TPM as a Lean Initiative

• Competitive costs require
  – Spending control
  – Defect control
  – Downtime reduction

• TPM = Total Productive Maintenance
  – Proactive (with all employees involved)
  – Preventive
  – Predictive
  – Planned

                                              Slide 2
Why Change?

• ACTIONS:
  – Reduce defectives / scrap
  – Reduction of lost production time
  – Lowest possible cost by reducing waste




                                             Slide 3
Lean System

            Peak Performance
       Pull system / flow production
Rapid Changeover / Customer-driven lot size
         Continuous Waste Reduction
               Lean Measures

 5S                              Standardized
Visual            TPM                Work
Factory


      Variation reduction / Six Sigma
        In-Station Process Control
   Leadership by Example & Commitment
   Employee Involvement & Mutual Respect
                                                Slide 4
7 Wastes

•   Transportation
•   Excess production
•   Added processes
•   Motion

• Waiting
• Inventory
• Non-conformance (defectives)
                                 Slide 5
Causes of Waste
• Excess Manning
  – Poor layout and material presentation
  – Rework and extra processes
  – Inconsistent / inefficient work methods
• Excess Downtime
  –   Tooling condition
  –   Unreliable equipment
  –   Long changeovers
  –   Incapable process
• Defectives - Rework or Replace
  – Incapable processes or process not
    compatible with customer expectations or
    design spec (design for mfg)
  – Tooling condition
  – Operator methods and errors
                                               Slide 6
Causes of Waste
• Excess Manning
  – Poor layout and material presentation
  – Rework and extra processes
  – Inconsistent / inefficient work methods
• Excess Downtime
  –   Tooling condition
  –   Unreliable equipment
  –   Long changeovers
  –   Incapable process
• Defectives - Rework or Replace
  – Incapable processes or process not
    compatible with customer expectations or
    design spec (design for mfg)
  – Tooling condition
  – Operator methods and errors
                                               Slide 7
Effective TPM Eliminates 5 Losses


1.   Equipment breakdowns
2.   Defects, scrap, and rework
3.   Safety Issues
4.   Mini stoppages
5.   Reduced speed




                                           Slide 8
What is TPM??

TPM is a Lean tool to optimize the effectiveness of
manufacturing equipment and tooling.

  1. Starts with 5S / Visual Factory
  2. Builds a comprehensive Downtime Database by
     cause, frequency, and duration
  3. Predicts and prevents downtime by PM system
  4. Expands role of Operator as first point of early
     warning and prevention
  5. Develops Professional Maintenance skills



                                                        Slide 9
Operator Autonomous Maintenance




Seven Steps                                             Aut. Mgt.   7
                                                                    7
of TPM                                           Standardization    6
                                          Autonomous Inspection
                                                                    5
                               General Inspection                   4
                      Initial Standards                             3
                                                                    3
          Countermeasures for Contamination
                                                                    2
                                                                    2
   Initial Clean-up
                                                                    1
                                                                    1
                                                                        Slide 10
TPM is Planned, Predictive, & Preventive


1. Starts with 5S / Visual Factory
2. Builds a comprehensive downtime data
   base by cause, frequency, and duration
3. Predicts and prevents downtime by PM
   system
4. Expands role of Operator as first point of
   early warning and prevention
5. Professional Maintenance



                                                Slide 11
5S Workplace

A safe, clean, orderly workplace is
fundamental to quality, efficiency, and teams

   Sort (organize)
   Shine (clean)
   Set in order (make orderly and neat)
   Standardize (visual place for everything)
   Sustain (maintain the system)

                                                Slide 12
TPM starts with 5S

• You can’t see problems clearly when
  the workplace is in disarray
• Cleaning and organizing the workplace
  helps the team to uncover problems
• Making problems visible is the first step
  of improvement
• Clean machines and workplace create
  pride & Safety



                                              Slide 13
Downtime Visual Controls

• Visual or audio alerts
  – Abnormality obvious at a glance (e.g. stoppage,
    reject, control fault)
  – Alerting Maint and team leaders
  – Provide real time “scoreboard” for employees
     •   Machine down light visible from aisle
     •   Production status board (e.g. actual counts vs. goal)
     •   Scrap counts and downtime minutes
     •   Located in clear view in shop (not in control room)
     •   Simple, self regulating, & employee managed



