International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print),
ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME
1
PLANNING FOR HIGH-RISE BUILDING CONSTRUCTION USING
LOCATION BASED REPETITIVE SCHEDULING METHOD (LBRSM)
Atul R. Kolhe1
, Dr. J. E. M. Macwan2
, Dr. K. A. Chauhan3
1
(Research Scholar, CED, SVNIT, Surat, India)
(Head, CED, Dr D Y Patil School of Engineering Charholi, Pune, India)
2
(Professor, CED, SVNIT, Surat, India)
3
(Associate Professor, CED, SVNIT, Surat, India)
ABSTRACT
This paper describes an advanced scheduling methodology that is part of a research program
devoted to the topic of Location Based Repetitive Scheduling Method for housing projects in India.
Now a day there is a cut throat competition in all fields of Engineering and construction in India. To
gain the success in the field of construction in these evolving times, project managers must
emphasize efficiency in all aspects of their operations, including resource flow process, mainly the
labor crew performance. Most often project manager has to plan location based repetitive projects
(LBRP). LBRP are the projects where certain activities are continuously repeating at each locations
of the project. Such as commercial housing projects, multistoried sky scrapers, the linear segmented
works like roads, long-bridges, airfields, tunnels, pipe network. The LBRP are characterized by the
repeating activities, which in most instants arise from the sub division of a generalized activity into
specific activities associated with particular locations. For e.g. painting activity for high-rise building
may broken into painting for first storey, painting for second storey and so on, where each storey is a
significant location of that high-rise building. Activities that repeat from one location to other
location creates a very important need for a construction schedule that facilitate the uninterrupted
work flow including work crews from one location to next, because it is often this requirement that
establishes activity starting times and determines the overall project duration. Hence uninterrupted
work flow becomes an extremely important issue for the planning and scheduling of high-rise
building, hence high rise building construction planners need to carefully design a process that
ensures a continuous and reliable flow of resources through different locations in a project. The
conventional Critical Path Method and its resource oriented extension such as time cost trader off,
limited resources allocations and resource leveling does not consider the waste time during the
INTERNATIONAL JOURNAL OF CIVIL ENGINEERING
AND TECHNOLOGY (IJCIET)
ISSN 0976 – 6308 (Print)
ISSN 0976 – 6316(Online)
Volume 5, Issue 5, May (2014), pp. 01-06
© IAEME: www.iaeme.com/ijciet.asp
Journal Impact Factor (2014): 7.9290 (Calculated by GISI)
www.jifactor.com
IJCIET
©IAEME
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print),
ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME
2
transformation of work flow from one location to the other. Location Based Repetitive Scheduling
Method (LBRSM) explicitly take care those entire requirements for repetitive nature projects like
high rise buildings. The application of such work flow continuity during LBRSM leads to
maximizing the use of a learning curve and minimizing idle time of each crew. This paper suggests
modified flow-line schedule, here called as ‘LBRSM’ based on real life case study, which can be
implemented at micro-level for high-rise building construction project.
Key-words: Location Based Repetitive Projects, Work Flow, High Rise Building Projects,
Location Based Repetitive Scheduling Method (LBRSM).
I. INTRODUCTION
Project plans and schedules are critical to the success of any project. Construction project
manager has to plan projects that are characterised by continuous or repeating activities, where the
same activities are running at different locations of the project, for example multi storey housing
project [7]. The effective advanced scheduling methodology for such project can be achieve by
family of repetitive scheduling methods (RSM) such as “Line-of-balance” (LOB), “Linear Schedule
Method” (LSM), “Time-location Matrix Model”, “Construction Planning Technique”, “Time Space
Scheduling method” (Harris and Ioannou 1998) [3], “Flow-Line (Mohr 1991) [2], “Location Based
Scheduling (LBS) Method”, and similar methods. The repetitive scheduling method was first
developed in the 1940’s as LOB by the Goodyear Company, and then furthered by the U.S. Navy in
the 1950’s (Arditi & Tokdemir, 2002) [1], but despite its long history it has gained relatively little
attention in the construction industry.
The repetitive scheduling methods will in this paper be referred to the comprehensive term of
Location Based Repetitive Scheduling Method (LBRSM), firstly described by Kenley (2004) as
Location-based Scheduling (LBS) [5]. LBRSM imply a shift in focus, from the discrete activities of
the CPM-approach to managing the progress of repetitive activities as performed by crews
moving through a building and completing all their work location by location. LBRSM uses the
graphical representation technique of a Flow-line chart, which is adapted for planning and
management of work-flows that facilitate resources to perform their work without interruptions
caused by other resources working with other activities at the same location [8]. Thus, LBRPSM
facilitate the establishment of continuous activities and a resource usage with a minimum of waiting
time and avoidance of work disturbance.
II. CASE DESCRIPTION
For implementing the ‘Location Based Repetitive Scheduling Method (LBRSM) and
analyzing the results the commercial housing project ‘MEGAPOLIS’, at Pune city has been taken as
a case study. The data were collected during several visits to the field and site offices form the
different persons.
Proposed Residential Development on “Plot No R-1/2, at Rajiv Gandhi Information and Bio
