FIRE SAFETY Part B Building Regulations David Cant  Health and Safety Consultant www.veritas-consulting.co.uk
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Coming into force on the 6 th  April 2007 New Regulation 16B: Fire Safety Information Revisions to Part B: Fire Safety Revised wording to B3 The Building and Approved Inspectors (Amendment) (No. 2) Regulations 2006
Changes to Part B (Fire Safety) of the Building Regulations and Approved Document B Volume 1  - Dwellinghouses Volume 2  – Buildings Other Than Dwellinghouses Flats (including multi-storey flats & mixed-use buildings) can be found in Volume 2
Procedural Changes Amended requirement B3(3) – part of internal fire spread (structure)
Procedural Changes
[object Object],[object Object],[object Object],Procedural Changes
"  Fire safety information   16B.   —(1) This regulation applies where building work— (a) consists of or includes the erection or extension of a relevant building; or (b) is carried out in connection with a relevant change of use of a building, and Part B of Schedule 1 imposes a requirement in relation to the work. (2) The person carrying out the work shall give fire safety information to the responsible person not later than the date of completion of the work, or the date of occupation of the building or extension, whichever is the earlier. (3) In this regulation—  (a) "fire safety information" means information relating to the design and construction of the building or extension, and the services, fittings and equipment provided in or in connection with the building or extension which will assist the responsible person to operate and maintain the building or extension with reasonable safety; (b) a " relevant building " is a building to which the Regulatory Reform (Fire Safety) Order 2005 applies[ 4 ], or will apply after the completion of building work; (c) a "relevant change of use" is a material change of use where, after the change of use takes place, the Regulatory Reform (Fire Safety) Order 2005 will apply, or continue to apply, to the building; and (d) " responsible person " has the meaning given by article 3 of the Regulatory Reform (Fire Safety) Order 2005."
Procedural Changes
Meaning of " responsible person " 3.  In this Order "responsible person" means— (a) in relation to a workplace, the employer, if the workplace is to any extent under his control; (b) in relation to any premises not falling within paragraph (a)—   (i) the person who has control of the premises (as occupier or otherwise) in connection with the carrying on by him of a trade, business or other undertaking (for profit or not); or (ii) the owner, where the person in control of the premises does not have control in connection with the carrying on by that person of a trade, business or other undertaking. STATUTORY INSTRUMENTS   2005 No. 1541   REGULATORY REFORM, ENGLAND AND WALES The Regulatory Reform (Fire Safety) Order 2005   Regulatory Reform (Fire Safety) Order 2005
Application to premises       6.  — (1)   This Order does not apply in relation to — (a) domestic premises, except to the extent mentioned in article 31(10); (b) an offshore installation within the meaning of regulation 3 of the Offshore Installation and Pipeline Works (Management and Administration) Regulations 1995[ 13 ]; (c) a ship, in respect of the normal ship-board activities of a ship's crew which are carried out solely by the crew under the direction of the master; (d) fields, woods or other land forming part of an agricultural or forestry undertaking but which is not inside a building and is situated away from the undertaking's main buildings; (e) an aircraft, locomotive or rolling stock, trailer or semi-trailer used as a means of transport or a vehicle for which a licence is in force under the Vehicle Excise and Registration Act 1994[ 14 ] or a vehicle exempted from duty under that Act; (f) a mine within the meaning of section 180 of the Mines and Quarries Act 1954[ 15 ], other than any building on the surface at a mine; (g) a borehole site to which the Borehole Sites and Operations Regulations 1995[ 16 ] apply. (2) Subject to the preceding paragraph of this article, this Order applies in relation to any premises Regulatory Reform (Fire Safety) Order 2005
PART 2 FIRE SAFETY DUTIES Duty to take general fire precautions    8. —(1) The responsible person must— (a) take such general fire precautions as will ensure, so far as is reasonably practicable, the safety of any of his employees; and (b) in relation to relevant persons who are not his employees, take such general fire precautions as may reasonably be required in the circumstances of the case to ensure that the premises are safe. Risk assessment      9. —(1) The responsible person must make a suitable and sufficient assessment of the risks to which relevant persons are exposed for the purpose of identifying the general fire precautions he needs to take to comply with the requirements and prohibitions imposed on him by or under this Order. Regulatory Reform (Fire Safety) Order 2005
