A PRESENTATION ON
STEAM POWER
PLANT
BY:
ANKIT RAJ
EEE,6th
sem
100210722421
CT Institute of
technology,
jalandhar
INDEX
CHAPTE
R NO.
CONTENT PAGE
NO.
1. INTRODUCTION
2. CLASSIFICATION OF STEAM POWER PLANT
3. LAYOUT OF A MODERN STEAM POWER
PLANT
4. SELECTION OF SITE FOR STEAM POWER
PLANT
5. COAL HANDLING SYSTEM
6. COMBUSTION SYSTEM
7. ASH HANDLING SYSTEM
8. BOILER
9. FEED PUMPS
10. ECONOMIZER
11. AIR-PREHEATER & SUPERHEATER
 INTRODUCTION OF STEAM POWER PLANT
• In india 65% of power is generated by steam or thermal
power plant.
• A steam power plant converts the chemical energy of the
fuels into mechanical/electrical energy.
 video of steam power plant
 CLASSIFICATION OF STEAM POWER PLANTS
 The steam power plants may be classified as follows:
1.Central stations.
2.Industrial power stations or captive power stations
1) Central stations : These stations is meant for general sale to the
customers who wish to purchase it.
2) Industrial power stations : This type of power station is run by a
manufacturing company for its own use & its output is not available
for general sale.
RANKINE CYCLE PROCESS & LAYOUT
 LAYOUT OF A MODERN STEAM POWER PLANT
Description about layout of steam power plant
• The layout of a modern steam power plant
comprises of the following four circuits :
1). Coal and Ash handling system
2). Air and gas Circuit
3.) Feed water and Steam flow circuit
4.) Cooling Water circuit
Components of a modern steam power plant:
1. Boiler 2. steam turbine
3. Generator 4. condenser
5. Cooling towers 6. circulating water pump
7. Boiler feed pump 8. wagon tippler
9. Crusher house 10. coal mill
11. Induced draught fans 12. Ash precipitators
13. Boiler chimney 14. Forced draught fans
15. Water treatment plant 16. Control room
17. Switch yard
Essential requirements of steam power plants
1. Reliability
2. Minimum capital cost
3. Minimum operating & maintenance cost
4. Capacity to meet peak load effectively
5. Minimum losses of energy in transmission
6. Low cost of energy supplied to the consumers
7. Reserve capacity to meet future demands
8. Simplicity of design
9. Use of automatic equipment
 SELECTION OF SITE FOR STEAM POWER STATION
• The following points should be taken into consideration while
selecting the site for a steam power station:
1. Availability of raw material 2. Nature of land
3. Cost of Land 4. Availability of water
5. Transport facilities 6. Ash disposal Facilities
7.Availability of labour 8. Size of the plant
9. Load centre 10. Public problems
11. Future extensions
COMBUSTION SYSTEM
general Aspects:
 The combustion equipment is a component of the steam generator. Since
of heat is the combustion of a fuel, a working unit must have, whatever,
equipment is necessary to receive the fuel & air, proportioned to each
other & to the boiler steam demand, mix, ignite, and perform any other
special combustion duties, such as distillation of volatile from coal prior
to ignition.
 Basic requirements :
1. Through mixing of fuel & air.
2. Ready & accurate response of rate of fuel feed to load.
3. Practical distillation of volatile components of coal.
4. Adequate control over point formation & accumulation of ASH, when
coal is the fuel.
ASH HANDLING SYSTEM
• Burning of pulverized coal in the furnace results in the generation of
large quantity of ash . This ash constitutes of 80% fly ash and 20%
bottom ash. Fly ash is one of the residues generated in combustion,
and comprises the fine particles that rise with the flue gases.
• A station using low grade fuel has to deal with large quantities of
ash. Handling of ash includes :
1. Its removal from the furnace.
2. Loading on the conveyers and delivery to the fill or dump from
where it can be disposed off by sale or otherwise.
ASH HANDLING CHARACTERISTICS
 A good ash handling plant should have the following characteristics :
1. It should have enough capacity to collect the large amount of ash that may be produced in a
station.
2. It should be able to handle hot and wet ash effectively and with good speed.
3. The plant should not cost much.
4. The operation charges should be minimum possible.
5. The operation of the plant should be noiseless as much as possible.
6. The plant should have high rate of handling.
7. The plant should be able to operate effectively under variable load conditions.
