SlideShare uma empresa Scribd logo
1 de 21
50 YEARS MAKING LIFE EASIER
FOR PEOPLE WHO BUILD.

                                                                         Domestic market
Founded in 1963               Consolidated industrial base
                              focusing on construction and
                              sustainable business
                                                             11 million square meters of
                                                             land bank

More than a thousand direct jobs at
six industrial divisions,
administrative offices and regional
commercial management offices                  Presence at 8 thousand
                                               points of sale and job
                                               sites all across Brazil
Mortar          Concrete        Steel Frame       High Tech
                    Precast     Cutting, Bending     Industries
                                 and Assembly
   Roofing
                  Warehouse                         Distribution
                 Development                          Centers
Precon Block

                  Real Estate                      Shopping Malls
 Porcelanato     Development
Porcelain Tile                                       Habitation

                                                     Education
PRESENCE
IN BRAZIL
             Two new units in 2012:




            Facility of precast structures
            and housing units.




            Facility of PVC roof tiles.


            Facility of mortar.
Pedro Leopoldo Division – MG                Nova Iguaçu Division – RJ                 Belo Horizonte Division – MG
Precon Engineering and Industrial                 Precon Industrial                           Precon Industrial




                          Formosa Division – GO                             Precon Estiraço
                             Precon Industrial                            Belo Horizonte - MG
SOLUTIONS ON STEEL TO STRUCTURE ALL SIZES
       WORKS WITH GREATER QUALITY,
        PRODUCTIVITY AND ECONOMY.


Arcellor Mittal accredited at Minas Gerais for steel frame
              cutting, bending and assembly
11 MILLION sqm AROUND THE
Confins Airport        CONFINS AIRPORT
PRECON ENGINEERING WAS BORN FROM THE TRADITION OF PRECON GROUP
  AND IT BRINGS IN ITS DNA INDUSTRIALIZATION AND SUSTAINABILITY.

                   THE COMPANY OPERATES IN THREE AREAS:


          Concrete                     Real Estate                  Warehouse
           Precast                    Development                  Development
         Structures

    Making easier the life of   Fulfilling the dream of owning   Large contracts assuring
         the builder               a house in half the time.           profitability.
PRECAST STRUTCURES




    BUILT TO SUIT
    DEVELOPMENT
    BUILT TO ORDER
PRECAST STRUTCURES




    BUILT TO SUIT
    DEVELOPMENT
    BUILT TO ORDER
REAL ESTATE DEVELOPMENT


  Desire of Precon to              20 years     Case Fundação              DATEC
  build a product                  of R&D       Dom Cabral
  targeted towards
  housing segment




 Housing deficit of Brazil                    1st company of Brazil to
                                              have an enterprise of the
                                              program Minha Casa
                                              Minha Vida (MCMV)
                                              certified by the
                                              sustainable seal Selo Azul
 The Precon Housing Solution is born          de Sustentabilidade da
                                              Caixa Econômica Federal
STANDARDIZATION OF THE PLAN /
                                  RMBH




 THE STANDARDIZATION OF THE
PROJECTS IN A SINGLE PLAN AND A
SINGLE PRODUCT BROUGHT SCALE
  AND THE BENEFITS OF SERIAL
PRODUCTION IN OUR INDUSTRIAL
           DIVISION
AUTOMAKER CONCEPT




   LAND PREPARATION AND                        CONCRETE POURING OF                                                                      MANUFACTURE OF PRECAST                      TRANSPORTATION OF PANELS
       FOUNDATION                                  STRUCTURE                              STRUCTURE TRANSPORTATION                             PANELS


According to the characteristic                     Preparation of                        Transportation of the structure             Technology to manufacture clay                Transportation of panels from
of each land the preparation is             molds, placement of frame and                  from the facility to the work             brick panels with lining concrete or            the facility to the work site.
  done and the foundation is                  concrete, and de-forms of                                site.                           mortar, with embedded frames
           deployed.                         beams, columns and preslab.                                                                      and installations.




  ASSEMBLY OF STRUCTURE AND PANELS                                  ASSEMBLY OF KITS                                         DELIVERY OF KITS                               ASSEMBLY OF KITS AND FINISHINGS


 Quick assembly of structure and precast               Preparation at the distribution center of                  Programmed logistic of kits between the               Assembly of kits with predefined processes at
panels at works. Precon technology on the             electric, hydraulic and finishing sets for the                distribution center and the work site.                 the work site and execution of finishing
              connections.                                                work.                                                                                            (flooring, painting and bathroom ware).
1st Product


Exceptional localization




2 bedrooms apartment,
Nearly 47 sqm,
Parking space and leisure area.
THE WORK: QUICKLY ASSEMBLY




        1                       2                              3
            Columns – 2 days         1st floor – 5 days            2nd floor – 5 days




       4                        5                              6
           3rd floor – 5 days       4th floor – 5 days             Platbands – 1 day

                                                          16 apartments built on 23 days
The work: Reduced Crew




 We use 20% of the traditional labor
 amount in a work site
WASTE GENERATION



Brazilian construction index   PRECON Engineering index




Reduction of 81% of waste generation in comparison
   with the Brazilian reference for conventional
                   construction.




