IS 1200 (Part 8) : 1993
(Reaffirmed 1997)
Edition 5.1
(2002-05)
Indian Standard
METHODS OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING
WORKS
PART 8 STEELWORK AND IRONWORK
( Fourth Revision )
(Incorporating Amendment No. 1)
UDC 69.003.12 : 693.81
© BIS 2002
B U R E A U O F I N D I A N S T A N D A R D S
MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG
NEW DELHI 110002
Price Group 2
Methods of Measurement of Works of Civil Engineering (Excluding River Valley Projects)
Sectional Committee, CED 44
FOREWORD
This Indian Standard (Part 8) (Fourth Revision) was adopted by the Bureau of Indian Standards,
after the draft finalized by the Methods of Measurement of Works of Civil Engineering (Excluding
River Valley Projects) Sectional Committee had been approved by the Civil Engineering Division
Council.
Measurement occupies a very important place in planning and execution of any civil engineering
work from the time of first estimates to final completion and settlement of payments of the project.
The methods followed for measurement are not uniform and considerable differences exist
between practices followed by one construction agency and another and also between various
Central and State Government departments. While it is recognized that each system of
measurement has to be specifically related to the administrative and financial organizations
within the department responsible for work, a unification of the various systems at technical level
has been accepted as very desirable, specially as it permits a wider circle of operation for civil
engineering contractors and eliminates ambiguities and misunderstandings arising out of
inadequate understanding of various systems followed.
Among the various civil engineering items, measurement of buildings had been first to be taken up
for standardization and this standard having provisions relating to all building works, was first
published in 1958 and was subsequently revised in 1964. In its second revision, the standard was
issued in different parts corresponding to different trades in building and civil engineering works.
As a result, the second revision of this standard (Part 8) was published in 1967 which was then
revised in 1974.
This fourth revision has been brought out to incorporate the changes found necessary in the light
of usage of this standard and suggestions made by various bodies implementing it.
This edition 5.1 incorporates Amendment No. 1 (May 2002). Side bar indicates modification of the
text as the result of incorporation of the amendment.
For the purpose of deciding whether a particular requirement of this standard is complied with,
the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded
off in accordance with IS 2 : 1960 ‘Rules for rounding off numerical values ( revised )’. The number
of significant places retained in the rounded off value should be the same as that of the specified
value in this standard.
IS 1200 (Part 8) : 1993
1
Indian Standard
METHODS OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING
WORKS
PART 8 STEELWORK AND IRONWORK
( Fourth Revision )
1 SCOPE
This standard (Part 8) covers the method of
measurement of steelwork and ironwork in
buildings and civil engineering works.
NOTE — The method of measurement for roof covering;
pipe lines, etc for water supply and sewerage; and pipe
lines, etc for gas and oil are covered in IS 1200
(Part 9) : 1973, IS 1200 (Part 16) : 1979 and IS 1200
(Part 20) : 1981 respectively.
2 REFERENCES
The following Indian Standards are necessary
adjuncts to this standard:
3 GENERAL RULES
3.1 Clubbing of Items
Items may be clubbed together provided that
break-up of clubbed items is agreed to be on the
basis of detailed description of items, stated in
this standard.
3.2 Booking of Dimensions
In booking dimensions, order shall be
consistent and generally in sequence of length,
width and height or depth or thickness.
3.3 Description of Items
The description of each item, which covers both
fabrication and erection, shall include
conveyance and delivery, handling, unloading,
storing, hoisting and all labour for finishing to
required shape and size. Alternatively, in each
item of work fabrication or erection shall be
described and measured separately.
3.4 Bill of Quantities
Items of work shall fully describe the materials
and truly represent the work to be executed.
3.5 Dimensions
Unless otherwise stated all works shall be
measured net in decimal system, as fixed in its
place, as given in 3.5.1 and 3.5.2.
3.5.1 Cross-sections and thicknesses shall be
taken from relevant Indian Standards. Length
and breadth shall be measured to nearest
0.001 m except for reinforcement which shall be
measured to nearest 0.005 m.
3.5.2 Areas shall be worked out to nearest
0.001 m2
.
3.6 The priming coat shall be described and
included in item of fabrication.
3.7 The mass of steel sheet, plate and strip;
rolled steel sections, steel rods, steel
reinforcements, and steel strips; forged steel,
steel castings and steel tubes shall be taken
from relevant Indian Standards.
3.7.1 The final mass of individual
categories/sections calculated based on
dimensions arrived at in 3.5.1 and 3.5.2 and
mass arrived at as per 3.7, shall be worked out
to nearest 1 kg.
3.8 Unless otherwise specified an addition of
2.5 percent of the mass of structure shall be
made for shop and site rivet heads in riveted
steel structures.
3.9 Unless otherwise specified, in the case of
welded steel structures no allowance shall be
made for the weld metal.
3.10 Wedging-up, under stanchion bases or
steel grillages shall be described and
enumerated.
IS No. Title
1200
(Part 9) : 1973
Method of measurement of
building and civil engineering
works : Part 9 Roof covering
(including cladding) ( second
revision )
1200
(Part 16) : 1979
Method of measurement of
building and civil engineering
works : Part 16 Laying of
water and sewer lines
including appurtenant
structures ( third revision )
1200
(Part 20) : 1981
Method of measurement of
building and civil engineering
works : Part 20 Laying of gas
and oil pipe lines ( third
revision )
1239
(Part 1) : 1979
Mild steel tubes, tubulars
and other wrought steel
fittings : Part 1 Mild steel
tubes ( fourth revision )