8. Commonly used equipment: belt conveyor, Trollies or rails cars etc.
ASH HANDLING EQUIPMENTS:
• The commonly used equipment for ash handling in large & medium
size plants may comprise of:
1. Bucket elevator
2. Bucket conveyor
3. Belt conveyor
4. Pneumatic conveyor
5. Hydraulic sluicing equipment
6. Trollies or rail cars etc.
 CLASSIFICATION OF ASH HANDLING SYSTEM :
 The modern ash-handling system are mainly classified into four groups :
1). Mechanical Handling system: This system is generally employed for low
capacity power plants using coal as fuel.
2.). Hydraulic system: In this system ash is carried with the flow of water with high
velocity through a channel & finally dumped in the sump.
3). Pneumatic system: This system can handle abrasive ash as well as fine dusty
materials such as fly ash.
4). Steam jet system: In this case steam at sufficiently high velocity is passed
through a pipe & dry solid materials of considerable size are carried along
with it.
FLY ASH DISPOSAL SYSTEM
• Burning of pulverized coal in the furnace results
in the generation of large quantity of ash . This
ash constitutes of 80% fly ash and 20% bottom
ash. Fly ash is one of the residues generated in
combustion, and comprises the fine particles that
rise with the flue gases.
 Fly Ash System
ESP
HOPPER
TRANSMITTER VESSEL
FLY ASH SILO
SPOUT/ASH CONDITIONER
CLOSE/OPEN TRUCK
 USES OF FLY ASH
• For road construction
• Cement production
• Stabilization of soft soils
• Mine reclamation
• Mineral filler in asphaltic concrete
• Bricks
MAIN PARTS OF ASH DISPOSAL SYSTEM
1. ELECTROSTATIC PRECIPITATOR (ESP)
2. HOPPER
 TRANSMITTER VESSEL
 BOILER
 Boiler is an apparatus to produce steam.
 Thermal energy released by combustion of fuel issued to
make steam at the desired temperature and pressure.
The steam produced is used for:
1). For generating power in steam engines or steam
turbines.
2). Heating the residential and industrial buildings.
3). Performing certain processes in the sugar mills,
chemical and textile industries.
 BOILER PROPERTIES
a). Safety: The boiler should be safe under the operating conditions.
b). Accessibility: the various part of boiler should be accessible for
repair & maintenance.
c). Capacity: Should be capable of supplying Steam according to the
requirements.
d). Efficiency: Should be able to absorb a maximum amount of heat
produced due to burning of fuel in the furnace.
e). It should be simple in construction.
f). Its initial cost and maintenance cost is low.
g). It should be capable of quick starting and loading.
 CLASSIFICATION OF BOILERS
• According to what flows in the TUBE :
a). FIRE TUBE
b). WATER TUBE
a). FIRE TUBE BOILERS
b). WATER TUBE BOILERS
Comparison between Fire-tube & water-tube boilers
S no. Particulars Fire tube boilers Water tube boilers
1. Mode of firing Internally fired Externally fired
2. Rate of steam
production
lower Higher
3. construction Difficult Simple
4. transportation Difficult Simple
5. Treatment of water Not so necessary More necessary
6. Operating pressure Limited to 16 bar Under high pressure as
100 bar
7. Floor area More floor area Less floor area
8. Shell diameter Large for same power Small same power
9. explosion Less More
10. Risk of bursting lesser More risk
 MERITS OF WATER TUBE BOILER OVER FIRE TUBE
BOILER :
a). Generation of steam is much quicker due to small ratio of water content to
steam content . This also helps in reaching the steaming temperature in short
time.
b). Its evaporative capacity is considerably larger and the steam pressure range is
also high.
c). Heating surfaces are more effective as the hot gases travel at right angles to the
direction of water flow.
d). The boiler can be easily transported and erected as its different parts can be
separated.
e). The combustion efficiency is higher because complete combustion of fuel is
possible as the combustion space is much larger.
f). All parts of the water tube boilers are easily accessible for cleaning, inspecting
and repairing.
 TYPES OF FIRE TUBE BOILERS
• There are mainly five types of fire tube boilers :
1). Simple vertical boiler
2). Cochran boiler
3.) Cornish boiler
4). Lancashire boiler
5). Locomotive boilers
1). SIMPLE VERTICAL BOILER
• It consist of a cylindrical shell,
