Railway Engineering
Submitted by:
Akshay Kaushal (110134)
Jaspreet Singh (110138)
https://www.youtube.com/watch?v=pvg3e2P2TAo
History of Indian Railway
Railway Engineering
• It is a branch of civil engineering concerned with the design,
construction, maintenance, and operation of railways.
• Railway engineering includes elements of civil, mechanical,
industrial, and electrical engineering.
• Railway engineers handle the design, construction, and operation
of railroads and mass transit systems that use a fixed guideway
(such as light rail or even monorails).
• Typical tasks would include determining horizontal and vertical
alignment design, station location and design, construction cost
estimating, and establishment of signaling & controlling system.
• Railroad engineers can also move into the specialized field of
train dispatching which focuses on train movement control.
Section of Permanent Way
RAIL GAUGE
The gauge of a railway track is defined as the
clear minimum perpendicular distance between
the inner faces of the two rails.
Dimension of gauges
1. Broad Gauge(BG) 1676mm(5’6”)
2. Standard Gauge(SG) 1435mm
3. Metre Gauge(MG) 1000mm
4. Narrow Gauge(NG) 762mm(2’6”)
5. Light Gauge 610mm
Coning of Wheels
• Coning of wheels – The distance between the inside edges of
wheel flanges is generally kept less than the gauge. Gap is
about 38 mm on Either side. Normally the tyre is absolutely
ahead centre on the head of the rail, as the wheel is coned to
keep it in this central position automatically. These wheel are
coned at a slope
• Theory of coning:- On a level track, as soon as the axle moves
towards one rail, the diameter of the wheel tread over the rail
increases, while It decreases over the other rail. This prevents
to further movement And axle retreats back to its original
position (with equal dia or both rails and equal pressure on
both rails).
Coning of Wheel on Level-track
RAILS
The high carbon rolled steel sections, which are laid
end-to-end, in two parallel lines over sleepers to
provide continuous and leveled surface for the trains
to move and for carrying axle loads of the rolling
stock are called rails.
`
Functions of the rails:
To provide continuous and level surface for the
movement of trains with minimum friction with
steel wheels of the rolling stock;
Provide strength, durability and lateral guidance
to the track;
Transmit the axle loads to sleepers which transfer
the same load to the underlying ballast and
formation;
Bear the stresses developed due to heavy vertical
loads, breaking forces and temperature variance.
RAILS
Types of rails:
1. Double Headed Rails (DH Rails)
2. Bull Headed Rails (BH Rails)
3. Flat-footed Rails (FF Rails)
Length of Rails
On Indian Railways the standard lengths are the following:
Length = 12.80 m. (42 ft.) for BG (say 13 m) and
Length = 11.89 m. (39 ft.) for MG (say 12 m)
Corrugated or Roaring Rails
In certain places, head of rails are found to be
corrugated rather than smooth and straight,
when the vehicles pass over such rails, a roaring
sound is created which is intense enough to be
unpleasant.
Hogged Rails
Due to battering action of wheels over the end of the rails, the
rails get bent down and get deflected at the ends. These rails are
called hogged rails.
Measures taken to rectify the hogged rails are:
1. Cropping
2. Replacing
3. Welding
4. Dehogging
Reason of Hogging!
https://www.youtube.com/watch?v=9njqDgjIcWQ
Kinks In Rails
When the ends of adjoining rails move slightly out of position,
“shoulders” or “kinks” are formed.
Measures taken to rectify kinks in rails:
1. By correcting alignment at joints and at curved locations.
2. Proper packing of joints.
3. Proper maintenance of the track periodically in repect of
cross levels, gauge, alignment, welding of worn out portions
etc.
Buckling of Rails
Buckling means the track has gone out of its original position or
alignment due to prevention of expansion of rails in hot weather
on account of temperature variations.
Damaged Rails
These are the rails which should be removed on
account of their becoming unsafe for a railway
track.
Rail Features
• Crushed Heads
• Square or Angular Break
• Split Heads
• Split Web
• Horizontal Fissures
• Transverse Fissures
• Flowing Metal in Heads
• Horizontal Cracks
Crushed Head
Split Heads
Horizontal and Transverse Fissures
Flowing Metal in Heads
Rail Joints
• Supported Rail Joint
• Suspended Rail Joint
• Bridge Joint
• Base Joint
• Welded Rail Joint
• Staggered or Broken Joint
• Square or Even Joint
• Compromise Joint
• Insulated Joint
• Expansion Joint`
Rail Joint
Insulated Joint
Expansion Joint
Creep of Rails
Creep is defined as the longitudinal movement
of the rail with respect to the sleepers.
Defects of Creep
(i) Sleepers move out of position thereby the rail gauge.
(ii) Position of points and crossings are disturbed.
