The process
1. Plan
2. Execute, monitor, and control
3. Close

OR…

1.       Execute
2.       Lose control
3.       Stop
4.       Plan, execute, …
© Kumar Dhanagopal, 2011       tcworld India   2
Challenges
•    Getting started
•    Scoping
•    Estimating effort
•    Scheduling
•    Baselining
•    Communicating
•    Following up!
•    Managing reviews
•    Reporting
© Kumar Dhanagopal, 2011      tcworld India   3
• If I can do it, anybody can

• Each one of us is a project manager




© Kumar Dhanagopal, 2011   tcworld India   4
Getting started
                                                Scoping
                                                Estimating effort
                           Getting started      Scheduling
                                                Baselining
                                                Communicating
                                                Following up!
                                                Managing reviews
• Engage early                                  Reporting

       – Is it ever ok to engage late?
       – Engaging early ≠ writing from day 1
• Participate in the project initiation phase
• Take charge
• Set aside time for doc planning




© Kumar Dhanagopal, 2011        tcworld India            5
Getting started
                                             Scoping
                                             Estimating effort
                           Scoping           Scheduling
                                             Baselining
                                             Communicating
                                             Following up!
                                             Managing reviews
• Use data from all sources                  Reporting




• Consider lifecycle use cases
• Prioritize use cases
• Look for opportunities to reuse content
© Kumar Dhanagopal, 2011     tcworld India            6
Getting started
                                                                                  Scoping
                                                                                  Estimating effort
                           Estimating effort                                      Scheduling
                                                                                  Baselining
                                                                                  Communicating
                                                                                  Following up!
                                                                                  Managing reviews
• Plan at as granular a level as possible                                         Reporting

     Use case / task Topic                                Type        Potential   Effort
                                                                      for reuse   (person
                                                                                  days)
     UC0-Set up a          Overview of clusters           Concept     Low         1.0
     cluster               Creating a cluster             Procedure   None        0.5
                           Configuring a cluster          Procedure   None        0.5
     UC1-Manage            Server lifecycle               Concept     Medium      1.5
     the server            Starting and stopping          Procedure   None        0.5
     lifecycle             server instances




© Kumar Dhanagopal, 2011                  tcworld India                                    7
Getting started
                                                        Scoping
                                                        Estimating effort
                           Estimating effort (contd.)   Scheduling
                                                        Baselining
                                                        Communicating
                                                        Following up!
                                                        Managing reviews
• Avoid calculators                                     Reporting


       – G-I-G-O
       – Result not really objective
• Keep a buffer!

It takes more to write less than to write more!




© Kumar Dhanagopal, 2011              tcworld India              8
Getting started
                                                  Scoping
                                                  Estimating effort
                           Scheduling             Scheduling
                                                  Baselining
                                                  Communicating
                                                  Following up!
Effort estimate: 50 person days                   Managing reviews
                                                  Reporting

Writers available: 2
Calendar days to complete the task: ?

• Look beyond the math!
       – Task divisibility
       – Task sequence
       – People: skills, availability, interest



© Kumar Dhanagopal, 2011      tcworld India                9
Getting started
                                                                                                       Scoping
                                                                                                       Estimating effort
                                                     Baselining                                        Scheduling
                                                                                                       Baselining
                                                                                                       Communicating
                                                                                                       Following up!
                                                                                                       Managing reviews
• How much analysis is enough?                                                                         Reporting



                                     120
       Reliability of the plan (%)




                                                                                        95
                                     100

                                     80

                                     60

                                     40

                                     20

                                      0
                                           0   10   20   30      40           50   60   70   80   90   100
                                                              Data available (%)

© Kumar Dhanagopal, 2011                                      tcworld India                                   10
Getting started
                                                  Scoping
                                                  Estimating effort
                           Baselining (contd.)    Scheduling
                                                  Baselining
                                                  Communicating
                                                  Following up!
                                                  Managing reviews
•    Practice progressive elaboration             Reporting


•    Get the plan reviewed
•    Keep a running list of “opens”
•    Commit only what’s feasible
•    Minimize the unknown unknowns
•    Be prepared to re-plan!



