PPPs in the Road Sector Presented by: Mauricio Ribeiro IFC Infrastructure Advisory Services Policies and Strategies to Face the Global Downturn -  The Way Forward in the Caribbean Bridgetown Barbados, October 15 & 16, 2009
Summary  Case Study – BA 093 Road PPP, Brazil Benefits Lessons Learned  (that could be interesting for the Caribbean countries) Lessons Learnt from Transportation Projects
Alternative Road Finance Methods Road Funds Budgetary Sources Private Finance Public - Private Partnerships Construction Rehabilitation Maintenance Construction Rehabilitation Maintenance
Benefits of PPP’s in the Road Sector ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Most common problems with the implementation of Transport Projects ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Pilot IFC/IADB/BNDES facility to fund infrastructure advisory to do PPPs Caracter í sticas Gerais do Convênio Implica ç ões ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
BA-093 Road PPP, Brazil  Area of the Road Studies and Project MAIN INDUSTRIAL HUBS ,[object Object],[object Object],[object Object],[object Object]
Studies Commissioned ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Traffic Engineering Legal Consultants Resettlement Environment IFC/IADB/BNDES Lead Advisors
Traffic Counting Sites Sites of the Road System Site Road AADV Total 1 BA-093 11,033   2 BA-093 6,756  3 BA-093 7,409  4 BA-093 6,022  5 BA-093 5,427  6 BA-512 5,480  9 BA-521 1,602  12 BA-524 2,029  13 BA-524 5,429  14 BA-526 18,585  15 BA-526 20,707  17 BA-535 12,055   Sites of the Road System Site Road AADV Total 7 BA-512 786  8 BA-519 6,277  10 BA-522 10,340  11 BA-523 3,022  12 BA-524 2,029  16 BA-531 7,101  18 BA-505 520  19 BA-093 719  20 BA-093 458  21 BA-400 1.280  22 BA-506 365  23 BR-101 5,739  24 BR-110 9,737  18.585 20.707 12.055 11.033
Highlights on the Users Profile Willingness to pay Trip Distance as Declared by Users Vehicle Ownership Trips Total Users priorities for the enhancement of the road Passenger Cars Trucks Pay tolls 80.2% 86.9% Do not pay tolls 19.8% 13.1% Distance Passenger cars Trucks More than 100 km 9.5% 24.7% 50 km to 100 km 21.0% 24.1% Less than 50 km 58.9% 50.4% Not informed 10.6% 0.8% Kind % Passenger Car 78% Trucks 22% Ownership Passenger Car Trucks Driver NA 21.8% Individual 65.3% 18.6% Rent 6.2% NA Corporate 20.7% 59.0% Not informed 7.8% 0.6% Activity Passenger cars Trucks Dualization of the road 41.60% 36.40% Pavement enhancement 30.10% 26.40% Third lanes construction 13.30% 15.90% Services to help the users 5.30% 3.70% Signaling enhancement  4.00% 9.60% Others 5.60% 7.90%
Number of people in the passenger cars of the BA 093 system Age of the Passenger Cars Frequency of Trips Reason of the Trips Highlights on the Users Profile Frequência Automóveis Caminhões Eventual 12,9% 8,7% 2x por sem. 9,7% 9,3% 3x por sem. 7,7% 8,0% 5x por sem. 5,5% 5,4% Diária 42,9% 34,0% Outros 21,3% 34,6% # of people/car Passenger Cars 1 50,8% 2 36,4% 3 12,8% 4 ou mais 0,0% Car Year of Production Passenger cars 2008 to 2005 57,3% 2004 to 2000 26,4% 1999 to 1990 14,8% Anterior a 89 1,5% Reason of Trip Passenger Cars Business 9,9% Fun/Visit 3,9% Home 22,1% Daily place of work 58,7% Other 5,2% No Information 0,2%
