Case Study:
1. Case A: Effect of assumed standard levels
2. Case B: Factory overhead variance analysis
Case A:
Effect of Assumed Standard Levels:
Harden Company has experienced increased production costs. The primary area of concern
identified by management is direct labor. The company is considering adopting a standard
cost system to help control labor and other costs. Useful historical data are not available
because detailed production records have not been maintained.
To establish labor standards, Harden Company has retained an engineering consulting firm.
After a complete study of the work process, the consultants recommended a labor standard
of one unit of production every 30 minutes, or 16 units per day for each worker. The
consultants further advised that Harden's wage rates were below the prevailing rate of $ per
hour.
Harden's production vice-president thought that this labor standard was too tight, and from
experience with the labor force, believed that a labor standard of 40 minutes per unit or 12
units per day for each worker would be more reasonable.
The president of Harden Company believed the standard should be set at a high level to
motivate the workers and to provide adequate information for control and reasonable cost
comparison. After much discussion, management decided to use a dual standard. The labor
standard of one unit every 30 minutes, recommended by the consulting firm, would be
employed in the plant as a motivation device, while a cost standard of 40 minutes per unit
would be used in reporting. Management also concluded that the workers would not be
informed of the cost standard used for reporting purposes. The production vice-president
conducted several sessions prior to implementation in the plant, informing the workers of
the new standard cost system and answering questions. The new standards were not
related to incentive pay but were introduced when wages were increased to $7 per hour.
The standard cost system was implemented on January 1, 19--. At the end of six months of
operation, these statistics on labor performance were presented to executive management:
January February March April May June
Production (units) 5,100 5,000 4,700 4,500 4,300 4,400
Direct labor hours 3,000 2,900 2,900 3,000 3,000 3,100
Quantity Variances:
Variance based on labor standard (one unit
each 30 minutes) $3150 U* $2,800 U $3,850 U $5,250U
$5,950
U $6,300 U
Variance based on cost standard (one unit
each 40 minutes) $2,800 F $3,033 F $1,633 F -0- $933U $1,167 U
*U = Unfavorable; F = Favorable
Materials quality, labor mix, and plant facilities and conditions have not changed to any
great extent during the six month period.
Required:
1. A discussion of the impact of different types of standards on motivations, and
specifically the likely effect on motivation of adopting the labor standard
recommended for Harden Company by the engineering firm.
2. An evaluation of Harden Company's decision to employ dual standards in its standard
cost system.
Answer:
1. Standards are often classified into three types - theoretical (tight), normal
(reasonable), or expected actual (loose). Standards which are too loose or too tight
will generally have a negative impact on workers motivation. If too loose, workers
will tend to set their goals at this low rate, thus reducing productivity below what is
obtainable; if too tight, workers will realize that it is impossible to attain the
standard, become frustrated, and will not attempt to meet the standard. An
attainable or reasonable standard which can be achieved under normal working
conditions is likely to contribute to the worker's motivation to achieve the designated
level of activity.
If executive management imposes standards, workers and plant management will
tend to react negatively because they feel threatened. If workers and plant
management participate in setting the standard, they can more readily identify with
it and it could become one of their personal goals.
In Harden's case, it appears that the standard was imposed on the workers by
management. In addition, management used an ideal standard to measure
performance. Both of these actions appear to have had a negative impact on output
over the first six months.
2. Harden made a poor decision to use dual standards. If the workers learn of the dual
standards, the company's entire measurement system may may become suspect and
credibility will be lost. Company morale could suffer because the workers would not
know for sure how the company evaluates their performance. as a result, disregard
for the present and any future cost control system may develop.
Case B:
Factory Overhead Variance Analysis:
Strayer Company uses a standard cost system and budgets the following sales and costs for
19--
Unit sales 20,000
Sales $2,00,000
Total production cost at standard 130,000
Gross profit 70,000
Beginning inventories None
Ending inventories None
The 19-- budgeted sales level was the normal capacity level used in calculating the factory
overhead predetermined standard cost rate per direct labor hour.
At the end of 19--, Strayer Company reported production and sales of 19,200 units. Total
factory overhead incurred was exactly equal to budgeted factory overhead for the year and
there was under-applied total factory overhead of $2,000 at December 31. Factory
overhead is applied to the work in process inventory on the basis of standard direct labor
hours allowed for units produced. Although there was a favorable labor efficiency variance,
there was neither a labor rate variance nor materials variances for the year.
Require: An explanation of the under-applied factory overhead of $2,000, being as specific
as the data permit and indicating the overhead variances affected. Strayer uses a three
variance method to analyze the total factory overhead.
Answer:
Under-applied factory overhead will arise when actual factory overhead incurred is larger
than the standard amount of factory overhead applied to work in process. The standard
amount of factory overhead applied to work in process is based on actual rather than on
budgeted units of output.
Based on the information given, the sum of the factory overhead spending, efficiency, and
idle capacity variances resulted in an unfavorable total factory overhead variance of $2,000.
The factory overhead efficiency variance must be favorable because it is computed on the
same basis as the direct labor efficiency variance which was given as favorable.
Strayer would have an unfavorable idle capacity variance because the actual activity level
for the year was less than the capacity level used in calculating the standard cost rate for
factory overhead.
As to the factory overhead spending variance, the balance would be unfavorable because
actual costs would have had to exceed the budgeted cost of the actual units produced since
the budget allowance for production of 19,200 units must be less than for 20,000 units and
the actual costs were exactly equal to the budget allowance for 20,000 units. The