Duty to consult enforcing authority before passing plans       45.  —(1) Where it is proposed to erect a building, or to make any extension of or structural alteration to a building and, in connection with the proposals, plans are, in accordance with building regulations, deposited with a local authority, the local authority must, subject to paragraph (3), consult the enforcing authority before passing those plans.     (2) Where it is proposed to change the use to which a building or part of a building is put and, in connection with that proposal, plans are, in accordance with building regulations, deposited with a local authority, the authority must, subject to paragraph (3), consult with the enforcing authority before passing the plans.     (3) The duty to consult imposed by paragraphs (1) and (2)— (a) only applies in relation to buildings or parts of buildings to which this Order applies, or would apply following the erection, extension, structural alteration or change of use; (b) does not apply where the local authority is also the enforcing authority. Regulatory Reform (Fire Safety) Order 2005 Duty to Consult
Procedural Changes
Volume One Dwellinghouses
New Diagram 1 illustrates basic principles
Direct reference to BS 5839-6: 2004 Grade D = mains powered with standby supply LD3 = Detectors in circulation spaces Extensions Provide smoke alarms where habitable rooms are provided above ground level or  if at ground level where there is no final exit from the new room Smoke & Heat Alarms
New guidance on the use of domestic sprinklers as a  compensatory feature. Specific alternative approaches in paragraphs: B1 – 2.7 houses with more than one floor over 4.5m above ground level B1 – 2.20b Loft conversions B4 – 9.15 Space separation Domestic Sprinklers
Not required in houses with a floor more than 4.5m above ground level. Locks (with or without removable keys) and stays may be fitted to egress windows, subject to the stay being fitted with a release catch, which may be child reistant Egress Windows
Escape provision to be no worse than the window it replaces: except- If original window is larger than necessary, opening can be reduced to minimum dimensions specified. Replacement Windows
Fire Doors Self Closing Devices Self-closing devices not required on fire doors within dwellings. Except Doors to integral garages Flat entrance doors (vol. 2) Fire Doors  ARE  still necessary
Alternative approach  DELETED Provide protected stairs & smoke alarms Some existing doors could be upgraded Alternative approach for open plan ground floor – Cut off door, escape window and sprinkler protection Loft Conversions
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Galleries
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Diagram 11  Junction of Compartment Wall with Roof
“ New” European roof test Constructions are classified within the BS EN 13501-5:2005 as BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) or FROOF(t4) BROOF(t4) being the highest performance and FROOF(t4) being the lowest  (t4) indicates test 4 from the soon to be BS EN 1187 Roof Coverings (Vol 1& 2)
Volume Two Buildings Other Than Dwellinghouses
New guidance on the use of domestic sprinklers as a  compensatory feature. Specific alternative approaches in paragraphs: B1 – 2.7 houses with more than one floor over 4.5m above ground level B4 – 9.15 Space separation Flats Domestic Sprinkler Protection for Flats Sprinklers to be provided within individual flats in blocks over 30m in height.  Limitation of BS 9251 clarified height restriction to under 20m in height can be ignored.
Smoke Control of Common Escape Route in Flats ,[object Object],[object Object],[object Object],[object Object],[object Object]
Flats
Guidance from BS 5588 incorporated into main text Moving back from having to purchase additional documents! Small Premises
Open Spatial Planning
Self Storage Buildings
Care Homes
Inclusive Design
Refuges
Compartmentation
Phased Evacuation
Compartment Walls/ Floors Junction
Guidance reworked for clarity Barriers in under floor voids Aluminium and uPVC windows not suitable for closing cavities Cavity Barriers
Notional Boundaries
Car Parks
External Walls
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Fire Service Access
Fire Fighting Shafts/ Fire Mains
Private Fire Hydrants
Door Measurement
Smoke Ventilators
Transitional Provisions
Fire Safety Risk Assessment Documents
www.communities.gov.uk
Changes to Oil Fired Boiler Requirements   From the 1 st  April 2007 the energy performance standard of new and replacement Oil fired central heating boilers. From that date, in normal circumstances when you plan to install a new boiler or replace an existing one, you will need a condensing boiler to meet the higher standards for energy efficiency. This follows on from Gas fired central heating boilers, which have had to comply since 1 st  April 2005.   For boilers installed on or after the 1 st  April 2007: The boiler should be a condensing type; and The boiler efficiency should not be less than 86% (as expressed by its SEDBUK value) Further information is available in the 2 nd  tier document  ‘ Domestic Heating Compliance Guide ’  which can be viewed at www.planningportal.gov.uk
Any Questions Thank You for Attending
 

