Development of Air Transport in India
• The first air flight in India was performed in the year
1911 when a Frenchman carried mail from Allahabad
to Naini.
• The first commercial air service was established in 1930
as Tata Airlines.
• Air India entered into Jet age in 1960 when Boeing 707
Services were started between India and London and
subsequently extended to New York.
• India’s first Boeing 747 (Jumbo-Jet) which is two and a
half times the size of Boeing 707 – Emperor Ashoka
was procured in 1971.
Airport Engineering
• Airport Engineering encompasses the planning, design, and
construction of terminals, runways, and navigation aids to
provide for passenger and freight service.
• Airport engineers design and construct airports. They must
account for the impacts and demands of aircraft in their
design of airport facilities.
• These engineers must use the analysis of predominant
wind direction to determine runway orientation, determine
the size of runway border and safety areas, different wing
tip to wing tip clearances for all gates and must designate
the clear zones in the entire port.
What is an AIRPORT?
• An airport is a facility where passengers connect
from ground transportation to air transportation.
• It is a location where aircraft such as airplanes,
helicopters take off and land.
• Aircraft may also be stored or maintained at an
airport.
• An airport should have runway for takeoffs and
landings, buildings such as hangars and terminal
buildings.
Definition
• AIRFIELD is an area where
an aircraft can land and
take off, which may or may
not be equipped with any
navigational aids or
markings. Many grass
strips are also designated
as airfields.
What are Aerodromes?
• AERODROMES
• A defined area on land or water (including any
buildings, installations and equipment) intended to be
used either wholly or in part for the arrival, departure
and surface movement of aircraft.
Hartsfield-Jackson Atlanta International
Airport
Airport History
• The world's first airport was built in 1928 at
Croydon near London (England). It was the main
airport for London till it was closed down in
1959, after the World War II. It is now open as a
visitor centre for aviation.
The International Civil Aviation
Organization (ICAO)
• The International Civil Aviation Organization
(ICAO), an agency of the United Nations, codifies
the principles and techniques of international air
navigation and fosters the planning and
development of international air transport to
ensure safe and orderly growth.
Types of
Airports
International
Airports
Regional
Airports
Domestic
Airports
International Airports
• An international airport has direct service to many other
airports.
• Handle scheduled commercial airlines both for passengers
and cargo.
• Many international airports also serve as "HUBS", or places
where non-direct flights may land and passengers switch
planes.
• Typically equipped with customs and immigration facilities
to handle international flights to and from other countries.
• Such airports are usually larger, and often feature longer
runways and facilities to accommodate the large aircraft.
(FBO, MRO etc..)
Hong Kong International Airport – Chek Lap Kok, Hong Kong
Incheon International Airport
Domestic Airports
• A domestic airport is an airport which handles only
domestic flights or flights within the same country.
• Domestic airports don't have customs and immigration
facilities and are therefore incapable of handling flights to or
from a foreign airport.
• These airports normally have short runways which are
sufficient to handle short/medium haul aircraft.
Regional Airports
• A regional airport is an airport serving traffic within a
relatively small or lightly populated geographical area.
• A regional airport usually does not have customs and
immigration facilities to process traffic between countries.
• Aircraft using these airports tend to be smaller business jets
or private aircraft (general aviation).
Louisiana Regional Airport, US
Aircraft Characteristics• The size;
– Span of wings: This decides the width of taxiway,
size of aprons and hangers.
– Height: This decides the height of hanger gate and
miscellaneous installations inside the hanger.
– Wheel base: This decides minimum taxiway
radius.
– Tail width: Required for size of parking and
apron.
• Minimum turning radius: To determine the radii at
the ends of the taxiways and to ascertain the position
on the loading apron.
• Gross Take-off weight: It governs the thickness of
• Take-off and landing distances: A number of factors
such as altitude of the airport, gradient of runway,
direction and intensity of wind, temperature and the
manner of landing and take-off which influence the
take-off and landing distances.
• Tyre pressure and contact area: It governs the
thickness of the pavement.
• Range: The frequency of operations and hence the
peak traffic volume and the runway capacity depend