magnitude of the spending variance is indeterminate from the information given.
Standard Costing System Discussion
Questions and Answers:
Questions:
1. (a) Define standard costs.
(b) Name some advantages of standard cost system.
See answer
2. A team of management consultants and company executives concluded that a
standard cost installation was desirable vehicle for accomplishing the objectives of a
progressive management. State some uses of standard costs that can be associated
with the above decision.
See answer
3. Does a standard cost system increases or decreases the amount of accounting and
clerical effort and expense required to prepare cost reports and financial statements?
See answer
4. Is a standard cost system equally applicable to job order costing and process costing
system?
See answer
5. A conference speaker discussing budgets and standard costs made the following
statement: "Budgets and standards are not the same thing. They have different
purposes and are set up and used in different ways ; yet a specific relationship exists
between them."
(a) Identify distinctions or differences between budgets and standards.
(b) Identify similarities between budgets and standards.
See answer
6. The use of standard costs in pricing and budgeting is quite valuable since decisions in
the fields of pricing and budgetary planning are made before the costs under
consideration are incurred. Discuss.
See answer
7. Explain how materials, labor and factory overhead standards are set, including the
types of people involved and the method used.
See answer
8. What type of variances are computed for materials, labor, and factory overhead?
See answer
9. In a paper mill, materials specification standards are set up for various grades of
pulp and secondary furnish (waste paper) for each grade and kind of paper
produced. Yet at regular intervals the cost accountant is able to determine a
materials mix variance. Why does a mix variance occurs?
See answer
10. How does the calculation of a mix variance differ from that of a quantity variance?
See answer
11. A cost standard in a process industry is often based on an assumed yield rate. Any
difference in actual yield from standard yield will produce a yield variance. Express
this variance in formula form.
See answer
12. Select the answer which best completes the statement:
(a) A purpose of standard costing is to: (1) determine the break even production
level; (2) control costs; (3) eliminate the need for subjective decisions by
management ; (4) allocate cost more accurately.
(b) A company employing very tight (theoretical) standards in a standard costing
system should expect that : (1) a large incentive bonus will be paid; (2) most
variances will be unfavorable; (3) employees will be strongly motivated to attain the
standards; (4) costs will be controlled better than if lower standards were used.
(c) Of the different types of standards listed below, the one which best describes
labor costs that should be incurred under forthcoming efficient operating conditions
is : (1) ideal; (2) basic; (3) maximum efficiency; (4) normal.
(d) In standard costing, standard hours allowed is a means of measuring: (1)
standard output at standard hours; (2) actual output at standard hours; (3) standard
output at actual hours; (4) actual output at actual hours.
(e) In preparing cost report at standard for process costing: (1) equivalent units are
not used; (2) equivalent units are computed using an approach that ignores
inventories; (3) the actual equivalent units are multiplied by the standard cost per
unit; (4) the standard equivalent units are multiplied by the actual cost per unit.
(f) In a standard cost system, the materials purchase price variance is obtained by
multiplying the: (1) actual price by the difference between actual quantity purchased
and standard quantity allowed; (2) actual quantity purchased by the difference
between actual price and standard price; (3) standard price by the difference
between standard quantity purchased and standard quantity allowed; (4) standard
quantity purchased by the difference between actual price and standard price.
(g) A favorable labor efficiency variance indicates: (1) the average wage rate paid
was less than the standard rate; (2) the standard labor hours allowed were greater
than the actual labor hours used; (3) the actual total labor cost incurred was less
than the standard labor cost allowed for the units produced; (4) the number of units
produced was less than the number of units budgeted for the period.
(h) Given below are notations and their respective meanings:
AH = Actual hours
SHA = Standard hours allowed for actual production
AR = Actual rate
SR = Standard rate
The formula that represents the labor efficiency variance is: (1) SR × (AH – SHA);
(2) AR × (AH – SHA); (3) AH × (AR – SR); (4) SHA × (AR – SR).
(i) The standard cost variance representing the difference between actual factory
overhead incurred and budgeted factory overhead based on actual hours worked is
the (1) volume variance; (2) spending variance; (3) efficiency variance; (4) quantity
variance.
(j) The fixed portion of the standard factory overhead application rate is a function
of a predetermined "normal" activity level. If standard hours allowed for good output
equal this normal activity level for a given period, the volume variance will be: (1)
zero; (2) favorable; (3) unfavorable; (4) either favorable or unfavorable, depending
on the budgeted overhead.
See answer
Answers:
1. (a) Standard costs are the predetermined costs of manufacturing products during a
specific period under current or anticipated operating conditions. Standards aid in
planning and controlling operations.
(b) The advantages of a standard cost system include the following:
1. The process in itself often discloses inefficiencies, because the setting of standards
requires a thorough analysis of all cost functions.
2. The process of setting standards forces management to plan efficient and
economical operations.
3. Standard costs establish clearly defined lines of cost responsibility and authority.
4. Standard costs are likely to be an important aid to management in obtaining
acceptable job performance by providing a clear idea as to what constitutes
acceptable performance.
5. Variances between actual performance and standard costs facilitate control
through the application of the principle of exception.
6. Faster reporting of operating data is possible; the shortened time between action
and the availability of control information helps management to prevent the
development of unfavorable cost trends.
2. A few uses of standard costs are:
(a) Establishing budgets.
(b) Controlling costs and motivating and measuring efficiencies.
(c) Promoting cost reduction.
(d) Simplifying cost procedures and expediting cost reports.
(e) Assigning costs to inventories.
(f) Setting sales prices.
3. In some way a standard cost system reduces clerical work. Variance reports add new
tasks, which may make expenses about equal. The fact that more information is
