SlideShare uma empresa Scribd logo
1 de 37
Contents
• AACE International
• AACE Sections and Region 7
• AACE Certifications
• What is CCP
• Eligibility Requirements and Registration
• Examination & Recertification
• Certification Challenges
• Skills & Knowledge of Cost Engineering 6.0
AACE International
• Association for the Advancement of Cost Engineering
• A non-profit professional association since 1956
• Members in 87 countries
• Cover 80 local sections in 9 regions
AACE Sections
AACE Region 7
• EGYPT - Greater Cairo
• UAE - United Arab Emirates
• SAUDI ARABIA - Arabian Gulf
• PAKISTAN – Pakistan
• OMAN – Oman
• LEBANON – Lebanon
• KUWAIT – Kuwait
• JORDAN – Jordan
• INDIA - South India
• INDIA - North India
• INDIA - Central India
AACE Certifications
1. Certified Cost Professional (CCP)
2. Earned Value Professional (EVP)
3. Planning & Scheduling Professional (PSP)
4. Certified Forensic Claims Consultant (CFCC)
5. Certified Estimating Professional (CEP)
6. Decision & Risk Management Professional (DRMP)
7. Certified Cost Technician (CCT)
8. Certified Scheduling Technician (CST)
What is (CCP) ?
1. CCP certification recognizes specialists who meet a set of cost and management
criteria by examination, experience, education and ethical qualifications.
2. CCP Certification is independently accredited by the Council of Engineering &
Scientific Specialty Boards (CESB).
3. Formerly known as Certified Cost Engineer (CCE) / Certified Cost Consultant (CCC).
CCP Eligibility Requirements
1. Professional experience
At least 8 full years of professional experience, of which up to 4 years may be
substituted by a college/university degree.
2. Technical Paper
Minimum of 2,500 word technical paper and signed affidavit must be
submitted within 30 days of registration.
3. Accept Canon of Ethics
CCP Registration
1. Registration and payment (US$500 Members, US$625 Non-Members) where
membership cost is ($170).
2. Submit experience verification, education certificate, and technical paper.
3. Receive clearance from AACE to schedule the exam
4. Login to KRYTERION web site to schedule your exam
Examination
Computer Based Test (CBT)
• CBT is 5 Hours (120 Questions)
• Exam is fully closed book
• Calculator is permitted
• Formula guides were developed to assist in specific
questions and available onscreen when needed
• Passing Grade is 70 %
• Results will be sent within 14 days after CBT exam
• Rescheduling is free-of-charge till 72 hours before exam
CCP Exam Location
Recertification
Recertification By Credit Plan
• Accumulation of 15 CEUs over a 3-year period.
• CEUs (Continuing Education Units) are equivalent to 10 hour.
• CEUs are earned in 6 separate categories:
A. Performed (Employment in related field)
B. Learned (Seminars, conferences, workshops, and courses)
C. Taught ( Full-time / part-time instructor)
D. Professional Papers (Published or presented)
E. Served (Volunteer work for AACE)
F. Obtained (Technical certification/license/degree)
Recertification By Exam
• Registration, payment, and passing the examination every 3 years.
• Fees : $500 members; $625 non-members.
• Technical paper is not required.
Certification Challenges
1. Technical Paper
2. Several Authors
3. Various Knowledge Areas
4. Significantly Large Material
5. No Well-known Help Books
Skills & Knowledge of Cost Engineering
• SECTION 1—COST
• SECTION 2—COST ESTIMATING
• SECTION 3—PLANNING & SCHEDULING
• SECTION 4—PROGRESS & COST CONTROL
• SECTION 5—PROJECT MANAGEMENT
• SECTION 6—ECONOMIC ANALYSIS, STATISTICS,
PROBABILITY, & RISK
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Cost
Structuring
Direct
Costs
Indirect
Costs
Fixed
Costs
Variable
Costs
EX:
Cost of
concrete used
for casting
foundation
EX:
Cost of
administrative
work in the
main office
EX:
Payrolls of site
engineers and
other
supervisors
EX:
Material used
and consumed
in producing
the product
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Material
Raw Material
Bulk Material
Fabricated
Material
Engineered
Material
Labor
Base wage
Fringe
Benefits
Medical &
Life Insurance
Overhead &
Profit
Engineering
Pure/Applied
Research
CAM / CAE /
CAD
Prototype
Patents &
Trade Secrets
Equipments
Cost New
Value
Market Value
(Used)
Residual
Values
Residual
Curves
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Cost-Change Concepts:
1- Inflation 2- Deflation 3- Escalation 4- Currency Variation
Sources of Inflation
1- Money Supply 2- Exchange Rate 3- Demand-Pull 4- Cost-Push
Depreciation Techniques
1- Straight Line 2- Double Declining Balance 3- Sum-of-Year Digits
Economic Analysis Techniques
1- Net Present Worth 2- Payback Period
3- Benefit / Cost Ratio 4- Equivalent Uniform Annual Cost
Skills & Knowledge of Cost Engineering
SECTION 2—COST ESTIMATION
Skills & Knowledge of Cost Engineering
SECTION 2—COST ESTIMATION
A- Conceptual Estimating
Units No.
Physical
Dimension
Capacity
Factor
Ratio or
Factor
Parametric
200 Rooms
Hotel 80 KM
Pipeline