IS 1200 (Part 8) : 1993
2
4 STEELWORK
4.1 Various items of steelwork shall be
classified and measured separately under
following categories. Work in each classification
shall be described. Bolted, riveted and welded
structures shall be described as such and
measured separately:
a) Rolled sections (joist, channel, angle or
tee) fixed independently without
connecting plates;
b) Rolled sections fixed with connecting plate
or angle cleats as in main and crossbeams,
hip and jack rafters, purlins connected to
common rafters and the like.
c) Rolled joists, with or without stiffeners in
grillages (the weight of stiffeners shall be
added to the mass of joists);
d) Compound girders;
e) Plate girders (stating type and overall
height of girder);
f) Lattice girders, aerial masts, tank staging
and like (stating details of members and
overall height of structure);
g) Single stanchions composed of rolled joists
or channels with caps, bases, splices,
angle brackets, etc;
h) Compound stanchions with caps, bases,
splices, angle brackets, etc;
j) Trusses and trussed purlins (stating spans
and overall heights);
k) Framing of cladding and glazing;
m) Crane gantry rails including fastenings:
n) Staircases including stringers, treads,
landings, handrails, etc;
p) Plates (plain or chequered), square cut or
notched, holed (ordinary or countersunk)
without any attachments;
q) Plates of classification (p) above with
riveted, bolted or welded attachments;
r) Running rails and girders for sliding
doors;
s) Platework with or without stiffeners for:
1) bunkers,
2) chutes,
3) chimneys including ladders,
4) tanks with or without covers including
stays but excluding stagings,
5) gutters and downpipes, and
6) furnace shell.
t) Anchor bolts, holding down bolts including
all fittings and sag rods;
u) Wind ties to roofs, strakes for wooden
bridges, cores for handrails (straight
portion), running bars for doors and
fencing posts and struts;
v) Framed work, such as grills, gratings,
framed guard bars, ladders, walkways,
railings, brackets and similar work;
w) Straps, hooks, clamps, holdfasts, wall ties,
insets, knee pieces, and sim ilar works;
y) Ornamental work as in grills, balustrades,
and curved, ramped and scroll portion of
cores for handrails; and
z) Steelwork for:
1) doors,
2) hydraulic gates, and
3) cassions and well curbs.
z1) Purpose made butt hinges for fixing to
stone or concrete door and window frames.
NOTES
1 In composite construction shear connectors, if any,
will form part of structural steelwork.
2 The above classification with suffix B, R or W shall be
indicated in bills of quantities to denote bolted, riveted
or welded construction respectively.
4.2 The steelwork shall be measured by mass
except otherwise mentioned.
4.3 Unless otherwise specified, mass of cleats,
brackets, packing pieces, bolts, nuts, washers,
distance pieces, separators, diaphragm, gussets
(taking overall rectangular dimensions), fish
plates, etc, shall be added to the weight of
respective items. In riveted work, allowance is
to be made for mass of rivet heads ( see 3.8 ). No
deduction shall be made for rivet or bolt holes
(excluding holes for anchor or holding down
bolts). Deduction in case of rivet or bolt hole
shall, however, be made if its area exceeds
0.02 m2
and for notch if its area exceeds
0.05 m2. For other type of openings like holes
for service pipe etc, deduction shall be made if
its area exceeds 0.1 m2
.
5 TUBULAR STRUCTURES
The tubular structures shall be described and
measured by weight.
6 CABLES/GUY WIRES
The cables and guy wires shall be described and
measured in running metre stating the
diameter or by weight.
7 BEARINGS
These shall be classified as roller, rocker,
sliding, etc, and fully described and enumerated.
8 PIPES FOR FLUES
8.1 Flue pipes of steel sheeting shall be
measured overall in running metres and
described as including all short lengths, cutting
and waste. The method of jointing and fixing
shall be described. Supports shall be measured
separately.
IS 1200 (Part 8) : 1993
3
8.2 The diameter of pipes, thickness of sheeting
and whether black or galvanized shall be
stated. In case of galvanized steel pipes, class of
galvanization [ see IS 1239 (Part 1) : 1979 ]
shall also be stated.
8.3 Bends, elbows, cowls, tapered pipes to fit
outlets of ranges, and roof plates with sleeve
shall be enumerated and measured as extra
over.
9 DUCT WORK
The duct metal work shall be described and
measured in square metres on the basis of
surface area. Support shall be measured
separately.
10 EXPANDED METAL WORK AND WELD
MESHWORK
Expanded metalwork and weld meshwork shall
be described including laps, meshes, weight,
strands and method of fixing and measured in
square metres. Openings exceeding 0.2 m2
shall be deducted. Raking or circular cutting
and waste shall be included in the description.
11 STEEL REINFORCEMENT
11.1 Reinforcement bars shall be measured in
running metres and their mass calculated as
per 3.7.1. The item of work shall include
removal of surface rust, straightening, cutting
to lengths, hooked ends, cranking or bending
(straight or spiral). Authorized overlaps,
chairs/separators shall be measured.
11.1.1 When welding of joints is authorized the
same shall be described; joints, butt welded
shall be measured in numbers and lap welded
shall be measured in running metres of the
length welded.
11.2 Fabric reinforcement shall be described
(including meshes and strands) and measured
in square metres. Authorized laps shall be
measured.
11.2.1 Wire netting used as encasement shall
be described (including meshes and wires) and
shall be measured in square metres.
Authorized laps shall be measured.
11.2.2 Raking or circular cutting and waste
shall be included in description.
11.3 Binding wire for reinforcement shall not
be measured, but shall be included in
description of item.
NOTE — Term ‘binding wire’ is reserved for wire
binding together reinforcement in contact.
11.4 Hoop iron shall be fully described and
measured in running metres,
12 MISCELLANEOUS WORK
12.1 Bolts including nuts and washers other
than those covered in 4.1 (t) shall be described
and measured by mass in kilograms.
12.2 Plain or barbed wire fencing shall be fully
