SlideShare uma empresa Scribd logo
1 de 30
Mohd. Roszaimy bin Musa (MG131002)
Master of Asset and Facilities Management
22 December 2014
Final Master Project Presentation
Faculty of Geoinformation
and Real Estate
A STUDY ON
LEVEL OF AWARENESS AND UNDERSTANDING OF
TOTAL ASSET MANAGEMENT MANUAL (TAMM)
STRATEGIC IMPLEMENTATION
Valen
Lim
TABLE OF
CONTENTS 01Introduction
Pages 3 - 7
02
Literature Review
Pages 8 - 11
03Research Methodology
Pages 12 - 15
04Data Analysis & Findings
Pages 16 - 19
05Discussion, Conclusion
& Recommendation
Pages 20 - 23
01
02 03 04 05
Universiti Teknologi Malaysia | Page 3
INTRODUCTION
+ Issues
+ Problem Statement
+ Research Aim
+ Research Questions
01
02 03 04 05
+ Issues
A new accounting standards will be
introduced in 2015 known as accrual
based accounting and one of its main
concern is regarding government
asset values in hope for better
management in future.
(Saleh and Pendlebury, 2006).
However, over the years
the Audit Office has
encountered dismay
reports on government
asset management
activities.
This is one of the reasons why public
perception of public governance has
always been negative though GAMP
and related procedure has been
introduced to govern its management.
Universiti Teknologi Malaysia | Page 4
Accountability Index Result of Government Financial Management
Low level of
understanding
and awareness
amongst asset
personnel on
TAMM
implementation
was reported in
previous study.
GAMP
introduced as
strategic
asset
management
Did send for
training but
problem
persistence
01
02 03 04 05
+ Problem Statement
Universiti Teknologi Malaysia | Page 5
GAO dismay
report on
government
asset
management Personnel
commitment
and
understanding
has relationship
to success
strategic
implementation
01
02 03 04 05
+ Research Aim
Universiti Teknologi Malaysia | Page 6
….to investigate the
level of understanding
and awareness of asset
personnel regarding
the elements of
implementation in
Asset Management
Strategy for
Government of
Malaysia
Contribution
Perceptio
n
…. examine the
relationship between
understanding the
elements of TAMM
implementation
strategy and
awareness towards it
01
02 03 04 05
+ Research Questions
Universiti Teknologi Malaysia | Page 7
Research question ONE two Create three Refine
What are the TAMM strategic
implementation elements that has
been emphasised in MAM?
To identify TAMM strategic
implementation element as to
whether it is aligned with MAM.
++ Research Objectives
++ Analysis Method
Content Analysis
What is the level of awareness
and understanding amongst asset
personnel concerning on TAMM
implementation strategy in MAM?
What is the relationship between
understanding TAMM
implementation strategy elements
towards the awareness of TAMM
implementation in MAM?
To investigate the level of
awareness and understanding
of asset personnel regarding the
TAMM strategic implementation
elements.
To examine the relationship
between awareness and
understanding of TAMM
strategic implementation
elements.
Descriptive Analysis Correlation and Regression Analysis
1 2 3
01
02
03 04 05
Universiti Teknologi Malaysia | Page 8
LITERATURE REVIEW
+ Asset and Asset Management
+ Strategic Management and
Strategic Asset Management
+ Government Asset Management
Policy
DefinitionofAsset
DefinitionofAsset
Management
OverviewofStrategic
Management
StrategicAsset
Management
GAMP
StructureofDocument
StructureofResponsibility
GAMPStrategic
ImplementationElements
01
02
03 04 05
Universiti Teknologi Malaysia | Page 9
+ Asset and Asset Management
Asset can be categorised as current
assets and fixed asset, or named as
tangible such as physical asset that
include property, plant and
equipment; and intangible which
included knowledge and goodwill
(Radu and Marius, 2011)
ISO 55000 defined asset as
an item, thing or entity
that has potential or
actual value to an