upon the normal haul length or the range.
Factors affecting selection of site for
Airport
• Availability of adequate area
• Accessibility
• Topography, soil condition and drainage
• Availability of construction materials
• Cost of development
• Cost of maintenance
• Traffic volume and type of traffic
• Cross-wind component
• Proximity of airways
• Safety factors
• Revenues
Typical Layout of an Airport
Important Components of An Airport
Layout
1. Runway
2. Terminal Building
3. Apron
4. Taxiway
5. Aircraft Stand
6. Hanger
7. Control Tower
8. Parking
Runways
A runway is the area where an aircraft lands or takes off. It
can be grass, or packed dirt, or a hard surface such as
asphalt or concrete. Runways have special markings on
them to help a pilot in the air to tell that it is a runway (and
not a road) and to help them when they are landing or
taking off. Runway markings are white.
Most runways have numbers on the end. The number is the
runway's compass direction. (For example, runway
numbered 36 would be pointing north or 360 degrees).
Some airports have more than one runway going in the
same direction, so they add letters to the end of the number
R for right, C for center, and L for left.
Terminal Buildings
Also known as airport terminal, these buildings are the
spaces where passengers board or alight from flights. These
buildings house all the necessary facilities for passengers to
check-in their luggage, clear the customs and have lounges to
wait before disembarking. The terminals can house cafes,
lounges and bars to serve as waiting areas for passengers.
Ticket counters, luggage check-in or transfer, security
checks and customs are the basics of all airport terminals. Large
airports can have more than one terminal that are connected to
one another through link ways such as walkways, sky-bridges or
trams. Smaller airports usually have only one terminal that
houses all the required facilities.
Aprons
Aircraft aprons are the areas where the aircraft park. Aprons
are also sometimes called ramps. They vary in size, from areas
that may hold five or ten small planes, to the very large areas
that the major airports have.`
4. Taxiway
A taxiway is a path on an airport
connecting runways with ramps, hangars, terminals and other
facilities. They mostly have hard surface such as asphalt or
concrete, although smaller airports sometimes
use gravel or grass.
5. Aircraft Stand
A portion of an apron designated as a taxiway and intended to
provide access to aircraft stands only.
7. Control Tower
A tower at an airfield from which air traffic is controlled by radio
and observed physically and by radar.
8. Parking
Parking is a specific area of airport at which vehicles park.
Runway Orientation & Design
• “Rectangular area on an aerodrome used for
landing and take off “
• Runway orientation is important in airport
planning
• Current practice is to layout a runway in the
direction of prevailing wind
IMPORTANCE OF RUNWAY LAYOUT
• Determination of runway is a critical task
• It is very important for safe take offs and
approaches
• The width and sloping of runway also play a
role in safe approaches . It can be illustrated
by the figure below :
RUNWAY NUMBERS
• Runways are numbered according the
magnetic compass direction they are
oriented to
• Consists of two numbers one at each end of
runway
• Preceding that number are eight stripes.
• By 500 feet is the touchdown zone , identified
by six stripes
• Runway numbers are not given in degrees,
rather in shorthand format
• e.g. a runway with a marking of 14 is actually
140 degrees
• For simplicity FAA rounds off the precise
headings to nearest tens
RUNWAY CONFIGURATION
• FAA includes over 20 runway layouts
• Amongst them there are 4 basic runway
patterns :
1. SIMPLE RUNWAY
2. PARALLEL RUNWAY
3. OPEN-V RUNWAYS
4. INTERSECTING RUNWAYS
PARALLEL RUNWAYS
There are 4
types of
parallel
runways
OPEN-V RUNWAYS
Runways diverging from different directions but do not
intersect and form an open-V shape are ‘OPEN-V runways’
INTERSECTING RUNWAYS
Two or more runways that cross each other are classified as
intersecting runways.
This type of runway is used when there are relatively strong
prevailing winds from more than one direction during the
year.
FACTORS AFFECTING RUNWAY
ORIENTATION
• WIND
• AIRSPACE AVAILABILITY
• ENVIRONMENTAL FACTORS
• OBSTRUCTIONS TO NAVIGATION
• AIR TRAFFIC CONTROL VISIBILITY
• WILD LIFE HAZARDS
• TERRAIN AND SOIL CONSIDERATION
RUNWAY LIGHTING
• These lights are used to assist pilot in to
identify the runway
• GREEN THRESHOLD LIGHTS : Line the
runway edge
• RED LIGHTS : Mark the end of runway
• BLUE LIGHTS : Run alongside taxiways
• While runways have YELLOW or WHITE
lights marking their edges
RUNWAY SIGNS
• Various kinds of runway signs are also
used for facilitation
• They differ according to their purpose
and action
Airport engineering

