INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
1 | P a g e
A Case Study of Productivity Improvement by using IE Tools
Mr. Satish Keru Raut
Department of Mechanical Engineering/JSPM’S RSSOER, Narhe, Pune/Maharashtra, India
* email@adress.xy
Prof. Kedar M. Relekar
Department of Mechanical Engineering /SSIET Ghogaon Karad/MSBTE/Maharashtra, India
Mr. Vikas Sarjerao Dhane
Dean Polytechnic Wing/AGCOE, MSBTE/Satara, Maharashtra, India
ABSTRACT
This paper presents a case study in the development and application of a time study in a engine block
manufacturing plant. The organization engages in the production of two product lines: engine blocks, heads of
diverse categories. The motivation for this study was the need to tackle the problem of productivity per shift
between the employee-association and the management of the company regarding questions of productivity.
The two products have similar production processes. The study’s most important finding is that the time of
producing a unit of product is directly proportional to the number of production stages involved and the time
spent at each stage. The study focuses on the MAHINDRA production line. Where stud hole and push rod
operation is very important for mounting the cylinder head on cylinder block and how to combine this both
operation on one single machine like Mahindra job. So the proposal is made to do these two operations for
HINO on BMV 60 by adjustment of special fixture like Mahindra. With this proposed solution a saving of 2 to
3 man power per cycle was obtained. The paper discusses the use of Industrial Engineering tools used for the
purpose of productivity improvement.
Keywords: manufacturing, process analysis, efficiency study, time study, management analysis.
The objectives of the study
• MINIMIZE EXCESS MAN POWER
By proper utilization of work movement and by proper action time planning of work we can
minimize the excess man power.
• MINIMIZE THE PRODUCTION TIME
By applying the tool of Industrial Engineering that is time study we can minimize the production
time; by improve the process of production (actual machining cycle time) by Process Engineer with the
help of Industrial Engineer we can minimize the production time.
• IMPROVE THE PRODUCION METHODE
By observation of production cycle or by observation of production work method with the help
of actual working associates we can improve the production work methods.
• EFFORT MINIMIZATION
By using of proper material handling equipments and by using proper work movement methods
we can minimize the effort of associate.
• IMPROVEMENT OF ERGONOMICS
Improve the relation between associate and machine using proper ergonomically consideration.
• IMPROVE THE RELATION BETWEEN ASSOCIATES AND MANAGEMENT
By launching the suggestion schemes related to any kind of departmental improvement we can
minimize the gap of communication between management and associates side.
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
2 | P a g e
INTRODUCTION
Research on time study incorporates a range of concerns, including its definition and management. Although
research on work measurement has evolved in a scientific and rigorous fashion, based on early works of Gilbert
and others, the quantitative mathematical modeling of production activities in terms of time study has not
evolved in a similarly rigorous fashion. In recent years, the manufacturing organization used as the case
example in this work has realized that scientific approaches could be developed to aid dispute settlement
between the employees’ association of the company and management regarding issues of productivity. In order
to achieve this, the company was motivated to approach a management consultant. This paper is an attempt to
present the methodology used in solving productivity issues at this company. The company concentrates on the
manufacture of two fast-moving items – engine blocks and cylinder heads. The operations are housed in a large
factory floor consisting of several manufacturing machines, each of which costs an equivalent of several lakhs.
An important problem faced in the production system is that of determining the time it takes to produce a unit of
product. In order to thoroughly analyze the problem, the production processes for each of product is analyzed.
Engine block production activities could be broken down into various steps: loading of block head on
conveyors, milling, drilling, boring, honing, finishing and packing.
Figure 1: The Production line for MAHINDRA and HINO.
WORK STUDY:
Work study forms the basis for work system design. The purpose of work design is to identify the most
effective means of achieving necessary functions. Historically, this work-study aims at improving the existing
and proposed ways of doing work and establishing standard times for work performance. Work is an activity in
which one exerts physical and mental effort to accomplish a given task or perform a duty.
Task: An amount of work that is assigned to a worker or for which a worker is responsible.
Work Element: A series of work activities that are logically grouped together because they have a unified
function in the task
Examples: Reaching for an object, Grasping the object, Moving the object, Walking, Eye movement
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
3 | P a g e
Fig 3. Structure of work study
METHOD STUDY:
METHOD STUDY PROCEDURE
Method-study concerned with “the way in which work is done (i.e., method)”. It is used to simplify the
way to accomplish a work and to improve the method of production. Method-study results in a more effective
use of material, plant, equipment and manpower. Method study is essentially concerned with finding better
ways of doing things. It adds value and increase the efficiency by eliminating unnecessary operations, avoidable
delays and other forms of waste.
Fig 4. Steps or procedure involved in methods study
WORK MEASUREMENT
Work measurement is the application of techniques designed to establish the time for a qualified worker
to carry out specified jobs at a defined level of performance or at a defined rate of working qualified worker is
one who has acquired the skill, knowledge and other attributes to carry out the work in hand to satisfactory
standards of quantity, quality and safety. Defined rate of working is the amount of work that can be produced by
a qualified worker/employee when working at normal space and effectively utilizing his time and where work is
not restricted by process limitation.
TECHNIQUE OF WORK MEASUREMENT:
• Time study: short cycle repetitive jobs
• Work sampling: Long cycle jobs
• Predetermined motion time standards: manual operations confined to one work centre.
TIME STUDY
Time study is also called work measurement. It is essential for both planning and control of operations.
According to British Standard Institute time study has been defined as “The application of techniques designed
to establish the time for a qualified worker to carry out a specified job at a defined level of performance.” Time
study is a direct and continuous observation of a task, using a timekeeping device (e.g., decimal minute
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
4 | P a g e
stopwatch, computer-assisted electronic stopwatch, and videotape camera) to record the time taken to
accomplish a task and it is often used when:
• There are repetitive work cycles of short to long duration,
• Wide variety of dissimilar work is performed, or
• Process control elements constitute a part of the cycle.
The Industrial Engineering Terminology Standard defines time study as "a work measurement technique
consisting of careful time measurement of the task with a time measuring instrument, adjusted for any observed
variance from normal effort or pace and to allow adequate time for such items as foreign elements, unavoidable
or machine delays, rest to overcome fatigue, and personal need.
METHODOLOGY AND READINGS
ACTUAL TIME STUDY TAKEN IN THE COMPANY FOR HINO MOTORS
OPEATIONS BEFORE MACHINING
Sr. No Operation Time
Required
(Sec)
Time
Proposed
(Sec.)
1 Raw material Unloading 60 20
2 Inspection
Scrap part putting time if any (60)
30 30
3 Number Punching (Manual) 90 10
4 Job loading on conveyer 90 0
Total cycle Timing 270 60
Operation
60 Sec.
