SlideShare uma empresa Scribd logo
1 de 24
JUST-IN-TIME
MANUFACTURING
A PowerPoint Presentation

BY
SWATI(54),
MEENAL(39),
REENU(45),
JAYA(66)
WHAT IS JIT?
• JIT is a manufacturing
philosophy involving an
integrated set of
procedures/activities designed
to achieve a volume of
production using minimal
inventories.
• A highly coordinated processing
system in which goods move
through the system, and
services are performed, just as
they need.
HOW IT WORKS?
HISTORY
• Evolved in Japan after World War II, as a result of their
diminishing market share in the auto industry.
• Founded by Taiichi Ohno, a vice president of Toyota.
• Basically implemented in Toyota plant 1950, well
established after 1970.
FOLLOWERS
• Adopted by General Electrical in the USA in the 1980.
• Some companies referred JIT with different names:
i. TOYOTA – ‘Toyota System’
ii. IBM – ‘Continuous flow manufacturing’
iii. GE- ‘Management by sight’
iv. HEWLETT- PACKARD- ‘stockless production & repetitive
manufacturing system’
7 WASTES
1)
2)
3)
4)

Waste of over production
Waste of waiting
Waste of transportation
Waste of Underutilization
of Employees
5) Waste of Inventory
6) Waste of motion
7) Waste of making defective
products
PRINCIPLES OF JIT
PRODUCTION
TOTAL QUALITY
MANAGEMENT
• Seek long-term
commitment
• Quality must be a
higher priority than cost
• Minimize Waste
PRODUCTION MANAGEMENT
• Pull System vs. Push System
– Pull = Made to order
– Push = Made for inventory

• Communication Techniques
– Completion of task-Kanban
– Problem- Andon or siren/light

• Flexibility of the system
• Design For Testability
– Poka-Yoke= Mistake-proofing
SUPPLIER MANAGEMENT
• Establish Long Term Relationships with few
E.g. Toyota Productions
suppliers.
• Delivery of Parts = 100% Defect Free
– Where they are needed
– When they are needed
– The exact quantity

• Work Together
• Elimination of inspection of parts
INVENTORY MANAGEMENT
 Eliminate

Safety Stock = Zero Inventory
 Inventory is Evil

Water = Inventory

Material
handling

Poor
training

Traditional systems use
inventory (water) to buffer the
process from problems (rocks)
that cause disruption.
Break
downs

Material
quality
problems

Long
setups
JIT systems view inventory as waste and work to lower
inventory levels to expose and correct the problems (rocks)
that cause disruption.

Material
handling

Poor
training

Break
downs

Material
quality
problems

Long
setups
Lowering the level of inventory is relatively easy to do.
However, the problems that arise must be corrected
quickly … Otherwise, the process will flounder.

Material
handling

Poor
training

Material
Break downs quality
problems

Long
setups
HUMAN RESOURCE
MANAGEMENT
• Company-wide Involvement
– Motivation for
continuous
improvement
– Problem Solving

• Diversified Employees
• Management Support and
Empowerment of workforce
JIT MANUFACTURING
BUILDING BLOCKS
Ultimate
Goal

Supporting
Goals

A
balanced
rapid flow

Reduce setup
and lead times

Eliminate disruptions
Make the system flexible

Product
Design

Process
Design

Eliminate waste
Minimize inventories

Personnel
Elements

Manufacturing Planning
REQUIREMENTS OF JIT
• Respond to Customer
Requirements
• Integrate all Processes
• Employee Participation
• Company wide
Commitment to education
• Eliminate redundancy
• Reduce all Inventory
• Establish Continuous
Improvement Goals

• Use a pull Production
System
• Design products for
Manufacturing
• Develop Controllable
Production Processes
• Have Defect Prevention
Program
• Reduce Setup Times
• Build Products to
Specification
OBSTACLES IN
CONVERSION
• Management not committed
• Workers not cooperative
• Decide which parts need most effort
• Start by trying to reduce setup times
• Gradually convert operations
• Convert suppliers to JIT
• Prepare for obstacles
• Suppliers may
resist
ADVANTAGES OF JIT
• High quality
• Flexibility
• Reduced setup times
• Reduced need for indirect labor
• Less waste
• Low warehouse cost

• Synchronization between production scheduling and work
hour
DISADVANTAGES OF JIT
• Time consuming
• No spare product to meet un expected order
• Supply Shock : If products do not reach on
time
• High risk factor
JIT IN GOODS :
• Leveraged JIT principles to make its manufacturing process
a success
• Leverage their suppliers to achieve the JIT goal
• Provide exceptionally short set up times to their customers
• Suppliers carry inventory instead of carrying it themselves.
• Has dependable suppliers with the ability to meet its
demanding lead time requirements.
• Seamless system that allows it to transmit its component
on requirements
• Willingness of suppliers to keep inventory on hand.
JIT IN SERVICES: MAC D

McDonald’s is the best example of JIT in
Services !
• McDonald's doesn't begin to cook until a
customer has placed a specific order.
• The major benefits are better food at a lower
cost.
• Wastage is reduced along with an improvised
taste that makes you want to scream out I’m
Lovin’ It !
THANK YOU!!

