Right from the Start Mistakes and traps to avoid while developing and planning your capital projects
This presentation was originally presented by Adnan Siddiqui for an AIChE webinar on April 28, 2010. You can view a recording of the webinar with the audio part at: Right from the Start: Mistakes to Avoid While Planning Capital Projects(http://apps.aiche.org/chemeondemand/Preview.aspx?ID=78E438C3-8FDF-44F7-8D2C-70BD62483662) www.ConcepSysSolutions.com - Adnan Siddiqui AIChE Webinar
Agenda About capital project planning Importance of good planning Major decisions to be made Common mistakes and traps to avoid Recovering from poor planning www.ConcepSysSolutions.com - Adnan Siddiqui
ConcepSys Solutions Founded in 2008 to license ground breaking integrated conceptual design software – ConcepSys. Easy to use yet powerful tool for feasibility stage studies (FEL-2) of process industry projects A minimum of 50% savings in time and money  compared to traditional work flow and other conceptual engineering software www.ConcepSysSolutions.com - Adnan Siddiqui
Capital Project Planning Development of initial design, cost estimate, and schedule to enable financial analysis and authorization of a capital project Also referred to as: Pre-Project Planning Front-End Loading (FEL) Front-End Engineering and Design (FEED) Pre-Construction www.ConcepSysSolutions.com - Adnan Siddiqui
Importance of Good Planning www.ConcepSysSolutions.com - Adnan Siddiqui
Typical FEL Process www.ConcepSysSolutions.com - Adnan Siddiqui
FEL 1 Major Decisions Capacity (product mix) Location Reliability Future expansion/modification Flexibility Input and outputs Technology www.ConcepSysSolutions.com - Adnan Siddiqui
FEL 2 Major Decisions Equipment sizing / type Non-process scope Control system strategy Design standards Level 1 schedule Long lead items Black and gray boxes www.ConcepSysSolutions.com - Adnan Siddiqui
FEL 3 Major Decisions Equipment supplier(s) OSBL scope Execution strategy Constructability EH&S LOPA / PHA www.ConcepSysSolutions.com - Adnan Siddiqui
Best Practices for FEL Gate reviews Value Improving Practices (VIPs) Attend June 2, 2010 AIChE webinar by Nat Schatz for more information Benchmarking Formal risk assessment (FMEA) Quality and completeness checks www.ConcepSysSolutions.com - Adnan Siddiqui
FEL 1 Mistakes Premature initiation Uncertain schedule, cost, capacity targets Ignoring technology risks www.ConcepSysSolutions.com - Adnan Siddiqui Image by elisharene via flickr.com
FEL 1 Traps We are using proven technology We will just scale up to new capacity This plant is just a copy of the existing one Past performance guarantees future performance www.ConcepSysSolutions.com - Adnan Siddiqui
FEL 2 Mistakes Premature completion Incomplete alternative evaluation Lack of operation input www.ConcepSysSolutions.com - Adnan Siddiqui Image by jonathan_moreau via flickr.com
FEL 2 Traps The gray boxes can be resolved later Inadequate attention to OSBL scope Incomplete or dysfunctional team Making the scope fit the expected cost instead of the expected objectives Lack of experienced process engineer involvement Inadequate peer / expert review www.ConcepSysSolutions.com - Adnan Siddiqui
FEL 3 Mistakes Inadequate detail Too much detail Ignorance of local conditions Poor resource planning Assumptions from FEL-2 are not verified or eliminated as needed www.ConcepSysSolutions.com - Adnan Siddiqui Image by proimos via flickr.com
FEL 3 Traps Scope creep Wrong scope Poor risk assessment www.ConcepSysSolutions.com - Adnan Siddiqui
Special Situations Joint ventures Emerging geographies New technology Fast track Retrofits / turnarounds www.ConcepSysSolutions.com - Adnan Siddiqui
Bonus Content Seven Laws of Projects (Matthew E. May) A major project is never completed on time, within budget, or with the original team Projects progress quickly until they become 85% complete. When things appear to be going well, you’ve overlooked something. ,[object Object]
If you have too few people on a project, they can’t solve the problems. www.ConcepSysSolutions.com - Adnan Siddiqui
Bonus Content Seven Laws of Projects (Matthew E. May) If you have too many, they create more problems than they can solve. A carelessly planned project will take three times longer to complete than expected. A carefully planned project will only take twice as long as expected.  Ten estimators will estimate the same work in ten different ways. And one estimator will estimate ten different ways at ten different times. www.ConcepSysSolutions.com - Adnan Siddiqui
Summary Getting conceptual design right from the start is critical to getting more bang for your capital buck in the end! Each phase of conceptual design has mistakes and traps to avoid. Chapter 9 of Perry’s 8th Edition has more information on Front-End Loading  Upcoming AIChE webinar on Value Improving Practices – June 2, 2010 www.ConcepSysSolutions.com - Adnan Siddiqui