technology Park, Phase III, Hinjewadi Industrial Area, Pune, Maharashtra”; MEGAPOLIS is located
along the outskirts of Pune, at Rajiv Gandhi Information and Bio-technology Park, Phase III,
Hinjewadi. The 150-acre Megapolis site consists of 21-storey premium towers and 14-storey
luxurious towers. The alphabets ‘A’, ‘B’, ‘C’ etc are given to these towers to identify them. This
integrated township will comprise of about 10000 high end houses. Megapolis has explored various
architectural themes offering the residential options ranging from studio to large five bedroom
apartments. Megapolis is away from the hustle and bustle of the city, traffic snarls, pollution and
offers a salubrious lifestyle that one can deserve. The consultant for the project is RSP, Singapore
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print),
ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME
3
who are the pioneers in integrated township designs and Belt Collins, Singapore, who are the global
leaders in the art of landscaping. This prime project has been introduced by Pegasus Properties Pvt.
Ltd. and has taken to execute by Joint Venture of two Leading groups in Pune, ‘Kumar Properties’ &
‘Avinash Bhoslae Group’. Every Building is to be executed with two floors sub structure in
conventional works & the rest in ‘MIVAN’ type of specialized aluminum base material.
III. IMPLEMENTING LBRSM ON MEGAPOLIS
LBRSM Approach
The study is limited for premium towers only. For a building of 21-storeys high, it is consist
of 21 typical floors resting on a podium floor. The plan for premium towers looks like typical
‘Y-shape’ including central core area. As the substructure, podium floor, underground tank work and
top dome are of non-repetitive type it is excluded from the study; separate schedule was prepared for
this work. The LBRSM approach is applied separately for three different arm of ‘Y-shape’ and
central core area. The schedule is divided for ‘MIVAN work’, which is a major part of this project
and ‘RCC work, external rough plastering, internal finishing work’. The ‘Logic Diagram’ has
prepared for one floor considering the sequence and interdependency of each activity. The activity
duration has calculated considering the construction methods, practical and location constrains as
well as resource constrains and crew optimization. This ‘Logic Diagram’ will repeat for each floor.
The schedule and logic diagram of a single floor for ‘MIVAN work’ and ‘RCC work, external rough
plastering, internal finishing work’ for ‘E’ building has sown in Table 1, Table 2, and Figure 1,
Figure 2 respectively.
Similarly schedule for internal finishing work and its logic diagram for each arm of ‘Y-shape’
has prepared. The cycle time for this work comes to fifty three days.
IV. PROPOSED LBRSM FLOWLINE SYSTEM DESIGN
LBRSM follows the ‘Flow-line’ system of project scheduling which has designed with the
basic principle of original time and locations. It is a graphical method in two dimensions where
X-axis represents Time, Y-axis represents Locations. Different activities in ‘Logic Diagram’ which
repeats at each location can be shown by flow-lines [4]. The slope of these flow lines represents an
output rate of the activities in the ‘Logic Diagram’ which is calculated by activity duration [6].
Previous research was concentrated for major activities only. Here the modified proposed innovative
methodology is adopted at micro level as the different schedules are prepared for different repeating
works. The Synchronization and Pacing are carried out when deciding the targeted output rate of
each activity to make the schedule more balanced. Synchronization means that planning a similar
targeted output rate for all activities. A synchronized schedule can be identified by parallel lines that
shows a constant time–space buffer between different tasks and Pacing means that the activities are
scheduled to continue from one location to another without interruptions for that the different minor
activities and tasks are clubbed tighter which forms an intermediate cycle within a location. The
methodology is designed in such a way that the locations, here in this project story of a high-rise
tower which are broken down into weekly or daily schedules for various activities considering the
minor activities are satisfying the linearity characteristics that is start and end locations having equal
output rate of the different activities. Flowline schedules graphically display output rates for each
construction activity, and make it extremely easy to track the progress of work at a glance by
objective schedule and progress schedule [9]. A typical flowline schedules of tower ‘A’, ‘E’, ‘F’,
‘G’, ‘H’ and ‘J’ for the works ‘MIVAN shuttering of RCC Walls and Slab’, ‘Placing and Fixing
Steel of RCC Walls and Slab’, ‘MIVAN hole packing’, and ‘Concreting of RCC Walls and Slab’ are
shown in Figure 3, Figure 4, Figure 5, and ‘Figure 6 respectively.
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print),
ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME
4
Table 1: Schedule of single floor (one arm of ‘Y-shape) for ‘MIVAN work’
ACTIVITY DESCRIPTION TIME
(DAYS)
DEPENDENCY
A Line out 1 Finish to Start (last
activity of previous
floor)
B Reinforcement Binding for Wall 3 A- Finish to Start
C De-shuttering of MIVAN Panels 3 B - Finish to Start -1d
D Setting & Fixing of MIVAN Panels 6 C- Finish to Start -1d
E Conduit Fixing for Electrical Provisions 2 D- Finish to Start
F Slab & Beams Reinforcement Binding 4 D- Finish to Start-3d
G Alignment & Checking 3 D- Finish to Start
H Mortar Packing at bottom of MIVAN panels 1 G- Finish to Start
I Pouring of Concrete 1 H- Finish to Start
Total Time required for single floor of ‘MIVAN work’ 16
E
A B C D G H I
F
Figure 1: Logic Diagram of single floor (one arm of ‘Y-shape) for ‘MIVAN work’
Table 2: Schedule of single floor (one arm of ‘Y-shape’) for ‘RCC work’
ACTIVITY DESCRIPTION TIME
(DAYS)
DEPENDENCY
P Erection of steel and amenities 3 Finish to Start (last activity
