Schedule Manager Overview
Agenda


 Why manage schedules in
                                    HD User Experience
  Teamcenter
 Schedule manager key            Intelligently Integrated
                                         Information
  capabilities
 Integrating schedules within   Future-proof Architecture
  Teamcenter
 Demonstration of Teamcenter
  9.1 features
 Closing




                                 © Siemens AG 2012. All Rights Reserved.
Page 2                                             Siemens PLM Software
Schedule Manager Overview
Why Manage Schedules in Teamcenter


 Why manage schedules in
                                        HD User Experience
  Teamcenter
 Schedule manager key                Intelligently Integrated
                                             Information
  capabilities
 Integrating schedules within       Future-proof Architecture
  Teamcenter
 Demonstration of Teamcenter
  9.1 features
 Closing




                                     © Siemens AG 2012. All Rights Reserved.
Page 3                                                 Siemens PLM Software
Schedule Manager Overview
Why Manage Schedules in Teamcenter


 Planning, executing and managing work in product-driven organizations


                                      Organizational & product complexity

                                      Scheduling and synchronizing activities
                                       across multiple teams

                                      Avoiding bottlenecks and scheduling
                                       snafus

                                      Pressure to meet cost reduction /
                                       operational efficiency goals

                                      Timely status reporting to ensure
                                       management visibility



                                              © Siemens AG 2012. All Rights Reserved.
Page 4                                                          Siemens PLM Software
Schedule Manager Overview
Why Manage Schedules in Teamcenter


   Enables the definition, delivery and execution of PLM work packages
   Tightly coupled with Teamcenter foundational capabilities
   Extends PLM work management processes to other PLM business processes
   Extends PLM work management processes to enterprise work management
    processes

                        PLM Processes                                 PPM Processes
                    Requirements testing / validation              Program portfolio planning
                    Change management planning                     Financial management
                    MRO service scheduling (9.1)                   Investment analysis
                    Portfolio management                           Capacity planning
                                                                    Resource management


                                           Schedule Manager
                                   Workgroup / departmental work management & execution
                                   Resource scheduling
                                   Deliverables management
                                   Process automation

                                       Teamcenter Platform Processes
                                               Workflow Product Data
                                      Organization Access Mgt Process History


                                                                                © Siemens AG 2012. All Rights Reserved.
Page 5                                                                                            Siemens PLM Software
Schedule Manager Overview
Why Manage Schedules in Teamcenter


 Engineering / Product Development
   Manager
   Team leader / coordinator
   Team member
 Senior leadership
   Product planners
   Product management
   Executives
 PMO*
   Program manager
   Project manager

  * PMO = program management office or
    project management office

                                         © Siemens AG 2012. All Rights Reserved.
Page 6                                                     Siemens PLM Software
Schedule Manager Overview
 Why Manage Schedules in Teamcenter


 Efficient WBS creation
     Use templates to quickly plan and estimate work effort
 Efficient management of work authorizations
     Control over who works on what and when
 Automated work execution
     Distribution of complete work package deliverables (not just the assignment)
 Automated work statusing
     Execution data updates via workflow
 Automated replanning
     Cross-schedule dependencies
     Actual date-to-plan date linking (10.1)

 Increased productivity for engineering / product
   development resources, team leaders and managers
                                                      © Siemens AG 2012. All Rights Reserved.
 Page 7                                                                 Siemens PLM Software
Schedule Manager Overview
Why Manage Schedules in Teamcenter


Complete PLM operational / management visibility
  Schedule status + deliverable status
  Visibility into work across matrix organizations via program views
  Visibility into planned & unplanned work via integration with Change
   Management
  Traceability and audit support via process & signoff history
  Out of the box reports with Teamcenter Reporting & Analytics




                                              © Siemens AG 2012. All Rights Reserved.
Page 8                                                          Siemens PLM Software
Schedule Manager Overview
Why Manage Schedules in Teamcenter


Accessibility
  Teamcenter is used every day by
   team leaders & resources
  Resources are more likely to
   update task information (and
   project plans will be more up-to-
   date) if
    the update is done for them
     automatically, or
    the ability to update the task is
     just “one click away”




                                         © Siemens AG 2012. All Rights Reserved.
Page 9                                                     Siemens PLM Software
Schedule Manager Overview
Schedule Manager Key Capabilities


 Why manage schedules in
                                       HD User Experience
  Teamcenter
 Schedule manager key               Intelligently Integrated
                                            Information
  capabilities
 Integrating schedules within      Future-proof Architecture
  Teamcenter
 Demonstration of Teamcenter
  9.1 features
 Closing




                                    © Siemens AG 2012. All Rights Reserved.
Page 10                                               Siemens PLM Software
Schedule Manager Overview
Key Capabilities


1. Schedule management              4. Work execution
     Templates                         Workflow-driven task assignments
     Resource assignments              Execution (status) updates
     Budgeting & costing               Team collaboration
2. Process automation               5. Performance management
     Requirements linking              Automated work statusing
     Deliverables                      Multi-schedule view of schedule
     Workflow                           performance
3. Multi-schedule management            Portfolio view of progress
     Master-sub schedules
     Proxy-tasks / milestones
     Cross-schedule dependencies

                                               © Siemens AG 2012. All Rights Reserved.
Page 11                                                          Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Create new schedule from
                             template
                              WBS with phase-gate
                               milestones
                              User / discipline
                               assignments
                              Workflow processes
                              Deliverables




                            © Siemens AG 2012. All Rights Reserved.
Page 12                                       Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Create new schedule from
                             template
                              WBS with phase-gate
                               milestones
                              User / discipline
                               assignments
                              Workflow processes
                              Deliverables
                              Set task schedule
                               properties
                                Duration, effort, task type,
                                 etc




                            © Siemens AG 2012. All Rights Reserved.
Page 13                                       Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Create new schedule from
                             template
                              WBS with phase-gate
                               milestones
                              User / discipline
                               assignments
                              Workflow processes
                              Deliverables
                              Set task schedule
                               properties
                                Duration, effort, task type,
                                 etc
                              Manage assignments


