Most businesses already implement improvement activities, some on a formal basis using
methods such as Six Sigma or Lean, others on a less formal basis using improvement tools
and techniques. The challenge facing managers is in getting ‘improvement’ to be part of the
day job; owned by everyone. This programme aims to fast-forward sustainable changes
using management and implementation methods that can be replicated time over, ensuring
that the gains made are maintained and repeated.



About the Programme
This programme is designed to provide managers with fast-track approaches that support
and build improvement sustainability across their areas of responsibility and throughout the
supply chain.

Whether you are a manager with significant experience in delivering improvement activities,
or new to the role of leading improvements, this programme will present the key stages and
elements in developing a sustainable improvement culture which can repeatedly optimise
efficiency and effectiveness.




Our Approach
The programme involves two interactive and practical workshops based around the central
pillars of Business Acumen, Core Tools, Culture & Leadership, Support & Report. Key to
our approach will be providing participants with the opportunity to engage in activities and
discussions around improvement challenges in their current management roles.

A critical element of the programme is the Improvement Project itself where participants
will be required to follow the processes of identifying, defining, implementing, measuring &
reporting on improvement outputs. Participants will have access to one-to-one support with
improvement project areas.




Macnaughton McGregor Ltd                                                                  1
 st
1 Floor, 8 Lansdowne Terrace, Gosforth
Newcastle upon Tyne NE3 1HN
www.2macs.com
Programme Delivery Schedule
The programme will be delivered in 2 blocks of 2 days with a gap to allow participants to
initiate, progress and receive support with their improvement projects. At the end of the
programme participants will be asked to report the successes and learning points for their
project using templates provided.




    Business             Core Tools                            Culture &        Support &
    Acumen                                  2-3 weeks         Leadership         Report

    Mapping             Improvement      Project definition   Culture Types   Visible
    Strategy to         Cycles                                                Management
    Operations
                                         & implementation
                                                              Team &
                        Base                                  Management      Supply Chain
    Project             Measures            Individual
                                                              Perspectives    Communication
    Definition                               Support
                        Team                                  Leadership      Presentation
    Core                Engagement                            Approaches      Approaches
    Measures            Techniques




          Improvement Project



     Leading & Managing a Sustainable Improvement Culture




Our aim is to deliver programmes during Winter 2011 and Spring 2012 based upon a
minimum of 8 participants per programme. Programmes can be delivered either in-house or
at a venue to suit participating businesses.




Macnaughton McGregor Ltd                                                                      2
 st
1 Floor, 8 Lansdowne Terrace, Gosforth
Newcastle upon Tyne NE3 1HN
www.2macs.com
Costs & Return on Investment
The programme fees are £500 plus VAT per person which is fully inclusive of all delivery,
programme materials, and individual support during the programme.

We expect each participant to be able to achieve a minimum return of £1,250 through their
improvement project, representing a 2.5 times return on the original cash investment on the
initial improvement activity alone.



Interested in Getting Involved?
If you are interested in finding out more or booking a place on the programme, please email
Vicky@2macs.com or telephone 0191 246 1160.




Macnaughton McGregor Ltd                                                                 3
 st
1 Floor, 8 Lansdowne Terrace, Gosforth
Newcastle upon Tyne NE3 1HN
www.2macs.com

Mais conteúdo relacionado

Destaque

OSvパンフレット v3
OSvパンフレット v3OSvパンフレット v3
OSvパンフレット v3Takuya ASADA
 
Driving at Work HSE Guide
Driving at Work HSE GuideDriving at Work HSE Guide
Driving at Work HSE GuideAlan Bassett
 
Sociala medier - den nya webbplatsen?
Sociala medier - den nya webbplatsen?Sociala medier - den nya webbplatsen?
Sociala medier - den nya webbplatsen?Tobias Franzén
 
Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...
Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...
Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...Alessandro Lovari
 