                                                             Slide 14
TPM is Planned, Predictive, & Preventive


1. Starts with 5S / Visual Factory
2. Builds a comprehensive
   downtime data base by cause,
   frequency, and duration
3. Predicts and prevents downtime by PM
   system
4. Expands role of Operator as first point of
   early warning and prevention
5. Professional Maintenance


                                                Slide 15
Downtime Database
• Categorize at a minimum by Equip, Tooling, C/O, Other
• Segmented bar graph for E-T-O lost time
• Subcategories for Equip (e.g.)
   –   Hydraulic / pneumatic
   –   Mechanical / lubrication
   –   Electrical / controls
   –   Shot-end components
• Subcategories for Tooling (e.g.)
   –   Slides
   –   Cores
   –   Inserts
   –   Ejector pins
• Subcategories for Other (e.g.)
   – Operator error
   – Materials
                                                          Slide 16
Minimum Downtime Tracking

                    Downtime by Cause 3500 ton Bay
Other                 (avg min/shift per Machine)


        120
Tools
        100

        80
                                                                    O
Minutes 60
                                                                    T
        40                                                          E

        20
Equip
         0
              1Q02 2Q02   Jun   Jul   Aug   Sep   Oct   Nov   Dec


                                                                    Slide 17
TPM is Planned, Predictive, & Preventive


1. Starts with 5S / Visual Factory
2. Builds a comprehensive downtime data
   base by cause, frequency, and duration
3. Predicts and prevents downtime
   by PM system
4. Expands role of Operator as first point of
   early warning and prevention
5. Professional Maintenance



                                                Slide 18
Predictive Maintenance Tools
• Rate/hr vs. target or historical normal output (B/W)
• Database
   – MP2 / maintenance history
   – statistical probability (frequency & duration)
• Physical prediction of impending failure
   – Sound (bearing)
   – Temperature (cooling water)
   – Flash (core pins)
   – Shot monitoring system
   – SPC on part geometry
   – Hydraulic pressure (ejector pins)
   – Spindle loads (amps)
   – Fluids / Lubrication analysis (milipore)
   – Vibration Signature Analysis
                                                         Slide 19
Preventive Maintenance System
• History of downtime by major machine & tool
   – Downtime measurement & tracking
   – Mean Time Between Failures
   – Average downtime
   – Pareto of causes at component level (eg L/S or temp sensor)
   – Cost to maintain
• Develop PM cards based on frequency of failure and magnitude of
  average lost time (start small & grow)
   – Limit & prox switches
   – Shot tip / sleeve
   – Critical frame and cylinder mounting bolts
   – Expendable tools
   – Valves, hoses, packing, seals
• PM’s have instruction, schedule/frequency & sign-off
   – PM’s / repairs done in window of opportunity when machine is down
   – Cycle count or date based execution of PM’s (eg cutter change)
   – PM status visual (work completed / not completed)
                                                                  Slide 20
TPM is Planned, Predictive, & Preventive

1. Starts with 5S / Visual Factory
2. Builds a comprehensive downtime data base by
   cause, frequency, and duration
3. Predicts and prevents downtime by PM system
4. Expands role of Operator as first point
   of early warning and prevention
   • One point lessons for operator awareness
   • Creates OMP (Operator - Maintenance
     Partnership)
   • Operator performs checks, problem
     solving, and improvements
1. Professional Maintenance


                                                  Slide 21
TPM

                       Production Operators
                          • Clean & Check
                          • Observe
                          • Categorize
                             Active
Production Planning                             Quality Engineers
& Control
                           Planned                 • Standards &
   • Schedule P.M.        Maintenance                Calibrations
                           Process
                      Manufacturing Engineers
                         • Equipment Planning
                         • Equipment Studies



                                                                Slide 22
OMP - Operator Maintenance Partnership


• Operator training in TPM
                                   TPM
• Operator basic equip inspection
  & tooling checks
• Operator basic cleaning
• Operator lubrication check
• One point lessons (capture
  knowledge)
• TPM Board & TPM Tags
  (proactive operator involvement)


                                         Slide 23
TPM Tag System


• Problem communication tool to and from
  maintenance, tool room, and production
  – Identify abnormal machine conditions
     • Record problem discovered by operator
     • Record problem found during scheduled PM
  – Status tracking system of requested repairs
  – TPM visual management tool (hang tags)
  – Repair history for future problem solving
• TPM Tag used for recording problem & fix
  – Blue Tag-Operator or Maint responsible to repair
  – Red Tag- Safety-related request (priority)



                                                       Slide 24
Tag Process
Operator/Supervisor                    Production Management                      Maintenance
1. Abnormality Identified
2. Fill out Tag Red= Safety
                 Blue= Prod/Maint
3. Hang C-tag as close to the defect
as possible
4. Hang A &B Tags on the TPM Tag                                                  5.Maintenance evaluates problem. If
status board by Machine location and                                              fixed immediately go to 6. If parts or
area of responsibility to correct.                                                time needed, maint pulls A tag from
                                                                                  board. The A tag is MWO. The B
                                                                                  tag is posted on the Maint WO
                                                                                  status section of the TPM Board
                                                                                  with est. timing.

