start, Yes, 0) 1 of 1
  • 4. City Center Office Building Addition 8/13/2012 23:01 PM Activity Look Ahead Activity Name(ID) Status Critical Percent Start Finish Complete Prepare and Solicit Bids for In N 95 04/04/2011 05/06/2011 Flooring(EC1170) Progress Prepare and Solicit Bids for Heat In Y 92 04/14/2011 05/03/2011 Pump(EC1190) Progress Excavation(EC1230) Not Started N 0 05/02/2011 06/02/2011 Review Bids for Heat Not Started Y 0 05/03/2011 05/17/2011 Pump(EC1240) Review Bids for Not Started N 0 05/06/2011 05/27/2011 Flooring(EC1250) Award Contract for In N 8 04/21/2011 05/05/2011 Brick(EC1260) Progress Deliver Brick(EC1280) Not Started N 0 05/05/2011 05/06/2011 1 of 1
  • 5. City Center Office Building Addition 8/13/2012 23:00 PM Duration Analysis Activity Planned Actual High Low Variance % Duration Duration Estimate Estimate (25%) (20%) Set Heat Pump 96 0 120 77 0 Rough-In Plumbing/Piping 19 0 24 15 0 Touch-up and Clean-up 19 0 24 15 0 Fabricate and Deliver Heat Pump and 3283 0 4104 2627 0 Controls Install Underground Water Lines 96 0 120 77 0 Form/Pour Concrete Footings 184 0 230 147 0 Concrete Foundation Walls 192 0 240 154 0 Erect Structural Frame 378 0 472 302 0 Floor Decking 251 0 314 201 0 Concrete First Floor 288 0 360 230 0 Install AC Grills and Registers 40 0 50 32 0 Assemble Brick Samples 0 0 0 0 0 Assemble and Submit Flooring Samples 0 0 0 0 0 Start Office Building Addition Project 0 0 0 0 0 Award Contract for Heat Pump 48 0 60 38 0 Assemble Technical Data for Heat Pump 58 58 72 46 100 Form and Pour Slab 88 0 110 70 0 Begin Structural Phase 0 0 0 0 0 Concrete Second Floor 288 0 360 230 0 Install Door and Window Frames 19 0 24 15 0 Install Exterior Doors and Windows 38 0 48 31 0 Prepare and Solicit Bids for Heat Pump 115 92 144 92 80 Finish Carpentry and Millwork 96 0 120 77 0 Building Addition Complete 0 0 0 0 0 Install Lighting Fixtures 58 0 72 46 0 Prepare and Solicit Bids for Brick 115 139 144 92 121 Exterior 1 of 3
  • 6. City Center Office Building Addition 8/13/2012 23:04 PM Activity Relationships Activity Name Responsibility Activity Status Start Finish Design Building Addition MILLS Completed 05/01/2011 05/01/2011 Pred Name Responsibility Finish Start Office Building Addition Project FOLEY 05/01/2011 Succ. Name Responsibility Start Review and Approve Designs MILLS 05/01/2011 Start Office Building FOLEY Completed 05/01/2011 05/01/2011 Addition Project Succ. Name Responsibility Start Design Building Addition MILLS 05/01/2011 Review and Approve MILLS Completed 05/01/2011 05/01/2011 Designs Pred Name Responsibility Finish Design Building Addition MILLS 05/01/2011 Succ. Name Responsibility Start Assemble Brick Samples NOLAN 05/01/2011 Assemble Technical Data for Heat Pump MILLS 05/01/2011 Assemble and Submit Flooring Samples HARIS 05/01/2011 Begin Building Construction FOLEY 05/01/2011 Assemble Brick Samples NOLAN Completed 05/01/2011 05/01/2011 Pred Name Responsibility Finish Review and Approve Designs MILLS 05/01/2011 Succ. Name Responsibility Start Review and Approve Brick Samples NOLAN 05/01/2011 Assemble Technical Data MILLS Completed 05/01/2011 05/01/2011 for Heat Pump Pred Name Responsibility Finish Review and Approve Designs MILLS 05/01/2011 Succ. Name Responsibility Start Review Technical Data on Heat Pumps MILLS 05/01/2011 Assemble and Submit HARIS Completed 05/01/2011 05/01/2011 1 of 15
