DOSSIER DE COMPETÊNCIAS
Consultor Sénior Business Intelligence
& Mobile Developer
Paulo Manuel de Oliveira e Silva
18 anos de experiência
22-07-1973
Índice
RESUMO DE EXPERIÊNCIA............................................................................................3
ÁREA DE COMPETÊNCIAS.............................................................................................4
PROJECTOS REALIZADOS..............................................................................................7
.....................................................................................................................................7
ydeal - Project Manager........................................................................................................................7
ydeal - Project Manager........................................................................................................................7
ydeal – Project Manager.......................................................................................................................7
Freelancer - Consultor Sénior Business Intelligence............................................................................8
ydeal - iOS Mobile Developer................................................................................................................8
ydeal - iOS Mobile Developer................................................................................................................8
BLIP - iOS Mobile Developer..................................................................................................................9
Freelancer - Consultor Sénior Business Intelligence............................................................................9
Freelancer - Consultor Sénior Business Intelligence............................................................................9
Freelancer - Consultor Sénior Business Intelligence..........................................................................10
Freelancer - Mobile Developer Sénior...............................................................................................10
Freelancer - Mobile Developer Sénior...............................................................................................11
Freelancer - Mobile Developer Sénior...............................................................................................11
Freelancer - Consultor Sénior Business Intelligence..........................................................................12
Freelancer - Consultor Sénior Business Intelligence..........................................................................12
GFI – Consultor Sénior Business Intelligence......................................................................................12
PHC Norte – Consultor PHC ................................................................................................................13
Ascensus – Consultor Sénior Business Intelligence.............................................................................13
Ascensus – Consultor Sénior Business Intelligence.............................................................................14
Novabase – Consultor Sénior Business Intelligence............................................................................14
Novabase – Consultor Sénior Business Intelligence............................................................................15
Novabase – Consultor Sénior Business Intelligence............................................................................15
Novabase – Consultor Sénior Business Intelligence............................................................................16
Novabase – Consultor Sénior Business Intelligence............................................................................16
A2 SIG – Consultor Business Intelligence............................................................................................16
A2 SIG – Consultor Business Intelligence............................................................................................17
Agilus – Consultor Business Intelligence.............................................................................................17
Agilus – Consultor Júnior Business Intelligence..................................................................................18
Agilus – Consultor Júnior Business Intelligence..................................................................................18
Agilus – Consultor Júnior Business Intelligence..................................................................................18
Agilus – Consultor Júnior Business Intelligence..................................................................................19
Agilus – Consultor Júnior Business Intelligence..................................................................................19
Agilus – Consultor Júnior Business Intelligence..................................................................................19
Agilus – Consultor Júnior Business Intelligence..................................................................................20
Agilus – Analista Programador............................................................................................................20
1
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
FORMAÇÃO................................................................................................................21
IDIOMAS.....................................................................................................................21
2
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
RESUMO DE EXPERIÊNCIA
Iniciei a minha carreira profissional em 1994 na área das tecnologias de informação,
após ter desistido de estudar. Em outubro de 1996 dei os meus primeiros passos na
área de suporte á decisão, atualmente uma das metodologias de Business Intelligence,
na qual permaneci até aos dias de hoje, o que representa 16 de experiência nesta
fantástica área.
Nestes 16 anos de experiência, não só tive o privilégio de colaborar em diversos
projetos de elevada dimensão, mas também com instituições de elevada reputação e
prestigio, quer nacional como internacional, nomeadamente:
• SAUDAÇOR;
• BLIP;
• Mota-Engil;
• Ministério da Saúde (ACSS);
• Grupo Salvador Caetano;
• Texas Instruments – Estados Unidos (Dallas) e França (Nice);
• Ministério da Administração Interna;
• IGIF – Instituto de Gestão Informática e Financeira do Ministério da Saúde;
• Império Bonança;
• Optimus;
• Riberalves SGPS;
• Grupo Lena SGPS;
• CTT;
• COLEP Portugal,
• SOGRAP Vinhos,
• ...
Ao longo da minha carreira profissional tive a oportunidade de utilizar um abrangente
leque tecnológico nas mais diversas áreas de atuação, bem como cooperar com
equipas mista e multirraciais. Desempenhei as mais diversas funções, tais como:
Levantamento de Requisitos, Análise e Desenho, Desenvolvimento, Implementação,
Documentação e Gestão de Projetos.
Na minha atividade profissional dei sempre provas de flexibilidade e iniciativa.
3
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
ÁREA DE COMPETÊNCIAS
Legenda :
Nivel 1 : Beginner – por exemplo: conhecimentos teóricos, académicos, só formação, …
Nivel 2 : intermediate – Nivel 1 + pequenos projectos, 4ários4s, …
Nivel 3 : professional – Nivel 1,2 + experiência professional em 4ários projectos
Nivel 4 : expert
Programação Nível Comentários
Java 3 Experiência profissional em projetos
Business Intelligence
Grails / Groovy 3 Experiência profissional em projetos
desenvolvimento de aplicações web à
medida
C, C++ 2 Experiência académica e pessoal
Objective-C 4 Experiência pessoal e profissional no
desenvolvimento de aplicações iOS
(iPhone e iPad)
Swift 2 Experiência pessoal
Web 4 Experiência profissional no
desenvolvimento e implementação de
várias soluções Web, Windows e
Business Intelligence:
— HTML
— DHTML
— JavaScript
— VBScript
— XML
— XSL
— XSLT
— CSS
— ASP
— …
Visual Basic 3 Experiência profissional
C#.net 4 Experiência profissional no
desenvolvimento e implementação de
várias aplicações de suporte à
execução de processo ETL
Python 3 Experiência profissional
PHP 3 Experiência profissional no
desenvolvimento de aplicações web e
web services (RESTful)
Ruby On Rails 2 Experiência profissional e pessoal no
desenvolvimento de aplicações web
NodeJS 3 Experiência profissional
Bases de Dados
SQL Server (2000, 2005, 2008, 4 Experiência profissional em projetos
4
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
2008 R2 ) Business Intelligence e
desenvolvimento à medida.
Microsoft Access 4 Experiência profissional em projetos
Business Intelligence e como auxiliar
aos processos ETL.
Oracle (9i, 11g) 3 Experiência profissional em projetos
Business Intelligence.
Informix 1 Experiência profissional em projetos
Business Intelligence.
MySQL 3 Experiência profissional em projetos de
desenvolvimento á medida para Web.
SQLite 4 Experiência profissional em projetos
iPhone, iPad, Windows e Web.
Ferramentas de Suporte à
Decisão & Datawarehouse
Microsoft Analysis Services 4
Experiência profissional em projetos
Business Intelligence.
EssBase 3
Experiência profissional em projetos
Business Intelligence.
SAS 3
Experiência profissional em projetos
Business Intelligence.
Gentia 4
Experiência profissional em projetos
Business Intelligence.
Ferramentas de ETL
ODI 3 Experiência profissional em projetos
Business Intelligence.
Microsoft DTS 4 Experiência profissional em projetos
Business Intelligence.
Microsoft SSIS 4 Experiência profissional em projetos
Business Intelligence.
Gentia 4 Experiência profissional em projetos
Business Intelligence.
SAS 3 Experiência profissional em projetos
Business Intelligence.