7. Operator/Supervisor check to see                                               6.After work is completed,
if work was done.                                                                 maintenance completes back side of
                                                                                   A tag and places both the A & B
                                                                                  tag in the work completed box

8. If OK, Operator/ supervisor         9. Production management reviews
removes C tag from machine and         the information. Also reviews the
places ABC tags in Completed box. If   comments and takes actions if
not OK, tags stay and maint is         required. Places tag in history file box
contacted. Contact noted on tag.       located in the office


                                       Tag information is recorded and reviewed for continuous improvement of PM
                                       database by Production and Maintenance; Repeat operator tags may indicate
                                       Maint needs to investigate.

                                                                                                                   Slide 25
TPM is Proactive, Predictive,
            Preventive & Planned

1. Starts with 5S / Visual Factory
2. Builds a comprehensive downtime data
   base by cause, frequency, and duration
3. Predicts and prevents downtime by PM
   system
4. Expands role of Operator as first point
   of early warning and prevention
5. Professional Maintenance


                                             Slide 26
Professional Maintenance


•   Equip Safety
•   Skill building
•   Cross-training
•   Area Maintenance
•   WC MRO stores
•   Maint Mgmt System
•   Down alarms
•   Radios
•   Planned PM

                                      Slide 27
Operator Autonomous Maintenance

                    7 Steps

                      T P M

                                                          Aut. Mgt.   7
                                                                      7
                                                   Standardization    6
                                       Autonomous Inspection
                    OIL
                                                                      5
                              General Inspection                      4
                    Prepare Temporary Standards                       3
                                                                      3
         Countermeasures for Contamination
                                                                      2
                                                                      2
 Initial Clean-up
                                                                      1
                                                                      1
                                                                          Slide 28
TPM
                 Initial Focus




                           TPM I    TPM II
                           Step 1   Step 4
            5S             Step 2   Step 5
                           Step 3   Step 6
                                    Step 7


prerequisite for TPM I


                                             Slide 29
STEP 3: Prepare Temporary Standards
This step is to enhance the equipment reliability
& maintainability.
• Temporary Check Sheet For Clean-Up,

  Lubrication, Start-up, and Shut-down:
   –   What items need to be done
   –   Who will perform the check
   –   How often to check
   –   Where the location is to be checked
   –   What to use for the inspection or cleaning
   –   Target time to complete the task


                                                    Slide 30
TPM Summary
• TPM = Total Productive
  Maintenance
   – Proactive (all employees
     involved)                                 Peak Performance

   – Preventive
   – Predictive                           Continuous Waste Reduction
   – Planned
• TPM is an integral part        5S                               Standardized
  of JLF Total Quality          Visual             TPM                Work
  production System             Factory




                                                                                 Slide 31
TPM is a Lean tool for
Quality and
Productivity




                         Slide 32

Mais conteúdo relacionado

Mais procurados (20)

010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
My machine camp
My machine campMy machine camp
My machine camp
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenance
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
Tpm
TpmTpm
Tpm
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 

Destaque

Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities博行 門眞
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Achuthan Rajagopal
 
Autonomous Maintenance Urdu
Autonomous Maintenance UrduAutonomous Maintenance Urdu
Autonomous Maintenance UrduFarid Ud Din
 
One Point Lesson (OPL) Basic presentation
One Point Lesson (OPL) Basic presentationOne Point Lesson (OPL) Basic presentation
One Point Lesson (OPL) Basic presentationavijit biswas
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...博行 門眞
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Sushil Anand
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance PresentationAbdul Rehman Ghauri
 
8d training slides
8d training slides 8d training slides
8d training slides Rohit Singh
 
Visual One Point Lessons
Visual One Point LessonsVisual One Point Lessons
Visual One Point LessonsSubikash Roy
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...博行 門眞
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools 博行 門眞
 