of previous floor)
Q Erection of formwork 3 P- Finish to Start
R Fixing of steel and amenities 3 Q - Finish to Start
S casting of slab & shear wall 1 R- Finish to Start
Total Time required for single floor of ‘MIVAN work’ 10
P Q R S
Figure 2: Logic Diagram of single floor (one arm of ‘Y-shape)’ for ‘RCC work’
1 2 3 4 5 6 7 8
1 2 3 4 5
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print),
ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME
5
Fig 3 : LBRSM Flow-line schedule for Fig 4 : LBRSM Flow-line schedule for ‘Placing
and Fixing Steel of RCC Walls & Slab’ ‘MIVAN shuttering of RCC Walls & Slab’
Fig 5: LBRSM Flow-line schedule for Fig 6: LBRSM Flow-line schedule for
‘MIVAN hole packing’ ‘Concreting of RCC Walls and Slab’
V. CONCLUSION
This paper presented a practical application of an advanced scheduling methodology; here
called as ‘Location Based Repetitive Scheduling Method (LBRSM), on a high-rise building
construction site. This methodology was developed using location based scheduling method applied
on repeating projects like high-rise building. LBRSM follows the ‘Flow-line’ system of project
scheduling which has designed with the basic principle of original time and locations [10]. Past
researchers had given much attention on major activities only. The LBRSM approach is applied here
separately for three different arm of ‘Y-shape’ and central core area. The schedule is divided for
‘MIVAN work’, which is a major part of this project and ‘RCC work, external rough plastering,
minor activities of internal finishing work’. Thus the proposed planning method works at micro-level
by taking care of minor activities. The different minor activities and tasks are clubbed tighter which
forms an intermediate cycle within a location. The different schedules are prepared for different
repeating works. The Synchronization and Pacing are carried out when deciding the targeted output
rate of each activity to make the schedule more balanced. The methodology is designed in such a
way that the locations, here in this project story of a high-rise tower, which are broken down into
weekly or daily schedules for various activities considering the minor activities are satisfying the
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print),
ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME
6
linearity characteristics that is start and end locations having equal output rate of the different
activities. Flowline schedules drawn here graphically display the output rates for each construction
activity, and make it extremely easy to track the progress of work at a glance by LBRSM flow-line
schedule. The advantage of this approach is that separate LBRSM flow-line schedules can prove a
better information and reporting tool for the subcontractors, suppliers and other agencies associated
with the high-rise building construction project.
VI. REFERENCES
1. Arditi, D., Sikangwan, P. & Tokdemir, O.B.(2002). “Scheduling system for high rise building
construction”, Construction Management and Economics, Vol. 20, No. 4, pp: 353-364.
2. Arthur W T Leung, Dr C M Tam (2003). “Scheduling for High-Rise Building Construction
Using Simulation Techniques”, Construction Informatics Digital Library
http://itc.scix.net/paper w78-2003186.content.
3. Asmadi Ismail, Mohamad Ibrahim Mohamad, Muhamad Azani Yahya (2010). “Time Impact
of Scheduling Simulation for High Rise Building”, International Journal of Sustainable
Construction Engineering & Technology Vol 1, No 2, December 2010, Published by:
University Tun Hussein Onn, Malaysia (UTHM) and Concrete Society of Malaysia (CSM) 55.
http://penerbit.uthm.edu.my/ejournal/index.php/journal/ijscet.
4. Jongeling, R. & Olofsson, O. (2007). “A method for planning of work-flow by combined use
of location-based scheduling and 4D CAD”. Automation in Construction, Vol. 16-2,
pp. 189-198, www.elsevier.com/locate/autcon.
5. Kenley, R. (2004). “Project micromanagement: Practical site planning and management of
work flow”, Proceedings of the 12th International conference of Lean Construction,
Helsingør, Denmark, 194–205.
6. Marco A. Bragadin, and Kalle Kähkönen, (2011). ‘Heuristic Solution for Resource Scheduling
For Repetitive Construction Projects”, Management and Innovation for a Sustainable Built
Environment, 20 – 23 June 2011, Amsterdam, The Netherlands, ISBN: 9789052693958.
7. Mendes, J R, Fernando, L, Heineck, M and Vaca, O L (1998). “New applications of line of
balance on scheduling of multi-storey buildings”, In: Hughes, W (Ed.), 14th Annual ARCOM
Conference, 9-11 September 1998, University of Reading. Association of Researchers in
Construction Management, Vol. 1, 118-26.
8. Russell Kenley., and Olli Seppänen.(2009). “Location-Based Management of Construction
Projects: Part of A New Typology for Project Scheduling Methodologies”, Proceedings of the
2009 Winter Simulation Conference, M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin and
R. G. Ingalls, eds.
9. Ricardo Mendes Jr. and Luiz Fernando M. Heineck, (July 1999). “Towards Production
Control on Multistory Building Construction Sites”, Proceedings IGLC-7, 26-28 July1999,
University of California, Berkeley, CA, USA, 313-324.
10. Shi, J., and AbouRizk, S.(1997). “Resource-Based Modeling for Construction Simulation”,
Journal of Construction Engineering and Management, 1997, 26-33.
11. Shaik Abdul Khader Jeelani, Dr.J.Karthikeyan and Dr.Adel S.Aldosary, “Performance
Evaluation of Design-Build (D-B) Projects with and without Agency Construction
Management”, International Journal of Civil Engineering & Technology (IJCIET), Volume 3,
Issue 2, 2012, pp. 265 - 278, ISSN Print: 0976 – 6308, ISSN Online: 0976 – 6316.
12. Misam.A and Mangulkar Madhuri.N., “Structural Response of Soft Story-High Rise Buildings
Under Different Shear Wall Location”, International Journal of Civil Engineering &
Technology (IJCIET), Volume 3, Issue 2, 2012, pp. 169 - 180, ISSN Print: 0976 – 6308,
ISSN Online: 0976 – 6316.