Ferramentas e aplicações
específicas
MicroStrategy 3 Experiência profissional
MS Project 3 Experiência profissional
Project Server 2 Experiência profissional
Redmine (OpenSource)
4
Experiência profissional como
freelancer para gestão de projeto e
controlo de tempo
Sistemas Operativos
5
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Microsoft Windows 4 Experiência profissional na ótica do
utilizador e programador
Microsoft Windows Server 3 Experiência profissional na ótica do
utilizador e programador
Mac OS X 4 Experiência pessoal e profissional
como iOS developer;
Mac OS X Server 3 Experiência pessoal e profissional
como iOS developer
Linux 2 Experiência pessoal
Unix 2 Experiência profissional em projetos
Business Intelligence
Web Servers
IIS 3 Experiência pessoal e professional
Apache 3 Experiência pessoal e professional
Tomcat 3 Experiência pessoal e professional
JRun 3 Experiência pessoal e professional
Subversion
Subversion (SVN) 3 Experiência pessoal e professional
GIT 3 Experiência pessoal
Outras
Adobe Flash 2 Experiência pessoal
Abobe DreamWeaver 4 Experiência pessoal
Adobe Fireworks 4 Experiência pessoal
…
6
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
PROJECTOS REALIZADOS
Os projectos mais importantes em que eu participei.
ydeal - Project Manager
01 Outubro 2014 – até à data
Contexto
Desenvolvimento de aplicação RSS Feed Server para os sites verangola.net e
verportugal.net.
Cliente
Ydeal
Realizações
Desenvolvimento de aplicação web e base de dados.
Tecnologias
PHP (simplemvcframework) e MySQL
ydeal - Project Manager
01 Outubro 2014 – até à data
Contexto
Desenvolvimento de aplicação web para os diretórios de empresas dos sites
verangola.net e verportugal.net.
Cliente
Ydeal
Realizações
Desenvolvimento de aplicação web e base de dados.
Tecnologias
Twitter Bootstrap, PHP (simplemvcframework) e MySQL
ydeal – Project Manager
01 Outubro 2014 – até à data
Contexto
Gestão de projectos e equipa de desenvolvimento mobile e web.
Cliente
Ydeal
Realizações
Gestão de projectos e equipa, análise e desenho, e desenvolvimento de aplicações
mobile Nativas e Híbridas (HTML5) e aplicações web e web RIA.
Tecnologias
Redmine, ProjectLibre, Apple Objective-C (iOS frameworks), Ionic Framework, Deployd
e nodejs
7
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Freelancer - Consultor Sénior Business Intelligence
14 Julho 2014 – até à data
Contexto
Desenvolvimento de uma aplicação web para gestão de lista de espera para as várias
unidades hospitalares, entidades convencionadas, carteira de serviços, capacidade
instalada e emissão de vales de saúde.
Empresa
Nimble
Cliente
SAUDAÇOR
Realizações
Desenvolvimento da aplicação web.
Tecnologias
Grails (groovy), Angularjs, Twitter Bootstrap, ionicons, jquery e Oracle RDBMS.
ydeal - iOS Mobile Developer
14 Abril 2014 – 30 Setembro 2014
Contexto
Como Mobile Developer, análise e desenvolvimento das várias versões das aplicações
Híbridas Daily-P e Daily-P Pro, para as plataformas iOS e Android e Backend de
suporte à informação.
https://itunes.apple.com/pt/app/daily-p/id853022755?mt=8
https://itunes.apple.com/pt/app/daily-p-pro/id933627295?mt=8
Cliente
Ydeal
Realizações
Análise e desenho, desenvolvimento da primeira mobile e Backend.
Tecnologias
Ionic Framework, Deployd e nodejs
ydeal - iOS Mobile Developer
13 Fevereiro 2014 – 10 Abril 2014
Contexto
Como iOS Developer, participação na análise e desenvolvimento da aplicação iOS
RPCRC (The Rotterdam Prostate Cancer Risk Calculator) para iOS;
https://itunes.apple.com/us/app/rotterdam-prostate-cancer/id729313737?mt=8
Cliente
Prostate Cancer Research Foundation.
8
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Realizações
Desenvolvimento da primeira versão da aplicação para iPad e adição das novas
funcionalidades a versão iPhone.
Tecnologias
Apple Objective-C (iOS frameworks)
BLIP - iOS Mobile Developer
25 Julho 2013 – 24 Setembro 2013
Contexto
iOS Developer, participação no desenvolvimento de novas funcionalidades para a
aplicação iOS Sportsbook, por um período contratual de dois meses utilizando a
metodologia scrum agile;
Cliente
BLIP / Betfair.
Realizações
Untap TV feature, Integração de Paypal payments / deposit, Native App WebWrapper ...
Tecnologias
Apple Objective-C (iOS frameworks), Untap TV framework, Alfresco Web Forms.
Freelancer - Consultor Sénior Business Intelligence
Janeiro 2012 – 24 Julho 2013
Contexto
Consultor Sénior Business Intelligence com as funções análise, desenho e
desenvolvimento de Data Warehouse e processos ETL para canalização da informação
e Relatórios;
Cliente
Mota-Engil ITS.
Realizações
Análise, desenho e desenvolvimento de Data Warehouse, processos ETL e relatórios.
Teste e correções.
Tecnologias
SQL Server RDBMS, SQL Server Integration Services, Microsoft Reporting Services,
Microsoft Analysis Services e Oracle RDBMS.
Freelancer - Consultor Sénior Business Intelligence
Outubro 2012 – Dezembro 2012
Contexto
Consultor Sénior Business Intelligence com as funções análise, desenho e
desenvolvimento de Dashboards, Web Services e aplicação Web RIA (Rich Internet
Application);
9
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Cliente
Ministério da Saúde, em regime de subcontratação pela Nimble Portal.
Realizações
Análise, desenho e desenvolvimento de Dashboards (MicroStrategy), Web Services
(Java e .Net WCF) e aplicação web (RIA) para unificação de autenticação dos
utilizadores web.
Teste e correções.
Tecnologias
Oracle RDBMS, MicroStrategy 9.2 e 9.3, .Net 4.5 e Java SE/EE, HTML, CSS,
Javascript, AngularJS e JQuery.
Freelancer - Consultor Sénior Business Intelligence
Maio 2012 – Setembro 2012
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho e
desenvolvimento e implementação dos modelos de suporte á decisão para RH
(Recursos Humanos), CRM e ISC (Índice Satisfação do Cliente) e de Peças Logística;
Cliente
Mcoutinho, em regime de subcontratação pela Bi4all.
Realizações
Análise, desenho e desenvolvimento do Data Warehouse, processo SSIS, utilizando as
“Best Practices” da Microsoft / Bi4all e Cubos (IBM Cognos);
Teste e correções;
Documentação técnica.
Tecnologias
Microsoft SQL Server, Microsoft SQL Server Integration Services, IBM Cognos
Framework e IBM Cognos Transformer.
Freelancer - Mobile Developer Sénior
Fevereiro 2012 – Março 2012
Contexto
Mobile Developer Sénior com as funções de análise, desenho e desenvolvimento de
uma Prova de Conceito para iOS (iPad) e Android na área comercial, com as seguintes
funcionalidades: Gestão de Encomendas (clientes, produtos), Google Maps e GPS
Tracking;
Cliente
Unicer
10
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Realizações
Análise, desenho e desenvolvimento da base de dados, Web Services (RESTful) e
Aplicação Mobile;
Teste e correções;
Documentação técnica.
