CONTROL TECHNIQUES
There are 2 types of control techniques.

1-Old control technique

2-New control technique



OLD CONTROL TECHNIQUE:
These are those which have long been used by managers. Some of the important techniques under
which this category are,

1-Budgeting

2-Cost accounting

3-Break even analysis

4-Financial statement and ratio analysis

5-Auditing

6-Report

7-Rules

8-Personal observation



A Budget is a statement of anticipated results during a designated time period expressed in financial and
non financial terms.

ADVANTAGES:
Improved co ordination and communication

Boost motivation and moral

Increase learning from past experience
DISADVANTAGE:
Rigid

Inflexible

Expensive

Curb the initiative of a good manager

NEW CONTROL TECHNIQUES:
These techniques which are of recent origin do not markedly overlap the traditional control devices but
provide the kind of information not readily available with the traditional method .It include

PERT (Program Evaluation and Review Techniques)

CPM (Critical Path Method)

Human resources accounting

PERT:
PERT is method to analyses the involved tasks in completing a given project, specially the time needed
to complete each task and to identify the minimum time needed to complete the total project .

This project model was the first of its kind, a revival for scientific management, founded by
Frederick Taylor (Taylorism) and later refined by Henry Ford (Fordism). DuPont's critical path
method was invented at roughly the same time as PERT.

        A PERT chart is a tool that facilitates decision making. The first draft of a PERT chart
        will number its events sequentially in 10s (10, 20, 30, etc.) to allow the later insertion of
        additional events.
        Two consecutive events in a PERT chart are linked by activities, which are
        conventionally represented as arrows (see the diagram above).
        The events are presented in a logical sequence and no activity can commence until its
        immediately preceding event is completed.
        The planner decides which milestones should be PERT events and also decides their
        “proper” sequence.
        A PERT chart may have multiple pages with many sub-tasks.

PERT is valuable to manage where multiple tasks are occurring simultaneously to reduce
redundancy.
STEPS INVOLVED IN PERT:




PERT planning involves the following steps:

   1.   Identify the specific activities and milestones.
   2.   Determine the proper sequence of the activities.
   3.   Construct a network diagram.
   4.   Estimate the time required for each activity.
   5.   Determine the critical path.
   6.   Update the PERT chart as the project progresses.



ADVANTAGES:

        PERT chart explicitly defines and makes visible dependencies (precedence relationships)
        between the WBS elements
        PERT facilitates identification of the critical path and makes this visible
        PERT facilitates identification of early start, late start, and slack for each activity,
        PERT provides for potentially reduced project duration due to better understanding of
        dependencies leading to improved overlapping of activities and tasks where feasible.
        The large amount of project data can be organized & presented in diagram for use in
        decision making.

        DISADVANTAGES:
        There can be potentially hundreds or thousands of activities and individual dependency
        relationships
        PERT is not easily scalable for smaller projects
        The network charts tend to be large and unwieldy requiring several pages to print and
        requiring special size paper
        The lack of a timeframe on most PERT/CPM charts makes it harder to show status
        although colours can help (e.g., specific colour for completed nodes)
CPM (Critical path method):
The Critical Path Method (CPM) is one of several related techniques for doing project planning.
CPM is for projects that are made up of a number of individual "activities." If some of the
activities require other activities to finish before they can start, then the project becomes a
complex web of activities.

Steps CPM Summary
CPM helps you identify a complex project's critical paths. You can find how long a project will take and
which activities must be on time. If you also have information about costs and crash costs and times,
CPM helps you determine how long the project should take, and which activities should be sped up
("crashed"). As we are doing it in this class, the steps are:

    1.    Have a list of the activities.
    2.    Draw the network diagram.
    3.    Put activity names, node numbers, times, and costs in a spreadsheet.
    4.    Use Pathfind to generate code for the paths.
    5.    Put the path information into the spreadsheet.
    6.    Calculate the paths' times.
    7.    Identify the critical paths, and the activities in each path.
    8.    Set up the formula to calculate the project's total cost.
    9.    Fill in the Tools | Solver... form.
    10.   Solve, and fix errors, if any.
    11.   For an economic analysis, change the maximum time constraint and solve again. Repeat until
          costs, including penalties and bonuses, start to go up.




          ADVANTAGE:
          Makes dependencies visible between the project activities; this is done by constructing
          project network diagrams or precedence diagrams
Organizes large and complex projects, hence allowing a more systematic approach to
project planning and scheduling, project execution, and risk management
Enables the calculation of the float (slack) of each activity.The float tells you exactly
how long an activity can come in late without it impacting the project schedule.
Encourages the Project Manager to reduce the project duration by optimizing the
critical path and using compression techniques as applicable
Increases visibility of impact of schedule revisions, which are usually necessary when
major milestones have been missed or when the risk of missing a major milestone looms
large
Enables the Project Manager to optimize efficiency by allocating resources
appropriately, consequently the overall cost can be reduced
Provides opportunities to respond to the negative risk going over-schedule by
identifying the activities that are most critical

DISADVANTAGES:

For large and complex projects, there’ll be thousands of activities and dependency
relationships. Without software it can be mighty difficult managing this. To make
matters worse, if the plan changes during project execution then the precedence diagram
will have to be redrawn. Fortunately, we do have relatively cheap software that can
handle this with ease.
One of the advantages of drawing a project precedence diagram is that you can print and
stick in the project area. The precedence diagram enables the team to stay focused on
project activities. Project team members are always cognizant of the critical path since it
is visible everyday. However, for large projects with thousands of activities, it may be
difficult to print the project network diagram. You would most definitely need a
plotter.