described and each line of wire shall be
measured in running metres.
12.3 Patent plain wire fencing shall be fully
described and measured in square metres.
12.4 Wire mattresses, nets shall be fully
described including method of tying and
measured in square metres. Authorised laps
shall be measured.
12.5 Collapsible gates shall be described and
measured in square metres as fixed stating size
of gate opening, pickets, pivoted flat bars and
size of meshes formed by them when fully
extended.
12.5.1 Top and bottom runners, pulleys, locking
lugs and handles shall be described and
included with item. Description shall also
include erection in position and securing
runners with holdfasts and brackets.
12.6 Steel rolling shutter/grills shall be
described and measured in square metres. The
width shall be measured as the outer distance
between the backs of the two guide channels of
the rolling shutters and the height shall be the
distance between the still and the centre of the
hood cover.
12.6.1 Gauge and type of the shutter/grills,
distance between centres of interlock and
bridge depth shall be stated.
12.6.2 Description shall include spring winding
mechanism operated mechanically or
manually, jamb guides, bottom rail, locking and
door operating arrangements.
12.6.3 Where a wicket gate has to be provided
it shall be described.
12.6.4 Any protective treatment required to be
applied at manufacturer’s works, such as
painting or hot dip galvanizing shall be
described.
12.7 Unless otherwise stated, steel doors,
windows, ventilators and glazing frames shall
be measured in square metres as fixed stating
type given in relevant Indian Standard.
12.7.1 Method of fixing and hanging and
fastenings shall be included with item.
12.8 Gates for Compound Walls and
Railing
Gates shall be described and enumerated or
measured in square metres; hangings, guide
rails and fastenings shall be described and
included with item.
IS 1200 (Part 8) : 1993
4
12.9 Steel Louvre
Louvres shall be described and measured in
square metres on basis of opening covered.
12.10 Slotted Pipes
Site perforated pipes shall be described and
measured by mass in kilogram. Deductions for
perforations/slots shall, however, be made if its
area exceeds 0.02 m2
.
12.10.1 The manufactured perforated pipe
shall, however, be described and measured in
running metres.
12.11 Metal sheet in wall cladding etc shall be
described and measured in square metres.
Gauge and type of sheet (whether black or
galvanized), type of connection/adjustment
with the supporting structures by bolting,
welding or by any other arrangements shall be
stated.
13 CAST IRONWORK
13.1 Cast iron flue (or smoke) pipes shall be
measured overall in running metres and
described as including all short length, cutting
and waste.
13.1.1 Method of jointing and fixing shall be
described, and diameter of pipes and mass per
standard length stated.
13.1.2 Bends, inspection doors and cowls shall
be enumerated and measured as extra over.
13.2 Spiral Staircases
Spiral staircases shall be enumerated, stating
overall diameter and height, total number of
treads, risers and sleeves in one piece, central
shaft or poles including base plate and other
attachment handrail and balusters.
l3.2.1 Exit landings shall be described and
enumerated.
13.2.2 Stays, if required, shall be stated.
13.3 Stanchions, Columns and Lamp Posts
These shall be described and measured in
numbers specifying mass.
13.4 Grid flooring and grills shall be described
including size and mass of each piece and
measured in square metres on the basis of
overall area.
13.5 Except as hereinbefore described, cast
ironwork shall be measured by mass and
classified under following headings.
a) Unmachined — such as brackets, frames,
gully traps, manhole covers, gratings, fire
doors, soot doors and frames; and balls
and stop cock boxes.
b) Machine turned — such as pulleys and
similar work.
Bureau of Indian Standards
BIS is a statutory institution established under the Bureau of Indian Standards Act, 1986 to promote
harmonious development of the activities of standardization, marking and quality certification of goods and
attending to connected matters in the country.
Copyright
BIS has the copyright of all its publications. No part of these publications may be reproduced in any form
without the prior permission in writing of BIS. This does not preclude the free use, in the course of
implementing the standard, of necessary details, such as symbols and sizes, type or grade designations.
Enquiries relating to copyright be addressed to the Director (Publications), BIS.
Review of Indian Standards
Amendments are issued to standards as the need arises on the basis of comments. Standards are also
reviewed periodically; a standard along with amendments is reaffirmed when such review indicates that no
changes are needed; if the review indicates that changes are needed, it is taken up for revision. Users of
Indian Standards should ascertain that they are in possession of the latest amendments or edition by
referring to the latest issue of ‘BIS Catalogue’ and ‘Standards : Monthly Additions’.
This Indian Standard has been developed from Doc : No. CED 44 (5152).
Amendments Issued Since Publication
Amend No. Date of Issue
Amd. No. 1 May 2002
BUREAU OF INDIAN STANDARDS
Headquarters:
Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi 110002.
Telephones: 323 01 31, 323 33 75, 323 94 02
Telegrams: Manaksanstha
(Common to all offices)
Regional Offices: Telephone
Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg
NEW DELHI 110002
323 76 17
323 38 41
Eastern : 1/14 C. I. T. Scheme VII M, V. I. P. Road, Kankurgachi
KOLKATA 700054
337 84 99, 337 85 61
337 86 26, 337 91 20
Northern : SCO 335-336, Sector 34-A, CHANDIGARH 160022 60 38 43
60 20 25
Southern : C. I. T. Campus, IV Cross Road, CHENNAI 600113 235 02 16, 235 04 42
235 15 19, 235 23 15
Western : Manakalaya, E9 MIDC, Marol, Andheri (East)
MUMBAI 400093
832 92 95, 832 78 58
832 78 91, 832 78 92
Branches : AHMEDABAD. BANGALORE. BHOPAL. BHUBANESHWAR. COIMBATORE.
FARIDABAD. GHAZIABAD. GUWAHATI. HYDERABAD. JAIPUR. KANPUR.
LUCKNOW. NAGPUR. NALAGARH. PATNA. PUNE. RAJKOT. THIRUVANANTHAPURAM.
VISHAKHAPATNAM.
