                            © Siemens AG 2012. All Rights Reserved.
Page 14                                       Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Create new schedule from
                             template
                              WBS with phase-gate
                               milestones
                              User / discipline
                               assignments
                              Workflow processes
                              Deliverables
                              Set task schedule
                               properties
                                 Duration, effort, task type,
                                  etc
                              Manage assignments
                              Manage costs

                            © Siemens AG 2012. All Rights Reserved.
Page 15                                       Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Integrate to PLM data
                              Link requirements to task
                              Validate tasks at all
                               milestones
                              Requirements define the
                               exit criteria for the schedule
                               or phase within a schedule




                            © Siemens AG 2012. All Rights Reserved.
Page 16                                       Siemens PLM Software
Schedule Manager Overview
Key Capabilities




                            Integrate to PLM processes
                             Schedule task initiates workflow task with
                              targets and references
                             Workflow task provides link back to schedule
                              task
                             Workflow task will update schedule task
                                           © Siemens AG 2012. All Rights Reserved.
Page 17                                                      Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                            Schedule Status
                             Value can be set manually or
                              by system
                             Configurable values & rules




                             © Siemens AG 2012. All Rights Reserved.
Page 18                                        Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                            Update schedule task
                            execution data
                             Thin client UI (8.3)




                             © Siemens AG 2012. All Rights Reserved.
Page 19                                        Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Update schedule task
                             execution data
                              RAC UI (9.0)




                            © Siemens AG 2012. All Rights Reserved.
Page 20                                       Siemens PLM Software
Schedule Manager Overview
Key Capabilities


                             Program Views
                              Quickly identify tasks that
                               need attention




                            © Siemens AG 2012. All Rights Reserved.
Page 21                                       Siemens PLM Software
Schedule Manager Overview
Integrating Schedules Within Teamcenter


 Why manage schedules in
                                             HD User Experience
  Teamcenter
 Schedule manager key                     Intelligently Integrated
                                                  Information
  capabilities
 Integrating schedules within            Future-proof Architecture
  Teamcenter
 Demonstration of Teamcenter
  9.1 features
 Closing




                                          © Siemens AG 2012. All Rights Reserved.
Page 22                                                     Siemens PLM Software
Schedule Manager Overview
Integrating Schedules


   Enables the definition, delivery and execution of PLM work packages
   Tightly coupled with Teamcenter foundational capabilities
   Extends PLM work management processes to other PLM business processes
   Extends PLM work management processes to enterprise work management
    processes

                        PLM Processes                                 PPM Processes
                    Requirements testing / validation              Program portfolio planning
                    Change management planning                     Financial management
                    MRO service scheduling (9.1)                   Investment analysis
                    Portfolio management                           Capacity planning
                                                                    Resource management


                                           Schedule Manager
                                   Workgroup / departmental work management & execution
                                   Resource scheduling
                                   Deliverables management
                                   Process automation

                                       Teamcenter Platform Processes
                                               Workflow Product Data
                                      Organization Access Mgt Process History


                                                                                © Siemens AG 2012. All Rights Reserved.
Page 23                                                                                           Siemens PLM Software
Schedule Manager Overview
Integrating Schedules


Definition
 Work is managed & executed in parallel and in
  sequence across various teams / departments / work
  streams / functions
 The work must be closely synchronized and
  coordinated
 Beneficial for complex projects
                                     Schedule A
   Complex assemblies                                                Schedule F

                                                   Schedule D                           Schedule H
   Many products to be released
                                        Schedule B                         Schedule G
   Dynamic environments                               Schedule E

   Multiple teams / disciplines
                                     Schedule C
   Milestone / phase-gate focus
   Many schedules

                                                      © Siemens AG 2012. All Rights Reserved.
Page 24                                                                 Siemens PLM Software
Schedule Manager Overview
           Integrating Schedules

           Master Schedule
                                                            Define the master schedule
                                                             Milestones ( ) defined once at the
                                                              master schedule level
                                                            Define the “Schedule / Execution
                                                            Horizon”
                                                             Determines how far into the future you
                                                              will do detailed planning
                             Schedule / Execution Horizon




                                                             Level of planning confidence is high
Time Now




                                                                      © Siemens AG 2012. All Rights Reserved.
           Page 25                                                                      Siemens PLM Software
Schedule Manager Overview
            Integrating Schedules

           Master Schedule
                                                                             Define the master schedule
                                                                              Milestones ( ) defined once at the
                                                                               master schedule level
           Mechanical Sub-schedule
                                                                             Define the “Schedule / Execution
             Sch A1
                                                                             Horizon”
                 Sch A2                                                       Determines how far into the future
                                                                               you will do detailed planning
                                              Schedule / Execution Horizon




                          Sch A3
                                                                              Level of planning confidence is high
           Electrical Sub-schedule
                              Sch B1
                                                                             Define the sub-schedules
                                   Sch B2
                                                                              By team, work stream, assembly, etc
                                                                             Create dependencies
Time Now




                                     Sch B3
                                                                              Within schedules
                                                                              Across schedules
                                                                             Assign workflow processes to
                                                                             schedule tasks
                                                                                       © Siemens AG 2012. All Rights Reserved.
            Page 26                                                                                      Siemens PLM Software
Schedule Manager Overview
           Integrating Schedules

           Master Schedule
                                                                                                                                        Start the first schedule, and as
                                                                                                                                        time progresses…
                                                                                                                                         Teamcenter will automatically
                                                                                                                                          “complete” and “start” schedule tasks
            Sch A1                                                          Sch D1
                                                                                                                                        And as the next milestone
                Sch A2                                                          Sch D2
                                                                                                                                        approaches…


                                                                                                       Scheduling / Execution Horizon
                                                                                                                                         Create schedules for next schedule /
                                             Schedule / Execution Horizon




                         Sch A3                                                      Sch D3

                                                                                                                                          execution horizon
                             Sch B1                                                      Sch E1                                          Create high level schedules from
                                  Sch B2                                                      Sch E2                                      templates
                                                                                                                                         Add the details „just in time‟
Time Now




                                    Sch B3                                                    Sch E3




                                                                                                                                                   © Siemens AG 2012. All Rights Reserved.
           Page 27                                                                                                                                                   Siemens PLM Software
Schedule Manager Overview
Demonstration