Mais conteúdo relacionado

Mais procurados

The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart Nicola2903
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectMeryem Yıldız
 
PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart Anju George
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Managementgrmkslideshare
 
NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2Future Managers
 
Construction scheduling
Construction schedulingConstruction scheduling
Construction schedulingZTE Nepal
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartVinay Prajapati
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Planproject management
 
Tracking Project WBS
Tracking Project WBSTracking Project WBS
Tracking Project WBSCameron
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)AnkitaKadam20
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using PertVishnu RC Vijayan
 
Apps4.Pro Planner Gantt chart (Chrome extension)
Apps4.Pro Planner Gantt chart (Chrome extension)Apps4.Pro Planner Gantt chart (Chrome extension)
Apps4.Pro Planner Gantt chart (Chrome extension)sanbss
 
Programme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartProgramme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartMathew Varghese V
 
Mba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aMba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aRai University
 

Mais procurados (19)

The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project Management focused on Scheduling of a Project
Project Management focused on Scheduling of a ProjectProject Management focused on Scheduling of a Project
Project Management focused on Scheduling of a Project
 
PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Management
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
 
NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2NCV 4 Project Management Hands-On Support Slide Show - Module 2
NCV 4 Project Management Hands-On Support Slide Show - Module 2
 
Lecture 6
Lecture 6Lecture 6
Lecture 6
 
Construction scheduling
Construction schedulingConstruction scheduling
Construction scheduling
 
Seminar on pert
Seminar on pertSeminar on pert
Seminar on pert
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert Chart
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Tracking Project WBS
Tracking Project WBSTracking Project WBS
Tracking Project WBS
 
PERT
PERTPERT
PERT
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using Pert
 
Apps4.Pro Planner Gantt chart (Chrome extension)
Apps4.Pro Planner Gantt chart (Chrome extension)Apps4.Pro Planner Gantt chart (Chrome extension)
Apps4.Pro Planner Gantt chart (Chrome extension)
 
Programme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartProgramme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt Chart
 
Mba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aMba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart a
 

Destaque

Information Technology in Controlling
Information Technology in ControllingInformation Technology in Controlling
Information Technology in ControllingAvadhesh Solanki
 
Control techniques chpt 19
Control techniques chpt 19Control techniques chpt 19
Control techniques chpt 19Chandan58
 
Controlling-Traditional Techniques
Controlling-Traditional TechniquesControlling-Traditional Techniques
Controlling-Traditional TechniquesRachit Srivastava
 
Techniques of controlling
Techniques of controllingTechniques of controlling
Techniques of controllingSweetp999
 
control techniques
control techniquescontrol techniques
control techniquesRakesh Kumar
 

Destaque (8)

Information Technology in Controlling
Information Technology in ControllingInformation Technology in Controlling
Information Technology in Controlling
 
Control techniques chpt 19
Control techniques chpt 19Control techniques chpt 19
Control techniques chpt 19
 
Controlling-Traditional Techniques
Controlling-Traditional TechniquesControlling-Traditional Techniques
Controlling-Traditional Techniques
 
Control techniques
Control techniquesControl techniques
Control techniques
 
Techniques of controlling
Techniques of controllingTechniques of controlling
Techniques of controlling
 
Control process
Control processControl process
Control process
 
Controlling ppt
Controlling pptControlling ppt
Controlling ppt
 
control techniques
control techniquescontrol techniques
control techniques
 

Semelhante a Control techniques

PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingHariasha
 
TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615EqraBaig
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4POOJA UDAYAN
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managersNaganna Chetty
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1ghulam MUSTAFA
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Managementrielaantonio
 
Scheduling coordination and control of projects
Scheduling coordination and control of projects Scheduling coordination and control of projects
Scheduling coordination and control of projects Somashekar S.M
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTS.Vijaya Bhaskar
 
6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptxresearcheracademic
 

Semelhante a Control techniques (20)

Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615TOOLS OF EDUCATIONAL MANAGEMENT-8615
TOOLS OF EDUCATIONAL MANAGEMENT-8615
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
 
Scheduling coordination and control of projects
Scheduling coordination and control of projects Scheduling coordination and control of projects
Scheduling coordination and control of projects
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx6- Scheduling & Networking Ch 6 project m.pptx
6- Scheduling & Networking Ch 6 project m.pptx
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
Pert and gantt chart.pptx
Pert and gantt chart.pptxPert and gantt chart.pptx
Pert and gantt chart.pptx
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 

Último

#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 

Último (20)