Tecnologias
Sencha Touch 2, Google Maps, Google Maps GPS Tracking, Apple Objective-C (iOS
frameworks), .Net C# Web Services (RESTful), Microsoft SQL Server, HTML, CSS3 e
Javascript.
Freelancer - Mobile Developer Sénior
Agosto 2011 – Janeiro 2012
Contexto
Mobile Developer Sénior com as funções de análise, desenho, desenvolvimento e
publicação da aplicação iOS (iPhone ) “InPanic”.
http://itunes.apple.com/pt/app/in-panic/id498300891?ls=1&mt=8
Cliente
Ascensus - CDSI
Realizações
Análise, desenho e desenvolvimento da base de dados dos Web Services (RESTful) e
Aplicação Mobile;
Desenvolvimento do Web Site;
Teste e correções;
Documentação técnica;
Publicação da aplicação na AppStore.
Tecnologias
Apple Objective-C (iOS frameworks), PHP Web Services (RESTful) e MySQL database.
Freelancer - Mobile Developer Sénior
Agosto 2011 – Novembro 2011
Contexto
Mobile Developer Sénior com as funções de análise, desenho, desenvolvimento e
publicação da aplicação / Livro iOS (iPhone e iPad) e Android “Casa Mágica”.
http://itunes.apple.com/us/app/casa-magica/id489493517?mt=8
Cliente
Ascensus – CDSI
Realizações
Análise, desenho e desenvolvimento da Aplicação Mobile;
Teste e correções;
Documentação técnica;
Publicação da aplicação na AppStore.
Tecnologias
Apple Objective-C (iOS frameworks), Titanium Appcelarator, HTML, CSS3 e Javascript.
11
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Freelancer - Consultor Sénior Business Intelligence
Dezembro 2010 – Setembro 2011
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento e implementação do Data Warehouse e processos ETL, para um
projecto de consolidação financeira, implementado na tecnologia Hyperion Financial
Management (HFM).
Cliente
Grupo Salvador Caetano, SQPS
Realizações
Análise e desenho do Data Warehouse (DW) e processos Extract, transform and load
(ETL);
Desenvolvimento do DW dos processo ETL em Oracle;
Desenvolvimento de uma Aplicação em C# para controlo dos processos ETL de
extração de dados do PHC (SQL Server);
Desenvolvimento de processos de extração para Microsoft Access;
Testes e correções;
Documentação técnica da Aplicação, DW e processos ETL (ODI e SSIS);
Formação dos administradores do sistema.
Tecnologias
Oracle RDBMs, HTM, HFM, ODI, python, jython, Microsoft SQL Server, SQL Server
Integration Services, .Net C# e Microsoft Access.
Freelancer - Consultor Sénior Business Intelligence
Abril 2010 – Dezembro 2010
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenvolvimento e
Implementação do Data Warehouse, processos ETL e Cubos OLAP, para os vários
modelos de suporte á decisão do grupo Riberalves SGPS. Desenvolvimento de uma
aplicação Web auxiliar á manutenção do DW.
Cliente
Riberalves, SGPS
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract, transform and load
(ETL) e Cubos OLAP;
Desenvolvimento do DW, processo ETL e Cubos OLAP;
Desenvolvimento de uma Aplicação web em C#;
Testes e correções;
Documentação técnica da Aplicação, DW e processos ETL.
Tecnologias
Microsoft SQL Server, SQL Server Integration Services, Microsoft Analysis Services e
.Net C#.
GFI – Consultor Sénior Business Intelligence
Janeiro 2008 – Julho 2008
12
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Contexto
Consultor Sénior Business Intelligence, com a função de “primary” dedicado a 100% aos
sistemas BI da Texas Instruments, Estados Unidos - Dallas e França - Nice (a
passagem de conhecimento foi efectuada em Nice por um período de dois meses, após
este período todos os trabalhos foram realizados remotamente a partir de Portugal).
Cliente
Texas Instruments, Estados Unidos (Dallas) e França (Nice).
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract, transform and load
(ETL) e Cubos Essbase;
Desenvolvimento do DW, processo ETL e Cubos Essbase;
Teste, correções e suporte técnico;
Apoio aos utilizadores Texas Intruments.
Tecnologias
Oracle RDBMs, SQL Server, Microsoft DTSX, Essbase e Business Objects.
PHC Norte – Consultor PHC
2006 – 2007
Contexto
Consultor Software PHC com as funções de assistência técnica à rede de distribuidores,
instalação, configuração, análise e desenvolvimento de necessidades específicas em
software PHC.
Cliente
Rede de distribuidores,
Grupo Lena, SGPS
Realizações
Instalação;
Configuração;
Análise de requisitos;
Desenvolvimento à medida utilizando a Framework do PHC;
Formação aos utilizadores finais.
Tecnologias
SQL Server, Framework PHC, Dbase.
Ascensus – Consultor Sénior Business Intelligence
Julho 2004 – Julho 2006
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento e implementação de um modelo de análise de risco na área da banca.
Cliente
Finibanco
13
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract transform and load
(ETL) e cubos MDDB;
Desenvolvimento do DW dos processo ETL e Cubos MDDB;
Desenvolvimento de uma aplicação web (JSP) de geração de data marts;
Teste e correções;
Documentação técnica;
Formação dos utilizadores.
Tecnologias
SAS Base, SAS DW, SAS MDDB, SAS MDDB Server, SAS Web AF e Java Server
Pages (JSP) para a aplicação Web.
Ascensus – Consultor Sénior Business Intelligence
Julho 2004 – Julho 2006
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento e implementação de um sistema de gestão e controlo te
telecomunicações.
Cliente
Accor | Amorin
Realizações
Análise e desenho da aplicação web, base de dados, processos de importação da
informação dos vários operadores e sistema de validação;
Desenvolvimento da aplicação, base de dados, processos de importação da informação
dos vários operadores e sistema de validação;
Teste e correções;
Documentação técnica;
Manual do Utilizador;
Manual do Administrador;
Formação dos utilizadores.
Tecnologias
Microsoft SQL Server, Active Server Pages (ASP) para a aplicação web.
Novabase – Consultor Sénior Business Intelligence
2001 – 2003
Contexto
Consultor Sénior Business Intelligence com as funções desenvolvimento e
implementação de um Executive Information Systems / Decision System Support
(EIS/DSS) na área da gestão orçamental, para campanhas publicitárias.
Cliente
Optimus
14
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Realizações
Desenvolvimento de processos Extract transform and load (ETL) e Cubos OLAP;
Testes e correções;
Formação aos utilizadores;
Tecnologias
SQL Server, DTS, Microsoft Analysis Services e Proclarity (como interface de
exploração dos cubos).
Novabase – Consultor Sénior Business Intelligence
2001 – 2003
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento e implementação de vários Executive Information Systems / Decision
System Support (EIS/DSS) no sector da banca.
Cliente
Finicrédito
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract transform and load
(ETL) e Cubos MDDB;
Desenvolvimento dos relatórios web;
Testes e correções;
Documentação técnica;
Formação aos utilizadores;
Tecnologias
SAS Base, SAS DWA, SAS Web/AF, SAS MDDB Server, SAS MDDB.