Gin WheelFailure - Nasc
Gin WheelFailure - NascGin WheelFailure - Nasc
Gin WheelFailure - NascAlan Bassett
 
Back to School 2014
Back to School 2014Back to School 2014
Back to School 2014Laura Rieben
 
Sharpest tool in the box: Choosing the right authoring tool for your learning...
Sharpest tool in the box: Choosing the right authoring tool for your learning...Sharpest tool in the box: Choosing the right authoring tool for your learning...
Sharpest tool in the box: Choosing the right authoring tool for your learning...Brightwave Group
 
Social Media for public administrations: opportunities and challenges
Social Media for public administrations: opportunities and challengesSocial Media for public administrations: opportunities and challenges
Social Media for public administrations: opportunities and challengesAlessandro Lovari
 
2014 Social Media Forecasts From The Experts
2014 Social Media Forecasts From The Experts2014 Social Media Forecasts From The Experts
2014 Social Media Forecasts From The ExpertsHeidi Cohen
 
Mentens - Employer Branding i Sociala Medier
Mentens - Employer Branding i Sociala MedierMentens - Employer Branding i Sociala Medier
Mentens - Employer Branding i Sociala MedierTobias Franzén
 
Oddziaływanie EC Karolin na środowisko
Oddziaływanie EC Karolin na środowiskoOddziaływanie EC Karolin na środowisko
Oddziaływanie EC Karolin na środowiskoEkokonsultacje
 
HSE Press Release Accident Statistics
HSE Press Release   Accident StatisticsHSE Press Release   Accident Statistics
HSE Press Release Accident StatisticsAlan Bassett
 
H & S Reform Progress October 11
H & S Reform  Progress October 11H & S Reform  Progress October 11
H & S Reform Progress October 11Alan Bassett
 
Scotland Invitation
Scotland InvitationScotland Invitation
Scotland InvitationAlan Bassett
 
BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜
BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜
BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜Takuya ASADA
 
Newcastle Construction Division Newsletter July 2010 Debbie Flynn
Newcastle Construction Division Newsletter   July 2010   Debbie FlynnNewcastle Construction Division Newsletter   July 2010   Debbie Flynn
Newcastle Construction Division Newsletter July 2010 Debbie FlynnAlan Bassett
 

Destaque (19)

OSvパンフレット v3
OSvパンフレット v3OSvパンフレット v3
OSvパンフレット v3
 
Driving at Work HSE Guide
Driving at Work HSE GuideDriving at Work HSE Guide
Driving at Work HSE Guide
 
Sociala medier - den nya webbplatsen?
Sociala medier - den nya webbplatsen?Sociala medier - den nya webbplatsen?
Sociala medier - den nya webbplatsen?
 
Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...
Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...
Non basta essere su Facebook per essere 2.0. La qualità della presenza della ...
 
Best of steve jobs
Best of steve jobsBest of steve jobs
Best of steve jobs
 
Gin WheelFailure - Nasc
Gin WheelFailure - NascGin WheelFailure - Nasc
Gin WheelFailure - Nasc
 
A Question of Content
A Question of ContentA Question of Content
A Question of Content
 
Back to School 2014
Back to School 2014Back to School 2014
Back to School 2014
 
Sharpest tool in the box: Choosing the right authoring tool for your learning...
Sharpest tool in the box: Choosing the right authoring tool for your learning...Sharpest tool in the box: Choosing the right authoring tool for your learning...
Sharpest tool in the box: Choosing the right authoring tool for your learning...
 