Mais conteúdo relacionado

Mais procurados

Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)y Sahaja
 
HIGH-VOLUME FLY ASH CONCRETE
HIGH-VOLUME FLY ASH CONCRETEHIGH-VOLUME FLY ASH CONCRETE
HIGH-VOLUME FLY ASH CONCRETEUmer Farooq
 
Design principles in prefabricated structures unit iii ce6016 pfs
Design principles in prefabricated structures unit iii   ce6016 pfsDesign principles in prefabricated structures unit iii   ce6016 pfs
Design principles in prefabricated structures unit iii ce6016 pfsPrakash Kumar Sekar
 
Geogrid-As a soil reinforcement
Geogrid-As a soil reinforcementGeogrid-As a soil reinforcement
Geogrid-As a soil reinforcementssp1505
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 Sachin PatiL
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundationsDar Hilal
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
Repair & Rehabilitation of Concrete Structures Using FRP Composites
Repair & Rehabilitation of Concrete Structures Using FRP CompositesRepair & Rehabilitation of Concrete Structures Using FRP Composites
Repair & Rehabilitation of Concrete Structures Using FRP CompositesParvez Ahmad Hashmat
 
ADVANCED CONCRETE TECHNOLOGY (CE361)
ADVANCED CONCRETE TECHNOLOGY  (CE361)ADVANCED CONCRETE TECHNOLOGY  (CE361)
ADVANCED CONCRETE TECHNOLOGY (CE361)VISHNU VIJAYAN
 
Rutting In Flexible Pavement ppt
Rutting In Flexible Pavement pptRutting In Flexible Pavement ppt
Rutting In Flexible Pavement pptPrashantHangal
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in IndiaRAMPRASAD KUMAWAT
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportBeing Deepak
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing TechniqueSeminar Links
 
Highway failure & their maintenance ppt
 Highway failure & their maintenance ppt Highway failure & their maintenance ppt
Highway failure & their maintenance pptBeing Deepak
 
Recycle material used in road construction
Recycle material used in road constructionRecycle material used in road construction
Recycle material used in road constructionpavan bathani
 

Mais procurados (20)

Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
HIGH-VOLUME FLY ASH CONCRETE
HIGH-VOLUME FLY ASH CONCRETEHIGH-VOLUME FLY ASH CONCRETE
HIGH-VOLUME FLY ASH CONCRETE
 
Design principles in prefabricated structures unit iii ce6016 pfs
Design principles in prefabricated structures unit iii   ce6016 pfsDesign principles in prefabricated structures unit iii   ce6016 pfs
Design principles in prefabricated structures unit iii ce6016 pfs
 
Geogrid-As a soil reinforcement
Geogrid-As a soil reinforcementGeogrid-As a soil reinforcement
Geogrid-As a soil reinforcement
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
PQC concrete road
PQC concrete roadPQC concrete road
PQC concrete road
 
4. wbm roads 10 sep
4. wbm roads 10 sep4. wbm roads 10 sep
4. wbm roads 10 sep
 
Concrete Technology Unit-II
Concrete Technology Unit-IIConcrete Technology Unit-II
Concrete Technology Unit-II
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
Repair & Rehabilitation of Concrete Structures Using FRP Composites
Repair & Rehabilitation of Concrete Structures Using FRP CompositesRepair & Rehabilitation of Concrete Structures Using FRP Composites
Repair & Rehabilitation of Concrete Structures Using FRP Composites
 
ADVANCED CONCRETE TECHNOLOGY (CE361)
ADVANCED CONCRETE TECHNOLOGY  (CE361)ADVANCED CONCRETE TECHNOLOGY  (CE361)
ADVANCED CONCRETE TECHNOLOGY (CE361)
 