Main Enhancements ,[object Object],[object Object],[object Object]
Pavement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PERFORMANCE STANDARDS FOR PAVEMENT
Security Enhancement: Side Lanes and Third Lanes Construction Third lanes – Required work Side lanes construction – Required work Road Segment Extension (km) Term to execute BA-093 4 1.60 Until  the end of the first year after contract signing 1.40 Road Segment Extension (km) Term to execute BA-093   1 14.13 Until the end of the first year of contract signing BA-093   2 4.16 BA-093   3 5.43 BA-526   15 5.52 BA-526   14 8.62 BA-535   17 28.00 BA-512 6 5.50 BA-093   4 8.66 Until the end of the second year of contract signing BA-093   5 13.57 BA-521   9 7.00 BA-524 12 8.71
Third Lanes Maps Road Segment Extension (km) BA-093 4 1.60 1.40
Side Lanes Maps Road Segment Extension (km) Execution BA-093   1 14.13 1 Year BA-093   2 4.16 BA-093   3 5.43 BA-526   15 5.52 BA-526   14 8.62 BA-535   17 28.00 BA-512 6 5.50 BA-093   4 8.66 2 Year BA-093   5 13.57 BA-521   9 7.00 BA-524 12 8.71
Capacity Analisys using HCM 2000 Service Levels Level A Level B Level C Level D Level E Level F
Level of Service by road segment
Capacity Enhancement – Required Works Capacity Enhancement – conditioned to traffic volume Capacity Enhancement - Dualization Triggers for dualization (single lane segments) Road Segment Extension Execution deadline (from signing) BA-093 1 14.1 km 3 rd  year BA-526 14 8.6 km 1 st  semester of 3 rd  year 15 5.5 km 1 st  semester of 3 rd  year BA-535 17 28.0 km 3 rd  year Road Segment Extension ADV Time BA-521 9 7,00 km 7,850 NA BA-524 12 8,71 km 8,490 NA 13 16,0 km 7,320 2013 BA-093 3 5,4 km 7,900 2015 2 4,2 km 7,910 2017 4 8,7 km 7,580 2017 5 13,6 km 6,910 2017 BA-512 6 5,5 km 8,260 2020
Dualization Works Required Work Works conditioned to traffic triggers Road Segment Extension Year of Execution BA-093 1 14.1 km Third year BA-526 14 8.6 km First semester of the third year 15 5.5 km First semester of third year BA-535 17 28.0 km Third year Road Segment Extension DAV Estimation BA-521 9 7.00 km 7,850 NA BA-524 12 8.71 km 8,490 NA 13 16.0 km 7,320 2013 BA-093 3 5.4 km 7,900 2015 2 4.2 km 7,910 2017 4 8.7 km 7,580 2017 5 13.6 km 6,910 2017 BA-512 6 5.5 km 8,260 2020
Toll System Placement Plaza Road Segment Municipality 1 BA-093 5 Mata de São João 2 BA-093 1 Simões Filho 3 BA-524 13 Simões Filho 4 BA-535 17 Camaçari 5 BA-526 14 Salvador Road crossing with BA 535 Salvador
Structuring Results and Next Steps ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lessons Learned  That could be interesting for Caribbean countries ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lessons Learned That could be interesting for Caribbean countries ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...BRTCoE
 