Social Media for public administrations: opportunities and challenges
Social Media for public administrations: opportunities and challengesSocial Media for public administrations: opportunities and challenges
Social Media for public administrations: opportunities and challenges
 
2014 Social Media Forecasts From The Experts
2014 Social Media Forecasts From The Experts2014 Social Media Forecasts From The Experts
2014 Social Media Forecasts From The Experts
 
Mentens - Employer Branding i Sociala Medier
Mentens - Employer Branding i Sociala MedierMentens - Employer Branding i Sociala Medier
Mentens - Employer Branding i Sociala Medier
 
Oddziaływanie EC Karolin na środowisko
Oddziaływanie EC Karolin na środowiskoOddziaływanie EC Karolin na środowisko
Oddziaływanie EC Karolin na środowisko
 
HSE Press Release Accident Statistics
HSE Press Release   Accident StatisticsHSE Press Release   Accident Statistics
HSE Press Release Accident Statistics
 
H & S Reform Progress October 11
H & S Reform  Progress October 11H & S Reform  Progress October 11
H & S Reform Progress October 11
 
Scotland Invitation
Scotland InvitationScotland Invitation
Scotland Invitation
 
BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜
BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜
BHyVeでOSvを起動したい
〜BIOSがなくてもこの先生きのこるには〜
 
Newcastle Construction Division Newsletter July 2010 Debbie Flynn
Newcastle Construction Division Newsletter   July 2010   Debbie FlynnNewcastle Construction Division Newsletter   July 2010   Debbie Flynn
Newcastle Construction Division Newsletter July 2010 Debbie Flynn
 
Hssh0910
Hssh0910Hssh0910
Hssh0910
 

Semelhante a Leading Managing a Sustainable Improvement Culture

Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor
 
Project Management The State of the Art
Project Management The State of the ArtProject Management The State of the Art
Project Management The State of the Artcssa
 
Project Management The State Of The Art
Project Management The State Of The ArtProject Management The State Of The Art
Project Management The State Of The Artsundong
 
Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...
Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...
Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...Wellingtone
 
Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...
Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...
Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...PMI-Montréal
 
How to Implement & Manage an Energy Management Program
How to Implement & Manage an Energy Management ProgramHow to Implement & Manage an Energy Management Program
How to Implement & Manage an Energy Management ProgramEnergy Advantage
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery AssessmentProfeo
 
Webinar - Introduction to Programme Management, 23 February 2017, Alan Macklin
Webinar - Introduction to Programme Management, 23 February 2017, Alan MacklinWebinar - Introduction to Programme Management, 23 February 2017, Alan Macklin
Webinar - Introduction to Programme Management, 23 February 2017, Alan MacklinAssociation for Project Management
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
PMI Cameroon 2017-2019 Strategic Plan
PMI Cameroon 2017-2019 Strategic PlanPMI Cameroon 2017-2019 Strategic Plan
PMI Cameroon 2017-2019 Strategic PlanPMI Cameroon Chapter
 
Austin C Mattson II Resume Mar 2012
Austin C  Mattson II Resume Mar 2012Austin C  Mattson II Resume Mar 2012
Austin C Mattson II Resume Mar 2012Austin Mattson II
 
julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5Julian Earl
 
2021| PMFT | E-BROCHURE
2021| PMFT | E-BROCHURE2021| PMFT | E-BROCHURE
2021| PMFT | E-BROCHUREDcolearning
 
Project planning and control - Nov
Project planning and control - NovProject planning and control - Nov
Project planning and control - NovIfeoma Onyemachi
 
PuruDate_Resume
PuruDate_ResumePuruDate_Resume
PuruDate_ResumePuru Date
 

Semelhante a Leading Managing a Sustainable Improvement Culture (20)

My CV
My CVMy CV
My CV
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016
 
Project Management The State of the Art
Project Management The State of the ArtProject Management The State of the Art
Project Management The State of the Art
 
Project Management The State Of The Art
Project Management The State Of The ArtProject Management The State Of The Art
Project Management The State Of The Art
 
Pmo
PmoPmo
Pmo
 
Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...
Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...
Banco de Credito del Peru - PMO Global Award Regional Winner - Americas - 201...
 
Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...
Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...
Symposium 2016 : Workshop 704 SYNERGY BETWEEN PROJECT MANAGEMENT AND PEOPLE C...
 