(Nonlinear)
(CapA/CapB) e
e= 0.6
Mathematical
Correlation
Factor of
Main
Equipment
B- Deterministic Estimating
Skills & Knowledge of Cost Engineering
SECTION 2—COST ESTIMATION
Review
Scope
IFC
Takeoff HOC
Customs &
Taxes
Fees
If Applicable
Risk Analysis
(Reserve)
Review &
Validation
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Planning
Influencing the future by making decisions based on missions, needs,
and objectives. It is the process of stating goals and determining the
most effective way of reaching them.
Scheduling
It is the process that converts the project work plan into a road map, that
if followed, will assure timely project completion.
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Planning
Tools
Gained
Experience
Hand
Books
Company
Standards
Model
Plans
Checklists
Historical
Database
Chart of
Accounts
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Planning Major Elements:
1. Summarizing Goals & Scope of Work
2. Time Planning
3. Cost Planning
4. Resource Planning
5. Quality Planning
6. Review
7. Planning for Change
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Scheduling
Tools
Bar Chart
CPMPERT
Skills & Knowledge of Cost Engineering
• SECTION 4—PROGRESS & COST CONTROL
Earned Value Example
Cost Units Total
Scheduled BC($ 500) WS(40) $ 20’000
Actual AC($ 550) WP(42) $ 23’100
PV (BCWS) = $ 20’000
AC (ACWP) = $ 23’100
EV (BCWP) = $ 500 x 42 = $ 21’000
Cost Performance
• Cost Variance
CV = EV – AC = - 2’100
• Cost Performance Indicator
CPI = EV / AC = 0.91
Over Budget
Schedule Performance
• Schedule Variance
SV = EV – PV = 1’000
• Schedule Performance Indicator
SPI = EV / PV = 1.05
Ahead Schedule
Skills & Knowledge of Cost Engineering
• SECTION 5—PROJECT MANAGEMENT
16. Project Management Fundamentals
17. Project Organization Structure
18. Project Communication
19. Project Labor Cost Control
20. Leadership and Management of Project People
21. Quality Management
22. Value Engineering
23. Contracting for Capital Projects
24. Strategic Asset Management
25. Change Management Practical Guide
26. Construction Claims & Disputes
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
27. Financial & Cash Flow Analysis
28. Corporate Investment Decision
29. Statistics & Probability
30. Optimization
31. Risk Management Fundamentals
32. Risk Management Practice Guide
33. Total Cost Management Overview
34. International System of Units
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Discount Factors
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Ex:
If present value is P=20’000 and i = 10 %
Find Future value after 5 years
F = 20’000 x ( 1 + 0.1)5
= 20’000 * 1.6105 = 32’210
Ex:
If present value is P=20’000 and i = 10 %,
Find Annuity value for the next five years
A = 20’000 x 0.1 x ( 1 + 0.1)5 / [( 1 + 0.1)5 -1]
= 20’000 x 0.1 x 1.61 / 0.61
= 20’000 x .02639 = 5’278
0 1 2 3 4 5
F
P
0 1 2 3 4 5
A
P
A A A A
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Ex: For the following Cashflow If the contractor’s minimum attractive
rate of return (MARR) is 6 percent, should the investment be made?
Year Expense Income Net
0 38’000 0 (38’000)
1 0 11’000 11’000
2 1’000 11’000 10’000
3 2’000 11’000 9’000
4 3’000 11’000 8’000
Total 44’000 44’000 0.00
Factor P
1 (38’000)
0.9434 10’377
0.8900 8’900
0.8396 7’556
0.7921 6’337
Total (4’830)
Another Solution : P = P0 + P1 + P2
P0 = (38’000)
P1 = -G (P/G,i,n)=-1,000 (P/G, 6 %, 4)=-1,000 (4.945) = (4’945)
P2 = A (P/A,i,n)=11,000 (P/A, 6 %, 4)=11,000 (3.465) = 38’115
P = (38’000) + (4’945 )+ 38’115 = (4’830)
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Mean : The sum of measurements divided by the number of
measurements
Median: The middle number when the data observations are
arranged in ascending or descending order
Mode: The measurement that occurs most often in the data set
Dispersion
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Variance : The average of the squared
deviations from the mean.
Standard Deviation : The square root of the variance
Central Tendency
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Z Score: Deviation from the mean relative to the standard deviation
Z=(X- μ)/σ
Standard Normal Distribution
Z Probability
1.00 68.3 %
1.282 80 %
1.645 90 %
1.96 95 %
2.00 95.4 %
2.326 98 %
2.576 99 %
3.00 99.7 %
Single In Single Out
34.15 % 15.85 %
40 % 10 %
45 % 5 %
47.5 % 2.5 %
47.7 % 2.3 %
49 % 1 %
49.5 % .5 %
49.85 % .15 %
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Standard Normal Distribution
EX: After reviewing the results for a concrete foundation activity that was exuted
several times , we found that the mean duration was 35 days with standard
deviation of 3.04 .
What will be the probability of finishing this activity in 35, 30, and 40 days?
1. For 35 Days, Probability = 50 %
2. Z = (35-30) / 3.04 = 1.645
From table, Probability = 5 %
3. Z = (40-35) / 3.04 = 1.645
From table, Probability = 50 + 45 = 95 %
A lecture on CCP Certificate