the greater portion of which is
full of water & remaining is
the steam space.
• At the bottom of the fire box is
grate on which fuel is burnt
and the ash from it falls in the
ash pit.
• A simple vertical boiler is self-
contained & can be easily
transported.
2). COCHRAN BOILER
• It is one of the best types of
vertical multi-tubular boiler,
and has a number of horizontal
fir tubes.
• Cochran boiler consist of a
cylindrical shell with a dome
shaped top where the space is
provided for steam.
3). CORNISH BOILER
 It consists of a cylindrical shell
with flat ends through which
passes a smaller flue tube
containing the furnace.
• The products of combustion
pass from the fire grate
forward over the brickwork
bridge to the end of the
furnace tube.
4). LANCASHIRE BOILER
• This boiler is reliable, has
simplicity of design, ease of
operation & less operating &
maintenance costs.
• It is commonly used in sugar-
mills & textile industries
where along with the power
system & steam for the process
work is also needed.
5). LOCOMOTIVE BOILERS
About Locomotive boilers :
• Locomotive boiler is a horizontal fire tube type mobile boiler. The main
requirement of this boiler is that it should produce steam at a very high
rate. Therefore, this boiler requires a large amount of heating surface
and large grate area to burn coal at a rapid rate. In order to provide the
large heating surface area, a large number of fire tubes are setup and
heat transfer rate is increased by creating strong draught by means of
steam jet.
• ADVANTAGE :
a. Large rate of steam generation per square metre of heating surface. To
some extent this is due to the vibration caused by the motion.
b. It is very compact.
c. The pressure of the steam is limited to about 20 bar.
 WATER TUBE BOILERS ARE CLASSIFIED AS :
1). Horizontal Straight tube boiler
There are two types of Horizontal straight tube boiler:
a. Longitudinal drum
b. Cross drum
there are three types of cross drum boiler :
1. two drum
2. four drum
3. three drum
2). Bent tube boiler
There are one type of bent tube boiler :
a. Low head three drum
 BOILER PERFORMANCE
1). Evaporative capacity :
It can be expressed in terms of :
a. kg of steam/hr
b. kg of hour/hr/m2 of heating surface
c. kg of steam/kg of fuel fired
2). Factor of Evaporation
• It is defined as the ratio of the heat received by 1kg of water at the
working conditions to that received by 1 kg of water evaporated from
and at 100 degree.
 FEED PUMP
 The feed pump is a pump
which is used to deliver feed
water to the boiler. It is a
desirable that the quantity of
water supplied should be at
least equal to the evaporated
and supplied to the engine.
 Two types of pumps which are
commonly used as feed pumps
are :
1. Reciprocating pumps
2. Rotary pumps
 ECONOMISER
• An economiser is a device in
which the waste of heat of the
flue gases is utilised for
heating the feed water.
• Economiser are mainly two
types:
a. Independent type
b. Integral type
About economiser
• The above figure shows that an independent type vertical tube
economiser. It is also called Green’s economiser.
• It is employed for boilers of medium pressure range upto about 25
bar.
• It consists of a large no. of vertical cast iron pipes p which are
connected with two horizontal pipes, one at the top & the other at
the bottom.
• Advantage:
overall efficiency of the plant is increased.
 AIR PREHEATER & SUPER HEATER
 AIR PREHEATER :
The function of the air preheater is to increases the temperature of
air before it enters the furnace. It is generally placed after the
economiser ; so the flue gases pass through the economiser & then
to the air.
• Degree of heating depends upon :
1. type of fuel
2. type of fuel burning equipment
3. rating at which the boiler & furnace are operated
About Air preheater
• There are three types of air
preheater:
1. Tubular type
2. Plate type
3. Storage type
• This pic shows that a tubular
type air preheater.
Super heater
• The function of a super heater is to increase the temperature of the
steam above its saturation point.
• Superheated steam has the following advantages:
1 steam consumption of the engine or turbine is reduced.
2. Efficiency of the steam plant is increased.
• There are two types of super heaters:
1. convective super heater
2. Radiant super heater

