Presented by
Robert Lambe, CFM
President, RAL Location Strategies
Preparing An Agile
Strategic Facilities Plan
StrategicFacilityGuide.com
Insight From Your Facility Data
StrategicFacilityGuide.com
Insight From Your Facility Data
Abstract
Given the rate of change and budget pressures today, many
organizations do not invest the time or resources to develop a
traditional strategic facility plan. This makes it difficult for
executives and facility staff to be confident that they have the
right facilities in place and they are making the best investments
in these assets.
However, an agile management approach can be used to
leverage available information and quickly create or revise a
draft strategic facility plan. Once developed, this draft strategic
facility plan can be used to guide decisions as well as to identify
important information gaps.
Why Consider an
Agile [Strategic] Facility Plan?
You want some type of directional facility
plan and don’t have one.
(Because of funding, time, buy-in, etc. etc.)
An agile facility approach may not
be right for your organization.
Draft Facility Plan “Placeholder”
– Established direction for near future
– Based on documented baseline & forecast
– Used to engage stakeholder input
Prioritized Action Plan / List
– Provides framework for decisions on asset
investments and operational priorities
Ongoing Assessment & Refinement Cycles
– Agile project management used for action items
– Reassess Draft Facility Plan based on measured
progress after completion of action items
What is an
Agile Facility Plan?
PERSPECTIVES OF FACILITIES
What are the different dimensions of facilities?
StrategicFacilityGuide.com
Insight From Your Facility Data
Architectural Perspective
“The Facility as Sculpture”
• Size & Configuration
• Form is important
• Image matters
(inside and out)
• Physical Context
• Asset Cost
Engineering /
Building System Perspective
“The Facility as Machine”
• System Efficiency
& Reliability
• Facility Condition
• Supporting
Technology
• Asset Cost
• Sustainability
Business Operations Perspective
“The Facility as Workplace”
• Operational
Efficiency
• Productivity
• Service Levels
• Occupant
Satisfaction
• Supporting
Technology
Real Estate Perspective
“The Facility as Property Asset”
• Location
• Market – Asset Value
• Image - Curb Appeal
Business Executive/
Finance Perspective
“The Facility as Business Asset”
• Business Value
• Operating Cost
• Workforce
Recruitment &
Retention
• Sustainability
Different Perspectives Often Emphasize Different
Dimensions of Facilities
The perspectives may
use different criteria
to evaluate a facility.
A plan helps alignment
or prioritization of
potentially conflicting
perspectives.
Size & Configuration
Occupant Satisfaction
System Efficiency/Reliability
Asset Value
Location
Sustainability
Image & Quality
Business Value
Facility Condition
Operating Cost
Operational Service Levels
Supporting Technology
Architectural
Engineering
Operations
RealEstate
Business
COMPETITIVE ADVANTAGE
How can our facilities best support the
organization’s mission?
StrategicFacilityGuide.com
Insight From Your Facility Data
Why Have Facilities?
• Facilities provide physical space for a
business purpose
– Size and location
– Suitable image & environment
– Budget and duration
• Increasingly displaced by virtual space
– Where physical presence not required, and
– Where technology can effectively support
remote-ness
How Can Your Facilities Provide
a Competitive Advantage?
• Location
– Market position
– Labor/recruiting
– Logistics
• Design
– Image
– Productivity: efficiency &
effectiveness by type of space
• Operation
– Service levels
– Risk management
• Cost effectiveness
– Capital (investment & asset)
– Operating costs
• Specific business value
– Sustainability
Understand Your
Current Facility
Assets
Understand Your
Organization’s
Competitive
Position
Capitalize on
the Value Each
Facility Asset
Contributes
STRATEGIC FACILITY THINKING
What is the value of a strategic facility plan?
StrategicFacilityGuide.com
Insight From Your Facility Data
Strategic Thinking is Always
Important for Facility Assets
• Facilities are expensive, and
often take a long time to put
in place or change.
• A strategic facility plan helps
to identify the highest value
facility actions and their
appropriate sequence.
A strategic facility plan helps properly
align your facilities with your needs.
Strategic Facility Plan
A strategic facility plan (SFP) is defined as a two-to-five
year facilities plan encompassing an entire portfolio of
owned and/or leased space that sets strategic facility
goals based on the organization’s strategic (business)
objectives. The strategic facilities goals, in turn,
determine short-term tactical plans, including
prioritization of, and funding for, annual facility related
projects.
- IFMA (International Facilities Management Association)
Simple Illustration
Office for
Business Admin
Business Plan
WHY?
Facility Plan
WHAT, WHEN?
Action Plan
HOW?
Retail for Local
Sales & Service
25,000 SF,
Baltimore, 2016
Refresh existing,
Per approved, $$
Data/Call Center
for Virtual/Online
Remote work
sites, 2018
Define roles and
touchdown space
Replace xx SF,
TBD, 2019
Capital plan
approval
Close...
Complete scoping
study by ABC
Rebrand...
Extend lease...
Find site...
8,000 SF,
North site, 2016
4,500 SF,
North site, 2016
5,000 SF,
North site, 2016
6,100 SF,
North site, 2016
5,000 SF,
North site, 2017
Why You Need a Plan
Better Cost/Investment Management
• Facilities typically are a large part of most organization’s budget/assets so
a plan is just good business.
• Provide guidance (not commitment) on investments and activities to fund.
• Minimize “mistimed” investments.
Better Asset Management
• Facilities cross all organization lines so a plan helps “visibly” coordinate
sometimes competing needs.
• Minimize waste (underutilized facilities).
• Maintain asset values.
Better Facility Operations
• Respond to changing business environment more easily.
• Improved alignment of SLA with organizational priorities.
• Improved awareness of facility criticality.
THE AGILE FACILITY PLAN
What to do when you don’t have a plan...
What is Agile?
Agile methodology is an alternative to
traditional project management, typically used
in software development. It helps teams
respond to unpredictability through
incremental, iterative work cadences, known
as sprints. Agile methodologies are an
alternative to waterfall, or traditional
sequential development.
- agilemethodology.org