available about the operations of the business should be of greater value than the
expenses of operating the accounting system.
4. Yes, standard costs can be used either in job order costing where the cost of specific
jobs put through a factory is ascertained, or process costing where the cost of
production in one or more manufacturing departments for a given period of time is
determined. a standard cost system applied to either job order or process costing will
bring the added advantage of cost analysis hitherto unavailable.
5. (a) Budgets and standards are not the same thing; yet a specific relationship
exists between them. The first difference between budgets and standards is one
of purpose. Budgets are statements of expected cost. At the beginning of a given
period, they are used to forecast requirements of finance, work force, and other
variables related to production and sales. Later in a given period, they are used as
comparison to be sure that actual costs are not exceeding expectations. Standard
costs, on the other hand, do not necessarily show what costs may be expected to be,
but rather, what they might be if certain highly desirable performance are attained.
For this reason they cannot be used alone for forecasting.
The second difference between budgets and standards is one of emphasis. A budget
emphasizes cost levels that should not be exceeded. If they are exceeded, then the
whole foundation upon which profits are predicted is jeopardized. But a standard
emphasizes the levels to which costs should be reduced. I these levels are reached,
profits are increased. Costs are not to exceed budget; they are to approach
standards.
A third difference is on of completeness. Budgets are customarily set for all
departments in the company, from sales to manufacturing. Standards, however, are
often set only for the manufacturing divisions. Budgets customarily include both
income and expense, whereas standards are more frequently set for expenses or
costs only.
A fourth difference is one of analysis and breakdown. When cost differs from budget,
a lower cost indicates good performance; a higher cost tells of a perilous situation.
But when actual cost differs in any marked degree from standards, the nature and
cause of the variance should be investigated so that needed corrective steps may be
taken in time.
These difference may be summarized by saying that a budget is a marker for
keeping out of trouble, whereas a standard is a compass that points the way to
improvements.
(b) Although standards and budgets have certain differences, they possess
similarities which are of such a nature that the existence of standard costs greatly
facilitates budget preparation. The first similarity is that both budgets and standards
attempt to predetermine expenses. The budget and the standards have been set by
records of current operational methods or procedures and have not just been set by
hopes for so-called "good production."
Second, both consider departmental expenses according to accounts. generally
speaking, all departments have their sub-accounts. They have been budgeted for a
certain amount to be spent for specific uses. If there are cost differences, they
should be investigated at the time they are happening.
Third similarity is that both assume costs are controllable along direct lines of
supervision and responsibility. Supervisors are responsible to manage not only for
production but also for cost of production. Supervisors should be aware of the budget
as well as the standards for their departments.
Finally, both require the issuance of periodic comparative cost reports. When the
costs are much higher or lower than the budgeted amount and are controlled by
standards, these differences should be broken down to show management specific
reasons for these differences at each interim reporting period.
Budgets are similar to standard costs in their methods of approach and
measurement. If standard costs are known, budgeted costs can be derived from
them by the application of ratios.
6. To set sales prices, executives need cost information furnished by the accounting
department. Since standard costs represent the cost that should be attained in a well
managed plant operated at normal capacity, they are ideally suited for furnishing
information which will enable the sales departments to price products.
Budgets are used for planning and coordinating future activities and for controlling
current activities. When budget figures are based on standard costs, the accuracy of
the resulting budget is strongly influenced by the reliability of the standard costs.
With standards available, production figures can be translated into the manufacturing
costs.
7. Materials - Materials price standards in most cases should be set by the purchasing
officer. Because prices are determined by the external influences, setting price
standards is mainly a task of accurate prediction.
Materials quantity standards should be set by engineers responsible for product
design. In setting these standards, companies may use engineering studies, sample
runs, historical studies, or a combination thereof depending on specific materials and
plant conditions.
Labor - Labor rates are often a result of union negotiations and should be obtained
from the personnel department. Labor time standards are set by properly trained
and experienced methods engineers using time and motion studies.
Factory Overhead - Variable factory overhead standards are based on the
company's flexible budget.
The fixed overhead standard is based on the company's budget for fixed factory
overhead, divided by an appropriate measure of activity.
8. Materials: Price and quantity variance
Labor: Rate and efficiency variance
Factory overhead: (1) Controllable and volume variance (2) Spending variance,
idle capacity variance, efficiency variance (3) Spending variance, variable overhead
efficiency variance, Fixed overhead efficiency variance, Idle capacity variance.
Mix and yield variances also can be calculated for the cost elements.
9. Although specifications are established primarily by the laboratory, mix changes are
made when production people feel the less costly grades of furnish or even pulp can
be used satisfactorily. Production people hope, of course, that the final result will still
be the same high quality product. The difference between the engineered laboratory
standard and the actual usage at different standard costs results in a mix variance.
10. The quantity variance is the result of comparing actual quantity at standard cost with
standard quantity at standard cost. The mix variance results when actual input is
used in ratios or quantities different from standard specifications at standard cost.
11. The yield variance is the difference between actual and standard (or expected) yield
multiplied by the standard value of product (or production). the formula is:
Yield variance = (Actual yield – standard yield) × weighted average of standard
materials cost
12. (a) 2; (b) 2; (c) 4; (d) 2; (e) 3; (f) 2; (g) 2 (h) 1; (i) 2; (j) 1