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Avg. Avg.
Taken
Raw
material
Unloading
19 20 18 21 20 21 22 21 20 20 20.2 20
Table no. 1&2 Time required earlier.
Chart no. 1 for Table no. 2
0
5
10
15
20
25
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Series1
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
5 | P a g e
During raw material unloading the material was manually unloaded and there is lots of manual efforts and time
required. And for unloading of single cylinder head they required 60 sec. to 80 sec. After observation of this
unloading process we suggested for hydraulic lifter cum trolley of conveyer height so that they can directly
place the job on conveyer. And they reduces there efforts and time 80%. After implementation of suggested
method we taking the time study, get reduced time 20 sec. from 60 to 80 sec. per cycle.
Operation
30
Sec.
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Avg.
Avg.
Taken
Inspection
Scrap part putting
time if any (60 sec.)
29 30 30 29 29 29 30 30 30 31 29.7 30
Chart no.2 and Table no.3
The operation Inspection is the necessary operation in all the processes to neglect any defect before the
machining. Now it takes 30 sec. to inspect and after some observation, time readings and discussion with shop
floor supervisor and associates; We conclude that this existing time is correct time to inspect the job that is 30
sec.
Operation
90
Sec.
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Avg.
Avg.
Taken
Number
punching
(manual)
10 9 10 9 8 10 10 9 10 10 9.5 10
Chart no.3 and Table no.4
28
28.5
29
29.5
30
30.5
31
31.5
Series1
0
2
4
6
8
10
12
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
Before starting the machining on the job they have to identify the job with the manual number punching. For
manual number punching they have to arrange the job manually in proper direction, for that they need more
efforts and more time to do this action. F
think about the effort minimization of associates in material handling and number punching. We search the
solution for number punching automation and we found the one company who is only
punching technology. That is Marks Pryor Marking Tech. Pvt. Ltd.
provide the pneumatic number punching machine solution. And we proposed this machine solution to
management of KFIL for punching operation. For the number punching operation they need
shift. After some discussion with management of purchase department of machine shop staff they finalize the
machine for number punching.
In next 1 month dated 26 Nov, 20132 the actual machine is installed in the shop. Then we take the time study
for the number punching operation and we get the huge reduction in time that is
only one associate is required. So we saved the 1 associate man powers.
Operation
90
Sec.
1st 2nd 3rd
Job loading
on conveyer
0 0
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
Before starting the machining on the job they have to identify the job with the manual number punching. For
manual number punching they have to arrange the job manually in proper direction, for that they need more
action. For this we observed that they need 90 sec. to do this action. Here we
think about the effort minimization of associates in material handling and number punching. We search the
solution for number punching automation and we found the one company who is only
Pryor Marking Tech. Pvt. Ltd. Pune. After contacting the company they
provide the pneumatic number punching machine solution. And we proposed this machine solution to
management of KFIL for punching operation. For the number punching operation they need
on with management of purchase department of machine shop staff they finalize the
Fig. no.5 punching machine
In next 1 month dated 26 Nov, 20132 the actual machine is installed in the shop. Then we take the time study
e number punching operation and we get the huge reduction in time that is 90 sec to 10 sec.
required. So we saved the 1 associate man powers.
3rd 4th 5th 6th 7th 8th 9th 10th
0 0 0 0 1 0 0 1
Chart no.4 and Table no.5
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
6 | P a g e
Before starting the machining on the job they have to identify the job with the manual number punching. For
manual number punching they have to arrange the job manually in proper direction, for that they need more
to do this action. Here we
think about the effort minimization of associates in material handling and number punching. We search the
solution for number punching automation and we found the one company who is only gives the solution of
contacting the company they
provide the pneumatic number punching machine solution. And we proposed this machine solution to
management of KFIL for punching operation. For the number punching operation they need 2 associates per
on with management of purchase department of machine shop staff they finalize the
In next 1 month dated 26 Nov, 20132 the actual machine is installed in the shop. Then we take the time study
90 sec to 10 sec. And for this
10th Avg.
Avg.
Taken
1 0.2 0
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
7 | P a g e
Before starting the machining KFIL is unload the raw material by manual and lifter is not used so that time
require unloading and loading that material on conveyer is 90 sec. After we study, we suggest lifter of the
height of conveyer that’s why time required for unloading and loading is total minimize that is 0 sec.
Sr. No.
Activity On
OP 10
Existing Time
in Seconds
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Proposed Avg.
Taken
1
Preparation
to work
(at the start)
10 9 8 9 7 6 5 5 6 7 5 7
2
Job cleaning
(previous)
15 15 14 15 14 15 14 13 15 14 15 15
3
Job
unloading
(from crane)
45 30 32 35 35 39 40 31 29 35 40 35
4 Job Loading 60 41 40 45 43 42 49 50 42 41 45 45
5
Table
cleaning
10 4 5 5 5 4 6 4 4 5 5 5
6
Job cleaning
(new)
15 11 10 12 10 9 8 9 10 11 11 10
7
Job
Positioning
20 11 12 10 9 9 8 11 10 11 10 10
8
Fixture
adjustment
5 5 6 4 6 5 5 5 4 6 5 5
9
Machine
Start
5 2 3 2 2 1 2 3 3 2 1 2
10
Machining
for HINO
Heads
300 300 300 300 300 300 300 300 300 300 300 300
485 434
Table no. 6 Proposed avg time.
RESULTS
Following is the results and representations of the data collected. After taking the above time study we can save
time from 485 sec. to 434 sec. that is 51 sec.
Existing time – 10 sec.
1
st
2
nd
3rd 4th 5th 6th 7
th
8th 9th 10
th
9 8 9 7 6 5 5 6 7 5
Proposed time – 7 sec.
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
Existing time – 15 sec.
1
st
2
nd
3rd
15 14 15
Proposed time –15 sec.
Existing time – 45 sec.
1
st
2
nd
3rd
30 32 35
Proposed time –35 sec
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
4th 5th 6th 7
th
8th
14 15 14 13 15
4th 5th 6th 7
th
8th
35 39 40 31 29
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
8 | P a g e
9th 10
th
14 15
9th 10
th
35 40
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
9 | P a g e
Existing time – 60 sec.
1st
2nd
3rd
4th
5th 6th 7th
8th 9th 10th
41 40 45 43 42 49 50 42 41 45
Proposed time –45 sec.
Existing time – 10 sec.
1st
2nd
3rd
4th 5th 6th 7th
8th 9th 10th
4 5 5 5 4 6 4 4 5 5
Proposed time – 5 sec.
30
32
35 35
39 40
31
29
35
40
0
5
10
15
20
25
30
35
40
45
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
3. Job unloading (from crane)
41 40
45 43 42
49 50
42 41
45
0
10
20
30
40
50
60
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
4. Job Loading
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
Existing time – 15 sec.
1st
2nd
3rd
11 10 12
Proposed time – 10 sec
.
Existing time – 20 sec.
1st
2nd
3rd
11 12 10
Proposed time – 10 sec.
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
4th 5th 6th 7th
8th
10 9 8 9 10
4th 5th 6th 7th
8th
9 9 8 11 10
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
10 | P a g e
9th 10th
11 11
9th 10th
11 10
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
Existing time – 5 sec.
1st
2nd
3rd
5 6 4
Proposed time – 5 sec.
Existing time – 5 sec.
1st
2nd
3rd
2 3 2
Proposed time – 2 sec.
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
4th 5th 6th 7th
8th
6 5 5 5 4
4th 5th 6th 7th
8th
2 1 2 3 3
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
11 | P a g e
9th 10th
6 5
9th 10th
2 1
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
Existing time – 300 sec.
1st
2nd
3rd
300 300 300
Proposed time – 300 sec.