Mais conteúdo relacionado

Mais procurados

PRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGNPRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGNRakshit vadi
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...Colt UK
 
Smoke extraction in buildings
Smoke extraction in buildingsSmoke extraction in buildings
Smoke extraction in buildingsvysakhmanohar
 
Galvanize_It_10_20_08.ppt
Galvanize_It_10_20_08.pptGalvanize_It_10_20_08.ppt
Galvanize_It_10_20_08.pptdivya
 
The Building Regulations and their approved documents
The Building Regulations and their approved documentsThe Building Regulations and their approved documents
The Building Regulations and their approved documentsJulian Swindell
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
Smoke Control in Buildings
Smoke Control in BuildingsSmoke Control in Buildings
Smoke Control in BuildingsIllinois ASHRAE
 
Considerations of good design
Considerations of good designConsiderations of good design
Considerations of good designMITS Gwalior
 
Difference Between Air-Cooled & Water-Cooled Chillers
Difference Between Air-Cooled & Water-Cooled ChillersDifference Between Air-Cooled & Water-Cooled Chillers
Difference Between Air-Cooled & Water-Cooled ChillersStayingChill
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between SystemsVictor Ashkenazy
 
Stairwell pressurization systems
Stairwell pressurization systemsStairwell pressurization systems
Stairwell pressurization systemsAyu Sazrina Sabari
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Nekumi Kida
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systemsjosebolis
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginersguestf11b52
 
11. Smoke Proof Enclosures
11. Smoke Proof Enclosures11. Smoke Proof Enclosures
11. Smoke Proof EnclosuresSadiq Alam
 
Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systemsmichaeljmack
 
Services in high rise building unit 1
Services in high rise building unit 1Services in high rise building unit 1
Services in high rise building unit 1Vankadari Kedar
 
Chilled water piping basics
Chilled water piping basicsChilled water piping basics
Chilled water piping basicsAp Naseem
 

Mais procurados (20)

PRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGNPRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGN
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...
 
Smoke extraction in buildings
Smoke extraction in buildingsSmoke extraction in buildings
Smoke extraction in buildings
 
Project on HVACR
Project on HVACRProject on HVACR
Project on HVACR
 
Galvanize_It_10_20_08.ppt
Galvanize_It_10_20_08.pptGalvanize_It_10_20_08.ppt
Galvanize_It_10_20_08.ppt
 
The Building Regulations and their approved documents
The Building Regulations and their approved documentsThe Building Regulations and their approved documents
The Building Regulations and their approved documents
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
Smoke Control in Buildings
Smoke Control in BuildingsSmoke Control in Buildings
Smoke Control in Buildings
 
Considerations of good design
Considerations of good designConsiderations of good design
Considerations of good design
 
Difference Between Air-Cooled & Water-Cooled Chillers
Difference Between Air-Cooled & Water-Cooled ChillersDifference Between Air-Cooled & Water-Cooled Chillers
Difference Between Air-Cooled & Water-Cooled Chillers
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
 
Stairwell pressurization systems
Stairwell pressurization systemsStairwell pressurization systems
Stairwell pressurization systems
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systems
 
Building Code - Egress
Building Code - EgressBuilding Code - Egress
Building Code - Egress
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 
11. Smoke Proof Enclosures
11. Smoke Proof Enclosures11. Smoke Proof Enclosures
11. Smoke Proof Enclosures
 
Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systems
 
Services in high rise building unit 1
Services in high rise building unit 1Services in high rise building unit 1
Services in high rise building unit 1
 
Chilled water piping basics
Chilled water piping basicsChilled water piping basics
Chilled water piping basics
 

Destaque

Fire safety in building
Fire safety in buildingFire safety in building
Fire safety in buildingArvind Kumar
 
Fire Safety Management
Fire Safety ManagementFire Safety Management
Fire Safety ManagementNc Das
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
FIRE AND SAFETY
FIRE AND SAFETYFIRE AND SAFETY
FIRE AND SAFETYraees4all
 
Fire Evacuation Plan
Fire Evacuation PlanFire Evacuation Plan
Fire Evacuation Planemmmily
 
Building Services Project 1 Board
Building Services Project 1 BoardBuilding Services Project 1 Board
Building Services Project 1 BoardKohSungJie
 