See core agile principles at: http://agilemanifesto.org/ (2001)
Agile Principles Applicable
to Facilities Management
• Customer satisfaction
• Early and continuous delivery of useful facilities
(shorter schedules/cycles)
• Harness change for competitive advantage (be
nimble and adaptable to changing requirements)
• Collaboration between business and facilities
• Technical excellence, Simplicity
• Continuous improvement – regular review &
adjustment
When to Use an Agile Approach
• When you have no choice
– Do not have a “sanctioned” Strategic Facility Plan
– Need affordable plan or update
– Have to plan from “bottom up”
• When it is a better fit for you
– In a dynamically changing environment
– Need quick plan or update to current plan
Need a collaborative environment with the
business and some latitude for the team!
Agile/Strategic Facility Process
• ROI
• Risk
• Goals
• Consensus
• Skills
• Scope
• Budget
• Schedule
• Steady State
• Linear Projection
• Evolution
• Wild Card
Future
• Facts
• Informed /
Professional
Opinion
• Opinion
Assess Forecast
PrioritizeExecute
STATUS QUO FUTURE NEEDS
DELIVERY ACTION PLAN
This is just a conceptual framework used to organize the presentation – free for unrestricted use (c) RAL Location Strategies 2016
Assess
• Opinion
• Informed
Opinion
• Professional
Opinion
STATUS QUO
Assess
Start with your
current facilities
(& operations)
and how well
they support the
current business
situation.
Tip: Consider the different
perspectives of facilities.
Assess
• What do you know?
– Facts: Size, type, cost
– Across the multiple dimensions of facilities
– Documented requirements, operations & SLA
• What do you believe?
– Assessments: condition, utilization...
(performance!)
– Complete missing info with best available opinions
• Tabletop review / assessment can be quick, efficient,
and probably effective enough
Suggestions
• Have a comprehensive, complete, and available
facility inventory.
– Define the facilities as intuitively as possible, based on
their functional purpose.
– Use an appropriate granularity for your quantity of
facilities.
• Draw on various data sources for economy of
effort and consistency; use meta-data to
understand data quality
– Define categories to quantify “soft” assessment
ratings.
• Start benchmarking/metrics immediately.
Forecast
• Steady State
• Linear Projection
• Evolution
• Wild Card
Future
FUTURE NEEDS
Forecast
Project how well
the current
facilities are
expected to
support the likely
future business
situation.
Tip: Consider how your facilities can
provide a competitive advantage.
Forecast
• What will the world look like in near future?
– How is this likely to effect your industry?
• Estimate the likely short-term business needs
– How can your facilities help provide a competitive
advantage?
• Estimate the likely short-term implications for
your current facilities:
– Continue status quo
– Need more information
– Ready for defined investments (projects)
– Need major changes
The Future is not Linear
• Ask What If?
– Much of the value of a
plan comes from being
ready when things don’t
go as expected
• Many forks in the road
can be forecast
– Define trigger points and
criteria for decisions
• Only do as much as time
allows
Image source: "Manual decision tree" by User:Gokul Jadhav - Own work. Licensed under Public Domain via Commons -
https://commons.wikimedia.org/wiki/File:Manual_decision_tree.jpg#/media/File:Manual_decision_tree.jpg
Prioritize
ACTION PLAN
• ROI
• Risk
• Goals
• Consensus
Prioritize
List the “actions”
that logically follow
from the Assess and
Forecast.
Prioritize which are
most important or
valuable to do first.
Tip: Apply strategic thinking
about value and sequence.
Prioritize
• Create a list of potential actions:
– Study: Need more information or better assessment
– Projects: Make change to physical plant
– Initiative: Make change to operational practices
(i.e.. facility commissioning or occupant education)
• Classify each action by the reason and urgency.
– Reason/justification:
• Financially justified investments (payback)
• Risk reduction, regulatory
• Business value, improvement in operations or other goal
– Urgency can be simple: immediate - later
• Put placeholder budgets and schedules on each.
Who Should Be Involved?
• Key Executives
– Resource levels
– Organizational priorities
• Stakeholders (Business & facility occupants)
– Business priorities
– Impacts to the business
• Facility staff and service providers
– Resource requirements
– Project logic
• Decision making may need to be iterative for all
groups to understand implications
Decisions should be
based on consensus
Execute
DELIVERY
• Skills
• Scope
• Budget
• Schedule
Execute
Use good project
management to
implement the
selected actions
Tip: Use an Agile Project
Management approach.
Execute
• Reasonable but timely status reporting
• Use established organizational systems for
execution of selected actions
– Team structure is the biggest challenge for most
organizations in adopting agile approaches
– Follow agile principles for short cycles with
ongoing adjustments and evaluation
• Track and evaluate results
– Use to update assessments
– Use for frequent course corrections in plan *
RINSE, LATHER, REPEAT
Build better data and better plan each year...
Conclusion
• Different perspectives of our facilities both help
identify how they provide value and complicate
how we evaluate them.
• A strategic approach helps prioritize facility
investments and initiatives to realize their
competitive value for our organization.
• The “Agile Methodology” is an incremental,
iterative management approach that can be
useful for Facility Planning in a rapidly changing
environment as long as there is a good
relationship between the business and facilities
groups.
StrategicFacilityGuide.com
Insight From Your Facility Data
About the Presenter
StrategicFacilityGuide.com
Insight From Your Facility Data
Robert Lambe is the Principal & Founder
of RAL Location Strategies. He helps
companies use available information to
better understand their facilities assets
and facilities management operations,
in order to target investments that align
with business requirements.
His practice areas are agile/strategic
facility planning, facility benchmarking,
location analysis, and facilities software
implementation. Bob also serves as the
Planning and Economic Development
Coordinator for his home town of
Marcy NY.
www.linkedin.com/in/lambe
Connect with me!
Blog: http://strategicfacilityguide.com/resources/articles/

