SlideShare uma empresa Scribd logo
1 de 24
Betting On the SUN
“I’d put my Money on the Sun and Solar Energy. What a source of Power! I hope we don’t have to
 Wait ‘till Oil and Coal run out before we tackle that”.
                                                         – Thomas Edison [1847 – 1931]




Over 450 million Indians have no electricity though India receives solar energy equivalent to nearly 5,000
trillion kWh/year - far more than the country’s total energy consumption today.
Solar Power In India
India's power sector has a total installed capacity of approximately 1, 47,402 Megawatt (MW) of which
63% is Thermal (coal-based)
25% Hydro
9% is Renewable and
3% is Gas and Nuclear-based.
Power shortages are estimated at about 11% of total energy and likely to
increase in the coming years. In the next 10 years, another 40,000 MW of
capacity and an investment of about Rs. 1, 00,000 lakh crore is needed into
the power sector.

Fortunately, India lies in sunny regions of the world. Most parts of India
receive 4-7 kWh of solar radiation per square meter per day with 250-300
sunny days in a year. India has abundant solar resources, as it receives
about 3000 hours of sunshine every year, equivalent to over 5,000 trillion
kWh.

India can easily utilize the power of solar energy. Today the contribution of
solar power with an installed capacity of 9.84 MW, is a fraction (< 0.1 %) of
the total renewable energy installed.
Jawaharlal Nehru National Solar Mission
► The Jawaharlal National Solar Mission is being launched under the brand name “Solar India” with an initial
investment of Rs. 4,337 crore.

► The Solar Mission recommends the implementation in 3 stages leading up to an installed capacity of 20,000
                     th
MW by the end of 13 Five Year Plan in 2022.

► The Mission will adopt a 3-phase approach:
                                                      th                           th
  Phase 1  spanning the remaining period of the 11 Plan and first year of the 12 Plan (up to 2012-13)
                                             th
  Phase 2  the remaining 4 years of the 12 Plan (2013-17)
                    th
  Phase 3  the 13 Plan (2017-22)
                                                      th       th
At the end of each plan, and mid-term during the 12 and 13 Plans, there will be an evaluation of progress,
review of capacity and targets for subsequent phases, based on emerging cost and technology trends, both
domestic and global.

Mission Targets are:
   • To create an enabling policy framework for the deployment of 20,000 MW of solar power by 2022.
   • To ramp up capacity of grid-connected solar power generation to 1000 MW within three years – by 2013;
       an additional 3000 MW by 2017 through the mandatory use of the renewable purchase obligation by
       utilities backed with a preferential tariff.
   • To create favorable conditions for solar manufacturing capability, particularly solar thermal for indigenous
       production and market leadership.
   • To promote programmes for off-grid applications, reaching 1000 MW by 2017 and 2000 MW by 2022.
   • To achieve 15 million sq. meters solar thermal collector area by 2017 and 20 million by 2022.
   • To deploy 20 million solar lighting systems for rural areas by 2022.
Highlights:
► The Cabinet has approved setting up of 1,100 MW of grid solar power and 200 MW capacities of off-grid solar
applications utilizing both solar thermal and photovoltaic technologies in the first phase of the Mission.

► The focal point, for the next 3 years, will be the NTPC Vidyut Vyapar Nigam (NVVN), which is the power
trading arm of the NTPC. Government will designate it for the purchase of solar power generated by
independent solar power producers, at rates fixed by the Central Regulatory Electricity Commission and for a
period specified by the latter.

► The Central Electricity Regulatory Commission has recently issued guidelines for fixing feed-in-tariff for
purchase of solar power taking into account current cost and technology trends. These will be revised on an
annual basis. The CERC has also stipulated that Power Purchase Agreement (PPA) that utilities will conclude
with solar power promoters should be for a period of 25 years.

► The PPAs shall be signed with the developers who will be setting up Solar Projects within next three years
(i.e. up to March 2013) and are connected to the grid at 33 KV level and above.

► The Mission will encourage rooftop solar PV and other small solar power plants, connected to LT/11 KV grid,
to replace conventional power and diesel-based generators. Operators of solar PV rooftop devices will also be
eligible to receive the feed-in tariff fixed by the CERC, both on the solar power consumed by the operator and
the solar power fed into the grid
► State Governments would also be encouraged to promote and establish Solar generation
Parks with dedicated infrastructure for setting up utility scale plants to ensure ease of capacity
creation.




► The Mission also includes a major initiative for promoting rooftop solar PV applications. Solar
tariff announced by the regulators will be applicable for such installations. The power distribution
companies will be involved in purchase of this power

Scalability: India is endowed with vast solar energy potential. About 5,000 trillion kWh per year
energy is incident over India’s land area with most parts receiving 4 -7 kWh per sq. m per day.
Hence both technology routes for conversion of solar radiation into heat and electricity, namely,
solar thermal and solar photovoltaics can effectively be harnessed providing huge scalability for
solar in India.

Funding: Funding for the ambitious targets would be from budgetary support and multilateral
mechanism under the UN system.

Pricing: The mission aims to have 20,000 MW of solar power connected to the grid by 2022 with
an allocation of Rs 4,337 crore in first phase. The offer of around Rs 17.50 a kWh of electricity, of
which the Centre will pay Rs 14 and the State utilities the balance

State utilities will have to purchase this power from the NTPC Vidyut Vyapar Nigam Ltd (NVVN),
the designated nodal agency by the Ministry of Power (MoP), for entering into a power purchase
agreement (PPA), of 25 years. The idea of introducing power trading instrument of REC is also an
ambitious plan.