Mais conteúdo relacionado

Semelhante a 20320140505001

Implementation of Line of Balance Method for Scheduling High-rise Building
Implementation of Line of Balance Method for Scheduling High-rise BuildingImplementation of Line of Balance Method for Scheduling High-rise Building
Implementation of Line of Balance Method for Scheduling High-rise BuildingIJERA Editor
 
Line of Balance
Line of BalanceLine of Balance
Line of BalanceIJMER
 
A Case Study On Applying Lean Construction To Concrete
A Case Study On Applying Lean Construction To ConcreteA Case Study On Applying Lean Construction To Concrete
A Case Study On Applying Lean Construction To ConcreteDawn Cook
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSIAEME Publication
 
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfkripeshdubey1
 
Scheduling and Financial Analysis of a High Rise Building
Scheduling and Financial Analysis of a High Rise BuildingScheduling and Financial Analysis of a High Rise Building
Scheduling and Financial Analysis of a High Rise Buildingiosrjce
 
J.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject constructionJ.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject constructionJ.S. Daniel
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...Lindsey Sais
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013IRJET Journal
 
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...IRJET Journal
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPSagar Kaptan
 
Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...ijtsrd
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGJignesh Kariya
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET Journal
 
A review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniquesA review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniquesAsadullah Malik
 
