1
1.17 billion passengers a
year Bank Station Capacity Upgrade Project
Innovative Contractor Engagement
Simon Addyman
Programme Manager
APM Project Professional of the Year 2013
Bank Station Capacity Upgrade Project
• Passenger Demand
• Project Definition
• ICE Procurement Model
• ICE Outcome
Agenda
2
1.17 billion passengers a year1.17 billion passengers a year
Accelerating Growth
1,170,000,000 passenger
journeys
?
3
Peak Congestion (2031)
Underground
By 2026, 30 Central London Stations will
experience crowding greater than 4pppsm
A rising proportion, currently 53% of journey
time, is spent in stations rather than on trains.
4
Project Background – Business Need
Project Background – Requirements & Benefits
5
Project Background – Requirements & Benefits
• Congestion relief – minimum passenger flow of Fruin
level C
• Step Free Access ... including acceptable means for
persons with reduced mobility (PRM)
• Fire & evacuation – compliant measures throughout all
new station areas
• Journey Time
• Ambience
• Step Free Access
Requirements:
Benefits:
PRIMARY REQUIREMENTS
• Increased capacity, reduce Journey times
• Step-free Access
• Compliant fire and evacuation
PRIMARY BENEFITS
• Journey time benefits of £774m
• Capacity of Fruin level C
• Benefit:Cost Ratio is 2.4:1
BankBank
MonumentMonument
Constrained
Work Site
Complex
Power
Solution
Complex
Construction
Sub-optimal
Operational
Interchange
Sub-optimal
Over time
Over budget
Project Baseline Solution – RIBA D
6
Contractor proposal Baseline scheme
Lessons Learnt from Victoria Station Upgrade
Bank SCU traditional v ICE
7
ICE – A structured solution
Key features of Innovative Contractor Engagement:
• Pre-qualify innovators.
• A structured and protected dialogue phase.
• LU disclose ALL project information and
acknowledge the cost of dialogue.
• Requirements statement and bid evaluated
against business output.
• Orthodox ITT/ Target cost Contract.
• LU share value of innovative ideas from
unsuccessful bidders
ICE in Practice
8
Project Solution - Stakeholders
• 67 buildings in the zone of influence
• 38 buildings with Heritage interest
• 6 buildings Grade 1 Listed – notably St
Mary Abchurch (Wren) and Mansion
House
• 14 Buildings are Grade 11/11*
• 80% buildings are in a conservation area
Innovation in Project Management:
A New ‘Front End’ Triangle
9
Innovative Tender Evaluation
BASE 1 2 3 4
Product 625,000£ 625,000£ 625,000£ 625,000£ 625,000£
CR1: Capacity Enhancement 17.0% 8.50 10.00 8.50 12.00 10.00
CR2: Reduction of Journey Times 17.0% 8.50 8.50 8.50 12.00 8.50
RO3: Design & Construction 15.0% 7.50 8.50 7.50 7.50 7.50
CR4: Step Free Access 10.0% 5.00 5.00 10.00 5.00 7.00
CR5: Fire and Evacuation Plan 10.0% 5.00 5.00 5.00 5.00 5.00
Subtotal Product 69.0% 34.50 37.00 39.50 41.50 38.00
Method
RO1: LUL Project Business Case 2.5% 1.25 1.25 1.25 1.25 1.25
RO2: Transport and Works Act Order 5.0% 2.50 2.50 2.50 2.50 2.50
CR 3 Disruption during construction 12.5% 6.25 6.25 6.25 8.00 6.25
CR 6 Time 2.5% 1.25 1.25 1.25 1.25 1.25
CR 7 Design to Cost 2.5% 1.25 1.25 1.25 1.25 1.25
RO4: Opportunities 6.0% 3.00 3.00 3.00 3.00 3.00
Subtotal Method 31.0% 15.50 15.50 15.50 17.25 15.50
Total 100% 50.00 52.50 55.00 58.75 53.50
Total Rank 5 4 2 1 3
Value Rating - £100m = 8.00 Quality pts if P = £625m) 8.00 8.40 8.80 9.40 8.56
VR rank 5 4 2 1 3
VFM 85.11% 89.36% 93.62% 100.00% 91.06%
P equiv 531,915£ 558,511£ 585,106£ 625,000£ 569,149£
Lost Value 93,085£ 66,489£ 39,894£ -£ 55,851£
Value of a Quality point (rank 1 .v. rank 4) £k £10,638
Better Value for LUL
• B:CR increase by 1.1 to 3.5:1 (45.1%)
• Journey time benefits increased by £148m to
£923m (19.2%)
• EFC reduced by £61m to £563m (9.8%)
• Induced Revenue increased by £31m to £229m
(15.6%)
10
The Final Scheme – Key Features
The Winning
Ideas!
94m Moving
Walkway
Arthur
St
Tunne
l
Acces
s
Triple
Escalat
ors
everyw
here
Arthur St Tunnel
Access
Triple Escalators
everywhere
Retained
20 Abchurch Lane for
Site Offices
94m Moving Walkway
Whole Block
construction site
Simpler Power
Relocation Scheme
Reduced
Blockade
Reduced
Blockade
Improved Customer Experience
Includes:
• 12 New Escalators
• 3 New Lifts
• 2 No moving walkways
11
Final Scheme Improvements
Legion Modelling shows a vast improvement
of both journey time and congestion relief
on the original scheme
Final Scheme Improvements
from Northern Line SB to Central Line
will start automatically…
AM 2026+31%Base Scheme Proposed Scheme
12
4D Model of Proposed Works
13
A Collaborative Solution
The Alliance Protocol
• Alliance Management Structure (G5, ADT, etc).
• Bank Board.
• Co-location.
• Behavioural and risk reduction incentivisation
mechanism to be shared down the supply chain.
• 8 core project objectives.
• 24 smart team objectives leading to personal
objectives for each team member.
14
• Embedded in design teams
• All key suppliers on incentivised contracts
• All key delivery sub-contracts in place by start of
Detailed Design Phase
• Extensive input into early BIM 3D model
development and clash detection during early
design
Tier 2 Engagement
• Design Workshops:
• Including operator, sponsor, maintainer,
contractor and crucially tier 2 suppliers.
• Early design wins and full ownership of design
solutions
Core Design Team Process at Scheme Design Stage
15
Bank Station Capacity Upgrade
Technical Design Developments
page 5
• Back of house
accommodation at ground
floor minimised
• Improved sightlines to lift
lobby
• LU transformer room
relocated to basement
level
• Maintenance lift access to
all plant rooms
• Soffit maintenance zone
provided
• Integrated 3D BIM model
Programme
16
The Winning Scheme
Thank You
Any Questions