RECs - Significantly, it seeks to achieve the grid connected capacity in the initial period through an
innovative system of Renewable Energy Certificates (RECs), which will be tradeable. The policy
has suggested a renewable purchase obligation (RPO) on states that could start with 0.25% of their
power off take in Phase I by 2013 and going up to 3% by 2022.

The below 80°C challenge – Solar Collectors
The Mission in its first two phases will promote solar heating systems, which are already using
proven technology and are commercially viable. The Mission is setting an ambitious target for
ensuring that applications, domestic and industrial, below 80 °C are solarised. The key strategy of
the Mission will be to make necessary policy changes to meet this objective:

   •   Firstly, make solar heaters mandatory, through building byelaws and incorporation in the
        National Building Code,
   •   Secondly, ensure the introduction of effective mechanisms for certification and rating of
        manufacturers of solar thermal applications,
   •   Thirdly, facilitate measurement and promotion of these individual devices through local
        agencies and power utilities, and
   •   Fourthly, support the upgrading of technologies and manufacturing capacities through soft
        loans, to achieve higher efficiencies and further cost reduction.
JNNSM’s OFF-GRID Initiatives:

In remote and far-flung areas where grid penetration is neither feasible nor cost effective, solar energy
applications are cost-effective. They ensure that people with no access, currently, to light and power, move
directly to solar, leap-frogging the fossil fuel trajectory of growth.

► Solar thermal heating applications, such as water heaters, fall in this category.
► Solar lighting systems for rural and remote areas are already being distributed commercially in several parts
of the country.
► Solar energy to power computers to assist learning in schools and hostels, Management Information System
(MIS) to assist better management of forests, powering milk chilling plants are some examples of new areas,
being tried successfully in the country.
SOLAR TECHNOLOGIES, TRENDS and FORECASTS



Solar electricity generation uses 2 types of technologies - photovoltaic (SPV) and Solar Thermal technology.
SOLAR COMPANY PROFILES   S
XL Telecom is one of the leading Indian manufacturers of Solar
Photovoltaic Modules, established in 1992. XL has over 15 years of experience
of manufacturing Solar Photovoltaic Modules and systems to various agencies in
India. The company has a solar photovoltaic cell manufacturing plant with a
capacity of 120 MW per annum                                                     OUTPERFORMER
XL is right now going through CDR process to reduce the debt and come back to
its glory days. New Project in Fab City is in progress and would add to its MW
capacity
.




            Moser Baer Photovoltaic (MBPV) aims to distinguish itself as a
significant player in the global photovoltaic market by leveraging its high-volume
manufacturing expertise and R & D.                                                         NEUTRAL
A first of its kind 80 MW, state-of-the-art, fully automated in-line crystalline silicon
cell manufacturing facility - 40 MW already in production - this will be scaled up
to 240 MW. A 200 MW thin film module plant is under construction.

Many JVs and technology tie-ups in place.



         Recession led to heavy losses. Yet to turn the corner.
.




       Restructuring all its entities is underway so as to unlock Biogas and     OUTPERFORMER
SOLAR valuations.



Promoters buying back their shares actively from market.


Aggressive Solar push across more than 5 states.

The company plans to establish solar power projects connected to the grid
with a total capacity of 500 MW in a phased manner with plans to establish a
series of solar projects in Gujarat, Maharashtra, Madhya Pradesh,
Chhattisgarh and Andhra Pradesh, in a phased manner. In Phase I, plans to
establish 65 MW and has chosen Medak district in Andhra Pradesh, Raipur in
Chhattisgarh, Hingoli in Maharashtra and Bhavnagar in Gujarat initially to set
up solar plants.
PAE Ltd’s subsidiary – Shurjo Energy focuses on thin-film solar
modules using the Copper Indium Gallium diselenide Technology (CIGS).
                                                                                OUTPERFORMER
SHURJO has a dominant presence in the off-grid solar utilities and appliances
market. Company modules range from 9 watts to 156 watts – one of the
widest CIGS market range.

Is working on a product range for the Building – Integrated Photovoltaics
(BiPV) market. Recently its modules met the IEC safety standards for module
long-term life (25+ years), quality and integrity.


        Technology is new, results yet to reflect, but company is bullish.
V Guard has a nice range of solar water heaters. Is trying to broad   OUTPERFORMER
base its products in the off-grid applications segment.


Promoters buying back their shares actively from market.
Euro Multivision’s proposed 40MW photo-voltaic (PV) and
polysilicon project is coming up in Kutch, Gujarat. Overall investment of
nearly Rs 2,700 crore spread over a 10-year period.                              OUTPERFORMER
The company has tied up with OTB Solar, a Dutch company, for the supply
of machinery and design know how to make solar cells at its SEZ and
expects to start production by January 2010. Enjoys SEZ Benefits.


         Most of the increase in turnover over the next two years is likely to
come from the photovoltaic business due to demand supply gap. Although
not really comparable, the only peer is Moser Baer which has been
struggling to turn profitable.
Numeric’s solar energy products include amorphous and crystalline
solar photovoltaic (PV) panels and solar charge controllers ranging from 12
volts to 196 volts and light emitting diode (LED) lighting systems.           OUTPERFORMER
Numeric has floated a wholly-owned unit Numeric Solar Energy. Numeric
Power plans to set up 1 Mw solar plant in Coimbatore, with an investment of
Rs. 25 crore. The company already has a 1.5 Mw windmill farm in the same
location.
Surana Telecom is restructuring its solar business and has          NEUTRAL
approved a proposal to demerge the solar business of Surana Telecom into
Surana Ventures.