DFM - Intership Evaluation Form
DFM - Intership Evaluation FormDFM - Intership Evaluation Form
DFM - Intership Evaluation FormTri Pham Huynh
 
Seminar 1 - MUR Information Night
Seminar 1 - MUR Information NightSeminar 1 - MUR Information Night
Seminar 1 - MUR Information NightSam Briggs
 

Destaque (20)

Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Autonomous Maintenance Urdu
Autonomous Maintenance UrduAutonomous Maintenance Urdu
Autonomous Maintenance Urdu
 
One Point Lesson (OPL) Basic presentation
One Point Lesson (OPL) Basic presentationOne Point Lesson (OPL) Basic presentation
One Point Lesson (OPL) Basic presentation
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance Presentation
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Tpm
TpmTpm
Tpm
 
8d training slides
8d training slides 8d training slides
8d training slides
 
Visual One Point Lessons
Visual One Point LessonsVisual One Point Lessons
Visual One Point Lessons
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 
Tpm final
Tpm finalTpm final
Tpm final
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
DFM - Intership Evaluation Form
DFM - Intership Evaluation FormDFM - Intership Evaluation Form
DFM - Intership Evaluation Form
 
Seminar 1 - MUR Information Night
Seminar 1 - MUR Information NightSeminar 1 - MUR Information Night
Seminar 1 - MUR Information Night
 

Semelhante a Tpm training

PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive MaintenanceDr. John V. Padua
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance reportbabarsaleeem11
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Ricky Smith CMRP, CMRT
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)Prashant Rasekar
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdfssuser089410
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...ADD VALUE CONSULTING Inc
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programshossam hassanein
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering Michel Mafumba
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Akhil Yelisetti
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02BhaveshShukla15
 
TKP437-8-Pemeliharaan-dan-perbaikan-mesin.ppt
TKP437-8-Pemeliharaan-dan-perbaikan-mesin.pptTKP437-8-Pemeliharaan-dan-perbaikan-mesin.ppt
TKP437-8-Pemeliharaan-dan-perbaikan-mesin.pptLarvaCutties
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality ManagementKarthikeyan I
 

Semelhante a Tpm training (20)

tpm olisa vincent
tpm olisa vincenttpm olisa vincent
tpm olisa vincent
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive Maintenance
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System Failure Reporting, Analysis, Corrective Action System
Failure Reporting, Analysis, Corrective Action System
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
TQM TPM
TQM TPMTQM TPM
TQM TPM
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 
Root Cause Analysis.pdf
Root Cause Analysis.pdfRoot Cause Analysis.pdf
Root Cause Analysis.pdf
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
TKP437-8-Pemeliharaan-dan-perbaikan-mesin.ppt
TKP437-8-Pemeliharaan-dan-perbaikan-mesin.pptTKP437-8-Pemeliharaan-dan-perbaikan-mesin.ppt
TKP437-8-Pemeliharaan-dan-perbaikan-mesin.ppt
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 

Último

Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 

Último (20)

Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

Tpm training

  • 1. Total Productive Maintenance TPM Overview Dave Hoyte, CEO JL French Corporation Slide 1
  • 2. TPM as a Lean Initiative • Competitive costs require – Spending control – Defect control – Downtime reduction • TPM = Total Productive Maintenance – Proactive (with all employees involved) – Preventive – Predictive – Planned Slide 2
  • 3. Why Change? • ACTIONS: – Reduce defectives / scrap – Reduction of lost production time – Lowest possible cost by reducing waste Slide 3
  • 4. Lean System Peak Performance Pull system / flow production Rapid Changeover / Customer-driven lot size Continuous Waste Reduction Lean Measures 5S Standardized Visual TPM Work Factory Variation reduction / Six Sigma In-Station Process Control Leadership by Example & Commitment Employee Involvement & Mutual Respect Slide 4
  • 5. 7 Wastes • Transportation • Excess production • Added processes • Motion • Waiting • Inventory • Non-conformance (defectives) Slide 5
  • 6. Causes of Waste • Excess Manning – Poor layout and material presentation – Rework and extra processes – Inconsistent / inefficient work methods • Excess Downtime – Tooling condition – Unreliable equipment – Long changeovers – Incapable process • Defectives - Rework or Replace – Incapable processes or process not compatible with customer expectations or design spec (design for mfg) – Tooling condition – Operator methods and errors Slide 6
  • 7. Causes of Waste • Excess Manning – Poor layout and material presentation – Rework and extra processes – Inconsistent / inefficient work methods • Excess Downtime – Tooling condition – Unreliable equipment – Long changeovers – Incapable process • Defectives - Rework or Replace – Incapable processes or process not compatible with customer expectations or design spec (design for mfg) – Tooling condition – Operator methods and errors Slide 7
  • 8. Effective TPM Eliminates 5 Losses 1. Equipment breakdowns 2. Defects, scrap, and rework 3. Safety Issues 4. Mini stoppages 5. Reduced speed Slide 8
  • 9. What is TPM?? TPM is a Lean tool to optimize the effectiveness of manufacturing equipment and tooling. 1. Starts with 5S / Visual Factory 2. Builds a comprehensive Downtime Database by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Develops Professional Maintenance skills Slide 9
  • 10. Operator Autonomous Maintenance Seven Steps Aut. Mgt. 7 7 of TPM Standardization 6 Autonomous Inspection 5 General Inspection 4 Initial Standards 3 3 Countermeasures for Contamination 2 2 Initial Clean-up 1 1 Slide 10
  • 11. TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance Slide 11
  • 12. 5S Workplace A safe, clean, orderly workplace is fundamental to quality, efficiency, and teams Sort (organize) Shine (clean) Set in order (make orderly and neat) Standardize (visual place for everything) Sustain (maintain the system) Slide 12
  • 13. TPM starts with 5S • You can’t see problems clearly when the workplace is in disarray • Cleaning and organizing the workplace helps the team to uncover problems • Making problems visible is the first step of improvement • Clean machines and workplace create pride & Safety Slide 13
  • 14. Downtime Visual Controls • Visual or audio alerts – Abnormality obvious at a glance (e.g. stoppage, reject, control fault) – Alerting Maint and team leaders – Provide real time “scoreboard” for employees • Machine down light visible from aisle • Production status board (e.g. actual counts vs. goal) • Scrap counts and downtime minutes • Located in clear view in shop (not in control room) • Simple, self regulating, & employee managed Slide 14
  • 15. TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance Slide 15
  • 16. Downtime Database • Categorize at a minimum by Equip, Tooling, C/O, Other • Segmented bar graph for E-T-O lost time • Subcategories for Equip (e.g.) – Hydraulic / pneumatic – Mechanical / lubrication – Electrical / controls – Shot-end components • Subcategories for Tooling (e.g.) – Slides – Cores – Inserts – Ejector pins • Subcategories for Other (e.g.) – Operator error – Materials Slide 16
  • 17. Minimum Downtime Tracking Downtime by Cause 3500 ton Bay Other (avg min/shift per Machine) 120 Tools 100 80 O Minutes 60 T 40 E 20 Equip 0 1Q02 2Q02 Jun Jul Aug Sep Oct Nov Dec Slide 17
  • 18. TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance Slide 18
  • 19. Predictive Maintenance Tools • Rate/hr vs. target or historical normal output (B/W) • Database – MP2 / maintenance history – statistical probability (frequency & duration) • Physical prediction of impending failure – Sound (bearing) – Temperature (cooling water) – Flash (core pins) – Shot monitoring system – SPC on part geometry – Hydraulic pressure (ejector pins) – Spindle loads (amps) – Fluids / Lubrication analysis (milipore) – Vibration Signature Analysis Slide 19
  • 20. Preventive Maintenance System • History of downtime by major machine & tool – Downtime measurement & tracking – Mean Time Between Failures – Average downtime – Pareto of causes at component level (eg L/S or temp sensor) – Cost to maintain • Develop PM cards based on frequency of failure and magnitude of average lost time (start small & grow) – Limit & prox switches – Shot tip / sleeve – Critical frame and cylinder mounting bolts – Expendable tools – Valves, hoses, packing, seals • PM’s have instruction, schedule/frequency & sign-off – PM’s / repairs done in window of opportunity when machine is down – Cycle count or date based execution of PM’s (eg cutter change) – PM status visual (work completed / not completed) Slide 20