Mais conteúdo relacionado

Mais procurados

AQ modelling with real world traffic emissions
AQ modelling with real world traffic emissionsAQ modelling with real world traffic emissions
AQ modelling with real world traffic emissionsScott Hamilton
 
Low Emission Strategy in London Jo Boyd-Wallis
Low Emission Strategy in London Jo Boyd-WallisLow Emission Strategy in London Jo Boyd-Wallis
Low Emission Strategy in London Jo Boyd-WallisSTEP_scotland
 
A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...
A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...
A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...Medi Ambient. Generalitat de Catalunya
 
Wastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- NorthgateWastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- NorthgateCity of College Station
 
TSRGD Roadshow 2 00pm graham hanson [compatibility mode]
TSRGD Roadshow 2 00pm graham hanson [compatibility mode]TSRGD Roadshow 2 00pm graham hanson [compatibility mode]
TSRGD Roadshow 2 00pm graham hanson [compatibility mode]LisaAtTransport
 
Hydrated lime in Asphalt Mixtures - An international perpective
Hydrated lime in Asphalt Mixtures - An international perpectiveHydrated lime in Asphalt Mixtures - An international perpective
Hydrated lime in Asphalt Mixtures - An international perpectiveDidier Lesueur
 
Kyushu University Presentation
Kyushu University Presentation Kyushu University Presentation
Kyushu University Presentation HEFContest
 