Pursuant to the scheme of arrangement, the existing shareholders of
Surana Telecom will be issued three new equity shares of Rs 10 each of
Surana Ventures for every four shares of Rs 5 each held in Surana Telecom
in addition to their existing shareholding of Surana Telecom.
Webel Solar has a facility in Salt Lake, Kolkatta and intends to
expand the same to 102MW by April 2010. The Greenfield expansion of 90          UNDERPERFORMER
MW is being established in the SEZ zone of Falta, Kolkatta. This would
provide benefits of excise and income tax exemptions for the company for
the next five years to 2013.
Webel exports almost all of its production i.e. 96% of its sales to countries
like US, Germany and Japan. Its global repute is backed by international
quality certifications like UL, ISPRA and ISO 9000.


        Webel faces competition from Tata BP Solar, Moser Baer, XL
Telecom and Euro Multivision in the local PV industry with tightening
margins and slackened demand.
Recent Solar Entrants List
SOLAR Cities / Farms / Parks

ANDHRA PRADESH
The Andhra Pradesh government is developing a solar city through a cluster of solar farms at Kadiri, Anantapur
district, to solar energy in the state.

The project is AP's second initiative in the solar power sector after Fab City in
Hyderabad, the country's single-largest manufacturing hub for semiconductors. The
solar city will come up on about 10,000 acres. Located in Kadiri area of Anantapur
district, it is spread over 10,000 acres of barren land. It has proximity to Bengaluru
International Airport (85 kms). The area has suitable radiation index for solar farms.

Four companies — Lanco Solar, Titan Energy Systems of India, Sunborne Inc. & AES
Solar of USA have decided to set up units in the solar city with total capacity of 2,000
mw.


GUJARAT
Until now, the only thing shining in the Rann of Kutch was a mirage. Now, the scorching sun could light up
another sparkling ring along the border, if a Rs 61,019 crore dream comes true. And, it won’t be an illusion, but
                              real mirrors. The Clinton Foundation’s proposal to generate about 5,000 megawatt
                              of power — is way larger than India’s biggest power project of 3,260MW in
                              Vindyachal. The biggest solar power plant planned so far is a 160MW project in
                              Portugal.

                             The cost of the project would be about $8-10 billion for 3,000 Mw and for 5,000
                             Mw; it would be about $15 billion. The feasibility study will be over in 2010 and the
                             plant will start in 2012.

                               With about 45 investment promises lined up in solar energy sector, Gujarat plans
to promote the desert as a hub for renewable energy. Gujarat has decided to allocate 1,500 hectares of land in
the desert and a small stretch in Santalpur in Bankaskantha district. The Gujarat Industrial Development
Corporation will create infrastructure for the ambitious ‘Solar Park’.


RAJASTHAN: Future powerhouse of North India
Based on the potential that the state holds, projection for the state are in the range of 97,636 MW to
4,45,794MW grid connected power projects, 10,823 MW to 16,234MW of wind
power and 85,221MW to 4,26,103 MW for solar photovoltaic and thermal
together.

The plan emphasizes action at grass root level and puts forward the idea of
implementing development projects strongly. The generation based tariff
structure that the state offers is one of the best in the country and will attract
many investors. This will come as an advantage given that good amount of solar
energy and huge unused land parcels are available in the state.
A Sunrise Report on Solar Sector by

Email: indiansolar@gmail.com
DISCLAIMER, Disclosure and Confidentiality:

This report is for private circulation only, and not for sale. The author does not guarantee the accuracy or correctness of the information provided in
this report or that any forecasts or projections made in this report will be realised.The information set out in this report has been prepared by the
author based upon information available to him and/or made available to him and/or from information available in the public domain. No independent
verification has been made of such information or sources. This report is for information purposes only. It has not been prepared with regard to the
specific investment objectives, financial situations and/or particular needs of any specific person who may receive this report. Investors should seek
advice from Financial Advisors/Certified Financial Planners/Financial Experts before taking any investment decisions or acting on any investment
strategies that may have been discussed or recommended in this report. No reliance may be placed for any purpose whatsoever on the information
contained in this report or on its completeness. The user assumes the entire risk of any use made of this information.

The author makes no representations or warranties regarding the accuracy, completeness or reliability of any information provided in this report and
assumes no responsibility for errors or omissions in the report. Recipients should conduct their own research before acting on any information
received through the report. This Note should not be deemed an indication of the state of affairs of the company nor shall it constitute an indication
that there has been no change in the business or state of affairs of the company since the date of publication of this report. The analyst/author for
this report certifies that all of the views expressed in this report accurately reflect his or her personal views about the subject company or companies
and its or their securities, and no part of his or her compensation was, is or will be, directly or indirectly related to specific recommendations
or views expressed in this report.

The author shall not be responsible or liable for any losses, costs, expenses, charges, including notional losses/lost opportunities incurred by a
recipient as a result of acting or non acting on any information/material contained in the report and shall not be liable to the recipient or any third
party for any damages of any kind, including but not limited to, direct, indirect, incidental, consequential or punitive damages, arising from or
connected with the report and its contents. This report does not constitute nor is it intended to constitute an offer to buy or sell or a solicitation to an
offer to buy or sell securities or derivatives or commodities or commodity derivatives or forex derivatives or any financial products or an attempt to
influence the opinion or behavior of investors or recipients or provide any investment advice. Nothing in this report constitutes investment, legal,
accounting and tax advice or a representation that any investment or strategy is suitable or appropriate to your specific circumstances. The
securities discussed and opinions expressed in this report may not be suitable for all investors, who must make their own investment decisions,
based on their own investment objectives, financial positions and needs of specific recipient. This may not be taken in substitution for the exercise of
independent judgment by any recipient. The recipient should independently evaluate the investment risks. The Information given in this document is
as of the date of this report and there can be no assurance that future results or events will be consistent with this information. This Information is
subject to change without any prior notice.