organisation.
Government asset is type of property
that under government possession
that needs to be managed and
administered to enhance the benefit
towards service delivery.
…. integrated management activities of different expertise to
add values and increase asset benefit towards achieving
organisation goals.
Contribution
people process
money
maximise
asset value
01
02
03 04 05
Universiti Teknologi Malaysia | Page 10
+ Strategic Management and Strategic Asset Management
strategic
formulation
strategic
implementation
strategic
evaluation
people process
technology
strategic asset
management
business
goal
Jolicoeur& Barret (2005)
Bryson (2004)
Kohtamakii (2011)
Atkinson (2006)
Lutchman (2006)
Amadi-Enchendu (2007)
Laue et. al (2012
David (2012)
Bryson, Barbara and Bryson (2009)
need communicate
Yang, Sun and Eppler (2009) Stapleberg (2006)
Woodhouse (2006) Mardiasmo (2008)
Maheswari (2006)planning
01
02
03 04 05
Universiti Teknologi Malaysia | Page 11
+ Government Asset Management Policy (GAMP)
GAMP
Strategic
Implementation
Element
process
governance
technology
human
Policy (GAMP)
Manual(TAMM)
AssetProcedure
SupportingDocuments
AssetOwner
AssetManagers
AssetOperator
Misnan (2012) claimed that the level
of willingness of government officers
toward GAMP was high amongst non-
movable asset personnel.
Yusof (2013) discovered
level of awareness and
understanding of TAMM
were low and nearly 50%
did not understand TAMM.
Berahim, Jaafar and Razali (2013)
concluded that through good
governance would help to minimise
problem facing by government agency
in managing assets.
Have common traits in research
methodology and main respondents.
Not touch on all elements of GAMP
strategic implementation.
01 02
03
04 05
Universiti Teknologi Malaysia | Page 12
RESEARCH
METHODOLOGY
+ Procedure One
+ Procedure Two
+ Procedure Three
01 02
03
04 05
Universiti Teknologi Malaysia | Page 13
+ Procedure One
Bowen (2009) argued that document
analysis provided better triangulation
upon potential biases by giving more
insight upon situation that need to be
observed and verifying the finding
from other sources.
Therefore, examining the
government’s documents
regarding movable asset
management would help
to enhance the knowledge
on asset management
practice.
To identify TAMM strategic implementation element as to whether it is
aligned with MAM.
GAMP Elements Coding
Governance Controlling Officer, Head of Department, UPA, Asset Officer, Annual Report
Process Registration, Life cycle process, Cost saving, Environmental friendly, Safe
and secure, Reporting , Asset performance, Asset condition, Procedure
setting
Technology SPA, Asset coding, Cooperation/ collaboration, Provider
Human Number of officer, Competency, Skills, Certified, Appointment of officer,
Duration of appointment, Culture / Programme
8MAM
Procedures
5
17
7
10
TAMM
01 02
03
04 05
Universiti Teknologi Malaysia | Page 14
+ Procedure Two
To investigate the level of awareness and understanding of asset personnel
regarding the TAMM strategic implementation elements.
002 pilot study session
010 panel of experts
select
007 experts run validation
032 preliminary respondents
031 data run reliability test
ALL acceptable questions
350 main respondents
152 federal departments
024 federal ministries
003 weeks of completion
ALL email distribution
42 items of questions
18 awareness questions
18 understanding questions
06 background questions
03 sections
05 likert-scale measurement
005 Descriptive analyses
001 Respondent attribute
001 Level of awareness
001 Level of understanding
002 Cross-tabulation
001 Rank Total Mean Scores
01 02
03
04 05
Universiti Teknologi Malaysia | Page 15
+ Procedure Three
To examine the relationship between awareness and understanding of
TAMM strategic implementation elements.
Hypothesis
Code
Hypothesis
Statement Test
Correlation
Analysis
