1 | 2
Guilherme Carvalho
Address: Rua Antônio Pisicchio, nº 100, apartment 604
ZIP: 86050-482 | Londrina-PR – Brazil
Contacts: +55 (43) 9650-2030 | gdcarvalho@yahoo.com.br
LinkedIn: br.linkedin.com/in/gdcarvalho
CIVIL ENGINEER
Planning, estimating and budgeting
Experienced on construction projects mainly in the fields of planning, budgeting,
measurement, cost control, surveying and technical engineering coordination.
Most of such professional experience was acquired in abroad (Portugal and
Mozambique).
Work Experience
 A. Yoshii Engenharia – from June 2014 to May 2015
(Large company – Construction)
Field Engineer
Responsible for the construction of all the infrastructure of the Approach Area,
Wet End Area and Electric Rooms of a Cellulose Pulp Drying Unit – PUMA
Project – Klabin Corporation.
 Construtora Andrade Gutierrez – from January 2014 to June 2014
(Large company – Construction)
Assistant Project Manager
Member of the Engineering staff during the feasibility study, resettlement plan
and budgeting/estimating of Moamba-Major Dam Project, in Maputo province,
Mozambique. Involved with the structured finance of the project.
 Construtora Andrade Gutierrez – from July 2010 to December 2013
(Large company – Construction)
Construction Coordinator
Coordinator of Technical Engineering of the project (i. e. Quality Control,
Surveying, Planning, Measurement, Budgeting and Cost Control). The
project scope was the construction and rehabilitation of 230km of roads in Cabo
Delgado province, Mozambique.
 Construtora Andrade Gutierrez – from January 2010 to June 2010
(Large company – Construction)
Junior Appraisal Engineer
Member of the engineering team of Andrade Gutierrez branch in Lisbon,
Portugal. Involved in the preparation of technical/commercial tenders for
construction bids in African countries, mainly roads, ports, airports and
dams.
 Tectran – from April 2009 to December 2009
(Small company – Urban planning, roads and streets design)
Junior Engineer
Designed streets and roads. Developed traffic analysis studies, land-
use/master plans and related budgets and reports.
2 | 2
 Usiminas – from August 2008 to January 2009
(Large company – Steel Industry)
Trainee Civil Engineer
Internship program on the development of the Light Steel Framing in Brazil.
Conversion of structural designs from reinforced concrete to Light Steel
Framing.
Education
 Bachelor degree in Civil Engineering by Universidade Federal de Minas Gerais
(2002-2008).
 MBA in Project Management by ISAE/FGV (2015-to be concluded in June
2017).
Complementary information
 Computer skills
 MS Office 2013 (Word, Excel, Power Point) advanced user
 MS Project 2013 advanced user.
 AutoCAD 2013 (2D) advanced user.
 Languages
 Portuguese: native language.
 English: fluent. Experienced three months of practice in the United States
(2008) and four years with South African suppliers and partners (2010-
2014). TOEFL certification obtained on 18 September 2015.
 Spanish: writing, reading and conversation (intermediate). Four years of
Language School (1998-2001).
1 | 2
Guilherme Domingues Carvalho
Brasileiro, 32 anos, casado, 2 filhos
Rua Antônio Pisicchio, nº 100, apto. 604 - Gleba Palhano
CEP: 86050-482 | Londrina, Paraná - Brasil
Contatos: (043) 9650-2030 | gdcarvalho@yahoo.com.br
LinkedIn: br.linkedin.com/in/gdcarvalho
ENGENHEIRO CIVIL
Perfil profissional
Engenheiro Civil formado pela Faculdade de Engenharia da UFMG, com
experiência em projetos e obras, predominantemente nas áreas de orçamento,
medição, planejamento, controle de custos, controle de qualidade e
topografia, adquirida principalmente em obras no exterior.
Formação
 Escolaridade
Formação superior completa.
 Graduação
Engenharia Civil, Universidade Federal de Minas Gerias (dezembro/2008).
 Pós-graduação – MBA
MBA em Gerenciamento de Projetos, ISAE/FGV (2015-conclusão prevista para
Julho de 2017).
Idiomas
 Espanhol: leitura intermediária, escrita intermediária, conversação
intermediária.
 Inglês: leitura avançada, escrita avançada, conversação avançada.
Certificação TOEFL obtida em 18/09/2015.
Histórico profissional
 A. Yoshii Engenharia - de junho/2014 a maio/2015
(Empresa de grande porte no segmento construção civil)
Engenheiro Civil Pleno
Responsável por parte da Produção na construção da usina de secagem de
celulose do Projeto PUMA/Klabin, em Ortigueira-PR.