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa DiagramDelay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa DiagramIJAEMSJORNAL
 

Semelhante a 20320140505001 (20)

Implementation of Line of Balance Method for Scheduling High-rise Building
Implementation of Line of Balance Method for Scheduling High-rise BuildingImplementation of Line of Balance Method for Scheduling High-rise Building
Implementation of Line of Balance Method for Scheduling High-rise Building
 
Line of Balance
Line of BalanceLine of Balance
Line of Balance
 
20320140503025
2032014050302520320140503025
20320140503025
 
A Case Study On Applying Lean Construction To Concrete
A Case Study On Applying Lean Construction To ConcreteA Case Study On Applying Lean Construction To Concrete
A Case Study On Applying Lean Construction To Concrete
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
 
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
 
A012610106
A012610106A012610106
A012610106
 
Scheduling and Financial Analysis of a High Rise Building
Scheduling and Financial Analysis of a High Rise BuildingScheduling and Financial Analysis of a High Rise Building
Scheduling and Financial Analysis of a High Rise Building
 
J.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject constructionJ.S. Daniel paper of fast tracking design in megaproject construction
J.S. Daniel paper of fast tracking design in megaproject construction
 
B1303020508
B1303020508B1303020508
B1303020508
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...A Review Of Planning   Scheduling Of A Pune Metro Rail Project Using Primaver...
A Review Of Planning Scheduling Of A Pune Metro Rail Project Using Primaver...
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
 
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
 
Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...Review on Planning and Scheduling of Construction Project by Management Tool ...
Review on Planning and Scheduling of Construction Project by Management Tool ...
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
 
A review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniquesA review of advanced linear repetitive scheduling methods and techniques
A review of advanced linear repetitive scheduling methods and techniques
 
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa DiagramDelay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
 

Mais de IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

Mais de IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Último

Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 

Último (20)

Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 

20320140505001

  • 1. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME 1 PLANNING FOR HIGH-RISE BUILDING CONSTRUCTION USING LOCATION BASED REPETITIVE SCHEDULING METHOD (LBRSM) Atul R. Kolhe1 , Dr. J. E. M. Macwan2 , Dr. K. A. Chauhan3 1 (Research Scholar, CED, SVNIT, Surat, India) (Head, CED, Dr D Y Patil School of Engineering Charholi, Pune, India) 2 (Professor, CED, SVNIT, Surat, India) 3 (Associate Professor, CED, SVNIT, Surat, India) ABSTRACT This paper describes an advanced scheduling methodology that is part of a research program devoted to the topic of Location Based Repetitive Scheduling Method for housing projects in India. Now a day there is a cut throat competition in all fields of Engineering and construction in India. To gain the success in the field of construction in these evolving times, project managers must emphasize efficiency in all aspects of their operations, including resource flow process, mainly the labor crew performance. Most often project manager has to plan location based repetitive projects (LBRP). LBRP are the projects where certain activities are continuously repeating at each locations of the project. Such as commercial housing projects, multistoried sky scrapers, the linear segmented works like roads, long-bridges, airfields, tunnels, pipe network. The LBRP are characterized by the repeating activities, which in most instants arise from the sub division of a generalized activity into specific activities associated with particular locations. For e.g. painting activity for high-rise building may broken into painting for first storey, painting for second storey and so on, where each storey is a significant location of that high-rise building. Activities that repeat from one location to other location creates a very important need for a construction schedule that facilitate the uninterrupted work flow including work crews from one location to next, because it is often this requirement that establishes activity starting times and determines the overall project duration. Hence uninterrupted work flow becomes an extremely important issue for the planning and scheduling of high-rise building, hence high rise building construction planners need to carefully design a process that ensures a continuous and reliable flow of resources through different locations in a project. The conventional Critical Path Method and its resource oriented extension such as time cost trader off, limited resources allocations and resource leveling does not consider the waste time during the INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET) ISSN 0976 – 6308 (Print) ISSN 0976 – 6316(Online) Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME: www.iaeme.com/ijciet.asp Journal Impact Factor (2014): 7.9290 (Calculated by GISI) www.jifactor.com IJCIET ©IAEME
  • 2. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME 2 transformation of work flow from one location to the other. Location Based Repetitive Scheduling Method (LBRSM) explicitly take care those entire requirements for repetitive nature projects like high rise buildings. The application of such work flow continuity during LBRSM leads to maximizing the use of a learning curve and minimizing idle time of each crew. This paper suggests modified flow-line schedule, here called as ‘LBRSM’ based on real life case study, which can be implemented at micro-level for high-rise building construction project. Key-words: Location Based Repetitive Projects, Work Flow, High Rise Building Projects, Location Based Repetitive Scheduling Method (LBRSM). I. INTRODUCTION Project plans and schedules are critical to the success of any project. Construction project manager has to plan projects that are characterised by continuous or repeating activities, where the same activities are running at different locations of the project, for example multi storey housing project [7]. The effective advanced scheduling methodology for such project can be achieve by family of repetitive scheduling methods (RSM) such as “Line-of-balance” (LOB), “Linear Schedule Method” (LSM), “Time-location Matrix Model”, “Construction Planning Technique”, “Time Space Scheduling method” (Harris and Ioannou 1998) [3], “Flow-Line (Mohr 1991) [2], “Location Based Scheduling (LBS) Method”, and similar methods. The repetitive scheduling method was first developed in the 1940’s as LOB by the Goodyear Company, and then furthered by the U.S. Navy in the 1950’s (Arditi & Tokdemir, 2002) [1], but despite its long history it has gained relatively little attention in the construction industry. The repetitive scheduling methods will in this paper be referred to the comprehensive term of Location Based Repetitive Scheduling Method (LBRSM), firstly described by Kenley (2004) as Location-based Scheduling (LBS) [5]. LBRSM imply a shift in focus, from the discrete activities of the CPM-approach to managing the progress of repetitive activities as performed by crews moving through a building and completing all their work location by location. LBRSM uses the graphical representation technique of a Flow-line chart, which is adapted for planning and management of work-flows that facilitate resources to perform their work without interruptions caused by other resources working with other activities at the same location [8]. Thus, LBRPSM facilitate the establishment of continuous activities and a resource usage with a minimum of waiting time and avoidance of work disturbance. II. CASE DESCRIPTION For implementing the ‘Location Based Repetitive Scheduling Method (LBRSM) and analyzing the results the commercial housing project ‘MEGAPOLIS’, at Pune city has been taken as a case study. The data were collected during several visits to the field and site offices form the different persons. Proposed Residential Development on “Plot No R-1/2, at Rajiv Gandhi Information and Bio technology Park, Phase III, Hinjewadi Industrial Area, Pune, Maharashtra”; MEGAPOLIS is located along the outskirts of Pune, at Rajiv Gandhi Information and Bio-technology Park, Phase III, Hinjewadi. The 150-acre Megapolis site consists of 21-storey premium towers and 14-storey luxurious towers. The alphabets ‘A’, ‘B’, ‘C’ etc are given to these towers to identify them. This integrated township will comprise of about 10000 high end houses. Megapolis has explored various architectural themes offering the residential options ranging from studio to large five bedroom apartments. Megapolis is away from the hustle and bustle of the city, traffic snarls, pollution and offers a salubrious lifestyle that one can deserve. The consultant for the project is RSP, Singapore