Novabase – Consultor Sénior Business Intelligence
2001 – 2003
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento e implementação de um Management Information System (MIS), na
área dos seguros, com a finalidade do saneamento de carteira.
Cliente
Seguro e Pensões
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract transform and load
(ETL);
Desenvolvimento do Data Warehouse (DW), processos Extract transform and load
(ETL);
Desenvolvimento dos relatórios web;
Testes e correções;
Documentação técnica.
Tecnologias
SAS Base, SAS WDA, SAS Web/AF, HTML, CSS e Javascript.
15
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Novabase – Consultor Sénior Business Intelligence
2001 – 2003
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento e implementação de um Balanced Scorecard (BSC).
Cliente
Continental Mabor
Realizações
Análise;
Desenvolvimento do sistema de administração do BSC;
Testes e correções;
Documentação técnica.
Tecnologias
Gentia, Gentia Renaissance BSC.
Novabase – Consultor Sénior Business Intelligence
2001 – 2003
Contexto
Consultor Sénior Business Intelligence com as funções de análise, desenho,
desenvolvimento, manutenção e manutenção evolutiva. Resolução de eventuais
anomalias detectadas.
Cliente
Império
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract transform and load
(ETL) e Cubos MDDB;
Desenvolvimento do DW dos processo ETL e cubos;
Desenvolvimento de Aplicação Web para geração de data marts da informação
existente no DW;
Manutenção;
Manutenção Evolutiva;
Testes e correções;
Documentação técnica.
Tecnologias
Gentia, Oracle RDBMS e SQL Server.
A2 SIG – Consultor Business Intelligence
2000 – 2001
Contexto
Consultor Business Intelligence com as funções de análise, desenho, desenvolvimento,
implementação e manutenção evolutiva do projeto EIS-GH (Executive Information
System de Gestão Hospitalar).
Cliente
IGIF - Instituto de Gestão Informática e Financeira do Ministério da Saúde
16
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract transform and load
(ETL) e cubos MDDB;
Desenvolvimento do DW dos processo ETL e cubos;
Implementação (instalação e configuração) nos vários Hospitais;
Manutenção evolutiva;
Testes e correções;
Documentação técnica;
Manutenção;
Manutenção evolutiva;
Formação aos utilizadores.
Tecnologias
Gentia e Oracle RDBMS.
A2 SIG – Consultor Business Intelligence
2000 – 2001
Contexto
Consultor Business Intelligence com as funções de análise, desenho, desenvolvimento,
implementação e manutenção evolutiva do projeto IGIF-ISD, (Índice de Satisfação do
Doente).
Cliente
IGIF - Instituto de Gestão Informática e Financeira do Ministério da Saúde
Realizações
Análise e desenho do Data Warehouse (DW), processos Extract transform and load
(ETL) e Cubos MDDB;
Desenvolvimento do DW dos processo ETL e Cubos MDDB;
Testes e correções.
Tecnologias
Gentia e Oracle RDBMS.
Agilus – Consultor Business Intelligence
1996 – 2000
Contexto
Consultor Business Intelligence com as funções de análise, desenho, desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) de gestão orçamental.
Cliente
MAI - Ministério da Administração Interna
Realizações
Análise e desenho dos processos Extract transform and load (ETL) e cubos MDDB;
Desenvolvimento dos processo ETL e Cubos MDDB;
Testes e correções.
Tecnologias
Gentia e Microsoft Excel.
17
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
manutenção evolutiva de um EIS/DSS (Executive Information System, Decision System
Support ) C.I.V, melhorias e inclusão de novos KPI’s para garantir a continuidade do
projeto pós expo 98.
Cliente
CTT
Realizações
Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB;
Testes e correções.
Tecnologias
Gentia e Oracle RDBMS.
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) para KPI’s de gestão e controlo de Recursos Humanos.
Cliente
SOGRAP
Realizações
Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB;
Testes e correções.
Tecnologias
Gentia, Oracle RDBMS e SQL Server.
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) para KPI’s de gestão comercial.
Cliente
COLEP Portugal
Realizações
Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB;
Testes e correções.
Tecnologias
Gentia.
18
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) para KPI’s de gestão industrial.
Cliente
COLEP Portugal
Realizações
Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB;
Desenvolvimento de uma base de dados em Microsoft Access;
Testes e correções.
Tecnologias
Gentia e Microsoft Access.
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) C.I.V com KPI’s de gestão de negócio. Este projecto foi inteiramente web e
com um período de vida limitado ao período de vigência da expo 98.
Cliente
CTT
Realizações
Desenho e desenvolvimento dos processos Extract transform and load (ETL) e Cubos
MDDB;
Testes e correções.
Tecnologias
Gentia e Oracle RDBMS.
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) para KPI’s de gestão comercial.
Cliente
TMGTT, Têxtil Manuel Gonçalves - Tecidos Técnicos
19
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
Realizações
Desenvolvimento dos processos Extract transform and load (ETL) e cubos MDDB;
Testes e correções.
Tecnologias
Gentia e SQL Server.
Agilus – Consultor Júnior Business Intelligence
1996 – 2000
Contexto
Consultor Júnior Business Intelligence com as funções de desenvolvimento,
implementação de um EIS/DSS (Executive Information System, Decision System
Support ) para KPI’s de gestão comercial.
Cliente
PRODITE ZEELANDIA
Realizações
Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB;
Testes e correções.
Tecnologias
Gentia e SQL Server.
Agilus – Analista Programador
1996 – 2000
Contexto
Como analista programador, participação na análise e desenvolvimento de diversos
projetos em Microsoft Visual Basic Profissional, designadamente para:
• Gestão de projetos, na área de prestação de serviços;
• Controlo de exploração na área de prestação de serviços;
• Gestão de marketing e acompanhamento do cliente na área de prestação de
serviços.
Cliente
Agilus
Realizações
Análise;
Desenho;
Desenvolvimento;
Testes e correções.
Tecnologias
Microsoft Visual Basic 4.5 profissional, Microsoft Visual Basic 5 profissional e Microsoft
Access.
20
(1996 – 2012)
DOSSIER DE COMPETÊNCIAS
FORMAÇÃO
2008 (Janeiro) Instituto Galileu Aveiro.
Upgrade SQL Server 2000 – 2005, Microsoft Excel 2003 Visual
Basic for Applications, Sharepoint Portal Server, Microsoft Office
Project Server 2007 – Managing Projects.
2001 (Setembro) Instituto SAS Lisboa.
SAS System Essentials for programmers; Data Manipulation with
SAS System; Automating you SAS Code with SAS Macro
Language; Client/Server Strategies using the SAS System;
Accessing MDDB using Web EIS Software; WEB/AF Client side
JAVA; Developing Customized Application using SAS/AF V8
Developing JSP Applications using WebAF Software; Building a
Data Warehouse using SAS/WA; Building Applications With
SAS/EIS and MDDB Server.
IDIOMAS
Inglês Fluente – falado, escrito
Legenda :
Nativo – Língua materna
Excelente – Elevado nível de proficiência
Fluente – Facilidade na comunicação
Médio – Compreende mas tem dificuldade em comunicar
21
(1996 – 2012)

Dossier Competencias

  • 1.