Mais conteúdo relacionado

Mais procurados

4sl Demand Management
4sl  Demand Management4sl  Demand Management
4sl Demand Managementtarransp
 
Business Architecture: Upwards, Downwards, Sideways, Back
Business Architecture: Upwards, Downwards, Sideways, BackBusiness Architecture: Upwards, Downwards, Sideways, Back
Business Architecture: Upwards, Downwards, Sideways, BackTetradian Consulting
 
Fp&a operating model
Fp&a operating modelFp&a operating model
Fp&a operating modeljarobertson2
 
Accelerated Business & Technology Capability Assessment and Roadmap
Accelerated Business & Technology Capability Assessment and RoadmapAccelerated Business & Technology Capability Assessment and Roadmap
Accelerated Business & Technology Capability Assessment and RoadmapSudhir Nilekar
 
Business Impact Analysis
Business Impact AnalysisBusiness Impact Analysis
Business Impact Analysisdlfrench
 
Business and IT Alignment using Architecture
Business and IT Alignment using ArchitectureBusiness and IT Alignment using Architecture
Business and IT Alignment using ArchitectureSudhir Nilekar
 
Operating model - Restructuring - Case study
Operating model - Restructuring - Case studyOperating model - Restructuring - Case study
Operating model - Restructuring - Case studyMohammad Mujeeb Beg
 
Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...
Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...
Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...DavidAltmen
 
Business Architecture and Enterprise Planning
Business Architecture and Enterprise PlanningBusiness Architecture and Enterprise Planning
Business Architecture and Enterprise Planningi3 Technologies, Inc
 
Planning Expansion and Adding Scope to your Current Shared Services Operation
Planning Expansion and Adding Scope to your Current Shared Services OperationPlanning Expansion and Adding Scope to your Current Shared Services Operation
Planning Expansion and Adding Scope to your Current Shared Services OperationScottMadden, Inc.
 