Neelesh Thakare CV.
Neelesh Thakare CV.Neelesh Thakare CV.
Neelesh Thakare CV.
 
How to Implement & Manage an Energy Management Program
How to Implement & Manage an Energy Management ProgramHow to Implement & Manage an Energy Management Program
How to Implement & Manage an Energy Management Program
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery Assessment
 
Webinar - Introduction to Programme Management, 23 February 2017, Alan Macklin
Webinar - Introduction to Programme Management, 23 February 2017, Alan MacklinWebinar - Introduction to Programme Management, 23 February 2017, Alan Macklin
Webinar - Introduction to Programme Management, 23 February 2017, Alan Macklin
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
PMI Cameroon 2017-2019 Strategic Plan
PMI Cameroon 2017-2019 Strategic PlanPMI Cameroon 2017-2019 Strategic Plan
PMI Cameroon 2017-2019 Strategic Plan
 
PRINCE2 quick guide
PRINCE2 quick guidePRINCE2 quick guide
PRINCE2 quick guide
 
Austin C Mattson II Resume Mar 2012
Austin C  Mattson II Resume Mar 2012Austin C  Mattson II Resume Mar 2012
Austin C Mattson II Resume Mar 2012
 
julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5julianearl-CV -20151108 Consult v1.5
julianearl-CV -20151108 Consult v1.5
 
2021| PMFT | E-BROCHURE
2021| PMFT | E-BROCHURE2021| PMFT | E-BROCHURE
2021| PMFT | E-BROCHURE
 
Project planning and control - Nov
Project planning and control - NovProject planning and control - Nov
Project planning and control - Nov
 
PgMP - Introduction to Program Management
PgMP -  Introduction to Program ManagementPgMP -  Introduction to Program Management
PgMP - Introduction to Program Management
 
PuruDate_Resume
PuruDate_ResumePuruDate_Resume
PuruDate_Resume
 

Mais de Alan Bassett

TOOLBOX TALK | noise and vibration
TOOLBOX TALK | noise and vibrationTOOLBOX TALK | noise and vibration
TOOLBOX TALK | noise and vibrationAlan Bassett
 
SAFETY ALERT | crane incident
SAFETY ALERT | crane incidentSAFETY ALERT | crane incident
SAFETY ALERT | crane incidentAlan Bassett
 
SAFETY ALERT | serious event silo explosion_11 5 2018 rv2
SAFETY ALERT | serious event silo explosion_11 5 2018 rv2SAFETY ALERT | serious event silo explosion_11 5 2018 rv2
SAFETY ALERT | serious event silo explosion_11 5 2018 rv2Alan Bassett
 
SAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalities
SAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalitiesSAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalities
SAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalitiesAlan Bassett
 
TOOLBOX TALK | dust and air quality
TOOLBOX TALK | dust and air qualityTOOLBOX TALK | dust and air quality
TOOLBOX TALK | dust and air qualityAlan Bassett
 
TOOLBOX TALK | Oxygen Enrichment
TOOLBOX TALK | Oxygen EnrichmentTOOLBOX TALK | Oxygen Enrichment
TOOLBOX TALK | Oxygen EnrichmentAlan Bassett
 
Safety alert 112 first aid
Safety alert 112 first aidSafety alert 112 first aid
Safety alert 112 first aidAlan Bassett
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsAlan Bassett
 
TOOLBOX TALK | safe use of lift trucks and telehandlers
TOOLBOX TALK | safe use of lift trucks and telehandlersTOOLBOX TALK | safe use of lift trucks and telehandlers
TOOLBOX TALK | safe use of lift trucks and telehandlersAlan Bassett
 
TOOLBOX TALK | Working at Height
TOOLBOX TALK | Working at HeightTOOLBOX TALK | Working at Height
TOOLBOX TALK | Working at HeightAlan Bassett
 