Approved doc b
Approved doc bApproved doc b
Approved doc bmick2560
 
Ireland, Part 1
Ireland, Part 1Ireland, Part 1
Ireland, Part 1iamjak123
 
Fire safety pp
Fire safety ppFire safety pp
Fire safety ppjbuttery
 
Chp2 Forces Building the Land
Chp2 Forces Building the LandChp2 Forces Building the Land
Chp2 Forces Building the Landsandraabate
 
BYL Rainham CPD - Structural Design for Fire Safety - Nov 15
BYL Rainham CPD - Structural Design for Fire Safety - Nov 15BYL Rainham CPD - Structural Design for Fire Safety - Nov 15
BYL Rainham CPD - Structural Design for Fire Safety - Nov 15Danny Hopkin
 
School Fire Safety Inspections
School Fire Safety InspectionsSchool Fire Safety Inspections
School Fire Safety InspectionsMeg Thompson
 
The principles of design 1
The principles of design 1The principles of design 1
The principles of design 1Carla Hinds
 
Ergonomical illumination in real world
Ergonomical illumination in real worldErgonomical illumination in real world
Ergonomical illumination in real worldGouthamarajan NT
 

Destaque (20)

Fire safety in building
Fire safety in buildingFire safety in building
Fire safety in building
 
Fire Safety Management
Fire Safety ManagementFire Safety Management
Fire Safety Management
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
1 Fire safety design principles
1  Fire safety design principles1  Fire safety design principles
1 Fire safety design principles
 
Building Regulations
Building RegulationsBuilding Regulations
Building Regulations
 
FIRE AND SAFETY
FIRE AND SAFETYFIRE AND SAFETY
FIRE AND SAFETY
 
Fire Evacuation Plan
Fire Evacuation PlanFire Evacuation Plan
Fire Evacuation Plan
 
Fire Safety Awareness
Fire Safety AwarenessFire Safety Awareness
Fire Safety Awareness
 
Building Services Project 1 Board
Building Services Project 1 BoardBuilding Services Project 1 Board
Building Services Project 1 Board
 
Approved doc b
Approved doc bApproved doc b
Approved doc b
 
Strip Mall Fire Tactics & Strategies
Strip Mall Fire Tactics & StrategiesStrip Mall Fire Tactics & Strategies
Strip Mall Fire Tactics & Strategies
 
Ireland, Part 1
Ireland, Part 1Ireland, Part 1
Ireland, Part 1
 
Fire safety pp
Fire safety ppFire safety pp
Fire safety pp
 
Chp2 Forces Building the Land
Chp2 Forces Building the LandChp2 Forces Building the Land
Chp2 Forces Building the Land
 
BYL Rainham CPD - Structural Design for Fire Safety - Nov 15
BYL Rainham CPD - Structural Design for Fire Safety - Nov 15BYL Rainham CPD - Structural Design for Fire Safety - Nov 15
BYL Rainham CPD - Structural Design for Fire Safety - Nov 15
 
INDUSTRIAL FIRE
INDUSTRIAL FIRE INDUSTRIAL FIRE
INDUSTRIAL FIRE
 
School Fire Safety Inspections
School Fire Safety InspectionsSchool Fire Safety Inspections
School Fire Safety Inspections
 
The principles of design 1
The principles of design 1The principles of design 1
The principles of design 1
 
Indian standard 1643
Indian standard 1643Indian standard 1643
Indian standard 1643
 
Ergonomical illumination in real world
Ergonomical illumination in real worldErgonomical illumination in real world
Ergonomical illumination in real world
 

Semelhante a Fire Safety Presentation on Building Regulations Part B 2007

2009 Sfpe Technical Changes To The Part 4 Fire Code
2009 Sfpe Technical Changes To The Part 4 Fire Code2009 Sfpe Technical Changes To The Part 4 Fire Code
2009 Sfpe Technical Changes To The Part 4 Fire Codeandrewwcwong
 
City of Salina Presentation-Information About Proposed Building Code Changes
City of Salina Presentation-Information About Proposed Building Code ChangesCity of Salina Presentation-Information About Proposed Building Code Changes
City of Salina Presentation-Information About Proposed Building Code ChangesCity of Salina
 