Regression
Analysis
H1 significant relationship
H2 significant relationship
H3 significant relationship
H4 significant relationship
H5 significant contribution
Total
Awareness
Governance
Process
Technology
Human
H1
H5
H2
H3
H4
independent
variables
dependent
variables
Level of Understanding
01 02 03
04
05
Universiti Teknologi Malaysia | Page 16
DATAANALYSIS & FINDINGS
+ Findings of Procedure One
+ Findings of Procedure Two
+ Findings of Procedure Three a
b
d e
Through content analysis,
all 4 TAMM strategy
implementation elements
were found in 8
procedures documents
Element of process has the
highest score of
observation.
Most respondents were in
Assistant Asset Manager
position and from federal
departments.
Level of awareness and
understanding were good.
However, respondents
perceived higher on level
of understanding
compared to level of
awareness.
Correlation analysis has
resulted with significant
relationship between all
independent variables and
dependent variable.
Multiple regressions
analysis has demonstrated
that the element of process
contribute 55.40% toward
the awareness level of asset
personnel.
01 02 03
04
05
Universiti Teknologi Malaysia | Page 17
+ Findings of Procedure One
MAM Procedure Documents Governance Process Technology Human
Role and Responsibility
Introduction to MAM
Receiving of Asset
Registration of Asset
Handling, Safekeeping and Inspection
Maintenance
Disposal
Theft and Write-off
TOTAL OBSERVATION SCORE 15 43 9 7
… first research
objective was
successfully
accomplished as all
4 elements of TAMM
implementation
strategy was found in
MAM procedures.
Please refer Appendix B
01 02 03
04
05
Universiti Teknologi Malaysia | Page 18
+ Findings of Procedure Two
68%
Respond Rate
60%
Ass. Asset Manager
Involvement
Support Service
Group Involvement
53%
Training for
MAM Procedure
61%
Have 1 – 3
Years Experience
44%
Working in
Department
77%
Managing
Movable Asset
31%
Respondent Attribute Awareness Understanding
Asset Manager
Ass. Asset Manager
Professional group
Ministry
Work more 5 years
TAMM Training
Both Training
Movable only
Movable and Immovable
0
1
2
3
4
5
Governance
Process
Technology
Human
… level of awareness was
lower than level of
understanding of TAMM
strategic implementation
elements.
01 02 03
04
05
Universiti Teknologi Malaysia | Page 19
+ Findings of Procedure Three
Total
Awareness
R2 = .567
0.00*
R2 =.554
X2
.000**.008**
R2 =.013
X1
X3 X4
Y = 0.452 + 0.206X1 + 0.610X2
* P < 0.05 ** ΔF Sig. < 0.05
… there were positive relationship between
understanding the elements of TAMM
strategic implementation towards total
awareness of asset personnel
… understanding the element of process and
governance have significantly contributed 56.70%
towards the total awareness of asset personnel
while 44.30% is contributed by other variables.
01 02 03 04
05
Universiti Teknologi Malaysia | Page 20
DICUSSION, CONCLUSION & RECOMMENDATION
+ Discussion
+ Conclusion
+ Recommendation
+ Summary of the study
RQ No. RQ Objective Analysis Used Results
1
To identify TAMM strategic
implementation element as to
whether it is aligned with MAM.
Content
Analysis
All 4 elements of TAMM
implementation strategy has been
found in MAM procedures.
2
To investigate the level of
awareness and understanding of
asset personnel regarding the
TAMM strategic implementation
elements.
Descriptive
Analysis
Level of awareness and understanding
were good.
However, respondents perceived
higher on level of understanding
compared to level of awareness.
3
To examine the relationship
between awareness and
understanding of TAMM strategic
implementation elements.
Correlation and
Regression
Analysis
Understanding the elements of TAMM
strategic implementation has positive
relationship with total awareness of
asset personnel.
Besides, elements of process and
governance contributed 56.70% to