CONCLUSION
This paper has argued for a need by current production managers or work
quantitative approaches in the determination of time standards. Bearing in mind this article may have addressed
key issues of concern to managers; we th
practicing engineers. It was observed that the current model is slightly different from previous models in the
sense that it incorporates some uncontrollable factors. All of these factors
positive impact on the model. Unfortunately, there seems to be no documentation that has incorporated this into
a model. This is an important gap closed by the current study. We have found that it is feasible to apply the
model in a real life situation. The study may be very beneficial to practicing managers in the industry since it
has captured some aspects that have been ignored till date in the management literature. This therefore, gives
more reliable information about the
information.
References
1. Aft, L.S. 2000. Work Measurement and Methods Improvement. John Wiley and Sons. ISBN: 0471370894.
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
4th 5th 6th 7th
8th
300 300 300 300 300
This paper has argued for a need by current production managers or work-study engineers to embrace more
quantitative approaches in the determination of time standards. Bearing in mind this article may have addressed
key issues of concern to managers; we therefore strongly believe that the work would readily have values to
It was observed that the current model is slightly different from previous models in the
sense that it incorporates some uncontrollable factors. All of these factors have been considered to have a
positive impact on the model. Unfortunately, there seems to be no documentation that has incorporated this into
a model. This is an important gap closed by the current study. We have found that it is feasible to apply the
el in a real life situation. The study may be very beneficial to practicing managers in the industry since it
has captured some aspects that have been ignored till date in the management literature. This therefore, gives
more reliable information about the system being studied when compared with previously obtainable
1. Aft, L.S. 2000. Work Measurement and Methods Improvement. John Wiley and Sons. ISBN: 0471370894.
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
12 | P a g e
9th 10th
300 300
study engineers to embrace more
quantitative approaches in the determination of time standards. Bearing in mind this article may have addressed
erefore strongly believe that the work would readily have values to
It was observed that the current model is slightly different from previous models in the
have been considered to have a
positive impact on the model. Unfortunately, there seems to be no documentation that has incorporated this into
a model. This is an important gap closed by the current study. We have found that it is feasible to apply the
el in a real life situation. The study may be very beneficial to practicing managers in the industry since it
has captured some aspects that have been ignored till date in the management literature. This therefore, gives
system being studied when compared with previously obtainable
1. Aft, L.S. 2000. Work Measurement and Methods Improvement. John Wiley and Sons. ISBN: 0471370894.
NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014
13 | P a g e
2. Barnes, R.M. 1980. Motion and Time Study: Design and Measurement of Work. John Wiley and Sons 7th
edition. ISBN: 0471059056.
3. Doty, L.A. 1989. Work Methods and Measurement for Management. Thompson Learning. ISBN:
0534914616.
4. Edo, M., Evans, T.D., and Viengkham, O.V. 2001. “Study on Structure and Time of Assembly Motion from a
Viewpoint of the Motion Velocity”. Bulletin of the College of Engineering, Forest Ecology and Management.
5. Hartley A.F., Dhillon S., Rutter, P.M., Brown D., and Jones I.F. 1998. “Pharmacy Research: The Place of
Work Measurement”. International Journal of Pharmacy Practice. 6(1):46-58.
6. Karger, D. W., and Bayha, F. H. 2003. Background and Foundations of Work Measurement. Industrial Press.
4th edition. ISBN: 0831111704.
7. Watson, I.J. 1988. Electronic Time Study. Colliery Guardian. 236(5):144.
8. Worrall, B.M. and Smith, M.D. 1985. Application of Computerized Time Study to Establish Time Standards.
Springer-Verlag: Berlin. pp. 745-750.
9. Zandin, K. B. 2003, Most Work Measurement System. Mareel-Dekken, 3rd edition. ISBN: 0824709555.

