2. •What is Virtualization?
Virtualization is Nothing But Creating Virtual Version of
Something, in Computer Terms it can be OS, Storage
Device, Network Resources.
Virtualization
3. Goal Of Virtualization
• Goal of Virtualization is to centralize administrative task while improving
scalability and overall Hardware Utilization. Many operating system can be
run on single high end server.
• An Enterprise can better manage the updates and rapid changes to OS
and applications without disturbing the users.
• Ultimately virtualization dramatically improves the efficiency and
Availability of System resources in enterprise.
4. Hardware Virtualization
• Hardware Virtualization or Platform Virtualization means
creation of virtual machine that act like real computer. For
Example Computer Running Microsoft Windows 7 May Host
The virtual machine look likes a ubuntu.
-Host Machine
-Guest Machine
5. Types Of Hardware Virtualization
• Full Virtualization :- Almost complete simulation of the actual hardware to
allow software, which typically consists of a guest operating system, to run
unmodified
• Partial Virtualization :- Some but not all of the target environment is
Simulated. Some guest programs, may need modifications to run in This virtual
environment.
• Para Virtualization :- Hardware environment is not simulated; however,
The guest programs are executed in their own isolated domains, as if they are
Running on a separate system. Guest programs need to be specifically modified
To run in this environment.
6. Creating Monitoring And
Maintenance Of Virtual Machines
• Prepare the requirement of virtual machine
Environment like how many user will connect
To the VM, How Many Applications will run on
The VM. As per requirement decide how much
Resources required for VM Like No. of Virtual
processor, RAM and NIC etc.
• Now Create the VM in hypervisor and install
The OS and All Other Application users want run.
• Keep Monitoring The VM And See How Much
Load it takes and if needed Change the resources
It uses.
7. Snapshotting of VM
• Snapshot is a state of virtual machine at an
exact time. Snapshots are taken by giving an
order to do so at a given time and can revert
on demand.
• Snapshot is extremely rapid backup technique.
• Snapshot can be moved to another machine
With its own hypervisor
8. Teleporation
• When the VM is temporarily stopped,
Snapshotted, then it can be moved to other
server and resumed on new host, this process
is known as Teleportation (or migration).
• If you take snapshot regularly then
Teleportation process become very fast
And uninterrupted to the users.
9. FailOver
• Failover allows VM to continue operations if
the host fails, in such failover case failover VM
continues its operation from last known
coherent state, rather then current state.
10. Challenges
• First challenge with virtualization is the
complexities of licensing.
• Virtualized desktop is depend on centralized
Server, storage and network.
Which puts user vulnerable to server and
Network outage or capacity limit.
11. Desktop Virtualization
• Desktop virtualization is the concept of separating the logical
desktop from the physical machine
• Desktop virtualization is more advance state of hardware
Virtualization.
• Rather than interacting with host computer directly via
Keyboard and mouse and monitor, user uses another
Computer or mobile device to interact with the server.
• Thin Clients in desktop virtualization are simple and much
Cheaper solution which are designed to connect through
The network
12. Virtualization in GHCL SodaAshDivision
APP
OS
APP
OS
APP
OS
Virtual Servers
Ncomp1 Domain Oracle
APP
OS
APP
OS
APP
OS
Virtual Servers
NCOMP2 AV Retro Backup
APP
OS
APP
OS
APP
OS
APP
OS
Virtual Servers
Proxy 1 Proxy 2 WSUS Veeam
Backup
Physical Server1
IBM 3650M4
Physical Server2
IBM 3650M4
Physical Server3
IBM 3650M4
13 Users 70 Users301 Users 160 Users 13 Users300 Users 300 Users10 Users 60 Users
Netgear 3220 NAS
Win 2k8 Win 2k3Win 2k8 Win 2k8 Win 2k8Win 2k8Win 2k8 Win 2k3Win 2k3 Win 2k8
Win 2012 R2
Win 2012 R2
Win 2012 R2
13. Resource Planning Of Host Server1
Resource Availabe VM Description Resources Assign Resource Remained
16 Procesor, 72 GB RAM,
8 NIC Card
Ncomputing For MS App.
16 Virtual Processor
4 Virtual Processor, 12 GB RAM,
2 NIC Card
32 GB RAM
1 NIC Card
Domain Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
Oracle Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
FailOver Of AV
2 Virtual Processor
6 GB RAM
1 NIC Card
FailOver Of Reliance Proxy
4 Virtual Processor
6 GB RAM
1 NIC Card
14. Resource Planning Of Host Server2
Resource Availabe VM Description Resources Assign Resource Remained
16 Procesor, 72 GB RAM,
8 NIC Card
Ncomputing For Open Source App.