Gason final presentation
Gason final presentationGason final presentation
Gason final presentationaleamex
 
Ghana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationGhana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationCopenhagen_Consensus
 
Ghana Priorities: Rural Transportation
Ghana Priorities: Rural TransportationGhana Priorities: Rural Transportation
Ghana Priorities: Rural TransportationCopenhagen_Consensus
 
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...RWM Brasil
 
Fornation Control of Platoons of Autonomous Vehicles
Fornation Control of Platoons of Autonomous VehiclesFornation Control of Platoons of Autonomous Vehicles
Fornation Control of Platoons of Autonomous VehiclesChouaieb NEMRI
 
STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...
STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...
STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...STEP_scotland
 
H2 Refuelling Stations for Commercial Scale Applications
H2 Refuelling Stations for Commercial Scale Applications H2 Refuelling Stations for Commercial Scale Applications
H2 Refuelling Stations for Commercial Scale Applications BOC Ltd
 
Airport Expertise 26 Mar 09[1]
Airport Expertise 26 Mar 09[1]Airport Expertise 26 Mar 09[1]
Airport Expertise 26 Mar 09[1]condies
 

Mais procurados (20)

Day1 session3 modelling
Day1 session3 modellingDay1 session3 modelling
Day1 session3 modelling
 
AQ modelling with real world traffic emissions
AQ modelling with real world traffic emissionsAQ modelling with real world traffic emissions
AQ modelling with real world traffic emissions
 
Low Emission Strategy in London Jo Boyd-Wallis
Low Emission Strategy in London Jo Boyd-WallisLow Emission Strategy in London Jo Boyd-Wallis
Low Emission Strategy in London Jo Boyd-Wallis
 
A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...
A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...
A VISION FOR AN ULTRA-LOW EMISSION CITY Improving air quality in London by Po...
 
Wastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- NorthgateWastewater Master Plan Update -- Northgate
Wastewater Master Plan Update -- Northgate
 
TSRGD Roadshow 2 00pm graham hanson [compatibility mode]
TSRGD Roadshow 2 00pm graham hanson [compatibility mode]TSRGD Roadshow 2 00pm graham hanson [compatibility mode]
TSRGD Roadshow 2 00pm graham hanson [compatibility mode]
 
Hydrated lime in Asphalt Mixtures - An international perpective
Hydrated lime in Asphalt Mixtures - An international perpectiveHydrated lime in Asphalt Mixtures - An international perpective
Hydrated lime in Asphalt Mixtures - An international perpective
 
Kyushu University Presentation
Kyushu University Presentation Kyushu University Presentation
Kyushu University Presentation
 
Gason final presentation
Gason final presentationGason final presentation
Gason final presentation
 
2014 Q4 RB slides
2014 Q4 RB slides2014 Q4 RB slides
2014 Q4 RB slides
 
Ghana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationGhana Priorities: Urban Transportation
Ghana Priorities: Urban Transportation
 
Ghana Priorities: Rural Transportation
Ghana Priorities: Rural TransportationGhana Priorities: Rural Transportation
Ghana Priorities: Rural Transportation
 
Chris lowe
Chris loweChris lowe
Chris lowe
 
CITYLAB - City Logistics in Living Laboratories
CITYLAB - City Logistics in Living Laboratories CITYLAB - City Logistics in Living Laboratories
CITYLAB - City Logistics in Living Laboratories
 
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
 
CK2017: Benefits of Electric Buses
CK2017: Benefits of Electric BusesCK2017: Benefits of Electric Buses
CK2017: Benefits of Electric Buses
 
Fornation Control of Platoons of Autonomous Vehicles
Fornation Control of Platoons of Autonomous VehiclesFornation Control of Platoons of Autonomous Vehicles
Fornation Control of Platoons of Autonomous Vehicles
 
STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...
STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...
STEP Annual Conference 2017 - Andy Eastlake, Low Carbon Vehicle Partnership -...
 