 Why manage schedules in
                                    HD User Experience
  Teamcenter
 Schedule manager key            Intelligently Integrated
                                         Information
  capabilities
 Integrating schedules within   Future-proof Architecture
  Teamcenter
 Demonstration of Teamcenter
  9.1 features
 Closing




                                 © Siemens AG 2012. All Rights Reserved.
Page 28                                            Siemens PLM Software
Integrated Schedule Management


AVI 1 Master Schedule




                                 © Siemens AG 2012. All Rights Reserved.
Page 29                                            Siemens PLM Software
Integrated Schedule Management


AVI 2 Work in sub-schedule




                                 © Siemens AG 2012. All Rights Reserved.
Page 30                                            Siemens PLM Software
Schedule Manager Overview
Demonstration


How to keep track of all those tasks?
 Team leaders, team members and management
   Need an easy way to identify at-risk tasks to avoid project delays
   They do not want to waste time searching for this information

Schedule status & program views
 Quickly identify tasks that need attention


                                               LATE!
                  TASK
                ABORTED
     NOT
   STARTED
                               OVER                        NEED
                              BUDGET                       HELP




                                                   © Siemens AG 2012. All Rights Reserved.
Page 31                                                              Siemens PLM Software
Integrated Schedule Management


AVI 3 Program views




                                 © Siemens AG 2012. All Rights Reserved.
Page 32                                            Siemens PLM Software
Schedule Manager Overview
Closing


 Why manage schedules in
                                    HD User Experience
  Teamcenter
 Schedule manager key            Intelligently Integrated
                                         Information
  capabilities
 Integrating schedules within   Future-proof Architecture
  Teamcenter
 Demonstration of Teamcenter
  9.1 features
 Closing




                                 © Siemens AG 2012. All Rights Reserved.
Page 33                                            Siemens PLM Software
Schedule Manager Overview
Summary


          Improve operational efficiencies and delivery projects on time

                     Eliminate scheduling bottlenecks with top-down enterprise
                     planning



                     Increase productivity with automated process integration


                     Synchronize work activities across disparate teams
                     and product assemblies with fully work integrated planning
                     and execution systems




                                                  © Siemens AG 2012. All Rights Reserved.
Page 34                                                             Siemens PLM Software
Schedule Manager Overview
Customer Examples


Automated change management process
 Use schedule manager APIs to create change schedules from templates
 Hundreds of change orders processed per month; Teamcenter projected
  to reduce operational costs by millions of dollars per year

Template-driven schedules with short durations
 Schedules execute in 1-2 month cycles
 Schedules are created from library of standard templates
 Resource complete their workflow tasks and the schedules are statused
  automatically

Create test plan (schedule) from test requirements
 Use schedule manager APIs to automatically create test plan (schedule
  tasks) from test requirements

                                               © Siemens AG 2012. All Rights Reserved.
Page 35                                                          Siemens PLM Software
Schedule Manager Overview
Customer Examples

A&D
  Automate the change management process
  Use schedule manager APIs to create schedules from templates
  Workflow automates the process and schedules are automatically
   statused
  Hundreds of change orders processed per month

Shipbuilding & Energy
  3rd party planning application used for program management, project
   planning, earned value reporting and resource planning
  Released projects send to Teamcenter
  Schedules created from templates
  Workflow sends work assignments to designers and engineers
  Execution data rolls up to the schedules
  Schedules send status updates to PPM projects

                                              © Siemens AG 2012. All Rights Reserved.
Page 36                                                         Siemens PLM Software
Schedule Manager Overview
Is Schedule Manager Right For You?


Product lifecycle management project management entails…
 Work breakdown structure planning, management & execution
 Supplier / customer involvement
 Requirements management and systems integration
 Deliverables management and the management of product breakdowns
 Change control and configuration management
 Collaborative product development (hug impact on risk reduction)
 Rapid aggregation of schedule data for easy consumption by management




                                               © Siemens AG 2012. All Rights Reserved.
Page 37                                                          Siemens PLM Software
Schedule Manager Overview
Benefits


Assumptions
 Employee (Business Associate) cost rates
   Team leader $60 / hour
   Team member $45 / hour
 Productivity gains
   Team leader 0.5 hours / week
   Team member 0.5 hours / week
 Team size 1:10

ROI
 Payback period is months, not years
 More time spent on value-add activities
                                             © Siemens AG 2012. All Rights Reserved.
Page 38                                                        Siemens PLM Software
Thank You



Siemens PLM Connection
         2012
     Las Vegas, NV
       May 7-10
                                      © Siemens AG 2012. All Rights Reserved.
               http://plmworld.org/
                                                        Siemens PLM Software

Mais conteúdo relacionado

Mais procurados

Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageAnand Subramaniam
 
Continuous Improvement Strategy
Continuous Improvement StrategyContinuous Improvement Strategy
Continuous Improvement StrategyCraig Marton
 
Cascading Strategy Through Hoshin Kanri (Strategy Deployment)
Cascading Strategy Through Hoshin Kanri (Strategy Deployment)Cascading Strategy Through Hoshin Kanri (Strategy Deployment)
Cascading Strategy Through Hoshin Kanri (Strategy Deployment)KaiNexus
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsAurelien Domont, MBA
 
Business Composability
Business ComposabilityBusiness Composability
Business ComposabilityCOMPETENSIS
 
SAP Signavio for SAP S/4HANA - 2023
SAP Signavio for SAP S/4HANA - 2023SAP Signavio for SAP S/4HANA - 2023
SAP Signavio for SAP S/4HANA - 2023Johannes Strasser
 
Establishing a Business Process Management Center of Excellence - Impact 2012
Establishing a Business Process Management Center of Excellence  - Impact 2012Establishing a Business Process Management Center of Excellence  - Impact 2012
Establishing a Business Process Management Center of Excellence - Impact 2012Prolifics
 
BA 553 - BPM Governance.ppt
BA 553 - BPM Governance.pptBA 553 - BPM Governance.ppt
BA 553 - BPM Governance.pptStevenShing
 