Mais conteúdo relacionado

Mais procurados

Ratio Analysis Ppt
Ratio Analysis PptRatio Analysis Ppt
Ratio Analysis Ppt
Mobasher Ali
 
Nike strategic management
Nike strategic managementNike strategic management
Nike strategic management
Hatice Akan
 
International business-environment-1220943187483599-8 (1)
International business-environment-1220943187483599-8 (1)International business-environment-1220943187483599-8 (1)
International business-environment-1220943187483599-8 (1)
tengsonjojie
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
Amar Keshari
 
Latest Trends in Operation Management
Latest Trends in Operation ManagementLatest Trends in Operation Management
Latest Trends in Operation Management
Prince Jha
 
Business environment ppt
Business environment pptBusiness environment ppt
Business environment ppt
Ronnie Sirsikar
 

Mais procurados (20)

Ratio Analysis Ppt
Ratio Analysis PptRatio Analysis Ppt
Ratio Analysis Ppt
 
Solutions manual for managerial accounting 16th edition by garrison ibsn 1259...
Solutions manual for managerial accounting 16th edition by garrison ibsn 1259...Solutions manual for managerial accounting 16th edition by garrison ibsn 1259...
Solutions manual for managerial accounting 16th edition by garrison ibsn 1259...
 
Nike strategic management
Nike strategic managementNike strategic management
Nike strategic management
 
International business-environment-1220943187483599-8 (1)
International business-environment-1220943187483599-8 (1)International business-environment-1220943187483599-8 (1)
International business-environment-1220943187483599-8 (1)
 
marginal and absorption costing
marginal and absorption costingmarginal and absorption costing
marginal and absorption costing
 
Activity based costing & activity based management
Activity  based costing & activity based managementActivity  based costing & activity based management
Activity based costing & activity based management
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
 
Activity-Based Costing System
Activity-Based Costing SystemActivity-Based Costing System
Activity-Based Costing System
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
 
Activity-based costing A Case study
Activity-based costing A Case studyActivity-based costing A Case study
Activity-based costing A Case study
 
Latest Trends in Operation Management
Latest Trends in Operation ManagementLatest Trends in Operation Management
Latest Trends in Operation Management
 
Solutions Manual for Managerial Accounting 5th Edition by Wild
Solutions Manual for Managerial Accounting 5th Edition by WildSolutions Manual for Managerial Accounting 5th Edition by Wild
Solutions Manual for Managerial Accounting 5th Edition by Wild
 
18.2 Product vs Period costs
18.2 Product vs Period costs18.2 Product vs Period costs
18.2 Product vs Period costs
 
Product cost and period cost
Product cost and period costProduct cost and period cost
Product cost and period cost
 
Target costing
Target costingTarget costing
Target costing
 
Cost volume-profit analysis
Cost volume-profit analysisCost volume-profit analysis
Cost volume-profit analysis
 
Ratio analysis -Inventory Turnover Ratio
Ratio analysis -Inventory Turnover Ratio Ratio analysis -Inventory Turnover Ratio
Ratio analysis -Inventory Turnover Ratio
 
Traditional & Abc
Traditional & AbcTraditional & Abc
Traditional & Abc
 
Business environment ppt
Business environment pptBusiness environment ppt
Business environment ppt
 
Cash management
Cash managementCash management
Cash management
 

Destaque

Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)
DSDEVDA
 
Management accounting overhead variance
Management accounting   overhead varianceManagement accounting   overhead variance
Management accounting overhead variance
Biswajit Bhattacharjee
 
Project Control System Manual
Project Control System ManualProject Control System Manual
Project Control System Manual
haroldtaylor1113
 
Amul Cost Sheet
Amul Cost SheetAmul Cost Sheet
Amul Cost Sheet
rheyaa
 
Management control system project final ppt
Management control system project  final pptManagement control system project  final ppt
Management control system project final ppt
Bikash Jaiswal
 
Need for variance analysis
Need for variance analysisNeed for variance analysis
Need for variance analysis
Vikash Rathour
 

Destaque (14)

Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)
 
Ac topics new
Ac topics newAc topics new
Ac topics new
 
Standard costing and its types
Standard costing and its typesStandard costing and its types
Standard costing and its types
 
Management accounting overhead variance
Management accounting   overhead varianceManagement accounting   overhead variance
Management accounting overhead variance
 
Project Control System Manual
Project Control System ManualProject Control System Manual
Project Control System Manual
 
Bangladesh Income Tax hand note_Ranjan sir lecture details (updated in light...
Bangladesh  Income Tax hand note_Ranjan sir lecture details (updated in light...Bangladesh  Income Tax hand note_Ranjan sir lecture details (updated in light...
Bangladesh Income Tax hand note_Ranjan sir lecture details (updated in light...
 