#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 

Control techniques

  • 1. CONTROL TECHNIQUES There are 2 types of control techniques. 1-Old control technique 2-New control technique OLD CONTROL TECHNIQUE: These are those which have long been used by managers. Some of the important techniques under which this category are, 1-Budgeting 2-Cost accounting 3-Break even analysis 4-Financial statement and ratio analysis 5-Auditing 6-Report 7-Rules 8-Personal observation A Budget is a statement of anticipated results during a designated time period expressed in financial and non financial terms. ADVANTAGES: Improved co ordination and communication Boost motivation and moral Increase learning from past experience
  • 2. DISADVANTAGE: Rigid Inflexible Expensive Curb the initiative of a good manager NEW CONTROL TECHNIQUES: These techniques which are of recent origin do not markedly overlap the traditional control devices but provide the kind of information not readily available with the traditional method .It include PERT (Program Evaluation and Review Techniques) CPM (Critical Path Method) Human resources accounting PERT: PERT is method to analyses the involved tasks in completing a given project, specially the time needed to complete each task and to identify the minimum time needed to complete the total project . This project model was the first of its kind, a revival for scientific management, founded by Frederick Taylor (Taylorism) and later refined by Henry Ford (Fordism). DuPont's critical path method was invented at roughly the same time as PERT. A PERT chart is a tool that facilitates decision making. The first draft of a PERT chart will number its events sequentially in 10s (10, 20, 30, etc.) to allow the later insertion of additional events. Two consecutive events in a PERT chart are linked by activities, which are conventionally represented as arrows (see the diagram above). The events are presented in a logical sequence and no activity can commence until its immediately preceding event is completed. The planner decides which milestones should be PERT events and also decides their “proper” sequence. A PERT chart may have multiple pages with many sub-tasks. PERT is valuable to manage where multiple tasks are occurring simultaneously to reduce redundancy.
  • 3. STEPS INVOLVED IN PERT: PERT planning involves the following steps: 1. Identify the specific activities and milestones. 2. Determine the proper sequence of the activities. 3. Construct a network diagram. 4. Estimate the time required for each activity. 5. Determine the critical path. 6. Update the PERT chart as the project progresses. ADVANTAGES: PERT chart explicitly defines and makes visible dependencies (precedence relationships) between the WBS elements PERT facilitates identification of the critical path and makes this visible PERT facilitates identification of early start, late start, and slack for each activity, PERT provides for potentially reduced project duration due to better understanding of dependencies leading to improved overlapping of activities and tasks where feasible. The large amount of project data can be organized & presented in diagram for use in decision making. DISADVANTAGES: There can be potentially hundreds or thousands of activities and individual dependency relationships PERT is not easily scalable for smaller projects The network charts tend to be large and unwieldy requiring several pages to print and requiring special size paper The lack of a timeframe on most PERT/CPM charts makes it harder to show status although colours can help (e.g., specific colour for completed nodes)
  • 4. CPM (Critical path method): The Critical Path Method (CPM) is one of several related techniques for doing project planning. CPM is for projects that are made up of a number of individual "activities." If some of the activities require other activities to finish before they can start, then the project becomes a complex web of activities. Steps CPM Summary CPM helps you identify a complex project's critical paths. You can find how long a project will take and which activities must be on time. If you also have information about costs and crash costs and times, CPM helps you determine how long the project should take, and which activities should be sped up ("crashed"). As we are doing it in this class, the steps are: 1. Have a list of the activities. 2. Draw the network diagram. 3. Put activity names, node numbers, times, and costs in a spreadsheet. 4. Use Pathfind to generate code for the paths. 5. Put the path information into the spreadsheet. 6. Calculate the paths' times. 7. Identify the critical paths, and the activities in each path. 8. Set up the formula to calculate the project's total cost. 9. Fill in the Tools | Solver... form. 10. Solve, and fix errors, if any. 11. For an economic analysis, change the maximum time constraint and solve again. Repeat until costs, including penalties and bonuses, start to go up. ADVANTAGE: Makes dependencies visible between the project activities; this is done by constructing project network diagrams or precedence diagrams
  • 5. Organizes large and complex projects, hence allowing a more systematic approach to project planning and scheduling, project execution, and risk management Enables the calculation of the float (slack) of each activity.The float tells you exactly how long an activity can come in late without it impacting the project schedule. Encourages the Project Manager to reduce the project duration by optimizing the critical path and using compression techniques as applicable Increases visibility of impact of schedule revisions, which are usually necessary when major milestones have been missed or when the risk of missing a major milestone looms large Enables the Project Manager to optimize efficiency by allocating resources appropriately, consequently the overall cost can be reduced Provides opportunities to respond to the negative risk going over-schedule by identifying the activities that are most critical DISADVANTAGES: For large and complex projects, there’ll be thousands of activities and dependency relationships. Without software it can be mighty difficult managing this. To make matters worse, if the plan changes during project execution then the precedence diagram will have to be redrawn. Fortunately, we do have relatively cheap software that can handle this with ease. One of the advantages of drawing a project precedence diagram is that you can print and stick in the project area. The precedence diagram enables the team to stay focused on project activities. Project team members are always cognizant of the critical path since it is visible everyday. However, for large projects with thousands of activities, it may be difficult to print the project network diagram. You would most definitely need a plotter.