Six Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram BakshiSix Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram BakshiLT COLONEL VIKRAM BAKSHI ( RETD)
 
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...Shamil Habet
 
Business Process Modeling with BPMN 2.0 - Second edition
Business Process Modeling with BPMN 2.0 - Second editionBusiness Process Modeling with BPMN 2.0 - Second edition
Business Process Modeling with BPMN 2.0 - Second editionGregor Polančič
 
Extended ECM for SAP Solutions
Extended ECM for SAP SolutionsExtended ECM for SAP Solutions
Extended ECM for SAP SolutionsOpenText
 
BMC Discovery with new Multi-Cloud Function
BMC Discovery with new Multi-Cloud FunctionBMC Discovery with new Multi-Cloud Function
BMC Discovery with new Multi-Cloud FunctionBill Spinner
 
MDM Architecture - SAP
MDM Architecture - SAPMDM Architecture - SAP
MDM Architecture - SAPCapgemini
 
Process mining in business process management
Process mining in business process managementProcess mining in business process management
Process mining in business process managementRamez Al-Fayez
 
Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...
Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...
Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...SAP Technology
 
Project Management Methodologies - Mind Map
Project Management Methodologies - Mind MapProject Management Methodologies - Mind Map
Project Management Methodologies - Mind MapWAJAHAT IQBAL
 

Mais procurados (20)

Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
Continuous Improvement Strategy
Continuous Improvement StrategyContinuous Improvement Strategy
Continuous Improvement Strategy
 
Business Process Management Training 1
Business Process Management Training 1Business Process Management Training 1
Business Process Management Training 1
 
Cascading Strategy Through Hoshin Kanri (Strategy Deployment)
Cascading Strategy Through Hoshin Kanri (Strategy Deployment)Cascading Strategy Through Hoshin Kanri (Strategy Deployment)
Cascading Strategy Through Hoshin Kanri (Strategy Deployment)
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
 
Business Composability
Business ComposabilityBusiness Composability
Business Composability
 
SAP Signavio for SAP S/4HANA - 2023
SAP Signavio for SAP S/4HANA - 2023SAP Signavio for SAP S/4HANA - 2023
SAP Signavio for SAP S/4HANA - 2023
 
Establishing a Business Process Management Center of Excellence - Impact 2012
Establishing a Business Process Management Center of Excellence  - Impact 2012Establishing a Business Process Management Center of Excellence  - Impact 2012
Establishing a Business Process Management Center of Excellence - Impact 2012
 
BA 553 - BPM Governance.ppt
BA 553 - BPM Governance.pptBA 553 - BPM Governance.ppt
BA 553 - BPM Governance.ppt
 
Six Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram BakshiSix Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
 
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
 
Business Process Modeling with BPMN 2.0 - Second edition
Business Process Modeling with BPMN 2.0 - Second editionBusiness Process Modeling with BPMN 2.0 - Second edition
Business Process Modeling with BPMN 2.0 - Second edition
 
Extended ECM for SAP Solutions
Extended ECM for SAP SolutionsExtended ECM for SAP Solutions
Extended ECM for SAP Solutions
 
BMC Discovery with new Multi-Cloud Function
BMC Discovery with new Multi-Cloud FunctionBMC Discovery with new Multi-Cloud Function
BMC Discovery with new Multi-Cloud Function
 
MDM Architecture - SAP
MDM Architecture - SAPMDM Architecture - SAP
MDM Architecture - SAP
 
Itto pmbok guide 6th edition
Itto   pmbok guide 6th editionItto   pmbok guide 6th edition
Itto pmbok guide 6th edition
 
Process mining in business process management
Process mining in business process managementProcess mining in business process management
Process mining in business process management
 
Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...
Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...
Process optimization and automation for SAP S/4HANA with SAP’s Business Techn...
 
Project Management Methodologies - Mind Map
Project Management Methodologies - Mind MapProject Management Methodologies - Mind Map
Project Management Methodologies - Mind Map
 
Business Architecture Foundations
Business Architecture FoundationsBusiness Architecture Foundations
Business Architecture Foundations
 

Semelhante a Visão Geral do Schedule Manager

CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM
CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLMCodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM
CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLMCodecamp Romania
 
Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectZulkefle Idris
 
Teamcenter rapid start capabilities and licensing tech transfer
Teamcenter rapid start capabilities and licensing tech transferTeamcenter rapid start capabilities and licensing tech transfer
Teamcenter rapid start capabilities and licensing tech transferSharath Shirsi
 
Softexpert BPM Kurumsal Surec Yonetimi
Softexpert BPM Kurumsal Surec YonetimiSoftexpert BPM Kurumsal Surec Yonetimi
Softexpert BPM Kurumsal Surec YonetimiHydron Consulting Grup
 
Oracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareOracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareLeon Smiers
 
Industry-forum 2011 PARTsolutions TESIS
Industry-forum 2011 PARTsolutions TESISIndustry-forum 2011 PARTsolutions TESIS
Industry-forum 2011 PARTsolutions TESISCADENAS
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting CapabilitiesQuinn Harry
 
Software Project Management by CMMi Level 5
Software Project Management by CMMi Level 5Software Project Management by CMMi Level 5
Software Project Management by CMMi Level 5mekongsolution
 
LeverX SAP DMS Webinar
LeverX SAP DMS WebinarLeverX SAP DMS Webinar
LeverX SAP DMS WebinarEric Stajda
 
LeverX - A Comprehensive Guide to SAP PLM 7.01
LeverX - A Comprehensive Guide to SAP PLM 7.01LeverX - A Comprehensive Guide to SAP PLM 7.01
LeverX - A Comprehensive Guide to SAP PLM 7.01LeverX
 
HPE Agile Manager and Project and Portfolio Management PPM overview
HPE Agile Manager and Project and Portfolio Management PPM overview HPE Agile Manager and Project and Portfolio Management PPM overview
HPE Agile Manager and Project and Portfolio Management PPM overview Jeffrey Nunn
 
HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016
HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016
HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016Jeffrey Nunn
 
Visual Studio ALM 2010 And The PMO V 1
Visual Studio ALM 2010 And The PMO V 1Visual Studio ALM 2010 And The PMO V 1
Visual Studio ALM 2010 And The PMO V 1bhardister
 