Mais conteúdo relacionado

Mais procurados

LA 1/18/18 Become A Web Developer: A Thinkful Info Session
LA 1/18/18 Become A Web Developer: A Thinkful Info SessionLA 1/18/18 Become A Web Developer: A Thinkful Info Session
LA 1/18/18 Become A Web Developer: A Thinkful Info SessionThinkful
 
Design thinking and innovation at apple
Design thinking and innovation at apple Design thinking and innovation at apple
Design thinking and innovation at apple Wei Li
 
IDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_FinalIDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_FinalKaren He
 
introduction UX Design - Course
introduction UX Design - Courseintroduction UX Design - Course
introduction UX Design - CourseZishan A. Mohammad
 
What IPD Really Is How To Start Right
What IPD Really Is How To Start RightWhat IPD Really Is How To Start Right
What IPD Really Is How To Start Rightdarren214
 
Stop the innovation wars
Stop the innovation warsStop the innovation wars
Stop the innovation warsWei Li
 
Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019
Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019
Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019Workology
 
UX STRAT Online 2021 Presentation by Veena Sonwalkar, frog
UX STRAT Online 2021 Presentation by Veena Sonwalkar, frogUX STRAT Online 2021 Presentation by Veena Sonwalkar, frog
UX STRAT Online 2021 Presentation by Veena Sonwalkar, frogUX STRAT
 
The Project Economy: Thoughts on the Future of Work
The Project Economy: Thoughts on the Future of WorkThe Project Economy: Thoughts on the Future of Work
The Project Economy: Thoughts on the Future of WorkBruce Gay, PMP
 
Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...
Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...
Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...mysociety
 
Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...
Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...
Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...Association for Project Management
 
UXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy Making
UXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy MakingUXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy Making
UXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy MakingUXPA International
 
Prototype
PrototypePrototype
Prototypejwawne1
 
Fluency - Information Slide Deck - October 2014
Fluency - Information Slide Deck - October 2014Fluency - Information Slide Deck - October 2014
Fluency - Information Slide Deck - October 2014Sinead Manus
 

Mais procurados (20)

LA 1/18/18 Become A Web Developer: A Thinkful Info Session
LA 1/18/18 Become A Web Developer: A Thinkful Info SessionLA 1/18/18 Become A Web Developer: A Thinkful Info Session
LA 1/18/18 Become A Web Developer: A Thinkful Info Session
 
Design thinking and innovation at apple
Design thinking and innovation at apple Design thinking and innovation at apple
Design thinking and innovation at apple
 
IDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_FinalIDEO Product Development Presentation Team 4_Final
IDEO Product Development Presentation Team 4_Final
 
introduction UX Design - Course
introduction UX Design - Courseintroduction UX Design - Course
introduction UX Design - Course
 
What IPD Really Is How To Start Right
What IPD Really Is How To Start RightWhat IPD Really Is How To Start Right
What IPD Really Is How To Start Right
 
Stop the innovation wars
Stop the innovation warsStop the innovation wars
Stop the innovation wars
 
Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019
Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019
Designing AI Driven Employee Experiences Workshop: Sept. 18, 2019
 
Ideo Presentation 2008
Ideo Presentation 2008Ideo Presentation 2008
Ideo Presentation 2008
 
Ideo ii
Ideo iiIdeo ii
Ideo ii
 
UX STRAT Online 2021 Presentation by Veena Sonwalkar, frog
UX STRAT Online 2021 Presentation by Veena Sonwalkar, frogUX STRAT Online 2021 Presentation by Veena Sonwalkar, frog
UX STRAT Online 2021 Presentation by Veena Sonwalkar, frog
 
Digital Transformation: Back to Basics
Digital Transformation: Back to BasicsDigital Transformation: Back to Basics
Digital Transformation: Back to Basics
 
The Project Economy: Thoughts on the Future of Work
The Project Economy: Thoughts on the Future of WorkThe Project Economy: Thoughts on the Future of Work
The Project Economy: Thoughts on the Future of Work
 
Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...
Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...
Don’t build it: a practical guide for those building Civic Tech - Luke Jordan...
 