  • 7. City Center Office Building Addition 8/14/2012 1:41 AM Activity Resource Assignments Activity (ID) Duration Start Finish Design Building Addition (EC1000) 417.6 11/01/2010 01/19/2011 Resource Name Duration Start Finish Paul Kim 441.6 11/01/2010 01/19/2011 Start Office Building Addition Project (EC1010) 0 11/01/2010 11/01/2010 Review and Approve Designs (EC1030) 172.8 01/17/2011 02/17/2011 Resource Name Duration Start Finish Paul Kim 172.8 01/17/2011 02/17/2011 Assemble Brick Samples (EC1040) 0 02/17/2011 02/17/2011 Assemble Technical Data for Heat Pump (EC1050) 57.6 02/16/2011 02/25/2011 Resource Name Duration Start Finish Paul Kim 57.6 02/16/2011 02/25/2011 Assemble and Submit Flooring Samples (EC1060) 0 02/25/2011 02/25/2011 Review and Approve Brick Samples (EC1070) 240 02/28/2011 04/13/2011 Resource Name Duration Start Finish Paul Kim 240 02/28/2011 04/13/2011 Review and Approve Flooring (EC1080) 224 02/25/2011 04/11/2011 Resource Name Duration Start Finish Paul Kim 224 02/25/2011 04/11/2011 Begin Building Construction (EC1090) 0 02/28/2011 02/28/2011 Site Preparation (EC1100) 345.6 02/23/2011 04/18/2011 Resource Name Duration Start Finish Excavator 345.6 02/23/2011 04/18/2011 Review Technical Data on Heat Pumps (EC1160) 216 02/24/2011 04/06/2011 Resource Name Duration Start Finish Paul Kim 216 02/24/2011 04/06/2011 Prepare and Solicit Bids for Flooring (EC1170) 192 04/04/2011 05/06/2011 1 of 8
  • 8. City Center Office Building Addition 8/13/2012 23:05 PM Schedule Report with Notebooks Activity Activity Status BL1 Start Start BL1 Finish Finish Review Bids for Heat Not Started 04/20/2011 05/03/2011 05/03/2011 05/17/2011 Pump(EC1240) Review Bids for Not Started 04/22/2011 05/06/2011 05/13/2011 05/27/2011 Flooring(EC1250) Award Contract for In Progress 04/29/2011 04/21/2011A 05/06/2011 05/05/2011 Brick(EC1260) Award Contract for Heat Not Started 05/04/2011 05/17/2011 05/11/2011 05/25/2011 Pump(EC1270) Deliver Brick(EC1280) Not Started 05/06/2011 05/05/2011 05/09/2011 05/06/2011 Fabricate and Deliver Heat Not Started 05/12/2011 05/25/2011 12/24/2012 01/04/2013 Pump and Controls(EC1290) Award Contract for Not Started 05/13/2011 05/27/2011 05/19/2011 06/03/2011 Flooring(EC1300) Fabricate and Deliver Not Started 05/20/2011 06/03/2011 06/13/2012 06/27/2012 Flooring(EC1310) Install Underground Water Not Started 05/20/2011 06/03/2011 06/06/2011 06/20/2011 Lines(EC1320) Notebook Topics: Notebook Description: Anticipated Problems Grading and soil conditions will slow this operation. Check estimate. Also, Plumber availability is limited for this work. Install Underground Electric Not Started 05/20/2011 06/03/2011 06/06/2011 06/20/2011 Conduit(EC1330) Form/Pour Concrete Not Started 06/07/2011 06/21/2011 07/08/2011 07/22/2011 Footings(EC1340) Concrete Foundation Not Started 07/11/2011 07/25/2011 08/11/2011 08/25/2011 Walls(EC1350) 2 of 5
  • 9. 8/14/2012 1:42 AM Resource Role Skill Sets Resource (Role count) Role Primary Role Proficiency Painter (1) Trades Yes 3 - Skilled Project Managers (1) Management Yes 3 - Skilled Paul Kim (1) Management Yes 3 - Skilled Dan Sharpe (1) Developer Yes 3 - Skilled Alice Wynn (2) Lean Six Sigma No 3 - Skilled Specialist Product Tester Yes 3 - Skilled Rea Johnson (1) Project Leader Yes 3 - Skilled Deepak Singh (2) DBA No 3 - Skilled Quality Assurance Yes 3 - Skilled Gary Marshall (3) Product Tester No 3 - Skilled Product Analyst Yes 3 - Skilled Product Designer No 3 - Skilled Larry West (2) Product Manager Yes 3 - Skilled Product Project Manager No 3 - Skilled Sue Baxter (2) 1 of 7