Ju t lifting bulletin
Ju t lifting bulletinJu t lifting bulletin
Ju t lifting bulletinAlan Bassett
 
02. point of work risk assessments
02. point of work risk assessments02. point of work risk assessments
02. point of work risk assessmentsAlan Bassett
 
45. 12 tips to a safe christmas
45. 12 tips to a safe christmas45. 12 tips to a safe christmas
45. 12 tips to a safe christmasAlan Bassett
 
Processed like-any-other-criminal
Processed like-any-other-criminalProcessed like-any-other-criminal
Processed like-any-other-criminalAlan Bassett
 
Toolbox talk alcohol substance_driving_2016
Toolbox talk alcohol substance_driving_2016Toolbox talk alcohol substance_driving_2016
Toolbox talk alcohol substance_driving_2016Alan Bassett
 
Safety bulletin 031 ring finger injuries
Safety bulletin 031 ring finger injuriesSafety bulletin 031 ring finger injuries
Safety bulletin 031 ring finger injuriesAlan Bassett
 
Toolbox talk jewellery
Toolbox talk jewelleryToolbox talk jewellery
Toolbox talk jewelleryAlan Bassett
 
40. work at height scaffold
40. work at height scaffold40. work at height scaffold
40. work at height scaffoldAlan Bassett
 
Grinder injury bos 17 10 16
Grinder injury bos 17 10 16Grinder injury bos 17 10 16
Grinder injury bos 17 10 16Alan Bassett
 

Mais de Alan Bassett (20)

TOOLBOX TALK | noise and vibration
TOOLBOX TALK | noise and vibrationTOOLBOX TALK | noise and vibration
TOOLBOX TALK | noise and vibration
 
SAFETY ALERT | crane incident
SAFETY ALERT | crane incidentSAFETY ALERT | crane incident
SAFETY ALERT | crane incident
 
SAFETY ALERT | serious event silo explosion_11 5 2018 rv2
SAFETY ALERT | serious event silo explosion_11 5 2018 rv2SAFETY ALERT | serious event silo explosion_11 5 2018 rv2
SAFETY ALERT | serious event silo explosion_11 5 2018 rv2
 
SAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalities
SAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalitiesSAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalities
SAFETY ALERT | Ig safety bulletin 3350 178 machine controller fatalities
 
TOOLBOX TALK | dust and air quality
TOOLBOX TALK | dust and air qualityTOOLBOX TALK | dust and air quality
TOOLBOX TALK | dust and air quality
 
TOOLBOX TALK | Oxygen Enrichment
TOOLBOX TALK | Oxygen EnrichmentTOOLBOX TALK | Oxygen Enrichment
TOOLBOX TALK | Oxygen Enrichment
 
Safety alert 112 first aid
Safety alert 112 first aidSafety alert 112 first aid
Safety alert 112 first aid
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
TOOLBOX TALK | safe use of lift trucks and telehandlers
TOOLBOX TALK | safe use of lift trucks and telehandlersTOOLBOX TALK | safe use of lift trucks and telehandlers
TOOLBOX TALK | safe use of lift trucks and telehandlers
 
TOOLBOX TALK | Working at Height
TOOLBOX TALK | Working at HeightTOOLBOX TALK | Working at Height
TOOLBOX TALK | Working at Height
 
Ju t lifting bulletin
Ju t lifting bulletinJu t lifting bulletin
Ju t lifting bulletin
 
02. point of work risk assessments
02. point of work risk assessments02. point of work risk assessments
02. point of work risk assessments
 
45. 12 tips to a safe christmas
45. 12 tips to a safe christmas45. 12 tips to a safe christmas
45. 12 tips to a safe christmas
 
Processed like-any-other-criminal
Processed like-any-other-criminalProcessed like-any-other-criminal
Processed like-any-other-criminal
 
Toolbox talk alcohol substance_driving_2016
Toolbox talk alcohol substance_driving_2016Toolbox talk alcohol substance_driving_2016
Toolbox talk alcohol substance_driving_2016
 