Rutting In Flexible Pavement ppt
Rutting In Flexible Pavement pptRutting In Flexible Pavement ppt
Rutting In Flexible Pavement ppt
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in India
 
distress of concrete
distress of concretedistress of concrete
distress of concrete
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar report
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
Highway failure & their maintenance ppt
 Highway failure & their maintenance ppt Highway failure & their maintenance ppt
Highway failure & their maintenance ppt
 
Recycle material used in road construction
Recycle material used in road constructionRecycle material used in road construction
Recycle material used in road construction
 

Destaque (14)

1200 15
1200 151200 15
1200 15
 
1200 10
1200 101200 10
1200 10
 
1200 13
1200 131200 13
1200 13
 
1200 5
1200 51200 5
1200 5
 
1200 9
1200 91200 9
1200 9
 
1200 12
1200 121200 12
1200 12
 
1200 6
1200 61200 6
1200 6
 
1200 4
1200 41200 4
1200 4
 
1200 11
1200 111200 11
1200 11
 
1200 7
1200 71200 7
1200 7
 
1200 14
1200 141200 14
1200 14
 
1200 3
1200 31200 3
1200 3
 
Steel code book
Steel code bookSteel code book
Steel code book
 
Is 456 2000
Is 456 2000Is 456 2000
Is 456 2000
 

Semelhante a 1200 8 (20)

4326
43264326
4326
 
2502
25022502
2502
 
5525
55255525
5525
 
13920
1392013920
13920
 
Is 2062 (2011)
Is 2062 (2011)Is 2062 (2011)
Is 2062 (2011)
 
Displacement for bridge movement of bearing.pdf
Displacement for bridge movement of bearing.pdfDisplacement for bridge movement of bearing.pdf
Displacement for bridge movement of bearing.pdf
 
Mtd4(5005)
Mtd4(5005)Mtd4(5005)
Mtd4(5005)
 
Is 800 2007_with_latest_ammendment
Is 800 2007_with_latest_ammendmentIs 800 2007_with_latest_ammendment
Is 800 2007_with_latest_ammendment
 
IS 800 2007
IS 800 2007IS 800 2007
IS 800 2007
 
Is.4326.1993
Is.4326.1993Is.4326.1993
Is.4326.1993
 
1200 4
1200 41200 4
1200 4
 
IS-1893-part1-2016-181029102047.pdf
IS-1893-part1-2016-181029102047.pdfIS-1893-part1-2016-181029102047.pdf
IS-1893-part1-2016-181029102047.pdf
 
1893-Part 1-2016.pdf
1893-Part 1-2016.pdf1893-Part 1-2016.pdf
1893-Part 1-2016.pdf
 
CSE_202_Chapter_4-1893-part-1-2016-1pdf.pdf
CSE_202_Chapter_4-1893-part-1-2016-1pdf.pdfCSE_202_Chapter_4-1893-part-1-2016-1pdf.pdf
CSE_202_Chapter_4-1893-part-1-2016-1pdf.pdf
 
Concrete technology
Concrete technology Concrete technology
Concrete technology
 
Concrete
ConcreteConcrete
Concrete
 
1200 5
1200 51200 5
1200 5
 
432 1
432 1432 1
432 1
 
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingSp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
 
Sp34 str detailing
Sp34     str detailingSp34     str detailing
Sp34 str detailing
 

Mais de Boopathi Yoganathan (20)

28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx
 
Front page upto content new
Front page upto content newFront page upto content new
Front page upto content new
 
Book report new
Book report newBook report new
Book report new
 
Fem
FemFem
Fem
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Embedded
EmbeddedEmbedded
Embedded
 
Earthquakes seminar
Earthquakes seminarEarthquakes seminar
Earthquakes seminar
 
10334
1033410334
10334
 
10302
1030210302
10302
 
10297
1029710297
10297
 
9527 1
9527 19527 1
9527 1
 
9459
94599459
9459
 
9456
94569456
9456
 
9429
94299429
9429
 
9417
94179417
9417
 
7873
78737873
7873
 
7563
75637563
7563
 
7500
75007500
7500
 
7436 2
7436 27436 2
7436 2
 
7436 1
7436 17436 1
7436 1
 

Último

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Último (20)