(iii) Interlocking mechanism gets
disturbed.
Remedies or Prevention of Creep
• Pulling back of rails
• Provision of Anchors or Anticreepers.
• Use of steel sleepers.
Anticreeper
Sleepers
Sleepers are the transverse ties that are laid to
support the rails. They transmit wheel load from
the rails to the ballast.
Classification of sleepers
(i) Wooden sleeper
(ii) Metal sleeper
Cast iron sleeper
Steel sleeper
(iii) Concrete sleeper
Reinforced concrete
Sleeper (R.C.C)
Prestressed Concrete
Sleeper .
Wooden Sleepers
• Hard wood such as, sal and teak
• Soft wood such as, chir and deodar
Metal Sleepers
Concrete Sleepers
Sleeper Density
Sleeper density is the number of sleepers Per
rail length. It is specified as (M+x) or (N+x),
where M or N is the length of the rail in meters
and x is a number that varies according to
factors such as axle load, speed, type & section
of the rail etc.
It varies in India from M+4 to M+7 for main
tracks.
Track Fittings & Fastenings
• Fish plates
• Spikes
– Dog spikes
– Screw spikes
– Round spikes
– Standard spikes
– Elastic spikes
• Bolts
– Dog or Hook bolt
– Fish bolt
– Rag bolt
– Fang nut and bolt
• Keys
– Wooden key for C.I. Chair
– M.S. key and steel trough
sleepers
– Stuart’s key
– Morgan key
– Cotter and tie bars
• Chairs
– Cast steel chairs
– Mild steel and Cast Iron
Slide Chairs
• Blocks
– Heel blocks
– Distance blocks
– Crossing blocks
– Check blocks
• Plates
– Bearing Plates
– Saddle Plates
Track Fittings & Fastenings contd..
Fish Plate
Dog Spike
Screw spikes
Chair
Bearing Plate
Ballast
To provide structural support for
the track, holding it in good line
and surface
To distribute the load evenly to the
subballast and subgrade and thus
help to provide stability
Provide for drainage
Ballast in railroad terminology is durable granular material placed between
the crosstie and the sub ballast to hold the track in line and grade.
The primary purposes of ballast are:
BALLAST
SUBBALLAST SUBGRADE
BALLAST SECTION
Types of Ballast
• Broken Stone
• Gravel or River Pebbles or Shingle
• Ashes or Cinders
• Sand
• Mooram
• Kankar
• Brick Ballast
• Blast Furnace Slag
• Selected Earth
Ballast Size
• For wooden sleepers = 5.1 cm
• For steel sleepers = 3.8 cm
• For under switches & crossings = 2.54 cm
Points & Crossings
• Points and crossings provide flexibility of
movement by connecting one line to another
according to requirements.
• They also help for imposing restrictions over
turnouts which necessarily retard the
movements.
• From safety aspect, it is also important as points
and crossings are weak kinks or points in the
track and vehicles are susceptible to derailments
at these places.
Turnouts
• It’s the simplest combination of points and crossings which
enables one track either a branch line or a siding, to take
off from another track.
• Parts of a turnout:
– A pair of points or switches
– A pair of stockrails
– A Vee crossing
– Two check rails
– Four lead rails
– Switch tie plate
– Studs or stops
– Bearing plates, slide chairs, stretcher bars etc.
– For operating the points – rods, cranks, levers etc.
– For locking system – locking box, lock bar, plunger bar etc.
Types of Switches
Crossings
A crossing or a frog is a device which provides two flangeways
through which the wheels of the flanges may move, when two
rails intersect each other at an angle.
Acute Angle Crossing
Diamond Crossing
Square Crossing
Track Junctions
• Turnouts
• Symmetrical split
• Three throw switch
• Double turnout or Tandem
• Diamond crossing
• Cross overs
• Single slip and double slip
• Gauntlet track and ladder tracks
• Temporary diversion
• Triangle
• Double junctions
Turnout
Symmetrical split
https://www.youtube.com/watch?v=L_wOPY5Pu-A
How Railway Track Changes
Signalling
It consists of the systems, devices and means by
which trains are operated efficiently and tracks
are used to maximum extent, maintaining the
safety of the passengers, the staff and the rolling
stock.
On the basis of Operating
Characteristics:
• Detonating Signals (Fog or audible signals)
• Hand signals (Visual Indication signals)
• Fixed signals (Visual Indication signals)
Detonating Signal
Hand Signals
Fixed Signals
• Stop or Semaphore type Signals
• Warner Signals
• Shunting Signals (Disc or Ground Signals)
• Coloured-light Signals
On the basis of Functional
Characteristics:
Semaphore type signals
Warner Signals
Shunting Signals
Coloured-light Signals
• Reception Signals
– Outer signals
– Home signals
• Departure Signals
– Starter
– Advance Starter
On the basis of Locational
Characteristics:
Departure Signals
• Repeater or Co-acting signals
• Routing Signals
• Calling on signals
• Point indicator
• Modified lower quadrant semaphore signal
• Miscellaneous signals
On the basis of Special Characteristics:
High Speed Bullet Train
https://www.youtube.com/watch?v=2-_yS60NhyM
THANK YOU