H2 Refuelling Stations for Commercial Scale Applications
H2 Refuelling Stations for Commercial Scale Applications H2 Refuelling Stations for Commercial Scale Applications
H2 Refuelling Stations for Commercial Scale Applications
 
Airport Expertise 26 Mar 09[1]
Airport Expertise 26 Mar 09[1]Airport Expertise 26 Mar 09[1]
Airport Expertise 26 Mar 09[1]
 

Destaque

Programme Management in the transport sector - a TfL case study webinar, 19th...
Programme Management in the transport sector - a TfL case study webinar, 19th...Programme Management in the transport sector - a TfL case study webinar, 19th...
Programme Management in the transport sector - a TfL case study webinar, 19th...Association for Project Management
 
Selling the Project: Connecting to Stakeholder Value
Selling the Project: Connecting to Stakeholder ValueSelling the Project: Connecting to Stakeholder Value
Selling the Project: Connecting to Stakeholder ValueJeremy Horn
 
How the London UNDERGROUND shaped London
How the London UNDERGROUND shaped LondonHow the London UNDERGROUND shaped London
How the London UNDERGROUND shaped LondonJIM MUKERJEE
 
Fit For The Future - TfL Plan For Modernising London Underground, London Over...
Fit For The Future - TfL Plan For Modernising London Underground, London Over...Fit For The Future - TfL Plan For Modernising London Underground, London Over...
Fit For The Future - TfL Plan For Modernising London Underground, London Over...Thorne & Derrick International
 
London Underground
London UndergroundLondon Underground
London UndergroundElvis London
 
Case studies transport solutions
Case studies transport solutionsCase studies transport solutions
Case studies transport solutionsPerrymanGeography
 
Full stack-web-design
Full stack-web-designFull stack-web-design
Full stack-web-designKevin Conboy
 
London underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition eventLondon underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition eventKTN
 
Victoria BID Development Pipeline
Victoria BID Development PipelineVictoria BID Development Pipeline
Victoria BID Development PipelineVictoriaBID
 
Peeling back the covers on government programmes, Richard Bacon MP
Peeling back the covers on government programmes, Richard Bacon MPPeeling back the covers on government programmes, Richard Bacon MP
Peeling back the covers on government programmes, Richard Bacon MPAssociation for Project Management
 
Equipping Programme Managers for Global Success -What programme managers can ...
Equipping Programme Managers for Global Success -What programme managers can ...Equipping Programme Managers for Global Success -What programme managers can ...
Equipping Programme Managers for Global Success -What programme managers can ...Association for Project Management
 

Destaque (20)

ECSIG (TfL) presentation 29 06-15 - final for sharing
ECSIG (TfL) presentation 29 06-15 - final for sharingECSIG (TfL) presentation 29 06-15 - final for sharing
ECSIG (TfL) presentation 29 06-15 - final for sharing
 
Programme Management in the transport sector - a TfL case study webinar, 19th...
Programme Management in the transport sector - a TfL case study webinar, 19th...Programme Management in the transport sector - a TfL case study webinar, 19th...
Programme Management in the transport sector - a TfL case study webinar, 19th...
 
Selling the Project: Connecting to Stakeholder Value
Selling the Project: Connecting to Stakeholder ValueSelling the Project: Connecting to Stakeholder Value
Selling the Project: Connecting to Stakeholder Value
 
How the London UNDERGROUND shaped London
How the London UNDERGROUND shaped LondonHow the London UNDERGROUND shaped London
How the London UNDERGROUND shaped London
 
Fit For The Future - TfL Plan For Modernising London Underground, London Over...
Fit For The Future - TfL Plan For Modernising London Underground, London Over...Fit For The Future - TfL Plan For Modernising London Underground, London Over...
Fit For The Future - TfL Plan For Modernising London Underground, London Over...
 