  • 10. 8/14/2012 1:42 AM Resource Code Assignments Resource Code Code Value Resource Name Classification CONTR Gary Marshall Conveying Subcontractor Roofing Subcontractor Utilities Subcontractor BPM Consultant 1 Millwork Subcontractor Thermal Protection Subcontractor Finishes & Fit-out Subcontractor Fire Suppression Subcontractor IT Consultant Sue Baxter Specialty Metal Fabricator Subcontractor FF&E Specialties BPM Consultant 2 Drywall Subcontractor BPM Consultant 3 Paul Riley Glass & Glazing Subcontractor Paving & Roadways Subcontractor Pool Installation Subcontractor Landscaping Subcontractor Concrete Foundation Subcontractor PTIC Molly Abraham Alice Wynn Lori McNeil FTTrade Operator 1 of 13
  • 11. 8/14/2012 1:46 AM Resource Role Associations Role (count) Resource (ID) Proficiency Primary Role Process Architect (5) Judy Billings (BillingsJ) 3 - Skilled Yes Frank Chu (Chuf) 2 - Expert Yes Wayne Prescott (PrescottW) 3 - Skilled Yes Michelle Peterson (PetersonM) 4 - Proficient No Ben Frost (FrostB) 2 - Expert No Accounting (2) Project Controls (Project Controls) 3 - Skilled No Administrator (Admin) 3 - Skilled No Business Analyst (4) Ian Vincent (VincentI) 3 - Skilled No Jo Wren (WrenJ) 3 - Skilled No IT Consultant (ITCon) 3 - Skilled Yes Carina Bennett (BennettC) 3 - Skilled No Business Analyst Level 1 (1) Michelle Peterson (PetersonM) 3 - Skilled Yes Change Management Coordinator (1) Peter Cooper (CooperP) 3 - Skilled Yes Consultant (4) External Contractors (Contr) 3 - Skilled Yes BPM Consultant 3 (Bpm003) 3 - Skilled Yes BPM Consultant 2 (Bpm002) 3 - Skilled Yes BPM Consultant 1 (Bpm001) 3 - Skilled Yes Civil/Structural Crews (0) DBA (2) 1 of 6
  • 12. 8/14/2012 1:47 AM Code Assignments Location Europe Europe Katalyst Virtualization Location Russia Russia Project Swordfish Location Europe Europe Zenith Continuity Program Location Latin America Latin America ACH Integration Project Location India India ERP Legacy Merge Location Latin America Latin America 2 of 3
  • 13. Construction Projects 8/14/2012 1:49 AM Project Portfolio Review Project(ID) Project Manager Project Location Current Phase Planned Start Data Date Haitang Corporate Park(EC00501) Chen China Development 09/01/2010 05/01/2011 ISSUE PRIORITY STATUS qsdfsaf Normal Closed City Center Office Building Thomas Europe Design 11/01/2010 05/01/2011 Addition(EC00515) Nesbid Building Expansion(EC00530) Pell India Initiation 07/01/2011 07/01/2011 Harbour Pointe Assisted Living Jones Australia Development 09/01/2010 05/01/2011 Center(EC00610) ISSUE PRIORITY STATUS Building 2 Subject To Delay High Closed Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.4 Finish Date Variance (days) is -6d on WBS: Harbour Pointe.1.2 Normal Closed Forecast Overrun Top Closed Unit Finishes Experiencing Productivity Delays High Closed RISK STATUS TYPE Concrete supply constrained Closed Threat Site access restricted for 2 weeks Closed Threat Weather delay due to hurricane Closed Threat Poor ground conditions Closed Threat Failed electrical inspection Closed Threat 1 of 3
  • 14. Construction Projects 8/14/2012 1:49 AM Project Portfolio Review Project(ID) Project Manager Project Location Current Phase Planned Start Data Date Interior design changes Closed Threat Contractor financial instability Closed Threat Permit delay Closed Threat Window manufacturing delay Closed Threat Weather delay due to unusually wet weather Closed Threat New roof coating cuts roof install time Closed Opportunity NOTEBOOK TOPIC NOTEBOOK DESCRIPTION Recent Accomplishments Recently past strucutral and traffic inspection. No weather delays in the past month allowed us to pull in finish date by a week. We successfully accomplsihed some work that had risk identified. The risks did not occur and we can now release 100k in contingency funds. Sponsor Feedback Owner is happy with progress and completed a walk through during the month. They do anticipate a few changes, primarily around the curbing and the reception area. Juniper Nursing Home(EC00620) Cortez Latin America Design 11/01/2010 05/01/2011 ISSUE PRIORITY STATUS Building 2 Subject To Delay High Closed Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.3 Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.4 2 of 3