The author may hold positions in some or all of the companies mentioned in the report and may buy/sell/trade/short some or all of the above
companies mentioned in the report either during when the report is in circulation or anytime after the report is released and in circulation. All of the
readers reading this report are advised to take any decisions involving buy/sell/trade from this perspective.

Any facts or figures mentioned in this report are merely indicative and the recipients should obtain correct facts and figures before making any
investment decisions.This report is specifically for residents in the territory of India. Although access may be available to recipients outside India,
though not expressly granted, author shall have no legal liabilities whatsoever in any laws of any jurisdiction other than India. The information
contained in this report may not be transmitted to, copied or distributed, in part or in whole, to any other person or to the media or reproduced in any
form, without the prior written consent of the author. The investments discussed or recommended in the report may not be suitable for all investors.
Trading in stocks, stock derivatives, commodities and commodity derivatives, and the like is inherently risky and the recipient agrees to assume
complete and full responsibility for the outcomes of all trading decisions that recipient makes, including but not limited to loss of capital. The
distribution of this report in certain jurisdictions may be restricted or prohibited and accordingly, persons who come into possession of this report are
required to inform themselves about, and to observe, any such restrictions. This report is not directed to, or intended for distribution to or use by, any
person or entity who is a citizen or resident of or located in any locality, state, country or other jurisdiction where such distribution, publication,
availability or use would be contrary to law or regulation or which would subject the author to any registration or licensing requirement within such
jurisdiction.

Mais conteúdo relacionado

Mais procurados

1355813121 solar power in india
1355813121 solar power  in india1355813121 solar power  in india
1355813121 solar power in indiaRandhir Kumar
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in IndiaShivam Mittal
 
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWSOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWShaantanu Gaur
 
Solar power in india
Solar power in indiaSolar power in india
Solar power in indiaAmit Goel
 
Indian Scene_solar energy
Indian Scene_solar energyIndian Scene_solar energy
Indian Scene_solar energyBharath P
 
Proposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportProposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportAnkit Singh
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Abhay Ocean India ltd.
 
Solar energy-report
Solar energy-reportSolar energy-report
Solar energy-reportKen Wong
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging TechnologyMd Shahabuddin
 
Future of solar power
Future of solar powerFuture of solar power
Future of solar powerShahed Babu
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyAbhishek Ashok
 
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLSIMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLSHemantJangid20
 
Scenario of solar power plant in india
Scenario of solar power plant in india Scenario of solar power plant in india
Scenario of solar power plant in india GautamKumar612
 
Innovative Applications Of Solar Energy
Innovative Applications Of Solar EnergyInnovative Applications Of Solar Energy
Innovative Applications Of Solar Energyswapnil_energy
 
Solar mission
Solar missionSolar mission
Solar missionkundana
 
Take Advantage Of Future Of Solar Energy
Take Advantage Of Future Of Solar EnergyTake Advantage Of Future Of Solar Energy
Take Advantage Of Future Of Solar EnergyHarpreet Singh Tibb
 
Solar energy in india
Solar energy in indiaSolar energy in india
Solar energy in indiadevesh soni
 

Mais procurados (20)

1355813121 solar power in india
1355813121 solar power  in india1355813121 solar power  in india
1355813121 solar power in india
 
Solar Energy in India
Solar Energy in IndiaSolar Energy in India
Solar Energy in India
 
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEWSOLAR POTENTIAL IN INDIA - AN OVERVIEW
SOLAR POTENTIAL IN INDIA - AN OVERVIEW
 
Solar power in india
Solar power in indiaSolar power in india
Solar power in india
 
Indian Scene_solar energy
Indian Scene_solar energyIndian Scene_solar energy
Indian Scene_solar energy
 
Proposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportProposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transport
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Solar energy-report
Solar energy-reportSolar energy-report
Solar energy-report
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
 
Future of solar power
Future of solar powerFuture of solar power
Future of solar power
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
 
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLSIMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
IMPROVING ELECTRIC VEHICLE PERFORMANCE USING PHOTOVOLTAIC CELLS
 
Scenario of solar power plant in india
Scenario of solar power plant in india Scenario of solar power plant in india
Scenario of solar power plant in india
 
Innovative Applications Of Solar Energy
Innovative Applications Of Solar EnergyInnovative Applications Of Solar Energy
Innovative Applications Of Solar Energy
 
Solar mission
Solar missionSolar mission
Solar mission
 
Take Advantage Of Future Of Solar Energy
Take Advantage Of Future Of Solar EnergyTake Advantage Of Future Of Solar Energy
Take Advantage Of Future Of Solar Energy
 
Solar energy in india
Solar energy in indiaSolar energy in india
Solar energy in india
 
Solar Energy
Solar EnergySolar Energy
Solar Energy
 

Destaque

A Solar Solution for Cities- Lou Kwiker, First Management Group
A Solar Solution for Cities- Lou Kwiker, First Management GroupA Solar Solution for Cities- Lou Kwiker, First Management Group
A Solar Solution for Cities- Lou Kwiker, First Management GroupContract Cities
 
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03Institution of Lighting Professionals
 
Co2 Balances in Cities | Chiel Boonstra
Co2 Balances in Cities | Chiel BoonstraCo2 Balances in Cities | Chiel Boonstra
Co2 Balances in Cities | Chiel Boonstraicarb
 
Four s services -solar energy report
Four s services -solar energy reportFour s services -solar energy report
Four s services -solar energy reportFour-S
 
Harnessing solar energy-options_for_india-full report
Harnessing solar energy-options_for_india-full reportHarnessing solar energy-options_for_india-full report
Harnessing solar energy-options_for_india-full reportabyshares24
 
Sustainability challenges before coal india
Sustainability challenges before coal indiaSustainability challenges before coal india
Sustainability challenges before coal indiaKrishna Deo Prasad
 
Concentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluationConcentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluationSindhu Maiyya
 
Solar energy business opportunity
Solar energy business opportunitySolar energy business opportunity
Solar energy business opportunityLokender Yadav
 
Coal sector development in india sample
Coal sector development in india sampleCoal sector development in india sample
Coal sector development in india samplePrashanth Dudi
 
Solar America Cities: Minneapolis & St. Paul
Solar America Cities: Minneapolis & St. PaulSolar America Cities: Minneapolis & St. Paul
Solar America Cities: Minneapolis & St. PaulUniversity of Minnesota
 

Destaque (17)

A Solar Solution for Cities- Lou Kwiker, First Management Group
A Solar Solution for Cities- Lou Kwiker, First Management GroupA Solar Solution for Cities- Lou Kwiker, First Management Group
A Solar Solution for Cities- Lou Kwiker, First Management Group
 
09titulacion
09titulacion09titulacion
09titulacion
 
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03
PLS 2016: ILP Technical Committee latest expert guidance & documents – GN03
 
Co2 Balances in Cities | Chiel Boonstra
Co2 Balances in Cities | Chiel BoonstraCo2 Balances in Cities | Chiel Boonstra
Co2 Balances in Cities | Chiel Boonstra
 
Climate Change and Transport in India: Initiatives and experience
Climate Change and Transport in India: Initiatives and experienceClimate Change and Transport in India: Initiatives and experience
Climate Change and Transport in India: Initiatives and experience
 
Four s services -solar energy report
Four s services -solar energy reportFour s services -solar energy report
Four s services -solar energy report
 
Harnessing solar energy-options_for_india-full report
Harnessing solar energy-options_for_india-full reportHarnessing solar energy-options_for_india-full report
Harnessing solar energy-options_for_india-full report
 
Coal sector india
Coal sector indiaCoal sector india
Coal sector india
 
Sustainability challenges before coal india
Sustainability challenges before coal indiaSustainability challenges before coal india
Sustainability challenges before coal india
 
Concentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluationConcentrated solar power in India - an evaluation
Concentrated solar power in India - an evaluation
 
Solar energy business opportunity
Solar energy business opportunitySolar energy business opportunity
Solar energy business opportunity
 
Securing the Supply Chain for Solar in India
Securing the Supply Chain for Solar in IndiaSecuring the Supply Chain for Solar in India
Securing the Supply Chain for Solar in India
 
Coal sector development in india sample
Coal sector development in india sampleCoal sector development in india sample
Coal sector development in india sample
 
Coal sector presentation
Coal sector presentationCoal sector presentation
Coal sector presentation
 
Lobel solar PPT
Lobel solar PPTLobel solar PPT
Lobel solar PPT
 
Solar power
Solar powerSolar power
Solar power
 
Solar America Cities: Minneapolis & St. Paul
Solar America Cities: Minneapolis & St. PaulSolar America Cities: Minneapolis & St. Paul
Solar America Cities: Minneapolis & St. Paul
 

Semelhante a Solar India - Sun Power is Solution to India's Energy Crisis

India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policiesNaresh Goud
 
Various Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptxVarious Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptxSonalikaM3
 
Harnessing solar in telangana
Harnessing solar in telanganaHarnessing solar in telangana
Harnessing solar in telanganaSatya Kumar DV
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
National solar mission
National solar missionNational solar mission
National solar missionSusDevIndia
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challengesJay Ranvir
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyMalik Sameeullah
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in indiaBinit Das
 
finalpresentation2.pptx
finalpresentation2.pptxfinalpresentation2.pptx
finalpresentation2.pptxNiveditaJha38
 
Introduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar MissionIntroduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar MissionKranav Sharma
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftHeadway Solar
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 
Floating Solar
Floating SolarFloating Solar
Floating Solarplzsorry
 

Semelhante a Solar India - Sun Power is Solution to India's Energy Crisis (20)

Solar mission
Solar missionSolar mission
Solar mission
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Various Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptxVarious Schemes of Renewable Energy.pptx
Various Schemes of Renewable Energy.pptx
 
Harnessing solar in telangana
Harnessing solar in telanganaHarnessing solar in telangana
Harnessing solar in telangana
 
Grid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A ReviewGrid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A Review
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
JSJawa_Feb27.ppt
JSJawa_Feb27.pptJSJawa_Feb27.ppt
JSJawa_Feb27.ppt
 
National solar mission
National solar missionNational solar mission
National solar mission
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challenges
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
21PESGM2656.pptx
21PESGM2656.pptx21PESGM2656.pptx
21PESGM2656.pptx
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in india
 
finalpresentation2.pptx
finalpresentation2.pptxfinalpresentation2.pptx
finalpresentation2.pptx
 
Introduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar MissionIntroduction to JNNSM- India's National Solar Mission
Introduction to JNNSM- India's National Solar Mission
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Floating Solar
Floating SolarFloating Solar
Floating Solar
 