    DOSSIER DE COMPETÊNCIAS ConsultorSénior Business Intelligence & Mobile Developer Paulo Manuel de Oliveira e Silva 18 anos de experiência 22-07-1973 Índice RESUMO DE EXPERIÊNCIA............................................................................................3 ÁREA DE COMPETÊNCIAS.............................................................................................4 PROJECTOS REALIZADOS..............................................................................................7 .....................................................................................................................................7 ydeal - Project Manager........................................................................................................................7 ydeal - Project Manager........................................................................................................................7 ydeal – Project Manager.......................................................................................................................7 Freelancer - Consultor Sénior Business Intelligence............................................................................8 ydeal - iOS Mobile Developer................................................................................................................8 ydeal - iOS Mobile Developer................................................................................................................8 BLIP - iOS Mobile Developer..................................................................................................................9 Freelancer - Consultor Sénior Business Intelligence............................................................................9 Freelancer - Consultor Sénior Business Intelligence............................................................................9 Freelancer - Consultor Sénior Business Intelligence..........................................................................10 Freelancer - Mobile Developer Sénior...............................................................................................10 Freelancer - Mobile Developer Sénior...............................................................................................11 Freelancer - Mobile Developer Sénior...............................................................................................11 Freelancer - Consultor Sénior Business Intelligence..........................................................................12 Freelancer - Consultor Sénior Business Intelligence..........................................................................12 GFI – Consultor Sénior Business Intelligence......................................................................................12 PHC Norte – Consultor PHC ................................................................................................................13 Ascensus – Consultor Sénior Business Intelligence.............................................................................13 Ascensus – Consultor Sénior Business Intelligence.............................................................................14 Novabase – Consultor Sénior Business Intelligence............................................................................14 Novabase – Consultor Sénior Business Intelligence............................................................................15 Novabase – Consultor Sénior Business Intelligence............................................................................15 Novabase – Consultor Sénior Business Intelligence............................................................................16 Novabase – Consultor Sénior Business Intelligence............................................................................16 A2 SIG – Consultor Business Intelligence............................................................................................16 A2 SIG – Consultor Business Intelligence............................................................................................17 Agilus – Consultor Business Intelligence.............................................................................................17 Agilus – Consultor Júnior Business Intelligence..................................................................................18 Agilus – Consultor Júnior Business Intelligence..................................................................................18 Agilus – Consultor Júnior Business Intelligence..................................................................................18 Agilus – Consultor Júnior Business Intelligence..................................................................................19 Agilus – Consultor Júnior Business Intelligence..................................................................................19 Agilus – Consultor Júnior Business Intelligence..................................................................................19 Agilus – Consultor Júnior Business Intelligence..................................................................................20 Agilus – Analista Programador............................................................................................................20 1 (1996 – 2012)
  • 2.
  • 3.
    DOSSIER DE COMPETÊNCIAS RESUMODE EXPERIÊNCIA Iniciei a minha carreira profissional em 1994 na área das tecnologias de informação, após ter desistido de estudar. Em outubro de 1996 dei os meus primeiros passos na área de suporte á decisão, atualmente uma das metodologias de Business Intelligence, na qual permaneci até aos dias de hoje, o que representa 16 de experiência nesta fantástica área. Nestes 16 anos de experiência, não só tive o privilégio de colaborar em diversos projetos de elevada dimensão, mas também com instituições de elevada reputação e prestigio, quer nacional como internacional, nomeadamente: • SAUDAÇOR; • BLIP; • Mota-Engil; • Ministério da Saúde (ACSS); • Grupo Salvador Caetano; • Texas Instruments – Estados Unidos (Dallas) e França (Nice); • Ministério da Administração Interna; • IGIF – Instituto de Gestão Informática e Financeira do Ministério da Saúde; • Império Bonança; • Optimus; • Riberalves SGPS; • Grupo Lena SGPS; • CTT; • COLEP Portugal, • SOGRAP Vinhos, • ... Ao longo da minha carreira profissional tive a oportunidade de utilizar um abrangente leque tecnológico nas mais diversas áreas de atuação, bem como cooperar com equipas mista e multirraciais. Desempenhei as mais diversas funções, tais como: Levantamento de Requisitos, Análise e Desenho, Desenvolvimento, Implementação, Documentação e Gestão de Projetos. Na minha atividade profissional dei sempre provas de flexibilidade e iniciativa. 3 (1996 – 2012)
  • 4.
    DOSSIER DE COMPETÊNCIAS ÁREADE COMPETÊNCIAS Legenda : Nivel 1 : Beginner – por exemplo: conhecimentos teóricos, académicos, só formação, … Nivel 2 : intermediate – Nivel 1 + pequenos projectos, 4ários4s, … Nivel 3 : professional – Nivel 1,2 + experiência professional em 4ários projectos Nivel 4 : expert Programação Nível Comentários Java 3 Experiência profissional em projetos Business Intelligence Grails / Groovy 3 Experiência profissional em projetos desenvolvimento de aplicações web à medida C, C++ 2 Experiência académica e pessoal Objective-C 4 Experiência pessoal e profissional no desenvolvimento de aplicações iOS (iPhone e iPad) Swift 2 Experiência pessoal Web 4 Experiência profissional no desenvolvimento e implementação de várias soluções Web, Windows e Business Intelligence: — HTML — DHTML — JavaScript — VBScript — XML — XSL — XSLT — CSS — ASP — … Visual Basic 3 Experiência profissional C#.net 4 Experiência profissional no desenvolvimento e implementação de várias aplicações de suporte à execução de processo ETL Python 3 Experiência profissional PHP 3 Experiência profissional no desenvolvimento de aplicações web e web services (RESTful) Ruby On Rails 2 Experiência profissional e pessoal no desenvolvimento de aplicações web NodeJS 3 Experiência profissional Bases de Dados SQL Server (2000, 2005, 2008, 4 Experiência profissional em projetos 4 (1996 – 2012)
  • 5.
    DOSSIER DE COMPETÊNCIAS 2008R2 ) Business Intelligence e desenvolvimento à medida. Microsoft Access 4 Experiência profissional em projetos Business Intelligence e como auxiliar aos processos ETL. Oracle (9i, 11g) 3 Experiência profissional em projetos Business Intelligence. Informix 1 Experiência profissional em projetos Business Intelligence. MySQL 3 Experiência profissional em projetos de desenvolvimento á medida para Web. SQLite 4 Experiência profissional em projetos iPhone, iPad, Windows e Web. Ferramentas de Suporte à Decisão & Datawarehouse Microsoft Analysis Services 4 Experiência profissional em projetos Business Intelligence. EssBase 3 Experiência profissional em projetos Business Intelligence. SAS 3 Experiência profissional em projetos Business Intelligence. Gentia 4 Experiência profissional em projetos Business Intelligence. Ferramentas de ETL ODI 3 Experiência profissional em projetos Business Intelligence. Microsoft DTS 4 Experiência profissional em projetos Business Intelligence. Microsoft SSIS 4 Experiência profissional em projetos Business Intelligence. Gentia 4 Experiência profissional em projetos Business Intelligence. SAS 3 Experiência profissional em projetos Business Intelligence. Ferramentas e aplicações específicas MicroStrategy 3 Experiência profissional MS Project 3 Experiência profissional Project Server 2 Experiência profissional Redmine (OpenSource) 4 Experiência profissional como freelancer para gestão de projeto e controlo de tempo Sistemas Operativos 5 (1996 – 2012)
  • 6.