  • 15. Construction Projects 8/14/2012 1:49 AM Project Portfolio Review Project(ID) Project Manager Project Location Current Phase Planned Start Data Date Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.5 Finish Date Variance (days) is -26d on WBS: Harbour Pointe.8 Normal Closed Finish Date Variance (days) is -36d on WBS: Harbour Pointe.5 Normal Closed Finish Date Variance (days) is -6d on WBS: Harbour Pointe.1.2 Normal Closed Forecast Overrun High Closed Unit Finishes Experiencing Productivity Delays High Closed Saratoga Senior Community(EC00630) Jones North America Initiation 06/01/2011 06/01/2011 ISSUE PRIORITY STATUS Building 2 Subject To Delay High Closed Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.3 Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.4 Finish Date Variance (days) is -21d on WBS: Harbour Normal Closed Pointe.2.5 Finish Date Variance (days) is -26d on WBS: Harbour Pointe.8 Normal Closed Finish Date Variance (days) is -36d on WBS: Harbour Pointe.5 Normal Closed Finish Date Variance (days) is -6d on WBS: Harbour Pointe.1.2 Normal Closed Forecast Overrun High Closed Unit Finishes Experiencing Productivity Delays High Closed 3 of 3
  • 16. Construction Projects 8/14/2012 1:49 AM Portfolio Counts Project Count: 6 Activity Count: 608 Issues Risks Open: 24 Opportunity:1 Threat:10 9.091% Opportunity Open Threat 90.91% 100.0% 1 of 1
  • 17. City Center Office Building Addition 8/14/2012 1:52 AM Document Assignments Document Category Activity Name Detailed Design Specifications Assemble Technical Data for Heat Pump Document Title Deliverable Work Product WBS Name Detailed Design Specification N N Design and Engineering Design Building Addition Document Title Deliverable Work Product WBS Name Detailed Design Specification N N Design and Engineering Assemble Technical Data for Heat Pump Document Title Deliverable Work Product WBS Name Design N N Design and Engineering Design Building Addition Document Title Deliverable Work Product WBS Name Design N N Design and Engineering 1 of 3
  • 18. Risk Scoring Report 8/14/2012 1:53 AM City Center Office Building Addition Project Summary Project ID: EC00515 Data Date: 05/01/2011 Project Name: City Center Office Building Addition Finish: 07/03/2013 Total Activities: 71 At Completion Cost: $745,786 Completed: 13 Actual Cost to Date: $124,028 In Progress: 3 Remaining Total Cost: $621,758 Risk Summary Report Date: Open Risks: Total Risks: Active Risks: Threats: Rejected (Closed): Opportunities: Managed (Closed): Proposed Risks: Impacted (Closed): Risk by Tolerance Threshold Probability Impacts Schedule Cost Tolerance Probability and Impact Scoring (PID) Risk Score is based on: Highest Impact Impact Severity 1 Severity 2 Severity 3 Key