Mais conteúdo relacionado

Mais procurados (20)

OEE
OEEOEE
OEE
 
Method study
Method studyMethod study
Method study
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular Manufacturing
 
Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
Industrial engineering presentation
Industrial engineering presentation Industrial engineering presentation
Industrial engineering presentation
 
Manufacturing Automation
Manufacturing AutomationManufacturing Automation
Manufacturing Automation
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
 
Lean and agile manufacturing system
Lean and agile manufacturing systemLean and agile manufacturing system
Lean and agile manufacturing system
 
INDUSTRIAL ENGINEERING - PLANT LAYOUT
INDUSTRIAL ENGINEERING -  PLANT LAYOUTINDUSTRIAL ENGINEERING -  PLANT LAYOUT
INDUSTRIAL ENGINEERING - PLANT LAYOUT
 
Manual Assembly Lines1
Manual Assembly Lines1Manual Assembly Lines1
Manual Assembly Lines1
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
Materials handling
Materials handlingMaterials handling
Materials handling
 
Line balancing
Line balancingLine balancing
Line balancing
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?
 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Productivity
ProductivityProductivity
Productivity
 

Semelhante a A Case Study of Productivity Improvement by using IE Tools

IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
IRJET- Applications of Process Industrial Engineering in Food Industry
IRJET- Applications of Process Industrial Engineering in Food IndustryIRJET- Applications of Process Industrial Engineering in Food Industry
IRJET- Applications of Process Industrial Engineering in Food IndustryIRJET Journal
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET Journal
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringIJECSJournal
 
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...IRJET Journal
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workloadeSAT Publishing House
 
Productivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniquesProductivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniqueseSAT Publishing House
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...IRJET Journal
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyValue Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyIRJET Journal
 
J0371055062
J0371055062J0371055062
J0371055062theijes
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 

Semelhante a A Case Study of Productivity Improvement by using IE Tools (20)

IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
IRJET- Applications of Process Industrial Engineering in Food Industry
IRJET- Applications of Process Industrial Engineering in Food IndustryIRJET- Applications of Process Industrial Engineering in Food Industry
IRJET- Applications of Process Industrial Engineering in Food Industry
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
Productivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniquesProductivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniques
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyValue Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
 
J0371055062
J0371055062J0371055062
J0371055062
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
Time and motion study
Time and motion study Time and motion study
Time and motion study
 

Mais de ijiert bestjournal

CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMPijiert bestjournal
 
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...ijiert bestjournal
 
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAFCOMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAFijiert bestjournal
 
POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
 POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINEijiert bestjournal
 
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY ijiert bestjournal
 
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAINREVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAINijiert bestjournal
 
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...ijiert bestjournal
 
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...ijiert bestjournal
 
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...ijiert bestjournal
 
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR ijiert bestjournal
 
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFTDESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFTijiert bestjournal
 
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...ijiert bestjournal
 
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENTHEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENTijiert bestjournal
 
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH ijiert bestjournal
 
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW ijiert bestjournal
 
DESIGN OF WELDING FIXTURES AND POSITIONERS
DESIGN OF WELDING FIXTURES AND POSITIONERSDESIGN OF WELDING FIXTURES AND POSITIONERS
DESIGN OF WELDING FIXTURES AND POSITIONERSijiert bestjournal
 
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...ijiert bestjournal
 
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...ijiert bestjournal
 
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...ijiert bestjournal
 

Mais de ijiert bestjournal (20)

CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
 
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAFCOMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
 
POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
 POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
 
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
 
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAINREVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
 
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
 
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
 
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
 
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
 
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFTDESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
 
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
 
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENTHEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
 
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
 
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
 
DESIGN OF WELDING FIXTURES AND POSITIONERS
DESIGN OF WELDING FIXTURES AND POSITIONERSDESIGN OF WELDING FIXTURES AND POSITIONERS
DESIGN OF WELDING FIXTURES AND POSITIONERS
 
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
 
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
 
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
 
MAGNETIC ABRASIVE FINISHING
MAGNETIC ABRASIVE FINISHINGMAGNETIC ABRASIVE FINISHING
MAGNETIC ABRASIVE FINISHING
 

Último

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Último (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