BPM Design Review Approach
BPM Design Review ApproachBPM Design Review Approach
BPM Design Review ApproachScott Simmons
 
CRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM ImplementationCRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM ImplementationSugarCRM
 
Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers IBM WebSphereIndia
 

Semelhante a Visão Geral do Schedule Manager (20)

Teamcenter Manufacturing
Teamcenter ManufacturingTeamcenter Manufacturing
Teamcenter Manufacturing
 
CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM
CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLMCodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM
CodeCamp Iasi 10 march 2012 - Cenit-Process-driven-PLM
 
Colazione con Oracle 9 marzo
Colazione con Oracle 9 marzoColazione con Oracle 9 marzo
Colazione con Oracle 9 marzo
 
Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex Project
 
Teamcenter rapid start capabilities and licensing tech transfer
Teamcenter rapid start capabilities and licensing tech transferTeamcenter rapid start capabilities and licensing tech transfer
Teamcenter rapid start capabilities and licensing tech transfer
 
Softexpert BPM Kurumsal Surec Yonetimi
Softexpert BPM Kurumsal Surec YonetimiSoftexpert BPM Kurumsal Surec Yonetimi
Softexpert BPM Kurumsal Surec Yonetimi
 
Oracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareOracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers share
 
Industry-forum 2011 PARTsolutions TESIS
Industry-forum 2011 PARTsolutions TESISIndustry-forum 2011 PARTsolutions TESIS
Industry-forum 2011 PARTsolutions TESIS
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
 
Software Project Management by CMMi Level 5
Software Project Management by CMMi Level 5Software Project Management by CMMi Level 5
Software Project Management by CMMi Level 5
 
LeverX SAP DMS Webinar
LeverX SAP DMS WebinarLeverX SAP DMS Webinar
LeverX SAP DMS Webinar
 
LeverX - A Comprehensive Guide to SAP PLM 7.01
LeverX - A Comprehensive Guide to SAP PLM 7.01LeverX - A Comprehensive Guide to SAP PLM 7.01
LeverX - A Comprehensive Guide to SAP PLM 7.01
 
Business Modeling and the Business Analyst
Business Modeling and the Business AnalystBusiness Modeling and the Business Analyst
Business Modeling and the Business Analyst
 
HPE Agile Manager and Project and Portfolio Management PPM overview
HPE Agile Manager and Project and Portfolio Management PPM overview HPE Agile Manager and Project and Portfolio Management PPM overview
HPE Agile Manager and Project and Portfolio Management PPM overview
 
HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016
HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016
HPE | Agile Manager and Project and Portfolio Management (PPM) overview feb 2016
 
Guide to Product Lifecycle Management
Guide to Product Lifecycle ManagementGuide to Product Lifecycle Management
Guide to Product Lifecycle Management
 
Visual Studio ALM 2010 And The PMO V 1
Visual Studio ALM 2010 And The PMO V 1Visual Studio ALM 2010 And The PMO V 1
Visual Studio ALM 2010 And The PMO V 1
 
BPM Design Review Approach
BPM Design Review ApproachBPM Design Review Approach
BPM Design Review Approach
 
CRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM ImplementationCRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM Implementation
 
Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers Enable process visbility: The Value Proposition for SAP customers
Enable process visbility: The Value Proposition for SAP customers
 

Mais de PLMX -Soluções para Negocios

Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica
Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica
Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica PLMX -Soluções para Negocios
 
Extensão Universitária em CAD CAM CAE com o Siemens NX
Extensão Universitária em CAD CAM CAE com o Siemens NXExtensão Universitária em CAD CAM CAE com o Siemens NX
Extensão Universitária em CAD CAM CAE com o Siemens NXPLMX -Soluções para Negocios
 
Siemens NX para Fornecedores da Indústria Automobilística
Siemens NX para Fornecedores da Indústria Automobilística Siemens NX para Fornecedores da Indústria Automobilística
Siemens NX para Fornecedores da Indústria Automobilística PLMX -Soluções para Negocios
 
Automatizando o processo de imagem para implantes ortopédicos
Automatizando o processo de imagem para implantes ortopédicos Automatizando o processo de imagem para implantes ortopédicos
Automatizando o processo de imagem para implantes ortopédicos PLMX -Soluções para Negocios
 
Estudo de Caso Siemens PLM e Taiyuan Mining Machinery Group (TMMG)
Estudo de Caso Siemens PLM e  Taiyuan Mining Machinery Group (TMMG)Estudo de Caso Siemens PLM e  Taiyuan Mining Machinery Group (TMMG)
Estudo de Caso Siemens PLM e Taiyuan Mining Machinery Group (TMMG)PLMX -Soluções para Negocios
 
Treinamento de Atualização para Synchronous Technology
Treinamento de Atualização para Synchronous TechnologyTreinamento de Atualização para Synchronous Technology
Treinamento de Atualização para Synchronous TechnologyPLMX -Soluções para Negocios
 
Tecnomatix 11 para Gerencimanento do Processo de Manufatura
Tecnomatix 11 para Gerencimanento do Processo de ManufaturaTecnomatix 11 para Gerencimanento do Processo de Manufatura
Tecnomatix 11 para Gerencimanento do Processo de ManufaturaPLMX -Soluções para Negocios
 

Mais de PLMX -Soluções para Negocios (20)

Siemens e SpaceX, estudo de caso
Siemens e SpaceX, estudo de casoSiemens e SpaceX, estudo de caso
Siemens e SpaceX, estudo de caso
 
I Workshop sobre INDÚSTRIA 4.0
I Workshop sobre INDÚSTRIA 4.0 I Workshop sobre INDÚSTRIA 4.0
I Workshop sobre INDÚSTRIA 4.0
 
Teamcenter Services Lifecycle Management - Siemens
Teamcenter Services Lifecycle Management - Siemens Teamcenter Services Lifecycle Management - Siemens
Teamcenter Services Lifecycle Management - Siemens
 
Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica
Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica
Extensão Universitária - Faculdade SENAI de Tecnologia Mecatrônica
 