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

1200 8

  • 1. IS 1200 (Part 8) : 1993 (Reaffirmed 1997) Edition 5.1 (2002-05) Indian Standard METHODS OF MEASUREMENT OF BUILDING AND CIVIL ENGINEERING WORKS PART 8 STEELWORK AND IRONWORK ( Fourth Revision ) (Incorporating Amendment No. 1) UDC 69.003.12 : 693.81 © BIS 2002 B U R E A U O F I N D I A N S T A N D A R D S MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG NEW DELHI 110002 Price Group 2
  • 2. Methods of Measurement of Works of Civil Engineering (Excluding River Valley Projects) Sectional Committee, CED 44 FOREWORD This Indian Standard (Part 8) (Fourth Revision) was adopted by the Bureau of Indian Standards, after the draft finalized by the Methods of Measurement of Works of Civil Engineering (Excluding River Valley Projects) Sectional Committee had been approved by the Civil Engineering Division Council. Measurement occupies a very important place in planning and execution of any civil engineering work from the time of first estimates to final completion and settlement of payments of the project. The methods followed for measurement are not uniform and considerable differences exist between practices followed by one construction agency and another and also between various Central and State Government departments. While it is recognized that each system of measurement has to be specifically related to the administrative and financial organizations within the department responsible for work, a unification of the various systems at technical level has been accepted as very desirable, specially as it permits a wider circle of operation for civil engineering contractors and eliminates ambiguities and misunderstandings arising out of inadequate understanding of various systems followed. Among the various civil engineering items, measurement of buildings had been first to be taken up for standardization and this standard having provisions relating to all building works, was first published in 1958 and was subsequently revised in 1964. In its second revision, the standard was issued in different parts corresponding to different trades in building and civil engineering works. As a result, the second revision of this standard (Part 8) was published in 1967 which was then revised in 1974. This fourth revision has been brought out to incorporate the changes found necessary in the light of usage of this standard and suggestions made by various bodies implementing it. This edition 5.1 incorporates Amendment No. 1 (May 2002). Side bar indicates modification of the text as the result of incorporation of the amendment. For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS 2 : 1960 ‘Rules for rounding off numerical values ( revised )’. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard.
  • 3. IS 1200 (Part 8) : 1993 1 Indian Standard METHODS OF MEASUREMENT OF BUILDING AND CIVIL ENGINEERING WORKS PART 8 STEELWORK AND IRONWORK ( Fourth Revision ) 1 SCOPE This standard (Part 8) covers the method of measurement of steelwork and ironwork in buildings and civil engineering works. NOTE — The method of measurement for roof covering; pipe lines, etc for water supply and sewerage; and pipe lines, etc for gas and oil are covered in IS 1200 (Part 9) : 1973, IS 1200 (Part 16) : 1979 and IS 1200 (Part 20) : 1981 respectively. 2 REFERENCES The following Indian Standards are necessary adjuncts to this standard: 3 GENERAL RULES 3.1 Clubbing of Items Items may be clubbed together provided that break-up of clubbed items is agreed to be on the basis of detailed description of items, stated in this standard. 3.2 Booking of Dimensions In booking dimensions, order shall be consistent and generally in sequence of length, width and height or depth or thickness. 3.3 Description of Items The description of each item, which covers both fabrication and erection, shall include conveyance and delivery, handling, unloading, storing, hoisting and all labour for finishing to required shape and size. Alternatively, in each item of work fabrication or erection shall be described and measured separately. 3.4 Bill of Quantities Items of work shall fully describe the materials and truly represent the work to be executed. 3.5 Dimensions Unless otherwise stated all works shall be measured net in decimal system, as fixed in its place, as given in 3.5.1 and 3.5.2. 3.5.1 Cross-sections and thicknesses shall be taken from relevant Indian Standards. Length and breadth shall be measured to nearest 0.001 m except for reinforcement which shall be measured to nearest 0.005 m. 3.5.2 Areas shall be worked out to nearest 0.001 m2 . 3.6 The priming coat shall be described and included in item of fabrication. 3.7 The mass of steel sheet, plate and strip; rolled steel sections, steel rods, steel reinforcements, and steel strips; forged steel, steel castings and steel tubes shall be taken from relevant Indian Standards. 3.7.1 The final mass of individual categories/sections calculated based on dimensions arrived at in 3.5.1 and 3.5.2 and mass arrived at as per 3.7, shall be worked out to nearest 1 kg. 3.8 Unless otherwise specified an addition of 2.5 percent of the mass of structure shall be made for shop and site rivet heads in riveted steel structures. 3.9 Unless otherwise specified, in the case of welded steel structures no allowance shall be made for the weld metal. 3.10 Wedging-up, under stanchion bases or steel grillages shall be described and enumerated. IS No. Title 1200 (Part 9) : 1973 Method of measurement of building and civil engineering works : Part 9 Roof covering (including cladding) ( second revision ) 1200 (Part 16) : 1979 Method of measurement of building and civil engineering works : Part 16 Laying of water and sewer lines including appurtenant structures ( third revision ) 1200 (Part 20) : 1981 Method of measurement of building and civil engineering works : Part 20 Laying of gas and oil pipe lines ( third revision ) 1239 (Part 1) : 1979 Mild steel tubes, tubulars and other wrought steel fittings : Part 1 Mild steel tubes ( fourth revision )