16 Virtual Processor
1 Virtual Processor, 4 GB RAM,
1 NIC Card
32 GB RAM
1 NIC Card
Antivirus Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
RestroSpect Backup Server
2 Virtual Processor
8 Gb RAM
1 NIC Card
FailOver Of Domain Server
2 Virtual Processor
6 Gb RAM
1 NIC Card
FailOver Of NC1
8 Virtual Processor
16 GB RAM
1 NIC Card
FailOver Of BSNL Proxy
1 Virtual Processor
2 Gb RAM
1 NIC Card
15. Resource Planning Of Host Server3
Resource Availabe VM Description Resources Assign Resource Remained
16 Procesor, 72 GB RAM,
8 NIC Card
Veeam Backup
4 Virtual Procesor
8 Virtual Processor, 2 GB RAM,
1 NIC Card
4 GB RAM
1 NIC Card
Windows Server Update Service
2 Virtual Processor
4 GB RAM
1 NIC Card
Reliance Proxy Server
2 Virtual Processor
4 GB RAM
1 NIC Card
BSNL Proxy Server
2 Virtual Processor
4 GB RAM
1 NIC Card
Test Server
2 Virtual Processor
4 GB RAM
1 NIC Card
FaiOver Of Domain Server
2 Virtual Processor
6 GB RAM
1 NIC Card
FailOver Of NC2
8 Virtual Processor
32 GB RAM
1 NIC Card
FailOver Of Antivirus
Shared NIC With Domain
6 GB RAM
1 NIC Card
FailOver Of BackUP Server
2 Virtual Processor
6 GB RAM
Shared NIC With AV
16. INTERNAL LAYOUT OF
GIGABIT ETHERNET/ FAST ETHERNET NETWORK,NODES AND RELATED PERIPHERALS
AT GHCL LTD. PLANT
SUTRAPADA, JUNAGADH, GUJRAT.
17. Index
• Introduction
• GHCL Existing Network Setup
• Existing Network Diagram
• Network Resources Usage of Switches
• Network Devices And Load On Them
• Business Benefit
• On Going CCTV Project Fiber Layout
18. Introduction
GHCL Ltd – Sutrapada Facility is having a state of
the art Network infrastructure in place. To
Support the Business with almost 99.999%
uptime. IT Team conducts The audit of the
existing set up to study the gap Addressing the
below mentioned parameters to the HOD.
• Redundancy
• Network Scalability
19. GHCL Existing Network Setup
• Existing network is based on
the industry standard practice
of design i.e. core – distribution
& edge / access layer.
• Redundancy has been built at
the core layer by deploying the
HSRP Configuration on existing
layer – 3 switches.
• Redundancy has been built at
the link as well as path at
almost all the locations.
GHCL Plant Logical Network
Admin
Disp
Godown
HRDPlant
Office
Materi
al W/B Securit
y
VRA
Soda
Ash
W.B
Inst
W.S
Safety
Rbc
LabMech
worksh
op
New
rmh
Bricket
plan
Rmh
con
UCR
LCR
CCR
Stores
21. Network Resources Usage of Switches
VLAN AREA SWITCHS RESOURCES USAGES Normal Hours Peak Hours
VLAN 1 IT ADMIN CORE SWITCHS
CPU / Ternary content-addressable
memory Utilization
13% 16%
VALN 2 DISP GODOWN DDISTRUBUTION SWITCHS
CPU / Ternary content-addressable
memory Utilization
13% 16%
VALN 3 PLANT OFFICE DDISTRUBUTION SWITCHS
CPU / Ternary content-addressable
memory Utilization
13% 16%
VALN 4 HRD DDISTRUBUTION SWITCHS
CPU / Ternary content-addressable
memory Utilization
13% 16%
VALN 5 ADMIN BULDING DDISTRUBUTION SWITCHS
CPU / Ternary content-addressable
memory Utilization
13% 16%
22. Network Devices And Load On Them
NO MODEL NO LOCATION VLAN ID Connected Users
1SGE2000 DISP GODOWN VLAN 2 9
2SGE2000 DISP GODOWN 2 VLAN 2
3SRW2024 MATERIAL WEB BRIGE VLAN 2 4
4SRW2024 MATERIAL GATE SECURITY VLAN 2 4
5SRW2024 VRA VLAN 2 2
6SRW2024 SODA S WEB BRIGE VLAN 2 3
7SGE2000 INU. W/s VLAN 2 6
8SRW2024 500 SECTION VLAN 2 4
9SGE2000 HRD VLAN 4 33
10SRW2024 STORE VLAN 4 15
11SGE2000 Plant Office Vlan 3 52
12SGE2000 LAB Vlan 3 7
13SGE2000 CCR Vlan 3 7
14SGE2000 LCR Vlan 3 9
15SGE2000 UCR Vlan 3 12
16SRW2024 RMH Control Room Vlan 3 5
17SRW2024 Mech Workshop Vlan 3 1
18SRW2024 New RMH Vlan 3 1
19SGE2000 ADMIN Switch=1 VLAN 1 24
20SGE2000 ADMIN Switch=2 VLAN 1 28
21SGE2000 ADMIN Switch=3 VLAN 5 52
22SG300 ADMIN Switch=4 VLAN 1 26
23SRW2024 Bricket Plant VLAN 3 1
Total Users 305
23. Business Benefit
• Switch level Redundancy Core & Distribution
• Network management easy.
• increase network reliability and uptime.
• Allows the IT Admin to work remotely.
24. Main Gate Security
CSO Office
Time Office /
HRD
Soda GodownSoda Gate
Security
Labour Gate
VRA
Material Weight
Bridge
Material Gate
Security Office
Lime Stone
RAMP 1
Lime Stone
RAMP 2
RBC Godown
IT Server Room
Steel Yard
Nr. Civil Office
Steel Yard Nr. Sea Water Area
(Standalone) UTP Cable
Fiber optic
GHCL Sutrapada CCTV Project Fiber Layout
Total 33 IP CCTV
Cameras Connected
Through 12 POE
Switches