Deep Retrofit: Irish Housing Building Standards
Deep Retrofit: Irish Housing Building StandardsDeep Retrofit: Irish Housing Building Standards
Deep Retrofit: Irish Housing Building StandardsSustainableEnergyAut
 
CFW Domestic Sprinkler Regulations - Domestic Fire Safety
CFW Domestic Sprinkler Regulations - Domestic Fire SafetyCFW Domestic Sprinkler Regulations - Domestic Fire Safety
CFW Domestic Sprinkler Regulations - Domestic Fire SafetyRae Davies
 
2008 Cfsa Seminar A Wong
2008 Cfsa Seminar A Wong2008 Cfsa Seminar A Wong
2008 Cfsa Seminar A Wongandrewwcwong
 
Br pdf ad_f_2010_v2
Br pdf ad_f_2010_v2Br pdf ad_f_2010_v2
Br pdf ad_f_2010_v2wirethehouse
 
Duplex Conversion - City of Toronto
Duplex Conversion - City of TorontoDuplex Conversion - City of Toronto
Duplex Conversion - City of Torontotboyko
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4vakil jagdish
 
Ontario Building Code Mid-Rise Combustible Construction Comparison
Ontario Building Code Mid-Rise Combustible Construction ComparisonOntario Building Code Mid-Rise Combustible Construction Comparison
Ontario Building Code Mid-Rise Combustible Construction ComparisonGerald Moore, CET, CBCO, CRBO
 
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...tboyko
 
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inAnthony Boyko
 
Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2wirethehouse
 
Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2wirethehouse
 
ICS flue system installation instructions
ICS flue system installation instructionsICS flue system installation instructions
ICS flue system installation instructionsSchiedel UK
 

Semelhante a Fire Safety Presentation on Building Regulations Part B 2007 (20)

Appendix and Introduction
Appendix and IntroductionAppendix and Introduction
Appendix and Introduction
 
2009 Sfpe Technical Changes To The Part 4 Fire Code
2009 Sfpe Technical Changes To The Part 4 Fire Code2009 Sfpe Technical Changes To The Part 4 Fire Code
2009 Sfpe Technical Changes To The Part 4 Fire Code
 
City of Salina Presentation-Information About Proposed Building Code Changes
City of Salina Presentation-Information About Proposed Building Code ChangesCity of Salina Presentation-Information About Proposed Building Code Changes
City of Salina Presentation-Information About Proposed Building Code Changes
 
Deep Retrofit: Irish Housing Building Standards
Deep Retrofit: Irish Housing Building StandardsDeep Retrofit: Irish Housing Building Standards
Deep Retrofit: Irish Housing Building Standards
 
CFW Domestic Sprinkler Regulations - Domestic Fire Safety
CFW Domestic Sprinkler Regulations - Domestic Fire SafetyCFW Domestic Sprinkler Regulations - Domestic Fire Safety
CFW Domestic Sprinkler Regulations - Domestic Fire Safety
 
2008 Cfsa Seminar A Wong
2008 Cfsa Seminar A Wong2008 Cfsa Seminar A Wong
2008 Cfsa Seminar A Wong
 
Session 13
Session 13Session 13
Session 13
 
Br pdf ad_f_2010_v2
Br pdf ad_f_2010_v2Br pdf ad_f_2010_v2
Br pdf ad_f_2010_v2
 
Duplex Conversion - City of Toronto
Duplex Conversion - City of TorontoDuplex Conversion - City of Toronto
Duplex Conversion - City of Toronto
 
2009 IECC: Commercial
2009 IECC: Commercial2009 IECC: Commercial
2009 IECC: Commercial
 
IECC 2009 Training
IECC 2009 TrainingIECC 2009 Training
IECC 2009 Training
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4
 
Ontario Building Code Mid-Rise Combustible Construction Comparison
Ontario Building Code Mid-Rise Combustible Construction ComparisonOntario Building Code Mid-Rise Combustible Construction Comparison
Ontario Building Code Mid-Rise Combustible Construction Comparison
 
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
Home Renovator's Guide to the Building Code - Creating a Duplex Overview Pres...
 