Último

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 

Último (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 

Solar India - Sun Power is Solution to India's Energy Crisis

  • 1.
  • 2. Betting On the SUN “I’d put my Money on the Sun and Solar Energy. What a source of Power! I hope we don’t have to Wait ‘till Oil and Coal run out before we tackle that”. – Thomas Edison [1847 – 1931] Over 450 million Indians have no electricity though India receives solar energy equivalent to nearly 5,000 trillion kWh/year - far more than the country’s total energy consumption today.
  • 3. Solar Power In India India's power sector has a total installed capacity of approximately 1, 47,402 Megawatt (MW) of which 63% is Thermal (coal-based) 25% Hydro 9% is Renewable and 3% is Gas and Nuclear-based. Power shortages are estimated at about 11% of total energy and likely to increase in the coming years. In the next 10 years, another 40,000 MW of capacity and an investment of about Rs. 1, 00,000 lakh crore is needed into the power sector. Fortunately, India lies in sunny regions of the world. Most parts of India receive 4-7 kWh of solar radiation per square meter per day with 250-300 sunny days in a year. India has abundant solar resources, as it receives about 3000 hours of sunshine every year, equivalent to over 5,000 trillion kWh. India can easily utilize the power of solar energy. Today the contribution of solar power with an installed capacity of 9.84 MW, is a fraction (< 0.1 %) of the total renewable energy installed.
  • 4. Jawaharlal Nehru National Solar Mission ► The Jawaharlal National Solar Mission is being launched under the brand name “Solar India” with an initial investment of Rs. 4,337 crore. ► The Solar Mission recommends the implementation in 3 stages leading up to an installed capacity of 20,000 th MW by the end of 13 Five Year Plan in 2022. ► The Mission will adopt a 3-phase approach: th th Phase 1  spanning the remaining period of the 11 Plan and first year of the 12 Plan (up to 2012-13) th Phase 2  the remaining 4 years of the 12 Plan (2013-17) th Phase 3  the 13 Plan (2017-22) th th At the end of each plan, and mid-term during the 12 and 13 Plans, there will be an evaluation of progress, review of capacity and targets for subsequent phases, based on emerging cost and technology trends, both domestic and global. Mission Targets are: • To create an enabling policy framework for the deployment of 20,000 MW of solar power by 2022. • To ramp up capacity of grid-connected solar power generation to 1000 MW within three years – by 2013; an additional 3000 MW by 2017 through the mandatory use of the renewable purchase obligation by utilities backed with a preferential tariff. • To create favorable conditions for solar manufacturing capability, particularly solar thermal for indigenous production and market leadership. • To promote programmes for off-grid applications, reaching 1000 MW by 2017 and 2000 MW by 2022. • To achieve 15 million sq. meters solar thermal collector area by 2017 and 20 million by 2022. • To deploy 20 million solar lighting systems for rural areas by 2022.
  • 5. Highlights: ► The Cabinet has approved setting up of 1,100 MW of grid solar power and 200 MW capacities of off-grid solar applications utilizing both solar thermal and photovoltaic technologies in the first phase of the Mission. ► The focal point, for the next 3 years, will be the NTPC Vidyut Vyapar Nigam (NVVN), which is the power trading arm of the NTPC. Government will designate it for the purchase of solar power generated by independent solar power producers, at rates fixed by the Central Regulatory Electricity Commission and for a period specified by the latter. ► The Central Electricity Regulatory Commission has recently issued guidelines for fixing feed-in-tariff for purchase of solar power taking into account current cost and technology trends. These will be revised on an annual basis. The CERC has also stipulated that Power Purchase Agreement (PPA) that utilities will conclude with solar power promoters should be for a period of 25 years. ► The PPAs shall be signed with the developers who will be setting up Solar Projects within next three years (i.e. up to March 2013) and are connected to the grid at 33 KV level and above. ► The Mission will encourage rooftop solar PV and other small solar power plants, connected to LT/11 KV grid, to replace conventional power and diesel-based generators. Operators of solar PV rooftop devices will also be eligible to receive the feed-in tariff fixed by the CERC, both on the solar power consumed by the operator and the solar power fed into the grid
  • 6. ► State Governments would also be encouraged to promote and establish Solar generation Parks with dedicated infrastructure for setting up utility scale plants to ensure ease of capacity creation. ► The Mission also includes a major initiative for promoting rooftop solar PV applications. Solar tariff announced by the regulators will be applicable for such installations. The power distribution companies will be involved in purchase of this power Scalability: India is endowed with vast solar energy potential. About 5,000 trillion kWh per year energy is incident over India’s land area with most parts receiving 4 -7 kWh per sq. m per day. Hence both technology routes for conversion of solar radiation into heat and electricity, namely, solar thermal and solar photovoltaics can effectively be harnessed providing huge scalability for solar in India. Funding: Funding for the ambitious targets would be from budgetary support and multilateral mechanism under the UN system. Pricing: The mission aims to have 20,000 MW of solar power connected to the grid by 2022 with an allocation of Rs 4,337 crore in first phase. The offer of around Rs 17.50 a kWh of electricity, of which the Centre will pay Rs 14 and the State utilities the balance State utilities will have to purchase this power from the NTPC Vidyut Vyapar Nigam Ltd (NVVN), the designated nodal agency by the Ministry of Power (MoP), for entering into a power purchase agreement (PPA), of 25 years. The idea of introducing power trading instrument of REC is also an ambitious plan. RECs - Significantly, it seeks to achieve the grid connected capacity in the initial period through an innovative system of Renewable Energy Certificates (RECs), which will be tradeable. The policy has suggested a renewable purchase obligation (RPO) on states that could start with 0.25% of their power off take in Phase I by 2013 and going up to 3% by 2022. The below 80°C challenge – Solar Collectors The Mission in its first two phases will promote solar heating systems, which are already using proven technology and are commercially viable. The Mission is setting an ambitious target for ensuring that applications, domestic and industrial, below 80 °C are solarised. The key strategy of the Mission will be to make necessary policy changes to meet this objective: • Firstly, make solar heaters mandatory, through building byelaws and incorporation in the National Building Code, • Secondly, ensure the introduction of effective mechanisms for certification and rating of manufacturers of solar thermal applications, • Thirdly, facilitate measurement and promotion of these individual devices through local agencies and power utilities, and • Fourthly, support the upgrading of technologies and manufacturing capacities through soft loans, to achieve higher efficiencies and further cost reduction.