Tteng 422 S2021 Module 3: Lane Management
Tteng 422  S2021 Module 3: Lane ManagementTteng 422  S2021 Module 3: Lane Management
Tteng 422 S2021 Module 3: Lane ManagementWael ElDessouki
 
Intelligent Transportation Systems (Transportation Engineering)
Intelligent Transportation Systems (Transportation Engineering)Intelligent Transportation Systems (Transportation Engineering)
Intelligent Transportation Systems (Transportation Engineering)Hossam Shafiq I
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsFairfax County
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesSYSTRA
 
Intelligent Transportation System (ITS) Project Update
Intelligent Transportation System (ITS) Project UpdateIntelligent Transportation System (ITS) Project Update
Intelligent Transportation System (ITS) Project UpdateFairfax County
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationFairfax County
 
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieBRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieRail~Volution
 
CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 James Nesbitt
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentFairfax County
 
Airfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest ProgramAirfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest ProgramApple Kuan
 
Transport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMSTransport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMSTristan Wiggill
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Shyam Raman
 
Tteng 441 traffic engineering fall 2021 part4
Tteng 441 traffic engineering fall 2021   part4Tteng 441 traffic engineering fall 2021   part4
Tteng 441 traffic engineering fall 2021 part4Wael ElDessouki
 
Heavy vehicle overload challenges
Heavy vehicle overload challengesHeavy vehicle overload challenges
Heavy vehicle overload challengesTristan Wiggill
 

Mais procurados (19)

Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
Tteng 422 S2021 Module 3: Lane Management
Tteng 422  S2021 Module 3: Lane ManagementTteng 422  S2021 Module 3: Lane Management
Tteng 422 S2021 Module 3: Lane Management
 
Intelligent Transportation Systems (Transportation Engineering)
Intelligent Transportation Systems (Transportation Engineering)Intelligent Transportation Systems (Transportation Engineering)
Intelligent Transportation Systems (Transportation Engineering)
 
First-Last Mile Presentation
First-Last Mile PresentationFirst-Last Mile Presentation
First-Last Mile Presentation
 
Reston Network Analysis: Existing Conditions
Reston Network Analysis: Existing ConditionsReston Network Analysis: Existing Conditions
Reston Network Analysis: Existing Conditions
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
 
Intelligent Transportation System (ITS) Project Update
Intelligent Transportation System (ITS) Project UpdateIntelligent Transportation System (ITS) Project Update
Intelligent Transportation System (ITS) Project Update
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and Mitigation
 
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew GuthrieBRT 101: Design, Operations and Economic Impact by Andrew Guthrie
BRT 101: Design, Operations and Economic Impact by Andrew Guthrie
 
CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental Assessment
 
Airfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest ProgramAirfields World Congress 2015 - Latest Program
Airfields World Congress 2015 - Latest Program
 
Transport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMSTransport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMS
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
Tteng 441 traffic engineering fall 2021 part4
Tteng 441 traffic engineering fall 2021   part4Tteng 441 traffic engineering fall 2021   part4
Tteng 441 traffic engineering fall 2021 part4
 
2 service standards gn final
2 service standards gn final2 service standards gn final
2 service standards gn final
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
Relief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and CriteriaRelief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and Criteria
 
Heavy vehicle overload challenges
Heavy vehicle overload challengesHeavy vehicle overload challenges
Heavy vehicle overload challenges
 

Semelhante a Barbados Road Pp Ps Mauricio Ribeiro Final Version3

IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
KYOVA Freight Presentation
KYOVA Freight PresentationKYOVA Freight Presentation
KYOVA Freight Presentationpyoungkyova
 
Performance Measures for Highway Capacity Decision Making
Performance Measures forHighway Capacity Decision MakingPerformance Measures forHighway Capacity Decision Making
Performance Measures for Highway Capacity Decision Makingpyoungkyova
 
Green telematics
Green telematicsGreen telematics
Green telematicsSandeep Kar
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring SystemIRJET Journal
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWIRJET Journal
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAIRJET Journal
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Avinash Shabade
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdfsandipanpaul16
 
Stirling Regional Centre Modelling
Stirling Regional Centre ModellingStirling Regional Centre Modelling
Stirling Regional Centre ModellingJumpingJaq
 
Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)Jalpa Jain
 
Scoping Post 2012 Climate Instruments: Nationally Appropriate Mitigation Acti...
Scoping Post 2012 Climate Instruments:Nationally Appropriate Mitigation Acti...Scoping Post 2012 Climate Instruments:Nationally Appropriate Mitigation Acti...
Scoping Post 2012 Climate Instruments: Nationally Appropriate Mitigation Acti...WRI Ross Center for Sustainable Cities
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkTexxi Global
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11absnakcac
 