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
Runway orientation
Runway orientationRunway orientation
Runway orientation
 
Airport planning and Design
Airport planning and DesignAirport planning and Design
Airport planning and Design
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructions
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
 
Airport Planning and Design
Airport Planning and Design Airport Planning and Design
Airport Planning and Design
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Components of Airfield
Components of AirfieldComponents of Airfield
Components of Airfield
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdf
 
Airport marking
Airport markingAirport marking
Airport marking
 
Taxiway design perfect ppt
Taxiway design perfect pptTaxiway design perfect ppt
Taxiway design perfect ppt
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
 
Runways
RunwaysRunways
Runways
 
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Runway Design ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 
09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy )
09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy )09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy )
09-Runway Configuration ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 

Destaque

Minimalism powerpoint full
Minimalism powerpoint fullMinimalism powerpoint full
Minimalism powerpoint full
10polarbears
 

Destaque (15)

Airports
AirportsAirports
Airports
 
EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt) EMAS - Engineered Material Arrestor System (seminar ppt)
EMAS - Engineered Material Arrestor System (seminar ppt)
 
ACO-1 Airport Familiarization
ACO-1 Airport Familiarization ACO-1 Airport Familiarization
ACO-1 Airport Familiarization
 
Airport terminal design (lecture note)
Airport terminal design (lecture note)Airport terminal design (lecture note)
Airport terminal design (lecture note)
 
Runway Construction Project Execution Plan
Runway Construction Project Execution PlanRunway Construction Project Execution Plan
Runway Construction Project Execution Plan
 
minimalism
minimalismminimalism
minimalism
 
Minimalism Architecture
Minimalism ArchitectureMinimalism Architecture
Minimalism Architecture
 
Pre history of architecture and biskupin
Pre history of architecture and biskupinPre history of architecture and biskupin
Pre history of architecture and biskupin
 
Building,types of building and case study about redential building
Building,types of building and case study about redential buildingBuilding,types of building and case study about redential building
Building,types of building and case study about redential building
 
Rationalism Architecture
Rationalism ArchitectureRationalism Architecture
Rationalism Architecture
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
5 Characteristics of Modern Minimalist House Designs
5 Characteristics of Modern Minimalist House Designs5 Characteristics of Modern Minimalist House Designs
5 Characteristics of Modern Minimalist House Designs
 
Minimalism powerpoint full
Minimalism powerpoint fullMinimalism powerpoint full
Minimalism powerpoint full
 
Minimalism ppt
Minimalism pptMinimalism ppt
Minimalism ppt
 
Minimalism
MinimalismMinimalism
Minimalism
 

Semelhante a Airport engineering

airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptx
cuhp21rdtt12
 
Airport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneAirport runway By Nikhil Pakwanne
Airport runway By Nikhil Pakwanne
NIKHIL PAKWANNE
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
Anujyadav514462
 

Semelhante a Airport engineering (20)

1.introduction
1.introduction1.introduction
1.introduction
 
Airport engineering
Airport engineeringAirport engineering
Airport engineering
 
Airport & railways engineering ce467 pdf
Airport & railways engineering   ce467 pdfAirport & railways engineering   ce467 pdf
Airport & railways engineering ce467 pdf
 
airports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxairports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptx
 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptx
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport Planning
 
Lecture 4.pdf
Lecture 4.pdfLecture 4.pdf
Lecture 4.pdf
 
AIRPORT.pptx
AIRPORT.pptxAIRPORT.pptx
AIRPORT.pptx
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport
AirportAirport
Airport
 
Airport
AirportAirport
Airport
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unit
 
Sam AIRPORT.pptx
Sam AIRPORT.pptxSam AIRPORT.pptx
Sam AIRPORT.pptx
 
UNIT-3.pptx
UNIT-3.pptxUNIT-3.pptx
UNIT-3.pptx
 
Presentation on Airport Engineering
Presentation on Airport EngineeringPresentation on Airport Engineering
Presentation on Airport Engineering
 
Airfield ground lighting (AGL)
Airfield ground lighting (AGL)Airfield ground lighting (AGL)
Airfield ground lighting (AGL)
 
Airport runway By Nikhil Pakwanne
Airport runway By Nikhil PakwanneAirport runway By Nikhil Pakwanne
Airport runway By Nikhil Pakwanne
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptx
 
Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
 

Mais de Jaspreet singh

RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
Jaspreet singh
 

Mais de Jaspreet singh (19)

Project Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdfProject Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdf
 
Soft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdfSoft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdf
 
Export Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdfExport Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdf
 
MSP
MSPMSP
MSP
 
Assignment -02 HR & OB.docx
Assignment -02 HR & OB.docxAssignment -02 HR & OB.docx
Assignment -02 HR & OB.docx
 
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdfHuman Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
 
Martig Construction Assi (1).pdf
Martig Construction Assi (1).pdfMartig Construction Assi (1).pdf
Martig Construction Assi (1).pdf
 