A Case Study of Productivity Improvement by using IE Tools

  • 1. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 1 | P a g e A Case Study of Productivity Improvement by using IE Tools Mr. Satish Keru Raut Department of Mechanical Engineering/JSPM’S RSSOER, Narhe, Pune/Maharashtra, India * email@adress.xy Prof. Kedar M. Relekar Department of Mechanical Engineering /SSIET Ghogaon Karad/MSBTE/Maharashtra, India Mr. Vikas Sarjerao Dhane Dean Polytechnic Wing/AGCOE, MSBTE/Satara, Maharashtra, India ABSTRACT This paper presents a case study in the development and application of a time study in a engine block manufacturing plant. The organization engages in the production of two product lines: engine blocks, heads of diverse categories. The motivation for this study was the need to tackle the problem of productivity per shift between the employee-association and the management of the company regarding questions of productivity. The two products have similar production processes. The study’s most important finding is that the time of producing a unit of product is directly proportional to the number of production stages involved and the time spent at each stage. The study focuses on the MAHINDRA production line. Where stud hole and push rod operation is very important for mounting the cylinder head on cylinder block and how to combine this both operation on one single machine like Mahindra job. So the proposal is made to do these two operations for HINO on BMV 60 by adjustment of special fixture like Mahindra. With this proposed solution a saving of 2 to 3 man power per cycle was obtained. The paper discusses the use of Industrial Engineering tools used for the purpose of productivity improvement. Keywords: manufacturing, process analysis, efficiency study, time study, management analysis. The objectives of the study • MINIMIZE EXCESS MAN POWER By proper utilization of work movement and by proper action time planning of work we can minimize the excess man power. • MINIMIZE THE PRODUCTION TIME By applying the tool of Industrial Engineering that is time study we can minimize the production time; by improve the process of production (actual machining cycle time) by Process Engineer with the help of Industrial Engineer we can minimize the production time. • IMPROVE THE PRODUCION METHODE By observation of production cycle or by observation of production work method with the help of actual working associates we can improve the production work methods. • EFFORT MINIMIZATION By using of proper material handling equipments and by using proper work movement methods we can minimize the effort of associate. • IMPROVEMENT OF ERGONOMICS Improve the relation between associate and machine using proper ergonomically consideration. • IMPROVE THE RELATION BETWEEN ASSOCIATES AND MANAGEMENT By launching the suggestion schemes related to any kind of departmental improvement we can minimize the gap of communication between management and associates side.
  • 2. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 2 | P a g e INTRODUCTION Research on time study incorporates a range of concerns, including its definition and management. Although research on work measurement has evolved in a scientific and rigorous fashion, based on early works of Gilbert and others, the quantitative mathematical modeling of production activities in terms of time study has not evolved in a similarly rigorous fashion. In recent years, the manufacturing organization used as the case example in this work has realized that scientific approaches could be developed to aid dispute settlement between the employees’ association of the company and management regarding issues of productivity. In order to achieve this, the company was motivated to approach a management consultant. This paper is an attempt to present the methodology used in solving productivity issues at this company. The company concentrates on the manufacture of two fast-moving items – engine blocks and cylinder heads. The operations are housed in a large factory floor consisting of several manufacturing machines, each of which costs an equivalent of several lakhs. An important problem faced in the production system is that of determining the time it takes to produce a unit of product. In order to thoroughly analyze the problem, the production processes for each of product is analyzed. Engine block production activities could be broken down into various steps: loading of block head on conveyors, milling, drilling, boring, honing, finishing and packing. Figure 1: The Production line for MAHINDRA and HINO. WORK STUDY: Work study forms the basis for work system design. The purpose of work design is to identify the most effective means of achieving necessary functions. Historically, this work-study aims at improving the existing and proposed ways of doing work and establishing standard times for work performance. Work is an activity in which one exerts physical and mental effort to accomplish a given task or perform a duty. Task: An amount of work that is assigned to a worker or for which a worker is responsible. Work Element: A series of work activities that are logically grouped together because they have a unified function in the task Examples: Reaching for an object, Grasping the object, Moving the object, Walking, Eye movement
  • 3. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 3 | P a g e Fig 3. Structure of work study METHOD STUDY: METHOD STUDY PROCEDURE Method-study concerned with “the way in which work is done (i.e., method)”. It is used to simplify the way to accomplish a work and to improve the method of production. Method-study results in a more effective use of material, plant, equipment and manpower. Method study is essentially concerned with finding better ways of doing things. It adds value and increase the efficiency by eliminating unnecessary operations, avoidable delays and other forms of waste. Fig 4. Steps or procedure involved in methods study WORK MEASUREMENT Work measurement is the application of techniques designed to establish the time for a qualified worker to carry out specified jobs at a defined level of performance or at a defined rate of working qualified worker is one who has acquired the skill, knowledge and other attributes to carry out the work in hand to satisfactory standards of quantity, quality and safety. Defined rate of working is the amount of work that can be produced by a qualified worker/employee when working at normal space and effectively utilizing his time and where work is not restricted by process limitation. TECHNIQUE OF WORK MEASUREMENT: • Time study: short cycle repetitive jobs • Work sampling: Long cycle jobs • Predetermined motion time standards: manual operations confined to one work centre. TIME STUDY Time study is also called work measurement. It is essential for both planning and control of operations. According to British Standard Institute time study has been defined as “The application of techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level of performance.” Time study is a direct and continuous observation of a task, using a timekeeping device (e.g., decimal minute