Mais conteúdo relacionado

Mais procurados

manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planningDinesh Nikam
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and PrinciplesAzmir Latif Beg
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control pptsudhir pawar
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean productionهشام جملة
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturingPrasad Bidwai
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production scheduleMRPeasy
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production Systemjasonhian
 

Mais procurados (20)

Just In Time
Just In TimeJust In Time
Just In Time
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
JIT
JITJIT
JIT
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Kanban system
Kanban systemKanban system
Kanban system
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Lean vs agile manufacturing
Lean vs agile manufacturingLean vs agile manufacturing
Lean vs agile manufacturing
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Just in time
Just in timeJust in time
Just in time
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturing
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Just in time
Just in timeJust in time
Just in time
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 

Destaque

Just-in-Time in McDonalds
Just-in-Time in McDonaldsJust-in-Time in McDonalds
Just-in-Time in McDonaldsAJ165
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations ManagementGargi Kapadia
 
Sistem informasi manufaktur
Sistem informasi manufakturSistem informasi manufaktur
Sistem informasi manufakturgleebelle
 
Case Study on Nissan Automobiles
Case Study on Nissan AutomobilesCase Study on Nissan Automobiles
Case Study on Nissan Automobilesorion_06
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainSaad Munami
 
Just in Time Manufactuing
Just in Time ManufactuingJust in Time Manufactuing
Just in Time ManufactuingRohan Nakrani
 
"Rediscover the Paseo"
"Rediscover the Paseo""Rediscover the Paseo"
"Rediscover the Paseo"guest696594
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTINGAKSHIT JAIN
 
Master scheduling
Master schedulingMaster scheduling
Master schedulingmehrdad66
 

Destaque (20)

Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Just-in-Time in McDonalds
Just-in-Time in McDonaldsJust-in-Time in McDonalds
Just-in-Time in McDonalds
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
Tqm Final Ppt
Tqm Final PptTqm Final Ppt
Tqm Final Ppt
 
Tqm power point
Tqm power pointTqm power point
Tqm power point
 
Sistem informasi manufaktur
Sistem informasi manufakturSistem informasi manufaktur
Sistem informasi manufaktur
 
Case Study on Nissan Automobiles
Case Study on Nissan AutomobilesCase Study on Nissan Automobiles
Case Study on Nissan Automobiles
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chain
 
Jit in mc donald's
Jit in mc donald'sJit in mc donald's
Jit in mc donald's
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Just in Time Manufactuing
Just in Time ManufactuingJust in Time Manufactuing
Just in Time Manufactuing
 
"Rediscover the Paseo"
"Rediscover the Paseo""Rediscover the Paseo"
"Rediscover the Paseo"
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTING
 
Master scheduling
Master schedulingMaster scheduling
Master scheduling
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 

Semelhante a Just in time manufacturing ppt

Just in time
Just in timeJust in time
Just in timeyashpalsg
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Blankdevil
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountsSabaKhalid48
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturingshahroze11
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operationsRajThakuri
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationSINGHZEE
 
5a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 20125a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 2012kimsach
 
Just In Time
Just In TimeJust In Time
Just In Timedvyvjy
 

Semelhante a Just in time manufacturing ppt (20)

10. just in-time
10. just in-time10. just in-time
10. just in-time
 
Just in time
Just in timeJust in time
Just in time
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
Just in time
Just in timeJust in time
Just in time
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Just in Time
Just in TimeJust in Time
Just in Time
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
Just In Time
Just In TimeJust In Time
Just In Time
 
TQM UNIT 4.pptx
TQM UNIT 4.pptxTQM UNIT 4.pptx
TQM UNIT 4.pptx
 
5a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 20125a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 2012
 
Just in time
Just in timeJust in time
Just in time
 
Just in Time
Just in Time Just in Time
Just in Time
 
Just In Time
Just In TimeJust In Time
Just In Time
 

Mais de Swati Luthra

Mais de Swati Luthra (12)

Air india final
Air india finalAir india final
Air india final
 
whatsapp ppt
whatsapp pptwhatsapp ppt
whatsapp ppt
 
training and development at infosys
training and development at infosystraining and development at infosys
training and development at infosys
 
sampling ppt
sampling pptsampling ppt
sampling ppt
 
Myntra.com ppt
Myntra.com pptMyntra.com ppt
Myntra.com ppt
 
Cadbury's marketing ppt
Cadbury's marketing pptCadbury's marketing ppt
Cadbury's marketing ppt
 