Legal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdfLegal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdf
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
staad pro
staad prostaad pro
staad pro
 
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
Paperspace
PaperspacePaperspace
Paperspace
 
Paper rca
Paper rcaPaper rca
Paper rca
 
Solid wealth
Solid wealthSolid wealth
Solid wealth
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materials
 
Minor project 2011 goup f
Minor project 2011 goup fMinor project 2011 goup f
Minor project 2011 goup f
 
Synopsis
SynopsisSynopsis
Synopsis
 

Último

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Último (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 

Airport engineering

  • 1. Airport Engineering Submitted by: Jaspreet Singh (110138) Akshay Kaushal (110134)
  • 2. Development of Air Transport in India • The first air flight in India was performed in the year 1911 when a Frenchman carried mail from Allahabad to Naini. • The first commercial air service was established in 1930 as Tata Airlines. • Air India entered into Jet age in 1960 when Boeing 707 Services were started between India and London and subsequently extended to New York. • India’s first Boeing 747 (Jumbo-Jet) which is two and a half times the size of Boeing 707 – Emperor Ashoka was procured in 1971.
  • 3. Airport Engineering • Airport Engineering encompasses the planning, design, and construction of terminals, runways, and navigation aids to provide for passenger and freight service. • Airport engineers design and construct airports. They must account for the impacts and demands of aircraft in their design of airport facilities. • These engineers must use the analysis of predominant wind direction to determine runway orientation, determine the size of runway border and safety areas, different wing tip to wing tip clearances for all gates and must designate the clear zones in the entire port.
  • 4. What is an AIRPORT? • An airport is a facility where passengers connect from ground transportation to air transportation. • It is a location where aircraft such as airplanes, helicopters take off and land. • Aircraft may also be stored or maintained at an airport. • An airport should have runway for takeoffs and landings, buildings such as hangars and terminal buildings.
  • 5. Definition • AIRFIELD is an area where an aircraft can land and take off, which may or may not be equipped with any navigational aids or markings. Many grass strips are also designated as airfields.
  • 6. What are Aerodromes? • AERODROMES • A defined area on land or water (including any buildings, installations and equipment) intended to be used either wholly or in part for the arrival, departure and surface movement of aircraft.
  • 8. Airport History • The world's first airport was built in 1928 at Croydon near London (England). It was the main airport for London till it was closed down in 1959, after the World War II. It is now open as a visitor centre for aviation.
  • 9. The International Civil Aviation Organization (ICAO) • The International Civil Aviation Organization (ICAO), an agency of the United Nations, codifies the principles and techniques of international air navigation and fosters the planning and development of international air transport to ensure safe and orderly growth.
  • 11. International Airports • An international airport has direct service to many other airports. • Handle scheduled commercial airlines both for passengers and cargo. • Many international airports also serve as "HUBS", or places where non-direct flights may land and passengers switch planes. • Typically equipped with customs and immigration facilities to handle international flights to and from other countries. • Such airports are usually larger, and often feature longer runways and facilities to accommodate the large aircraft. (FBO, MRO etc..)
  • 12. Hong Kong International Airport – Chek Lap Kok, Hong Kong
  • 14. Domestic Airports • A domestic airport is an airport which handles only domestic flights or flights within the same country. • Domestic airports don't have customs and immigration facilities and are therefore incapable of handling flights to or from a foreign airport. • These airports normally have short runways which are sufficient to handle short/medium haul aircraft.
  • 15. Regional Airports • A regional airport is an airport serving traffic within a relatively small or lightly populated geographical area. • A regional airport usually does not have customs and immigration facilities to process traffic between countries. • Aircraft using these airports tend to be smaller business jets or private aircraft (general aviation).
  • 17. Aircraft Characteristics• The size; – Span of wings: This decides the width of taxiway, size of aprons and hangers. – Height: This decides the height of hanger gate and miscellaneous installations inside the hanger. – Wheel base: This decides minimum taxiway radius. – Tail width: Required for size of parking and apron. • Minimum turning radius: To determine the radii at the ends of the taxiways and to ascertain the position on the loading apron. • Gross Take-off weight: It governs the thickness of