2011 YEF program introduction
2011 YEF program introduction2011 YEF program introduction
2011 YEF program introduction
 
Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...
Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...
Future Skills, Future Work: Projecting the Future, Challenge Paper Six, 16 Ap...
 
UXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy Making
UXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy MakingUXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy Making
UXPA2019 Experience-Led Strategy: The Role of Design Thinking in Strategy Making
 
Prototype
PrototypePrototype
Prototype
 
Fluency - Information Slide Deck - October 2014
Fluency - Information Slide Deck - October 2014Fluency - Information Slide Deck - October 2014
Fluency - Information Slide Deck - October 2014
 
Week 6
Week 6Week 6
Week 6
 
Ideo Marketing
Ideo MarketingIdeo Marketing
Ideo Marketing
 

Semelhante a Avoid Capital Project Planning Mistakes

Reducing Time Spent On Requirements
Reducing Time Spent On RequirementsReducing Time Spent On Requirements
Reducing Time Spent On RequirementsByron Workman
 
From Technical Debt to Technical Health
From Technical Debt to Technical HealthFrom Technical Debt to Technical Health
From Technical Debt to Technical HealthMikael Vesavuori
 
2014 12 03 projects where agile approach seems to be optimal fin
2014 12 03 projects where agile approach seems to be optimal fin2014 12 03 projects where agile approach seems to be optimal fin
2014 12 03 projects where agile approach seems to be optimal finMarek Niziolek
 
Agilelessons scanagile-final 2013
Agilelessons scanagile-final 2013Agilelessons scanagile-final 2013
Agilelessons scanagile-final 2013lokori
 
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxDeliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxtheodorelove43763
 
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxDeliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxcargillfilberto
 
Enterprise Architecture in Practice: from Datastore to APIs and Apps
Enterprise Architecture in Practice: from Datastore to APIs and AppsEnterprise Architecture in Practice: from Datastore to APIs and Apps
Enterprise Architecture in Practice: from Datastore to APIs and AppsWSO2
 
Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Kubilay Balci
 
Introduction to Systems Analysis and Design
Introduction to Systems Analysis and DesignIntroduction to Systems Analysis and Design
Introduction to Systems Analysis and DesignNikRHassan1
 
Speed Creation REEW
Speed Creation REEWSpeed Creation REEW
Speed Creation REEWSven Krause
 
about start up for you 12
about start up for you 12about start up for you 12
about start up for you 12aliaalistartup
 
Lean Software Development
Lean Software DevelopmentLean Software Development
Lean Software DevelopmentSaqib Raza
 
20150227 agility in it projects m niziolek (sent)
20150227  agility in it projects m niziolek (sent)20150227  agility in it projects m niziolek (sent)
20150227 agility in it projects m niziolek (sent)Marek Niziolek
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Phil Comelio
 
The waterfall, a commonly misapprehended methodological concept
The waterfall, a commonly misapprehended methodological conceptThe waterfall, a commonly misapprehended methodological concept
The waterfall, a commonly misapprehended methodological conceptAxel Vanhooren
 
Agile Vs Waterfall Case Study
Agile Vs Waterfall Case StudyAgile Vs Waterfall Case Study
Agile Vs Waterfall Case StudyGina Alfaro
 
Lean Software Development Principles
Lean Software Development PrinciplesLean Software Development Principles
Lean Software Development PrinciplesJohn Vajda
 

Semelhante a Avoid Capital Project Planning Mistakes (20)

Reducing Time Spent On Requirements
Reducing Time Spent On RequirementsReducing Time Spent On Requirements
Reducing Time Spent On Requirements
 
From Technical Debt to Technical Health
From Technical Debt to Technical HealthFrom Technical Debt to Technical Health
From Technical Debt to Technical Health
 
2014 12 03 projects where agile approach seems to be optimal fin
2014 12 03 projects where agile approach seems to be optimal fin2014 12 03 projects where agile approach seems to be optimal fin
2014 12 03 projects where agile approach seems to be optimal fin
 
Agilelessons scanagile-final 2013
Agilelessons scanagile-final 2013Agilelessons scanagile-final 2013
Agilelessons scanagile-final 2013
 
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxDeliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
 
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxDeliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
 
Enterprise Architecture in Practice: from Datastore to APIs and Apps
Enterprise Architecture in Practice: from Datastore to APIs and AppsEnterprise Architecture in Practice: from Datastore to APIs and Apps
Enterprise Architecture in Practice: from Datastore to APIs and Apps
 
Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...
 