Cost & Managerial Accounting Budgeting Techniques
Cost & Managerial Accounting Budgeting TechniquesCost & Managerial Accounting Budgeting Techniques
Cost & Managerial Accounting Budgeting Techniques
 
Amul Cost Sheet
Amul Cost SheetAmul Cost Sheet
Amul Cost Sheet
 
Hul final ppt
Hul final pptHul final ppt
Hul final ppt
 
Management control system project final ppt
Management control system project  final pptManagement control system project  final ppt
Management control system project final ppt
 
Budgeting & Variance Analysis
Budgeting & Variance AnalysisBudgeting & Variance Analysis
Budgeting & Variance Analysis
 
Need for variance analysis
Need for variance analysisNeed for variance analysis
Need for variance analysis
 
MBA case study presentation template
MBA case study presentation templateMBA case study presentation template
MBA case study presentation template
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysis
 

Semelhante a Standard costing and variance analysis case study

Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)
Mvs Krishna
 
ACC 207 Final Project Memorandum to ManagementMaria L. Schir.docx
ACC 207 Final Project Memorandum to ManagementMaria L. Schir.docxACC 207 Final Project Memorandum to ManagementMaria L. Schir.docx
ACC 207 Final Project Memorandum to ManagementMaria L. Schir.docx
nettletondevon
 
BBA 2301, Principles of Accounting II 1 Course Lea
  BBA 2301, Principles of Accounting II 1 Course Lea  BBA 2301, Principles of Accounting II 1 Course Lea
BBA 2301, Principles of Accounting II 1 Course Lea
CicelyBourqueju
 
Required ResourceTextSchneider, A. (2017). Managerial Accounti.docx
Required ResourceTextSchneider, A. (2017). Managerial Accounti.docxRequired ResourceTextSchneider, A. (2017). Managerial Accounti.docx
Required ResourceTextSchneider, A. (2017). Managerial Accounti.docx
audeleypearl
 
Mca i fma u 4.3 standard costing
Mca i fma u 4.3 standard costingMca i fma u 4.3 standard costing
Mca i fma u 4.3 standard costing
Rai University
 
Bca i fma u 4.3 standard costing
Bca i fma u 4.3 standard costingBca i fma u 4.3 standard costing
Bca i fma u 4.3 standard costing
Rai University
 
LearningObjectivesAfter studying Chapter 8, you will be a.docx
LearningObjectivesAfter studying Chapter 8, you will be a.docxLearningObjectivesAfter studying Chapter 8, you will be a.docx
LearningObjectivesAfter studying Chapter 8, you will be a.docx
croysierkathey
 
Project Summer Internship
Project Summer InternshipProject Summer Internship
Project Summer Internship
Shivam Mishra
 
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
tamicawaysmith
 

Semelhante a Standard costing and variance analysis case study (20)

Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)
 
ACC 207 Final Project Memorandum to ManagementMaria L. Schir.docx
ACC 207 Final Project Memorandum to ManagementMaria L. Schir.docxACC 207 Final Project Memorandum to ManagementMaria L. Schir.docx
ACC 207 Final Project Memorandum to ManagementMaria L. Schir.docx
 
Understanding SAP production order variance
Understanding SAP production order varianceUnderstanding SAP production order variance
Understanding SAP production order variance
 
Standard Costing - Uses & Limitations
Standard Costing - Uses & LimitationsStandard Costing - Uses & Limitations
Standard Costing - Uses & Limitations
 
Standard & labour costing
Standard & labour costingStandard & labour costing
Standard & labour costing
 
BBA 2301, Principles of Accounting II 1 Course Lea
  BBA 2301, Principles of Accounting II 1 Course Lea  BBA 2301, Principles of Accounting II 1 Course Lea
BBA 2301, Principles of Accounting II 1 Course Lea
 
Chapter 9 Standard Costing A Managerial Control Tool
Chapter 9 Standard Costing A Managerial Control ToolChapter 9 Standard Costing A Managerial Control Tool
Chapter 9 Standard Costing A Managerial Control Tool
 
Ch18 Managerial accounting aiou mba mcom 8508
Ch18 Managerial accounting aiou mba mcom 8508Ch18 Managerial accounting aiou mba mcom 8508
Ch18 Managerial accounting aiou mba mcom 8508
 
Required ResourceTextSchneider, A. (2017). Managerial Accounti.docx
Required ResourceTextSchneider, A. (2017). Managerial Accounti.docxRequired ResourceTextSchneider, A. (2017). Managerial Accounti.docx
Required ResourceTextSchneider, A. (2017). Managerial Accounti.docx
 
Mca i fma u 4.3 standard costing
Mca i fma u 4.3 standard costingMca i fma u 4.3 standard costing
Mca i fma u 4.3 standard costing
 
Bca i fma u 4.3 standard costing
Bca i fma u 4.3 standard costingBca i fma u 4.3 standard costing
Bca i fma u 4.3 standard costing
 
Presentation.pdf
Presentation.pdfPresentation.pdf
Presentation.pdf
 
LearningObjectivesAfter studying Chapter 8, you will be a.docx
LearningObjectivesAfter studying Chapter 8, you will be a.docxLearningObjectivesAfter studying Chapter 8, you will be a.docx
LearningObjectivesAfter studying Chapter 8, you will be a.docx
 
Chapter4.ppt
Chapter4.pptChapter4.ppt
Chapter4.ppt
 
Dispose off those overheads
Dispose off those overheadsDispose off those overheads
Dispose off those overheads
 
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
 
Project Summer Internship
Project Summer InternshipProject Summer Internship
Project Summer Internship
 
Standard Costing:The complete concept.
Standard Costing:The complete concept.Standard Costing:The complete concept.
Standard Costing:The complete concept.
 