London underground
London undergroundLondon underground
London underground
 
London Underground
London UndergroundLondon Underground
London Underground
 
Case studies transport solutions
Case studies transport solutionsCase studies transport solutions
Case studies transport solutions
 
Full stack-web-design
Full stack-web-designFull stack-web-design
Full stack-web-design
 
London underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition eventLondon underground presentation for Digital Railways competition event
London underground presentation for Digital Railways competition event
 
Victoria BID Development Pipeline
Victoria BID Development PipelineVictoria BID Development Pipeline
Victoria BID Development Pipeline
 
How the BBC successfully produced the Olympics
How the BBC successfully produced the OlympicsHow the BBC successfully produced the Olympics
How the BBC successfully produced the Olympics
 
Wave hub presentation to APM SWWE branch 18 05 16
Wave hub presentation to APM SWWE branch 18 05 16Wave hub presentation to APM SWWE branch 18 05 16
Wave hub presentation to APM SWWE branch 18 05 16
 
Guy Hindley: My life in planning, hints & tips
Guy Hindley: My life in planning, hints & tips Guy Hindley: My life in planning, hints & tips
Guy Hindley: My life in planning, hints & tips
 
Overcoming knowledge management barriers, 9th June 2016
Overcoming knowledge management barriers, 9th June 2016Overcoming knowledge management barriers, 9th June 2016
Overcoming knowledge management barriers, 9th June 2016
 
UK submarine dismantling: A case study in programme management
UK submarine dismantling: A case study in programme managementUK submarine dismantling: A case study in programme management
UK submarine dismantling: A case study in programme management
 
The meaning of communication: Jacqui Gatehouse
The meaning of communication: Jacqui GatehouseThe meaning of communication: Jacqui Gatehouse
The meaning of communication: Jacqui Gatehouse
 
Newcomers event
Newcomers eventNewcomers event
Newcomers event
 
Peeling back the covers on government programmes, Richard Bacon MP
Peeling back the covers on government programmes, Richard Bacon MPPeeling back the covers on government programmes, Richard Bacon MP
Peeling back the covers on government programmes, Richard Bacon MP
 
Equipping Programme Managers for Global Success -What programme managers can ...
Equipping Programme Managers for Global Success -What programme managers can ...Equipping Programme Managers for Global Success -What programme managers can ...
Equipping Programme Managers for Global Success -What programme managers can ...
 

Semelhante a Bank station upgrade presentation 9th June 2014

Moving London Forward - Crossrail
Moving London Forward - Crossrail Moving London Forward - Crossrail
Moving London Forward - Crossrail Ibrahim Al-Hudhaif
 
Governance and the art of decision making on Crossrail by "Walter Macharg - H...
Governance and the art of decision making on Crossrail by "Walter Macharg - H...Governance and the art of decision making on Crossrail by "Walter Macharg - H...
Governance and the art of decision making on Crossrail by "Walter Macharg - H...Project Controls Expo
 
Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...
Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...
Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...Project Controls Expo
 
AITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan StirzakerAITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan StirzakerJumpingJaq
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...
Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...
Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...Invest Northern Ireland
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgradeRobert Lee - CEng, MICE, PMP
 
Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915
Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915
Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915Association for Project Management
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Russell Publishing
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017Association for Project Management
 
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...Project Controls Expo
 
Traffic signal
Traffic signalTraffic signal
Traffic signalaloknitb
 
Solar Cloth case studies April16
Solar Cloth case studies April16Solar Cloth case studies April16
Solar Cloth case studies April16Kevin McIntyre
 
June 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationJune 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationRebecca Markillie
 

Semelhante a Bank station upgrade presentation 9th June 2014 (20)

Moving London Forward - Crossrail
Moving London Forward - Crossrail Moving London Forward - Crossrail
Moving London Forward - Crossrail
 
Governance and the art of decision making on Crossrail by "Walter Macharg - H...
Governance and the art of decision making on Crossrail by "Walter Macharg - H...Governance and the art of decision making on Crossrail by "Walter Macharg - H...
Governance and the art of decision making on Crossrail by "Walter Macharg - H...
 
Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...
Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...
Tideway - Transforming the Thames by "Niall Faris - Project Controls Leader f...
 
AITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan StirzakerAITPM Conference Presentation -Callan Stirzaker
AITPM Conference Presentation -Callan Stirzaker
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...
Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...
Crossrail Suppy Chain Engagement Seminar 2013 - Terry Morgan, Martin Rowark, ...
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915
Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915
Delivering the Forth Replacement Crossing (Lawrence Shackman) SCOT100915
 
Sgcp14beckmanncp
Sgcp14beckmanncpSgcp14beckmanncp
Sgcp14beckmanncp
 
M25 Media Pack
M25 Media PackM25 Media Pack
M25 Media Pack
 
Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)Richard Aaroe, CEO, WaveTrainSystems (WTS)
Richard Aaroe, CEO, WaveTrainSystems (WTS)
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017West of England Rail Electrification Programme, 23 February 2017
West of England Rail Electrification Programme, 23 February 2017
 
Sustainable Urban Mobility Planning
Sustainable Urban Mobility PlanningSustainable Urban Mobility Planning
Sustainable Urban Mobility Planning
 
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
Project Control Staff – Make or Buy? by "Mike Laws - Project Controls Manager...
 
Traffic signal
Traffic signalTraffic signal
Traffic signal
 
Solar Cloth case studies April16
Solar Cloth case studies April16Solar Cloth case studies April16
Solar Cloth case studies April16
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
June 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationJune 2015 ITM Power Company Presentation
June 2015 ITM Power Company Presentation
 

Mais de Association for Project Management

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Association for Project Management
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...Association for Project Management
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Association for Project Management
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...Association for Project Management
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Association for Project Management
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Association for Project Management
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Association for Project Management
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 

Mais de Association for Project Management (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 

Último

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Último (20)