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Left hand turnout
Left hand turnoutLeft hand turnout
Left hand turnout
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018
 
P.way
P.wayP.way
P.way
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 

Destaque

Meter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gaugeMeter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gauge
Parv Garg
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
HARITSEHRAWAT
 
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Durga Rai
 

Destaque (20)

Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
 
Meter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gaugeMeter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gauge
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERING
 
03 superelevation and spiral curves
03 superelevation and spiral curves03 superelevation and spiral curves
03 superelevation and spiral curves
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Highway & Railway Engineering
Highway & Railway EngineeringHighway & Railway Engineering
Highway & Railway Engineering
 
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
 

Semelhante a Railway engineering

Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
Emaan Sharma
 

Semelhante a Railway engineering (20)

1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway and Airport Engineering
Railway and Airport EngineeringRailway and Airport Engineering
Railway and Airport Engineering
 
railwaypartPPT
railwaypartPPTrailwaypartPPT
railwaypartPPT
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
Points and crossings.ppt
Points and crossings.pptPoints and crossings.ppt
Points and crossings.ppt
 
Railway track
Railway trackRailway track
Railway track
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Escalators uol (1)
Escalators uol (1)Escalators uol (1)
Escalators uol (1)
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptx
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdf
 
3rd unit
3rd unit3rd unit
3rd unit
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
Railway Engineering: Points and crossings
Railway Engineering: Points and crossingsRailway Engineering: Points and crossings
Railway Engineering: Points and crossings
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 

Mais de Akshay D Nicator

Mais de Akshay D Nicator (9)

The Effect of Rise Husk Ash on Strength and Permeability of Concrete
The Effect of Rise Husk Ash on Strength and Permeability of ConcreteThe Effect of Rise Husk Ash on Strength and Permeability of Concrete
The Effect of Rise Husk Ash on Strength and Permeability of Concrete
 
Energy Conservation Through Green Buildings
Energy Conservation Through Green BuildingsEnergy Conservation Through Green Buildings
Energy Conservation Through Green Buildings
 
Paperspace in AutoCAD
Paperspace in AutoCADPaperspace in AutoCAD
Paperspace in AutoCAD
 
Wind loads
Wind loadsWind loads
Wind loads
 
An unpayable debt
An unpayable debt An unpayable debt
An unpayable debt
 
Recycled Concrete Aggregate - A Solid Wealth
Recycled Concrete Aggregate - A Solid WealthRecycled Concrete Aggregate - A Solid Wealth
Recycled Concrete Aggregate - A Solid Wealth
 
Use of Nanotechnology in Civil Engineering
Use of Nanotechnology in Civil EngineeringUse of Nanotechnology in Civil Engineering
Use of Nanotechnology in Civil Engineering
 
I Wish We Could Run Away
I Wish We Could Run AwayI Wish We Could Run Away
I Wish We Could Run Away
 
Manmade Disasters
Manmade DisastersManmade Disasters
Manmade Disasters
 

Último

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Último (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Railway engineering