41. line of fire
41. line of fire41. line of fire
41. line of fire
 
Safety bulletin 031 ring finger injuries
Safety bulletin 031 ring finger injuriesSafety bulletin 031 ring finger injuries
Safety bulletin 031 ring finger injuries
 
Toolbox talk jewellery
Toolbox talk jewelleryToolbox talk jewellery
Toolbox talk jewellery
 
40. work at height scaffold
40. work at height scaffold40. work at height scaffold
40. work at height scaffold
 
Grinder injury bos 17 10 16
Grinder injury bos 17 10 16Grinder injury bos 17 10 16
Grinder injury bos 17 10 16
 

Leading Managing a Sustainable Improvement Culture

  • 1. MACNAUGHTON MCGREGOR LTD Leading & Managing a Sustainable Improvement Culture A Short Programme for Managers
  • 2. Leading and Managing a Sustainable Improvement Culture Most businesses already implement improvement activities, some on a formal basis using methods such as Six Sigma or Lean, others on a less formal basis using improvement tools and techniques. The challenge facing managers is in getting ‘improvement’ to be part of the day job; owned by everyone. This programme aims to fast-forward sustainable changes using management and implementation methods that can be replicated time over, ensuring that the gains made are maintained and repeated. About the Programme This programme is designed to provide managers with fast-track approaches that support and build improvement sustainability across their areas of responsibility and throughout the supply chain. Whether you are a manager with significant experience in delivering improvement activities, or new to the role of leading improvements, this programme will present the key stages and elements in developing a sustainable improvement culture which can repeatedly optimise efficiency and effectiveness. Our Approach The programme involves two interactive and practical workshops based around the central pillars of Business Acumen, Core Tools, Culture & Leadership, Support & Report. Key to our approach will be providing participants with the opportunity to engage in activities and discussions around improvement challenges in their current management roles. A critical element of the programme is the Improvement Project itself where participants will be required to follow the processes of identifying, defining, implementing, measuring & reporting on improvement outputs. Participants will have access to one-to-one support with improvement project areas. Macnaughton McGregor Ltd 1 st 1 Floor, 8 Lansdowne Terrace, Gosforth Newcastle upon Tyne NE3 1HN www.2macs.com
  • 3. Programme Delivery Schedule The programme will be delivered in 2 blocks of 2 days with a gap to allow participants to initiate, progress and receive support with their improvement projects. At the end of the programme participants will be asked to report the successes and learning points for their project using templates provided. Business Core Tools Culture & Support & Acumen 2-3 weeks Leadership Report Mapping Improvement Project definition Culture Types Visible Strategy to Cycles Management Operations & implementation Team & Base Management Supply Chain Project Measures Individual Perspectives Communication Definition Support Team Leadership Presentation Core Engagement Approaches Approaches Measures Techniques Improvement Project Leading & Managing a Sustainable Improvement Culture Our aim is to deliver programmes during Winter 2011 and Spring 2012 based upon a minimum of 8 participants per programme. Programmes can be delivered either in-house or at a venue to suit participating businesses. Macnaughton McGregor Ltd 2 st 1 Floor, 8 Lansdowne Terrace, Gosforth Newcastle upon Tyne NE3 1HN www.2macs.com
  • 4. Costs & Return on Investment The programme fees are £500 plus VAT per person which is fully inclusive of all delivery, programme materials, and individual support during the programme. We expect each participant to be able to achieve a minimum return of £1,250 through their improvement project, representing a 2.5 times return on the original cash investment on the initial improvement activity alone. Interested in Getting Involved? If you are interested in finding out more or booking a place on the programme, please email Vicky@2macs.com or telephone 0191 246 1160. Macnaughton McGregor Ltd 3 st 1 Floor, 8 Lansdowne Terrace, Gosforth Newcastle upon Tyne NE3 1HN www.2macs.com