Business Alignment
Business AlignmentBusiness Alignment
Business AlignmentMichael Galo
 
The 7 Lessons Learned of Highly Effective Shared Services
The 7 Lessons Learned of Highly Effective Shared Services  The 7 Lessons Learned of Highly Effective Shared Services
The 7 Lessons Learned of Highly Effective Shared Services Chazey Partners
 
RFP Selection Process
RFP Selection ProcessRFP Selection Process
RFP Selection ProcessJoann Martin
 
Strategic Portfolio Management for IT
Strategic Portfolio Management for ITStrategic Portfolio Management for IT
Strategic Portfolio Management for ITiasaglobal
 

Mais procurados (19)

4sl Demand Management
4sl  Demand Management4sl  Demand Management
4sl Demand Management
 
Business Architecture: Upwards, Downwards, Sideways, Back
Business Architecture: Upwards, Downwards, Sideways, BackBusiness Architecture: Upwards, Downwards, Sideways, Back
Business Architecture: Upwards, Downwards, Sideways, Back
 
Fp&a operating model
Fp&a operating modelFp&a operating model
Fp&a operating model
 
Accelerated Business & Technology Capability Assessment and Roadmap
Accelerated Business & Technology Capability Assessment and RoadmapAccelerated Business & Technology Capability Assessment and Roadmap
Accelerated Business & Technology Capability Assessment and Roadmap
 
Business Impact Analysis
Business Impact AnalysisBusiness Impact Analysis
Business Impact Analysis
 
Business and IT Alignment using Architecture
Business and IT Alignment using ArchitectureBusiness and IT Alignment using Architecture
Business and IT Alignment using Architecture
 
Operating model - Restructuring - Case study
Operating model - Restructuring - Case studyOperating model - Restructuring - Case study
Operating model - Restructuring - Case study
 
Automating PeopleSoft HR Processes
Automating PeopleSoft HR ProcessesAutomating PeopleSoft HR Processes
Automating PeopleSoft HR Processes
 
Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...
Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...
Financial Planning & Analysis (FP&A) - Practices, Roles, Responsibilities and...
 
Business Architecture and Enterprise Planning
Business Architecture and Enterprise PlanningBusiness Architecture and Enterprise Planning
Business Architecture and Enterprise Planning
 
Strategy map 16
Strategy map 16Strategy map 16
Strategy map 16
 
Planning Expansion and Adding Scope to your Current Shared Services Operation
Planning Expansion and Adding Scope to your Current Shared Services OperationPlanning Expansion and Adding Scope to your Current Shared Services Operation
Planning Expansion and Adding Scope to your Current Shared Services Operation
 
Business Alignment
Business AlignmentBusiness Alignment
Business Alignment
 
Boski CV
Boski CVBoski CV
Boski CV
 
The 7 Lessons Learned of Highly Effective Shared Services
The 7 Lessons Learned of Highly Effective Shared Services  The 7 Lessons Learned of Highly Effective Shared Services
The 7 Lessons Learned of Highly Effective Shared Services
 
Sanjib_Kumar_Kar_Updated
Sanjib_Kumar_Kar_UpdatedSanjib_Kumar_Kar_Updated
Sanjib_Kumar_Kar_Updated
 
RFP Selection Process
RFP Selection ProcessRFP Selection Process
RFP Selection Process
 
Strategic Portfolio Management for IT
Strategic Portfolio Management for ITStrategic Portfolio Management for IT
Strategic Portfolio Management for IT
 
KPIs and Dashboards
KPIs and DashboardsKPIs and Dashboards
KPIs and Dashboards
 

Destaque

Property management business pla 2013 2016
Property management business pla 2013 2016Property management business pla 2013 2016
Property management business pla 2013 2016mohamad aref mneimneh
 
Agile governance towards facilitative project management - article - fortes ...
Agile governance  towards facilitative project management - article - fortes ...Agile governance  towards facilitative project management - article - fortes ...
Agile governance towards facilitative project management - article - fortes ...FortesSolutions
 
Agile pm is that the end of the project manager as we know it - fortes solu...
Agile pm   is that the end of the project manager as we know it - fortes solu...Agile pm   is that the end of the project manager as we know it - fortes solu...
Agile pm is that the end of the project manager as we know it - fortes solu...FortesSolutions
 
5 Strategies for Successful Project Management. MAKE IT REAL.
5 Strategies for Successful Project Management. MAKE IT REAL.5 Strategies for Successful Project Management. MAKE IT REAL.
5 Strategies for Successful Project Management. MAKE IT REAL.Hagen Management
 
RICS - Strategic Facilities Management - 1st Edition oct 2013
RICS - Strategic Facilities Management - 1st Edition oct 2013RICS - Strategic Facilities Management - 1st Edition oct 2013
RICS - Strategic Facilities Management - 1st Edition oct 2013Muriel Walter
 
Agile Maintenance
Agile MaintenanceAgile Maintenance
Agile MaintenanceNaresh Jain
 
Evolution Of Team Interaction Models
Evolution Of Team Interaction ModelsEvolution Of Team Interaction Models
Evolution Of Team Interaction ModelsNaresh Jain
 
JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016
JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016
JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016JLL
 
The real workplace trends to steal from tech
The real workplace trends to steal from tech The real workplace trends to steal from tech
The real workplace trends to steal from tech JLL
 
Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...Alan McSweeney
 
Facility Management The Basics
Facility Management   The BasicsFacility Management   The Basics
Facility Management The BasicsSanjay Chaudhuri
 
March 2017 U.S. employment update and outlook
March 2017 U.S. employment update and outlookMarch 2017 U.S. employment update and outlook
March 2017 U.S. employment update and outlookJLL
 

Destaque (14)

Property management business pla 2013 2016
Property management business pla 2013 2016Property management business pla 2013 2016
Property management business pla 2013 2016
 
Agile governance towards facilitative project management - article - fortes ...
Agile governance  towards facilitative project management - article - fortes ...Agile governance  towards facilitative project management - article - fortes ...
Agile governance towards facilitative project management - article - fortes ...
 