 Construtora Andrade Gutierrez - de janeiro/2014 a junho/2014
(Empresa de grande porte no segmento construção civil)
Engenheiro Civil Pleno
Integrante da equipe técnica atuante na fase de estudos de viabilidade, plano
de reassentamento da população e orçamentação da obra da barragem de
Moamba-Major, na província de Maputo, em Moçambique. Envolvimento com
o financiamento estruturado da obra.
 Construtora Andrade Gutierrez - de julho/2010 a dezembro/2013
(Empresa de grande porte no segmento construção civil)
Engenheiro Civil Pleno
Inicialmente, Engenheiro de Planejamento e, seis meses depois,
coordenador da Engenharia Técnica da obra (Laboratório de Materiais e
2 | 2
Controle de Qualidade, Topografia, Planejamento, Medição, Orçamentação e
Controle de Custos). Obra de construção e reabilitação de 230km de rodovias
na província de Cabo Delgado, Moçambique.
 Construtora Andrade Gutierrez - de janeiro/2010 a junho/2010
(Empresa de grande porte no segmento construção civil)
Engenheiro Orçamentista Júnior
Integrante da equipe técnica da sucursal da AG em Lisboa (Portugal),
envolvido na elaboração de propostas técnicas e comerciais para licitações
de obras em países do continente africano (estradas, portos, aeroportos e
barragens).
 Tectran - de abril/2009 a dezembro/2009
(Empresa de pequeno porte no segmento engenharia)
Engenheiro Civil Júnior
Elaboração de projetos viários, estudos de tráfego, Relatórios de Impacto na
Circulação, Planejamento Urbano e orçamentos relacionados.
 Usiminas - de agosto/2008 a janeiro/2009
(Empresa de grande porte no segmento metalúrgico, siderúrgico)
Estagiário
Estágio na área de desenvolvimento da aplicação do aço na construção civil,
com ênfase no método construtivo steel frame. Conversão de projetos em
concreto armado para estrutura metálica.
Informações complementares
 Região de trabalho
Aceita viajar pela empresa.
 Informática
Domínio do pacote MS Office 2013 (Word, Excel, Power Point) e MS Project
2013. Domínio do AutoCAD 2013.
28/09/2015

Resume-Guilherme Carvalho-EN & PT

  • 1.
    1 | 2 GuilhermeCarvalho Address: Rua Antônio Pisicchio, nº 100, apartment 604 ZIP: 86050-482 | Londrina-PR – Brazil Contacts: +55 (43) 9650-2030 | gdcarvalho@yahoo.com.br LinkedIn: br.linkedin.com/in/gdcarvalho CIVIL ENGINEER Planning, estimating and budgeting Experienced on construction projects mainly in the fields of planning, budgeting, measurement, cost control, surveying and technical engineering coordination. Most of such professional experience was acquired in abroad (Portugal and Mozambique). Work Experience  A. Yoshii Engenharia – from June 2014 to May 2015 (Large company – Construction) Field Engineer Responsible for the construction of all the infrastructure of the Approach Area, Wet End Area and Electric Rooms of a Cellulose Pulp Drying Unit – PUMA Project – Klabin Corporation.  Construtora Andrade Gutierrez – from January 2014 to June 2014 (Large company – Construction) Assistant Project Manager Member of the Engineering staff during the feasibility study, resettlement plan and budgeting/estimating of Moamba-Major Dam Project, in Maputo province, Mozambique. Involved with the structured finance of the project.  Construtora Andrade Gutierrez – from July 2010 to December 2013 (Large company – Construction) Construction Coordinator Coordinator of Technical Engineering of the project (i. e. Quality Control, Surveying, Planning, Measurement, Budgeting and Cost Control). The project scope was the construction and rehabilitation of 230km of roads in Cabo Delgado province, Mozambique.  Construtora Andrade Gutierrez – from January 2010 to June 2010 (Large company – Construction) Junior Appraisal Engineer Member of the engineering team of Andrade Gutierrez branch in Lisbon, Portugal. Involved in the preparation of technical/commercial tenders for construction bids in African countries, mainly roads, ports, airports and dams.  Tectran – from April 2009 to December 2009 (Small company – Urban planning, roads and streets design) Junior Engineer Designed streets and roads. Developed traffic analysis studies, land- use/master plans and related budgets and reports.
  • 2.