Introduction to Systems Analysis and Design
Introduction to Systems Analysis and DesignIntroduction to Systems Analysis and Design
Introduction to Systems Analysis and Design
 
Speed Creation REEW
Speed Creation REEWSpeed Creation REEW
Speed Creation REEW
 
about start up for you 12
about start up for you 12about start up for you 12
about start up for you 12
 
Agile Dev. II
Agile Dev. IIAgile Dev. II
Agile Dev. II
 
IoT Product Design and Prototyping
IoT Product Design and PrototypingIoT Product Design and Prototyping
IoT Product Design and Prototyping
 
Lean Software Development
Lean Software DevelopmentLean Software Development
Lean Software Development
 
20150227 agility in it projects m niziolek (sent)
20150227  agility in it projects m niziolek (sent)20150227  agility in it projects m niziolek (sent)
20150227 agility in it projects m niziolek (sent)
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?
 
Vb ch 1-introduction
Vb ch 1-introductionVb ch 1-introduction
Vb ch 1-introduction
 
The waterfall, a commonly misapprehended methodological concept
The waterfall, a commonly misapprehended methodological conceptThe waterfall, a commonly misapprehended methodological concept
The waterfall, a commonly misapprehended methodological concept
 
Agile Vs Waterfall Case Study
Agile Vs Waterfall Case StudyAgile Vs Waterfall Case Study
Agile Vs Waterfall Case Study
 
Lean Software Development Principles
Lean Software Development PrinciplesLean Software Development Principles
Lean Software Development Principles
 

Último

Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 

Último (20)

Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 

Avoid Capital Project Planning Mistakes

  • 1. Right from the Start Mistakes and traps to avoid while developing and planning your capital projects
  • 2. This presentation was originally presented by Adnan Siddiqui for an AIChE webinar on April 28, 2010. You can view a recording of the webinar with the audio part at: Right from the Start: Mistakes to Avoid While Planning Capital Projects(http://apps.aiche.org/chemeondemand/Preview.aspx?ID=78E438C3-8FDF-44F7-8D2C-70BD62483662) www.ConcepSysSolutions.com - Adnan Siddiqui AIChE Webinar
  • 3. Agenda About capital project planning Importance of good planning Major decisions to be made Common mistakes and traps to avoid Recovering from poor planning www.ConcepSysSolutions.com - Adnan Siddiqui
  • 4. ConcepSys Solutions Founded in 2008 to license ground breaking integrated conceptual design software – ConcepSys. Easy to use yet powerful tool for feasibility stage studies (FEL-2) of process industry projects A minimum of 50% savings in time and money compared to traditional work flow and other conceptual engineering software www.ConcepSysSolutions.com - Adnan Siddiqui
  • 5. Capital Project Planning Development of initial design, cost estimate, and schedule to enable financial analysis and authorization of a capital project Also referred to as: Pre-Project Planning Front-End Loading (FEL) Front-End Engineering and Design (FEED) Pre-Construction www.ConcepSysSolutions.com - Adnan Siddiqui
  • 6. Importance of Good Planning www.ConcepSysSolutions.com - Adnan Siddiqui
  • 7. Typical FEL Process www.ConcepSysSolutions.com - Adnan Siddiqui
  • 8. FEL 1 Major Decisions Capacity (product mix) Location Reliability Future expansion/modification Flexibility Input and outputs Technology www.ConcepSysSolutions.com - Adnan Siddiqui
  • 9. FEL 2 Major Decisions Equipment sizing / type Non-process scope Control system strategy Design standards Level 1 schedule Long lead items Black and gray boxes www.ConcepSysSolutions.com - Adnan Siddiqui
  • 10. FEL 3 Major Decisions Equipment supplier(s) OSBL scope Execution strategy Constructability EH&S LOPA / PHA www.ConcepSysSolutions.com - Adnan Siddiqui
  • 11. Best Practices for FEL Gate reviews Value Improving Practices (VIPs) Attend June 2, 2010 AIChE webinar by Nat Schatz for more information Benchmarking Formal risk assessment (FMEA) Quality and completeness checks www.ConcepSysSolutions.com - Adnan Siddiqui
  • 12. FEL 1 Mistakes Premature initiation Uncertain schedule, cost, capacity targets Ignoring technology risks www.ConcepSysSolutions.com - Adnan Siddiqui Image by elisharene via flickr.com
  • 13. FEL 1 Traps We are using proven technology We will just scale up to new capacity This plant is just a copy of the existing one Past performance guarantees future performance www.ConcepSysSolutions.com - Adnan Siddiqui
  • 14. FEL 2 Mistakes Premature completion Incomplete alternative evaluation Lack of operation input www.ConcepSysSolutions.com - Adnan Siddiqui Image by jonathan_moreau via flickr.com
  • 15. FEL 2 Traps The gray boxes can be resolved later Inadequate attention to OSBL scope Incomplete or dysfunctional team Making the scope fit the expected cost instead of the expected objectives Lack of experienced process engineer involvement Inadequate peer / expert review www.ConcepSysSolutions.com - Adnan Siddiqui
  • 16. FEL 3 Mistakes Inadequate detail Too much detail Ignorance of local conditions Poor resource planning Assumptions from FEL-2 are not verified or eliminated as needed www.ConcepSysSolutions.com - Adnan Siddiqui Image by proimos via flickr.com
  • 17. FEL 3 Traps Scope creep Wrong scope Poor risk assessment www.ConcepSysSolutions.com - Adnan Siddiqui
  • 18. Special Situations Joint ventures Emerging geographies New technology Fast track Retrofits / turnarounds www.ConcepSysSolutions.com - Adnan Siddiqui
  • 19.
  • 20. If you have too few people on a project, they can’t solve the problems. www.ConcepSysSolutions.com - Adnan Siddiqui
  • 21. Bonus Content Seven Laws of Projects (Matthew E. May) If you have too many, they create more problems than they can solve. A carelessly planned project will take three times longer to complete than expected. A carefully planned project will only take twice as long as expected. Ten estimators will estimate the same work in ten different ways. And one estimator will estimate ten different ways at ten different times. www.ConcepSysSolutions.com - Adnan Siddiqui
  • 22. Summary Getting conceptual design right from the start is critical to getting more bang for your capital buck in the end! Each phase of conceptual design has mistakes and traps to avoid. Chapter 9 of Perry’s 8th Edition has more information on Front-End Loading Upcoming AIChE webinar on Value Improving Practices – June 2, 2010 www.ConcepSysSolutions.com - Adnan Siddiqui
  • 23. Want to know more? Join Front-End Loader weekly email list for project management and conceptual design tips www.ConcepSysSolutions.com Send email to aasiddiqui@concepsyssolutions.com Sign-up to be notified for short and practical seminars and webinars Send email to get free copy of upcoming e-Book on process industry project conceptual design www.ConcepSysSolutions.com - Adnan Siddiqui

Notas do Editor

  1. Seminar Abstract“Right from the Start – Mistakes and traps to avoid while developing and planning your capital projects”Proper planning of capital projects is critical to final outcome. To achieve a project’s goals with respect to cost, schedule, quality, and operation, project teams must deliver a high quality conceptual design and project plan. This webinar will start with an overview of current best practices and tools for project planning. After sharing the latest knowledge and research from leading project management entities, the webinar will list common mistakes and traps to avoid during project planning to ensure your project’s success. This webinar should be attended by project managers, process engineers, design engineers, and others involved in developing and planning capital projects.
  2. The level of detail must be sufficient to match a business or company’s financial risk tolerance.Discuss tradeoff between certainty and wasted effort for canceled projectsDiscuss impact of company culture on schedule vs. cost tradeoffs
  3. The red line indicates your ability to influence project costs (your influence declines as the project proceeds – the early decisions set the project cost)The blue line is the project cumulative (can also refer to cost of changes) – adding equipment on flowsheet is much easier than adding equiment during EPC phase or in the field before startup
  4. Typical front-end planning processFEL-1Led by the commercial / business team (marketing, finance, supply chain)May involved R&D and senior process engineersFEL-2 Typically the first contact with engineering Core engineering team and project leadership is establishedFEL-3Engineering team expanded – contractor engagement as necessary by the owner to bring discipline depth and capacityAdd graphic to address how the process is not isolated and outside factors (market conditions, competitor capital spending, government regulations, etc.) constrain as well as influence and disrupt this process
  5. Add graphic to indicate preliminary schedule and cost estimate or expectations are established in this stage
  6. Resource planning includes: Engineering, construction, bulks, major equipment.