  • 1. Railway Engineering Submitted by: Akshay Kaushal (110134) Jaspreet Singh (110138)
  • 3. Railway Engineering • It is a branch of civil engineering concerned with the design, construction, maintenance, and operation of railways. • Railway engineering includes elements of civil, mechanical, industrial, and electrical engineering. • Railway engineers handle the design, construction, and operation of railroads and mass transit systems that use a fixed guideway (such as light rail or even monorails). • Typical tasks would include determining horizontal and vertical alignment design, station location and design, construction cost estimating, and establishment of signaling & controlling system. • Railroad engineers can also move into the specialized field of train dispatching which focuses on train movement control.
  • 5. RAIL GAUGE The gauge of a railway track is defined as the clear minimum perpendicular distance between the inner faces of the two rails.
  • 6. Dimension of gauges 1. Broad Gauge(BG) 1676mm(5’6”) 2. Standard Gauge(SG) 1435mm 3. Metre Gauge(MG) 1000mm 4. Narrow Gauge(NG) 762mm(2’6”) 5. Light Gauge 610mm
  • 7. Coning of Wheels • Coning of wheels – The distance between the inside edges of wheel flanges is generally kept less than the gauge. Gap is about 38 mm on Either side. Normally the tyre is absolutely ahead centre on the head of the rail, as the wheel is coned to keep it in this central position automatically. These wheel are coned at a slope • Theory of coning:- On a level track, as soon as the axle moves towards one rail, the diameter of the wheel tread over the rail increases, while It decreases over the other rail. This prevents to further movement And axle retreats back to its original position (with equal dia or both rails and equal pressure on both rails).
  • 8. Coning of Wheel on Level-track
  • 9. RAILS The high carbon rolled steel sections, which are laid end-to-end, in two parallel lines over sleepers to provide continuous and leveled surface for the trains to move and for carrying axle loads of the rolling stock are called rails. `
  • 10. Functions of the rails: To provide continuous and level surface for the movement of trains with minimum friction with steel wheels of the rolling stock; Provide strength, durability and lateral guidance to the track; Transmit the axle loads to sleepers which transfer the same load to the underlying ballast and formation; Bear the stresses developed due to heavy vertical loads, breaking forces and temperature variance.
  • 11. RAILS Types of rails: 1. Double Headed Rails (DH Rails) 2. Bull Headed Rails (BH Rails) 3. Flat-footed Rails (FF Rails)
  • 12. Length of Rails On Indian Railways the standard lengths are the following: Length = 12.80 m. (42 ft.) for BG (say 13 m) and Length = 11.89 m. (39 ft.) for MG (say 12 m)
  • 13. Corrugated or Roaring Rails In certain places, head of rails are found to be corrugated rather than smooth and straight, when the vehicles pass over such rails, a roaring sound is created which is intense enough to be unpleasant.
  • 14. Hogged Rails Due to battering action of wheels over the end of the rails, the rails get bent down and get deflected at the ends. These rails are called hogged rails. Measures taken to rectify the hogged rails are: 1. Cropping 2. Replacing 3. Welding 4. Dehogging
  • 16. Kinks In Rails When the ends of adjoining rails move slightly out of position, “shoulders” or “kinks” are formed. Measures taken to rectify kinks in rails: 1. By correcting alignment at joints and at curved locations. 2. Proper packing of joints. 3. Proper maintenance of the track periodically in repect of cross levels, gauge, alignment, welding of worn out portions etc.
  • 17. Buckling of Rails Buckling means the track has gone out of its original position or alignment due to prevention of expansion of rails in hot weather on account of temperature variations.
  • 18. Damaged Rails These are the rails which should be removed on account of their becoming unsafe for a railway track.
  • 19. Rail Features • Crushed Heads • Square or Angular Break • Split Heads • Split Web • Horizontal Fissures • Transverse Fissures • Flowing Metal in Heads • Horizontal Cracks
  • 24.
  • 25. Rail Joints • Supported Rail Joint • Suspended Rail Joint • Bridge Joint • Base Joint • Welded Rail Joint • Staggered or Broken Joint • Square or Even Joint • Compromise Joint • Insulated Joint • Expansion Joint`
  • 27.
  • 30. Creep of Rails Creep is defined as the longitudinal movement of the rail with respect to the sleepers.