Extensão Universitária em CAD CAM CAE com o Siemens NX
Extensão Universitária em CAD CAM CAE com o Siemens NXExtensão Universitária em CAD CAM CAE com o Siemens NX
Extensão Universitária em CAD CAM CAE com o Siemens NX
 
Siemens NX para Fornecedores da Indústria Automobilística
Siemens NX para Fornecedores da Indústria Automobilística Siemens NX para Fornecedores da Indústria Automobilística
Siemens NX para Fornecedores da Indústria Automobilística
 
Teamcenter Product Cost Fact Sheet
Teamcenter Product Cost Fact SheetTeamcenter Product Cost Fact Sheet
Teamcenter Product Cost Fact Sheet
 
Oque há de novo no NX 10
Oque há de novo no NX 10Oque há de novo no NX 10
Oque há de novo no NX 10
 
What's New Solid Edge ST7
What's New Solid Edge ST7What's New Solid Edge ST7
What's New Solid Edge ST7
 
Automatizando o processo de imagem para implantes ortopédicos
Automatizando o processo de imagem para implantes ortopédicos Automatizando o processo de imagem para implantes ortopédicos
Automatizando o processo de imagem para implantes ortopédicos
 
Mitsubishi Pencil e Siemens PLM
Mitsubishi Pencil e Siemens PLMMitsubishi Pencil e Siemens PLM
Mitsubishi Pencil e Siemens PLM
 
Estudo de Caso Siemens PLM e Taiyuan Mining Machinery Group (TMMG)
Estudo de Caso Siemens PLM e  Taiyuan Mining Machinery Group (TMMG)Estudo de Caso Siemens PLM e  Taiyuan Mining Machinery Group (TMMG)
Estudo de Caso Siemens PLM e Taiyuan Mining Machinery Group (TMMG)
 
Caso de Sucesso Ulma Packaging
Caso de Sucesso Ulma PackagingCaso de Sucesso Ulma Packaging
Caso de Sucesso Ulma Packaging
 
A Excelência do Projeto ao Produto
A Excelência do Projeto ao ProdutoA Excelência do Projeto ao Produto
A Excelência do Projeto ao Produto
 
Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr
 
O que há de novo no Solid Edge ST6
O que há de novo no Solid Edge ST6 O que há de novo no Solid Edge ST6
O que há de novo no Solid Edge ST6
 
Treinamento de Atualização para Synchronous Technology
Treinamento de Atualização para Synchronous TechnologyTreinamento de Atualização para Synchronous Technology
Treinamento de Atualização para Synchronous Technology
 
Estudo de Caso Comil - Siemens PLM
Estudo de Caso Comil - Siemens PLMEstudo de Caso Comil - Siemens PLM
Estudo de Caso Comil - Siemens PLM
 
Tecnomatix 11 para simulação e validação
Tecnomatix 11 para simulação e validaçãoTecnomatix 11 para simulação e validação
Tecnomatix 11 para simulação e validação
 
Tecnomatix 11 para Gerencimanento do Processo de Manufatura
Tecnomatix 11 para Gerencimanento do Processo de ManufaturaTecnomatix 11 para Gerencimanento do Processo de Manufatura
Tecnomatix 11 para Gerencimanento do Processo de Manufatura
 

Último

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Último (20)

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Visão Geral do Schedule Manager