    DOSSIER DE COMPETÊNCIAS MicrosoftWindows 4 Experiência profissional na ótica do utilizador e programador Microsoft Windows Server 3 Experiência profissional na ótica do utilizador e programador Mac OS X 4 Experiência pessoal e profissional como iOS developer; Mac OS X Server 3 Experiência pessoal e profissional como iOS developer Linux 2 Experiência pessoal Unix 2 Experiência profissional em projetos Business Intelligence Web Servers IIS 3 Experiência pessoal e professional Apache 3 Experiência pessoal e professional Tomcat 3 Experiência pessoal e professional JRun 3 Experiência pessoal e professional Subversion Subversion (SVN) 3 Experiência pessoal e professional GIT 3 Experiência pessoal Outras Adobe Flash 2 Experiência pessoal Abobe DreamWeaver 4 Experiência pessoal Adobe Fireworks 4 Experiência pessoal … 6 (1996 – 2012)
  • 7.
    DOSSIER DE COMPETÊNCIAS PROJECTOSREALIZADOS Os projectos mais importantes em que eu participei. ydeal - Project Manager 01 Outubro 2014 – até à data Contexto Desenvolvimento de aplicação RSS Feed Server para os sites verangola.net e verportugal.net. Cliente Ydeal Realizações Desenvolvimento de aplicação web e base de dados. Tecnologias PHP (simplemvcframework) e MySQL ydeal - Project Manager 01 Outubro 2014 – até à data Contexto Desenvolvimento de aplicação web para os diretórios de empresas dos sites verangola.net e verportugal.net. Cliente Ydeal Realizações Desenvolvimento de aplicação web e base de dados. Tecnologias Twitter Bootstrap, PHP (simplemvcframework) e MySQL ydeal – Project Manager 01 Outubro 2014 – até à data Contexto Gestão de projectos e equipa de desenvolvimento mobile e web. Cliente Ydeal Realizações Gestão de projectos e equipa, análise e desenho, e desenvolvimento de aplicações mobile Nativas e Híbridas (HTML5) e aplicações web e web RIA. Tecnologias Redmine, ProjectLibre, Apple Objective-C (iOS frameworks), Ionic Framework, Deployd e nodejs 7 (1996 – 2012)
  • 8.
    DOSSIER DE COMPETÊNCIAS Freelancer- Consultor Sénior Business Intelligence 14 Julho 2014 – até à data Contexto Desenvolvimento de uma aplicação web para gestão de lista de espera para as várias unidades hospitalares, entidades convencionadas, carteira de serviços, capacidade instalada e emissão de vales de saúde. Empresa Nimble Cliente SAUDAÇOR Realizações Desenvolvimento da aplicação web. Tecnologias Grails (groovy), Angularjs, Twitter Bootstrap, ionicons, jquery e Oracle RDBMS. ydeal - iOS Mobile Developer 14 Abril 2014 – 30 Setembro 2014 Contexto Como Mobile Developer, análise e desenvolvimento das várias versões das aplicações Híbridas Daily-P e Daily-P Pro, para as plataformas iOS e Android e Backend de suporte à informação. https://itunes.apple.com/pt/app/daily-p/id853022755?mt=8 https://itunes.apple.com/pt/app/daily-p-pro/id933627295?mt=8 Cliente Ydeal Realizações Análise e desenho, desenvolvimento da primeira mobile e Backend. Tecnologias Ionic Framework, Deployd e nodejs ydeal - iOS Mobile Developer 13 Fevereiro 2014 – 10 Abril 2014 Contexto Como iOS Developer, participação na análise e desenvolvimento da aplicação iOS RPCRC (The Rotterdam Prostate Cancer Risk Calculator) para iOS; https://itunes.apple.com/us/app/rotterdam-prostate-cancer/id729313737?mt=8 Cliente Prostate Cancer Research Foundation. 8 (1996 – 2012)
  • 9.
    DOSSIER DE COMPETÊNCIAS Realizações Desenvolvimentoda primeira versão da aplicação para iPad e adição das novas funcionalidades a versão iPhone. Tecnologias Apple Objective-C (iOS frameworks) BLIP - iOS Mobile Developer 25 Julho 2013 – 24 Setembro 2013 Contexto iOS Developer, participação no desenvolvimento de novas funcionalidades para a aplicação iOS Sportsbook, por um período contratual de dois meses utilizando a metodologia scrum agile; Cliente BLIP / Betfair. Realizações Untap TV feature, Integração de Paypal payments / deposit, Native App WebWrapper ... Tecnologias Apple Objective-C (iOS frameworks), Untap TV framework, Alfresco Web Forms. Freelancer - Consultor Sénior Business Intelligence Janeiro 2012 – 24 Julho 2013 Contexto Consultor Sénior Business Intelligence com as funções análise, desenho e desenvolvimento de Data Warehouse e processos ETL para canalização da informação e Relatórios; Cliente Mota-Engil ITS. Realizações Análise, desenho e desenvolvimento de Data Warehouse, processos ETL e relatórios. Teste e correções. Tecnologias SQL Server RDBMS, SQL Server Integration Services, Microsoft Reporting Services, Microsoft Analysis Services e Oracle RDBMS. Freelancer - Consultor Sénior Business Intelligence Outubro 2012 – Dezembro 2012 Contexto Consultor Sénior Business Intelligence com as funções análise, desenho e desenvolvimento de Dashboards, Web Services e aplicação Web RIA (Rich Internet Application); 9 (1996 – 2012)
  • 10.
    DOSSIER DE COMPETÊNCIAS Cliente Ministérioda Saúde, em regime de subcontratação pela Nimble Portal. Realizações Análise, desenho e desenvolvimento de Dashboards (MicroStrategy), Web Services (Java e .Net WCF) e aplicação web (RIA) para unificação de autenticação dos utilizadores web. Teste e correções. Tecnologias Oracle RDBMS, MicroStrategy 9.2 e 9.3, .Net 4.5 e Java SE/EE, HTML, CSS, Javascript, AngularJS e JQuery. Freelancer - Consultor Sénior Business Intelligence Maio 2012 – Setembro 2012 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho e desenvolvimento e implementação dos modelos de suporte á decisão para RH (Recursos Humanos), CRM e ISC (Índice Satisfação do Cliente) e de Peças Logística; Cliente Mcoutinho, em regime de subcontratação pela Bi4all. Realizações Análise, desenho e desenvolvimento do Data Warehouse, processo SSIS, utilizando as “Best Practices” da Microsoft / Bi4all e Cubos (IBM Cognos); Teste e correções; Documentação técnica. Tecnologias Microsoft SQL Server, Microsoft SQL Server Integration Services, IBM Cognos Framework e IBM Cognos Transformer. Freelancer - Mobile Developer Sénior Fevereiro 2012 – Março 2012 Contexto Mobile Developer Sénior com as funções de análise, desenho e desenvolvimento de uma Prova de Conceito para iOS (iPad) e Android na área comercial, com as seguintes funcionalidades: Gestão de Encomendas (clientes, produtos), Google Maps e GPS Tracking; Cliente Unicer 10 (1996 – 2012)
  • 11.