increase their total awareness.
01 02 03 04
05
Universiti Teknologi Malaysia | Page 21
+ Discussion
RQ No. Results Author (Year) Supported Literature
1
All 4 elements of TAMM
implementation strategy has been
found in MAM procedures.
Mardiasmo (2008)
Asset management performance rest in governance issues
that materialised from working procedure, reporting setting,
dedicated organisation and officers.
2
Level of awareness and
understanding were good.
However, respondents perceived
higher on level of understanding
compared to level of awareness.
Misnan (2012)
Yusof (2013)
Has commitment to improve practice in GAMP.
Contrary to the findings on TAMM implementation
awareness and understanding amongst non-movable asset
managers were low and nearly 50% did not understand
what TAMM is all about.
3
Understanding the elements of
TAMM strategic implementation
has positive relationship with total
awareness of asset personnel.
Besides, elements of process and
governance contributed 56.70% to
increase their total awareness.
Atkinson (2006)
Kohtamaki (2011)
Lack of understanding, staffs participation in strategic
planning has significant impact towards strategy
implementation and effected organisation performance.
Lutchman (2006)
Laeu (2014)
Mardiasmo (2008)
Berahiim, Jaafar
and Razali (2013)
Understanding the process function linked people and
technology to produce a better quality in delivering its
service to achieve organisation desired goal.
Emphasised good governance contribution to help in
minimising problem in managing government asset.
01 02 03 04
05
Universiti Teknologi Malaysia | Page 22
+ Conclusion
01 02 03 04
05
Universiti Teknologi Malaysia | Page 23
+ Recommendation
Federalassetpersonnel
should have knowledge or
understanding of those
elements to interpret its
presence in the procedure.
AssistantAssetManagerand
SupportService Groupofficer
need furthertrainingto
increasetheirunderstanding
on TAMM.
Federal ministry and
department agency
should have prudent plan
to increase the
understanding level of its
asset personnel
regarding TAMM
Improving the sample
technique to include asset
personnel from state and
district department, thus a
bigger population of UPA
can derive a better result in
future
It is recommended that to
look from Asset Owner or
Asset Operator or User
perspective of Government
Asset Strategic Management
UPA OFFICER FEDERAL AGENCY FUTURE STUDY
Thank You
Universiti Teknologi Malaysia | Page 25
APPENDIX A : VALIDITY AND RELIABILTY TEST RESULT
Sekaran and Bougie (2009) had mentioned that any item under 0.60 is
considered to be poor and value that falls between 0.60 and 0.70 is
considered acceptable for internal reliability level of research instrument.
It has been suggested to accept question code B14 because panels of
expert have validated it and no suggestion from any panels to drop or
amend the question during the first phase of pilot study session.
TAMM Elements Component
Governance Top management involvement
Organisation structure
Management review
Process Asset recognition
Asset Life Cycle
Cost Saving
Established process
Process setting
Clarity of the process
Performance indicator
Reporting
Technology System usage
Monitoring system
Promoting innovation
Human Qualified workers
Competency development
Competency assessment
Foster culture change
Universiti Teknologi Malaysia | Page 25
APPENDIX B : STRATIFIED SAMPLING TECHNIQUE
n = number of sample
N = number of population
e = p-value (0.05)
*each federal agency has an average of three (3) officers to manage the assets.
Universiti Teknologi Malaysia | Page 25
APPENDIX B : DESCRIPTIVE ANALYSIS
Universiti Teknologi Malaysia | Page 25
APPENDIX B : DESCRIPTIVE ANALYSIS
Universiti Teknologi Malaysia | Page 25
APPENDIX C : CORRELATION ANALYSIS
Universiti Teknologi Malaysia | Page 25
APPENDIX C : MULTIPLE REGRESSION ANALYSIS