  • 1. Schedule Manager Overview Mark Homrich Teamcenter Product Management © Siemens AG 2012. All Rights Reserved. http://plmworld.org/ Siemens PLM Software
  • 2. Schedule Manager Overview Agenda  Why manage schedules in HD User Experience Teamcenter  Schedule manager key Intelligently Integrated Information capabilities  Integrating schedules within Future-proof Architecture Teamcenter  Demonstration of Teamcenter 9.1 features  Closing © Siemens AG 2012. All Rights Reserved. Page 2 Siemens PLM Software
  • 3. Schedule Manager Overview Why Manage Schedules in Teamcenter  Why manage schedules in HD User Experience Teamcenter  Schedule manager key Intelligently Integrated Information capabilities  Integrating schedules within Future-proof Architecture Teamcenter  Demonstration of Teamcenter 9.1 features  Closing © Siemens AG 2012. All Rights Reserved. Page 3 Siemens PLM Software
  • 4. Schedule Manager Overview Why Manage Schedules in Teamcenter Planning, executing and managing work in product-driven organizations  Organizational & product complexity  Scheduling and synchronizing activities across multiple teams  Avoiding bottlenecks and scheduling snafus  Pressure to meet cost reduction / operational efficiency goals  Timely status reporting to ensure management visibility © Siemens AG 2012. All Rights Reserved. Page 4 Siemens PLM Software
  • 5. Schedule Manager Overview Why Manage Schedules in Teamcenter  Enables the definition, delivery and execution of PLM work packages  Tightly coupled with Teamcenter foundational capabilities  Extends PLM work management processes to other PLM business processes  Extends PLM work management processes to enterprise work management processes PLM Processes PPM Processes  Requirements testing / validation  Program portfolio planning  Change management planning  Financial management  MRO service scheduling (9.1)  Investment analysis  Portfolio management  Capacity planning  Resource management Schedule Manager  Workgroup / departmental work management & execution  Resource scheduling  Deliverables management  Process automation Teamcenter Platform Processes Workflow Product Data Organization Access Mgt Process History © Siemens AG 2012. All Rights Reserved. Page 5 Siemens PLM Software
  • 6. Schedule Manager Overview Why Manage Schedules in Teamcenter  Engineering / Product Development  Manager  Team leader / coordinator  Team member  Senior leadership  Product planners  Product management  Executives  PMO*  Program manager  Project manager * PMO = program management office or project management office © Siemens AG 2012. All Rights Reserved. Page 6 Siemens PLM Software
  • 7. Schedule Manager Overview Why Manage Schedules in Teamcenter Efficient WBS creation  Use templates to quickly plan and estimate work effort Efficient management of work authorizations  Control over who works on what and when Automated work execution  Distribution of complete work package deliverables (not just the assignment) Automated work statusing  Execution data updates via workflow Automated replanning  Cross-schedule dependencies  Actual date-to-plan date linking (10.1)  Increased productivity for engineering / product development resources, team leaders and managers © Siemens AG 2012. All Rights Reserved. Page 7 Siemens PLM Software
  • 8. Schedule Manager Overview Why Manage Schedules in Teamcenter Complete PLM operational / management visibility  Schedule status + deliverable status  Visibility into work across matrix organizations via program views  Visibility into planned & unplanned work via integration with Change Management  Traceability and audit support via process & signoff history  Out of the box reports with Teamcenter Reporting & Analytics © Siemens AG 2012. All Rights Reserved. Page 8 Siemens PLM Software
  • 9. Schedule Manager Overview Why Manage Schedules in Teamcenter Accessibility  Teamcenter is used every day by team leaders & resources  Resources are more likely to update task information (and project plans will be more up-to- date) if  the update is done for them automatically, or  the ability to update the task is just “one click away” © Siemens AG 2012. All Rights Reserved. Page 9 Siemens PLM Software
  • 10. Schedule Manager Overview Schedule Manager Key Capabilities  Why manage schedules in HD User Experience Teamcenter  Schedule manager key Intelligently Integrated Information capabilities  Integrating schedules within Future-proof Architecture Teamcenter  Demonstration of Teamcenter 9.1 features  Closing © Siemens AG 2012. All Rights Reserved. Page 10 Siemens PLM Software
  • 11. Schedule Manager Overview Key Capabilities 1. Schedule management 4. Work execution  Templates  Workflow-driven task assignments  Resource assignments  Execution (status) updates  Budgeting & costing  Team collaboration 2. Process automation 5. Performance management  Requirements linking  Automated work statusing  Deliverables  Multi-schedule view of schedule  Workflow performance 3. Multi-schedule management  Portfolio view of progress  Master-sub schedules  Proxy-tasks / milestones  Cross-schedule dependencies © Siemens AG 2012. All Rights Reserved. Page 11 Siemens PLM Software
  • 12. Schedule Manager Overview Key Capabilities Create new schedule from template  WBS with phase-gate milestones  User / discipline assignments  Workflow processes  Deliverables © Siemens AG 2012. All Rights Reserved. Page 12 Siemens PLM Software
  • 13. Schedule Manager Overview Key Capabilities Create new schedule from template  WBS with phase-gate milestones  User / discipline assignments  Workflow processes  Deliverables  Set task schedule properties  Duration, effort, task type, etc © Siemens AG 2012. All Rights Reserved. Page 13 Siemens PLM Software
  • 14. Schedule Manager Overview Key Capabilities Create new schedule from template  WBS with phase-gate milestones  User / discipline assignments  Workflow processes  Deliverables  Set task schedule properties  Duration, effort, task type, etc  Manage assignments © Siemens AG 2012. All Rights Reserved. Page 14 Siemens PLM Software
  • 15. Schedule Manager Overview Key Capabilities Create new schedule from template  WBS with phase-gate milestones  User / discipline assignments  Workflow processes  Deliverables  Set task schedule properties  Duration, effort, task type, etc  Manage assignments  Manage costs © Siemens AG 2012. All Rights Reserved. Page 15 Siemens PLM Software
  • 16. Schedule Manager Overview Key Capabilities Integrate to PLM data  Link requirements to task  Validate tasks at all milestones  Requirements define the exit criteria for the schedule or phase within a schedule © Siemens AG 2012. All Rights Reserved. Page 16 Siemens PLM Software
  • 17. Schedule Manager Overview Key Capabilities Integrate to PLM processes  Schedule task initiates workflow task with targets and references  Workflow task provides link back to schedule task  Workflow task will update schedule task © Siemens AG 2012. All Rights Reserved. Page 17 Siemens PLM Software
  • 18. Schedule Manager Overview Key Capabilities Schedule Status  Value can be set manually or by system  Configurable values & rules © Siemens AG 2012. All Rights Reserved. Page 18 Siemens PLM Software
  • 19. Schedule Manager Overview Key Capabilities Update schedule task execution data  Thin client UI (8.3) © Siemens AG 2012. All Rights Reserved. Page 19 Siemens PLM Software
  • 20. Schedule Manager Overview Key Capabilities Update schedule task execution data  RAC UI (9.0) © Siemens AG 2012. All Rights Reserved. Page 20 Siemens PLM Software
  • 21. Schedule Manager Overview Key Capabilities Program Views  Quickly identify tasks that need attention © Siemens AG 2012. All Rights Reserved. Page 21 Siemens PLM Software
  • 22. Schedule Manager Overview Integrating Schedules Within Teamcenter  Why manage schedules in HD User Experience Teamcenter  Schedule manager key Intelligently Integrated Information capabilities  Integrating schedules within Future-proof Architecture Teamcenter  Demonstration of Teamcenter 9.1 features  Closing © Siemens AG 2012. All Rights Reserved. Page 22 Siemens PLM Software