© Kumar Dhanagopal, 2011          tcworld India          11
Getting started
                                                                 Scoping
                                                                 Estimating effort
                           Communicating                         Scheduling
                                                                 Baselining
                                                                 Communicating
                                                                 Following up!

• Recognize communication channels                               Managing reviews
                                                                 Reporting

       2 people 1 channel,                      3   3,   4   6
       n x (n-1)/2
       10   45!
•    Communicate bad news early
•    It’s ok to over-communicate
•    Include all stakeholders
•    Know your champion
•    Listen!
© Kumar Dhanagopal, 2011        tcworld India                           12
Getting started
                                               Scoping
                                               Estimating effort
                           Following up        Scheduling
                                               Baselining
                                               Communicating
                                               Following up!
                                               Managing reviews
•    Use all possible means                    Reporting


•    Keep a running to-do list
•    Push for an ETC date
•    Set reminders, flag email




© Kumar Dhanagopal, 2011       tcworld India          13
Getting started
                                                   Scoping
                                                   Estimating effort
                           Following up (contd.)   Scheduling
                                                   Baselining
                                                   Communicating
                                                   Following up!
                                                   Managing reviews
                                                   Reporting




© Kumar Dhanagopal, 2011           tcworld India          14
Getting started
                                                     Scoping
                                                     Estimating effort
                           Managing reviews          Scheduling
                                                     Baselining
                                                     Communicating
                                                     Following up!
                                                     Managing reviews
•       Plan                                         Reporting


       – Identify reviewers up front
       – Define expectations, schedule, and process
•       Execute
       –      Watch reviewers’ priorities
       –      Reiterate expectations
       –      Monitor progress
       –      Facilitate reviews: doc walkthrough,
              incremental review, piecemeal review
© Kumar Dhanagopal, 2011         tcworld India               15
Getting started
                                              Scoping
                                              Estimating effort
                           Reporting          Scheduling
                                              Baselining
                                              Communicating
                                              Following up!
                                              Managing reviews
•    Report regularly                         Reporting


•    Report w.r.t the plan
•    Flag issues, early
•    Focus on the future




© Kumar Dhanagopal, 2011      tcworld India          16
Getting started
                                                                    Scoping
                                                                    Estimating effort
                           Reporting (contd.)                       Scheduling
                                                                    Baselining
                                                                    Communicating
                                                                    Following up!
                                                                    Managing reviews
• Report on the future                                              Reporting



Task    Planned       Work                          Work      Revised
      effort (days) done (%)                      remaining    plan
T1               10        50                             7        12
T3               10        50                             8        13
Total            20         ?                            15        25

Work remaining: 15 / 25 = 60%
Work done: 100 – 60 = only 40%


© Kumar Dhanagopal, 2011          tcworld India                            17
Getting started
                                                                                                             Scoping
                                                                                                             Estimating effort
                                      Reporting (contd.)                                                     Scheduling
                                                                                                             Baselining
                                                                                                             Communicating
                                                                                                             Following up!
                                                                                                             Managing reviews
• Track the “burn” rate                                                                                      Reporting


                            100

                            80
           Work remaining




                            60

                            40

                            20

                             0
                                  1   2   3   4   5     6      7        8      9   10   11    12   13   14     15
                                                                      Time

                                                      Plan            Actual       Forecast

© Kumar Dhanagopal, 2011                              tcworld India                                                 18
Think big picture


• Take the project seriously, not project
  management

• There’s life beyond the project




© Kumar Dhanagopal, 2011         tcworld India   19
Thank you!