Semelhante a Barbados Road Pp Ps Mauricio Ribeiro Final Version3 (20)

IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
KYOVA Freight Presentation
KYOVA Freight PresentationKYOVA Freight Presentation
KYOVA Freight Presentation
 
Performance Measures for Highway Capacity Decision Making
Performance Measures forHighway Capacity Decision MakingPerformance Measures forHighway Capacity Decision Making
Performance Measures for Highway Capacity Decision Making
 
Green telematics
Green telematicsGreen telematics
Green telematics
 
IRJET - Smart Traffic Monitoring System
IRJET -  	  Smart Traffic Monitoring SystemIRJET -  	  Smart Traffic Monitoring System
IRJET - Smart Traffic Monitoring System
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
 
Congestion Pricing
Congestion PricingCongestion Pricing
Congestion Pricing
 
,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf,Exit Exam Tutorial -Traffic Engineering.pdf
,Exit Exam Tutorial -Traffic Engineering.pdf
 
Stirling Regional Centre Modelling
Stirling Regional Centre ModellingStirling Regional Centre Modelling
Stirling Regional Centre Modelling
 
Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)
 
Final Defence (3).pptx
Final Defence (3).pptxFinal Defence (3).pptx
Final Defence (3).pptx
 
Scoping Post 2012 Climate Instruments: Nationally Appropriate Mitigation Acti...
Scoping Post 2012 Climate Instruments:Nationally Appropriate Mitigation Acti...Scoping Post 2012 Climate Instruments:Nationally Appropriate Mitigation Acti...
Scoping Post 2012 Climate Instruments: Nationally Appropriate Mitigation Acti...
 
June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop
 
ITS in Bahrain
ITS in BahrainITS in Bahrain
ITS in Bahrain
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing Work
 
9 pilot projects rs final
9 pilot projects rs final9 pilot projects rs final
9 pilot projects rs final
 
I495 route 9 sac meeting 1 9 8-11
I495 route 9 sac meeting  1 9 8-11I495 route 9 sac meeting  1 9 8-11
I495 route 9 sac meeting 1 9 8-11
 

Mais de Mauricio Portugal Ribeiro

12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...
12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...
12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...Mauricio Portugal Ribeiro
 
A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...
A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...
A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...Mauricio Portugal Ribeiro
 
Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...
Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...
Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...Mauricio Portugal Ribeiro
 
Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...
Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...
Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...Mauricio Portugal Ribeiro
 
Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...
Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...
Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...Mauricio Portugal Ribeiro
 
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPsPrograma do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPsMauricio Portugal Ribeiro
 
Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...
Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...
Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...Mauricio Portugal Ribeiro
 
A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...
A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...
A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...Mauricio Portugal Ribeiro
 
Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...
Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...
Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...Mauricio Portugal Ribeiro
 
Curso Melhores Práticas em Concessões e PPPs - maio de 2016
Curso Melhores Práticas em Concessões e PPPs - maio de 2016Curso Melhores Práticas em Concessões e PPPs - maio de 2016
Curso Melhores Práticas em Concessões e PPPs - maio de 2016Mauricio Portugal Ribeiro
 
10 Anos da lei de PPP & 20 Anos da Lei de Concessões
10 Anos da lei de PPP & 20 Anos da Lei de Concessões10 Anos da lei de PPP & 20 Anos da Lei de Concessões
10 Anos da lei de PPP & 20 Anos da Lei de ConcessõesMauricio Portugal Ribeiro
 
Seguro-garantia de cumprimento de contrato com cobertura integral como único ...
Seguro-garantia de cumprimento de contrato com cobertura integral como único ...Seguro-garantia de cumprimento de contrato com cobertura integral como único ...
Seguro-garantia de cumprimento de contrato com cobertura integral como único ...Mauricio Portugal Ribeiro
 