  • 23. Schedule Manager Overview Integrating Schedules  Enables the definition, delivery and execution of PLM work packages  Tightly coupled with Teamcenter foundational capabilities  Extends PLM work management processes to other PLM business processes  Extends PLM work management processes to enterprise work management processes PLM Processes PPM Processes  Requirements testing / validation  Program portfolio planning  Change management planning  Financial management  MRO service scheduling (9.1)  Investment analysis  Portfolio management  Capacity planning  Resource management Schedule Manager  Workgroup / departmental work management & execution  Resource scheduling  Deliverables management  Process automation Teamcenter Platform Processes Workflow Product Data Organization Access Mgt Process History © Siemens AG 2012. All Rights Reserved. Page 23 Siemens PLM Software
  • 24. Schedule Manager Overview Integrating Schedules Definition  Work is managed & executed in parallel and in sequence across various teams / departments / work streams / functions  The work must be closely synchronized and coordinated  Beneficial for complex projects Schedule A  Complex assemblies Schedule F Schedule D Schedule H  Many products to be released Schedule B Schedule G  Dynamic environments Schedule E  Multiple teams / disciplines Schedule C  Milestone / phase-gate focus  Many schedules © Siemens AG 2012. All Rights Reserved. Page 24 Siemens PLM Software
  • 25. Schedule Manager Overview Integrating Schedules Master Schedule Define the master schedule  Milestones ( ) defined once at the master schedule level Define the “Schedule / Execution Horizon”  Determines how far into the future you will do detailed planning Schedule / Execution Horizon  Level of planning confidence is high Time Now © Siemens AG 2012. All Rights Reserved. Page 25 Siemens PLM Software
  • 26. Schedule Manager Overview Integrating Schedules Master Schedule Define the master schedule  Milestones ( ) defined once at the master schedule level Mechanical Sub-schedule Define the “Schedule / Execution Sch A1 Horizon” Sch A2  Determines how far into the future you will do detailed planning Schedule / Execution Horizon Sch A3  Level of planning confidence is high Electrical Sub-schedule Sch B1 Define the sub-schedules Sch B2  By team, work stream, assembly, etc Create dependencies Time Now Sch B3  Within schedules  Across schedules Assign workflow processes to schedule tasks © Siemens AG 2012. All Rights Reserved. Page 26 Siemens PLM Software
  • 27. Schedule Manager Overview Integrating Schedules Master Schedule Start the first schedule, and as time progresses…  Teamcenter will automatically “complete” and “start” schedule tasks Sch A1 Sch D1 And as the next milestone Sch A2 Sch D2 approaches… Scheduling / Execution Horizon  Create schedules for next schedule / Schedule / Execution Horizon Sch A3 Sch D3 execution horizon Sch B1 Sch E1  Create high level schedules from Sch B2 Sch E2 templates  Add the details „just in time‟ Time Now Sch B3 Sch E3 © Siemens AG 2012. All Rights Reserved. Page 27 Siemens PLM Software
  • 28. Schedule Manager Overview Demonstration  Why manage schedules in HD User Experience Teamcenter  Schedule manager key Intelligently Integrated Information capabilities  Integrating schedules within Future-proof Architecture Teamcenter  Demonstration of Teamcenter 9.1 features  Closing © Siemens AG 2012. All Rights Reserved. Page 28 Siemens PLM Software
  • 29. Integrated Schedule Management AVI 1 Master Schedule © Siemens AG 2012. All Rights Reserved. Page 29 Siemens PLM Software
  • 30. Integrated Schedule Management AVI 2 Work in sub-schedule © Siemens AG 2012. All Rights Reserved. Page 30 Siemens PLM Software
  • 31. Schedule Manager Overview Demonstration How to keep track of all those tasks?  Team leaders, team members and management  Need an easy way to identify at-risk tasks to avoid project delays  They do not want to waste time searching for this information Schedule status & program views  Quickly identify tasks that need attention LATE! TASK ABORTED NOT STARTED OVER NEED BUDGET HELP © Siemens AG 2012. All Rights Reserved. Page 31 Siemens PLM Software
  • 32. Integrated Schedule Management AVI 3 Program views © Siemens AG 2012. All Rights Reserved. Page 32 Siemens PLM Software
  • 33. Schedule Manager Overview Closing  Why manage schedules in HD User Experience Teamcenter  Schedule manager key Intelligently Integrated Information capabilities  Integrating schedules within Future-proof Architecture Teamcenter  Demonstration of Teamcenter 9.1 features  Closing © Siemens AG 2012. All Rights Reserved. Page 33 Siemens PLM Software
  • 34. Schedule Manager Overview Summary Improve operational efficiencies and delivery projects on time Eliminate scheduling bottlenecks with top-down enterprise planning Increase productivity with automated process integration Synchronize work activities across disparate teams and product assemblies with fully work integrated planning and execution systems © Siemens AG 2012. All Rights Reserved. Page 34 Siemens PLM Software
  • 35. Schedule Manager Overview Customer Examples Automated change management process  Use schedule manager APIs to create change schedules from templates  Hundreds of change orders processed per month; Teamcenter projected to reduce operational costs by millions of dollars per year Template-driven schedules with short durations  Schedules execute in 1-2 month cycles  Schedules are created from library of standard templates  Resource complete their workflow tasks and the schedules are statused automatically Create test plan (schedule) from test requirements  Use schedule manager APIs to automatically create test plan (schedule tasks) from test requirements © Siemens AG 2012. All Rights Reserved. Page 35 Siemens PLM Software
  • 36. Schedule Manager Overview Customer Examples A&D  Automate the change management process  Use schedule manager APIs to create schedules from templates  Workflow automates the process and schedules are automatically statused  Hundreds of change orders processed per month Shipbuilding & Energy  3rd party planning application used for program management, project planning, earned value reporting and resource planning  Released projects send to Teamcenter  Schedules created from templates  Workflow sends work assignments to designers and engineers  Execution data rolls up to the schedules  Schedules send status updates to PPM projects © Siemens AG 2012. All Rights Reserved. Page 36 Siemens PLM Software
  • 37. Schedule Manager Overview Is Schedule Manager Right For You? Product lifecycle management project management entails…  Work breakdown structure planning, management & execution  Supplier / customer involvement  Requirements management and systems integration  Deliverables management and the management of product breakdowns  Change control and configuration management  Collaborative product development (hug impact on risk reduction)  Rapid aggregation of schedule data for easy consumption by management © Siemens AG 2012. All Rights Reserved. Page 37 Siemens PLM Software
  • 38. Schedule Manager Overview Benefits Assumptions  Employee (Business Associate) cost rates  Team leader $60 / hour  Team member $45 / hour  Productivity gains  Team leader 0.5 hours / week  Team member 0.5 hours / week  Team size 1:10 ROI  Payback period is months, not years  More time spent on value-add activities © Siemens AG 2012. All Rights Reserved. Page 38 Siemens PLM Software
  • 39. Thank You Siemens PLM Connection 2012 Las Vegas, NV May 7-10 © Siemens AG 2012. All Rights Reserved. http://plmworld.org/ Siemens PLM Software

Notas do Editor

  1. Mandatory for all Product Management & Product Marketing Presentation
  2. Work Execution
  3. Schedule manager is department / team level task-oriented work management & workflow-driven execution