  • 3. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME 3 who are the pioneers in integrated township designs and Belt Collins, Singapore, who are the global leaders in the art of landscaping. This prime project has been introduced by Pegasus Properties Pvt. Ltd. and has taken to execute by Joint Venture of two Leading groups in Pune, ‘Kumar Properties’ & ‘Avinash Bhoslae Group’. Every Building is to be executed with two floors sub structure in conventional works & the rest in ‘MIVAN’ type of specialized aluminum base material. III. IMPLEMENTING LBRSM ON MEGAPOLIS LBRSM Approach The study is limited for premium towers only. For a building of 21-storeys high, it is consist of 21 typical floors resting on a podium floor. The plan for premium towers looks like typical ‘Y-shape’ including central core area. As the substructure, podium floor, underground tank work and top dome are of non-repetitive type it is excluded from the study; separate schedule was prepared for this work. The LBRSM approach is applied separately for three different arm of ‘Y-shape’ and central core area. The schedule is divided for ‘MIVAN work’, which is a major part of this project and ‘RCC work, external rough plastering, internal finishing work’. The ‘Logic Diagram’ has prepared for one floor considering the sequence and interdependency of each activity. The activity duration has calculated considering the construction methods, practical and location constrains as well as resource constrains and crew optimization. This ‘Logic Diagram’ will repeat for each floor. The schedule and logic diagram of a single floor for ‘MIVAN work’ and ‘RCC work, external rough plastering, internal finishing work’ for ‘E’ building has sown in Table 1, Table 2, and Figure 1, Figure 2 respectively. Similarly schedule for internal finishing work and its logic diagram for each arm of ‘Y-shape’ has prepared. The cycle time for this work comes to fifty three days. IV. PROPOSED LBRSM FLOWLINE SYSTEM DESIGN LBRSM follows the ‘Flow-line’ system of project scheduling which has designed with the basic principle of original time and locations. It is a graphical method in two dimensions where X-axis represents Time, Y-axis represents Locations. Different activities in ‘Logic Diagram’ which repeats at each location can be shown by flow-lines [4]. The slope of these flow lines represents an output rate of the activities in the ‘Logic Diagram’ which is calculated by activity duration [6]. Previous research was concentrated for major activities only. Here the modified proposed innovative methodology is adopted at micro level as the different schedules are prepared for different repeating works. The Synchronization and Pacing are carried out when deciding the targeted output rate of each activity to make the schedule more balanced. Synchronization means that planning a similar targeted output rate for all activities. A synchronized schedule can be identified by parallel lines that shows a constant time–space buffer between different tasks and Pacing means that the activities are scheduled to continue from one location to another without interruptions for that the different minor activities and tasks are clubbed tighter which forms an intermediate cycle within a location. The methodology is designed in such a way that the locations, here in this project story of a high-rise tower which are broken down into weekly or daily schedules for various activities considering the minor activities are satisfying the linearity characteristics that is start and end locations having equal output rate of the different activities. Flowline schedules graphically display output rates for each construction activity, and make it extremely easy to track the progress of work at a glance by objective schedule and progress schedule [9]. A typical flowline schedules of tower ‘A’, ‘E’, ‘F’, ‘G’, ‘H’ and ‘J’ for the works ‘MIVAN shuttering of RCC Walls and Slab’, ‘Placing and Fixing Steel of RCC Walls and Slab’, ‘MIVAN hole packing’, and ‘Concreting of RCC Walls and Slab’ are shown in Figure 3, Figure 4, Figure 5, and ‘Figure 6 respectively.
  • 4. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME 4 Table 1: Schedule of single floor (one arm of ‘Y-shape) for ‘MIVAN work’ ACTIVITY DESCRIPTION TIME (DAYS) DEPENDENCY A Line out 1 Finish to Start (last activity of previous floor) B Reinforcement Binding for Wall 3 A- Finish to Start C De-shuttering of MIVAN Panels 3 B - Finish to Start -1d D Setting & Fixing of MIVAN Panels 6 C- Finish to Start -1d E Conduit Fixing for Electrical Provisions 2 D- Finish to Start F Slab & Beams Reinforcement Binding 4 D- Finish to Start-3d G Alignment & Checking 3 D- Finish to Start H Mortar Packing at bottom of MIVAN panels 1 G- Finish to Start I Pouring of Concrete 1 H- Finish to Start Total Time required for single floor of ‘MIVAN work’ 16 E A B C D G H I F Figure 1: Logic Diagram of single floor (one arm of ‘Y-shape) for ‘MIVAN work’ Table 2: Schedule of single floor (one arm of ‘Y-shape’) for ‘RCC work’ ACTIVITY DESCRIPTION TIME (DAYS) DEPENDENCY P Erection of steel and amenities 3 Finish to Start (last activity of previous floor) Q Erection of formwork 3 P- Finish to Start R Fixing of steel and amenities 3 Q - Finish to Start S casting of slab & shear wall 1 R- Finish to Start Total Time required for single floor of ‘MIVAN work’ 10 P Q R S Figure 2: Logic Diagram of single floor (one arm of ‘Y-shape)’ for ‘RCC work’ 1 2 3 4 5 6 7 8 1 2 3 4 5