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Steam Power Plants
Steam Power PlantsSteam Power Plants
Steam Power Plants
 
Power Generation and Steam power plant
Power Generation and Steam power plantPower Generation and Steam power plant
Power Generation and Steam power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppe
 
Study of corrosion and erosion in boilers
Study of corrosion and erosion in boilersStudy of corrosion and erosion in boilers
Study of corrosion and erosion in boilers
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ppe unit 2
Ppe unit 2Ppe unit 2
Ppe unit 2
 
Thermal power plant1
Thermal power plant1Thermal power plant1
Thermal power plant1
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
STEAM POWER PLANT : COMBUSTION PROCESS
STEAM POWER PLANT  : COMBUSTION PROCESS STEAM POWER PLANT  : COMBUSTION PROCESS
STEAM POWER PLANT : COMBUSTION PROCESS
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
power plant engineering Unit 1
power plant engineering Unit 1power plant engineering Unit 1
power plant engineering Unit 1
 
Steam power plant
Steam power plant Steam power plant
Steam power plant
 
Ppe unit 1
Ppe unit 1Ppe unit 1
Ppe unit 1
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plant
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Steam power plant 2
Steam power plant 2Steam power plant 2
Steam power plant 2
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Steam Power Plant
Steam Power Plant Steam Power Plant
Steam Power Plant
 

Destaque

Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant Enamul Khan
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)Ranjeet Kumar
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAmay Jain
 
Gas turbine power plants
Gas turbine power plantsGas turbine power plants
Gas turbine power plantsNishkam Dhiman
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power PlantsDebajyoti Bose
 
CoalFireSteamPowerPlant System
CoalFireSteamPowerPlant SystemCoalFireSteamPowerPlant System
CoalFireSteamPowerPlant Systems4712io
 
New Coke Perception
New Coke PerceptionNew Coke Perception
New Coke Perceptionfaiz moh
 
Zeev Fisher Company Ip Policy In Light Of An Upcoming Crisis
Zeev Fisher   Company Ip Policy In Light Of An Upcoming CrisisZeev Fisher   Company Ip Policy In Light Of An Upcoming Crisis
Zeev Fisher Company Ip Policy In Light Of An Upcoming CrisisMIT Forum of Israel
 
Turbine Inlet Air Cooling (TIAC) - ARANER
Turbine Inlet Air Cooling (TIAC) - ARANERTurbine Inlet Air Cooling (TIAC) - ARANER
Turbine Inlet Air Cooling (TIAC) - ARANERARANER
 
Patents 101 and Patent Prosecution Overview and Costs
Patents 101 and Patent Prosecution Overview and CostsPatents 101 and Patent Prosecution Overview and Costs
Patents 101 and Patent Prosecution Overview and CostsLarry Baratta
 
Case study of patent development
Case study of patent developmentCase study of patent development
Case study of patent developmentajay maheshwari
 
A project report on coco cola
A project report on coco colaA project report on coco cola
A project report on coco colayerroju venkatesh
 
whose Basmati it is?- case solution
whose Basmati it is?- case solutionwhose Basmati it is?- case solution
whose Basmati it is?- case solutionSunny Gandhi
 

Destaque (20)

Steam Power Plants
Steam Power PlantsSteam Power Plants
Steam Power Plants
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 
STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
Gas turbine power plants
Gas turbine power plantsGas turbine power plants
Gas turbine power plants
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
CoalFireSteamPowerPlant System
CoalFireSteamPowerPlant SystemCoalFireSteamPowerPlant System
CoalFireSteamPowerPlant System
 