Standard costing technique 1
Standard costing technique 1Standard costing technique 1
Standard costing technique 1
 
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
 

Último

Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Último (20)

Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

Standard costing and variance analysis case study

  • 1. Standard Costing and Variance Analysis Case Study: 1. Case A: Effect of assumed standard levels 2. Case B: Factory overhead variance analysis Case A: Effect of Assumed Standard Levels: Harden Company has experienced increased production costs. The primary area of concern identified by management is direct labor. The company is considering adopting a standard cost system to help control labor and other costs. Useful historical data are not available because detailed production records have not been maintained. To establish labor standards, Harden Company has retained an engineering consulting firm. After a complete study of the work process, the consultants recommended a labor standard of one unit of production every 30 minutes, or 16 units per day for each worker. The consultants further advised that Harden's wage rates were below the prevailing rate of $ per hour. Harden's production vice-president thought that this labor standard was too tight, and from experience with the labor force, believed that a labor standard of 40 minutes per unit or 12 units per day for each worker would be more reasonable. The president of Harden Company believed the standard should be set at a high level to motivate the workers and to provide adequate information for control and reasonable cost comparison. After much discussion, management decided to use a dual standard. The labor standard of one unit every 30 minutes, recommended by the consulting firm, would be employed in the plant as a motivation device, while a cost standard of 40 minutes per unit would be used in reporting. Management also concluded that the workers would not be informed of the cost standard used for reporting purposes. The production vice-president conducted several sessions prior to implementation in the plant, informing the workers of the new standard cost system and answering questions. The new standards were not related to incentive pay but were introduced when wages were increased to $7 per hour. The standard cost system was implemented on January 1, 19--. At the end of six months of operation, these statistics on labor performance were presented to executive management: January February March April May June Production (units) 5,100 5,000 4,700 4,500 4,300 4,400 Direct labor hours 3,000 2,900 2,900 3,000 3,000 3,100 Quantity Variances: Variance based on labor standard (one unit each 30 minutes) $3150 U* $2,800 U $3,850 U $5,250U $5,950 U $6,300 U Variance based on cost standard (one unit each 40 minutes) $2,800 F $3,033 F $1,633 F -0- $933U $1,167 U *U = Unfavorable; F = Favorable
  • 2. Materials quality, labor mix, and plant facilities and conditions have not changed to any great extent during the six month period. Required: 1. A discussion of the impact of different types of standards on motivations, and specifically the likely effect on motivation of adopting the labor standard recommended for Harden Company by the engineering firm. 2. An evaluation of Harden Company's decision to employ dual standards in its standard cost system. Answer: 1. Standards are often classified into three types - theoretical (tight), normal (reasonable), or expected actual (loose). Standards which are too loose or too tight will generally have a negative impact on workers motivation. If too loose, workers will tend to set their goals at this low rate, thus reducing productivity below what is obtainable; if too tight, workers will realize that it is impossible to attain the standard, become frustrated, and will not attempt to meet the standard. An attainable or reasonable standard which can be achieved under normal working conditions is likely to contribute to the worker's motivation to achieve the designated level of activity. If executive management imposes standards, workers and plant management will tend to react negatively because they feel threatened. If workers and plant management participate in setting the standard, they can more readily identify with it and it could become one of their personal goals. In Harden's case, it appears that the standard was imposed on the workers by management. In addition, management used an ideal standard to measure performance. Both of these actions appear to have had a negative impact on output over the first six months. 2. Harden made a poor decision to use dual standards. If the workers learn of the dual standards, the company's entire measurement system may may become suspect and credibility will be lost. Company morale could suffer because the workers would not know for sure how the company evaluates their performance. as a result, disregard for the present and any future cost control system may develop.
  • 3. Case B: Factory Overhead Variance Analysis: Strayer Company uses a standard cost system and budgets the following sales and costs for 19-- Unit sales 20,000 Sales $2,00,000 Total production cost at standard 130,000 Gross profit 70,000 Beginning inventories None Ending inventories None The 19-- budgeted sales level was the normal capacity level used in calculating the factory overhead predetermined standard cost rate per direct labor hour. At the end of 19--, Strayer Company reported production and sales of 19,200 units. Total factory overhead incurred was exactly equal to budgeted factory overhead for the year and there was under-applied total factory overhead of $2,000 at December 31. Factory overhead is applied to the work in process inventory on the basis of standard direct labor hours allowed for units produced. Although there was a favorable labor efficiency variance, there was neither a labor rate variance nor materials variances for the year. Require: An explanation of the under-applied factory overhead of $2,000, being as specific as the data permit and indicating the overhead variances affected. Strayer uses a three variance method to analyze the total factory overhead. Answer: Under-applied factory overhead will arise when actual factory overhead incurred is larger than the standard amount of factory overhead applied to work in process. The standard amount of factory overhead applied to work in process is based on actual rather than on budgeted units of output. Based on the information given, the sum of the factory overhead spending, efficiency, and idle capacity variances resulted in an unfavorable total factory overhead variance of $2,000. The factory overhead efficiency variance must be favorable because it is computed on the same basis as the direct labor efficiency variance which was given as favorable. Strayer would have an unfavorable idle capacity variance because the actual activity level for the year was less than the capacity level used in calculating the standard cost rate for factory overhead. As to the factory overhead spending variance, the balance would be unfavorable because actual costs would have had to exceed the budgeted cost of the actual units produced since