  • 4. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 4 | P a g e stopwatch, computer-assisted electronic stopwatch, and videotape camera) to record the time taken to accomplish a task and it is often used when: • There are repetitive work cycles of short to long duration, • Wide variety of dissimilar work is performed, or • Process control elements constitute a part of the cycle. The Industrial Engineering Terminology Standard defines time study as "a work measurement technique consisting of careful time measurement of the task with a time measuring instrument, adjusted for any observed variance from normal effort or pace and to allow adequate time for such items as foreign elements, unavoidable or machine delays, rest to overcome fatigue, and personal need. METHODOLOGY AND READINGS ACTUAL TIME STUDY TAKEN IN THE COMPANY FOR HINO MOTORS OPEATIONS BEFORE MACHINING Sr. No Operation Time Required (Sec) Time Proposed (Sec.) 1 Raw material Unloading 60 20 2 Inspection Scrap part putting time if any (60) 30 30 3 Number Punching (Manual) 90 10 4 Job loading on conveyer 90 0 Total cycle Timing 270 60 Operation 60 Sec. 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Avg. Avg. Taken Raw material Unloading 19 20 18 21 20 21 22 21 20 20 20.2 20 Table no. 1&2 Time required earlier. Chart no. 1 for Table no. 2 0 5 10 15 20 25 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Series1
  • 5. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 5 | P a g e During raw material unloading the material was manually unloaded and there is lots of manual efforts and time required. And for unloading of single cylinder head they required 60 sec. to 80 sec. After observation of this unloading process we suggested for hydraulic lifter cum trolley of conveyer height so that they can directly place the job on conveyer. And they reduces there efforts and time 80%. After implementation of suggested method we taking the time study, get reduced time 20 sec. from 60 to 80 sec. per cycle. Operation 30 Sec. 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Avg. Avg. Taken Inspection Scrap part putting time if any (60 sec.) 29 30 30 29 29 29 30 30 30 31 29.7 30 Chart no.2 and Table no.3 The operation Inspection is the necessary operation in all the processes to neglect any defect before the machining. Now it takes 30 sec. to inspect and after some observation, time readings and discussion with shop floor supervisor and associates; We conclude that this existing time is correct time to inspect the job that is 30 sec. Operation 90 Sec. 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Avg. Avg. Taken Number punching (manual) 10 9 10 9 8 10 10 9 10 10 9.5 10 Chart no.3 and Table no.4 28 28.5 29 29.5 30 30.5 31 31.5 Series1 0 2 4 6 8 10 12 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
  • 6. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] Before starting the machining on the job they have to identify the job with the manual number punching. For manual number punching they have to arrange the job manually in proper direction, for that they need more efforts and more time to do this action. F think about the effort minimization of associates in material handling and number punching. We search the solution for number punching automation and we found the one company who is only punching technology. That is Marks Pryor Marking Tech. Pvt. Ltd. provide the pneumatic number punching machine solution. And we proposed this machine solution to management of KFIL for punching operation. For the number punching operation they need shift. After some discussion with management of purchase department of machine shop staff they finalize the machine for number punching. In next 1 month dated 26 Nov, 20132 the actual machine is installed in the shop. Then we take the time study for the number punching operation and we get the huge reduction in time that is only one associate is required. So we saved the 1 associate man powers. Operation 90 Sec. 1st 2nd 3rd Job loading on conveyer 0 0 INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] Before starting the machining on the job they have to identify the job with the manual number punching. For manual number punching they have to arrange the job manually in proper direction, for that they need more action. For this we observed that they need 90 sec. to do this action. Here we think about the effort minimization of associates in material handling and number punching. We search the solution for number punching automation and we found the one company who is only Pryor Marking Tech. Pvt. Ltd. Pune. After contacting the company they provide the pneumatic number punching machine solution. And we proposed this machine solution to management of KFIL for punching operation. For the number punching operation they need on with management of purchase department of machine shop staff they finalize the Fig. no.5 punching machine In next 1 month dated 26 Nov, 20132 the actual machine is installed in the shop. Then we take the time study e number punching operation and we get the huge reduction in time that is 90 sec to 10 sec. required. So we saved the 1 associate man powers. 3rd 4th 5th 6th 7th 8th 9th 10th 0 0 0 0 1 0 0 1 Chart no.4 and Table no.5 NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 6 | P a g e Before starting the machining on the job they have to identify the job with the manual number punching. For manual number punching they have to arrange the job manually in proper direction, for that they need more to do this action. Here we think about the effort minimization of associates in material handling and number punching. We search the solution for number punching automation and we found the one company who is only gives the solution of contacting the company they provide the pneumatic number punching machine solution. And we proposed this machine solution to management of KFIL for punching operation. For the number punching operation they need 2 associates per on with management of purchase department of machine shop staff they finalize the In next 1 month dated 26 Nov, 20132 the actual machine is installed in the shop. Then we take the time study 90 sec to 10 sec. And for this 10th Avg. Avg. Taken 1 0.2 0
  • 7. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 7 | P a g e Before starting the machining KFIL is unload the raw material by manual and lifter is not used so that time require unloading and loading that material on conveyer is 90 sec. After we study, we suggest lifter of the height of conveyer that’s why time required for unloading and loading is total minimize that is 0 sec. Sr. No. Activity On OP 10 Existing Time in Seconds 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Proposed Avg. Taken 1 Preparation to work (at the start) 10 9 8 9 7 6 5 5 6 7 5 7 2 Job cleaning (previous) 15 15 14 15 14 15 14 13 15 14 15 15 3 Job unloading (from crane) 45 30 32 35 35 39 40 31 29 35 40 35 4 Job Loading 60 41 40 45 43 42 49 50 42 41 45 45 5 Table cleaning 10 4 5 5 5 4 6 4 4 5 5 5 6 Job cleaning (new) 15 11 10 12 10 9 8 9 10 11 11 10 7 Job Positioning 20 11 12 10 9 9 8 11 10 11 10 10 8 Fixture adjustment 5 5 6 4 6 5 5 5 4 6 5 5 9 Machine Start 5 2 3 2 2 1 2 3 3 2 1 2 10 Machining for HINO Heads 300 300 300 300 300 300 300 300 300 300 300 300 485 434 Table no. 6 Proposed avg time. RESULTS Following is the results and representations of the data collected. After taking the above time study we can save time from 485 sec. to 434 sec. that is 51 sec. Existing time – 10 sec. 1 st 2 nd 3rd 4th 5th 6th 7 th 8th 9th 10 th 9 8 9 7 6 5 5 6 7 5 Proposed time – 7 sec.