  • 21. TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention • One point lessons for operator awareness • Creates OMP (Operator - Maintenance Partnership) • Operator performs checks, problem solving, and improvements 1. Professional Maintenance Slide 21
  • 22. TPM Production Operators • Clean & Check • Observe • Categorize Active Production Planning Quality Engineers & Control Planned • Standards & • Schedule P.M. Maintenance Calibrations Process Manufacturing Engineers • Equipment Planning • Equipment Studies Slide 22
  • 23. OMP - Operator Maintenance Partnership • Operator training in TPM TPM • Operator basic equip inspection & tooling checks • Operator basic cleaning • Operator lubrication check • One point lessons (capture knowledge) • TPM Board & TPM Tags (proactive operator involvement) Slide 23
  • 24. TPM Tag System • Problem communication tool to and from maintenance, tool room, and production – Identify abnormal machine conditions • Record problem discovered by operator • Record problem found during scheduled PM – Status tracking system of requested repairs – TPM visual management tool (hang tags) – Repair history for future problem solving • TPM Tag used for recording problem & fix – Blue Tag-Operator or Maint responsible to repair – Red Tag- Safety-related request (priority) Slide 24
  • 25. Tag Process Operator/Supervisor Production Management Maintenance 1. Abnormality Identified 2. Fill out Tag Red= Safety Blue= Prod/Maint 3. Hang C-tag as close to the defect as possible 4. Hang A &B Tags on the TPM Tag 5.Maintenance evaluates problem. If status board by Machine location and fixed immediately go to 6. If parts or area of responsibility to correct. time needed, maint pulls A tag from board. The A tag is MWO. The B tag is posted on the Maint WO status section of the TPM Board with est. timing. 7. Operator/Supervisor check to see 6.After work is completed, if work was done. maintenance completes back side of A tag and places both the A & B tag in the work completed box 8. If OK, Operator/ supervisor 9. Production management reviews removes C tag from machine and the information. Also reviews the places ABC tags in Completed box. If comments and takes actions if not OK, tags stay and maint is required. Places tag in history file box contacted. Contact noted on tag. located in the office Tag information is recorded and reviewed for continuous improvement of PM database by Production and Maintenance; Repeat operator tags may indicate Maint needs to investigate. Slide 25
  • 26. TPM is Proactive, Predictive, Preventive & Planned 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance Slide 26
  • 27. Professional Maintenance • Equip Safety • Skill building • Cross-training • Area Maintenance • WC MRO stores • Maint Mgmt System • Down alarms • Radios • Planned PM Slide 27
  • 28. Operator Autonomous Maintenance 7 Steps T P M Aut. Mgt. 7 7 Standardization 6 Autonomous Inspection OIL 5 General Inspection 4 Prepare Temporary Standards 3 3 Countermeasures for Contamination 2 2 Initial Clean-up 1 1 Slide 28
  • 29. TPM Initial Focus TPM I TPM II Step 1 Step 4 5S Step 2 Step 5 Step 3 Step 6 Step 7 prerequisite for TPM I Slide 29
  • 30. STEP 3: Prepare Temporary Standards This step is to enhance the equipment reliability & maintainability. • Temporary Check Sheet For Clean-Up, Lubrication, Start-up, and Shut-down: – What items need to be done – Who will perform the check – How often to check – Where the location is to be checked – What to use for the inspection or cleaning – Target time to complete the task Slide 30
  • 31. TPM Summary • TPM = Total Productive Maintenance – Proactive (all employees involved) Peak Performance – Preventive – Predictive Continuous Waste Reduction – Planned • TPM is an integral part 5S Standardized of JLF Total Quality Visual TPM Work production System Factory Slide 31
  • 32. TPM is a Lean tool for Quality and Productivity Slide 32

Notas do Editor

  1. A key to standardized work and to eliminating waste is the importance of workplace improvements.
  2. A key to standardized work and to eliminating waste is the importance of workplace improvements.
  3. These are the 7 steps for Operator Autonomous Maintenance: 1. Initial clean-up 2. Countermeasures for Hard-to-Access & Source of Contamination 3. Prepare Temporary Standards 4. General Inspection 5. Autonomous Inspection 6. Standardization 7. Autonomous Management
  4. All of these activities must work together to fully achieve a successful planned maintenance program. Everyone must understand their roles and responsibilities and execute as a team. Planned maintenance can no longer be the sole responsibility of the maintenance department.
  5. These are the 7 steps for Operator Autonomous Maintenance: 1. Initial clean-up 2. Countermeasures for Hard-to-Access & Source of Contamination 3. Prepare Temporary Standards 4. General Inspection 5. Autonomous Inspection 6. Standardization 7. Autonomous Management
  6. This step is to enhance equipment reliability and maintainability. In this step we will prepare standards for lubrication, cleaning and items to inspect. The experience gained in steps 1 and 2 combined with support from the maintenance group will enable us to prepare the initial check sheets.