  • 31. Defects of Creep (i) Sleepers move out of position thereby the rail gauge. (ii) Position of points and crossings are disturbed. (iii) Interlocking mechanism gets disturbed.
  • 32. Remedies or Prevention of Creep • Pulling back of rails • Provision of Anchors or Anticreepers. • Use of steel sleepers. Anticreeper
  • 33. Sleepers Sleepers are the transverse ties that are laid to support the rails. They transmit wheel load from the rails to the ballast.
  • 34. Classification of sleepers (i) Wooden sleeper (ii) Metal sleeper Cast iron sleeper Steel sleeper (iii) Concrete sleeper Reinforced concrete Sleeper (R.C.C) Prestressed Concrete Sleeper .
  • 35. Wooden Sleepers • Hard wood such as, sal and teak • Soft wood such as, chir and deodar
  • 38. Sleeper Density Sleeper density is the number of sleepers Per rail length. It is specified as (M+x) or (N+x), where M or N is the length of the rail in meters and x is a number that varies according to factors such as axle load, speed, type & section of the rail etc. It varies in India from M+4 to M+7 for main tracks.
  • 39. Track Fittings & Fastenings • Fish plates • Spikes – Dog spikes – Screw spikes – Round spikes – Standard spikes – Elastic spikes • Bolts – Dog or Hook bolt – Fish bolt – Rag bolt – Fang nut and bolt • Keys – Wooden key for C.I. Chair – M.S. key and steel trough sleepers – Stuart’s key – Morgan key – Cotter and tie bars • Chairs – Cast steel chairs – Mild steel and Cast Iron Slide Chairs
  • 40. • Blocks – Heel blocks – Distance blocks – Crossing blocks – Check blocks • Plates – Bearing Plates – Saddle Plates Track Fittings & Fastenings contd..
  • 44. Chair
  • 46. Ballast To provide structural support for the track, holding it in good line and surface To distribute the load evenly to the subballast and subgrade and thus help to provide stability Provide for drainage Ballast in railroad terminology is durable granular material placed between the crosstie and the sub ballast to hold the track in line and grade. The primary purposes of ballast are:
  • 48. Types of Ballast • Broken Stone • Gravel or River Pebbles or Shingle • Ashes or Cinders • Sand • Mooram • Kankar • Brick Ballast • Blast Furnace Slag • Selected Earth
  • 49. Ballast Size • For wooden sleepers = 5.1 cm • For steel sleepers = 3.8 cm • For under switches & crossings = 2.54 cm
  • 50. Points & Crossings • Points and crossings provide flexibility of movement by connecting one line to another according to requirements. • They also help for imposing restrictions over turnouts which necessarily retard the movements. • From safety aspect, it is also important as points and crossings are weak kinks or points in the track and vehicles are susceptible to derailments at these places.
  • 51. Turnouts • It’s the simplest combination of points and crossings which enables one track either a branch line or a siding, to take off from another track. • Parts of a turnout: – A pair of points or switches – A pair of stockrails – A Vee crossing – Two check rails – Four lead rails – Switch tie plate – Studs or stops – Bearing plates, slide chairs, stretcher bars etc. – For operating the points – rods, cranks, levers etc. – For locking system – locking box, lock bar, plunger bar etc.
  • 52.
  • 53.
  • 55. Crossings A crossing or a frog is a device which provides two flangeways through which the wheels of the flanges may move, when two rails intersect each other at an angle.
  • 59. Track Junctions • Turnouts • Symmetrical split • Three throw switch • Double turnout or Tandem • Diamond crossing • Cross overs • Single slip and double slip • Gauntlet track and ladder tracks • Temporary diversion • Triangle • Double junctions
  • 63. Signalling It consists of the systems, devices and means by which trains are operated efficiently and tracks are used to maximum extent, maintaining the safety of the passengers, the staff and the rolling stock.
  • 64. On the basis of Operating Characteristics: • Detonating Signals (Fog or audible signals) • Hand signals (Visual Indication signals) • Fixed signals (Visual Indication signals)
  • 68. • Stop or Semaphore type Signals • Warner Signals • Shunting Signals (Disc or Ground Signals) • Coloured-light Signals On the basis of Functional Characteristics:
  • 73. • Reception Signals – Outer signals – Home signals • Departure Signals – Starter – Advance Starter On the basis of Locational Characteristics:
  • 75. • Repeater or Co-acting signals • Routing Signals • Calling on signals • Point indicator • Modified lower quadrant semaphore signal • Miscellaneous signals On the basis of Special Characteristics:
  • 76. High Speed Bullet Train https://www.youtube.com/watch?v=2-_yS60NhyM