 Reduction of nearly 6 tons of waste generated per
 apartment built with Precon Engineering method.
STRUCTURAL SAFETY

The concrete structure of the building and walls
without structural function are an extra safety item to
clients, once the removal of walls, partial or total, do
not affect the performance of the concrete structure.
SUSTAINABILITY
      Conservation of Material Resources

               Social Practices

             Project and Comfort

       Urban Quality and Neighborhood

             Energetic Efficiency
DATEC

        Precon Engineering is the first company of Brazil to have an
        enterprise of the program Minha Casa Minha Vida (MCMV)
        certified by the sustainable seal Selo Azul de Sustentabilidade da
        Caixa Econômica Federal – Ville Barcelona, at the city of Betim.




        “Innovation, Industrialization and Sustainability:

        The Precon Housing Solution”

Mais conteúdo relacionado

Semelhante a Precon apresentação bruno_dias_ingles1

The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionBrij Consulting, LLC
 
Nic Profile.New
Nic Profile.NewNic Profile.New
Nic Profile.NewKarlbritz
 
412346228-Pragati-Towers-Mumbai.pdf
412346228-Pragati-Towers-Mumbai.pdf412346228-Pragati-Towers-Mumbai.pdf
412346228-Pragati-Towers-Mumbai.pdfRenukaChalikwar2
 
City Concrete Brochure Web
City Concrete Brochure WebCity Concrete Brochure Web
City Concrete Brochure Webmelattar
 
Large Scale Additive Manufacturing and Construction
Large Scale Additive Manufacturing and Construction Large Scale Additive Manufacturing and Construction
Large Scale Additive Manufacturing and Construction KTN
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericssonabbasz
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructionsengineeringwatch
 
MCM Presenattion
MCM PresenattionMCM Presenattion
MCM PresenattionChris Boyd
 
Converge Remote Build, Phase II, V1 only
Converge Remote Build, Phase II, V1 onlyConverge Remote Build, Phase II, V1 only
Converge Remote Build, Phase II, V1 onlyBrij Consulting, LLC
 
Portfolio
PortfolioPortfolio
PortfolioCraigW
 
Corporate Presentation Dec 2010
Corporate Presentation   Dec 2010Corporate Presentation   Dec 2010
Corporate Presentation Dec 2010vivekhalbe
 

Semelhante a Precon apresentação bruno_dias_ingles1 (20)

Project Engineering Group -Brouchure
Project Engineering Group -Brouchure Project Engineering Group -Brouchure
Project Engineering Group -Brouchure
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix Expansion
 
Rons Brochure 3
Rons Brochure 3Rons Brochure 3
Rons Brochure 3
 
Nic Profile.New
Nic Profile.NewNic Profile.New
Nic Profile.New
 
412346228-Pragati-Towers-Mumbai.pdf
412346228-Pragati-Towers-Mumbai.pdf412346228-Pragati-Towers-Mumbai.pdf
412346228-Pragati-Towers-Mumbai.pdf
 
City Concrete Brochure Web
City Concrete Brochure WebCity Concrete Brochure Web
City Concrete Brochure Web
 
Large Scale Additive Manufacturing and Construction
Large Scale Additive Manufacturing and Construction Large Scale Additive Manufacturing and Construction
Large Scale Additive Manufacturing and Construction
 
PTS service proposal for Ericsson
PTS service proposal for EricssonPTS service proposal for Ericsson
PTS service proposal for Ericsson
 
Ngsurvey profile
Ngsurvey profileNgsurvey profile
Ngsurvey profile
 
Portfolio
PortfolioPortfolio
Portfolio
 
IT applications in construction
IT applications in constructionIT applications in construction
IT applications in construction
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
MCM Presenattion
MCM PresenattionMCM Presenattion
MCM Presenattion
 
MCM Presentation
MCM PresentationMCM Presentation
MCM Presentation
 
Sasha Rodriguez_Nov_2016
Sasha Rodriguez_Nov_2016Sasha Rodriguez_Nov_2016
Sasha Rodriguez_Nov_2016
 
Converge Remote Build, Phase II, V1 only
Converge Remote Build, Phase II, V1 onlyConverge Remote Build, Phase II, V1 only
Converge Remote Build, Phase II, V1 only
 
duplex villa ppt
duplex villa pptduplex villa ppt
duplex villa ppt
 
Portfolio
PortfolioPortfolio
Portfolio
 
Corporate Presentation Dec 2010
Corporate Presentation   Dec 2010Corporate Presentation   Dec 2010
Corporate Presentation Dec 2010
 