PPP Mais e o regime dos contratos de concessão e PPP
PPP Mais e o regime dos contratos de concessão e PPPPPP Mais e o regime dos contratos de concessão e PPP
PPP Mais e o regime dos contratos de concessão e PPPMauricio Portugal Ribeiro
 
SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA
SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA
SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA Mauricio Portugal Ribeiro
 
Aumento de eficiência operacional de infraestrutura versus a sua expansão
Aumento de eficiência operacional de infraestrutura versus a sua expansãoAumento de eficiência operacional de infraestrutura versus a sua expansão
Aumento de eficiência operacional de infraestrutura versus a sua expansãoMauricio Portugal Ribeiro
 
Reequilíbrios incompletos de contratos de concessão e PPP
Reequilíbrios incompletos de contratos de concessão e PPPReequilíbrios incompletos de contratos de concessão e PPP
Reequilíbrios incompletos de contratos de concessão e PPPMauricio Portugal Ribeiro
 
Equilíbrio econômico-financeiro e distribuição de riscos
Equilíbrio econômico-financeiro e distribuição de riscosEquilíbrio econômico-financeiro e distribuição de riscos
Equilíbrio econômico-financeiro e distribuição de riscosMauricio Portugal Ribeiro
 
O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...
O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...
O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...Mauricio Portugal Ribeiro
 
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPsPrograma do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPsMauricio Portugal Ribeiro
 
COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...
COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...
COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...Mauricio Portugal Ribeiro
 

Mais de Mauricio Portugal Ribeiro (20)

12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...
12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...
12 erros mais comuns de modelagem em concessões e PPPs e a recente decisão do...
 
A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...
A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...
A Medida Provisória n⁰ 752/16 e os setores rodoviário e aeroportuário - Seu c...
 
Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...
Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...
Texto de projeto de lei sobre participação público-privada aprovado pelo Sena...
 
Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...
Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...
Comentários às Diretrizes Recentemente Publicadas do Novo Programa de Investi...
 
Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...
Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...
Medida Provisória 727 sobre PPI: o Governo Temer renunciou a usar investiment...
 
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPsPrograma do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPs
 
Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...
Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...
Aleatoriedade em processos de reequilíbrio de contratos: o uso de estimativas...
 
A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...
A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...
A necessidade de aperfeiçoamento da distribuição de riscos a ser prevista nos...
 
Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...
Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...
Comentários ao Estudo sobre Estruturação de Concessões e PPPs elaborado pelo ...
 
Curso Melhores Práticas em Concessões e PPPs - maio de 2016
Curso Melhores Práticas em Concessões e PPPs - maio de 2016Curso Melhores Práticas em Concessões e PPPs - maio de 2016
Curso Melhores Práticas em Concessões e PPPs - maio de 2016
 
10 Anos da lei de PPP & 20 Anos da Lei de Concessões
10 Anos da lei de PPP & 20 Anos da Lei de Concessões10 Anos da lei de PPP & 20 Anos da Lei de Concessões
10 Anos da lei de PPP & 20 Anos da Lei de Concessões
 
Seguro-garantia de cumprimento de contrato com cobertura integral como único ...
Seguro-garantia de cumprimento de contrato com cobertura integral como único ...Seguro-garantia de cumprimento de contrato com cobertura integral como único ...
Seguro-garantia de cumprimento de contrato com cobertura integral como único ...
 