Mais conteúdo relacionado

Mais procurados

Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoignitetribes
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control ChecklistAnand Subramaniam
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery Mahendra Bhuva
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW TW Carl
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPMA Consultants
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Schedulingsslovepk
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction Dr Fereidoun Dejahang
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and TechniquesInvensis Learning
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Murali Naidu
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYVALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYSJMIT,now NMAMIT NITTE
 

Mais procurados (20)

Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
PMP_Project Cost Management
PMP_Project Cost ManagementPMP_Project Cost Management
PMP_Project Cost Management
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital Projects
 
Wbs & Project Scheduling
Wbs & Project SchedulingWbs & Project Scheduling
Wbs & Project Scheduling
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and Techniques
 
PMP-Cost Management area
PMP-Cost Management areaPMP-Cost Management area
PMP-Cost Management area
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Pid.pdf
Pid.pdfPid.pdf
Pid.pdf
 
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYVALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
 

Destaque

RPFT Exam Questions
RPFT Exam QuestionsRPFT Exam Questions
RPFT Exam QuestionsExamure4
 
ASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning ApproachASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning ApproachJohn Knotts
 
PMI RMP Training Materials Online
PMI RMP Training Materials OnlinePMI RMP Training Materials Online
PMI RMP Training Materials Onlinestefanhenry
 

Destaque (18)

PMP Preparation - 10 Communication Management
PMP Preparation - 10 Communication ManagementPMP Preparation - 10 Communication Management
PMP Preparation - 10 Communication Management
 
PMP Preparation - 03 Framework
PMP Preparation - 03 FrameworkPMP Preparation - 03 Framework
PMP Preparation - 03 Framework
 
PMP Preparation - 01 Get Ready
PMP Preparation - 01 Get ReadyPMP Preparation - 01 Get Ready
PMP Preparation - 01 Get Ready
 
PMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk ManagementPMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk Management
 
PMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource ManagementPMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource Management
 
RPFT Exam Questions
RPFT Exam QuestionsRPFT Exam Questions
RPFT Exam Questions
 
Pmp Final Review - M Maged
Pmp Final Review - M MagedPmp Final Review - M Maged
Pmp Final Review - M Maged
 
PMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope ManagementPMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope Management
 
PMP Preparation - 02 FAQ
PMP Preparation - 02 FAQPMP Preparation - 02 FAQ
PMP Preparation - 02 FAQ
 
PMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost ManagementPMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost Management
 
PMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality ManagementPMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality Management
 
PMP Preparation - 06 Time Management
PMP Preparation - 06 Time ManagementPMP Preparation - 06 Time Management
PMP Preparation - 06 Time Management
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
One day master class
One day master classOne day master class
One day master class
 
One day master class
One day master classOne day master class
One day master class
 
ASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning ApproachASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning Approach
 
Project Management Applications Using Google Documents
Project Management Applications Using Google DocumentsProject Management Applications Using Google Documents
Project Management Applications Using Google Documents
 
PMI RMP Training Materials Online
PMI RMP Training Materials OnlinePMI RMP Training Materials Online
PMI RMP Training Materials Online
 

Semelhante a A lecture on CCP Certificate

Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, betterHarold van Heeringen
 
What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?SwatiKapoor43
 
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
CHAMP Year 1 Outcomes  Leadership Committee December 5 2014CHAMP Year 1 Outcomes  Leadership Committee December 5 2014
CHAMP Year 1 Outcomes Leadership Committee December 5 2014cccschamp
 
Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)Najmul Hussain
 
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...Tarun Singh
 
2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptxAbdul Azeem
 
Career development for chemical engineers
Career development for chemical engineersCareer development for chemical engineers
Career development for chemical engineersDanish Bade
 
Cts pump operator cum mechanic
Cts pump operator cum mechanicCts pump operator cum mechanic
Cts pump operator cum mechanicAtish Verma
 
Implementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini NetherlandsImplementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini NetherlandsNiteen Kumar
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagementDhamo daran
 
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Nesma
 
day 3-2 PMP.pptx
day 3-2 PMP.pptxday 3-2 PMP.pptx
day 3-2 PMP.pptxAhmedKayed6
 
Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Roger H. Mandel
 
How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?Meghna Arora
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyMike Poland, CMRP
 

Semelhante a A lecture on CCP Certificate (20)

Ccp brochure
Ccp brochureCcp brochure
Ccp brochure
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Project mgt lesson plan
Project mgt lesson planProject mgt lesson plan
Project mgt lesson plan
 
2015 Toronto Section Presentation
2015 Toronto Section Presentation2015 Toronto Section Presentation
2015 Toronto Section Presentation
 
day 3 PMP.pptx
day 3 PMP.pptxday 3 PMP.pptx
day 3 PMP.pptx
 
What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?
 
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
CHAMP Year 1 Outcomes  Leadership Committee December 5 2014CHAMP Year 1 Outcomes  Leadership Committee December 5 2014
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
 
Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)
 
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
 
2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx
 
Career development for chemical engineers
Career development for chemical engineersCareer development for chemical engineers
Career development for chemical engineers
 
Cts pump operator cum mechanic
Cts pump operator cum mechanicCts pump operator cum mechanic
Cts pump operator cum mechanic
 
Implementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini NetherlandsImplementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini Netherlands
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
 