Agile pm is that the end of the project manager as we know it - fortes solu...
Agile pm   is that the end of the project manager as we know it - fortes solu...Agile pm   is that the end of the project manager as we know it - fortes solu...
Agile pm is that the end of the project manager as we know it - fortes solu...
 
5 Strategies for Successful Project Management. MAKE IT REAL.
5 Strategies for Successful Project Management. MAKE IT REAL.5 Strategies for Successful Project Management. MAKE IT REAL.
5 Strategies for Successful Project Management. MAKE IT REAL.
 
RICS - Strategic Facilities Management - 1st Edition oct 2013
RICS - Strategic Facilities Management - 1st Edition oct 2013RICS - Strategic Facilities Management - 1st Edition oct 2013
RICS - Strategic Facilities Management - 1st Edition oct 2013
 
Agile Maintenance
Agile MaintenanceAgile Maintenance
Agile Maintenance
 
Evolution Of Team Interaction Models
Evolution Of Team Interaction ModelsEvolution Of Team Interaction Models
Evolution Of Team Interaction Models
 
JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016
JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016
JLL’s perspective on top 10 global corporate real estate (CRE) trends for 2016
 
The real workplace trends to steal from tech
The real workplace trends to steal from tech The real workplace trends to steal from tech
The real workplace trends to steal from tech
 
Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...
 
Lean vs agile manufacturing
Lean vs agile manufacturingLean vs agile manufacturing
Lean vs agile manufacturing
 
Facility management
Facility managementFacility management
Facility management
 
Facility Management The Basics
Facility Management   The BasicsFacility Management   The Basics
Facility Management The Basics
 
March 2017 U.S. employment update and outlook
March 2017 U.S. employment update and outlookMarch 2017 U.S. employment update and outlook
March 2017 U.S. employment update and outlook
 

Semelhante a Agile Strategic Facilities Plan

Who needs EA… when we have DevOps?
Who needs EA… when we have DevOps?Who needs EA… when we have DevOps?
Who needs EA… when we have DevOps?Jeff Jakubiak
 
Agile Capacity Management
Agile Capacity ManagementAgile Capacity Management
Agile Capacity ManagementPrecisely
 
Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...
Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...
Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...Scrum Bangalore
 
Resource scheduling & capacity planning for project online webinar 25 oct18
Resource scheduling & capacity planning for project online  webinar 25 oct18Resource scheduling & capacity planning for project online  webinar 25 oct18
Resource scheduling & capacity planning for project online webinar 25 oct18Mike Otranto
 
3 Enterprise Storage Assessment
3 Enterprise Storage Assessment3 Enterprise Storage Assessment
3 Enterprise Storage AssessmentJeremiah Loscalzo
 
Practical Enterprise Architecture in Medium-size Corporation using TOGAF
Practical Enterprise Architecture in Medium-size Corporation using TOGAFPractical Enterprise Architecture in Medium-size Corporation using TOGAF
Practical Enterprise Architecture in Medium-size Corporation using TOGAFMichael Sukachev
 
Accenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAPAccenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAPLionel Vuillemin
 
Principle 11 needs to go! by Ken France at #AgileIndia2019
Principle 11 needs to go! by Ken France at #AgileIndia2019Principle 11 needs to go! by Ken France at #AgileIndia2019
Principle 11 needs to go! by Ken France at #AgileIndia2019Agile India
 
Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management Cisco
 
Turning your Excel Business Process Workflows into an Automated Business Inte...
Turning your Excel Business Process Workflows into an Automated Business Inte...Turning your Excel Business Process Workflows into an Automated Business Inte...
Turning your Excel Business Process Workflows into an Automated Business Inte...OAUGNJ
 
How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...Tristan Wiggill
 
KScope14 ranzal Organizational Value through Analytics
KScope14 ranzal Organizational Value through AnalyticsKScope14 ranzal Organizational Value through Analytics
KScope14 ranzal Organizational Value through AnalyticsAlithya
 
20 best practices for fusion hcm cloud implementation
20   best practices for fusion hcm cloud implementation20   best practices for fusion hcm cloud implementation
20 best practices for fusion hcm cloud implementationmohamed refaei
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationFeras Ahmad
 
Integrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudIntegrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudPoornima N
 

Semelhante a Agile Strategic Facilities Plan (20)

Logicas Pres (Eng)
Logicas Pres (Eng)Logicas Pres (Eng)
Logicas Pres (Eng)
 
Who needs EA… when we have DevOps?
Who needs EA… when we have DevOps?Who needs EA… when we have DevOps?
Who needs EA… when we have DevOps?
 