Questions?

kumards_99@yahoo.com




© Kumar Dhanagopal, 2011   tcworld India   20

Mais conteúdo relacionado

Mais procurados

NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change ManagementLeanleaders.org
 
Hugh Williams from Hughenden Consulting; Chairman’s Opening Address
Hugh Williams from Hughenden Consulting; Chairman’s Opening AddressHugh Williams from Hughenden Consulting; Chairman’s Opening Address
Hugh Williams from Hughenden Consulting; Chairman’s Opening Addresseyefortransport
 
Basic concepts of network analysis
Basic concepts of network analysisBasic concepts of network analysis
Basic concepts of network analysisAnupam Kumar
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsLeanleaders.org
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of ContentsLeanleaders.org
 
NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingLeanleaders.org
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project ManagementLeanleaders.org
 
Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012NASAPMC
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 

Mais procurados (20)

NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change Management
 
Hugh Williams from Hughenden Consulting; Chairman’s Opening Address
Hugh Williams from Hughenden Consulting; Chairman’s Opening AddressHugh Williams from Hughenden Consulting; Chairman’s Opening Address
Hugh Williams from Hughenden Consulting; Chairman’s Opening Address
 
NG BB 01 Introduction
NG BB 01 IntroductionNG BB 01 Introduction
NG BB 01 Introduction
 
Basic concepts of network analysis
Basic concepts of network analysisBasic concepts of network analysis
Basic concepts of network analysis
 
Scrum checklist
Scrum checklistScrum checklist
Scrum checklist
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 26 Control Charts
NG BB 26 Control ChartsNG BB 26 Control Charts
NG BB 26 Control Charts
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the Process
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
Aligned Strategy
Aligned StrategyAligned Strategy
Aligned Strategy
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of Contents
 
NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake Proofing
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project Management
 
Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
IA 7/ UX 1: IA? IxD? UX!
IA 7/ UX 1: IA? IxD? UX!IA 7/ UX 1: IA? IxD? UX!
IA 7/ UX 1: IA? IxD? UX!
 

Destaque

Why DITA?
Why DITA?Why DITA?
Why DITA?akashjd
 
Kapil Verma: What's new in FrameMaker 10
Kapil Verma: What's new in FrameMaker 10Kapil Verma: What's new in FrameMaker 10
Kapil Verma: What's new in FrameMaker 10akashjd
 
Kapil Verma: Key Trends in Technical Communication
Kapil Verma: Key Trends in Technical CommunicationKapil Verma: Key Trends in Technical Communication
Kapil Verma: Key Trends in Technical Communicationakashjd
 
Isabelle: Multilingual Technical Communication
Isabelle: Multilingual Technical CommunicationIsabelle: Multilingual Technical Communication
Isabelle: Multilingual Technical Communicationakashjd
 
Ziegler: Requirements of CMS in TC
Ziegler: Requirements of CMS in TCZiegler: Requirements of CMS in TC
Ziegler: Requirements of CMS in TCakashjd
 
Prof Klaus: Terminology Management
Prof Klaus: Terminology ManagementProf Klaus: Terminology Management
Prof Klaus: Terminology Managementakashjd
 
FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)
FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)
FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)Maxwell Hoffmann
 

Destaque (7)

Why DITA?
Why DITA?Why DITA?
Why DITA?
 
Kapil Verma: What's new in FrameMaker 10
Kapil Verma: What's new in FrameMaker 10Kapil Verma: What's new in FrameMaker 10
Kapil Verma: What's new in FrameMaker 10
 
Kapil Verma: Key Trends in Technical Communication
Kapil Verma: Key Trends in Technical CommunicationKapil Verma: Key Trends in Technical Communication
Kapil Verma: Key Trends in Technical Communication
 
Isabelle: Multilingual Technical Communication
Isabelle: Multilingual Technical CommunicationIsabelle: Multilingual Technical Communication
Isabelle: Multilingual Technical Communication
 
Ziegler: Requirements of CMS in TC
Ziegler: Requirements of CMS in TCZiegler: Requirements of CMS in TC
Ziegler: Requirements of CMS in TC
 
Prof Klaus: Terminology Management
Prof Klaus: Terminology ManagementProf Klaus: Terminology Management
Prof Klaus: Terminology Management
 
FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)
FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)
FrameMaker 11: What’s new in FM11 & FM11 Publishing Server (Lavacon2012)
 