day 3-2 PMP.pptx
day 3-2 PMP.pptxday 3-2 PMP.pptx
day 3-2 PMP.pptx
 
Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
 

Último

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 

Último (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 

A lecture on CCP Certificate

  • 1.
  • 2. Contents • AACE International • AACE Sections and Region 7 • AACE Certifications • What is CCP • Eligibility Requirements and Registration • Examination & Recertification • Certification Challenges • Skills & Knowledge of Cost Engineering 6.0
  • 3. AACE International • Association for the Advancement of Cost Engineering • A non-profit professional association since 1956 • Members in 87 countries • Cover 80 local sections in 9 regions
  • 5. AACE Region 7 • EGYPT - Greater Cairo • UAE - United Arab Emirates • SAUDI ARABIA - Arabian Gulf • PAKISTAN – Pakistan • OMAN – Oman • LEBANON – Lebanon • KUWAIT – Kuwait • JORDAN – Jordan • INDIA - South India • INDIA - North India • INDIA - Central India
  • 6. AACE Certifications 1. Certified Cost Professional (CCP) 2. Earned Value Professional (EVP) 3. Planning & Scheduling Professional (PSP) 4. Certified Forensic Claims Consultant (CFCC) 5. Certified Estimating Professional (CEP) 6. Decision & Risk Management Professional (DRMP) 7. Certified Cost Technician (CCT) 8. Certified Scheduling Technician (CST)
  • 7. What is (CCP) ? 1. CCP certification recognizes specialists who meet a set of cost and management criteria by examination, experience, education and ethical qualifications. 2. CCP Certification is independently accredited by the Council of Engineering & Scientific Specialty Boards (CESB). 3. Formerly known as Certified Cost Engineer (CCE) / Certified Cost Consultant (CCC).
  • 8. CCP Eligibility Requirements 1. Professional experience At least 8 full years of professional experience, of which up to 4 years may be substituted by a college/university degree. 2. Technical Paper Minimum of 2,500 word technical paper and signed affidavit must be submitted within 30 days of registration. 3. Accept Canon of Ethics
  • 9. CCP Registration 1. Registration and payment (US$500 Members, US$625 Non-Members) where membership cost is ($170). 2. Submit experience verification, education certificate, and technical paper. 3. Receive clearance from AACE to schedule the exam 4. Login to KRYTERION web site to schedule your exam
  • 10. Examination Computer Based Test (CBT) • CBT is 5 Hours (120 Questions) • Exam is fully closed book • Calculator is permitted • Formula guides were developed to assist in specific questions and available onscreen when needed • Passing Grade is 70 % • Results will be sent within 14 days after CBT exam • Rescheduling is free-of-charge till 72 hours before exam
  • 12. Recertification Recertification By Credit Plan • Accumulation of 15 CEUs over a 3-year period. • CEUs (Continuing Education Units) are equivalent to 10 hour. • CEUs are earned in 6 separate categories: A. Performed (Employment in related field) B. Learned (Seminars, conferences, workshops, and courses) C. Taught ( Full-time / part-time instructor) D. Professional Papers (Published or presented) E. Served (Volunteer work for AACE) F. Obtained (Technical certification/license/degree) Recertification By Exam • Registration, payment, and passing the examination every 3 years. • Fees : $500 members; $625 non-members. • Technical paper is not required.
  • 13. Certification Challenges 1. Technical Paper 2. Several Authors 3. Various Knowledge Areas 4. Significantly Large Material 5. No Well-known Help Books
  • 14. Skills & Knowledge of Cost Engineering • SECTION 1—COST • SECTION 2—COST ESTIMATING • SECTION 3—PLANNING & SCHEDULING • SECTION 4—PROGRESS & COST CONTROL • SECTION 5—PROJECT MANAGEMENT • SECTION 6—ECONOMIC ANALYSIS, STATISTICS, PROBABILITY, & RISK
  • 15. Skills & Knowledge of Cost Engineering SECTION 1—COST Cost Structuring Direct Costs Indirect Costs Fixed Costs Variable Costs EX: Cost of concrete used for casting foundation EX: Cost of administrative work in the main office EX: Payrolls of site engineers and other supervisors EX: Material used and consumed in producing the product
  • 16. Skills & Knowledge of Cost Engineering SECTION 1—COST
  • 17. Skills & Knowledge of Cost Engineering SECTION 1—COST Material Raw Material Bulk Material Fabricated Material Engineered Material Labor Base wage Fringe Benefits Medical & Life Insurance Overhead & Profit Engineering Pure/Applied Research CAM / CAE / CAD Prototype Patents & Trade Secrets Equipments Cost New Value Market Value (Used) Residual Values Residual Curves
  • 18. Skills & Knowledge of Cost Engineering SECTION 1—COST Cost-Change Concepts: 1- Inflation 2- Deflation 3- Escalation 4- Currency Variation Sources of Inflation 1- Money Supply 2- Exchange Rate 3- Demand-Pull 4- Cost-Push Depreciation Techniques 1- Straight Line 2- Double Declining Balance 3- Sum-of-Year Digits Economic Analysis Techniques 1- Net Present Worth 2- Payback Period 3- Benefit / Cost Ratio 4- Equivalent Uniform Annual Cost
  • 19. Skills & Knowledge of Cost Engineering SECTION 2—COST ESTIMATION