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
 
Best uPVC sliding sash window
Best uPVC sliding sash windowBest uPVC sliding sash window
Best uPVC sliding sash window
 
1642
16421642
1642
 
Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2
 
Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2Br pdf ad_j_2010_v2
Br pdf ad_j_2010_v2
 
ICS flue system installation instructions
ICS flue system installation instructionsICS flue system installation instructions
ICS flue system installation instructions
 

Último

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 

Último (20)

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

Fire Safety Presentation on Building Regulations Part B 2007

  • 1. FIRE SAFETY Part B Building Regulations David Cant Health and Safety Consultant www.veritas-consulting.co.uk
  • 2.
  • 3. Coming into force on the 6 th April 2007 New Regulation 16B: Fire Safety Information Revisions to Part B: Fire Safety Revised wording to B3 The Building and Approved Inspectors (Amendment) (No. 2) Regulations 2006
  • 4. Changes to Part B (Fire Safety) of the Building Regulations and Approved Document B Volume 1 - Dwellinghouses Volume 2 – Buildings Other Than Dwellinghouses Flats (including multi-storey flats & mixed-use buildings) can be found in Volume 2
  • 5. Procedural Changes Amended requirement B3(3) – part of internal fire spread (structure)
  • 7.
  • 8. " Fire safety information   16B. —(1) This regulation applies where building work— (a) consists of or includes the erection or extension of a relevant building; or (b) is carried out in connection with a relevant change of use of a building, and Part B of Schedule 1 imposes a requirement in relation to the work. (2) The person carrying out the work shall give fire safety information to the responsible person not later than the date of completion of the work, or the date of occupation of the building or extension, whichever is the earlier. (3) In this regulation—  (a) "fire safety information" means information relating to the design and construction of the building or extension, and the services, fittings and equipment provided in or in connection with the building or extension which will assist the responsible person to operate and maintain the building or extension with reasonable safety; (b) a " relevant building " is a building to which the Regulatory Reform (Fire Safety) Order 2005 applies[ 4 ], or will apply after the completion of building work; (c) a "relevant change of use" is a material change of use where, after the change of use takes place, the Regulatory Reform (Fire Safety) Order 2005 will apply, or continue to apply, to the building; and (d) " responsible person " has the meaning given by article 3 of the Regulatory Reform (Fire Safety) Order 2005."
  • 10. Meaning of " responsible person " 3. In this Order "responsible person" means— (a) in relation to a workplace, the employer, if the workplace is to any extent under his control; (b) in relation to any premises not falling within paragraph (a)—   (i) the person who has control of the premises (as occupier or otherwise) in connection with the carrying on by him of a trade, business or other undertaking (for profit or not); or (ii) the owner, where the person in control of the premises does not have control in connection with the carrying on by that person of a trade, business or other undertaking. STATUTORY INSTRUMENTS   2005 No. 1541   REGULATORY REFORM, ENGLAND AND WALES The Regulatory Reform (Fire Safety) Order 2005 Regulatory Reform (Fire Safety) Order 2005
  • 11. Application to premises      6. — (1) This Order does not apply in relation to — (a) domestic premises, except to the extent mentioned in article 31(10); (b) an offshore installation within the meaning of regulation 3 of the Offshore Installation and Pipeline Works (Management and Administration) Regulations 1995[ 13 ]; (c) a ship, in respect of the normal ship-board activities of a ship's crew which are carried out solely by the crew under the direction of the master; (d) fields, woods or other land forming part of an agricultural or forestry undertaking but which is not inside a building and is situated away from the undertaking's main buildings; (e) an aircraft, locomotive or rolling stock, trailer or semi-trailer used as a means of transport or a vehicle for which a licence is in force under the Vehicle Excise and Registration Act 1994[ 14 ] or a vehicle exempted from duty under that Act; (f) a mine within the meaning of section 180 of the Mines and Quarries Act 1954[ 15 ], other than any building on the surface at a mine; (g) a borehole site to which the Borehole Sites and Operations Regulations 1995[ 16 ] apply. (2) Subject to the preceding paragraph of this article, this Order applies in relation to any premises Regulatory Reform (Fire Safety) Order 2005