Agile Capacity Management
Agile Capacity ManagementAgile Capacity Management
Agile Capacity Management
 
Enterprise Architecture
Enterprise Architecture Enterprise Architecture
Enterprise Architecture
 
Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...
Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...
Scrum Bangalore 16th Meetup - March 5, 2016 - Yes Scrum Did Wonders Beyond IT...
 
Resource scheduling & capacity planning for project online webinar 25 oct18
Resource scheduling & capacity planning for project online  webinar 25 oct18Resource scheduling & capacity planning for project online  webinar 25 oct18
Resource scheduling & capacity planning for project online webinar 25 oct18
 
3 Enterprise Storage Assessment
3 Enterprise Storage Assessment3 Enterprise Storage Assessment
3 Enterprise Storage Assessment
 
Practical Enterprise Architecture in Medium-size Corporation using TOGAF
Practical Enterprise Architecture in Medium-size Corporation using TOGAFPractical Enterprise Architecture in Medium-size Corporation using TOGAF
Practical Enterprise Architecture in Medium-size Corporation using TOGAF
 
Accenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAPAccenture-Value-Realization-for-SAP
Accenture-Value-Realization-for-SAP
 
Principle 11 needs to go! by Ken France at #AgileIndia2019
Principle 11 needs to go! by Ken France at #AgileIndia2019Principle 11 needs to go! by Ken France at #AgileIndia2019
Principle 11 needs to go! by Ken France at #AgileIndia2019
 
Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management
 
Turning your Excel Business Process Workflows into an Automated Business Inte...
Turning your Excel Business Process Workflows into an Automated Business Inte...Turning your Excel Business Process Workflows into an Automated Business Inte...
Turning your Excel Business Process Workflows into an Automated Business Inte...
 
Heidi's Resume_2016
Heidi's Resume_2016Heidi's Resume_2016
Heidi's Resume_2016
 
How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...How to become truly demand driven based on accurate customer orders rather th...
How to become truly demand driven based on accurate customer orders rather th...
 
VCP Roadmap
VCP RoadmapVCP Roadmap
VCP Roadmap
 
KScope14 ranzal Organizational Value through Analytics
KScope14 ranzal Organizational Value through AnalyticsKScope14 ranzal Organizational Value through Analytics
KScope14 ranzal Organizational Value through Analytics
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
20 best practices for fusion hcm cloud implementation
20   best practices for fusion hcm cloud implementation20   best practices for fusion hcm cloud implementation
20 best practices for fusion hcm cloud implementation
 
Best practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementationBest practices for fusion hcm cloud implementation
Best practices for fusion hcm cloud implementation
 
Integrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudIntegrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloud
 

Último

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 

Último (20)

Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 

Agile Strategic Facilities Plan

  • 1. Presented by Robert Lambe, CFM President, RAL Location Strategies Preparing An Agile Strategic Facilities Plan StrategicFacilityGuide.com Insight From Your Facility Data
  • 2. StrategicFacilityGuide.com Insight From Your Facility Data Abstract Given the rate of change and budget pressures today, many organizations do not invest the time or resources to develop a traditional strategic facility plan. This makes it difficult for executives and facility staff to be confident that they have the right facilities in place and they are making the best investments in these assets. However, an agile management approach can be used to leverage available information and quickly create or revise a draft strategic facility plan. Once developed, this draft strategic facility plan can be used to guide decisions as well as to identify important information gaps.
  • 3. Why Consider an Agile [Strategic] Facility Plan? You want some type of directional facility plan and don’t have one. (Because of funding, time, buy-in, etc. etc.) An agile facility approach may not be right for your organization.
  • 4. Draft Facility Plan “Placeholder” – Established direction for near future – Based on documented baseline & forecast – Used to engage stakeholder input Prioritized Action Plan / List – Provides framework for decisions on asset investments and operational priorities Ongoing Assessment & Refinement Cycles – Agile project management used for action items – Reassess Draft Facility Plan based on measured progress after completion of action items What is an Agile Facility Plan?
  • 5. PERSPECTIVES OF FACILITIES What are the different dimensions of facilities? StrategicFacilityGuide.com Insight From Your Facility Data
  • 6. Architectural Perspective “The Facility as Sculpture” • Size & Configuration • Form is important • Image matters (inside and out) • Physical Context • Asset Cost
  • 7. Engineering / Building System Perspective “The Facility as Machine” • System Efficiency & Reliability • Facility Condition • Supporting Technology • Asset Cost • Sustainability
  • 8. Business Operations Perspective “The Facility as Workplace” • Operational Efficiency • Productivity • Service Levels • Occupant Satisfaction • Supporting Technology
  • 9. Real Estate Perspective “The Facility as Property Asset” • Location • Market – Asset Value • Image - Curb Appeal
  • 10. Business Executive/ Finance Perspective “The Facility as Business Asset” • Business Value • Operating Cost • Workforce Recruitment & Retention • Sustainability
  • 11. Different Perspectives Often Emphasize Different Dimensions of Facilities The perspectives may use different criteria to evaluate a facility. A plan helps alignment or prioritization of potentially conflicting perspectives. Size & Configuration Occupant Satisfaction System Efficiency/Reliability Asset Value Location Sustainability Image & Quality Business Value Facility Condition Operating Cost Operational Service Levels Supporting Technology Architectural Engineering Operations RealEstate Business
  • 12. COMPETITIVE ADVANTAGE How can our facilities best support the organization’s mission? StrategicFacilityGuide.com Insight From Your Facility Data
  • 13. Why Have Facilities? • Facilities provide physical space for a business purpose – Size and location – Suitable image & environment – Budget and duration • Increasingly displaced by virtual space – Where physical presence not required, and – Where technology can effectively support remote-ness
  • 14. How Can Your Facilities Provide a Competitive Advantage? • Location – Market position – Labor/recruiting – Logistics • Design – Image – Productivity: efficiency & effectiveness by type of space • Operation – Service levels – Risk management • Cost effectiveness – Capital (investment & asset) – Operating costs • Specific business value – Sustainability Understand Your Current Facility Assets Understand Your Organization’s Competitive Position Capitalize on the Value Each Facility Asset Contributes
  • 15. STRATEGIC FACILITY THINKING What is the value of a strategic facility plan? StrategicFacilityGuide.com Insight From Your Facility Data
  • 16. Strategic Thinking is Always Important for Facility Assets • Facilities are expensive, and often take a long time to put in place or change. • A strategic facility plan helps to identify the highest value facility actions and their appropriate sequence. A strategic facility plan helps properly align your facilities with your needs.
  • 17. Strategic Facility Plan A strategic facility plan (SFP) is defined as a two-to-five year facilities plan encompassing an entire portfolio of owned and/or leased space that sets strategic facility goals based on the organization’s strategic (business) objectives. The strategic facilities goals, in turn, determine short-term tactical plans, including prioritization of, and funding for, annual facility related projects. - IFMA (International Facilities Management Association)
  • 18. Simple Illustration Office for Business Admin Business Plan WHY? Facility Plan WHAT, WHEN? Action Plan HOW? Retail for Local Sales & Service 25,000 SF, Baltimore, 2016 Refresh existing, Per approved, $$ Data/Call Center for Virtual/Online Remote work sites, 2018 Define roles and touchdown space Replace xx SF, TBD, 2019 Capital plan approval Close... Complete scoping study by ABC Rebrand... Extend lease... Find site... 8,000 SF, North site, 2016 4,500 SF, North site, 2016 5,000 SF, North site, 2016 6,100 SF, North site, 2016 5,000 SF, North site, 2017
  • 19. Why You Need a Plan Better Cost/Investment Management • Facilities typically are a large part of most organization’s budget/assets so a plan is just good business. • Provide guidance (not commitment) on investments and activities to fund. • Minimize “mistimed” investments. Better Asset Management • Facilities cross all organization lines so a plan helps “visibly” coordinate sometimes competing needs. • Minimize waste (underutilized facilities). • Maintain asset values. Better Facility Operations • Respond to changing business environment more easily. • Improved alignment of SLA with organizational priorities. • Improved awareness of facility criticality.
  • 20. THE AGILE FACILITY PLAN What to do when you don’t have a plan...
  • 21. What is Agile? Agile methodology is an alternative to traditional project management, typically used in software development. It helps teams respond to unpredictability through incremental, iterative work cadences, known as sprints. Agile methodologies are an alternative to waterfall, or traditional sequential development. - agilemethodology.org See core agile principles at: http://agilemanifesto.org/ (2001)