Mais conteúdo relacionado

Semelhante a MASTER PROJECT: Awareness and Understanding of Government Asset Management Policy Implementation Strategy

An Analysis of the Adaptation of Electronic new Government Accounting System ...
An Analysis of the Adaptation of Electronic new Government Accounting System ...An Analysis of the Adaptation of Electronic new Government Accounting System ...
An Analysis of the Adaptation of Electronic new Government Accounting System ...
IJAEMSJORNAL
 
Fm challance and opportunity in malaysia
Fm challance and opportunity in malaysiaFm challance and opportunity in malaysia
Fm challance and opportunity in malaysia
Datok Asri
 
Determinants of knowledge management systems success in the banking industry
Determinants of knowledge management systems success in the banking industryDeterminants of knowledge management systems success in the banking industry
Determinants of knowledge management systems success in the banking industry
jaysoncham
 
Performance measurement,[1] in thai
Performance measurement,[1] in thaiPerformance measurement,[1] in thai
Performance measurement,[1] in thai
kesavneupane
 

Semelhante a MASTER PROJECT: Awareness and Understanding of Government Asset Management Policy Implementation Strategy (20)

Jisc smudie project report 1
Jisc smudie project report 1Jisc smudie project report 1
Jisc smudie project report 1
 
Lit chapter 1 (auto recovered)
Lit chapter 1 (auto recovered)Lit chapter 1 (auto recovered)
Lit chapter 1 (auto recovered)
 
Km system 2
Km system 2Km system 2
Km system 2
 
International Journal of Business and Management Invention (IJBMI)
International Journal of Business and Management Invention (IJBMI)International Journal of Business and Management Invention (IJBMI)
International Journal of Business and Management Invention (IJBMI)
 
MENTION 2015 Slides
MENTION 2015 SlidesMENTION 2015 Slides
MENTION 2015 Slides
 
An Analysis of the Adaptation of Electronic new Government Accounting System ...
An Analysis of the Adaptation of Electronic new Government Accounting System ...An Analysis of the Adaptation of Electronic new Government Accounting System ...
An Analysis of the Adaptation of Electronic new Government Accounting System ...
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES) International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
 
Fm challance and opportunity in malaysia
Fm challance and opportunity in malaysiaFm challance and opportunity in malaysia
Fm challance and opportunity in malaysia
 
F352835
F352835F352835
F352835
 
Determinants of knowledge management systems success in the banking industry
Determinants of knowledge management systems success in the banking industryDeterminants of knowledge management systems success in the banking industry
Determinants of knowledge management systems success in the banking industry
 
W11 span of control- lorick and thurman
W11 span of control- lorick and thurmanW11 span of control- lorick and thurman
W11 span of control- lorick and thurman
 
Drivers of Project Management (PM) Education in India - A Research Study
Drivers of Project Management (PM) Education in India - A Research StudyDrivers of Project Management (PM) Education in India - A Research Study
Drivers of Project Management (PM) Education in India - A Research Study
 
Relationship Between Organizational Factors, Technological Factors and Enterp...
Relationship Between Organizational Factors, Technological Factors and Enterp...Relationship Between Organizational Factors, Technological Factors and Enterp...
Relationship Between Organizational Factors, Technological Factors and Enterp...
 
Relationship between organizational
Relationship between organizationalRelationship between organizational
Relationship between organizational
 
Drivers of Project Management (PM) Education in India - A Research Study
Drivers of Project Management (PM) Education in India - A Research StudyDrivers of Project Management (PM) Education in India - A Research Study
Drivers of Project Management (PM) Education in India - A Research Study
 
Performance measurement,[1] in thai
Performance measurement,[1] in thaiPerformance measurement,[1] in thai
Performance measurement,[1] in thai
 
Analysis of linkages between logistics information systems and
Analysis of linkages between logistics information systems andAnalysis of linkages between logistics information systems and
Analysis of linkages between logistics information systems and
 
An Evaluation Of SISP Process Stages In The Context Of Developing Countries A...
An Evaluation Of SISP Process Stages In The Context Of Developing Countries A...An Evaluation Of SISP Process Stages In The Context Of Developing Countries A...
An Evaluation Of SISP Process Stages In The Context Of Developing Countries A...
 
Doc 4
Doc 4Doc 4
Doc 4
 
ISPMS Background, Purpose and Approach
ISPMS Background, Purpose and ApproachISPMS Background, Purpose and Approach
ISPMS Background, Purpose and Approach
 

Último

2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
ScottMeyers35
 

Último (20)

Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
9867746289 Independent Call Girls in Mumbai Airport 24/7 - Mumbai Escorts
 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 

MASTER PROJECT: Awareness and Understanding of Government Asset Management Policy Implementation Strategy