  • 4. the budget allowance for production of 19,200 units must be less than for 20,000 units and the actual costs were exactly equal to the budget allowance for 20,000 units. The magnitude of the spending variance is indeterminate from the information given. Standard Costing System Discussion Questions and Answers: Questions: 1. (a) Define standard costs. (b) Name some advantages of standard cost system. See answer 2. A team of management consultants and company executives concluded that a standard cost installation was desirable vehicle for accomplishing the objectives of a progressive management. State some uses of standard costs that can be associated with the above decision. See answer 3. Does a standard cost system increases or decreases the amount of accounting and clerical effort and expense required to prepare cost reports and financial statements? See answer 4. Is a standard cost system equally applicable to job order costing and process costing system? See answer 5. A conference speaker discussing budgets and standard costs made the following statement: "Budgets and standards are not the same thing. They have different purposes and are set up and used in different ways ; yet a specific relationship exists between them." (a) Identify distinctions or differences between budgets and standards. (b) Identify similarities between budgets and standards. See answer 6. The use of standard costs in pricing and budgeting is quite valuable since decisions in the fields of pricing and budgetary planning are made before the costs under consideration are incurred. Discuss. See answer 7. Explain how materials, labor and factory overhead standards are set, including the types of people involved and the method used. See answer
  • 5. 8. What type of variances are computed for materials, labor, and factory overhead? See answer 9. In a paper mill, materials specification standards are set up for various grades of pulp and secondary furnish (waste paper) for each grade and kind of paper produced. Yet at regular intervals the cost accountant is able to determine a materials mix variance. Why does a mix variance occurs? See answer 10. How does the calculation of a mix variance differ from that of a quantity variance? See answer 11. A cost standard in a process industry is often based on an assumed yield rate. Any difference in actual yield from standard yield will produce a yield variance. Express this variance in formula form. See answer 12. Select the answer which best completes the statement: (a) A purpose of standard costing is to: (1) determine the break even production level; (2) control costs; (3) eliminate the need for subjective decisions by management ; (4) allocate cost more accurately. (b) A company employing very tight (theoretical) standards in a standard costing system should expect that : (1) a large incentive bonus will be paid; (2) most variances will be unfavorable; (3) employees will be strongly motivated to attain the standards; (4) costs will be controlled better than if lower standards were used. (c) Of the different types of standards listed below, the one which best describes labor costs that should be incurred under forthcoming efficient operating conditions is : (1) ideal; (2) basic; (3) maximum efficiency; (4) normal. (d) In standard costing, standard hours allowed is a means of measuring: (1) standard output at standard hours; (2) actual output at standard hours; (3) standard output at actual hours; (4) actual output at actual hours. (e) In preparing cost report at standard for process costing: (1) equivalent units are not used; (2) equivalent units are computed using an approach that ignores inventories; (3) the actual equivalent units are multiplied by the standard cost per unit; (4) the standard equivalent units are multiplied by the actual cost per unit. (f) In a standard cost system, the materials purchase price variance is obtained by multiplying the: (1) actual price by the difference between actual quantity purchased and standard quantity allowed; (2) actual quantity purchased by the difference between actual price and standard price; (3) standard price by the difference between standard quantity purchased and standard quantity allowed; (4) standard quantity purchased by the difference between actual price and standard price. (g) A favorable labor efficiency variance indicates: (1) the average wage rate paid was less than the standard rate; (2) the standard labor hours allowed were greater than the actual labor hours used; (3) the actual total labor cost incurred was less than the standard labor cost allowed for the units produced; (4) the number of units produced was less than the number of units budgeted for the period.
  • 6. (h) Given below are notations and their respective meanings: AH = Actual hours SHA = Standard hours allowed for actual production AR = Actual rate SR = Standard rate The formula that represents the labor efficiency variance is: (1) SR × (AH – SHA); (2) AR × (AH – SHA); (3) AH × (AR – SR); (4) SHA × (AR – SR). (i) The standard cost variance representing the difference between actual factory overhead incurred and budgeted factory overhead based on actual hours worked is the (1) volume variance; (2) spending variance; (3) efficiency variance; (4) quantity variance. (j) The fixed portion of the standard factory overhead application rate is a function of a predetermined "normal" activity level. If standard hours allowed for good output equal this normal activity level for a given period, the volume variance will be: (1) zero; (2) favorable; (3) unfavorable; (4) either favorable or unfavorable, depending on the budgeted overhead. See answer Answers: 1. (a) Standard costs are the predetermined costs of manufacturing products during a specific period under current or anticipated operating conditions. Standards aid in planning and controlling operations. (b) The advantages of a standard cost system include the following: 1. The process in itself often discloses inefficiencies, because the setting of standards requires a thorough analysis of all cost functions. 2. The process of setting standards forces management to plan efficient and economical operations. 3. Standard costs establish clearly defined lines of cost responsibility and authority. 4. Standard costs are likely to be an important aid to management in obtaining acceptable job performance by providing a clear idea as to what constitutes acceptable performance. 5. Variances between actual performance and standard costs facilitate control through the application of the principle of exception. 6. Faster reporting of operating data is possible; the shortened time between action and the availability of control information helps management to prevent the development of unfavorable cost trends. 2. A few uses of standard costs are: (a) Establishing budgets. (b) Controlling costs and motivating and measuring efficiencies. (c) Promoting cost reduction. (d) Simplifying cost procedures and expediting cost reports. (e) Assigning costs to inventories. (f) Setting sales prices. 3. In some way a standard cost system reduces clerical work. Variance reports add new tasks, which may make expenses about equal. The fact that more information is available about the operations of the business should be of greater value than the expenses of operating the accounting system.