PPP Mais e o regime dos contratos de concessão e PPP
PPP Mais e o regime dos contratos de concessão e PPPPPP Mais e o regime dos contratos de concessão e PPP
PPP Mais e o regime dos contratos de concessão e PPP
 
SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA
SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA
SEMINÁRIO SOBRE MITIGAÇÃO DE RISCOS EM CONCESSÕES DE INFRAESTRUTURA
 
Aumento de eficiência operacional de infraestrutura versus a sua expansão
Aumento de eficiência operacional de infraestrutura versus a sua expansãoAumento de eficiência operacional de infraestrutura versus a sua expansão
Aumento de eficiência operacional de infraestrutura versus a sua expansão
 
Reequilíbrios incompletos de contratos de concessão e PPP
Reequilíbrios incompletos de contratos de concessão e PPPReequilíbrios incompletos de contratos de concessão e PPP
Reequilíbrios incompletos de contratos de concessão e PPP
 
Equilíbrio econômico-financeiro e distribuição de riscos
Equilíbrio econômico-financeiro e distribuição de riscosEquilíbrio econômico-financeiro e distribuição de riscos
Equilíbrio econômico-financeiro e distribuição de riscos
 
O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...
O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...
O atraso em reequilibrar concessões e PPPs pode ser enquadrado como improbida...
 
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPsPrograma do curso equilíbrio econômico-financeiro de concessoes e PPPs
Programa do curso equilíbrio econômico-financeiro de concessoes e PPPs
 
COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...
COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...
COMO LIDAR COM O RISCO DE FINANCIAMENTO DE CONCESSÕES E PPPS EM PERÍODOS DE N...
 