  • 18. • Take-off and landing distances: A number of factors such as altitude of the airport, gradient of runway, direction and intensity of wind, temperature and the manner of landing and take-off which influence the take-off and landing distances. • Tyre pressure and contact area: It governs the thickness of the pavement. • Range: The frequency of operations and hence the peak traffic volume and the runway capacity depend upon the normal haul length or the range.
  • 19. Factors affecting selection of site for Airport • Availability of adequate area • Accessibility • Topography, soil condition and drainage • Availability of construction materials • Cost of development • Cost of maintenance • Traffic volume and type of traffic • Cross-wind component • Proximity of airways • Safety factors • Revenues
  • 20. Typical Layout of an Airport
  • 21. Important Components of An Airport Layout 1. Runway 2. Terminal Building 3. Apron 4. Taxiway 5. Aircraft Stand 6. Hanger 7. Control Tower 8. Parking
  • 22. Runways A runway is the area where an aircraft lands or takes off. It can be grass, or packed dirt, or a hard surface such as asphalt or concrete. Runways have special markings on them to help a pilot in the air to tell that it is a runway (and not a road) and to help them when they are landing or taking off. Runway markings are white. Most runways have numbers on the end. The number is the runway's compass direction. (For example, runway numbered 36 would be pointing north or 360 degrees). Some airports have more than one runway going in the same direction, so they add letters to the end of the number R for right, C for center, and L for left.
  • 23.
  • 24. Terminal Buildings Also known as airport terminal, these buildings are the spaces where passengers board or alight from flights. These buildings house all the necessary facilities for passengers to check-in their luggage, clear the customs and have lounges to wait before disembarking. The terminals can house cafes, lounges and bars to serve as waiting areas for passengers. Ticket counters, luggage check-in or transfer, security checks and customs are the basics of all airport terminals. Large airports can have more than one terminal that are connected to one another through link ways such as walkways, sky-bridges or trams. Smaller airports usually have only one terminal that houses all the required facilities.
  • 25. Aprons Aircraft aprons are the areas where the aircraft park. Aprons are also sometimes called ramps. They vary in size, from areas that may hold five or ten small planes, to the very large areas that the major airports have.`
  • 26.
  • 27. 4. Taxiway A taxiway is a path on an airport connecting runways with ramps, hangars, terminals and other facilities. They mostly have hard surface such as asphalt or concrete, although smaller airports sometimes use gravel or grass.
  • 28. 5. Aircraft Stand A portion of an apron designated as a taxiway and intended to provide access to aircraft stands only.
  • 29. 7. Control Tower A tower at an airfield from which air traffic is controlled by radio and observed physically and by radar. 8. Parking Parking is a specific area of airport at which vehicles park.
  • 30. Runway Orientation & Design • “Rectangular area on an aerodrome used for landing and take off “ • Runway orientation is important in airport planning • Current practice is to layout a runway in the direction of prevailing wind
  • 31. IMPORTANCE OF RUNWAY LAYOUT • Determination of runway is a critical task • It is very important for safe take offs and approaches • The width and sloping of runway also play a role in safe approaches . It can be illustrated by the figure below :
  • 32.
  • 33. RUNWAY NUMBERS • Runways are numbered according the magnetic compass direction they are oriented to • Consists of two numbers one at each end of runway • Preceding that number are eight stripes.
  • 34. • By 500 feet is the touchdown zone , identified by six stripes • Runway numbers are not given in degrees, rather in shorthand format • e.g. a runway with a marking of 14 is actually 140 degrees • For simplicity FAA rounds off the precise headings to nearest tens
  • 35. RUNWAY CONFIGURATION • FAA includes over 20 runway layouts • Amongst them there are 4 basic runway patterns : 1. SIMPLE RUNWAY 2. PARALLEL RUNWAY 3. OPEN-V RUNWAYS 4. INTERSECTING RUNWAYS
  • 36.
  • 37. PARALLEL RUNWAYS There are 4 types of parallel runways
  • 38. OPEN-V RUNWAYS Runways diverging from different directions but do not intersect and form an open-V shape are ‘OPEN-V runways’
  • 39. INTERSECTING RUNWAYS Two or more runways that cross each other are classified as intersecting runways. This type of runway is used when there are relatively strong prevailing winds from more than one direction during the year.
  • 40. FACTORS AFFECTING RUNWAY ORIENTATION • WIND • AIRSPACE AVAILABILITY • ENVIRONMENTAL FACTORS • OBSTRUCTIONS TO NAVIGATION • AIR TRAFFIC CONTROL VISIBILITY • WILD LIFE HAZARDS • TERRAIN AND SOIL CONSIDERATION
  • 41. RUNWAY LIGHTING • These lights are used to assist pilot in to identify the runway • GREEN THRESHOLD LIGHTS : Line the runway edge • RED LIGHTS : Mark the end of runway • BLUE LIGHTS : Run alongside taxiways • While runways have YELLOW or WHITE lights marking their edges