    2 | 2 Usiminas – from August 2008 to January 2009 (Large company – Steel Industry) Trainee Civil Engineer Internship program on the development of the Light Steel Framing in Brazil. Conversion of structural designs from reinforced concrete to Light Steel Framing. Education  Bachelor degree in Civil Engineering by Universidade Federal de Minas Gerais (2002-2008).  MBA in Project Management by ISAE/FGV (2015-to be concluded in June 2017). Complementary information  Computer skills  MS Office 2013 (Word, Excel, Power Point) advanced user  MS Project 2013 advanced user.  AutoCAD 2013 (2D) advanced user.  Languages  Portuguese: native language.  English: fluent. Experienced three months of practice in the United States (2008) and four years with South African suppliers and partners (2010- 2014). TOEFL certification obtained on 18 September 2015.  Spanish: writing, reading and conversation (intermediate). Four years of Language School (1998-2001).
  • 3.
    1 | 2 GuilhermeDomingues Carvalho Brasileiro, 32 anos, casado, 2 filhos Rua Antônio Pisicchio, nº 100, apto. 604 - Gleba Palhano CEP: 86050-482 | Londrina, Paraná - Brasil Contatos: (043) 9650-2030 | gdcarvalho@yahoo.com.br LinkedIn: br.linkedin.com/in/gdcarvalho ENGENHEIRO CIVIL Perfil profissional Engenheiro Civil formado pela Faculdade de Engenharia da UFMG, com experiência em projetos e obras, predominantemente nas áreas de orçamento, medição, planejamento, controle de custos, controle de qualidade e topografia, adquirida principalmente em obras no exterior. Formação  Escolaridade Formação superior completa.  Graduação Engenharia Civil, Universidade Federal de Minas Gerias (dezembro/2008).  Pós-graduação – MBA MBA em Gerenciamento de Projetos, ISAE/FGV (2015-conclusão prevista para Julho de 2017). Idiomas  Espanhol: leitura intermediária, escrita intermediária, conversação intermediária.  Inglês: leitura avançada, escrita avançada, conversação avançada. Certificação TOEFL obtida em 18/09/2015. Histórico profissional  A. Yoshii Engenharia - de junho/2014 a maio/2015 (Empresa de grande porte no segmento construção civil) Engenheiro Civil Pleno Responsável por parte da Produção na construção da usina de secagem de celulose do Projeto PUMA/Klabin, em Ortigueira-PR.  Construtora Andrade Gutierrez - de janeiro/2014 a junho/2014 (Empresa de grande porte no segmento construção civil) Engenheiro Civil Pleno Integrante da equipe técnica atuante na fase de estudos de viabilidade, plano de reassentamento da população e orçamentação da obra da barragem de Moamba-Major, na província de Maputo, em Moçambique. Envolvimento com o financiamento estruturado da obra.  Construtora Andrade Gutierrez - de julho/2010 a dezembro/2013 (Empresa de grande porte no segmento construção civil) Engenheiro Civil Pleno Inicialmente, Engenheiro de Planejamento e, seis meses depois, coordenador da Engenharia Técnica da obra (Laboratório de Materiais e
  • 4.
    2 | 2 Controlede Qualidade, Topografia, Planejamento, Medição, Orçamentação e Controle de Custos). Obra de construção e reabilitação de 230km de rodovias na província de Cabo Delgado, Moçambique.  Construtora Andrade Gutierrez - de janeiro/2010 a junho/2010 (Empresa de grande porte no segmento construção civil) Engenheiro Orçamentista Júnior Integrante da equipe técnica da sucursal da AG em Lisboa (Portugal), envolvido na elaboração de propostas técnicas e comerciais para licitações de obras em países do continente africano (estradas, portos, aeroportos e barragens).  Tectran - de abril/2009 a dezembro/2009 (Empresa de pequeno porte no segmento engenharia) Engenheiro Civil Júnior Elaboração de projetos viários, estudos de tráfego, Relatórios de Impacto na Circulação, Planejamento Urbano e orçamentos relacionados.  Usiminas - de agosto/2008 a janeiro/2009 (Empresa de grande porte no segmento metalúrgico, siderúrgico) Estagiário Estágio na área de desenvolvimento da aplicação do aço na construção civil, com ênfase no método construtivo steel frame. Conversão de projetos em concreto armado para estrutura metálica. Informações complementares  Região de trabalho Aceita viajar pela empresa.  Informática Domínio do pacote MS Office 2013 (Word, Excel, Power Point) e MS Project 2013. Domínio do AutoCAD 2013. 28/09/2015