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 

Bank station upgrade presentation 9th June 2014

  • 1. 1 1.17 billion passengers a year Bank Station Capacity Upgrade Project Innovative Contractor Engagement Simon Addyman Programme Manager APM Project Professional of the Year 2013 Bank Station Capacity Upgrade Project • Passenger Demand • Project Definition • ICE Procurement Model • ICE Outcome Agenda
  • 2. 2 1.17 billion passengers a year1.17 billion passengers a year Accelerating Growth 1,170,000,000 passenger journeys ?
  • 3. 3 Peak Congestion (2031) Underground By 2026, 30 Central London Stations will experience crowding greater than 4pppsm A rising proportion, currently 53% of journey time, is spent in stations rather than on trains.
  • 4. 4 Project Background – Business Need Project Background – Requirements & Benefits
  • 5. 5 Project Background – Requirements & Benefits • Congestion relief – minimum passenger flow of Fruin level C • Step Free Access ... including acceptable means for persons with reduced mobility (PRM) • Fire & evacuation – compliant measures throughout all new station areas • Journey Time • Ambience • Step Free Access Requirements: Benefits: PRIMARY REQUIREMENTS • Increased capacity, reduce Journey times • Step-free Access • Compliant fire and evacuation PRIMARY BENEFITS • Journey time benefits of £774m • Capacity of Fruin level C • Benefit:Cost Ratio is 2.4:1 BankBank MonumentMonument Constrained Work Site Complex Power Solution Complex Construction Sub-optimal Operational Interchange Sub-optimal Over time Over budget Project Baseline Solution – RIBA D
  • 6. 6 Contractor proposal Baseline scheme Lessons Learnt from Victoria Station Upgrade Bank SCU traditional v ICE
  • 7. 7 ICE – A structured solution Key features of Innovative Contractor Engagement: • Pre-qualify innovators. • A structured and protected dialogue phase. • LU disclose ALL project information and acknowledge the cost of dialogue. • Requirements statement and bid evaluated against business output. • Orthodox ITT/ Target cost Contract. • LU share value of innovative ideas from unsuccessful bidders ICE in Practice
  • 8. 8 Project Solution - Stakeholders • 67 buildings in the zone of influence • 38 buildings with Heritage interest • 6 buildings Grade 1 Listed – notably St Mary Abchurch (Wren) and Mansion House • 14 Buildings are Grade 11/11* • 80% buildings are in a conservation area Innovation in Project Management: A New ‘Front End’ Triangle
  • 9. 9 Innovative Tender Evaluation BASE 1 2 3 4 Product 625,000£ 625,000£ 625,000£ 625,000£ 625,000£ CR1: Capacity Enhancement 17.0% 8.50 10.00 8.50 12.00 10.00 CR2: Reduction of Journey Times 17.0% 8.50 8.50 8.50 12.00 8.50 RO3: Design & Construction 15.0% 7.50 8.50 7.50 7.50 7.50 CR4: Step Free Access 10.0% 5.00 5.00 10.00 5.00 7.00 CR5: Fire and Evacuation Plan 10.0% 5.00 5.00 5.00 5.00 5.00 Subtotal Product 69.0% 34.50 37.00 39.50 41.50 38.00 Method RO1: LUL Project Business Case 2.5% 1.25 1.25 1.25 1.25 1.25 RO2: Transport and Works Act Order 5.0% 2.50 2.50 2.50 2.50 2.50 CR 3 Disruption during construction 12.5% 6.25 6.25 6.25 8.00 6.25 CR 6 Time 2.5% 1.25 1.25 1.25 1.25 1.25 CR 7 Design to Cost 2.5% 1.25 1.25 1.25 1.25 1.25 RO4: Opportunities 6.0% 3.00 3.00 3.00 3.00 3.00 Subtotal Method 31.0% 15.50 15.50 15.50 17.25 15.50 Total 100% 50.00 52.50 55.00 58.75 53.50 Total Rank 5 4 2 1 3 Value Rating - £100m = 8.00 Quality pts if P = £625m) 8.00 8.40 8.80 9.40 8.56 VR rank 5 4 2 1 3 VFM 85.11% 89.36% 93.62% 100.00% 91.06% P equiv 531,915£ 558,511£ 585,106£ 625,000£ 569,149£ Lost Value 93,085£ 66,489£ 39,894£ -£ 55,851£ Value of a Quality point (rank 1 .v. rank 4) £k £10,638 Better Value for LUL • B:CR increase by 1.1 to 3.5:1 (45.1%) • Journey time benefits increased by £148m to £923m (19.2%) • EFC reduced by £61m to £563m (9.8%) • Induced Revenue increased by £31m to £229m (15.6%)
  • 10. 10 The Final Scheme – Key Features The Winning Ideas! 94m Moving Walkway Arthur St Tunne l Acces s Triple Escalat ors everyw here Arthur St Tunnel Access Triple Escalators everywhere Retained 20 Abchurch Lane for Site Offices 94m Moving Walkway Whole Block construction site Simpler Power Relocation Scheme Reduced Blockade Reduced Blockade Improved Customer Experience Includes: • 12 New Escalators • 3 New Lifts • 2 No moving walkways
  • 11. 11 Final Scheme Improvements Legion Modelling shows a vast improvement of both journey time and congestion relief on the original scheme Final Scheme Improvements from Northern Line SB to Central Line will start automatically… AM 2026+31%Base Scheme Proposed Scheme
  • 12. 12 4D Model of Proposed Works
  • 13. 13 A Collaborative Solution The Alliance Protocol • Alliance Management Structure (G5, ADT, etc). • Bank Board. • Co-location. • Behavioural and risk reduction incentivisation mechanism to be shared down the supply chain. • 8 core project objectives. • 24 smart team objectives leading to personal objectives for each team member.
  • 14. 14 • Embedded in design teams • All key suppliers on incentivised contracts • All key delivery sub-contracts in place by start of Detailed Design Phase • Extensive input into early BIM 3D model development and clash detection during early design Tier 2 Engagement • Design Workshops: • Including operator, sponsor, maintainer, contractor and crucially tier 2 suppliers. • Early design wins and full ownership of design solutions Core Design Team Process at Scheme Design Stage
  • 15. 15 Bank Station Capacity Upgrade Technical Design Developments page 5 • Back of house accommodation at ground floor minimised • Improved sightlines to lift lobby • LU transformer room relocated to basement level • Maintenance lift access to all plant rooms • Soffit maintenance zone provided • Integrated 3D BIM model Programme