Semelhante a Kumar: Managing Documentation Projects

NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized WorkLeanleaders.org
 
Agile tour 2011 puiu mircea
Agile tour 2011   puiu mirceaAgile tour 2011   puiu mircea
Agile tour 2011 puiu mirceaAgora Group
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionAnand Subramaniam
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people Kobi Vider
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
Enhancing learning transfer in the workplace
Enhancing learning transfer in the workplaceEnhancing learning transfer in the workplace
Enhancing learning transfer in the workplaceEd Holton
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
Becoming Agile - Challenge the Traditional Thinking
Becoming Agile -  Challenge the Traditional ThinkingBecoming Agile -  Challenge the Traditional Thinking
Becoming Agile - Challenge the Traditional ThinkingAgileSparks
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsLeanleaders.org
 
Case Study: Managing a Metrics Initiative
Case Study: Managing a Metrics InitiativeCase Study: Managing a Metrics Initiative
Case Study: Managing a Metrics InitiativeSurbhi Dangi
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventLeanleaders.org
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayneNASAPMC
 

Semelhante a Kumar: Managing Documentation Projects (20)

NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized Work
 
Agile tour 2011 puiu mircea
Agile tour 2011   puiu mirceaAgile tour 2011   puiu mircea
Agile tour 2011 puiu mircea
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Agile Webinar: Managing Distributed Teams
Agile Webinar: Managing Distributed TeamsAgile Webinar: Managing Distributed Teams
Agile Webinar: Managing Distributed Teams
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
Agile at AT&T
Agile at AT&TAgile at AT&T
Agile at AT&T
 
Enhancing learning transfer in the workplace
Enhancing learning transfer in the workplaceEnhancing learning transfer in the workplace
Enhancing learning transfer in the workplace
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
Becoming Agile - Challenge the Traditional Thinking
Becoming Agile -  Challenge the Traditional ThinkingBecoming Agile -  Challenge the Traditional Thinking
Becoming Agile - Challenge the Traditional Thinking
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of Experiments
 
Managing performance effectively in Contact Centres
Managing performance effectively in Contact CentresManaging performance effectively in Contact Centres
Managing performance effectively in Contact Centres
 
Depth of a Kanban Implementation
Depth of a Kanban ImplementationDepth of a Kanban Implementation
Depth of a Kanban Implementation
 
Case Study: Managing a Metrics Initiative
Case Study: Managing a Metrics InitiativeCase Study: Managing a Metrics Initiative
Case Study: Managing a Metrics Initiative
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement Event
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 

