Earned Value Measurement in
         MS Project
          Jeff Smoot




                              1
EVM in MS Project

Earned Value Management (EVM): A
  management methodology for integrating
  scope, schedule, and resources, and for
  objectively measuring project performance
  (earned value) and comparing it to the actual
  cost of work performed (actual cost)
                           – PMI PMBOK, 4th Edition, pg. 433



                                                           2
EVM in MS Project
• How do we go from this….




                      Source: EMEN5030 10/24/05 Lecture, Bob Kois
                                                                    3
EVM in MS Project
• To this….




                              4
EVM in MS Project
• Steps to view Earned Value in MS Project
   – Set Baseline
   – Set Status Date
   – Preconfigured Tables
   – Generate Earned Value Over Time Report




 Assuming all work packages, resources, and resource usage has been input into MS Project

                                                                                            5
Set Baseline
• MS Project uses the Baseline as the basis for the
  Planned Value (PV) calculation
• In the Project View, Set a Baseline for the project.




                                                         6
Set Baseline
• Planned Value (PV) for TrackMyFitness Project




                                                  7
Set Status Date
• A snapshot in time of current project performance.
• In MS Project, set the status date to the desired date to
  review project progress.




    Due to nature of Earned Value Calculation, the status date will affect displayed data
                                                                                            8
Preconfigured Tables
• MS Project has 3 preconfigured views for
  reviewing Earned Value in table format.
   – Earned Value
      • PV (BCWS), EV (BCWP), AC (ACWP), SV, CV,
        EAC, BAC, VAC
   – Earned Value Cost Indicators
      • CV%, CPI, TCIP
   – Earned Value Schedule Indicators
      • SV%, SPI




              Each individual table can be further customized.
                                                                 9
Earned Value Table




                 10
Generate EV Over Time Report
•   MS Project has a preconfigured Earned Value Over Time Report.
•   In the Project View, select Visual Reports, then Earned Value Over Time
    Report from the pop-up




                                                                              11
Pivot Table




In addition to EV, PV, AC the pivot table allows you to view multiple other project metrics

                                                                                              12
EV Over Time Report




An easy graphical summary of project status
                                              13

Mais conteúdo relacionado

Mais procurados

Implementing Automation After Making Lean Improvements
Implementing Automation After Making Lean ImprovementsImplementing Automation After Making Lean Improvements
Implementing Automation After Making Lean Improvements
Advent Design Corporation
 
Managing predictable variability
Managing predictable variability Managing predictable variability
Managing predictable variability
Deepali Bhosale
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
samjune
 

Mais procurados (20)

The Basics of Contracting
The Basics of ContractingThe Basics of Contracting
The Basics of Contracting
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Liquadated damages
Liquadated damagesLiquadated damages
Liquadated damages
 
Unit 2 manufacturing system design
Unit   2 manufacturing system designUnit   2 manufacturing system design
Unit 2 manufacturing system design
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
types of contracts
 types of contracts types of contracts
types of contracts
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Implementing Automation After Making Lean Improvements
Implementing Automation After Making Lean ImprovementsImplementing Automation After Making Lean Improvements
Implementing Automation After Making Lean Improvements
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Inventory 1.1
Inventory 1.1Inventory 1.1
Inventory 1.1
 
Cost Savings Presentation May 2012
Cost Savings  Presentation   May 2012Cost Savings  Presentation   May 2012
Cost Savings Presentation May 2012
 
Managing predictable variability
Managing predictable variability Managing predictable variability
Managing predictable variability
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
Agile manufacturing(1)
Agile manufacturing(1)Agile manufacturing(1)
Agile manufacturing(1)
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 

Semelhante a EVM in MS Project

R simpson elee
R simpson eleeR simpson elee
R simpson elee
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
NASAPMC
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
Glen Alleman
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
Glen Alleman
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
NASAPMC
 
Power Point For Cmgt 410
Power Point For Cmgt 410Power Point For Cmgt 410
Power Point For Cmgt 410
steffiann88
 
Project2007
Project2007Project2007
Project2007
KellySee
 
Law.richard
Law.richardLaw.richard
Law.richard
NASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
NASAPMC
 

Semelhante a EVM in MS Project (20)

R simpson elee
R simpson eleeR simpson elee
R simpson elee
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Program Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown StructureProgram Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown Structure
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
 
A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)A gentle introduction to earned value management systems (neutral)
A gentle introduction to earned value management systems (neutral)
 
Building a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two DaysBuilding a Credible Performance Measurement Baseline in Two Days
Building a Credible Performance Measurement Baseline in Two Days
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
Power Point For Cmgt 410
Power Point For Cmgt 410Power Point For Cmgt 410
Power Point For Cmgt 410
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - Formulas
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
Project2007
Project2007Project2007
Project2007
 
Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)Building a Credible Performance Measurement Baseline (v3)
Building a Credible Performance Measurement Baseline (v3)
 
Earned value
Earned valueEarned value
Earned value
 
The Intersection of Earned Value Management and Agile Software Development
The Intersection of Earned Value Management and Agile Software DevelopmentThe Intersection of Earned Value Management and Agile Software Development
The Intersection of Earned Value Management and Agile Software Development
 
Law.richard
Law.richardLaw.richard
Law.richard
 
DPPM1
DPPM1DPPM1
DPPM1
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 

Último (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 

EVM in MS Project

  • 1. Earned Value Measurement in MS Project Jeff Smoot 1
  • 2. EVM in MS Project Earned Value Management (EVM): A management methodology for integrating scope, schedule, and resources, and for objectively measuring project performance (earned value) and comparing it to the actual cost of work performed (actual cost) – PMI PMBOK, 4th Edition, pg. 433 2
  • 3. EVM in MS Project • How do we go from this…. Source: EMEN5030 10/24/05 Lecture, Bob Kois 3
  • 4. EVM in MS Project • To this…. 4
  • 5. EVM in MS Project • Steps to view Earned Value in MS Project – Set Baseline – Set Status Date – Preconfigured Tables – Generate Earned Value Over Time Report Assuming all work packages, resources, and resource usage has been input into MS Project 5
  • 6. Set Baseline • MS Project uses the Baseline as the basis for the Planned Value (PV) calculation • In the Project View, Set a Baseline for the project. 6
  • 7. Set Baseline • Planned Value (PV) for TrackMyFitness Project 7
  • 8. Set Status Date • A snapshot in time of current project performance. • In MS Project, set the status date to the desired date to review project progress. Due to nature of Earned Value Calculation, the status date will affect displayed data 8
  • 9. Preconfigured Tables • MS Project has 3 preconfigured views for reviewing Earned Value in table format. – Earned Value • PV (BCWS), EV (BCWP), AC (ACWP), SV, CV, EAC, BAC, VAC – Earned Value Cost Indicators • CV%, CPI, TCIP – Earned Value Schedule Indicators • SV%, SPI Each individual table can be further customized. 9
  • 11. Generate EV Over Time Report • MS Project has a preconfigured Earned Value Over Time Report. • In the Project View, select Visual Reports, then Earned Value Over Time Report from the pop-up 11
  • 12. Pivot Table In addition to EV, PV, AC the pivot table allows you to view multiple other project metrics 12
  • 13. EV Over Time Report An easy graphical summary of project status 13

Notas do Editor

  1. All work packages from WBS put into MS project. Calendars entered. Resources (costs) entered for each task