  • 1. Mohd. Roszaimy bin Musa (MG131002) Master of Asset and Facilities Management 22 December 2014 Final Master Project Presentation Faculty of Geoinformation and Real Estate A STUDY ON LEVEL OF AWARENESS AND UNDERSTANDING OF TOTAL ASSET MANAGEMENT MANUAL (TAMM) STRATEGIC IMPLEMENTATION Valen Lim
  • 2. TABLE OF CONTENTS 01Introduction Pages 3 - 7 02 Literature Review Pages 8 - 11 03Research Methodology Pages 12 - 15 04Data Analysis & Findings Pages 16 - 19 05Discussion, Conclusion & Recommendation Pages 20 - 23
  • 3. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 3 INTRODUCTION + Issues + Problem Statement + Research Aim + Research Questions
  • 4. 01 02 03 04 05 + Issues A new accounting standards will be introduced in 2015 known as accrual based accounting and one of its main concern is regarding government asset values in hope for better management in future. (Saleh and Pendlebury, 2006). However, over the years the Audit Office has encountered dismay reports on government asset management activities. This is one of the reasons why public perception of public governance has always been negative though GAMP and related procedure has been introduced to govern its management. Universiti Teknologi Malaysia | Page 4 Accountability Index Result of Government Financial Management
  • 5. Low level of understanding and awareness amongst asset personnel on TAMM implementation was reported in previous study. GAMP introduced as strategic asset management Did send for training but problem persistence 01 02 03 04 05 + Problem Statement Universiti Teknologi Malaysia | Page 5 GAO dismay report on government asset management Personnel commitment and understanding has relationship to success strategic implementation
  • 6. 01 02 03 04 05 + Research Aim Universiti Teknologi Malaysia | Page 6 ….to investigate the level of understanding and awareness of asset personnel regarding the elements of implementation in Asset Management Strategy for Government of Malaysia Contribution Perceptio n …. examine the relationship between understanding the elements of TAMM implementation strategy and awareness towards it
  • 7. 01 02 03 04 05 + Research Questions Universiti Teknologi Malaysia | Page 7 Research question ONE two Create three Refine What are the TAMM strategic implementation elements that has been emphasised in MAM? To identify TAMM strategic implementation element as to whether it is aligned with MAM. ++ Research Objectives ++ Analysis Method Content Analysis What is the level of awareness and understanding amongst asset personnel concerning on TAMM implementation strategy in MAM? What is the relationship between understanding TAMM implementation strategy elements towards the awareness of TAMM implementation in MAM? To investigate the level of awareness and understanding of asset personnel regarding the TAMM strategic implementation elements. To examine the relationship between awareness and understanding of TAMM strategic implementation elements. Descriptive Analysis Correlation and Regression Analysis 1 2 3
  • 8. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 8 LITERATURE REVIEW + Asset and Asset Management + Strategic Management and Strategic Asset Management + Government Asset Management Policy DefinitionofAsset DefinitionofAsset Management OverviewofStrategic Management StrategicAsset Management GAMP StructureofDocument StructureofResponsibility GAMPStrategic ImplementationElements
  • 9. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 9 + Asset and Asset Management Asset can be categorised as current assets and fixed asset, or named as tangible such as physical asset that include property, plant and equipment; and intangible which included knowledge and goodwill (Radu and Marius, 2011) ISO 55000 defined asset as an item, thing or entity that has potential or actual value to an organisation. Government asset is type of property that under government possession that needs to be managed and administered to enhance the benefit towards service delivery. …. integrated management activities of different expertise to add values and increase asset benefit towards achieving organisation goals. Contribution people process money maximise asset value
  • 10. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 10 + Strategic Management and Strategic Asset Management strategic formulation strategic implementation strategic evaluation people process technology strategic asset management business goal Jolicoeur& Barret (2005) Bryson (2004) Kohtamakii (2011) Atkinson (2006) Lutchman (2006) Amadi-Enchendu (2007) Laue et. al (2012 David (2012) Bryson, Barbara and Bryson (2009) need communicate Yang, Sun and Eppler (2009) Stapleberg (2006) Woodhouse (2006) Mardiasmo (2008) Maheswari (2006)planning