Kumar: Managing Documentation Projects

  • 1. Managing Documentation Projects Kumar Dhanagopal tcworld India March 12, 2011
  • 2. The process 1. Plan 2. Execute, monitor, and control 3. Close OR… 1. Execute 2. Lose control 3. Stop 4. Plan, execute, … © Kumar Dhanagopal, 2011 tcworld India 2
  • 3. Challenges • Getting started • Scoping • Estimating effort • Scheduling • Baselining • Communicating • Following up! • Managing reviews • Reporting © Kumar Dhanagopal, 2011 tcworld India 3
  • 4. • If I can do it, anybody can • Each one of us is a project manager © Kumar Dhanagopal, 2011 tcworld India 4
  • 5. Getting started Scoping Estimating effort Getting started Scheduling Baselining Communicating Following up! Managing reviews • Engage early Reporting – Is it ever ok to engage late? – Engaging early ≠ writing from day 1 • Participate in the project initiation phase • Take charge • Set aside time for doc planning © Kumar Dhanagopal, 2011 tcworld India 5
  • 6. Getting started Scoping Estimating effort Scoping Scheduling Baselining Communicating Following up! Managing reviews • Use data from all sources Reporting • Consider lifecycle use cases • Prioritize use cases • Look for opportunities to reuse content © Kumar Dhanagopal, 2011 tcworld India 6
  • 7. Getting started Scoping Estimating effort Estimating effort Scheduling Baselining Communicating Following up! Managing reviews • Plan at as granular a level as possible Reporting Use case / task Topic Type Potential Effort for reuse (person days) UC0-Set up a Overview of clusters Concept Low 1.0 cluster Creating a cluster Procedure None 0.5 Configuring a cluster Procedure None 0.5 UC1-Manage Server lifecycle Concept Medium 1.5 the server Starting and stopping Procedure None 0.5 lifecycle server instances © Kumar Dhanagopal, 2011 tcworld India 7
  • 8. Getting started Scoping Estimating effort Estimating effort (contd.) Scheduling Baselining Communicating Following up! Managing reviews • Avoid calculators Reporting – G-I-G-O – Result not really objective • Keep a buffer! It takes more to write less than to write more! © Kumar Dhanagopal, 2011 tcworld India 8
  • 9. Getting started Scoping Estimating effort Scheduling Scheduling Baselining Communicating Following up! Effort estimate: 50 person days Managing reviews Reporting Writers available: 2 Calendar days to complete the task: ? • Look beyond the math! – Task divisibility – Task sequence – People: skills, availability, interest © Kumar Dhanagopal, 2011 tcworld India 9
  • 10. Getting started Scoping Estimating effort Baselining Scheduling Baselining Communicating Following up! Managing reviews • How much analysis is enough? Reporting 120 Reliability of the plan (%) 95 100 80 60 40 20 0 0 10 20 30 40 50 60 70 80 90 100 Data available (%) © Kumar Dhanagopal, 2011 tcworld India 10
  • 11. Getting started Scoping Estimating effort Baselining (contd.) Scheduling Baselining Communicating Following up! Managing reviews • Practice progressive elaboration Reporting • Get the plan reviewed • Keep a running list of “opens” • Commit only what’s feasible • Minimize the unknown unknowns • Be prepared to re-plan! © Kumar Dhanagopal, 2011 tcworld India 11
  • 12. Getting started Scoping Estimating effort Communicating Scheduling Baselining Communicating Following up! • Recognize communication channels Managing reviews Reporting 2 people 1 channel, 3 3, 4 6 n x (n-1)/2 10 45! • Communicate bad news early • It’s ok to over-communicate • Include all stakeholders • Know your champion • Listen! © Kumar Dhanagopal, 2011 tcworld India 12
  • 13. Getting started Scoping Estimating effort Following up Scheduling Baselining Communicating Following up! Managing reviews • Use all possible means Reporting • Keep a running to-do list • Push for an ETC date • Set reminders, flag email © Kumar Dhanagopal, 2011 tcworld India 13
  • 14. Getting started Scoping Estimating effort Following up (contd.) Scheduling Baselining Communicating Following up! Managing reviews Reporting © Kumar Dhanagopal, 2011 tcworld India 14
  • 15. Getting started Scoping Estimating effort Managing reviews Scheduling Baselining Communicating Following up! Managing reviews • Plan Reporting – Identify reviewers up front – Define expectations, schedule, and process • Execute – Watch reviewers’ priorities – Reiterate expectations – Monitor progress – Facilitate reviews: doc walkthrough, incremental review, piecemeal review © Kumar Dhanagopal, 2011 tcworld India 15
  • 16. Getting started Scoping Estimating effort Reporting Scheduling Baselining Communicating Following up! Managing reviews • Report regularly Reporting • Report w.r.t the plan • Flag issues, early • Focus on the future © Kumar Dhanagopal, 2011 tcworld India 16
  • 17. Getting started Scoping Estimating effort Reporting (contd.) Scheduling Baselining Communicating Following up! Managing reviews • Report on the future Reporting Task Planned Work Work Revised effort (days) done (%) remaining plan T1 10 50 7 12 T3 10 50 8 13 Total 20 ? 15 25 Work remaining: 15 / 25 = 60% Work done: 100 – 60 = only 40% © Kumar Dhanagopal, 2011 tcworld India 17
  • 18. Getting started Scoping Estimating effort Reporting (contd.) Scheduling Baselining Communicating Following up! Managing reviews • Track the “burn” rate Reporting 100 80 Work remaining 60 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Time Plan Actual Forecast © Kumar Dhanagopal, 2011 tcworld India 18
  • 19. Think big picture • Take the project seriously, not project management • There’s life beyond the project © Kumar Dhanagopal, 2011 tcworld India 19
  • 20. Thank you! Questions? kumards_99@yahoo.com © Kumar Dhanagopal, 2011 tcworld India 20