Future accountings
Future accountingsFuture accountings
Future accountings
 
Types of Taxes
Types of TaxesTypes of Taxes
Types of Taxes
 
Spiri com
Spiri comSpiri com
Spiri com
 
google working
google workinggoogle working
google working
 
disaster management
disaster managementdisaster management
disaster management
 
Dell swati & final
Dell swati & finalDell swati & final
Dell swati & final
 

Último

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 

Último (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Just in time manufacturing ppt

  • 2. WHAT IS JIT? • JIT is a manufacturing philosophy involving an integrated set of procedures/activities designed to achieve a volume of production using minimal inventories. • A highly coordinated processing system in which goods move through the system, and services are performed, just as they need.
  • 4. HISTORY • Evolved in Japan after World War II, as a result of their diminishing market share in the auto industry. • Founded by Taiichi Ohno, a vice president of Toyota. • Basically implemented in Toyota plant 1950, well established after 1970.
  • 5. FOLLOWERS • Adopted by General Electrical in the USA in the 1980. • Some companies referred JIT with different names: i. TOYOTA – ‘Toyota System’ ii. IBM – ‘Continuous flow manufacturing’ iii. GE- ‘Management by sight’ iv. HEWLETT- PACKARD- ‘stockless production & repetitive manufacturing system’
  • 6. 7 WASTES 1) 2) 3) 4) Waste of over production Waste of waiting Waste of transportation Waste of Underutilization of Employees 5) Waste of Inventory 6) Waste of motion 7) Waste of making defective products
  • 8. TOTAL QUALITY MANAGEMENT • Seek long-term commitment • Quality must be a higher priority than cost • Minimize Waste
  • 9. PRODUCTION MANAGEMENT • Pull System vs. Push System – Pull = Made to order – Push = Made for inventory • Communication Techniques – Completion of task-Kanban – Problem- Andon or siren/light • Flexibility of the system • Design For Testability – Poka-Yoke= Mistake-proofing
  • 10. SUPPLIER MANAGEMENT • Establish Long Term Relationships with few E.g. Toyota Productions suppliers. • Delivery of Parts = 100% Defect Free – Where they are needed – When they are needed – The exact quantity • Work Together • Elimination of inspection of parts
  • 11. INVENTORY MANAGEMENT  Eliminate Safety Stock = Zero Inventory  Inventory is Evil Water = Inventory Material handling Poor training Traditional systems use inventory (water) to buffer the process from problems (rocks) that cause disruption. Break downs Material quality problems Long setups
  • 12. JIT systems view inventory as waste and work to lower inventory levels to expose and correct the problems (rocks) that cause disruption. Material handling Poor training Break downs Material quality problems Long setups
  • 13. Lowering the level of inventory is relatively easy to do. However, the problems that arise must be corrected quickly … Otherwise, the process will flounder. Material handling Poor training Material Break downs quality problems Long setups
  • 14. HUMAN RESOURCE MANAGEMENT • Company-wide Involvement – Motivation for continuous improvement – Problem Solving • Diversified Employees • Management Support and Empowerment of workforce
  • 15. JIT MANUFACTURING BUILDING BLOCKS Ultimate Goal Supporting Goals A balanced rapid flow Reduce setup and lead times Eliminate disruptions Make the system flexible Product Design Process Design Eliminate waste Minimize inventories Personnel Elements Manufacturing Planning
  • 16. REQUIREMENTS OF JIT • Respond to Customer Requirements • Integrate all Processes • Employee Participation • Company wide Commitment to education • Eliminate redundancy • Reduce all Inventory • Establish Continuous Improvement Goals • Use a pull Production System • Design products for Manufacturing • Develop Controllable Production Processes • Have Defect Prevention Program • Reduce Setup Times • Build Products to Specification
  • 17. OBSTACLES IN CONVERSION • Management not committed • Workers not cooperative • Decide which parts need most effort • Start by trying to reduce setup times • Gradually convert operations • Convert suppliers to JIT • Prepare for obstacles • Suppliers may resist
  • 18. ADVANTAGES OF JIT • High quality • Flexibility • Reduced setup times • Reduced need for indirect labor • Less waste • Low warehouse cost • Synchronization between production scheduling and work hour
  • 19. DISADVANTAGES OF JIT • Time consuming • No spare product to meet un expected order • Supply Shock : If products do not reach on time • High risk factor
  • 20. JIT IN GOODS : • Leveraged JIT principles to make its manufacturing process a success • Leverage their suppliers to achieve the JIT goal • Provide exceptionally short set up times to their customers • Suppliers carry inventory instead of carrying it themselves. • Has dependable suppliers with the ability to meet its demanding lead time requirements.
  • 21. • Seamless system that allows it to transmit its component on requirements • Willingness of suppliers to keep inventory on hand.
  • 22. JIT IN SERVICES: MAC D McDonald’s is the best example of JIT in Services !
  • 23. • McDonald's doesn't begin to cook until a customer has placed a specific order. • The major benefits are better food at a lower cost. • Wastage is reduced along with an improvised taste that makes you want to scream out I’m Lovin’ It !