  • 5. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME 5 Fig 3 : LBRSM Flow-line schedule for Fig 4 : LBRSM Flow-line schedule for ‘Placing and Fixing Steel of RCC Walls & Slab’ ‘MIVAN shuttering of RCC Walls & Slab’ Fig 5: LBRSM Flow-line schedule for Fig 6: LBRSM Flow-line schedule for ‘MIVAN hole packing’ ‘Concreting of RCC Walls and Slab’ V. CONCLUSION This paper presented a practical application of an advanced scheduling methodology; here called as ‘Location Based Repetitive Scheduling Method (LBRSM), on a high-rise building construction site. This methodology was developed using location based scheduling method applied on repeating projects like high-rise building. LBRSM follows the ‘Flow-line’ system of project scheduling which has designed with the basic principle of original time and locations [10]. Past researchers had given much attention on major activities only. The LBRSM approach is applied here separately for three different arm of ‘Y-shape’ and central core area. The schedule is divided for ‘MIVAN work’, which is a major part of this project and ‘RCC work, external rough plastering, minor activities of internal finishing work’. Thus the proposed planning method works at micro-level by taking care of minor activities. The different minor activities and tasks are clubbed tighter which forms an intermediate cycle within a location. The different schedules are prepared for different repeating works. The Synchronization and Pacing are carried out when deciding the targeted output rate of each activity to make the schedule more balanced. The methodology is designed in such a way that the locations, here in this project story of a high-rise tower, which are broken down into weekly or daily schedules for various activities considering the minor activities are satisfying the
  • 6. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online), Volume 5, Issue 5, May (2014), pp. 01-06 © IAEME 6 linearity characteristics that is start and end locations having equal output rate of the different activities. Flowline schedules drawn here graphically display the output rates for each construction activity, and make it extremely easy to track the progress of work at a glance by LBRSM flow-line schedule. The advantage of this approach is that separate LBRSM flow-line schedules can prove a better information and reporting tool for the subcontractors, suppliers and other agencies associated with the high-rise building construction project. VI. REFERENCES 1. Arditi, D., Sikangwan, P. & Tokdemir, O.B.(2002). “Scheduling system for high rise building construction”, Construction Management and Economics, Vol. 20, No. 4, pp: 353-364. 2. Arthur W T Leung, Dr C M Tam (2003). “Scheduling for High-Rise Building Construction Using Simulation Techniques”, Construction Informatics Digital Library http://itc.scix.net/paper w78-2003186.content. 3. Asmadi Ismail, Mohamad Ibrahim Mohamad, Muhamad Azani Yahya (2010). “Time Impact of Scheduling Simulation for High Rise Building”, International Journal of Sustainable Construction Engineering & Technology Vol 1, No 2, December 2010, Published by: University Tun Hussein Onn, Malaysia (UTHM) and Concrete Society of Malaysia (CSM) 55. http://penerbit.uthm.edu.my/ejournal/index.php/journal/ijscet. 4. Jongeling, R. & Olofsson, O. (2007). “A method for planning of work-flow by combined use of location-based scheduling and 4D CAD”. Automation in Construction, Vol. 16-2, pp. 189-198, www.elsevier.com/locate/autcon. 5. Kenley, R. (2004). “Project micromanagement: Practical site planning and management of work flow”, Proceedings of the 12th International conference of Lean Construction, Helsingør, Denmark, 194–205. 6. Marco A. Bragadin, and Kalle Kähkönen, (2011). ‘Heuristic Solution for Resource Scheduling For Repetitive Construction Projects”, Management and Innovation for a Sustainable Built Environment, 20 – 23 June 2011, Amsterdam, The Netherlands, ISBN: 9789052693958. 7. Mendes, J R, Fernando, L, Heineck, M and Vaca, O L (1998). “New applications of line of balance on scheduling of multi-storey buildings”, In: Hughes, W (Ed.), 14th Annual ARCOM Conference, 9-11 September 1998, University of Reading. Association of Researchers in Construction Management, Vol. 1, 118-26. 8. Russell Kenley., and Olli Seppänen.(2009). “Location-Based Management of Construction Projects: Part of A New Typology for Project Scheduling Methodologies”, Proceedings of the 2009 Winter Simulation Conference, M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin and R. G. Ingalls, eds. 9. Ricardo Mendes Jr. and Luiz Fernando M. Heineck, (July 1999). “Towards Production Control on Multistory Building Construction Sites”, Proceedings IGLC-7, 26-28 July1999, University of California, Berkeley, CA, USA, 313-324. 10. Shi, J., and AbouRizk, S.(1997). “Resource-Based Modeling for Construction Simulation”, Journal of Construction Engineering and Management, 1997, 26-33. 11. Shaik Abdul Khader Jeelani, Dr.J.Karthikeyan and Dr.Adel S.Aldosary, “Performance Evaluation of Design-Build (D-B) Projects with and without Agency Construction Management”, International Journal of Civil Engineering & Technology (IJCIET), Volume 3, Issue 2, 2012, pp. 265 - 278, ISSN Print: 0976 – 6308, ISSN Online: 0976 – 6316. 12. Misam.A and Mangulkar Madhuri.N., “Structural Response of Soft Story-High Rise Buildings Under Different Shear Wall Location”, International Journal of Civil Engineering & Technology (IJCIET), Volume 3, Issue 2, 2012, pp. 169 - 180, ISSN Print: 0976 – 6308, ISSN Online: 0976 – 6316.