  • 8. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] Existing time – 15 sec. 1 st 2 nd 3rd 15 14 15 Proposed time –15 sec. Existing time – 45 sec. 1 st 2 nd 3rd 30 32 35 Proposed time –35 sec INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] 4th 5th 6th 7 th 8th 14 15 14 13 15 4th 5th 6th 7 th 8th 35 39 40 31 29 NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 8 | P a g e 9th 10 th 14 15 9th 10 th 35 40
  • 9. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 9 | P a g e Existing time – 60 sec. 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 41 40 45 43 42 49 50 42 41 45 Proposed time –45 sec. Existing time – 10 sec. 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 4 5 5 5 4 6 4 4 5 5 Proposed time – 5 sec. 30 32 35 35 39 40 31 29 35 40 0 5 10 15 20 25 30 35 40 45 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 3. Job unloading (from crane) 41 40 45 43 42 49 50 42 41 45 0 10 20 30 40 50 60 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 4. Job Loading
  • 10. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] Existing time – 15 sec. 1st 2nd 3rd 11 10 12 Proposed time – 10 sec . Existing time – 20 sec. 1st 2nd 3rd 11 12 10 Proposed time – 10 sec. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] 4th 5th 6th 7th 8th 10 9 8 9 10 4th 5th 6th 7th 8th 9 9 8 11 10 NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 10 | P a g e 9th 10th 11 11 9th 10th 11 10
  • 11. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] Existing time – 5 sec. 1st 2nd 3rd 5 6 4 Proposed time – 5 sec. Existing time – 5 sec. 1st 2nd 3rd 2 3 2 Proposed time – 2 sec. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] 4th 5th 6th 7th 8th 6 5 5 5 4 4th 5th 6th 7th 8th 2 1 2 3 3 NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 11 | P a g e 9th 10th 6 5 9th 10th 2 1
  • 12. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] Existing time – 300 sec. 1st 2nd 3rd 300 300 300 Proposed time – 300 sec. CONCLUSION This paper has argued for a need by current production managers or work quantitative approaches in the determination of time standards. Bearing in mind this article may have addressed key issues of concern to managers; we th practicing engineers. It was observed that the current model is slightly different from previous models in the sense that it incorporates some uncontrollable factors. All of these factors positive impact on the model. Unfortunately, there seems to be no documentation that has incorporated this into a model. This is an important gap closed by the current study. We have found that it is feasible to apply the model in a real life situation. The study may be very beneficial to practicing managers in the industry since it has captured some aspects that have been ignored till date in the management literature. This therefore, gives more reliable information about the information. References 1. Aft, L.S. 2000. Work Measurement and Methods Improvement. John Wiley and Sons. ISBN: 0471370894. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] 4th 5th 6th 7th 8th 300 300 300 300 300 This paper has argued for a need by current production managers or work-study engineers to embrace more quantitative approaches in the determination of time standards. Bearing in mind this article may have addressed key issues of concern to managers; we therefore strongly believe that the work would readily have values to It was observed that the current model is slightly different from previous models in the sense that it incorporates some uncontrollable factors. All of these factors have been considered to have a positive impact on the model. Unfortunately, there seems to be no documentation that has incorporated this into a model. This is an important gap closed by the current study. We have found that it is feasible to apply the el in a real life situation. The study may be very beneficial to practicing managers in the industry since it has captured some aspects that have been ignored till date in the management literature. This therefore, gives more reliable information about the system being studied when compared with previously obtainable 1. Aft, L.S. 2000. Work Measurement and Methods Improvement. John Wiley and Sons. ISBN: 0471370894. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 12 | P a g e 9th 10th 300 300 study engineers to embrace more quantitative approaches in the determination of time standards. Bearing in mind this article may have addressed erefore strongly believe that the work would readily have values to It was observed that the current model is slightly different from previous models in the have been considered to have a positive impact on the model. Unfortunately, there seems to be no documentation that has incorporated this into a model. This is an important gap closed by the current study. We have found that it is feasible to apply the el in a real life situation. The study may be very beneficial to practicing managers in the industry since it has captured some aspects that have been ignored till date in the management literature. This therefore, gives system being studied when compared with previously obtainable 1. Aft, L.S. 2000. Work Measurement and Methods Improvement. John Wiley and Sons. ISBN: 0471370894.
  • 13. NOVATEURNOVATEURNOVATEURNOVATEUR PUBLICATIONSPUBLICATIONSPUBLICATIONSPUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOVVOLUME 1, ISSUE 1 NOV----2014201420142014 13 | P a g e 2. Barnes, R.M. 1980. Motion and Time Study: Design and Measurement of Work. John Wiley and Sons 7th edition. ISBN: 0471059056. 3. Doty, L.A. 1989. Work Methods and Measurement for Management. Thompson Learning. ISBN: 0534914616. 4. Edo, M., Evans, T.D., and Viengkham, O.V. 2001. “Study on Structure and Time of Assembly Motion from a Viewpoint of the Motion Velocity”. Bulletin of the College of Engineering, Forest Ecology and Management. 5. Hartley A.F., Dhillon S., Rutter, P.M., Brown D., and Jones I.F. 1998. “Pharmacy Research: The Place of Work Measurement”. International Journal of Pharmacy Practice. 6(1):46-58. 6. Karger, D. W., and Bayha, F. H. 2003. Background and Foundations of Work Measurement. Industrial Press. 4th edition. ISBN: 0831111704. 7. Watson, I.J. 1988. Electronic Time Study. Colliery Guardian. 236(5):144. 8. Worrall, B.M. and Smith, M.D. 1985. Application of Computerized Time Study to Establish Time Standards. Springer-Verlag: Berlin. pp. 745-750. 9. Zandin, K. B. 2003, Most Work Measurement System. Mareel-Dekken, 3rd edition. ISBN: 0824709555.