New Coke Perception
New Coke PerceptionNew Coke Perception
New Coke Perception
 
Zeev Fisher Company Ip Policy In Light Of An Upcoming Crisis
Zeev Fisher   Company Ip Policy In Light Of An Upcoming CrisisZeev Fisher   Company Ip Policy In Light Of An Upcoming Crisis
Zeev Fisher Company Ip Policy In Light Of An Upcoming Crisis
 
Turbine Inlet Air Cooling (TIAC) - ARANER
Turbine Inlet Air Cooling (TIAC) - ARANERTurbine Inlet Air Cooling (TIAC) - ARANER
Turbine Inlet Air Cooling (TIAC) - ARANER
 
Patents 101 and Patent Prosecution Overview and Costs
Patents 101 and Patent Prosecution Overview and CostsPatents 101 and Patent Prosecution Overview and Costs
Patents 101 and Patent Prosecution Overview and Costs
 
my presentation on turbines
my presentation on turbinesmy presentation on turbines
my presentation on turbines
 
Case Study of Coca Cola
Case Study of Coca ColaCase Study of Coca Cola
Case Study of Coca Cola
 
GAS TURBINE
GAS TURBINEGAS TURBINE
GAS TURBINE
 
Case study of patent development
Case study of patent developmentCase study of patent development
Case study of patent development
 
A project report on coco cola
A project report on coco colaA project report on coco cola
A project report on coco cola
 
whose Basmati it is?- case solution
whose Basmati it is?- case solutionwhose Basmati it is?- case solution
whose Basmati it is?- case solution
 

Semelhante a 1727092 634985076667011250

B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersRai University
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersRai University
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
Power plant engineering
Power plant engineeringPower plant engineering
Power plant engineeringnareshmeb
 
Boiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharelBoiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharelansaluniversity3
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilersTariq Jamshaid
 
Atd boilers unit 4 ppt
Atd boilers unit 4 pptAtd boilers unit 4 ppt
Atd boilers unit 4 pptMadhu Mahesh
 
Power plant by ejaz
Power plant by ejazPower plant by ejaz
Power plant by ejazDrEjaz1
 
Power plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghPower plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghVarun Pratap Singh
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTS.Vijaya Bhaskar
 

Semelhante a 1727092 634985076667011250 (20)

Reading
ReadingReading
Reading
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilers
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilers
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Steam boilers
Steam boilersSteam boilers
Steam boilers
 
Power plant engineering
Power plant engineeringPower plant engineering
Power plant engineering
 
boilers
boilersboilers
boilers
 
Boilers
BoilersBoilers
Boilers
 
Boiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharelBoiler(Introduction,classification and it's types) by sujan kharel
Boiler(Introduction,classification and it's types) by sujan kharel
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilers
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANT
 
sugar mill ss.pptx
sugar mill ss.pptxsugar mill ss.pptx
sugar mill ss.pptx
 
Atd boilers unit 4 ppt
Atd boilers unit 4 pptAtd boilers unit 4 ppt
Atd boilers unit 4 ppt
 
Steam genrator
Steam genratorSteam genrator
Steam genrator
 
Boiler
BoilerBoiler
Boiler
 
Power plant by ejaz
Power plant by ejazPower plant by ejaz
Power plant by ejaz
 
Power plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap SinghPower plant engineering unit 2 notes by Varun Pratap Singh
Power plant engineering unit 2 notes by Varun Pratap Singh
 
Unit 4 b nuclear
Unit 4 b nuclearUnit 4 b nuclear
Unit 4 b nuclear
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANT
 