  • 4. IS 1200 (Part 8) : 1993 2 4 STEELWORK 4.1 Various items of steelwork shall be classified and measured separately under following categories. Work in each classification shall be described. Bolted, riveted and welded structures shall be described as such and measured separately: a) Rolled sections (joist, channel, angle or tee) fixed independently without connecting plates; b) Rolled sections fixed with connecting plate or angle cleats as in main and crossbeams, hip and jack rafters, purlins connected to common rafters and the like. c) Rolled joists, with or without stiffeners in grillages (the weight of stiffeners shall be added to the mass of joists); d) Compound girders; e) Plate girders (stating type and overall height of girder); f) Lattice girders, aerial masts, tank staging and like (stating details of members and overall height of structure); g) Single stanchions composed of rolled joists or channels with caps, bases, splices, angle brackets, etc; h) Compound stanchions with caps, bases, splices, angle brackets, etc; j) Trusses and trussed purlins (stating spans and overall heights); k) Framing of cladding and glazing; m) Crane gantry rails including fastenings: n) Staircases including stringers, treads, landings, handrails, etc; p) Plates (plain or chequered), square cut or notched, holed (ordinary or countersunk) without any attachments; q) Plates of classification (p) above with riveted, bolted or welded attachments; r) Running rails and girders for sliding doors; s) Platework with or without stiffeners for: 1) bunkers, 2) chutes, 3) chimneys including ladders, 4) tanks with or without covers including stays but excluding stagings, 5) gutters and downpipes, and 6) furnace shell. t) Anchor bolts, holding down bolts including all fittings and sag rods; u) Wind ties to roofs, strakes for wooden bridges, cores for handrails (straight portion), running bars for doors and fencing posts and struts; v) Framed work, such as grills, gratings, framed guard bars, ladders, walkways, railings, brackets and similar work; w) Straps, hooks, clamps, holdfasts, wall ties, insets, knee pieces, and sim ilar works; y) Ornamental work as in grills, balustrades, and curved, ramped and scroll portion of cores for handrails; and z) Steelwork for: 1) doors, 2) hydraulic gates, and 3) cassions and well curbs. z1) Purpose made butt hinges for fixing to stone or concrete door and window frames. NOTES 1 In composite construction shear connectors, if any, will form part of structural steelwork. 2 The above classification with suffix B, R or W shall be indicated in bills of quantities to denote bolted, riveted or welded construction respectively. 4.2 The steelwork shall be measured by mass except otherwise mentioned. 4.3 Unless otherwise specified, mass of cleats, brackets, packing pieces, bolts, nuts, washers, distance pieces, separators, diaphragm, gussets (taking overall rectangular dimensions), fish plates, etc, shall be added to the weight of respective items. In riveted work, allowance is to be made for mass of rivet heads ( see 3.8 ). No deduction shall be made for rivet or bolt holes (excluding holes for anchor or holding down bolts). Deduction in case of rivet or bolt hole shall, however, be made if its area exceeds 0.02 m2 and for notch if its area exceeds 0.05 m2. For other type of openings like holes for service pipe etc, deduction shall be made if its area exceeds 0.1 m2 . 5 TUBULAR STRUCTURES The tubular structures shall be described and measured by weight. 6 CABLES/GUY WIRES The cables and guy wires shall be described and measured in running metre stating the diameter or by weight. 7 BEARINGS These shall be classified as roller, rocker, sliding, etc, and fully described and enumerated. 8 PIPES FOR FLUES 8.1 Flue pipes of steel sheeting shall be measured overall in running metres and described as including all short lengths, cutting and waste. The method of jointing and fixing shall be described. Supports shall be measured separately.
  • 5. IS 1200 (Part 8) : 1993 3 8.2 The diameter of pipes, thickness of sheeting and whether black or galvanized shall be stated. In case of galvanized steel pipes, class of galvanization [ see IS 1239 (Part 1) : 1979 ] shall also be stated. 8.3 Bends, elbows, cowls, tapered pipes to fit outlets of ranges, and roof plates with sleeve shall be enumerated and measured as extra over. 9 DUCT WORK The duct metal work shall be described and measured in square metres on the basis of surface area. Support shall be measured separately. 10 EXPANDED METAL WORK AND WELD MESHWORK Expanded metalwork and weld meshwork shall be described including laps, meshes, weight, strands and method of fixing and measured in square metres. Openings exceeding 0.2 m2 shall be deducted. Raking or circular cutting and waste shall be included in the description. 11 STEEL REINFORCEMENT 11.1 Reinforcement bars shall be measured in running metres and their mass calculated as per 3.7.1. The item of work shall include removal of surface rust, straightening, cutting to lengths, hooked ends, cranking or bending (straight or spiral). Authorized overlaps, chairs/separators shall be measured. 11.1.1 When welding of joints is authorized the same shall be described; joints, butt welded shall be measured in numbers and lap welded shall be measured in running metres of the length welded. 11.2 Fabric reinforcement shall be described (including meshes and strands) and measured in square metres. Authorized laps shall be measured. 11.2.1 Wire netting used as encasement shall be described (including meshes and wires) and shall be measured in square metres. Authorized laps shall be measured. 11.2.2 Raking or circular cutting and waste shall be included in description. 11.3 Binding wire for reinforcement shall not be measured, but shall be included in description of item. NOTE — Term ‘binding wire’ is reserved for wire binding together reinforcement in contact. 11.4 Hoop iron shall be fully described and measured in running metres, 12 MISCELLANEOUS WORK 12.1 Bolts including nuts and washers other than those covered in 4.1 (t) shall be described and measured by mass in kilograms. 12.2 Plain or barbed wire fencing shall be fully described and each line of wire shall be measured in running metres. 