  • 7. 4. Yes, standard costs can be used either in job order costing where the cost of specific jobs put through a factory is ascertained, or process costing where the cost of production in one or more manufacturing departments for a given period of time is determined. a standard cost system applied to either job order or process costing will bring the added advantage of cost analysis hitherto unavailable. 5. (a) Budgets and standards are not the same thing; yet a specific relationship exists between them. The first difference between budgets and standards is one of purpose. Budgets are statements of expected cost. At the beginning of a given period, they are used to forecast requirements of finance, work force, and other variables related to production and sales. Later in a given period, they are used as comparison to be sure that actual costs are not exceeding expectations. Standard costs, on the other hand, do not necessarily show what costs may be expected to be, but rather, what they might be if certain highly desirable performance are attained. For this reason they cannot be used alone for forecasting. The second difference between budgets and standards is one of emphasis. A budget emphasizes cost levels that should not be exceeded. If they are exceeded, then the whole foundation upon which profits are predicted is jeopardized. But a standard emphasizes the levels to which costs should be reduced. I these levels are reached, profits are increased. Costs are not to exceed budget; they are to approach standards. A third difference is on of completeness. Budgets are customarily set for all departments in the company, from sales to manufacturing. Standards, however, are often set only for the manufacturing divisions. Budgets customarily include both income and expense, whereas standards are more frequently set for expenses or costs only. A fourth difference is one of analysis and breakdown. When cost differs from budget, a lower cost indicates good performance; a higher cost tells of a perilous situation. But when actual cost differs in any marked degree from standards, the nature and cause of the variance should be investigated so that needed corrective steps may be taken in time. These difference may be summarized by saying that a budget is a marker for keeping out of trouble, whereas a standard is a compass that points the way to improvements. (b) Although standards and budgets have certain differences, they possess similarities which are of such a nature that the existence of standard costs greatly facilitates budget preparation. The first similarity is that both budgets and standards attempt to predetermine expenses. The budget and the standards have been set by records of current operational methods or procedures and have not just been set by hopes for so-called "good production." Second, both consider departmental expenses according to accounts. generally speaking, all departments have their sub-accounts. They have been budgeted for a certain amount to be spent for specific uses. If there are cost differences, they should be investigated at the time they are happening. Third similarity is that both assume costs are controllable along direct lines of supervision and responsibility. Supervisors are responsible to manage not only for production but also for cost of production. Supervisors should be aware of the budget as well as the standards for their departments. Finally, both require the issuance of periodic comparative cost reports. When the costs are much higher or lower than the budgeted amount and are controlled by standards, these differences should be broken down to show management specific reasons for these differences at each interim reporting period. Budgets are similar to standard costs in their methods of approach and
  • 8. measurement. If standard costs are known, budgeted costs can be derived from them by the application of ratios. 6. To set sales prices, executives need cost information furnished by the accounting department. Since standard costs represent the cost that should be attained in a well managed plant operated at normal capacity, they are ideally suited for furnishing information which will enable the sales departments to price products. Budgets are used for planning and coordinating future activities and for controlling current activities. When budget figures are based on standard costs, the accuracy of the resulting budget is strongly influenced by the reliability of the standard costs. With standards available, production figures can be translated into the manufacturing costs. 7. Materials - Materials price standards in most cases should be set by the purchasing officer. Because prices are determined by the external influences, setting price standards is mainly a task of accurate prediction. Materials quantity standards should be set by engineers responsible for product design. In setting these standards, companies may use engineering studies, sample runs, historical studies, or a combination thereof depending on specific materials and plant conditions. Labor - Labor rates are often a result of union negotiations and should be obtained from the personnel department. Labor time standards are set by properly trained and experienced methods engineers using time and motion studies. Factory Overhead - Variable factory overhead standards are based on the company's flexible budget. The fixed overhead standard is based on the company's budget for fixed factory overhead, divided by an appropriate measure of activity. 8. Materials: Price and quantity variance Labor: Rate and efficiency variance Factory overhead: (1) Controllable and volume variance (2) Spending variance, idle capacity variance, efficiency variance (3) Spending variance, variable overhead efficiency variance, Fixed overhead efficiency variance, Idle capacity variance. Mix and yield variances also can be calculated for the cost elements. 9. Although specifications are established primarily by the laboratory, mix changes are made when production people feel the less costly grades of furnish or even pulp can be used satisfactorily. Production people hope, of course, that the final result will still be the same high quality product. The difference between the engineered laboratory standard and the actual usage at different standard costs results in a mix variance. 10. The quantity variance is the result of comparing actual quantity at standard cost with standard quantity at standard cost. The mix variance results when actual input is used in ratios or quantities different from standard specifications at standard cost. 11. The yield variance is the difference between actual and standard (or expected) yield multiplied by the standard value of product (or production). the formula is: Yield variance = (Actual yield – standard yield) × weighted average of standard materials cost 12. (a) 2; (b) 2; (c) 4; (d) 2; (e) 3; (f) 2; (g) 2 (h) 1; (i) 2; (j) 1