  • 22. Agile Principles Applicable to Facilities Management • Customer satisfaction • Early and continuous delivery of useful facilities (shorter schedules/cycles) • Harness change for competitive advantage (be nimble and adaptable to changing requirements) • Collaboration between business and facilities • Technical excellence, Simplicity • Continuous improvement – regular review & adjustment
  • 23. When to Use an Agile Approach • When you have no choice – Do not have a “sanctioned” Strategic Facility Plan – Need affordable plan or update – Have to plan from “bottom up” • When it is a better fit for you – In a dynamically changing environment – Need quick plan or update to current plan Need a collaborative environment with the business and some latitude for the team!
  • 24. Agile/Strategic Facility Process • ROI • Risk • Goals • Consensus • Skills • Scope • Budget • Schedule • Steady State • Linear Projection • Evolution • Wild Card Future • Facts • Informed / Professional Opinion • Opinion Assess Forecast PrioritizeExecute STATUS QUO FUTURE NEEDS DELIVERY ACTION PLAN This is just a conceptual framework used to organize the presentation – free for unrestricted use (c) RAL Location Strategies 2016
  • 25. Assess • Opinion • Informed Opinion • Professional Opinion STATUS QUO Assess Start with your current facilities (& operations) and how well they support the current business situation. Tip: Consider the different perspectives of facilities.
  • 26. Assess • What do you know? – Facts: Size, type, cost – Across the multiple dimensions of facilities – Documented requirements, operations & SLA • What do you believe? – Assessments: condition, utilization... (performance!) – Complete missing info with best available opinions • Tabletop review / assessment can be quick, efficient, and probably effective enough
  • 27. Suggestions • Have a comprehensive, complete, and available facility inventory. – Define the facilities as intuitively as possible, based on their functional purpose. – Use an appropriate granularity for your quantity of facilities. • Draw on various data sources for economy of effort and consistency; use meta-data to understand data quality – Define categories to quantify “soft” assessment ratings. • Start benchmarking/metrics immediately.
  • 28. Forecast • Steady State • Linear Projection • Evolution • Wild Card Future FUTURE NEEDS Forecast Project how well the current facilities are expected to support the likely future business situation. Tip: Consider how your facilities can provide a competitive advantage.
  • 29. Forecast • What will the world look like in near future? – How is this likely to effect your industry? • Estimate the likely short-term business needs – How can your facilities help provide a competitive advantage? • Estimate the likely short-term implications for your current facilities: – Continue status quo – Need more information – Ready for defined investments (projects) – Need major changes
  • 30. The Future is not Linear • Ask What If? – Much of the value of a plan comes from being ready when things don’t go as expected • Many forks in the road can be forecast – Define trigger points and criteria for decisions • Only do as much as time allows Image source: "Manual decision tree" by User:Gokul Jadhav - Own work. Licensed under Public Domain via Commons - https://commons.wikimedia.org/wiki/File:Manual_decision_tree.jpg#/media/File:Manual_decision_tree.jpg
  • 31. Prioritize ACTION PLAN • ROI • Risk • Goals • Consensus Prioritize List the “actions” that logically follow from the Assess and Forecast. Prioritize which are most important or valuable to do first. Tip: Apply strategic thinking about value and sequence.
  • 32. Prioritize • Create a list of potential actions: – Study: Need more information or better assessment – Projects: Make change to physical plant – Initiative: Make change to operational practices (i.e.. facility commissioning or occupant education) • Classify each action by the reason and urgency. – Reason/justification: • Financially justified investments (payback) • Risk reduction, regulatory • Business value, improvement in operations or other goal – Urgency can be simple: immediate - later • Put placeholder budgets and schedules on each.
  • 33. Who Should Be Involved? • Key Executives – Resource levels – Organizational priorities • Stakeholders (Business & facility occupants) – Business priorities – Impacts to the business • Facility staff and service providers – Resource requirements – Project logic • Decision making may need to be iterative for all groups to understand implications Decisions should be based on consensus
  • 34. Execute DELIVERY • Skills • Scope • Budget • Schedule Execute Use good project management to implement the selected actions Tip: Use an Agile Project Management approach.
  • 35. Execute • Reasonable but timely status reporting • Use established organizational systems for execution of selected actions – Team structure is the biggest challenge for most organizations in adopting agile approaches – Follow agile principles for short cycles with ongoing adjustments and evaluation • Track and evaluate results – Use to update assessments – Use for frequent course corrections in plan *
  • 36. RINSE, LATHER, REPEAT Build better data and better plan each year...
  • 37. Conclusion • Different perspectives of our facilities both help identify how they provide value and complicate how we evaluate them. • A strategic approach helps prioritize facility investments and initiatives to realize their competitive value for our organization. • The “Agile Methodology” is an incremental, iterative management approach that can be useful for Facility Planning in a rapidly changing environment as long as there is a good relationship between the business and facilities groups. StrategicFacilityGuide.com Insight From Your Facility Data
  • 38. About the Presenter StrategicFacilityGuide.com Insight From Your Facility Data Robert Lambe is the Principal & Founder of RAL Location Strategies. He helps companies use available information to better understand their facilities assets and facilities management operations, in order to target investments that align with business requirements. His practice areas are agile/strategic facility planning, facility benchmarking, location analysis, and facilities software implementation. Bob also serves as the Planning and Economic Development Coordinator for his home town of Marcy NY. www.linkedin.com/in/lambe Connect with me! Blog: http://strategicfacilityguide.com/resources/articles/