12.3 Patent plain wire fencing shall be fully described and measured in square metres. 12.4 Wire mattresses, nets shall be fully described including method of tying and measured in square metres. Authorised laps shall be measured. 12.5 Collapsible gates shall be described and measured in square metres as fixed stating size of gate opening, pickets, pivoted flat bars and size of meshes formed by them when fully extended. 12.5.1 Top and bottom runners, pulleys, locking lugs and handles shall be described and included with item. Description shall also include erection in position and securing runners with holdfasts and brackets. 12.6 Steel rolling shutter/grills shall be described and measured in square metres. The width shall be measured as the outer distance between the backs of the two guide channels of the rolling shutters and the height shall be the distance between the still and the centre of the hood cover. 12.6.1 Gauge and type of the shutter/grills, distance between centres of interlock and bridge depth shall be stated. 12.6.2 Description shall include spring winding mechanism operated mechanically or manually, jamb guides, bottom rail, locking and door operating arrangements. 12.6.3 Where a wicket gate has to be provided it shall be described. 12.6.4 Any protective treatment required to be applied at manufacturer’s works, such as painting or hot dip galvanizing shall be described. 12.7 Unless otherwise stated, steel doors, windows, ventilators and glazing frames shall be measured in square metres as fixed stating type given in relevant Indian Standard. 12.7.1 Method of fixing and hanging and fastenings shall be included with item. 12.8 Gates for Compound Walls and Railing Gates shall be described and enumerated or measured in square metres; hangings, guide rails and fastenings shall be described and included with item.
  • 6. IS 1200 (Part 8) : 1993 4 12.9 Steel Louvre Louvres shall be described and measured in square metres on basis of opening covered. 12.10 Slotted Pipes Site perforated pipes shall be described and measured by mass in kilogram. Deductions for perforations/slots shall, however, be made if its area exceeds 0.02 m2 . 12.10.1 The manufactured perforated pipe shall, however, be described and measured in running metres. 12.11 Metal sheet in wall cladding etc shall be described and measured in square metres. Gauge and type of sheet (whether black or galvanized), type of connection/adjustment with the supporting structures by bolting, welding or by any other arrangements shall be stated. 13 CAST IRONWORK 13.1 Cast iron flue (or smoke) pipes shall be measured overall in running metres and described as including all short length, cutting and waste. 13.1.1 Method of jointing and fixing shall be described, and diameter of pipes and mass per standard length stated. 13.1.2 Bends, inspection doors and cowls shall be enumerated and measured as extra over. 13.2 Spiral Staircases Spiral staircases shall be enumerated, stating overall diameter and height, total number of treads, risers and sleeves in one piece, central shaft or poles including base plate and other attachment handrail and balusters. l3.2.1 Exit landings shall be described and enumerated. 13.2.2 Stays, if required, shall be stated. 13.3 Stanchions, Columns and Lamp Posts These shall be described and measured in numbers specifying mass. 13.4 Grid flooring and grills shall be described including size and mass of each piece and measured in square metres on the basis of overall area. 13.5 Except as hereinbefore described, cast ironwork shall be measured by mass and classified under following headings. a) Unmachined — such as brackets, frames, gully traps, manhole covers, gratings, fire doors, soot doors and frames; and balls and stop cock boxes. b) Machine turned — such as pulleys and similar work.
  • 7. Bureau of Indian Standards BIS is a statutory institution established under the Bureau of Indian Standards Act, 1986 to promote harmonious development of the activities of standardization, marking and quality certification of goods and attending to connected matters in the country. Copyright BIS has the copyright of all its publications. No part of these publications may be reproduced in any form without the prior permission in writing of BIS. This does not preclude the free use, in the course of implementing the standard, of necessary details, such as symbols and sizes, type or grade designations. Enquiries relating to copyright be addressed to the Director (Publications), BIS. Review of Indian Standards Amendments are issued to standards as the need arises on the basis of comments. Standards are also reviewed periodically; a standard along with amendments is reaffirmed when such review indicates that no changes are needed; if the review indicates that changes are needed, it is taken up for revision. Users of Indian Standards should ascertain that they are in possession of the latest amendments or edition by referring to the latest issue of ‘BIS Catalogue’ and ‘Standards : Monthly Additions’. This Indian Standard has been developed from Doc : No. CED 44 (5152). Amendments Issued Since Publication Amend No. Date of Issue Amd. No. 1 May 2002 BUREAU OF INDIAN STANDARDS Headquarters: Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi 110002. Telephones: 323 01 31, 323 33 75, 323 94 02 Telegrams: Manaksanstha (Common to all offices) Regional Offices: Telephone Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg NEW DELHI 110002 323 76 17 323 38 41 Eastern : 1/14 C. I. T. Scheme VII M, V. I. P. Road, Kankurgachi KOLKATA 700054 337 84 99, 337 85 61 337 86 26, 337 91 20 Northern : SCO 335-336, Sector 34-A, CHANDIGARH 160022 60 38 43 60 20 25 Southern : C. I. T. Campus, IV Cross Road, CHENNAI 600113 235 02 16, 235 04 42 235 15 19, 235 23 15 Western : Manakalaya, E9 MIDC, Marol, Andheri (East) MUMBAI 400093 832 92 95, 832 78 58 832 78 91, 832 78 92 Branches : AHMEDABAD. BANGALORE. BHOPAL. BHUBANESHWAR. COIMBATORE. FARIDABAD. GHAZIABAD. GUWAHATI. HYDERABAD. JAIPUR. KANPUR. LUCKNOW. NAGPUR. NALAGARH. PATNA. PUNE. RAJKOT. THIRUVANANTHAPURAM. VISHAKHAPATNAM.               