    DOSSIER DE COMPETÊNCIAS Realizações Análise,desenho e desenvolvimento da base de dados, Web Services (RESTful) e Aplicação Mobile; Teste e correções; Documentação técnica. Tecnologias Sencha Touch 2, Google Maps, Google Maps GPS Tracking, Apple Objective-C (iOS frameworks), .Net C# Web Services (RESTful), Microsoft SQL Server, HTML, CSS3 e Javascript. Freelancer - Mobile Developer Sénior Agosto 2011 – Janeiro 2012 Contexto Mobile Developer Sénior com as funções de análise, desenho, desenvolvimento e publicação da aplicação iOS (iPhone ) “InPanic”. http://itunes.apple.com/pt/app/in-panic/id498300891?ls=1&mt=8 Cliente Ascensus - CDSI Realizações Análise, desenho e desenvolvimento da base de dados dos Web Services (RESTful) e Aplicação Mobile; Desenvolvimento do Web Site; Teste e correções; Documentação técnica; Publicação da aplicação na AppStore. Tecnologias Apple Objective-C (iOS frameworks), PHP Web Services (RESTful) e MySQL database. Freelancer - Mobile Developer Sénior Agosto 2011 – Novembro 2011 Contexto Mobile Developer Sénior com as funções de análise, desenho, desenvolvimento e publicação da aplicação / Livro iOS (iPhone e iPad) e Android “Casa Mágica”. http://itunes.apple.com/us/app/casa-magica/id489493517?mt=8 Cliente Ascensus – CDSI Realizações Análise, desenho e desenvolvimento da Aplicação Mobile; Teste e correções; Documentação técnica; Publicação da aplicação na AppStore. Tecnologias Apple Objective-C (iOS frameworks), Titanium Appcelarator, HTML, CSS3 e Javascript. 11 (1996 – 2012)
  • 12.
    DOSSIER DE COMPETÊNCIAS Freelancer- Consultor Sénior Business Intelligence Dezembro 2010 – Setembro 2011 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento e implementação do Data Warehouse e processos ETL, para um projecto de consolidação financeira, implementado na tecnologia Hyperion Financial Management (HFM). Cliente Grupo Salvador Caetano, SQPS Realizações Análise e desenho do Data Warehouse (DW) e processos Extract, transform and load (ETL); Desenvolvimento do DW dos processo ETL em Oracle; Desenvolvimento de uma Aplicação em C# para controlo dos processos ETL de extração de dados do PHC (SQL Server); Desenvolvimento de processos de extração para Microsoft Access; Testes e correções; Documentação técnica da Aplicação, DW e processos ETL (ODI e SSIS); Formação dos administradores do sistema. Tecnologias Oracle RDBMs, HTM, HFM, ODI, python, jython, Microsoft SQL Server, SQL Server Integration Services, .Net C# e Microsoft Access. Freelancer - Consultor Sénior Business Intelligence Abril 2010 – Dezembro 2010 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenvolvimento e Implementação do Data Warehouse, processos ETL e Cubos OLAP, para os vários modelos de suporte á decisão do grupo Riberalves SGPS. Desenvolvimento de uma aplicação Web auxiliar á manutenção do DW. Cliente Riberalves, SGPS Realizações Análise e desenho do Data Warehouse (DW), processos Extract, transform and load (ETL) e Cubos OLAP; Desenvolvimento do DW, processo ETL e Cubos OLAP; Desenvolvimento de uma Aplicação web em C#; Testes e correções; Documentação técnica da Aplicação, DW e processos ETL. Tecnologias Microsoft SQL Server, SQL Server Integration Services, Microsoft Analysis Services e .Net C#. GFI – Consultor Sénior Business Intelligence Janeiro 2008 – Julho 2008 12 (1996 – 2012)
  • 13.
    DOSSIER DE COMPETÊNCIAS Contexto ConsultorSénior Business Intelligence, com a função de “primary” dedicado a 100% aos sistemas BI da Texas Instruments, Estados Unidos - Dallas e França - Nice (a passagem de conhecimento foi efectuada em Nice por um período de dois meses, após este período todos os trabalhos foram realizados remotamente a partir de Portugal). Cliente Texas Instruments, Estados Unidos (Dallas) e França (Nice). Realizações Análise e desenho do Data Warehouse (DW), processos Extract, transform and load (ETL) e Cubos Essbase; Desenvolvimento do DW, processo ETL e Cubos Essbase; Teste, correções e suporte técnico; Apoio aos utilizadores Texas Intruments. Tecnologias Oracle RDBMs, SQL Server, Microsoft DTSX, Essbase e Business Objects. PHC Norte – Consultor PHC 2006 – 2007 Contexto Consultor Software PHC com as funções de assistência técnica à rede de distribuidores, instalação, configuração, análise e desenvolvimento de necessidades específicas em software PHC. Cliente Rede de distribuidores, Grupo Lena, SGPS Realizações Instalação; Configuração; Análise de requisitos; Desenvolvimento à medida utilizando a Framework do PHC; Formação aos utilizadores finais. Tecnologias SQL Server, Framework PHC, Dbase. Ascensus – Consultor Sénior Business Intelligence Julho 2004 – Julho 2006 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento e implementação de um modelo de análise de risco na área da banca. Cliente Finibanco 13 (1996 – 2012)
  • 14.
    DOSSIER DE COMPETÊNCIAS Realizações Análisee desenho do Data Warehouse (DW), processos Extract transform and load (ETL) e cubos MDDB; Desenvolvimento do DW dos processo ETL e Cubos MDDB; Desenvolvimento de uma aplicação web (JSP) de geração de data marts; Teste e correções; Documentação técnica; Formação dos utilizadores. Tecnologias SAS Base, SAS DW, SAS MDDB, SAS MDDB Server, SAS Web AF e Java Server Pages (JSP) para a aplicação Web. Ascensus – Consultor Sénior Business Intelligence Julho 2004 – Julho 2006 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento e implementação de um sistema de gestão e controlo te telecomunicações. Cliente Accor | Amorin Realizações Análise e desenho da aplicação web, base de dados, processos de importação da informação dos vários operadores e sistema de validação; Desenvolvimento da aplicação, base de dados, processos de importação da informação dos vários operadores e sistema de validação; Teste e correções; Documentação técnica; Manual do Utilizador; Manual do Administrador; Formação dos utilizadores. Tecnologias Microsoft SQL Server, Active Server Pages (ASP) para a aplicação web. Novabase – Consultor Sénior Business Intelligence 2001 – 2003 Contexto Consultor Sénior Business Intelligence com as funções desenvolvimento e implementação de um Executive Information Systems / Decision System Support (EIS/DSS) na área da gestão orçamental, para campanhas publicitárias. Cliente Optimus 14 (1996 – 2012)
  • 15.
    DOSSIER DE COMPETÊNCIAS Realizações Desenvolvimentode processos Extract transform and load (ETL) e Cubos OLAP; Testes e correções; Formação aos utilizadores; Tecnologias SQL Server, DTS, Microsoft Analysis Services e Proclarity (como interface de exploração dos cubos). Novabase – Consultor Sénior Business Intelligence 2001 – 2003 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento e implementação de vários Executive Information Systems / Decision System Support (EIS/DSS) no sector da banca. Cliente Finicrédito Realizações Análise e desenho do Data Warehouse (DW), processos Extract transform and load (ETL) e Cubos MDDB; Desenvolvimento dos relatórios web; Testes e correções; Documentação técnica; Formação aos utilizadores; Tecnologias SAS Base, SAS DWA, SAS Web/AF, SAS MDDB Server, SAS MDDB. Novabase – Consultor Sénior Business Intelligence 2001 – 2003 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento e implementação de um Management Information System (MIS), na área dos seguros, com a finalidade do saneamento de carteira. Cliente Seguro e Pensões Realizações Análise e desenho do Data Warehouse (DW), processos Extract transform and load (ETL); Desenvolvimento do Data Warehouse (DW), processos Extract transform and load (ETL); Desenvolvimento dos relatórios web; Testes e correções; Documentação técnica. Tecnologias SAS Base, SAS WDA, SAS Web/AF, HTML, CSS e Javascript. 15 (1996 – 2012)
  • 16.