  • 12. PART 2 FIRE SAFETY DUTIES Duty to take general fire precautions    8. —(1) The responsible person must— (a) take such general fire precautions as will ensure, so far as is reasonably practicable, the safety of any of his employees; and (b) in relation to relevant persons who are not his employees, take such general fire precautions as may reasonably be required in the circumstances of the case to ensure that the premises are safe. Risk assessment      9. —(1) The responsible person must make a suitable and sufficient assessment of the risks to which relevant persons are exposed for the purpose of identifying the general fire precautions he needs to take to comply with the requirements and prohibitions imposed on him by or under this Order. Regulatory Reform (Fire Safety) Order 2005
  • 13. Duty to consult enforcing authority before passing plans      45. —(1) Where it is proposed to erect a building, or to make any extension of or structural alteration to a building and, in connection with the proposals, plans are, in accordance with building regulations, deposited with a local authority, the local authority must, subject to paragraph (3), consult the enforcing authority before passing those plans.     (2) Where it is proposed to change the use to which a building or part of a building is put and, in connection with that proposal, plans are, in accordance with building regulations, deposited with a local authority, the authority must, subject to paragraph (3), consult with the enforcing authority before passing the plans.     (3) The duty to consult imposed by paragraphs (1) and (2)— (a) only applies in relation to buildings or parts of buildings to which this Order applies, or would apply following the erection, extension, structural alteration or change of use; (b) does not apply where the local authority is also the enforcing authority. Regulatory Reform (Fire Safety) Order 2005 Duty to Consult
  • 16. New Diagram 1 illustrates basic principles
  • 17. Direct reference to BS 5839-6: 2004 Grade D = mains powered with standby supply LD3 = Detectors in circulation spaces Extensions Provide smoke alarms where habitable rooms are provided above ground level or if at ground level where there is no final exit from the new room Smoke & Heat Alarms
  • 18. New guidance on the use of domestic sprinklers as a compensatory feature. Specific alternative approaches in paragraphs: B1 – 2.7 houses with more than one floor over 4.5m above ground level B1 – 2.20b Loft conversions B4 – 9.15 Space separation Domestic Sprinklers
  • 19. Not required in houses with a floor more than 4.5m above ground level. Locks (with or without removable keys) and stays may be fitted to egress windows, subject to the stay being fitted with a release catch, which may be child reistant Egress Windows
  • 20. Escape provision to be no worse than the window it replaces: except- If original window is larger than necessary, opening can be reduced to minimum dimensions specified. Replacement Windows
  • 21. Fire Doors Self Closing Devices Self-closing devices not required on fire doors within dwellings. Except Doors to integral garages Flat entrance doors (vol. 2) Fire Doors ARE still necessary
  • 22. Alternative approach DELETED Provide protected stairs & smoke alarms Some existing doors could be upgraded Alternative approach for open plan ground floor – Cut off door, escape window and sprinkler protection Loft Conversions
  • 23.
  • 24.
  • 25. Diagram 11 Junction of Compartment Wall with Roof
  • 26. “ New” European roof test Constructions are classified within the BS EN 13501-5:2005 as BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) or FROOF(t4) BROOF(t4) being the highest performance and FROOF(t4) being the lowest (t4) indicates test 4 from the soon to be BS EN 1187 Roof Coverings (Vol 1& 2)
  • 27. Volume Two Buildings Other Than Dwellinghouses
  • 28. New guidance on the use of domestic sprinklers as a compensatory feature. Specific alternative approaches in paragraphs: B1 – 2.7 houses with more than one floor over 4.5m above ground level B4 – 9.15 Space separation Flats Domestic Sprinkler Protection for Flats Sprinklers to be provided within individual flats in blocks over 30m in height. Limitation of BS 9251 clarified height restriction to under 20m in height can be ignored.
  • 29.
  • 30. Flats
  • 31. Guidance from BS 5588 incorporated into main text Moving back from having to purchase additional documents! Small Premises
  • 40. Guidance reworked for clarity Barriers in under floor voids Aluminium and uPVC windows not suitable for closing cavities Cavity Barriers
  • 44.
  • 45. Fire Fighting Shafts/ Fire Mains
  • 50. Fire Safety Risk Assessment Documents
  • 52. Changes to Oil Fired Boiler Requirements   From the 1 st April 2007 the energy performance standard of new and replacement Oil fired central heating boilers. From that date, in normal circumstances when you plan to install a new boiler or replace an existing one, you will need a condensing boiler to meet the higher standards for energy efficiency. This follows on from Gas fired central heating boilers, which have had to comply since 1 st April 2005.   For boilers installed on or after the 1 st April 2007: The boiler should be a condensing type; and The boiler efficiency should not be less than 86% (as expressed by its SEDBUK value) Further information is available in the 2 nd tier document ‘ Domestic Heating Compliance Guide ’ which can be viewed at www.planningportal.gov.uk
  • 53. Any Questions Thank You for Attending
  • 54.