  • 11. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 11 + Government Asset Management Policy (GAMP) GAMP Strategic Implementation Element process governance technology human Policy (GAMP) Manual(TAMM) AssetProcedure SupportingDocuments AssetOwner AssetManagers AssetOperator Misnan (2012) claimed that the level of willingness of government officers toward GAMP was high amongst non- movable asset personnel. Yusof (2013) discovered level of awareness and understanding of TAMM were low and nearly 50% did not understand TAMM. Berahim, Jaafar and Razali (2013) concluded that through good governance would help to minimise problem facing by government agency in managing assets. Have common traits in research methodology and main respondents. Not touch on all elements of GAMP strategic implementation.
  • 12. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 12 RESEARCH METHODOLOGY + Procedure One + Procedure Two + Procedure Three
  • 13. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 13 + Procedure One Bowen (2009) argued that document analysis provided better triangulation upon potential biases by giving more insight upon situation that need to be observed and verifying the finding from other sources. Therefore, examining the government’s documents regarding movable asset management would help to enhance the knowledge on asset management practice. To identify TAMM strategic implementation element as to whether it is aligned with MAM. GAMP Elements Coding Governance Controlling Officer, Head of Department, UPA, Asset Officer, Annual Report Process Registration, Life cycle process, Cost saving, Environmental friendly, Safe and secure, Reporting , Asset performance, Asset condition, Procedure setting Technology SPA, Asset coding, Cooperation/ collaboration, Provider Human Number of officer, Competency, Skills, Certified, Appointment of officer, Duration of appointment, Culture / Programme 8MAM Procedures 5 17 7 10 TAMM
  • 14. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 14 + Procedure Two To investigate the level of awareness and understanding of asset personnel regarding the TAMM strategic implementation elements. 002 pilot study session 010 panel of experts select 007 experts run validation 032 preliminary respondents 031 data run reliability test ALL acceptable questions 350 main respondents 152 federal departments 024 federal ministries 003 weeks of completion ALL email distribution 42 items of questions 18 awareness questions 18 understanding questions 06 background questions 03 sections 05 likert-scale measurement 005 Descriptive analyses 001 Respondent attribute 001 Level of awareness 001 Level of understanding 002 Cross-tabulation 001 Rank Total Mean Scores
  • 15. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 15 + Procedure Three To examine the relationship between awareness and understanding of TAMM strategic implementation elements. Hypothesis Code Hypothesis Statement Test Correlation Analysis Regression Analysis H1 significant relationship H2 significant relationship H3 significant relationship H4 significant relationship H5 significant contribution Total Awareness Governance Process Technology Human H1 H5 H2 H3 H4 independent variables dependent variables Level of Understanding
  • 16. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 16 DATAANALYSIS & FINDINGS + Findings of Procedure One + Findings of Procedure Two + Findings of Procedure Three a b d e Through content analysis, all 4 TAMM strategy implementation elements were found in 8 procedures documents Element of process has the highest score of observation. Most respondents were in Assistant Asset Manager position and from federal departments. Level of awareness and understanding were good. However, respondents perceived higher on level of understanding compared to level of awareness. Correlation analysis has resulted with significant relationship between all independent variables and dependent variable. Multiple regressions analysis has demonstrated that the element of process contribute 55.40% toward the awareness level of asset personnel.
  • 17. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 17 + Findings of Procedure One MAM Procedure Documents Governance Process Technology Human Role and Responsibility Introduction to MAM Receiving of Asset Registration of Asset Handling, Safekeeping and Inspection Maintenance Disposal Theft and Write-off TOTAL OBSERVATION SCORE 15 43 9 7 … first research objective was successfully accomplished as all 4 elements of TAMM implementation strategy was found in MAM procedures. Please refer Appendix B
  • 18. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 18 + Findings of Procedure Two 68% Respond Rate 60% Ass. Asset Manager Involvement Support Service Group Involvement 53% Training for MAM Procedure 61% Have 1 – 3 Years Experience 44% Working in Department 77% Managing Movable Asset 31% Respondent Attribute Awareness Understanding Asset Manager Ass. Asset Manager Professional group Ministry Work more 5 years TAMM Training Both Training Movable only Movable and Immovable 0 1 2 3 4 5 Governance Process Technology Human … level of awareness was lower than level of understanding of TAMM strategic implementation elements.
  • 19. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 19 + Findings of Procedure Three Total Awareness R2 = .567 0.00* R2 =.554 X2 .000**.008** R2 =.013 X1 X3 X4 Y = 0.452 + 0.206X1 + 0.610X2 * P < 0.05 ** ΔF Sig. < 0.05 … there were positive relationship between understanding the elements of TAMM strategic implementation towards total awareness of asset personnel … understanding the element of process and governance have significantly contributed 56.70% towards the total awareness of asset personnel while 44.30% is contributed by other variables.