Barbados Road Pp Ps Mauricio Ribeiro Final Version3

  • 1. PPPs in the Road Sector Presented by: Mauricio Ribeiro IFC Infrastructure Advisory Services Policies and Strategies to Face the Global Downturn - The Way Forward in the Caribbean Bridgetown Barbados, October 15 & 16, 2009
  • 2. Summary Case Study – BA 093 Road PPP, Brazil Benefits Lessons Learned (that could be interesting for the Caribbean countries) Lessons Learnt from Transportation Projects
  • 3. Alternative Road Finance Methods Road Funds Budgetary Sources Private Finance Public - Private Partnerships Construction Rehabilitation Maintenance Construction Rehabilitation Maintenance
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. Traffic Counting Sites Sites of the Road System Site Road AADV Total 1 BA-093 11,033 2 BA-093 6,756 3 BA-093 7,409 4 BA-093 6,022 5 BA-093 5,427 6 BA-512 5,480 9 BA-521 1,602 12 BA-524 2,029 13 BA-524 5,429 14 BA-526 18,585 15 BA-526 20,707 17 BA-535 12,055 Sites of the Road System Site Road AADV Total 7 BA-512 786 8 BA-519 6,277 10 BA-522 10,340 11 BA-523 3,022 12 BA-524 2,029 16 BA-531 7,101 18 BA-505 520 19 BA-093 719 20 BA-093 458 21 BA-400 1.280 22 BA-506 365 23 BR-101 5,739 24 BR-110 9,737 18.585 20.707 12.055 11.033
  • 10. Highlights on the Users Profile Willingness to pay Trip Distance as Declared by Users Vehicle Ownership Trips Total Users priorities for the enhancement of the road Passenger Cars Trucks Pay tolls 80.2% 86.9% Do not pay tolls 19.8% 13.1% Distance Passenger cars Trucks More than 100 km 9.5% 24.7% 50 km to 100 km 21.0% 24.1% Less than 50 km 58.9% 50.4% Not informed 10.6% 0.8% Kind % Passenger Car 78% Trucks 22% Ownership Passenger Car Trucks Driver NA 21.8% Individual 65.3% 18.6% Rent 6.2% NA Corporate 20.7% 59.0% Not informed 7.8% 0.6% Activity Passenger cars Trucks Dualization of the road 41.60% 36.40% Pavement enhancement 30.10% 26.40% Third lanes construction 13.30% 15.90% Services to help the users 5.30% 3.70% Signaling enhancement 4.00% 9.60% Others 5.60% 7.90%
  • 11. Number of people in the passenger cars of the BA 093 system Age of the Passenger Cars Frequency of Trips Reason of the Trips Highlights on the Users Profile Frequência Automóveis Caminhões Eventual 12,9% 8,7% 2x por sem. 9,7% 9,3% 3x por sem. 7,7% 8,0% 5x por sem. 5,5% 5,4% Diária 42,9% 34,0% Outros 21,3% 34,6% # of people/car Passenger Cars 1 50,8% 2 36,4% 3 12,8% 4 ou mais 0,0% Car Year of Production Passenger cars 2008 to 2005 57,3% 2004 to 2000 26,4% 1999 to 1990 14,8% Anterior a 89 1,5% Reason of Trip Passenger Cars Business 9,9% Fun/Visit 3,9% Home 22,1% Daily place of work 58,7% Other 5,2% No Information 0,2%
  • 12.
  • 13.
  • 14. Security Enhancement: Side Lanes and Third Lanes Construction Third lanes – Required work Side lanes construction – Required work Road Segment Extension (km) Term to execute BA-093 4 1.60 Until the end of the first year after contract signing 1.40 Road Segment Extension (km) Term to execute BA-093 1 14.13 Until the end of the first year of contract signing BA-093 2 4.16 BA-093 3 5.43 BA-526 15 5.52 BA-526 14 8.62 BA-535 17 28.00 BA-512 6 5.50 BA-093 4 8.66 Until the end of the second year of contract signing BA-093 5 13.57 BA-521 9 7.00 BA-524 12 8.71
  • 15. Third Lanes Maps Road Segment Extension (km) BA-093 4 1.60 1.40
  • 16. Side Lanes Maps Road Segment Extension (km) Execution BA-093 1 14.13 1 Year BA-093 2 4.16 BA-093 3 5.43 BA-526 15 5.52 BA-526 14 8.62 BA-535 17 28.00 BA-512 6 5.50 BA-093 4 8.66 2 Year BA-093 5 13.57 BA-521 9 7.00 BA-524 12 8.71
  • 17. Capacity Analisys using HCM 2000 Service Levels Level A Level B Level C Level D Level E Level F
  • 18. Level of Service by road segment
  • 19. Capacity Enhancement – Required Works Capacity Enhancement – conditioned to traffic volume Capacity Enhancement - Dualization Triggers for dualization (single lane segments) Road Segment Extension Execution deadline (from signing) BA-093 1 14.1 km 3 rd year BA-526 14 8.6 km 1 st semester of 3 rd year 15 5.5 km 1 st semester of 3 rd year BA-535 17 28.0 km 3 rd year Road Segment Extension ADV Time BA-521 9 7,00 km 7,850 NA BA-524 12 8,71 km 8,490 NA 13 16,0 km 7,320 2013 BA-093 3 5,4 km 7,900 2015 2 4,2 km 7,910 2017 4 8,7 km 7,580 2017 5 13,6 km 6,910 2017 BA-512 6 5,5 km 8,260 2020
  • 20. Dualization Works Required Work Works conditioned to traffic triggers Road Segment Extension Year of Execution BA-093 1 14.1 km Third year BA-526 14 8.6 km First semester of the third year 15 5.5 km First semester of third year BA-535 17 28.0 km Third year Road Segment Extension DAV Estimation BA-521 9 7.00 km 7,850 NA BA-524 12 8.71 km 8,490 NA 13 16.0 km 7,320 2013 BA-093 3 5.4 km 7,900 2015 2 4.2 km 7,910 2017 4 8.7 km 7,580 2017 5 13.6 km 6,910 2017 BA-512 6 5.5 km 8,260 2020
  • 21. Toll System Placement Plaza Road Segment Municipality 1 BA-093 5 Mata de São João 2 BA-093 1 Simões Filho 3 BA-524 13 Simões Filho 4 BA-535 17 Camaçari 5 BA-526 14 Salvador Road crossing with BA 535 Salvador
  • 22.