  • 19. As of: 05/01/2011 Project Status Report for: City Center Office Building Addition (EC00515) SPONSOR BUSINESS SEGMENT PROJECT MANAGER CURRENT PHASE LOCATION Forsyth 1004050 Thomas Design Europe DESCRIPTION Project is for the addition to the office building in center city. This includes design and construct work. FINISH START TARGET FINISH % COMPLETE ACTIVITIES COMPLETED PROJECT SCORE 11/01/2010 07/03/2013 06/19/2013 14.88% 13 of 71 80 APPROVED BUDGET COST TO DATE AT COMPLETION COST VARIANCE LABOR TO DATE LABOR VARIANCE $734,195 $124,028 $745,786 -$11,591 2038 h -201.4 h PRIORITY ISSUES OPEN RISKS 0 priority of 0 issues 0 open of 0 risks NOTEBOOKS MILESTONES Date Status Assemble Brick Samples 2/15/2011 Completed Assemble and Submit Flooring Samples 2/15/2011 Completed Begin Building Construction 2/15/2011 Completed Begin Structural Phase 11/10/2011 Not Started Building Addition Complete 6/19/2013 Not Started
  • 20. Qualitative Risk Report 8/14/2012 1:54 AM City Center Office Building Addition Project Summary Project ID EC00515 Data Date Project Name City Center Office Building Finish Addition Total Activities 71 At Completion Cost Completed 13 Actual Cost to Date $124,028 In Progress 3 Remaining Total Cost Risk Summary Risks by Tolerance Threshold
  • 21. City Center Office Building Addition 8/14/2012 1:55 AM Project Hierarchy Including Steps WBS Code WBS Code Name Activity Name(ID) Status Start Finish Interior Interior Finishes Finishes Drywall in Offices (EC1700) Not Started 02/05/2013 03/27/2013 Touch-up and Clean-up (EC1820) Not Started 06/19/2013 06/21/2013 Finishes Complete (EC1840) Not Started 06/26/2013 06/26/2013 Punch List (EC1850) Not Started 06/26/2013 07/03/2013 Building Addition Complete (EC1860) Not Started 07/03/2013 07/03/2013 Exterior Finishes Close-In Phase Begins (EC1590) Not Started 05/15/2012 05/15/2012 Building Enclosed (EC1620) Not Started 06/18/2012 06/18/2012 Foundation Begin Building Construction (EC1090) Completed 02/28/2011A 02/28/2011A Site Preparation (EC1100) Completed 02/23/2011A 04/18/2011A Excavation (EC1230) Not Started 05/02/2011 06/02/2011 Install Underground Water Lines (EC1320) Not Started 06/03/2011 06/20/2011 Install Underground Electric Conduit Not Started 06/03/2011 06/20/2011 (EC1330) Form/Pour Concrete Footings (EC1340) Not Started 06/21/2011 07/22/2011 Concrete Foundation Walls (EC1350) Not Started 07/25/2011 08/25/2011 Form and Pour Slab (EC1360) Not Started 08/26/2011 09/12/2011 Backfill and Compact Walls (EC1370) Not Started 09/13/2011 09/19/2011 Foundation Phase Complete (EC1380) Not Started 09/19/2011 09/19/2011 Structure Erect Structural Frame (EC1390) Not Started 09/19/2011 11/24/2011 Begin Structural Phase (EC1410) Not Started 11/24/2011 11/24/2011 Floor Decking (EC1420) Not Started 11/24/2011 01/11/2012 Concrete First Floor (EC1430) Not Started 01/11/2012 03/01/2012 Erect Stairwell and Elevator Walls (EC1460) Not Started 03/01/2012 04/04/2012 Concrete Basement Slab (EC1470) Not Started 03/01/2012 04/04/2012 1 of 4
  • 22. 8/14/2012 2:05 AM Users Login Name Personal Name Resource Global Profile admin admin MathisL <Admin Superuser> biadmin biadmin Trades <Admin Superuser> user01 user01 Product Dev <Admin Superuser> user02 user02 <Admin Superuser> Page 1 of 1
  • 23. 8/14/2012 2:06 AM Project Template Management Template Name Division Added By Date Added Business Process Template admin 8/12/2010 Assisted Living Facility admin1 9/7/2010 IT Template admin 8/12/2010 Product Development Template admin 8/12/2010 1 of 1