Último

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 

Último (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

1727092 634985076667011250

  • 1. A PRESENTATION ON STEAM POWER PLANT BY: ANKIT RAJ EEE,6th sem 100210722421 CT Institute of technology, jalandhar
  • 2. INDEX CHAPTE R NO. CONTENT PAGE NO. 1. INTRODUCTION 2. CLASSIFICATION OF STEAM POWER PLANT 3. LAYOUT OF A MODERN STEAM POWER PLANT 4. SELECTION OF SITE FOR STEAM POWER PLANT 5. COAL HANDLING SYSTEM 6. COMBUSTION SYSTEM 7. ASH HANDLING SYSTEM 8. BOILER 9. FEED PUMPS 10. ECONOMIZER 11. AIR-PREHEATER & SUPERHEATER
  • 3.  INTRODUCTION OF STEAM POWER PLANT • In india 65% of power is generated by steam or thermal power plant. • A steam power plant converts the chemical energy of the fuels into mechanical/electrical energy.
  • 4.  video of steam power plant
  • 5.  CLASSIFICATION OF STEAM POWER PLANTS  The steam power plants may be classified as follows: 1.Central stations. 2.Industrial power stations or captive power stations 1) Central stations : These stations is meant for general sale to the customers who wish to purchase it. 2) Industrial power stations : This type of power station is run by a manufacturing company for its own use & its output is not available for general sale.
  • 7.  LAYOUT OF A MODERN STEAM POWER PLANT
  • 8. Description about layout of steam power plant • The layout of a modern steam power plant comprises of the following four circuits : 1). Coal and Ash handling system 2). Air and gas Circuit 3.) Feed water and Steam flow circuit 4.) Cooling Water circuit
  • 9. Components of a modern steam power plant: 1. Boiler 2. steam turbine 3. Generator 4. condenser 5. Cooling towers 6. circulating water pump 7. Boiler feed pump 8. wagon tippler 9. Crusher house 10. coal mill 11. Induced draught fans 12. Ash precipitators 13. Boiler chimney 14. Forced draught fans 15. Water treatment plant 16. Control room 17. Switch yard
  • 10. Essential requirements of steam power plants 1. Reliability 2. Minimum capital cost 3. Minimum operating & maintenance cost 4. Capacity to meet peak load effectively 5. Minimum losses of energy in transmission 6. Low cost of energy supplied to the consumers 7. Reserve capacity to meet future demands 8. Simplicity of design 9. Use of automatic equipment
  • 11.  SELECTION OF SITE FOR STEAM POWER STATION • The following points should be taken into consideration while selecting the site for a steam power station: 1. Availability of raw material 2. Nature of land 3. Cost of Land 4. Availability of water 5. Transport facilities 6. Ash disposal Facilities 7.Availability of labour 8. Size of the plant 9. Load centre 10. Public problems 11. Future extensions
  • 12. COMBUSTION SYSTEM general Aspects:  The combustion equipment is a component of the steam generator. Since of heat is the combustion of a fuel, a working unit must have, whatever, equipment is necessary to receive the fuel & air, proportioned to each other & to the boiler steam demand, mix, ignite, and perform any other special combustion duties, such as distillation of volatile from coal prior to ignition.  Basic requirements : 1. Through mixing of fuel & air. 2. Ready & accurate response of rate of fuel feed to load. 3. Practical distillation of volatile components of coal. 4. Adequate control over point formation & accumulation of ASH, when coal is the fuel.
  • 13. ASH HANDLING SYSTEM • Burning of pulverized coal in the furnace results in the generation of large quantity of ash . This ash constitutes of 80% fly ash and 20% bottom ash. Fly ash is one of the residues generated in combustion, and comprises the fine particles that rise with the flue gases. • A station using low grade fuel has to deal with large quantities of ash. Handling of ash includes : 1. Its removal from the furnace. 2. Loading on the conveyers and delivery to the fill or dump from where it can be disposed off by sale or otherwise.
  • 14. ASH HANDLING CHARACTERISTICS  A good ash handling plant should have the following characteristics : 1. It should have enough capacity to collect the large amount of ash that may be produced in a station. 2. It should be able to handle hot and wet ash effectively and with good speed. 3. The plant should not cost much. 4. The operation charges should be minimum possible. 5. The operation of the plant should be noiseless as much as possible. 6. The plant should have high rate of handling. 7. The plant should be able to operate effectively under variable load conditions. 8. Commonly used equipment: belt conveyor, Trollies or rails cars etc.