  • 7. JNNSM’s OFF-GRID Initiatives: In remote and far-flung areas where grid penetration is neither feasible nor cost effective, solar energy applications are cost-effective. They ensure that people with no access, currently, to light and power, move directly to solar, leap-frogging the fossil fuel trajectory of growth. ► Solar thermal heating applications, such as water heaters, fall in this category. ► Solar lighting systems for rural and remote areas are already being distributed commercially in several parts of the country. ► Solar energy to power computers to assist learning in schools and hostels, Management Information System (MIS) to assist better management of forests, powering milk chilling plants are some examples of new areas, being tried successfully in the country.
  • 8. SOLAR TECHNOLOGIES, TRENDS and FORECASTS Solar electricity generation uses 2 types of technologies - photovoltaic (SPV) and Solar Thermal technology.
  • 9.
  • 10.
  • 12. XL Telecom is one of the leading Indian manufacturers of Solar Photovoltaic Modules, established in 1992. XL has over 15 years of experience of manufacturing Solar Photovoltaic Modules and systems to various agencies in India. The company has a solar photovoltaic cell manufacturing plant with a capacity of 120 MW per annum OUTPERFORMER XL is right now going through CDR process to reduce the debt and come back to its glory days. New Project in Fab City is in progress and would add to its MW capacity
  • 13. . Moser Baer Photovoltaic (MBPV) aims to distinguish itself as a significant player in the global photovoltaic market by leveraging its high-volume manufacturing expertise and R & D. NEUTRAL A first of its kind 80 MW, state-of-the-art, fully automated in-line crystalline silicon cell manufacturing facility - 40 MW already in production - this will be scaled up to 240 MW. A 200 MW thin film module plant is under construction. Many JVs and technology tie-ups in place. Recession led to heavy losses. Yet to turn the corner.
  • 14. . Restructuring all its entities is underway so as to unlock Biogas and OUTPERFORMER SOLAR valuations. Promoters buying back their shares actively from market. Aggressive Solar push across more than 5 states. The company plans to establish solar power projects connected to the grid with a total capacity of 500 MW in a phased manner with plans to establish a series of solar projects in Gujarat, Maharashtra, Madhya Pradesh, Chhattisgarh and Andhra Pradesh, in a phased manner. In Phase I, plans to establish 65 MW and has chosen Medak district in Andhra Pradesh, Raipur in Chhattisgarh, Hingoli in Maharashtra and Bhavnagar in Gujarat initially to set up solar plants.
  • 15. PAE Ltd’s subsidiary – Shurjo Energy focuses on thin-film solar modules using the Copper Indium Gallium diselenide Technology (CIGS). OUTPERFORMER SHURJO has a dominant presence in the off-grid solar utilities and appliances market. Company modules range from 9 watts to 156 watts – one of the widest CIGS market range. Is working on a product range for the Building – Integrated Photovoltaics (BiPV) market. Recently its modules met the IEC safety standards for module long-term life (25+ years), quality and integrity. Technology is new, results yet to reflect, but company is bullish.
  • 16. V Guard has a nice range of solar water heaters. Is trying to broad OUTPERFORMER base its products in the off-grid applications segment. Promoters buying back their shares actively from market.
  • 17. Euro Multivision’s proposed 40MW photo-voltaic (PV) and polysilicon project is coming up in Kutch, Gujarat. Overall investment of nearly Rs 2,700 crore spread over a 10-year period. OUTPERFORMER The company has tied up with OTB Solar, a Dutch company, for the supply of machinery and design know how to make solar cells at its SEZ and expects to start production by January 2010. Enjoys SEZ Benefits. Most of the increase in turnover over the next two years is likely to come from the photovoltaic business due to demand supply gap. Although not really comparable, the only peer is Moser Baer which has been struggling to turn profitable.
  • 18. Numeric’s solar energy products include amorphous and crystalline solar photovoltaic (PV) panels and solar charge controllers ranging from 12 volts to 196 volts and light emitting diode (LED) lighting systems. OUTPERFORMER Numeric has floated a wholly-owned unit Numeric Solar Energy. Numeric Power plans to set up 1 Mw solar plant in Coimbatore, with an investment of Rs. 25 crore. The company already has a 1.5 Mw windmill farm in the same location.
  • 19. Surana Telecom is restructuring its solar business and has NEUTRAL approved a proposal to demerge the solar business of Surana Telecom into Surana Ventures. Pursuant to the scheme of arrangement, the existing shareholders of Surana Telecom will be issued three new equity shares of Rs 10 each of Surana Ventures for every four shares of Rs 5 each held in Surana Telecom in addition to their existing shareholding of Surana Telecom.
  • 20. Webel Solar has a facility in Salt Lake, Kolkatta and intends to expand the same to 102MW by April 2010. The Greenfield expansion of 90 UNDERPERFORMER MW is being established in the SEZ zone of Falta, Kolkatta. This would provide benefits of excise and income tax exemptions for the company for the next five years to 2013. Webel exports almost all of its production i.e. 96% of its sales to countries like US, Germany and Japan. Its global repute is backed by international quality certifications like UL, ISPRA and ISO 9000. Webel faces competition from Tata BP Solar, Moser Baer, XL Telecom and Euro Multivision in the local PV industry with tightening margins and slackened demand.
  • 22. SOLAR Cities / Farms / Parks ANDHRA PRADESH The Andhra Pradesh government is developing a solar city through a cluster of solar farms at Kadiri, Anantapur district, to solar energy in the state. The project is AP's second initiative in the solar power sector after Fab City in Hyderabad, the country's single-largest manufacturing hub for semiconductors. The solar city will come up on about 10,000 acres. Located in Kadiri area of Anantapur district, it is spread over 10,000 acres of barren land. It has proximity to Bengaluru International Airport (85 kms). The area has suitable radiation index for solar farms. Four companies — Lanco Solar, Titan Energy Systems of India, Sunborne Inc. & AES Solar of USA have decided to set up units in the solar city with total capacity of 2,000 mw. GUJARAT Until now, the only thing shining in the Rann of Kutch was a mirage. Now, the scorching sun could light up another sparkling ring along the border, if a Rs 61,019 crore dream comes true. And, it won’t be an illusion, but real mirrors. The Clinton Foundation’s proposal to generate about 5,000 megawatt of power — is way larger than India’s biggest