  • 20. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 20 DICUSSION, CONCLUSION & RECOMMENDATION + Discussion + Conclusion + Recommendation + Summary of the study RQ No. RQ Objective Analysis Used Results 1 To identify TAMM strategic implementation element as to whether it is aligned with MAM. Content Analysis All 4 elements of TAMM implementation strategy has been found in MAM procedures. 2 To investigate the level of awareness and understanding of asset personnel regarding the TAMM strategic implementation elements. Descriptive Analysis Level of awareness and understanding were good. However, respondents perceived higher on level of understanding compared to level of awareness. 3 To examine the relationship between awareness and understanding of TAMM strategic implementation elements. Correlation and Regression Analysis Understanding the elements of TAMM strategic implementation has positive relationship with total awareness of asset personnel. Besides, elements of process and governance contributed 56.70% to increase their total awareness.
  • 21. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 21 + Discussion RQ No. Results Author (Year) Supported Literature 1 All 4 elements of TAMM implementation strategy has been found in MAM procedures. Mardiasmo (2008) Asset management performance rest in governance issues that materialised from working procedure, reporting setting, dedicated organisation and officers. 2 Level of awareness and understanding were good. However, respondents perceived higher on level of understanding compared to level of awareness. Misnan (2012) Yusof (2013) Has commitment to improve practice in GAMP. Contrary to the findings on TAMM implementation awareness and understanding amongst non-movable asset managers were low and nearly 50% did not understand what TAMM is all about. 3 Understanding the elements of TAMM strategic implementation has positive relationship with total awareness of asset personnel. Besides, elements of process and governance contributed 56.70% to increase their total awareness. Atkinson (2006) Kohtamaki (2011) Lack of understanding, staffs participation in strategic planning has significant impact towards strategy implementation and effected organisation performance. Lutchman (2006) Laeu (2014) Mardiasmo (2008) Berahiim, Jaafar and Razali (2013) Understanding the process function linked people and technology to produce a better quality in delivering its service to achieve organisation desired goal. Emphasised good governance contribution to help in minimising problem in managing government asset.
  • 22. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 22 + Conclusion
  • 23. 01 02 03 04 05 Universiti Teknologi Malaysia | Page 23 + Recommendation Federalassetpersonnel should have knowledge or understanding of those elements to interpret its presence in the procedure. AssistantAssetManagerand SupportService Groupofficer need furthertrainingto increasetheirunderstanding on TAMM. Federal ministry and department agency should have prudent plan to increase the understanding level of its asset personnel regarding TAMM Improving the sample technique to include asset personnel from state and district department, thus a bigger population of UPA can derive a better result in future It is recommended that to look from Asset Owner or Asset Operator or User perspective of Government Asset Strategic Management UPA OFFICER FEDERAL AGENCY FUTURE STUDY
  • 25. Universiti Teknologi Malaysia | Page 25 APPENDIX A : VALIDITY AND RELIABILTY TEST RESULT Sekaran and Bougie (2009) had mentioned that any item under 0.60 is considered to be poor and value that falls between 0.60 and 0.70 is considered acceptable for internal reliability level of research instrument. It has been suggested to accept question code B14 because panels of expert have validated it and no suggestion from any panels to drop or amend the question during the first phase of pilot study session. TAMM Elements Component Governance Top management involvement Organisation structure Management review Process Asset recognition Asset Life Cycle Cost Saving Established process Process setting Clarity of the process Performance indicator Reporting Technology System usage Monitoring system Promoting innovation Human Qualified workers Competency development Competency assessment Foster culture change
  • 26. Universiti Teknologi Malaysia | Page 25 APPENDIX B : STRATIFIED SAMPLING TECHNIQUE n = number of sample N = number of population e = p-value (0.05) *each federal agency has an average of three (3) officers to manage the assets.
  • 27. Universiti Teknologi Malaysia | Page 25 APPENDIX B : DESCRIPTIVE ANALYSIS
  • 28. Universiti Teknologi Malaysia | Page 25 APPENDIX B : DESCRIPTIVE ANALYSIS
  • 29. Universiti Teknologi Malaysia | Page 25 APPENDIX C : CORRELATION ANALYSIS
  • 30. Universiti Teknologi Malaysia | Page 25 APPENDIX C : MULTIPLE REGRESSION ANALYSIS