  • 15. ASH HANDLING EQUIPMENTS: • The commonly used equipment for ash handling in large & medium size plants may comprise of: 1. Bucket elevator 2. Bucket conveyor 3. Belt conveyor 4. Pneumatic conveyor 5. Hydraulic sluicing equipment 6. Trollies or rail cars etc.
  • 16.  CLASSIFICATION OF ASH HANDLING SYSTEM :  The modern ash-handling system are mainly classified into four groups : 1). Mechanical Handling system: This system is generally employed for low capacity power plants using coal as fuel. 2.). Hydraulic system: In this system ash is carried with the flow of water with high velocity through a channel & finally dumped in the sump. 3). Pneumatic system: This system can handle abrasive ash as well as fine dusty materials such as fly ash. 4). Steam jet system: In this case steam at sufficiently high velocity is passed through a pipe & dry solid materials of considerable size are carried along with it.
  • 17. FLY ASH DISPOSAL SYSTEM • Burning of pulverized coal in the furnace results in the generation of large quantity of ash . This ash constitutes of 80% fly ash and 20% bottom ash. Fly ash is one of the residues generated in combustion, and comprises the fine particles that rise with the flue gases.
  • 18.  Fly Ash System ESP HOPPER TRANSMITTER VESSEL FLY ASH SILO SPOUT/ASH CONDITIONER CLOSE/OPEN TRUCK
  • 19.  USES OF FLY ASH • For road construction • Cement production • Stabilization of soft soils • Mine reclamation • Mineral filler in asphaltic concrete • Bricks
  • 20. MAIN PARTS OF ASH DISPOSAL SYSTEM 1. ELECTROSTATIC PRECIPITATOR (ESP)
  • 21.
  • 24.  BOILER  Boiler is an apparatus to produce steam.  Thermal energy released by combustion of fuel issued to make steam at the desired temperature and pressure. The steam produced is used for: 1). For generating power in steam engines or steam turbines. 2). Heating the residential and industrial buildings. 3). Performing certain processes in the sugar mills, chemical and textile industries.
  • 25.  BOILER PROPERTIES a). Safety: The boiler should be safe under the operating conditions. b). Accessibility: the various part of boiler should be accessible for repair & maintenance. c). Capacity: Should be capable of supplying Steam according to the requirements. d). Efficiency: Should be able to absorb a maximum amount of heat produced due to burning of fuel in the furnace. e). It should be simple in construction. f). Its initial cost and maintenance cost is low. g). It should be capable of quick starting and loading.
  • 26.  CLASSIFICATION OF BOILERS • According to what flows in the TUBE : a). FIRE TUBE b). WATER TUBE
  • 27. a). FIRE TUBE BOILERS
  • 28. b). WATER TUBE BOILERS
  • 29. Comparison between Fire-tube & water-tube boilers S no. Particulars Fire tube boilers Water tube boilers 1. Mode of firing Internally fired Externally fired 2. Rate of steam production lower Higher 3. construction Difficult Simple 4. transportation Difficult Simple 5. Treatment of water Not so necessary More necessary 6. Operating pressure Limited to 16 bar Under high pressure as 100 bar 7. Floor area More floor area Less floor area 8. Shell diameter Large for same power Small same power 9. explosion Less More 10. Risk of bursting lesser More risk
  • 30.  MERITS OF WATER TUBE BOILER OVER FIRE TUBE BOILER : a). Generation of steam is much quicker due to small ratio of water content to steam content . This also helps in reaching the steaming temperature in short time. b). Its evaporative capacity is considerably larger and the steam pressure range is also high. c). Heating surfaces are more effective as the hot gases travel at right angles to the direction of water flow. d). The boiler can be easily transported and erected as its different parts can be separated. e). The combustion efficiency is higher because complete combustion of fuel is possible as the combustion space is much larger. f). All parts of the water tube boilers are easily accessible for cleaning, inspecting and repairing.
  • 31.  TYPES OF FIRE TUBE BOILERS • There are mainly five types of fire tube boilers : 1). Simple vertical boiler 2). Cochran boiler 3.) Cornish boiler 4). Lancashire boiler 5). Locomotive boilers