    DOSSIER DE COMPETÊNCIAS Novabase– Consultor Sénior Business Intelligence 2001 – 2003 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento e implementação de um Balanced Scorecard (BSC). Cliente Continental Mabor Realizações Análise; Desenvolvimento do sistema de administração do BSC; Testes e correções; Documentação técnica. Tecnologias Gentia, Gentia Renaissance BSC. Novabase – Consultor Sénior Business Intelligence 2001 – 2003 Contexto Consultor Sénior Business Intelligence com as funções de análise, desenho, desenvolvimento, manutenção e manutenção evolutiva. Resolução de eventuais anomalias detectadas. Cliente Império Realizações Análise e desenho do Data Warehouse (DW), processos Extract transform and load (ETL) e Cubos MDDB; Desenvolvimento do DW dos processo ETL e cubos; Desenvolvimento de Aplicação Web para geração de data marts da informação existente no DW; Manutenção; Manutenção Evolutiva; Testes e correções; Documentação técnica. Tecnologias Gentia, Oracle RDBMS e SQL Server. A2 SIG – Consultor Business Intelligence 2000 – 2001 Contexto Consultor Business Intelligence com as funções de análise, desenho, desenvolvimento, implementação e manutenção evolutiva do projeto EIS-GH (Executive Information System de Gestão Hospitalar). Cliente IGIF - Instituto de Gestão Informática e Financeira do Ministério da Saúde 16 (1996 – 2012)
  • 17.
    DOSSIER DE COMPETÊNCIAS Realizações Análisee desenho do Data Warehouse (DW), processos Extract transform and load (ETL) e cubos MDDB; Desenvolvimento do DW dos processo ETL e cubos; Implementação (instalação e configuração) nos vários Hospitais; Manutenção evolutiva; Testes e correções; Documentação técnica; Manutenção; Manutenção evolutiva; Formação aos utilizadores. Tecnologias Gentia e Oracle RDBMS. A2 SIG – Consultor Business Intelligence 2000 – 2001 Contexto Consultor Business Intelligence com as funções de análise, desenho, desenvolvimento, implementação e manutenção evolutiva do projeto IGIF-ISD, (Índice de Satisfação do Doente). Cliente IGIF - Instituto de Gestão Informática e Financeira do Ministério da Saúde Realizações Análise e desenho do Data Warehouse (DW), processos Extract transform and load (ETL) e Cubos MDDB; Desenvolvimento do DW dos processo ETL e Cubos MDDB; Testes e correções. Tecnologias Gentia e Oracle RDBMS. Agilus – Consultor Business Intelligence 1996 – 2000 Contexto Consultor Business Intelligence com as funções de análise, desenho, desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) de gestão orçamental. Cliente MAI - Ministério da Administração Interna Realizações Análise e desenho dos processos Extract transform and load (ETL) e cubos MDDB; Desenvolvimento dos processo ETL e Cubos MDDB; Testes e correções. Tecnologias Gentia e Microsoft Excel. 17 (1996 – 2012)
  • 18.
    DOSSIER DE COMPETÊNCIAS Agilus– Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, manutenção evolutiva de um EIS/DSS (Executive Information System, Decision System Support ) C.I.V, melhorias e inclusão de novos KPI’s para garantir a continuidade do projeto pós expo 98. Cliente CTT Realizações Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB; Testes e correções. Tecnologias Gentia e Oracle RDBMS. Agilus – Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) para KPI’s de gestão e controlo de Recursos Humanos. Cliente SOGRAP Realizações Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB; Testes e correções. Tecnologias Gentia, Oracle RDBMS e SQL Server. Agilus – Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) para KPI’s de gestão comercial. Cliente COLEP Portugal Realizações Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB; Testes e correções. Tecnologias Gentia. 18 (1996 – 2012)
  • 19.
    DOSSIER DE COMPETÊNCIAS Agilus– Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) para KPI’s de gestão industrial. Cliente COLEP Portugal Realizações Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB; Desenvolvimento de uma base de dados em Microsoft Access; Testes e correções. Tecnologias Gentia e Microsoft Access. Agilus – Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) C.I.V com KPI’s de gestão de negócio. Este projecto foi inteiramente web e com um período de vida limitado ao período de vigência da expo 98. Cliente CTT Realizações Desenho e desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB; Testes e correções. Tecnologias Gentia e Oracle RDBMS. Agilus – Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) para KPI’s de gestão comercial. Cliente TMGTT, Têxtil Manuel Gonçalves - Tecidos Técnicos 19 (1996 – 2012)
  • 20.
    DOSSIER DE COMPETÊNCIAS Realizações Desenvolvimentodos processos Extract transform and load (ETL) e cubos MDDB; Testes e correções. Tecnologias Gentia e SQL Server. Agilus – Consultor Júnior Business Intelligence 1996 – 2000 Contexto Consultor Júnior Business Intelligence com as funções de desenvolvimento, implementação de um EIS/DSS (Executive Information System, Decision System Support ) para KPI’s de gestão comercial. Cliente PRODITE ZEELANDIA Realizações Desenvolvimento dos processos Extract transform and load (ETL) e Cubos MDDB; Testes e correções. Tecnologias Gentia e SQL Server. Agilus – Analista Programador 1996 – 2000 Contexto Como analista programador, participação na análise e desenvolvimento de diversos projetos em Microsoft Visual Basic Profissional, designadamente para: • Gestão de projetos, na área de prestação de serviços; • Controlo de exploração na área de prestação de serviços; • Gestão de marketing e acompanhamento do cliente na área de prestação de serviços. Cliente Agilus Realizações Análise; Desenho; Desenvolvimento; Testes e correções. Tecnologias Microsoft Visual Basic 4.5 profissional, Microsoft Visual Basic 5 profissional e Microsoft Access. 20 (1996 – 2012)
  • 21.
    DOSSIER DE COMPETÊNCIAS FORMAÇÃO 2008(Janeiro) Instituto Galileu Aveiro. Upgrade SQL Server 2000 – 2005, Microsoft Excel 2003 Visual Basic for Applications, Sharepoint Portal Server, Microsoft Office Project Server 2007 – Managing Projects. 2001 (Setembro) Instituto SAS Lisboa. SAS System Essentials for programmers; Data Manipulation with SAS System; Automating you SAS Code with SAS Macro Language; Client/Server Strategies using the SAS System; Accessing MDDB using Web EIS Software; WEB/AF Client side JAVA; Developing Customized Application using SAS/AF V8 Developing JSP Applications using WebAF Software; Building a Data Warehouse using SAS/WA; Building Applications With SAS/EIS and MDDB Server. IDIOMAS Inglês Fluente – falado, escrito Legenda : Nativo – Língua materna Excelente – Elevado nível de proficiência Fluente – Facilidade na comunicação Médio – Compreende mas tem dificuldade em comunicar 21 (1996 – 2012)