  • 20. Skills & Knowledge of Cost Engineering SECTION 2—COST ESTIMATION A- Conceptual Estimating Units No. Physical Dimension Capacity Factor Ratio or Factor Parametric 200 Rooms Hotel 80 KM Pipeline (Nonlinear) (CapA/CapB) e e= 0.6 Mathematical Correlation Factor of Main Equipment
  • 21. B- Deterministic Estimating Skills & Knowledge of Cost Engineering SECTION 2—COST ESTIMATION Review Scope IFC Takeoff HOC Customs & Taxes Fees If Applicable Risk Analysis (Reserve) Review & Validation
  • 22. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Planning Influencing the future by making decisions based on missions, needs, and objectives. It is the process of stating goals and determining the most effective way of reaching them. Scheduling It is the process that converts the project work plan into a road map, that if followed, will assure timely project completion.
  • 23. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Planning Tools Gained Experience Hand Books Company Standards Model Plans Checklists Historical Database Chart of Accounts
  • 24. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Planning Major Elements: 1. Summarizing Goals & Scope of Work 2. Time Planning 3. Cost Planning 4. Resource Planning 5. Quality Planning 6. Review 7. Planning for Change
  • 25. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Scheduling Tools Bar Chart CPMPERT
  • 26. Skills & Knowledge of Cost Engineering • SECTION 4—PROGRESS & COST CONTROL Earned Value Example Cost Units Total Scheduled BC($ 500) WS(40) $ 20’000 Actual AC($ 550) WP(42) $ 23’100 PV (BCWS) = $ 20’000 AC (ACWP) = $ 23’100 EV (BCWP) = $ 500 x 42 = $ 21’000 Cost Performance • Cost Variance CV = EV – AC = - 2’100 • Cost Performance Indicator CPI = EV / AC = 0.91 Over Budget Schedule Performance • Schedule Variance SV = EV – PV = 1’000 • Schedule Performance Indicator SPI = EV / PV = 1.05 Ahead Schedule
  • 27. Skills & Knowledge of Cost Engineering • SECTION 5—PROJECT MANAGEMENT 16. Project Management Fundamentals 17. Project Organization Structure 18. Project Communication 19. Project Labor Cost Control 20. Leadership and Management of Project People 21. Quality Management 22. Value Engineering 23. Contracting for Capital Projects 24. Strategic Asset Management 25. Change Management Practical Guide 26. Construction Claims & Disputes
  • 28. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS 27. Financial & Cash Flow Analysis 28. Corporate Investment Decision 29. Statistics & Probability 30. Optimization 31. Risk Management Fundamentals 32. Risk Management Practice Guide 33. Total Cost Management Overview 34. International System of Units
  • 29. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS Discount Factors
  • 30. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS Ex: If present value is P=20’000 and i = 10 % Find Future value after 5 years F = 20’000 x ( 1 + 0.1)5 = 20’000 * 1.6105 = 32’210 Ex: If present value is P=20’000 and i = 10 %, Find Annuity value for the next five years A = 20’000 x 0.1 x ( 1 + 0.1)5 / [( 1 + 0.1)5 -1] = 20’000 x 0.1 x 1.61 / 0.61 = 20’000 x .02639 = 5’278 0 1 2 3 4 5 F P 0 1 2 3 4 5 A P A A A A
  • 31. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS
  • 32. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS Ex: For the following Cashflow If the contractor’s minimum attractive rate of return (MARR) is 6 percent, should the investment be made? Year Expense Income Net 0 38’000 0 (38’000) 1 0 11’000 11’000 2 1’000 11’000 10’000 3 2’000 11’000 9’000 4 3’000 11’000 8’000 Total 44’000 44’000 0.00 Factor P 1 (38’000) 0.9434 10’377 0.8900 8’900 0.8396 7’556 0.7921 6’337 Total (4’830) Another Solution : P = P0 + P1 + P2 P0 = (38’000) P1 = -G (P/G,i,n)=-1,000 (P/G, 6 %, 4)=-1,000 (4.945) = (4’945) P2 = A (P/A,i,n)=11,000 (P/A, 6 %, 4)=11,000 (3.465) = 38’115 P = (38’000) + (4’945 )+ 38’115 = (4’830)
  • 33. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Mean : The sum of measurements divided by the number of measurements Median: The middle number when the data observations are arranged in ascending or descending order Mode: The measurement that occurs most often in the data set Dispersion
  • 34. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Variance : The average of the squared deviations from the mean. Standard Deviation : The square root of the variance Central Tendency
  • 35. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Z Score: Deviation from the mean relative to the standard deviation Z=(X- μ)/σ Standard Normal Distribution Z Probability 1.00 68.3 % 1.282 80 % 1.645 90 % 1.96 95 % 2.00 95.4 % 2.326 98 % 2.576 99 % 3.00 99.7 % Single In Single Out 34.15 % 15.85 % 40 % 10 % 45 % 5 % 47.5 % 2.5 % 47.7 % 2.3 % 49 % 1 % 49.5 % .5 % 49.85 % .15 %
  • 36. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Standard Normal Distribution EX: After reviewing the results for a concrete foundation activity that was exuted several times , we found that the mean duration was 35 days with standard deviation of 3.04 . What will be the probability of finishing this activity in 35, 30, and 40 days? 1. For 35 Days, Probability = 50 % 2. Z = (35-30) / 3.04 = 1.645 From table, Probability = 5 % 3. Z = (40-35) / 3.04 = 1.645 From table, Probability = 50 + 45 = 95 %