  • 32. 1). SIMPLE VERTICAL BOILER • It consist of a cylindrical shell, the greater portion of which is full of water & remaining is the steam space. • At the bottom of the fire box is grate on which fuel is burnt and the ash from it falls in the ash pit. • A simple vertical boiler is self- contained & can be easily transported.
  • 33. 2). COCHRAN BOILER • It is one of the best types of vertical multi-tubular boiler, and has a number of horizontal fir tubes. • Cochran boiler consist of a cylindrical shell with a dome shaped top where the space is provided for steam.
  • 34. 3). CORNISH BOILER  It consists of a cylindrical shell with flat ends through which passes a smaller flue tube containing the furnace. • The products of combustion pass from the fire grate forward over the brickwork bridge to the end of the furnace tube.
  • 35. 4). LANCASHIRE BOILER • This boiler is reliable, has simplicity of design, ease of operation & less operating & maintenance costs. • It is commonly used in sugar- mills & textile industries where along with the power system & steam for the process work is also needed.
  • 37. About Locomotive boilers : • Locomotive boiler is a horizontal fire tube type mobile boiler. The main requirement of this boiler is that it should produce steam at a very high rate. Therefore, this boiler requires a large amount of heating surface and large grate area to burn coal at a rapid rate. In order to provide the large heating surface area, a large number of fire tubes are setup and heat transfer rate is increased by creating strong draught by means of steam jet. • ADVANTAGE : a. Large rate of steam generation per square metre of heating surface. To some extent this is due to the vibration caused by the motion. b. It is very compact. c. The pressure of the steam is limited to about 20 bar.
  • 38.  WATER TUBE BOILERS ARE CLASSIFIED AS : 1). Horizontal Straight tube boiler There are two types of Horizontal straight tube boiler: a. Longitudinal drum b. Cross drum there are three types of cross drum boiler : 1. two drum 2. four drum 3. three drum 2). Bent tube boiler There are one type of bent tube boiler : a. Low head three drum
  • 39.  BOILER PERFORMANCE 1). Evaporative capacity : It can be expressed in terms of : a. kg of steam/hr b. kg of hour/hr/m2 of heating surface c. kg of steam/kg of fuel fired 2). Factor of Evaporation • It is defined as the ratio of the heat received by 1kg of water at the working conditions to that received by 1 kg of water evaporated from and at 100 degree.
  • 40.  FEED PUMP  The feed pump is a pump which is used to deliver feed water to the boiler. It is a desirable that the quantity of water supplied should be at least equal to the evaporated and supplied to the engine.  Two types of pumps which are commonly used as feed pumps are : 1. Reciprocating pumps 2. Rotary pumps
  • 41.  ECONOMISER • An economiser is a device in which the waste of heat of the flue gases is utilised for heating the feed water. • Economiser are mainly two types: a. Independent type b. Integral type
  • 42. About economiser • The above figure shows that an independent type vertical tube economiser. It is also called Green’s economiser. • It is employed for boilers of medium pressure range upto about 25 bar. • It consists of a large no. of vertical cast iron pipes p which are connected with two horizontal pipes, one at the top & the other at the bottom. • Advantage: overall efficiency of the plant is increased.
  • 43.  AIR PREHEATER & SUPER HEATER  AIR PREHEATER : The function of the air preheater is to increases the temperature of air before it enters the furnace. It is generally placed after the economiser ; so the flue gases pass through the economiser & then to the air. • Degree of heating depends upon : 1. type of fuel 2. type of fuel burning equipment 3. rating at which the boiler & furnace are operated
  • 44. About Air preheater • There are three types of air preheater: 1. Tubular type 2. Plate type 3. Storage type • This pic shows that a tubular type air preheater.
  • 45. Super heater • The function of a super heater is to increase the temperature of the steam above its saturation point. • Superheated steam has the following advantages: 1 steam consumption of the engine or turbine is reduced. 2. Efficiency of the steam plant is increased. • There are two types of super heaters: 1. convective super heater 2. Radiant super heater