power project of 3,260MW in Vindyachal. The biggest solar power plant planned so far is a 160MW project in Portugal. The cost of the project would be about $8-10 billion for 3,000 Mw and for 5,000 Mw; it would be about $15 billion. The feasibility study will be over in 2010 and the plant will start in 2012. With about 45 investment promises lined up in solar energy sector, Gujarat plans to promote the desert as a hub for renewable energy. Gujarat has decided to allocate 1,500 hectares of land in the desert and a small stretch in Santalpur in Bankaskantha district. The Gujarat Industrial Development Corporation will create infrastructure for the ambitious ‘Solar Park’. RAJASTHAN: Future powerhouse of North India Based on the potential that the state holds, projection for the state are in the range of 97,636 MW to 4,45,794MW grid connected power projects, 10,823 MW to 16,234MW of wind power and 85,221MW to 4,26,103 MW for solar photovoltaic and thermal together. The plan emphasizes action at grass root level and puts forward the idea of implementing development projects strongly. The generation based tariff structure that the state offers is one of the best in the country and will attract many investors. This will come as an advantage given that good amount of solar energy and huge unused land parcels are available in the state.
  • 23. A Sunrise Report on Solar Sector by Email: indiansolar@gmail.com
  • 24. DISCLAIMER, Disclosure and Confidentiality: This report is for private circulation only, and not for sale. The author does not guarantee the accuracy or correctness of the information provided in this report or that any forecasts or projections made in this report will be realised.The information set out in this report has been prepared by the author based upon information available to him and/or made available to him and/or from information available in the public domain. No independent verification has been made of such information or sources. This report is for information purposes only. It has not been prepared with regard to the specific investment objectives, financial situations and/or particular needs of any specific person who may receive this report. Investors should seek advice from Financial Advisors/Certified Financial Planners/Financial Experts before taking any investment decisions or acting on any investment strategies that may have been discussed or recommended in this report. No reliance may be placed for any purpose whatsoever on the information contained in this report or on its completeness. The user assumes the entire risk of any use made of this information. The author makes no representations or warranties regarding the accuracy, completeness or reliability of any information provided in this report and assumes no responsibility for errors or omissions in the report. Recipients should conduct their own research before acting on any information received through the report. This Note should not be deemed an indication of the state of affairs of the company nor shall it constitute an indication that there has been no change in the business or state of affairs of the company since the date of publication of this report. The analyst/author for this report certifies that all of the views expressed in this report accurately reflect his or her personal views about the subject company or companies and its or their securities, and no part of his or her compensation was, is or will be, directly or indirectly related to specific recommendations or views expressed in this report. The author shall not be responsible or liable for any losses, costs, expenses, charges, including notional losses/lost opportunities incurred by a recipient as a result of acting or non acting on any information/material contained in the report and shall not be liable to the recipient or any third party for any damages of any kind, including but not limited to, direct, indirect, incidental, consequential or punitive damages, arising from or connected with the report and its contents. This report does not constitute nor is it intended to constitute an offer to buy or sell or a solicitation to an offer to buy or sell securities or derivatives or commodities or commodity derivatives or forex derivatives or any financial products or an attempt to influence the opinion or behavior of investors or recipients or provide any investment advice. Nothing in this report constitutes investment, legal, accounting and tax advice or a representation that any investment or strategy is suitable or appropriate to your specific circumstances. The securities discussed and opinions expressed in this report may not be suitable for all investors, who must make their own investment decisions, based on their own investment objectives, financial positions and needs of specific recipient. This may not be taken in substitution for the exercise of independent judgment by any recipient. The recipient should independently evaluate the investment risks. The Information given in this document is as of the date of this report and there can be no assurance that future results or events will be consistent with this information. This Information is subject to change without any prior notice. The author may hold positions in some or all of the companies mentioned in the report and may buy/sell/trade/short some or all of the above companies mentioned in the report either during when the report is in circulation or anytime after the report is released and in circulation. All of the readers reading this report are advised to take any decisions involving buy/sell/trade from this perspective. Any facts or figures mentioned in this report are merely indicative and the recipients should obtain correct facts and figures before making any investment decisions.This report is specifically for residents in the territory of India. Although access may be available to recipients outside India, though not expressly granted, author shall have no legal liabilities whatsoever in any laws of any jurisdiction other than India. The information contained in this report may not be transmitted to, copied or distributed, in part or in whole, to any other person or to the media or reproduced in any form, without the prior written consent of the author. The investments discussed or recommended in the report may not be suitable for all investors. Trading in stocks, stock derivatives, commodities and commodity derivatives, and the like is inherently risky and the recipient agrees to assume complete and full responsibility for the outcomes of all trading decisions that recipient makes, including but not limited to loss of capital. The distribution of this report in certain jurisdictions may be restricted or prohibited and accordingly, persons who come into possession of this report are required to inform themselves about, and to observe, any such restrictions. This report is not directed to, or intended for distribution to or use by, any person or entity who is a citizen or resident of or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which would subject the author to any registration or licensing requirement within such jurisdiction.