Cv Feb 2012
Cv Feb 2012Cv Feb 2012
Cv Feb 2012
 

Precon apresentação bruno_dias_ingles1

  • 1. 50 YEARS MAKING LIFE EASIER FOR PEOPLE WHO BUILD. Domestic market Founded in 1963 Consolidated industrial base focusing on construction and sustainable business 11 million square meters of land bank More than a thousand direct jobs at six industrial divisions, administrative offices and regional commercial management offices Presence at 8 thousand points of sale and job sites all across Brazil
  • 2. Mortar Concrete Steel Frame High Tech Precast Cutting, Bending Industries and Assembly Roofing Warehouse Distribution Development Centers Precon Block Real Estate Shopping Malls Porcelanato Development Porcelain Tile Habitation Education
  • 3. PRESENCE IN BRAZIL Two new units in 2012: Facility of precast structures and housing units. Facility of PVC roof tiles. Facility of mortar.
  • 4. Pedro Leopoldo Division – MG Nova Iguaçu Division – RJ Belo Horizonte Division – MG Precon Engineering and Industrial Precon Industrial Precon Industrial Formosa Division – GO Precon Estiraço Precon Industrial Belo Horizonte - MG
  • 5. SOLUTIONS ON STEEL TO STRUCTURE ALL SIZES WORKS WITH GREATER QUALITY, PRODUCTIVITY AND ECONOMY. Arcellor Mittal accredited at Minas Gerais for steel frame cutting, bending and assembly
  • 6. 11 MILLION sqm AROUND THE Confins Airport CONFINS AIRPORT
  • 7. PRECON ENGINEERING WAS BORN FROM THE TRADITION OF PRECON GROUP AND IT BRINGS IN ITS DNA INDUSTRIALIZATION AND SUSTAINABILITY. THE COMPANY OPERATES IN THREE AREAS: Concrete Real Estate Warehouse Precast Development Development Structures Making easier the life of Fulfilling the dream of owning Large contracts assuring the builder a house in half the time. profitability.
  • 8. PRECAST STRUTCURES BUILT TO SUIT DEVELOPMENT BUILT TO ORDER
  • 9. PRECAST STRUTCURES BUILT TO SUIT DEVELOPMENT BUILT TO ORDER
  • 10. REAL ESTATE DEVELOPMENT Desire of Precon to 20 years Case Fundação DATEC build a product of R&D Dom Cabral targeted towards housing segment Housing deficit of Brazil 1st company of Brazil to have an enterprise of the program Minha Casa Minha Vida (MCMV) certified by the sustainable seal Selo Azul The Precon Housing Solution is born de Sustentabilidade da Caixa Econômica Federal
  • 11. STANDARDIZATION OF THE PLAN / RMBH THE STANDARDIZATION OF THE PROJECTS IN A SINGLE PLAN AND A SINGLE PRODUCT BROUGHT SCALE AND THE BENEFITS OF SERIAL PRODUCTION IN OUR INDUSTRIAL DIVISION
  • 12. AUTOMAKER CONCEPT LAND PREPARATION AND CONCRETE POURING OF MANUFACTURE OF PRECAST TRANSPORTATION OF PANELS FOUNDATION STRUCTURE STRUCTURE TRANSPORTATION PANELS According to the characteristic Preparation of Transportation of the structure Technology to manufacture clay Transportation of panels from of each land the preparation is molds, placement of frame and from the facility to the work brick panels with lining concrete or the facility to the work site. done and the foundation is concrete, and de-forms of site. mortar, with embedded frames deployed. beams, columns and preslab. and installations. ASSEMBLY OF STRUCTURE AND PANELS ASSEMBLY OF KITS DELIVERY OF KITS ASSEMBLY OF KITS AND FINISHINGS Quick assembly of structure and precast Preparation at the distribution center of Programmed logistic of kits between the Assembly of kits with predefined processes at panels at works. Precon technology on the electric, hydraulic and finishing sets for the distribution center and the work site. the work site and execution of finishing connections. work. (flooring, painting and bathroom ware).
  • 13.
  • 14.
  • 15. 1st Product Exceptional localization 2 bedrooms apartment, Nearly 47 sqm, Parking space and leisure area.
  • 16. THE WORK: QUICKLY ASSEMBLY 1 2 3 Columns – 2 days 1st floor – 5 days 2nd floor – 5 days 4 5 6 3rd floor – 5 days 4th floor – 5 days Platbands – 1 day 16 apartments built on 23 days
  • 17. The work: Reduced Crew We use 20% of the traditional labor amount in a work site
  • 18. WASTE GENERATION Brazilian construction index PRECON Engineering index Reduction of 81% of waste generation in comparison with the Brazilian reference for conventional construction. Reduction of nearly 6 tons of waste generated per apartment built with Precon Engineering method.
  • 19. STRUCTURAL SAFETY The concrete structure of the building and walls without structural function are an extra safety item to clients, once the removal of walls, partial or total, do not affect the performance of the concrete structure.
  • 20. SUSTAINABILITY Conservation of Material Resources Social Practices Project and Comfort Urban Quality and Neighborhood Energetic Efficiency
  • 21. DATEC Precon Engineering is the first company of Brazil to have an enterprise of the program Minha Casa Minha Vida (MCMV) certified by the sustainable seal Selo Azul de Sustentabilidade da Caixa Econômica Federal – Ville Barcelona, at the city of Betim. “Innovation, Industrialization and Sustainability: The Precon Housing Solution”