  • 24. 8/14/2012 2:06 AM Profile Privileges Profile Scope Security Profile Security Privilege GLOBAL <No Global Privileges> Administrator Add Global Activity Codes Add Global Issue Codes Add Project Codes Add Resource Codes Add Resources Add/Delete Secure Codes Add/Edit/Delete Activity Step Templates Add/Edit/Delete Categories and Overhead Codes Add/Edit/Delete Cost Accounts Add/Edit/Delete Currencies Add/Edit/Delete Financial Period Dates Add/Edit/Delete Funding Sources Add/Edit/Delete Global Activity and Assignment Layouts, Views and Filters Add/Edit/Delete Global Calendars Add/Edit/Delete Global Dashboards Add/Edit/Delete Global Portfolios Add/Edit/Delete Global Project, WBS and Portfolio Layouts, Views and Filters Add/Edit/Delete Global Reports Add/Edit/Delete Global Resource and Role Teams Add/Edit/Delete Global Scenarios Add/Edit/Delete Issue Forms Add/Edit/Delete Microsoft Project Templates Add/Edit/Delete OBS Add/Edit/Delete Project Templates Add/Edit/Delete Rate Types and Units of Measure Add/Edit/Delete Resource Calendars 1 of 14
  • 25. 8/14/2012 2:06 AM Profile Privileges Profile Scope Security Profile Security Privilege Add/Edit/Delete Resource Curves Add/Edit/Delete Risk Categories, Matrices, and Thresholds Add/Edit/Delete Roles Add/Edit/Delete Security Profiles Add/Edit/Delete Timesheet Period Dates Add/Edit/Delete User Defined Fields Add/Edit/Delete User Interface Views Add/Edit/Delete Users Administer Global External Applications Administer Scheduled Services Approve Resource Timesheets Assign Secure Codes Delete Global Activity Codes Delete Global Issue Codes Delete Project Codes Delete Resource Codes Delete Resources Edit Application Settings Edit Global Activity Codes Edit Global Change Definitions Edit Global Issue Codes Edit Global Tracking Layouts Edit Project Codes Edit Projects from Scorecards Edit Resource Codes Edit Resources Edit Secure Codes Import Project Management XER, MPP, MPX, and P3 Import XLS Import XML 2 of 14
  • 26. 8/14/2012 2:06 AM Profile Privileges Profile Scope Security Profile Security Privilege Provision Users from LDAP View All Global/Project Data via SDK View Resource Role Proficiency View Resource and Role Costs/Financials View Secure Codes Executive / Stakeholder Add Project Codes Add Resource Codes Add/Delete Secure Codes Add/Edit/Delete Funding Sources Add/Edit/Delete Global Activity and Assignment Layouts, Views and Filters Add/Edit/Delete Global Portfolios Add/Edit/Delete Global Project, WBS and Portfolio Layouts, Views and Filters Add/Edit/Delete Global Resource and Role Teams Add/Edit/Delete Resource Curves Add/Edit/Delete Security Profiles Add/Edit/Delete User Defined Fields Add/Edit/Delete Users Approve Resource Timesheets Assign Secure Codes Delete Project Codes Delete Resource Codes Edit Global Tracking Layouts Edit Project Codes Edit Projects from Scorecards Edit Resource Codes Edit Secure Codes 3 of 14
  • 27. 8/14/2012 2:17 AM Calendar Use Calendar Name Corporate - Standard Full Time (Default Calendar) Project ID Project Name Resource ID Resource Name CORP00591 Order Management Redesign AndersonG Glen Anderson, VP Development CORP00424 Lead Qualification Project VincentI Ian Vincent CORP00307 Online Invoice Generation Project CharlesM Mandy Charles, VP IT Ops CORP00103 Order Fullfillment Phase II ZhuS Shannon Zhu CORP00768 Logistics Reengineering Program LaffertyV Vanessa Lafferty CORP00118 GIS Interface Project BennettC Carina Bennett CORP00712 Cash Flow BI Project PaxsonD Dan Paxson CORP00595 Nexus Project SinghD Deepak Singh CORP00852 eBusiness Transformation Program SharpeD Dan Sharpe CORP00384 Alliance Portal Integration Project ITCon IT Consultant PROD00914 Project Nano LiR Roy Li PROD00414 4G Tablet Project RiceB Barbara Rice, PMO PROD00111 Magna Pad Product Test Director PROD00228 Xstar Release II ChopraA Amit Chopra AbrahamM Molly Abraham 2 of 10